7/30/2019 Iduction Quarry Se west bokaro
1/37
1West Bokaro Q-SE
West Bokaro
Mining Stream
Quarry - Sou th Eas tern
-
7/30/2019 Iduction Quarry Se west bokaro
2/37
2West Bokaro Q-SE
West Bokaro Seam Wise Reserve 1.11.2008
West Bokaro
WASHERY
FRS
Sec_C
Sect._DQuarry_SE
Housing
Dump Dump
Dump
Dump
G.M. Office
Banji
N
DURUN.E.BLOCK
KARMATIA
CMC
Mine office
Quarry_AB
Qyarry_E
Central Side
-
7/30/2019 Iduction Quarry Se west bokaro
3/37
3West Bokaro Q-SE
Our Operations
Blasting Shovelling Dumping
Overburden Removal
Coal Loading
Coal Crushing
Coal
Beneficiation
Despatch
Coal Mining & Beneficiation
Environmental
Measures
Earth filling
Afforestation
Drilling
-
7/30/2019 Iduction Quarry Se west bokaro
4/37
4West Bokaro Q-SE
Raw Coal Production till FY20
-
7/30/2019 Iduction Quarry Se west bokaro
5/37
5West Bokaro Q-SE
Box Cut 1 & 2
Box Cut _3
Box Cut _4
Quarry SE Work ings
-
7/30/2019 Iduction Quarry Se west bokaro
6/37
6West Bokaro Q-SE
Q-SE Equ ipment f leet
Excavators : 6 ( 4 Shovels : 14.8 m3, 2 Loaders : 15.8 m3)Rear Dumpers : 40(95 T)Rotary Drills : 7 (150 mm).
Graders :2
(16 H)
Dozers : 7 TD and2 WD.Explosive Used : SME (Orica)
-
7/30/2019 Iduction Quarry Se west bokaro
7/377West Bokaro Q-SE
Best Practices
7 days working.
Staggered weekly day of rest and canteen breaks.
Two grade system without supervisory level.
Semi-mobile canteens and field offices.
Ergonomically designed equipment.
Competency mapping- 4Q Toyota Model
Electronic Display Board.
GPS Online Data Management.
-
7/30/2019 Iduction Quarry Se west bokaro
8/378West Bokaro Q-SE
EMPLOYEE SATISFACTION
- Reward & Recognition
- SHABASH
- Attractive Incentive Bonus
- SGA recognition
- Aspire / SIPs recognition
- Suggestion Reward
- Rewarding Performances in JDCs
- Long Service award ( 20, 25,30,35,40 Years)
-
7/30/2019 Iduction Quarry Se west bokaro
9/379West Bokaro Q-SE
ACHIVEMENT OF THE
TRAINING PROCESSES
REDUCED TRAINING PERIOD (18 TO 6 MONTHS)
EASY ACCEPTABILITY TO WORLDS BEST
OPERATING PRACTICES.
GREENTRAINEES TRAINED AS TRAINERS .
FIELD TRAINING TIME REDUCED DRASITICALLY
FROM SEVERAL MONTHS TO AVERAGE 3 WEEKS.TRAINEDTO HANDLE ALL POSSIBILE TYPES OF
EMERGENCIES.
ENABLER FOR ACHIEVING BENCHMARK
OPERATING PARAMETERS.
-
7/30/2019 Iduction Quarry Se west bokaro
10/3710West Bokaro Q-SE
OUTDOOR ADVENTURE TRG.
BY TSAF.
TECHNICAL TRG. AT SNTI
HMV COURSE AT JSR.
PROCESS ORIENTED TRG. AT
WB.
TRAINING BY OEMS
SIMULATOR BASED TRAINING
TRG. BY EXPERT INTERNTL
TRAINERS + OJT.
OUTDOOR ADVENTURETRAINING BY TSAF
GREEN TRAINING PROGRAMME
-
7/30/2019 Iduction Quarry Se west bokaro
11/3711West Bokaro Q-SE
SIMULATOR TRAINING
-
7/30/2019 Iduction Quarry Se west bokaro
12/3712West Bokaro Q-SE
SIMULATOR TRAINING
Teaches correct control procedures from safety, production
and machine wear and tear perspectives.
Starting the truck Reversing under a shovel Dumping
-
7/30/2019 Iduction Quarry Se west bokaro
13/3713West Bokaro Q-SE
SIMULATOR TRAINING
Simulators...
Creates an environment very similar to a real machine at work
-
7/30/2019 Iduction Quarry Se west bokaro
14/3714West Bokaro Q-SE
SIMULATOR TRAINING
Exposes the operator to various simulated events many
too dangerous or difficult to test for real.
