IEEE SCC21/P1547.1 Draft Standard Conformance Test Procedures for Equipment Interconnecting Distributed Energy Resources with Electric Power Systems and Associated Interfaces Working Group Meeting October 27, 2016; Oak Brook, IL Facilities Sponsored by ComEd Chair: Sudipta Chakraborty Secretary: Andy Hoke Treasurer: Charlie Vartanian Vice Chairs: Babak Enayati Karl Schoder Tim Zgonena IEEE SCC21 Liaison: Mike Kipness -------------- ------------------- ----------------------- [email protected] 303 384-7093 [email protected] 303 275-4416

Transcript of IEEE SCC21/P1547.1 Draft Standard Conformance Test...

Page 1: IEEE SCC21/P1547.1 Draft Standard Conformance Test ...grouper.ieee.org/groups/scc21/1547.1_revision... · 10/27/2016  · IEEE SCC21/P1547.1 Draft Standard Conformance Test Procedures

IEEE SCC21/P1547.1 Draft Standard Conformance Test Procedures for Equipment Interconnecting Distributed Energy Resources with Electric Power Systems and Associated

Interfaces

Working Group Meeting October 27, 2016; Oak Brook, IL Facilities Sponsored by ComEd

Chair: Sudipta Chakraborty Secretary: Andy Hoke Treasurer: Charlie Vartanian Vice Chairs: Babak Enayati Karl Schoder Tim Zgonena

IEEE SCC21 Liaison: Mike Kipness -------------- ------------------- -----------------------

[email protected] 303 384-7093 [email protected] 303 275-4416

Page 2: IEEE SCC21/P1547.1 Draft Standard Conformance Test ...grouper.ieee.org/groups/scc21/1547.1_revision... · 10/27/2016  · IEEE SCC21/P1547.1 Draft Standard Conformance Test Procedures

Welcome

Security Procedures and Onsite Contact Manuel Avendano Manager, Smart Grid & Technology

3/20/2017

2

Page 3: IEEE SCC21/P1547.1 Draft Standard Conformance Test ...grouper.ieee.org/groups/scc21/1547.1_revision... · 10/27/2016  · IEEE SCC21/P1547.1 Draft Standard Conformance Test Procedures

Evacuation Routes and Emergency Numbers

3/20/2017

3

Page 4: IEEE SCC21/P1547.1 Draft Standard Conformance Test ...grouper.ieee.org/groups/scc21/1547.1_revision... · 10/27/2016  · IEEE SCC21/P1547.1 Draft Standard Conformance Test Procedures

Agenda – P1547.1 Working Group Meeting (Day 1)

4

Thursday 10/27 – Full day

8:15-9:00 AM Welcome and introduction: agenda, IEEE mandatory slides, P1547.1 groups, approval of past minutes, timeline to ballot

9:00-9:30 AM Brief review of 1547 Requirements Verification Matrix Clarification of Matrix details/requirements and implications to P1547.1

9:30-10:30 AM Installation, commissioning and periodic testing subgroup session (ICP)

10:30-10:45 AM Break 10:45-11:45 AM Regulation subgroup session (REG) - focus on frequency

regulation 11:45 AM-12:15 PM Microgrid capabilities subgroup session (MG) 12:15-1:15 PM Lunch 1:15-2:15 PM Abnormal voltage and frequency subgroup session (V&F) 2:15-3:15 PM Power quality subgroup session (PQ) 3:15-3:30 PM Break 3:30-4:30 PM Unintentional islanding subgroup session (UI) 4:30-5:00 PM Path from 1547 publication to 1547.1 publication

Page 5: IEEE SCC21/P1547.1 Draft Standard Conformance Test ...grouper.ieee.org/groups/scc21/1547.1_revision... · 10/27/2016  · IEEE SCC21/P1547.1 Draft Standard Conformance Test Procedures

Agenda – P1547.1 Working Group Meeting (Day 2)

