MUNICIPAL MANAGER’S OFFICE
Focus Area
IDP Objectives
Objective number
Strategy/Project Title
Indicator Annual Target
Means of verification
Baseline Q1 Q2 Q3 Q4 Budget
PU
BL
IC P
AR
TIC
IPA
TIO
N
To
ensure
effectiv
e public
particip
ation in
process
es of
decisio
n
making
GG
01
Conduct civil
education
Number of
civil education
conducted
Conduct 8
civil
education
Attendanc
e register
Public
participation
policy in place
Conduct
two civil
educatio
n
programs
Conduct two
civil
education
programs
Conduct two
civil
education
programs
Conduct two civil
education programs
R800 000
MUNICIPAL MANAGER’S OFFICE
Focus Area
IDP Objectives
Objective number
Strategy/Project Title
Indicator Annual Target
Means of verification
Baseline Q1 Q2 Q3 Q4 Budget
Complaints and
Petition
Management
Approved
petition
management
guidelines
Update
petition
register
and submit
report to
Council
Updated
petition
register
Section 79
committee in
place. (petition
management
guidelines
have been
approved)
Update
the
Petitions
Register
and
submit
quarterly
report
Update and
compile
report on
petitions
Update and
compile
report on
petitions
Update and
compile report on
petitions
strengthen and
build capacity of
ward committee
system
Number of
Ward
Committees
trained
Number of
Attend four
sittings of
ward
committee
meetings
per quarter
Report and
Attendanc
e register
31 Ward
Committees
have been
established;
310 trained
Attend 4
sittings of
ward
committe
e
meetings
Attend 4
sittings of
ward
committee
meetings.
Attend 4
sittings of
ward
committee
meetings
Attend 4 sittings of
ward committee
meetings
R3 533 85
6
MUNICIPAL MANAGER’S OFFICE
Focus Area
IDP Objectives
Objective number
Strategy/Project Title
Indicator Annual Target
Means of verification
Baseline Q1 Q2 Q3 Q4 Budget
sittings of
Ward
Committee
Meetings
in
compliance
with back
to basics
31 Ward
Administrators
have been
appointed
.
Co-ordinate
Mayoral Imbizo’s
and Budget Public
Hearings in all 31
wards Annually
Number of
Mayoral
Imbizo’s and
IDP Public
hearings
Conduct 2
Mayoral
Imbizo’s
and 1 IDP
&Budget
public
hearing
Attendanc
e register
and
summary
of inputs
from
community
IDP & Budget
Process Plan
for 2015/16
has been
adopted by
council
Convene
one
Mayoral
Imbizo’s (
state of
local
address)
…………….. Conduct
Mayoral
Imbizo’s
(Midyear
report)
Conduct IDP public
hearings
R366 800
MUNICIPAL MANAGER’S OFFICE
Focus Area
IDP Objectives
Objective number
Strategy/Project Title
Indicator Annual Target
Means of verification
Baseline Q1 Q2 Q3 Q4 Budget
MU
NIC
IPA
L P
LA
NN
ING
To
provid
e
effectiv
e
munici
pal
planni
ng
GG
02
Develop IDP and
Budget planning
processes
appropriate to the
municipality
annually
Approval of IDP
& budget
process plan for
2016/17
Approved IDP
and Budget for
2016/17
Cond
duct
annual
IDP &
Budget
review
for 2016/
Council
resolution.
Five year IDP
adopted by
Council in
2012 and
reviewed
annual
Table
IDP and
Budget
process
plan
2016/17
Table the draft IDP & annual budget with related policies to the council.
Approval of the annual budget & IDP with related policies
R838 400
MUNICIPAL MANAGER’S OFFICE
Focus Area
IDP Objectives
Objective number
Strategy/Project Title
Indicator Annual Target
Means of verification
Baseline Q1 Q2 Q3 Q4 Budget
Approved ward
based plans
Develop
ment of
ward
base
plans
.
