Industry Association Resource Centre By: Rossouw Theron Date: 28-05-2007 Slide: 1 of 18 IEC’s test requirements for Ground Lead Disconnectors, not sufficient for Eskom applications Presented at: UPDEA Colloquium Electrotechnical Standardisation Presented by: Rossouw Theron (IARC)

Transcript of IEC's test requirements for Ground Lead Disconnectors, not ...

Page 1: IEC's test requirements for Ground Lead Disconnectors, not ...

Industry Association Resource Centre By: Rossouw Theron Date: 28-05-2007 Slide: 1 of 18

IEC’s test requirements for Ground Lead Disconnectors,

not sufficient for Eskom applications

Presented at: UPDEA Colloquium Electrotechnical Standardisation

Presented by: Rossouw Theron (IARC)

Page 2: IEC's test requirements for Ground Lead Disconnectors, not ...

Industry Association Resource Centre By: Rossouw Theron Date: 28-05-2007 Slide: 2 of 18

Arrester

Arrester

GLD

GLD

Typical surge arresterTypical surge arrester

Page 3: IEC's test requirements for Ground Lead Disconnectors, not ...

Industry Association Resource Centre By: Rossouw Theron Date: 28-05-2007 Slide: 3 of 18

Arrester

Grading resistor

Grading resistor

Spark gapSpark gap {

Ground lead disconnector (GLD)Ground lead disconnector (GLD)

Page 4: IEC's test requirements for Ground Lead Disconnectors, not ...

Industry Association Resource Centre By: Rossouw Theron Date: 28-05-2007 Slide: 4 of 18

Spark gap Grading resistor

Arrester

• 2 Cartridge

• 2 Cartridge

Ground lead disconnector (GLD)Ground lead disconnector (GLD)

Page 5: IEC's test requirements for Ground Lead Disconnectors, not ...

Industry Association Resource Centre By: Rossouw Theron Date: 28-05-2007 Slide: 5 of 18

IEC 60099IEC 60099--4: GLD test requirements4: GLD test requirements

IEC 60099-4: Specification for metal-oxide surge arresters without gaps for a.c. systems

Type test requirments for GLDs according to IEC 60099-4 are:•Disconnector withstand tests•Disconnector operation test

Page 6: IEC's test requirements for Ground Lead Disconnectors, not ...

Industry Association Resource Centre By: Rossouw Theron Date: 28-05-2007 Slide: 6 of 18

IEC 60099IEC 60099--4: GLD test requirements4: GLD test requirements

Disconnector withstand tests:When an arrester is fitted with a GLD it shall withstand, without operating, each of the following tests:

• Long-duration current impulse testThe arrester and GLD are subjected to a series of 18 long-duration current impulses (2000 μs square wave).

• Operating duty testThe arrester and GLD is subjected to a series of 20 lightning current impulses (10 kA, 8/20 μs) and 2 high current impulses (100 kA, 4/10 μs).

Page 7: IEC's test requirements for Ground Lead Disconnectors, not ...

Industry Association Resource Centre By: Rossouw Theron Date: 28-05-2007 Slide: 7 of 18

IEC 60099IEC 60099--4: GLD test requirements4: GLD test requirements

Disconnector operation test:The time delay for the operation of the disconnector is determined for three values of current, 20 A, 200 A and 800 A r.m.s

GLD operation curve

0.01

0.1

1

10

10 100 1000Current in Ampere

Tim

e in

sec

onds 20 A

200 A

800 A

Page 8: IEC's test requirements for Ground Lead Disconnectors, not ...

Industry Association Resource Centre By: Rossouw Theron Date: 28-05-2007 Slide: 8 of 18

Failures Failures –– Prior to 2003Prior to 2003

Arresters failed

GLDs did not operate

Page 9: IEC's test requirements for Ground Lead Disconnectors, not ...

Industry Association Resource Centre By: Rossouw Theron Date: 28-05-2007 Slide: 9 of 18

SEF setting philosophy• Trip delay: 3 s to 15 s• Pick-up: 3 A to 6 A

0.01

0.1

1

10

100

1 10 100 1000Current in Ampere

Tim

e in

sec

onds

Grading of Sensitive Earth Fault (SEF) with GLDGrading of Sensitive Earth Fault (SEF) with GLD

Typical GLD operation curves

Page 10: IEC's test requirements for Ground Lead Disconnectors, not ...