5

Friday 10/28 – Half day

8:15-9:15 AM Synchronization subgroup session (Sync) 9:15-10:15 AM Interoperability subgroup session (Interop) 10:15-10:30 AM Break 10:30-11:00 AM Modeling and simulation subgroup session (M&S) 11:00-11:30 AM Hardware-in-the-loop subgroup session (HIL) 11:30 AM-12:00 PM Wrap-up, next actions, adjourn

Page 6: IEEE SCC21/P1547.1 Draft Standard Conformance Test ...grouper.ieee.org/groups/scc21/1547.1_revision... · 10/27/2016  · IEEE SCC21/P1547.1 Draft Standard Conformance Test Procedures

SCC21 P1547.1 Standard Conformance Test Procedures for Equipment Interconnecting Distributed Energy Resources with Electric Power Systems and Associated Interfaces (IEEE SA Standards Board approved PAR Dec 2014)

Scope This standard specifies the type, production, commissioning and periodic tests, and evaluations that shall be performed to confirm that the interconnection and interoperation functions of equipment and systems interconnecting distributed energy resources with the electric power system conform to IEEE Standard 1547.

6

Page 7: IEEE SCC21/P1547.1 Draft Standard Conformance Test ...grouper.ieee.org/groups/scc21/1547.1_revision... · 10/27/2016  · IEEE SCC21/P1547.1 Draft Standard Conformance Test Procedures

SCC21 P1547.1 Standard Conformance Test Procedures for Equipment Interconnecting Distributed Energy Resources with Electric Power Systems and Associated Interfaces

Purpose Interconnection equipment that connects distributed energy resources (DER) to an electric power system (EPS) shall meet the requirements specified in IEEE Standard 1547. Standardized test and evaluation procedures are necessary to establish and verify compliance with those requirements. These procedures shall provide repeatable results and flexibility to accommodate a variety of DER technologies and functions.

7

Page 8: IEEE SCC21/P1547.1 Draft Standard Conformance Test ...grouper.ieee.org/groups/scc21/1547.1_revision... · 10/27/2016  · IEEE SCC21/P1547.1 Draft Standard Conformance Test Procedures

8

Participants: IEEE Disclosure of Affiliation Every member and participant in a working group, Sponsor ballot, or other standards development activity shall disclose his or her affiliation(s), which includes employer(s) and any other affiliation(s). An individual is deemed “affiliated” with any individual or entity that has been, or will be, financially or materially supporting that individual’s participation in a particular IEEE standards activity. This includes, but is not limited to, his or her employer(s) and any individual or entity that has or will have, either directly or indirectly, requested, paid for, or otherwise sponsored his or her participation. Failure to disclose every such affiliation(s) may result in complete or partial loss of rights to participate in IEEE-SA activities. An individual is not excused from compliance with this policy by reason of any claim of a conflicting obligation (whether contractual or otherwise) that prohibits disclosure of affiliation(s). A person who believes that a participant’s disclosure is materially incomplete or incorrect should report that fact to the appropriate Sponsor(s).

Page 9: IEEE SCC21/P1547.1 Draft Standard Conformance Test ...grouper.ieee.org/groups/scc21/1547.1_revision... · 10/27/2016  · IEEE SCC21/P1547.1 Draft Standard Conformance Test Procedures

Disclosure of Affiliation

All participants please announce your name and affiliation

Also please announce your name and affiliation as you make comments or ask questions Officers Introductions

3/20/2017

9

Page 10: IEEE SCC21/P1547.1 Draft Standard Conformance Test ...grouper.ieee.org/groups/scc21/1547.1_revision... · 10/27/2016  · IEEE SCC21/P1547.1 Draft Standard Conformance Test Procedures

Participants, Patents, and Duty to Inform

All participants in this meeting have certain obligations under the IEEE-SA Patent Policy.