Copy of
ward base
plans
…. Develop
and
adopt
terms of
reference
and set
steering
committe
e
Compilation
of ward base
plans
Approval of
ward base
plans
…… R300
000.00
MUNICIPAL MANAGER’S OFFICE
Focus Area
IDP Objectives
Objective number
Strategy/Project Title
Indicator Annual Target
Means of verification
Baseline Q1 Q2 Q3 Q4 Budget
Number of back
to basic report
submitted
submit
twelve(12
)monthly
reports to
COGTA
Proof of
submissio
n
Back to basics
campaign has
been adopted
by Council
Compile
and
submit
three
reports to
COGTA
Compile
and submit
three reports
to COGTA
Compile
and submit
three reports
to COGTA
Compile and
submit three
reports to COGTA
MUNICIPAL MANAGER’S OFFICE
Focus Area
IDP Objectives
Objective number
Strategy/Project Title
Indicator Annual Target
Means of verification
Baseline Q1 Q2 Q3 Q4 Budget
Nyandeni
development
plan (vision
2030)
Compilati
on of
Nyandeni
develop
ment
plan
(phase
one)
2030
vision
Copy of
Nyandeni
developme
nt plan
Council
resolution on
development
of Municipal
master plan
Develop
and
adopt
terms of
reference
Facilitate
consultation
on the draft
master plan
situational
analysis
Conduct
public
consultation
on the draft
master plan
Table the Municipal
master plan to
Council
R500
000.00
MUNICIPAL MANAGER’S OFFICE
Focus Area
IDP Objectives
Objective number
Strategy/Project Title
Indicator Annual Target
Means of verification
Baseline Q1 Q2 Q3 Q4 Budget
INT
ER
GO
VE
RN
ME
NT
AL
RE
LA
TIO
NS
To
ensure
meanin
gful
partici
pation
by all
sphere
s of
govern
ment
GG
03
Improve
communication
and collaboration
across the
spheres of
government
Number of IGR
Forum Meetings
Convene
4 IGR
Forums
Attendanc
e register
and
minutes
IGR Forum
has been
launched and
& ToR were
adopted by
Council
Convene
1 IGR
meeting
Convene 1
IGR meeting
Convene 1
IGR meeting
Convene 1 IGR
meeting
R123 664
MUNICIPAL MANAGER’S OFFICE
Focus Area
IDP Objectives
Objective number
Strategy/Project Title
Indicator Annual Target
Means of verification
Baseline Q1 Q2 Q3 Q4 Budget
INT
ER
GO
VE
RN
ME
NT
AL
RE
LA
TIO
NS
To
ensure
meanin
gful
partici
pation
by all
sphere
s of
govern
ment
GG
03
Formalise
Relations with the
District
Municipality on
DM functions
performed at the
local municipality
(Disaster, Water
and Sanitation,
Housing,
Environmental
Health) &other
service delivery
departments
Number of
working
agreements
signed with
District
Municipality
Sign 2
working
agreeme
nts with
the
District
Municipal
ity on
water,
sanitation
and
disaster
manage
ment
Copy of
signed
working
agreement
s
No formal
agreements
are in place
except with
DSRAC
Facilitate
signing of
working
agreements
-
MUNICIPAL MANAGER’S OFFICE
Focus Area
IDP Objectives
Objective number
Strategy/Project Title
Indicator Annual Target
Means of verification
Baseline Q1 Q2 Q3 Q4 Budget
Tra
dit
ion
al A
uth
ori
ties
To
Strengt
hen
Relatio
ns with
Traditi
onal
Leader
ship
GG
04
To foster
collaboration with
Traditional
Authorities
Approved Policy
on Traditional
Leaders
Review
policy on
traditiona
l leaders
Council
resolution
12 Traditional
leaders are
serving in the
Municipal
Council
………. Conduct
consultations
on policy
………..
Table the policy to
Council for
adoption
R157 200
MUNICIPAL MANAGER’S OFFICE
Focus Area
IDP Objectives
Objective number
Strategy/Project Title
Indicator Annual Target
Means of verification
Baseline Q1 Q2 Q3 Q4 Budget
Leg
al s
ervi
ces
To
improv
e
manag
ement
and
admini
stratio
n of
legal
matter
s
GG
05
Develop
mechanism to
fast-track
finalization of
pending litigations
Signed litigation
register
Updating
of the
litigation
register
Signed
quarterly
litigation
register
Litigation
register in
place
Updating
of the
litigation
register
Updating of
the litigation
register
Updating of
the litigation
register
Updating of the
litigation register
R733 600
MUNICIPAL MANAGER’S OFFICE
Focus Area
IDP Objectives
Objective number
Strategy/Project Title
Indicator Annual Target
Means of verification
Baseline Q1 Q2 Q3 Q4 Budget
By-
law
s
To fast-
track
service
s
delivery
through
the
develo
pment
and
reviewa
l of
effectiv
e by-
GG
06
Develop new by-
laws
Number of
gazetted By-
Laws
Assist
departme
nts to
develop
at least
two
Bylaws
Copy of
Bylaws
18 By-laws in
place
Establish
need for
develop
ment of
new
Bylaws
Draft new
Bylaws
Conduct
consultations
on new
Bylaws
Table the new
Bylaws to Council
and submit for
Gazetting
R104,800
MUNICIPAL MANAGER’S OFFICE
Focus Area
IDP Objectives
Objective number
Strategy/Project Title
Indicator Annual Target
Means of verification
Baseline Q1 Q2 Q3 Q4 Budget
laws
To
maximi
se
adminis
trative
and
operati
onal
efficien
cy
through
GG
07
Review of the
delegation
register
Signed register
of delegation
between the AO
and SM and
between AO
and Mayor
representing
Council
Review
and
adopt
council
delegatio
n register
in line
with
legislatio
n
Council
resolution
System of
delegation is in
place
……. Reviewal of
the
delegation
register.
