Page 1: IEDP 2012 Guidelines - Thornhill Associates · 2017-02-23 · The*Purpose*of*BANKSETA’s*International*Executive*Development* Programmes* The!BANKSETA!International!Executive!Development!Programme!(IEDP)!is!designed!to

!

!

International*Executive*Development*Programme*2012*

*

*

*

Page 2: IEDP 2012 Guidelines - Thornhill Associates · 2017-02-23 · The*Purpose*of*BANKSETA’s*International*Executive*Development* Programmes* The!BANKSETA!International!Executive!Development!Programme!(IEDP)!is!designed!to

!

!

*

*

*

*

Mission*

“To!support!transformation!and!people!development!and!through!

partnerships!to!enable!stakeholders!to!advance!the!national!and!global!

position!of!the!broader!banking!and!microfinance!industry.”!

!

!

!

!

!

!

!

!

!

!

!

!

Page 3: IEDP 2012 Guidelines - Thornhill Associates · 2017-02-23 · The*Purpose*of*BANKSETA’s*International*Executive*Development* Programmes* The!BANKSETA!International!Executive!Development!Programme!(IEDP)!is!designed!to

!

!

The*Purpose*of*BANKSETA’s*International*Executive*Development*Programmes*

The!BANKSETA!International!Executive!Development!Programme!(IEDP)!is!designed!to!

compliment!the!existing!Executive!Development!Programmes!implemented!by!employers!in!the!

Banking!and!Microfinance!Sector.!!This!fully!funded!programme!adds!a!South!African,!African!

and!International!perspective!to!the!development!of!high!potential!senior!managers.!

The!programme!creates!an!opportunity!for!senior!managers,!who!have!been!identified!by!their!

employers!as!having!high!potential,!to!engage!in!a!learning!development!opportunity.!!Time!will!

be!spent!with!senior!executives!of!the!companies!that!will!be!visited,!as!well!as!formal!learning!

with!business!school!faculty!operating!in!the!host!countries.!

Participants!will!also!have!the!opportunity!to!interact!with!other!financial!organisations!and!

business!whilst!researching!and!developing!a!business!case!topic!for!presentation!to!both!host!

country!senior!executives!and!a!panel!drawn!from!amongst!senior!executives!of!South!African!

financial!services!organizations.!

Acceptance!to!the!programme!is!subject!to!the!formal!selection!process!and!confirmation!of!

acceptance!by!the!BANKSETA!Management!Development!Committee!(MDC).!

Irrespective!of!the!host!destinations!(in!this!instance!either,!London,!United!Kingdom!or!New!

York,!United!States!including!African!destinations),!this!Leadership!Programme!is!very!intensive.!!

Participants!will!require!the!commitment!of!personal!time!as!well!as!time!away!from!home!and!

office!whilst!on!the!programme.!!A!significant!amount!of!time!will!also!be!devoted!to!afterhours!

syndicate!work.!

Participant*Selection*Criteria*and*Nomination*Process*

BANKSETAQregistered!employers!will!be!requested!to!identify!and!screen!from!the!existing!

talent!pool,!those!high!potential!candidates!who!are!currently!in!senior!management!positions!

and!who!have!the!potential!to!be!or!will!be!appointed!to!senior!executives!within!a!two!or!

three!year!period.!!!

*

Page 4: IEDP 2012 Guidelines - Thornhill Associates · 2017-02-23 · The*Purpose*of*BANKSETA’s*International*Executive*Development* Programmes* The!BANKSETA!International!Executive!Development!Programme!(IEDP)!is!designed!to

!

!

Guidelines)for)Employer)Representatives))Applicants!for!the!BANKSETA!IEDP!2012!are!required!to!complete!an!online!application!form!as!

well!as!three!further!assessment!tools.!

!

What)is)required)of)the)ideal)candidates?)

• Destined!for!Executive!positions!in!the!Banking!and!Microfinance!Sector;!

• Equipped!with!the!mental!and!emotional!capabilities!to!succeed,!including!the!ability!to!

think!strategically;!

• Good!interpersonal!skills!and!able!to!work!in!a!team;!