Participants: -- “Shall inform the IEEE (or cause the IEEE to be informed)” of the identity of each

“holder of any potential Essential Patent Claims of which they are personally aware” if the claims are owned or controlled by the participant or the entity the participant is from, employed by, or otherwise represents

- “Personal awareness” means that the participant “is personally aware that the holder may have a potential Essential Patent Claim,” even if the participant is not personally aware of the specific patents or patent claims

-- “Should inform the IEEE (or cause the IEEE to be informed)” of the identity of “any other holders of such potential Essential Patent Claims” (that is, third parties that are not affiliated with the participant, with the participant’s employer, or with anyone else that the participant is from or otherwise represents)

-- The above does not apply if the patent claim is already the subject of an Accepted Letter of Assurance that applies to the proposed standard(s) under consideration by this group

“Quoted text excerpted from IEEE-SA Standards Board Bylaws subclause 6.2” l Early identification of holders of potential Essential Patent Claims is strongly

encouraged l No duty to perform a patent search

10

Page 11: IEEE SCC21/P1547.1 Draft Standard Conformance Test ...grouper.ieee.org/groups/scc21/1547.1_revision... · 10/27/2016  · IEEE SCC21/P1547.1 Draft Standard Conformance Test Procedures

Patent Related Links

All participants should be familiar with their obligations under the IEEE-SA Policies & Procedures for standards development.

Patent Policy is stated in these sources: IEEE-SA Standards Boards Bylaws http://standards.ieee.org/guides/bylaws/sect6-7.html#6 IEEE-SA Standards Board Operations Manual http://standards.ieee.org/guides/opman/sect6.html#6.3 Material about the patent policy is available at http://standards.ieee.org/board/pat/pat-material.html

11

If you have questions, contact the IEEE-SA Standards Board Patent Committee Administrator at [email protected] or visit http://standards.ieee.org/board/pat/index.html

This slide set is available at http://standards.ieee.org/board/pat/pat-slideset.ppt

Page 12: IEEE SCC21/P1547.1 Draft Standard Conformance Test ...grouper.ieee.org/groups/scc21/1547.1_revision... · 10/27/2016  · IEEE SCC21/P1547.1 Draft Standard Conformance Test Procedures

Call for Potentially Essential Patents

If anyone in this meeting is personally aware of the holder of any patent claims that are potentially essential to implementation of the proposed standard(s) under consideration by this group and that are not already the subject of an Accepted Letter of Assurance:

– Either speak up now or – Provide the chair of this group with the identity of the

holder(s) of any and all such claims as soon as possible or

– Cause an LOA to be submitted

12

Page 13: IEEE SCC21/P1547.1 Draft Standard Conformance Test ...grouper.ieee.org/groups/scc21/1547.1_revision... · 10/27/2016  · IEEE SCC21/P1547.1 Draft Standard Conformance Test Procedures

Other Guidelines for IEEE WG Meetings

13

All IEEE-SA standards meetings shall be conducted in compliance with all applicable laws, including antitrust and competition laws. •Don’t discuss the interpretation, validity, or essentiality of patents/patent claims.

•Don’t discuss specific license rates, terms, or conditions. • Relative costs, including licensing costs of essential patent claims, of different

technical approaches may be discussed in standards development meetings.

• Technical considerations remain primary focus

•Don’t discuss or engage in the fixing of product prices, allocation of customers, or division of sales markets.

•Don’t discuss the status or substance of ongoing or threatened litigation.

•Don’t be silent if inappropriate topics are discussed … do formally object. ---------------------------------------------------------------

See IEEE-SA Standards Board Operations Manual, clause 5.3.10 and “Promoting Competition and Innovation: What You Need to Know about the IEEE Standards Association's Antitrust and Competition Policy” for more details.

Page 14: IEEE SCC21/P1547.1 Draft Standard Conformance Test ...grouper.ieee.org/groups/scc21/1547.1_revision... · 10/27/2016  · IEEE SCC21/P1547.1 Draft Standard Conformance Test Procedures

IEEE 1547 Standards Example Use in USA

14

Page 15: IEEE SCC21/P1547.1 Draft Standard Conformance Test ...grouper.ieee.org/groups/scc21/1547.1_revision... · 10/27/2016  · IEEE SCC21/P1547.1 Draft Standard Conformance Test Procedures

P1547.1 WG Approvals

15

• P1547.1 June WG meeting minutes (June 16, Portland OR) Uploaded to iMeet on July 28, 2016