Adoption of
the reviewed
delegation
register
…….. .
MUNICIPAL MANAGER’S OFFICE
Focus Area
IDP Objectives
Objective number
Strategy/Project Title
Indicator Annual Target
Means of verification
Baseline Q1 Q2 Q3 Q4 Budget
the use
of the
system
s of
delegat
ion
Co
mm
un
icat
ion
To
provid
e
accura
te,
timely
and
reliable
GG
08
Develop an
effective
communication
system and
procedure manual
aligned to the
National
Adopted
Communicatio
n strategy and
Communicatio
n Policy
Review of
the
communica
tion policy
and
strategy
Council
resolution
and copies
of
reviewed
communic
ation
policy and
Communicatio
n policy and
Strategy in
place
Update
communi
cation
strategy
(consolid
ate
departme
ntal
Conduct
consultation
on reviewal
of
communicati
on policy
and strategy
Review
communication
policy and strategy.
R73 660.
MUNICIPAL MANAGER’S OFFICE
Focus Area
IDP Objectives
Objective number
Strategy/Project Title
Indicator Annual Target
Means of verification
Baseline Q1 Q2 Q3 Q4 Budget
inform
ation
to
citizen
s
Framework strategy. inputs)
Number of
Communicator
s Forum
meetings
conducted
Convene 4
Communic
ators
Forum
Meetings
Attendanc
e register
and
minutes
Communicator
s forum has
been
established
Convene
one
communi
cators
forum
meeting
Convene
one
communicat
ors forum
meeting
Convene
one
communicat
ors forum
meeting
Convene one
communicators
forum meeting
To improve the
corporate identity
of the institution
Number of
consultations
conducted.
To conduct
3
consultatio
n on re-
Attendanc
e registers
Existing logo
and Council
resolution
approving the
………….
.
Conduct
one
consultation
Conduct
one
consultation
Conduct one
consultation
MUNICIPAL MANAGER’S OFFICE
Focus Area
IDP Objectives
Objective number
Strategy/Project Title
Indicator Annual Target
Means of verification
Baseline Q1 Q2 Q3 Q4 Budget
branding process plan.
Direct
communication of
information to the
public
Number of
news letter
editions,
media
releases,
4
newsletters
developed
and
released.
Copies of
news
letters
Newsletter t is
in place,
notices and
publications
are done
Issue
one news
letter
Issue one
news letter
Issue one
news letter
Issue one news
letter
R262 000
MUNICIPAL MANAGER’S OFFICE
Focus Area
IDP Objectives
Objective number
Strategy/Project Title
Indicator Annual Target
Means of verification
Baseline Q1 Q2 Q3 Q4 Budget
notices,
publications
12 notices
and 3
publication
s issued
Issue
three
notices
Issue three
notices
Issue three
notices
Issue three notices
Issue one
publication
Issue one
publication
Issue one
publication
Intern
al
audit
To
monitor
internal
controls
and
GG:9 Perform audits as
per risk –based
internal audit plan
to ensure
compliance with
Approved
annual audit
committee
charter,
annual
Review
Audit
Committee
Charter,
Internal
Approved
annual
audit
committee
charter,
Fully
Functional
Internal Unit in
place and
Audit
Review
Audit
Committe
e
Charter,
- Review Audit
Committee Charter,
Internal Audit
Charter 2016 / 17
and Internal Audit
R314 400
MUNICIPAL MANAGER’S OFFICE
Focus Area
IDP Objectives
Objective number
Strategy/Project Title
Indicator Annual Target
Means of verification
Baseline Q1 Q2 Q3 Q4 Budget
provide
advice
to
manag
ement
and
council
relevant
legislations and to
ensure internal
controls are in
place.
internal audit
charter and
annual
internal audit
plan
Audit
Charter
and
Internal
Audit Plan
and report
submitted
to Audit
committee
annual
internal
audit
charter
and annual
internal
audit plan
Committee
established
Internal
Audit
Charter
2015 / 16
and
Internal
Audit
Plan
Plan
Number of
reports of the
Internal Audit
Unit submitted
Carry out
10 audit
projects
Copies of
the audit
reports
and
minutes of
the audit
Finalise
prior year
audits,
two new
audit
project
3 audit
projects as
per internal
audit plan
3 audit
projects as
per internal
audit plan
undertake 2 audit
projects as per
internal audit plan •
MUNICIPAL MANAGER’S OFFICE
Focus Area
IDP Objectives
Objective number
Strategy/Project Title
Indicator Annual Target
Means of verification
Baseline Q1 Q2 Q3 Q4 Budget
committee
meetings.