• Likely!to!remain!long!enough!in!the!Banking!and!Microfinance!Sector!in!order!to!contribute!

to!its!growth.!

Assessment)Tools:)The!application!process!will!comprise!of!the!following:!

• Online!application!form;!

• Online!360°!feedback!tool;!

• Individual!panel!interview;!

• Online!case!study!analysis.!

Schedule:)

Output) Start)Date) End)Date)

Deadline!for!nominee!applications! 12!Sept.!2011! 14!Oct.!2011!

Deadline!for!completion!of!360°!feedback!questionnaire! 12!Sept.!2011! 14!Oct.!2011!

Interviews!to!take!place!(RECOMMENDATION!–!conduct!close!

together!as!possible)!

19!Oct.!2011! 28!Oct.!2011!

Page 5: IEDP 2012 Guidelines - Thornhill Associates · 2017-02-23 · The*Purpose*of*BANKSETA’s*International*Executive*Development* Programmes* The!BANKSETA!International!Executive!Development!Programme!(IEDP)!is!designed!to

!

!

Deadline!for!submission!of!case!study! 24!Oct.!2011! 28!Oct.!2011!

Case!Studies!to!be!marked!and!moderated! 29!Oct.!2011! 10!Nov.!2011!

Employer!Representatives!to!evaluate!candidate!applications:!

application!form,!case!study!result,!360°!feedback,!interview!

report!

11!Nov.!2011! 18!Nov.!2011!

Employer!Representatives!submit!final!nominations!to!

BANKSETA!

! 18!Nov.!2011!

Management!Development!Committee!–!review!of!final!

candidates!

! 1!Dec.!2011!

BANKSETA!informs!Employer!Representatives!!of!the!final!

outcome!

! 12!Dec.!2011!

Process:)• Once!the!potential!candidate!has!been!identified,!the!Employer!Representative!will!enter!

details!of!nominated!candidate!onto!the!online!system.!!Thornhill!will!eQmail!candidate/s!

directly!with!the!link!for!the!online!completion!of!the!application!form!and!the!360°!

feedback!questionnaire;!

• The!Employer!Representatives!need!to!organise!the!formation!of!the!interview!panel!

• Interviews!must!take!place!between!19!to!28!October2011.!!!

• Candidates!will!need!to!complete!the!online!Case!Study!Analysis!during!the!week!of!24!to!

28!October!2011.!!This!will!be!a!TIMED!ASSESSMENT.!!! !

• Once!consensus!has!been!reached,!the!Employer!Representatives!must!submit!a!list!of!the!

[email protected]!!no!later!than!16:00!pm!on!

Friday,!18!November!2011.!!!

*

Page 6: IEDP 2012 Guidelines - Thornhill Associates · 2017-02-23 · The*Purpose*of*BANKSETA’s*International*Executive*Development* Programmes* The!BANKSETA!International!Executive!Development!Programme!(IEDP)!is!designed!to

!

!

Requirements)for)the)successful)participants)Each!participant!will!be!expected!to:!

• Have!a!valid!South!African!passport;!

• Fully!participate!in!all!programme!activities.!!The!attendance!is!compulsory!and!none!of!

the!elements!are!optional;!

• Work!in!a!syndicate!group!to!scope!the!research!to!be!undertaken!both!locally!and!

internationally.!!Attend!and!participate!in!meetings!related!to!the!research!and!deliver!

the!research!paper!and!presentation!in!the!format!prescribed!by!the!local!business!

schools;!

• Refine!the!approach!to!the!business!case!by!meeting!as!agreed!between!syndicate!

members;!

• Plan!for!and!undertake!local!research!into!the!business!case!topic!allocated,!crafted!by!

the!syndicate,!before!departure!to!the!host!countries;!

• Participate!in!social!and!business!functions!as!an!ambassador!for!South!Africa,!the!South!

African!banking!and!Microfinance!industry!and!BANKSETA;!

• Complete,!within!the!agreed!timeframes,!all!assignments!required!by!the!programme!

both!in!South!Africa!and!in!the!host!countries;!

• Complete!evaluation!forms!and!contribute!to!feedback!sessions!throughout!the!

programme;!and!

