IEEE 802.11 TGmc – Nanjing September 2013

1
doc.: IEEE 802.11-13/xxxxr0 Submission IEEE 802.11 TGmc – Nanjing September 2013 Since July 2013 meeting, held 3 teleconferences Comment resolution 801 comments (713 LB, 88 remaining 2012 call for comments); approximately 190 comments remain to be resolved Corrections to 11ad inconsistencies and ambiguities, see https://mentor.ieee.org/802.11/dcn/13/11-13-0937- 02-000m-proposed-pre-ballot-changes-related-to-11ad- text.docx Goals for September Meeting: Complete LB193 comment resolution Working Group letter ballot on P802.11REVmc D2.0 Hear presentations September 2013 Slide 1

description

Since July 2013 meeting, h eld 3 teleconferences Comment resolution 801 comments (713 LB, 88 remaining 2012 call for comments); approximately 190 comments remain to be resolved - PowerPoint PPT Presentation

Transcript of IEEE 802.11 TGmc – Nanjing September 2013

Page 1: IEEE 802.11 TGmc – Nanjing September 2013

doc.: IEEE 802.11-13/xxxxr0

Submission

IEEE 802.11 TGmc – NanjingSeptember 2013

• Since July 2013 meeting, held 3 teleconferences– Comment resolution

– 801 comments (713 LB, 88 remaining 2012 call for comments); approximately 190 comments remain to be resolved

– Corrections to 11ad inconsistencies and ambiguities, see https://mentor.ieee.org/802.11/dcn/13/11-13-0937-02-000m-proposed-pre-ballot-changes-related-to-11ad-text.docx

• Goals for September Meeting:– Complete LB193 comment resolution

– Working Group letter ballot on P802.11REVmc D2.0

– Hear presentations

September 2013

Slide 1