To be approved on October 27, 2016 – approved at the

meeting with majority

Page 16: IEEE SCC21/P1547.1 Draft Standard Conformance Test ...grouper.ieee.org/groups/scc21/1547.1_revision... · 10/27/2016  · IEEE SCC21/P1547.1 Draft Standard Conformance Test Procedures

16

P1547.1 Subgroups – October 2016 Chair/Officer:

Sudipta Chakraborty

Overall document

(OD)

General requirements

(GR)

Officer: Tim Zgonena

Abnormal voltage and frequency

tests (V&F)

Voltage and frequency regulation tests (Reg)

Unintentional islanding tests (UI)

Power quality tests

(PQ)

Ramp rate tests (RR)

Synchronization tests (Sync)

Officer: Karl Schoder

Modeling and simulation

(M&S)

Hardware-in-the-loop

tests (HIL)

Interoperability tests

(Interop)

Officer: Babak Enayati

Installation, commissioning, periodic tests (ICP)

DER microgrid

capabilities (MG)

Chair: Tom Basso

Secretary: Andy Hoke

Page 17: IEEE SCC21/P1547.1 Draft Standard Conformance Test ...grouper.ieee.org/groups/scc21/1547.1_revision... · 10/27/2016  · IEEE SCC21/P1547.1 Draft Standard Conformance Test Procedures

17

P1547.1 Subgroups – October 2016

Subgroup

Gen

eral

requ

irem

ents

Ove

rall

Docu

men

t

Abno

rmal

vol

tage

and

freq

uenc

y co

nditi

ons t

ests

Volta

ge a

nd fr

eque

ncy

regu

latio

n te

sts

Uni

nten

tiona

l isl

andi

ng te

sts

Pow

er q

ualit

y te

sts

Soft

star

t/ra

mp

rate

test

s

Sync

hron

izat

ion

test

s

Mod

elin

g an

d si

mul

atio

n

Hard

war

e-in

-the

-loop

test

s

Inte

rope

rabi

lity

test

s

Inst

alla

tion,

com

mis

sion

ing,

and

pe

riodi

c te

stin

g

DER

mic

rogr

id c

apab

ilitie

s an

d m

icro

grid

inte

rcon

nect

ion

devi

ces

Officer Sudipta Chakraborty

Sudipta Chakraborty

Tim Zgonena

Tim Zgonena

Tim Zgonena

Tim Zgonena

Tim Zgonena

Tim Zgonena Karl Schoder Karl Schoder Karl Schoder Babak

Enayati Babak

Enayati

Subgroup Chair(s)

Sudipta Chakraborty

Sudipta Chakraborty

John Berdner Brian Lydic Sig

Gonzalez Bob White Delayed start

Marcelo Algrain Delayed start Karl Schoder Brian Seal Mark Siira Chris Rowe?

Mark Siira Marcelo Algrain

Jon Ehlmann Greg Kern Soonwook

Hong Bob Fox Wayne Stec

Tom McDermott?

Jens Boemer

Aminul Huque

John Berdner

Note: Listing order of subgroup chairs is arbitrary

Page 18: IEEE SCC21/P1547.1 Draft Standard Conformance Test ...grouper.ieee.org/groups/scc21/1547.1_revision... · 10/27/2016  · IEEE SCC21/P1547.1 Draft Standard Conformance Test Procedures

18

P1547.1 Subgroup Call Schedule – October 2016 Subgroup Designation MON TUE WED THU FRI

EDT EDT EDT EDT EDT

P1547.1 Officers / subgoup chairs 12-1pm, biweekly

GR - General Reqs OD - Overal Document V&F - Abnormal conditions (V/FRT) tests 12-2pm

REG - Voltage and frequency regulation tests 3-4pm, biweekly

UI - Unintentional islanding tests 1-2pm

PQ - Power quality tests 3-4pm, biweekly

RR - Ramp rate/soft start tests Sync - Synchronization tests M&S - Modeling and simulation tests HIL - Hardware-in-the-loop tests Interop - Interoperability tests 4pm, biweekly ICP - Installation, commissioning, and periodic tests