2014/15
as per
internal
audit
plan
Number of
audit
committee
meetings held
Convene 4
Audit
Committee
Meetings
Minutes
and
attendance
registers
Audit
Committee is
in place
Convene
1
ordinary
Audit
Committe
e
Meeting
Convene 1
ordinary
Audit
Committee
Meeting
Convene 1
ordinary
Audit
Committee
Meeting
Convene 1 ordinary
Audit Committee
Meeting
Internal Audit Unit
to track and
Status report
on the
Conduct
audit on the
Progress
reports on
AG Audit
Action Plan
- - Monitor the
implementati
Conduct audit on
the implementation
MUNICIPAL MANAGER’S OFFICE
Focus Area
IDP Objectives
Objective number
Strategy/Project Title
Indicator Annual Target
Means of verification
Baseline Q1 Q2 Q3 Q4 Budget
monitor
implementation of
management
audit action plan
progress on
implementatio
n of the Audit
action plan
implementa
tion of
Audit
Action Plan
for 14/15
the
implement
ation of the
Audit
Action
Plan
has been
developed and
adopted by
Council
on of the
audit action
plan
of Audit Action Plan
and compile report
Risk Management
To identify, assess and mitigate municipal risk
GG:10
Develop and implement comprehensive risk management strategy/policy, risk management profile risk register and management charter.
Adopted risk
management
strategy, risk
register and
management
charter
Review
Risk
Manageme
nt Plan, risk
Manageme
nt
Committee
charter, risk
manageme
nt strategy
Approved
copies of
Risk
Managem
ent Plan,
risk
Managem
ent
Committee
charter,
risk
Risk Management systems are in place
- - Conduct stakeholder workshops on risk management Review Risk
Management
Plan, risk
Management
Committee
charter, risk
Approval of Risk
Management Plan,
risk Management
Committee charter,
risk management
strategy and profile.
R209 600.
00
MUNICIPAL MANAGER’S OFFICE
Focus Area
IDP Objectives
Objective number
Strategy/Project Title
Indicator Annual Target
Means of verification
Baseline Q1 Q2 Q3 Q4 Budget
and profile. managem
ent
strategy
and profile.
management
strategy and
profile.
Number of risk
committee
meetings
Conduct
four risk
manageme
nt
committee
meetings
Minutes, attendance register
Appointed risk committee
Convene1 meeting
Convene1 meeting
Convene1 meeting
Convene1 meeting
MUNICIPAL MANAGER’S OFFICE
Focus Area
IDP Objectives
Objective number
Strategy/Project Title
Indicator Annual Target
Means of verification
Baseline Q1 Q2 Q3 Q4 Budget
Develop systems
and processes to
combat corruption
Reviewed fraud prevention strategy
Reviewed Fraud Prevention policy and strategy
Council resolution and attendance register
Fraud prevention strategy in place
Review fraud
prevention
strategy
Consultation and approval of the fraud prevention strategy Approval of fraud prevention strategy
Conduct fraud awareness campaign.
Conduct fraud awareness campaign.
R157 200
MUNICIPAL MANAGER’S OFFICE
Focus Area
IDP Objectives
Objective number
Strategy/Project Title
Indicator Annual Target
Means of verification
Baseline Q1 Q2 Q3 Q4 Budget
Co
un
cil A
ffai
rs
To
ensure
efficien
t and
effectiv
e
council
suppor
t
GG
11
Timely and
accurate
recording of
Council Decisions
Signed Council
Resolutions by
the Speaker
Distributi
on of
two(2)qu
arterly
council
resolutio
ns
booklets
Copy of
booklets
Council
Resolutions
Register in
place
………….
.
Consolidate
and
Distribute a
Council
Resolutions
booklet
………… Consolidate and
Distribute a Council
Resolutions booklet
R200 000
Number of
Ordinary,
Standing
Committee,
EXCO and
Co-
ordinate
4
Ordinary
Council
Attendanc
e registers
and
minutes
Annual Council
Calendar is in
place
Co-
ordinate
1
ordinary
Council
Co-ordinate
1 ordinary
Council
Meeting , 1
EXCO and
Co-ordinate
1 ordinary
Council
Meeting , 1
EXCO and
Co-ordinate 1
ordinary Council
Meeting , 1 EXCO
and 1 standing
MUNICIPAL MANAGER’S OFFICE
Focus Area
IDP Objectives
Objective number
Strategy/Project Title
Indicator Annual Target
Means of verification
Baseline Q1 Q2 Q3 Q4 Budget
Council
Meetings as per
Council calendar
meetings
,
4ordinary
Exco
meetings
4
Standing
Committe
Meeting,
EXCO
and 1
standing
committe
e
meeting
and an
1 standing
committee
meeting
1 standing
committee
meeting
committee meeting
MUNICIPAL MANAGER’S OFFICE
Focus Area
IDP Objectives
Objective number
Strategy/Project Title
Indicator Annual Target
Means of verification
Baseline Q1 Q2 Q3 Q4 Budget
e
Meetings
.