• Formally!present!the!business!case!to!senior!executive!panels!in!both!the!host!countries!

and!South!Africa.!

Final!nomination!of!the!programme!does!not!guarantee!selection!onto!the!Programme.!!The!

BANKSETA!MDC!will,!when!finalising!the!list!of!successful!candidates!be!guided!by!the!

following:!

• National!Skills!Development!Strategy;!

• Assessment!reports!on!each!nominee;!

• The!abovementioned!required!documentation;!

• Candidate(s)!undertaking!to!participate;!

• Letter!of!support!from!the!Line!Manager!to!the!nominee.!

Page 7: IEDP 2012 Guidelines - Thornhill Associates · 2017-02-23 · The*Purpose*of*BANKSETA’s*International*Executive*Development* Programmes* The!BANKSETA!International!Executive!Development!Programme!(IEDP)!is!designed!to

!

!

This!development!opportunity!should!meet!a!skills!need!identified!in!the!nominee’s!Personal!

Development!Plan,!as!well!as!to!the!business.!

Selection!for!attendance!on!this!programme!will!be!a!confirmation!that!the!nominee!is!to!be!

developed!for!accelerated!promotion!within!the!organisation!and!that!their!development!is!

being!actively!managed!by!their!employer.!

Action*Learning*Project*(ALP)*A!key!element!of!the!IEDP!is!to!engage!with!a!syndicate!group!in!researching!and!developing!a!

business!case!for!a!topic!that!has!value!to!the!Banking!and!Microfinance!Sectors.!!The!purpose!

of!the!research!element!of!the!IEDP!is!to!present!the!findings!of!an!exhaustive!research!and!

learning!process!that!aims!to!provide!a!solution!to!the!research!question!developed!by!each!

syndicate.!!The!result!is!to!be!presented!in!the!form!of!a!comprehensive!written!report!and!a!

PowerPoint!presentation.!!Details!of!the!required!format!and!related!details!will!be!provided!

during!the!workshops!at!the!local!business!schools.!

Syndicates!will!work!with!a!topic!champion!and!a!coach!throughout!the!whole!programme.!!The!

final!research!document!is!to!be!delivered!to!the!BANKSETA!seven!days!prior!to!the!final!

presentation.!!Presentations!will!first!be!made!to!a!panel!of!experts!in!the!host!countries,!and!

finally!to!a!panel!of!senior!South!African!financial!services!experts.!

Personal*Development*Plan*Success!in!the!programme!will,!in!large!measure,!be!dependent!upon!the!extent!to!which!the!

participant!engages!with!his/her!line!manager!and!the!HR!support!within!the!organisation.!!

Expectations!from!all!parties!should!be!agreed!upQfront!and!signed!off.!

Reflection*and*Feedback*Sessions*All!participants!are!required!to!engage!in!sessions!to!provide!inQdepth!feedback.!!These!

meetings!also!serve!to!record!the!progress!of!the!programme!and!to!give!feedback!to!the!local!

business!schools!and!BANKSETA!on!how!to!improve!elements!contained!in!the!programme.!

Presentations*

In)host)countries)The!final!task!to!be!completed!in!the!host!country!is!a!presentation!by!each!syndicate!of!their!

proposals!resulting!from!their!research.!!This!presentation!will!be!made!to!a!panel!drawn!from!

the!participating!faculty!at!the!business!schools!and!employers.!

Page 8: IEDP 2012 Guidelines - Thornhill Associates · 2017-02-23 · The*Purpose*of*BANKSETA’s*International*Executive*Development* Programmes* The!BANKSETA!International!Executive!Development!Programme!(IEDP)!is!designed!to

!

!

In)South)Africa)After!returning!from!the!international!component!of!the!leadership!intervention,!syndicates!

will!spend!time!fineQtuning!their!research!report!and!adjusting!their!presentations!before!

delivering!them!to!a!panel!drawn!from!senior!executives!in!the!South!African!financial!services!

sector.!!

High*Level*Schedule*and*Programme*Dates*for*BANKSETA*IEDP*2012*

Features*IEDP*USA/*UK**

(Investment*&*Retail*Banking)*

Timing*

April!2012!–!Orientation!