11am, biweekly

MG - DER microgrid capability and interconnection device tests

11am-12pm (DONE as of Aug 2016)

Page 19: IEEE SCC21/P1547.1 Draft Standard Conformance Test ...grouper.ieee.org/groups/scc21/1547.1_revision... · 10/27/2016  · IEEE SCC21/P1547.1 Draft Standard Conformance Test Procedures

Production Tests

• Definition: o Production test: A test conducted on every unit of

equipment prior to shipment (IEEE 1547.1-2005) • In IEEE 1547.1-2005, the only production tests are for tripping

and synchronization • For P1547.1 any revised or new production tests are the

responsibility of the subgroups writing the corresponding Type tests

19

Page 20: IEEE SCC21/P1547.1 Draft Standard Conformance Test ...grouper.ieee.org/groups/scc21/1547.1_revision... · 10/27/2016  · IEEE SCC21/P1547.1 Draft Standard Conformance Test Procedures

Tentative Timeline to Ballot for P1547.1

20

Dates Activities Status June 16, 2016 P1547.1 WG meeting – Draft 1 initiated Done Summer 2016 P1547.1 subgroups work and complete Draft 1 Done September 30, 2016 P1547.1 Draft 1 posted for WG consideration Done October 15, 2016 Comments posted to iMeet Central Done October 27-28, 2016 P1547.1 WG meeting – Draft 1 discussed Ongoing January 31, 2017 P1547.1 Draft 2 posted for WG meeting March 1-2/3 2017 P1547.1 WG meeting – Draft 2 discussed May 2017 P1547.1 Draft 3 posted for WG meeting June 2017 P1547.1 WG meeting – Draft 3 discussed September 2017 P1547.1 Draft 4 posted for WG meeting October 2017 P1547.1 WG meeting – Draft 4 discussed January 2018 P1547.1 Draft 5 posted for WG meeting February 2018 P1547.1 WG meeting – Draft 5 discussed March 15, 2018 P1547.1 Pre-ballot draft sent to WG April 15, 2018 P1547.1 Comment sheet feedback on pre-ballot

draft

April – May 2018 P1547.1 Subgroups work on pre-ballot resolution June 2018 Pre-ballots comments resolution completed July 2018 P1547.1 To IEEE ballot

NERC, Atlanta GA 1.5 or 2 Days?

Will try to make it accelerated

Page 21: IEEE SCC21/P1547.1 Draft Standard Conformance Test ...grouper.ieee.org/groups/scc21/1547.1_revision... · 10/27/2016  · IEEE SCC21/P1547.1 Draft Standard Conformance Test Procedures

Fostering Technological Innovation and Excellence

For The Benefit Of Humanity

Thank You

21

Page 22: IEEE SCC21/P1547.1 Draft Standard Conformance Test ...grouper.ieee.org/groups/scc21/1547.1_revision... · 10/27/2016  · IEEE SCC21/P1547.1 Draft Standard Conformance Test Procedures

IEEE SCC21/P1547.1 Draft Standard Conformance Test Procedures for Equipment Interconnecting Distributed Energy Resources with Electric Power Systems and Associated Interfaces

P547.1 Working Group Meeting October 27-28, 2016; Oak Brook, IL

Next Actions

Chair: Sudipta Chakraborty Secretary: Andy Hoke Treasurer: Charlie Vartanian Vice Chairs: Babak Enayati Karl Schoder Tim Zgonena

IEEE SCC21 Liaison: Mike Kipness -------------- ------------------- -----------------------

[email protected] 303 384-7093 [email protected] 303 275-4416

Page 23: IEEE SCC21/P1547.1 Draft Standard Conformance Test ...grouper.ieee.org/groups/scc21/1547.1_revision... · 10/27/2016  · IEEE SCC21/P1547.1 Draft Standard Conformance Test Procedures