Open
MUNICIPAL MANAGER’S OFFICE
Focus Area
IDP Objectives
Objective number
Strategy/Project Title
Indicator Annual Target
Means of verification
Baseline Q1 Q2 Q3 Q4 Budget
To
ensure
efficient
and
effectiv
e
council
support
GG
11
Quarterly
reports on
verification of
Councillors
claims
Verify
documen
ts
submitte
d by
Councillo
rs that
have
financial
implicatio
ns for the
institution
Quarterly
reports on
verification
of claims
submitted
by
Councillors
.
- Develop
and
present
quarterly
reports to
Council
Develop and
present
quarterly
reports to
Council
Develop and
present
quarterly
reports to
Council
Develop and
present quarterly
reports to Council
MUNICIPAL MANAGER’S OFFICE
Focus Area
IDP Objectives
Objective number
Strategy/Project Title
Indicator Annual Target
Means of verification
Baseline Q1 Q2 Q3 Q4 Budget
Improve ethics
and morality in the
municipality
Annual life style
audited report
Conduct
the life
style
audits for
Councillo
rs and
employe
es.
Lifestyle
audit
reports
Fraud
prevention
strategy and
Declaration
form in place
.
Develop
a
framewor
k for
conductin
g lifestyle
audits for
Councillo
rs and
Employe
es
Conduct
workshops
on
modalities
for the
implementati
on of lifestyle
audits for
Councilors
and
Employees
Conduct
lifestyle
audits on
Councilors
and
employees
Develop an annual
report on lifestyle
audits for
Councilors and
employees
MUNICIPAL MANAGER’S OFFICE
Focus Area
IDP Objectives
Objective number
Strategy/Project Title
Indicator Annual Target
Means of verification
Baseline Q1 Q2 Q3 Q4 Budget
Institu
tional
PMS
To
provide
a tool
for
measur
ing
achiev
ement
of
predete
rmined
objecti
ves
GG
12
Compilation of
management
report to Exco
Number of
management
reports
submitted to
Exco
Submit 4
manageme
nt reports
to Exco
Signed
copies of
managem
ent reports
Management
report are
developed
annually
Compile
one
manage
ment
report
Compile one
management
report
Compile one
management
report
Compile one
management report
R209 600
MUNICIPAL MANAGER’S OFFICE
Focus Area
IDP Objectives
Objective number
Strategy/Project Title
Indicator Annual Target
Means of verification
Baseline Q1 Q2 Q3 Q4 Budget
Compilation of
MFMA, S52(d),
S72, S121& MSA
S46 reports
Number of
MFMA & MSA
reports
submitted
Compilatio
n of MFMA,
S52(d),
S72,
S121&
MSA S46
reports
Copies of
reports
Reports have
been compiled
for 2013/14
Financial Year
Compile MSA Sec 46 and MFMA Sec 52(d) Reports
and
section
121
report(dr
aft)
Compile MFMA Sec 72 and Sec 121 final Report
Compile MFMA Sec 52(d) Report
Compile MFMA Sec 52(d) report
MUNICIPAL MANAGER’S OFFICE
Focus Area
IDP Objectives
Objective number
Strategy/Project Title
Indicator Annual Target
Means of verification
Baseline Q1 Q2 Q3 Q4 Budget
Sp
ecia
l Pro
gra
ms
To
contrib
ute to
nationa
l
develo
GG
13
Mainstreaming of
programs at all
levels
Number of
women
programmes
supported
4 women
programme
s supported
Attendanc
e registers
and
progress
reports
Women
Caucus in
place
Hosting
of
Nyandeni
women’s
day
Formation of
young
women at
ward level.
Projects visit
for
assessments
Provide support to
women projects
MUNICIPAL MANAGER’S OFFICE
Focus Area
IDP Objectives
Objective number
Strategy/Project Title
Indicator Annual Target
Means of verification
Baseline Q1 Q2 Q3 Q4 Budget
pment
prioriti
es on
design
ated
groups
(wome
n,
youth,
disable
d,
childre
n and
elderly)
Hosting of
16 days of
activism
against
abuse of
women and
children
MUNICIPAL MANAGER’S OFFICE
Focus Area
IDP Objectives
Objective number
Strategy/Project Title
Indicator Annual Target
Means of verification
Baseline Q1 Q2 Q3 Q4 Budget
Sp
ecia
l Pro
gra
ms
To
contrib
ute to
nationa
l
develo
pment
prioriti
es on
GG
13
Mainstreaming of
programs at all
levels
Number of
children and
elderly
programmes
supported
Support
Ematoleni
children’s
first
program as
per
assessmen
t (4
schools)
Report and
attendance
register
Children
programme s
supported
(ongoing)
-
Launch of
Ematoleni
child first
program
To conduct
back to
school
campaign
Provide support to
girl guide program
MUNICIPAL MANAGER’S OFFICE
Focus Area
IDP Objectives
Objective number
Strategy/Project Title
Indicator Annual Target
Means of verification
Baseline Q1 Q2 Q3 Q4 Budget
design
ated
groups
(wome
n,
youth,
disable
Number of
elderly
programmes
supported
50elderly
supported
Report and
attendance
register
Elderly forum
in place
Participat
ion of
elderly in
Golden
games
Handing
over of
corporate
gifts to
elderly
Visit elderly
centres
Visit elderly centres
MUNICIPAL MANAGER’S OFFICE
Focus Area
IDP Objectives
Objective number
Strategy/Project Title
Indicator Annual Target
Means of verification
Baseline Q1 Q2 Q3 Q4 Budget
d,
childre
n and
elderly)
Number of
women
programmes
supported
Support to
women
programs
at least 2
projects
Reports
and
attendance
register
Women’s
caucus in
place
Hosting
of
Nyandeni
women’s
Month
Facilitate
formation of
Young
women
structures at
ward level.