May!–!September!!2012!–!Local!and!

International!Faculty,!Company!visits!and!

ALPs!

October!2012!–!Final!presentations*

Programme*destinations* New!York,!London,!Ghana!&!Uganda*

The*IEDP*United*States*of*America*2012*Programme*

The!programme!will!develop!functional!leaders!with!an!interest!in!Investment!Banking,!in!

developing!their!understanding!of!and!skills!relating!to:!

• The!changing!context!of!Investment!Banking!and!the!African!business!environment;!

• Optimal!execution!against!the!backdrop!of!the!changing!trends!in!Investment!Banking;!

and!

• Strategic!Leadership.!

))

Page 9: IEDP 2012 Guidelines - Thornhill Associates · 2017-02-23 · The*Purpose*of*BANKSETA’s*International*Executive*Development* Programmes* The!BANKSETA!International!Executive!Development!Programme!(IEDP)!is!designed!to

!

!

Structure)of)the)IEDP)The!programme!will!consist!of!4!study!blocks!in!addition!to!an!orientation!and!action!learning!

project!presentation!and!graduation!day.!

Study!block!1!(5!days)!will!be!presented!with!a!South!African!Business!School.!!Study!block!2!(10!

days)!will!take!place!in!New!York!in!addition!to!4!days!traveling!and!socioQcultural!programme.!!

Study!Block!3!(5!days)!will!be!back!at!the!local!Business!School.!!Study!block!4!(4!days)!will!take!

place!in!Ghana,!Accra.!!The!themes!of!the!programme!will!be!weaved!through!all!four!!study!

blocks.!

Learning)Methodology)Building!on!the!use!of!high!level!faculty!and!the!action!learning!coaching!process,!as!well!as!the!

personal!leadership!coaching!process!and!cultural!programme,!the!local!business!school!will!

employ!the!following!methodologies!to!enhance!the!effectiveness!of!the!programme.!

• Programme!integrator!will!weave!the!themes!of!the!programme!together!and!allow!for!

application;!

• Emphasis!on!application!versus!content!driven!design,!including!provocative!experiences,!

new!approaches!to!case!stories,!behavioural!simulation,!customer!experience,!partnering!

with!internal!executives!and!role!immersion,!etc.;!

• Guest!speakers!emphasising!excellence!in!African!case!studies!and!experiences;!

• Guest!speakers!from!the!Investment!Banking!industry;!

• Action!learning!to!be!contained!in!the!individual!banking!groups!to!allow!for!greater!

applicability!of!outcomes!of!the!projects;!

• CompanyQspecific!sponsors!and!mentors;!and!

• Female!role!models!as!guest!speakers.!

The*IEDP*United*Kingdom*2012*Programme*

Overview)of)the)programme)The!BANKSETA!IEDP!will!be!run!in!concurrence!with!a!local!and!international!business!school!in!

London!and!is!designed!to!fast!track!careers!of!participants!through!an!innovative!mix!of!peer!

to!peer!learning,!simulations,!Action!Learning!Projects!(ALP)!and!cutting!edge!leadership!

Page 10: IEDP 2012 Guidelines - Thornhill Associates · 2017-02-23 · The*Purpose*of*BANKSETA’s*International*Executive*Development* Programmes* The!BANKSETA!International!Executive!Development!Programme!(IEDP)!is!designed!to

!

!

theories.!!The!modules!run!at!the!Business!School!in!London!will!provide!a!practical!insight!into!

various!aspects!of!banking!with!an!emphasis!on!Retail!Banking.!A!three!day!study!tour!to!

Kampala,!Uganda!will!provide!participants!with!an!understanding!of!the!opportunities!and!

challenges!facing!banks!in!this!country.!

The!local!and!international!Business!Schools!strive!to!turn!knowledge!into!action.!!To!this!end!

the!programme!has!a!strong!focus!on!the!individual!participant!and!includes!coaching!to!ensure!

that!goals!formulated!by!the!participants!on!the!programme!are!implemented!back!at!work.!

The!programme!promises!to!be!a!life!changing!experience!and!one!that!will!lay!the!foundation!

for!rapid!career!advancement.!