Tentative Timeline to Ballot for P1547.1

23

Dates Activities Status June 16, 2016 P1547.1 WG meeting – Draft 1 initiated Done Summer 2016 P1547.1 subgroups work and complete Draft 1 Done September 30, 2016 P1547.1 Draft 1 posted for WG consideration Done October 15, 2016 Comments posted to iMeet Central Done October 27-28, 2016 P1547.1 WG meeting – Draft 1 discussed Ongoing January 31, 2017 P1547.1 Draft 2 posted for WG meeting March 1-2, 2017 P1547.1 WG meeting – Draft 2 discussed May 2017 P1547.1 Draft 3 posted for WG meeting June 2017 P1547.1 WG meeting – Draft 3 discussed September 2017 P1547.1 Draft 4 posted for WG meeting October 2017 P1547.1 WG meeting – Draft 4 discussed January 2018 P1547.1 Draft 5 posted for WG meeting February 2018 P1547.1 WG meeting – Draft 5 discussed March 15, 2018 P1547.1 Pre-ballot draft sent to WG April 15, 2018 P1547.1 Comment sheet feedback on pre-ballot

draft

April – May 2018 P1547.1 Subgroups work on pre-ballot resolution June 2018 Pre-ballots comments resolution completed July 2018 P1547.1 To IEEE ballot

NERC, Atlanta GA 1.5 days

Page 24: IEEE SCC21/P1547.1 Draft Standard Conformance Test ...grouper.ieee.org/groups/scc21/1547.1_revision... · 10/27/2016  · IEEE SCC21/P1547.1 Draft Standard Conformance Test Procedures

Next Steps – Till Next P1547.1 WG Meeting

24

Nov. 2016 – Jan. 2017

• P1547.1 subgroups work and complete Draft 2 materials

Jan 23, 2027

• P1547.1 Draft 2 content due to Andy

Jan. 31, 2017

• P1547.1 Draft 2 posted in iMC for WG consideration

Feb. 10, 2017

•Comments due to P1547.1 Secretary

Feb. 15, 2017

•Compiled comments provided to the subgroups

Mar. 1-2, 2017

• P1547.1 WG meeting – Draft 2 discussed • Next meeting at Atlanta, 1.5 days for P1547.1 (following 1.5

days of P1547)

Page 25: IEEE SCC21/P1547.1 Draft Standard Conformance Test ...grouper.ieee.org/groups/scc21/1547.1_revision... · 10/27/2016  · IEEE SCC21/P1547.1 Draft Standard Conformance Test Procedures

25

P1547.1 Subgroup Call Schedule – October 2016 Subgroup Designation MON TUE WED THU FRI

EDT EDT EDT EDT EDT

P1547.1 Officers / subgoup chairs 12-1pm, biweekly

GR - General Reqs OD - Overal Document V&F - Abnormal conditions (V/FRT) tests 12-2pm

REG - Voltage and frequency regulation tests 3-4pm, biweekly

UI - Unintentional islanding tests 1-2pm

PQ - Power quality tests 3-4pm, biweekly

RR - Ramp rate/soft start tests Sync - Synchronization tests M&S - Modeling and simulation tests HIL - Hardware-in-the-loop tests Interop - Interoperability tests 4pm, biweekly ICP - Installation, commissioning, and periodic tests

11am, biweekly

MG - DER microgrid capability and interconnection device tests

11am-12pm (DONE as of Aug 2016)

Page 26: IEEE SCC21/P1547.1 Draft Standard Conformance Test ...grouper.ieee.org/groups/scc21/1547.1_revision... · 10/27/2016  · IEEE SCC21/P1547.1 Draft Standard Conformance Test Procedures

Next Steps

26

• Officers: continue monthly call between officers

• Officers and Subgroup Chairs: continue monthly calls between the officers and subgroup chairs

• All subgroups start writing actual test procedures into Draft 2 • Utilize IEEE tools (iMeet Central, listserv etc.)

• Adjourn

Page 27: IEEE SCC21/P1547.1 Draft Standard Conformance Test ...grouper.ieee.org/groups/scc21/1547.1_revision... · 10/27/2016  · IEEE SCC21/P1547.1 Draft Standard Conformance Test Procedures

Fostering Technological Innovation and Excellence

For The Benefit Of Humanity

Thank You