Project visit
for
assessment
Provide support to
women’s projects
(2)
MUNICIPAL MANAGER’S OFFICE
Focus Area
IDP Objectives
Objective number
Strategy/Project Title
Indicator Annual Target
Means of verification
Baseline Q1 Q2 Q3 Q4 Budget
Number of
youth
programmes
supported;
Support to
two youth
programme
s
Report and
attendance
register
Youth
development
plan in place,
youth council
in place
Facilitate
Induction
of youth
Council
Resuscitate
youth forums
Resuscitate
youth forums
Provide support to
youth Cooperative.
R319 400
Conduct career
exhibition in
conjunction with
Community
services
MUNICIPAL MANAGER’S OFFICE
Focus Area
IDP Objectives
Objective number
Strategy/Project Title
Indicator Annual Target
Means of verification
Baseline Q1 Q2 Q3 Q4 Budget
Report of Miss
Nyandeni
Hosting of
Miss
Nyandeni
Report and
attendance
register
Miss Nyandeni
is hosted
annually
Conduct
auditions
for Miss
Nyandeni
in Wards
Hosting of
Miss
Nyandeni
………. …
MUNICIPAL MANAGER’S OFFICE
Focus Area
IDP Objectives
Objective number
Strategy/Project Title
Indicator Annual Target
Means of verification
Baseline Q1 Q2 Q3 Q4 Budget
Number of
disabled
programmes
supported
Support at
least 3
disabled
programme
s
Report and
attendance
registers
Disabled
structure in
place
Visit 3
disabled
projects
at ward
level
Facilitate
building of
disabled
structure (
Ward 7)
Participate in
PSC
meeting to
monitor
building of
the structure
Participate in PSC
meeting to monitor
building of the
structure
R157 200
To promote all
sporting codes
within the
municipality
Number of
sporting
codes formed;
Results of the
Participate
in SALGA
Games
Report and
attendance
register
Sport Council
is established
Conduct
session
with all
sporting
codes
Hosting of
Marathon
and horse
racing.
Resuscitatio
n of sport
forums
Resuscitation of
sport forums
R 209 600
MUNICIPAL MANAGER’S OFFICE
Focus Area
IDP Objectives
Objective number
Strategy/Project Title
Indicator Annual Target
Means of verification
Baseline Q1 Q2 Q3 Q4 Budget
Mayors’ Cup SALGA
Mayoral cup
held
Conduct
SALGA
mayoral
cup at
ward
level
Conduct
Local and
District
SALGA
games
SALGA
mayoral cup
at local level
…………
District
SALGA
games
SALGA
provincial
final games
DEPARTMENT: BUDGET & TREASURY OFFICE
Targets for the Quarters
Focus Area
IDP Objectives
Objective number
Strategy/Project Title
Indicator Annual Target
Means of verification
Baseline Q1 Q2 Q3 Q4 Amount
Revenue Management
To ensure effective Debtors management by June 2017
FVM 14
Perform Debtors data cleansing by June 2016
Updated Debtors Master File.