What)can)be)expected)from)the)programme?)

Local)Business)School)The!teaching!programme!is!very!interactive!with!extensive!use!made!of!case!studies!and!small!

group!work!to!promote!a!thorough!understanding!of!the!course!content.!!The!following!will!be!

covered:!

• Personal!Development!Workshop!–!at!the!start!of!the!programme,!participants!will!

engage!in!two!days!of!interactive!group!exercises!and!get!feedback!on!their!

performance!both!from!facilitators!and!from!their!colleagues.!!This!process!will!help!

participants!set!goals!for!themselves!for!what!they!want!to!achieve!back!at!work.!

• The!academic!modules!will!include!a!selection!from!the!following!topics:!

o Banking!and!financial!services!in!South!Africa;!

o Leadership!–!vision!into!action;!

o Corporate!strategy;!

o Marketing!and!brand!management;!

o Strategic!finance;!

o Economics!–!the!South!African!and!international!business!environment;!

o Risk!taking!and!decision!making;!

o Corporate!governance;!

o Information!and!communication!technology;!

o Talent!Management!–!Managing!people!in!the!New!World!of!Work;!

o Operational!Management!–!Benchmarking!the!Best;!

Page 11: IEDP 2012 Guidelines - Thornhill Associates · 2017-02-23 · The*Purpose*of*BANKSETA’s*International*Executive*Development* Programmes* The!BANKSETA!International!Executive!Development!Programme!(IEDP)!is!designed!to

!

!

o Innovation!and!Entrepreneurship.!

!

International)Business)Schools)The!international!Business!Schools!are!highly!rated!in!the!financial!world!and!is!situated!at!the!

hub!of!the!City!of!London!and!Uganda!and!therefore!well!placed!to!provide!a!global!perspective!

on!best!practices!in!banking.!!Their!approach!is!very!much!one!of!engaging!with!experts!from!

various!financial!institutions!in!London!and!Uganda!to!provide!first!hand!and!up!to!date!insights!

for!the!participants.!!The!topics!covered!will!include!a!selection!from:!

• Banking!industry!overview;!

• Global!banking!systems;!

• Trends!in!transactional!banking;!

• Managing!credit!card!portfolios;!

• NonQbank!Retail!Banking;!

• Bank!systems!–!competition!and!crisis;!

• Credit!risk!and!loan!portfolio!assessment;!

• PeerQtoQpeer!workplace!learning!sessions!(host!bank!visits);!

• Simulations.!

Claw*Back*Principle*

The!BANKSETA!is!required!in!terms!of!the!Public!Finance!Management!Act!(PFMA)!to!ensure!

that!funds!allocated!are!accounted!for!including!recovery!of!funds!as!and!when!losses!occur.!

Participating!employers!will!on!a!prorated!basis!be!liable!to!pay!to!BANKSETA!all!losses!incurred!

as!s!result!of!drop!offs!from!the!programme!including!but!not!limited!to!resignations!specifically!

those!involving!movements!by!participants!to!careers!outside!the!banking!and!microfinance!

sector!in!South!Africa.!

It!is!within!this!context!that!BANKSETA!will!recover!from!employers!the!funds!and/or!costs!

incurred!due!to!non!completion!and/or!drop!off!of!its!candidate(s)!from!this!project.!!

All!participating!employers!will!as!such!be!required!to!sign!a!Memorandum!of!Agreement!with!

BANKSETA!to!this!effect.!

!

Page 12: IEDP 2012 Guidelines - Thornhill Associates · 2017-02-23 · The*Purpose*of*BANKSETA’s*International*Executive*Development* Programmes* The!BANKSETA!International!Executive!Development!Programme!(IEDP)!is!designed!to

!

!

!

!

*

All*questions*pertaining*to*the*programme*and*related*processes*

should*be*directed*to*[email protected]**

Address*Thornhill!Office!Park,!Block!22,!94!Bekker!Road,!Midrand,!1686!

PO!Box!11678.!Vorna!Valley,!16!

)Telephone*

(011)!805Q9661!

)Call*Centre*086!102!0002!

)*

www.bankseta.org.za**