IE 201 INTRODUCTION TO ENGINEERING DESIGN. L-3d Presentation Team 5 Abdullah AbuKhwejah Abdullah...

13
IE 201 IE 201 INTRODUCTION TO INTRODUCTION TO ENGINEERING DESIGN ENGINEERING DESIGN

Transcript of IE 201 INTRODUCTION TO ENGINEERING DESIGN. L-3d Presentation Team 5 Abdullah AbuKhwejah Abdullah...

Page 1: IE 201 INTRODUCTION TO ENGINEERING DESIGN. L-3d Presentation Team 5 Abdullah AbuKhwejah Abdullah Siami Adam Jalal Rami Almatani Mohamed AlShayea.

IE 201IE 201IE 201IE 201INTRODUCTION TO INTRODUCTION TO

ENGINEERING DESIGNENGINEERING DESIGN

Page 2: IE 201 INTRODUCTION TO ENGINEERING DESIGN. L-3d Presentation Team 5 Abdullah AbuKhwejah Abdullah Siami Adam Jalal Rami Almatani Mohamed AlShayea.

L-3d Presentation

Team 5Abdullah AbuKhwejahAbdullah SiamiAdam JalalRami AlmataniMohamed AlShayea

Page 3: IE 201 INTRODUCTION TO ENGINEERING DESIGN. L-3d Presentation Team 5 Abdullah AbuKhwejah Abdullah Siami Adam Jalal Rami Almatani Mohamed AlShayea.

Agenda•Context 1 min•The work 1 min

– KTSA 1 min– GANTT CHART 1 min– ARTIFACT SKETCHES 1 min

– Discussion 1 min

Page 4: IE 201 INTRODUCTION TO ENGINEERING DESIGN. L-3d Presentation Team 5 Abdullah AbuKhwejah Abdullah Siami Adam Jalal Rami Almatani Mohamed AlShayea.

• Introduction:

This is the fourth installment of the IE 201 project which is L3-D (implementation). This step comes right after we have selected the artifact which is to obtain, dissect the artifact and prepare for the final step. In this assignment we will apply the KTSA on the artifact and develop a (Gantt chart) that shows when the tasks will be completed. Finally we will sketch our artifact parts after dissection and shall number the parts so that it will be easy for us to put back together.

Page 5: IE 201 INTRODUCTION TO ENGINEERING DESIGN. L-3d Presentation Team 5 Abdullah AbuKhwejah Abdullah Siami Adam Jalal Rami Almatani Mohamed AlShayea.

We first apply the Kepner-Tregoe Situation Analysis KTSA on the artifact that we obtained from the previous assignment which is Bicycle to help us prioritize the tasks and activities that remain to  be completed.

The Work:

Page 6: IE 201 INTRODUCTION TO ENGINEERING DESIGN. L-3d Presentation Team 5 Abdullah AbuKhwejah Abdullah Siami Adam Jalal Rami Almatani Mohamed AlShayea.

-The table below shows the KTDA for our implementation problems

SITUATION ANALYSIS

PROBLEMSTIMING

(H,M,L)TREND

(H,M,L)IMPACT

(H,M,L)PROCESS

(PA,DA,PPA)

1. DISSECT BICYCLEHHHDA,PPA

2. SKETCH PARTSMLMPPA

3. REASSEMBLE BICYCLE

HMMDA,PPA

4. TEST PARTSMLMPA

5. ADD DYNAMOMLHPPA

6. ADD LAMPHMMPPA

7. TEST THE COMPONENTS

MMHDA,PPA

Page 7: IE 201 INTRODUCTION TO ENGINEERING DESIGN. L-3d Presentation Team 5 Abdullah AbuKhwejah Abdullah Siami Adam Jalal Rami Almatani Mohamed AlShayea.

Now, after applying the KTDA we need to have a Gantt Chart to show when the tasks will be completed. It lets us know who is working on each task and how long it will take.

Page 8: IE 201 INTRODUCTION TO ENGINEERING DESIGN. L-3d Presentation Team 5 Abdullah AbuKhwejah Abdullah Siami Adam Jalal Rami Almatani Mohamed AlShayea.

- The table below represents a Gantt Chart for our implementation procedure.

SundaySaturday  

8p.m.7p.m.6p.m.10p.m.9p.m.8p.m.7p.m.

6p.m.problem

30 min

Memb. 1 and

memb. 4 dissect bicycle

2h 30 minMemb. 5 sketch

bicycle's parts

30min

Memb. 2 and

memb. 4 reassemble bicycle

Page 9: IE 201 INTRODUCTION TO ENGINEERING DESIGN. L-3d Presentation Team 5 Abdullah AbuKhwejah Abdullah Siami Adam Jalal Rami Almatani Mohamed AlShayea.

1h30minMemb. 2

and memb. 3 test the parts

45min

Memb. 1 and

memb. 2 add the dynamo

45min

Memb. 3 and

memb. 4 add the lamp

1h30minMemb. 4 test all

components

SundaySaturday

8p.m.7p.m.6p.m.10p.m.9p.m.8p.m.7p.m.6p.m.

Page 10: IE 201 INTRODUCTION TO ENGINEERING DESIGN. L-3d Presentation Team 5 Abdullah AbuKhwejah Abdullah Siami Adam Jalal Rami Almatani Mohamed AlShayea.

Now, we go for the artifact parts' sketches. After we dissected the Bicycle we made sketches for each part followed by a number and its name to make it easy when we put back together.

Page 11: IE 201 INTRODUCTION TO ENGINEERING DESIGN. L-3d Presentation Team 5 Abdullah AbuKhwejah Abdullah Siami Adam Jalal Rami Almatani Mohamed AlShayea.
Page 12: IE 201 INTRODUCTION TO ENGINEERING DESIGN. L-3d Presentation Team 5 Abdullah AbuKhwejah Abdullah Siami Adam Jalal Rami Almatani Mohamed AlShayea.

• Discussion:

We have come to the end of the assignment L3-D (implementation) which was the fourth assignment for this project. It contained firstly, the KTSA table and results, secondly we used the results and added them to a Gantt chart which helped us figure out who was doing what and how long it would take to achieve. And last but not least we drew some sketches of the parts after dissection to artifact, and we numbered the parts so that it would be easier to put back together. We look forward to the final part of the project L3-E.

Page 13: IE 201 INTRODUCTION TO ENGINEERING DESIGN. L-3d Presentation Team 5 Abdullah AbuKhwejah Abdullah Siami Adam Jalal Rami Almatani Mohamed AlShayea.

THANK YOU