Debtors Information Update
Data collection complete forms
Inaccurate Debtors Records
Report on Number of Forms Issued
Report on Verification of data
Report on uploaded data on debtors master file
Updated Master File
Updated Master File
Implementation of MPRA by June 2016
Approved Valuation Roll and Supplementary valuation roll
Updating the Supplementary Valuation Roll
Approved Supplementary Valuation Roll
2012-2013 Approved General Valuation Roll
Report on Data Collection on property changes
Progress Report on Property valuation
Valuation report & Objections Register
Submit Supplementary Valuation Roll to Council for Adoption & approval
R26
2 0
00
DEPARTMENT: BUDGET & TREASURY OFFICE
Targets for the Quarters
Focus Area
IDP Objectives
Objective number
Strategy/Project Title
Indicator Annual Target
Means of verification
Baseline Q1 Q2 Q3 Q4 Amount
Review of Financial Policies and by June 2016
Approved Credit Control and Debt Collection policy and by-laws
Review Credit Control and debt collection policy
Council Resolution for approval of Policy
2014/15 Approved Credit Control and Debt Collection Policy is in place
- - Submission of Draft Reviewed Credit Control and Debt collection policy to Council
Submit Credit Control and Debt collection policy to Council for approval
To increase revenue by 20% By June 2017
FVM 15
Develop and implement Revenue enhancement strategy by June 2016 by increasing revenue collection by 6% by June 2016
Approved & Reviewed Revenue Enhancement Strategy,
Reviewal
of
Revenue
Enhance
ment
Strategy
increase
revenue
collectio
n by 6%
Approved & Reviewed Revenue Enhancement Strategy Report on Actual Revenue Collected
Revenue
Enhance
ment
strategy
is in
place
Actual
Revenue
Collected
was
R10,9m
in
2013/14
----- Report on Actual Revenue Collected (per month:R2, 800 000 per quarter)
--------- Report on Actual Revenue Collected (per month:R2, 800 000 per quarter)
Develop draft reviewed revenue enhancement strategy and consultation Report on Actual Revenue (per month:R2, 800 000 per quarter)
Submission of Reviewed Revenue Enhancement Strategy to Council for approval Report on Actual Revenue (per month:R2, 800 000 per quarter)
DEPARTMENT: BUDGET & TREASURY OFFICE
Targets for the Quarters
Focus Area
IDP Objectives
Objective number
Strategy/Project Title
Indicator Annual Target
Means of verification
Baseline Q1 Q2 Q3 Q4 Amount
Implementation of credit control and debt collection policy by June 2016
Reduction of the old debtors balance by 10%
Compile
a report
on
Impleme
ntation of
Credit
Control
and Debt
Collectio
n policy
Approved Report on Implementation of Credit Control & Debt Collection Policy
Credit Control and debt collection policy reviewed and approved. Arrears amount to R12,8m in 2013/14
Report on Acknowledgement of debt and Arrear Collections
Report on Acknowledgement of debt and Arrear Collections
Report on Acknowledgement of debt and Arrear Collections
Report on Acknowledgement of debt and Arrear Collections
R2
40
63
4
DEPARTMENT: BUDGET & TREASURY OFFICE
Targets for the Quarters
Focus Area
IDP Objectives
Objective number
Strategy/Project Title
Indicator Annual Target
Means of verification
Baseline Q1 Q2 Q3 Q4 Amount
Expenditure Management
To ensure effective budget management by June 2017
FVM 16
Development of realistic and credible Budget by June 2016
Approved budget
Approved 2016/17 annual budget
Council Resolution and approved budget for 2016/17
Budget compiled in compliance with MFMA requirements
Approved IDP/Budget process plan
- Adjustment budget, and Draft Budget submitted to Council and both PT & NT
Final Budget submitted to Council for approval and both PT & NT
Adherence to budget reforms by June 2016
Budget Returns (Section 71, 52(d) Section 72, C- Schedule and B-Schedule and C-Schedule
Compliance reports as per MFMA Calendar
Signed Monthly Reports, Quarterly Reports, Annual Report and proof of submission
No
unauthori
zed
expendit
ure in
2013/14
Monthly and Quarterly Budget Statements submitted to Council and both PT and NT
Monthly and Quarterly Budget Statements submitted to Council and both PT and NT
Monthly, Quarterly and Mid-Year Budget Report submitted to Council and both PT and NT
Monthly and Quarterly Budget Statements and submitted to Council and both PT and NT
DEPARTMENT: BUDGET & TREASURY OFFICE
Targets for the Quarters
Focus Area
IDP Objectives
Objective number
Strategy/Project Title
Indicator Annual Target
Means of verification
Baseline Q1 Q2 Q3 Q4 Amount
Asset Management
To ensure proper management of municipal assets by June 2017
FVM17
Review GRAP Asset Management Policy by June 2016
Approved Asset Management Policy
Conduct annual review of Fixed asset policy
Council resolution and signed policy
2014-15 Asset Management Policy in place
-
-
Submission of the draft Reviewed Fixed Asset management policy to Council
Submit Fixed Asset management policy to Council for adoption
R848 0
00
Updating of GRAP Asset Register by June 2016
Approved GRAP compliant asset register
Updating of fixed asset register annually
Updated GRAP fixed asset register
GRAP
Complian
t Asset
Register
is in
place
Update GRAP Asset Register
Update GRAP Asset Register
Update GRAP Asset Register
Update GRAP Asset Register
Acquisiti
on and
maintena
nce of
municipa
l fleet by
June
2016
Updated
fleet
managem
ent
Report
Management of fleet and maintenance
Signed Quarterly Reports on Fleet Acquisition & Maintenance
New fleet has been procured and maintenance unit is in place
Quarterly Reports on Fleet Acquisition and Maintenance
Quarterly Reports on Fleet Acquisition and Maintenance
Quarterly Reports on Fleet Acquisition and Maintenance
Quarterly Reports on Fleet Acquisition and Maintenance
DEPARTMENT: BUDGET & TREASURY OFFICE
Targets for the Quarters
Focus Area
IDP Objectives
Objective number
Strategy/Project Title
Indicator Annual Target
Means of verification
Baseline Q1 Q2 Q3 Q4 Amount
Supply Chain Management
To ensure proper SCM procedures by June 2017
FVM 18
Ensure compliance of SCM policy that is in line with relevant legislation and regulations by June 2016
Approved Compliant SCM policy
Review SCM policy annually
Approved SCM Policy and Council Resolution
2014-15 SCM policy is in place
------ --- Submission of the Draft Reviewed SCM policy to Council
Submit SCM Policy to Council for approval.