Dust or Fog Road Surfaces
-
7/30/2019 Iduction Quarry Se west bokaro
15/3715West Bokaro Q-SE
SIMULATOR TRAINING
Records the operator's reactions together with vital machine
operating information
-
7/30/2019 Iduction Quarry Se west bokaro
16/3716West Bokaro Q-SE
SIMULATOR TRAINING
Gives out an operator's detailed report, and can "play back"
the operator's session to evaluate his performance.
-
7/30/2019 Iduction Quarry Se west bokaro
17/3717West Bokaro Q-SE
Quarry Production in Process
-
7/30/2019 Iduction Quarry Se west bokaro
18/3718West Bokaro Q-SE
Canteen
-
7/30/2019 Iduction Quarry Se west bokaro
19/37
19West Bokaro Q-SE
Locker Room
-
7/30/2019 Iduction Quarry Se west bokaro
20/37
20West Bokaro Q-SE
GREENERY AT SHOPFLOOR
-
7/30/2019 Iduction Quarry Se west bokaro
21/37
21West Bokaro Q-SE
Quarry SE at Night (Face)
-
7/30/2019 Iduction Quarry Se west bokaro
22/37
22West Bokaro Q-SE
Quarry SE at Night (Haul Road)
-
7/30/2019 Iduction Quarry Se west bokaro
23/37
23West Bokaro Q-SE
Quarry SE at Night (Dump yard)
-
7/30/2019 Iduction Quarry Se west bokaro
24/37
24West Bokaro Q-SE
Quarry SE at Night (Installations)
-
7/30/2019 Iduction Quarry Se west bokaro
25/37
25West Bokaro Q-SE
OB DUMP UNDER RECLAIMATION
-
7/30/2019 Iduction Quarry Se west bokaro
26/37
26West Bokaro Q-SE
Thank you
-
7/30/2019 Iduction Quarry Se west bokaro
27/37
27West Bokaro Q-SE
Location
-
7/30/2019 Iduction Quarry Se west bokaro
28/37
28West Bokaro Q-SE
A brief history
West Bokaro becomes a Division of Tata Steel1972
Management taken over by M/s West Bokaro (P)Ltd., a wholly owned subsidiary of Tata Steel
1952
Mine comes into existence as M/s Bokaro &Ramgarh Ltd. Management of mine given to M/s
Anderson Wright
1947
-
7/30/2019 Iduction Quarry Se west bokaro
29/37
29West Bokaro Q-SE
A Division of TATA STEEL, providing 48% coking coal & 100%
thermal coal requirement of the Company
We also provide 34% of the thermal coal requirement of Jojobera
Plant, Tata Power
Employee strength 3411 of which 40% are technically qualified
12 % unskilled , Mostly employment on land basis
Location: 200 kms North of Jamshedpur
Leasehold: 4300 acres
West Bokaro : An Introduction
-
7/30/2019 Iduction Quarry Se west bokaro
30/37
30West Bokaro Q-SE
Our customers and Products
Clean Coal
Middlings
Tailings
Rejects
Coke Plant,TISCO
Power Engg., TISCO
Brick Kilns
Captive Power Plant
Ash 13 %
Ash 38-41 %
Ash 35-38 %
Ash 66-68 %
Our Key Customers
Tata Power
Products
-
7/30/2019 Iduction Quarry Se west bokaro
31/37
31West Bokaro Q-SE
Overland Conveyor
Transportation of Material
Ropeways
-
7/30/2019 Iduction Quarry Se west bokaro
32/37
32West Bokaro Q-SE
Quick Loading Complex, Chainpur
-
7/30/2019 Iduction Quarry Se west bokaro
33/37
33West Bokaro Q-SE
EMPLOYEE SATISFACTION
- Joint consultation Foras
Joint Departmental Council
Central Joint Council
JCCM
(Department Level)
(Divisional Level)
(Apex Level)
Frequency
Quarterly
Monthly
Quarterly
-
7/30/2019 Iduction Quarry Se west bokaro
34/37
34West Bokaro Q-SE
CONDUCIVE WORK ENVIRONMENT
ISO 14001 Certified
Towards OHSAS 18000 certification
Ergonomically Designed equipment
Review of Safety & Environment every Day
Haul Road Profile Mapping (ASI)
Adoption of Total Productive Maintenance (TPM)
-
7/30/2019 Iduction Quarry Se west bokaro
35/37
35West Bokaro Q-SE
Quality of Life
Free Electricity & Fuel Free Accommodation to employees
Free Education
Coaching & Career counseling
Schemes like Employees Family Benefit Scheme and
Medical Separation Scheme
Club, Recreation & Community Centers
Parks & Gardens 60 bedded hospital
A i i
-
7/30/2019 Iduction Quarry Se west bokaro
36/37
36West Bokaro Q-SE
Aspiration
To be the most admired unit in
the Coal Industry
-
7/30/2019 Iduction Quarry Se west bokaro
37/37
End o f Presentat ion