Industry Association Resource Centre By: Rossouw Theron Date: 28-05-2007 Slide: 10 of 18

Typical SEF setting:5 s @ 5 A

Specified minimum GLD operating time:

3 s @ 5 A

0.01

0.1

1

10

100

1 10 100 1000Current in Ampere

Tim

e in

sec

onds

Specified GLD operating timeSpecified GLD operating time

Page 11: IEC's test requirements for Ground Lead Disconnectors, not ...

Industry Association Resource Centre By: Rossouw Theron Date: 28-05-2007 Slide: 11 of 18

Failures: 2004 Failures: 2004 -- 20052005

GLD operated

Arrester not damaged

Page 12: IEC's test requirements for Ground Lead Disconnectors, not ...

Industry Association Resource Centre By: Rossouw Theron Date: 28-05-2007 Slide: 12 of 18

100

1000

10000

100000

1000000

1 10 100 1000 10000

Time [ us ] Effective duration of impulse (tail time - rise time)

Cur

rent

[ A

]

Typical

lightning

flash current

duration

8/204/10

0/2000

GLD test points according to IEC 60099GLD test points according to IEC 60099--44

Page 13: IEC's test requirements for Ground Lead Disconnectors, not ...

Industry Association Resource Centre By: Rossouw Theron Date: 28-05-2007 Slide: 13 of 18

100

1000

10000

100000

1000000

1 10 100 1000 10000Time [ us ]

Effective duration of impulse (tail time - rise time)

Cur

rent

[ A

]

MOV failure level

Typical

lightning

flash current

duration

8/204/10

0/2000

30/80

Arrester damage curveArrester damage curve

Page 14: IEC's test requirements for Ground Lead Disconnectors, not ...

Industry Association Resource Centre By: Rossouw Theron Date: 28-05-2007 Slide: 14 of 18

100

1000

10000

100000

1000000

1 10 100 1000 10000Time [ us ]

Effective duration of impulse (tail time - rise time)

Cur

rent

[ A

]

MOV failure level Old GLD

Typical

lightning

flash current

duration

8/204/10

0/2000

30/80

Arrester damage curve vs transient operation curve of GLDArrester damage curve vs transient operation curve of GLD

Page 15: IEC's test requirements for Ground Lead Disconnectors, not ...

Industry Association Resource Centre By: Rossouw Theron Date: 28-05-2007 Slide: 15 of 18

100

1000

10000

100000

1000000

1 10 100 1000 10000Time [ us ]

Effective duration of impulse (tail time - rise time)

Cur

rent

[ A

]

MOV failure level Old GLD New GLD

Typical

lightning

flash current

duration

8/204/10

0/2000

30/80

Arrester damage curve vs transient operation curve of GLDArrester damage curve vs transient operation curve of GLD

Page 16: IEC's test requirements for Ground Lead Disconnectors, not ...

Industry Association Resource Centre By: Rossouw Theron Date: 28-05-2007 Slide: 16 of 18

GLD operation for 30/80 us current impulseGLD operation for 30/80 us current impulse

0

10

20

30

40

Product X (Old) Product A Product B Product C Product X (New )

Ipea

k [k

A]

Withstood Operated

Page 17: IEC's test requirements for Ground Lead Disconnectors, not ...

Industry Association Resource Centre By: Rossouw Theron Date: 28-05-2007 Slide: 17 of 18

Eskom’s GLD test requirementsEskom’s GLD test requirements

1. Disconnector operation testGLD operating time is determined at 20 A, 200 A and 800 A, as well as at 5 A

2. Long duration current impulse withstand test18 x 2000 μs square wave current impulsesGLD resistance measurements and 5 A operation test

3. Operating duty withstand test20 x 8/20 μs, 10 kA and 2 x 4/10 μs, 100 kA current impulsesGLD resistance measurements and 5 A operation test

4. High lightning duty current impulse withstand test2 x 30/80, 30 kA current impulsesGLD resistance measurements and 5 A operation test

5. Repetitive surge withstand ability test1000 voltage impulses, sufficient to ensure spark-over of the GLD’s internal gap GLD resistance measurements and 5 A operation test

6. Moisture ingress testGLD is immersed in boiling water for 42 hours