Acquisition of goods and Services in compliance with
Quarterly report on implementation of SCM Policy
Implementation of the SCM Policy
SCM Quarterly Reports on Implementation of SCM policy
Reduced irregular expenditure by 56% in 2013-14
Quarterly Reports on Implementation of SCM Policy
Quarterly Reports on Implementation of SCM Policy
Quarterly Reports on Implementation of SCM Policy
Quarterly Reports on Implementation of SCM Policy
DEPARTMENT: BUDGET & TREASURY OFFICE
Targets for the Quarters
Focus Area
IDP Objectives
Objective number
Strategy/Project Title
Indicator Annual Target
Means of verification
Baseline Q1 Q2 Q3 Q4 Amount
Supply Chain Management Policy and regulations by 30th June 2016
Report on turnaround time for bid processing, (not more than 90 days for bids R200 000+), 14 day turnaround for bids R30 000 – R200 000, and 6 day turnaround time for quotations less than R30 000
Report on turnaround time for bid processing, (not more than 90 days for bids R200 000+), 14 day turnaround for bids R30 000 – R200 000, and 6 day turnaround time for quotations less than R30 000
Report on turnaround time for bid processing, (not more than 90 days for bids R200 000+), 14 day turnaround for bids R30 000 – R200 000, and 6 day turnaround time for quotations less than R30 000
Report on turnaround time for bid processing, (not more than 90 days for bids R200 000+), 14 day turnaround for bids R30 000 – R200 000, and 6 day turnaround time for quotations less than R30 000
DEPARTMENT: BUDGET & TREASURY OFFICE
Targets for the Quarters
Focus Area
IDP Objectives
Objective number
Strategy/Project Title
Indicator Annual Target
Means of verification
Baseline Q1 Q2 Q3 Q4 Amount
Proper Contract Management by June 2016
Updated Annual Contract Register
Updated contract register
Contract Register
Contract Register is in place
Update contract register and review commitments register
Update
contract
register
and
review
commitme
nts
register
Update
contract
register
and
review
commitme
nts
register
Update
contract
register
and
review
commitme
nts
register
Reporting
To ensure compliance with the provisions
FVM 19
Development of AFS
Signed AFS 2014/15
Submission of signed AFS by 31st August 2015
Signed AFS 2014/15
In-house GRAP AFS submitted by 31st August
2014-15 Annual Financial Statements submitted to Auditor General
Quarterly Management Accounts
Mid-Year Financial Statements
Quarterly Management Accounts
R1 1
67 2
00
DEPARTMENT: BUDGET & TREASURY OFFICE
Targets for the Quarters
Focus Area
IDP Objectives
Objective number
Strategy/Project Title
Indicator Annual Target
Means of verification
Baseline Q1 Q2 Q3 Q4 Amount
MFMA and norms and standard of National treasury
Annual Audit for 2014/15
Final AG Audit Report 2014/15
Unqualified Audit Report December 2014
copy of the final AG audit report
Unqualified Audit Report in 2013/14
Checklist for Audit
Signed Audit report
Progress Report on Audit Action Plan submitted to Internal Audit , Audit Committee and both NT & PT
Progress Report on Audit Action Plan submitted to Internal Audit , Audit Committee and both NT & PT
DEPARTMENT: BUDGET & TREASURY OFFICE
Targets for the Quarters
Focus Area
IDP Objectives
Objective number
Strategy/Project Title
Indicator Annual Target
Means of verification
Baseline Q1 Q2 Q3 Q4 Amount
Develop the implementation plan and facilitate the trainings for SCOA
Implementation of process plan for SCOA
Road Map for SCOA be drafted by June 2016
Quarterly performance and annual reports
SCOA Gazette and Implementation plan adopted by Council in December 2014 and submitted to Treasury
Setup SCOA Committee and have terms of reference approved
Workshop SCOA to the Management and EXCO
-- ---
DEPARTMENT: COMMUNITY SERVICES 2015 / 2016 SDBIP
UNIT: COMMUNITY SERVICES
Targets for the Quarter
Strategic Focus Area
5 year objectives
Objective no.
Project title / strategy
Outcome / Output indicator
Means of verification
Annual Targets
Baseline Q 1 Q 2 Q 3 Q 4
Bu
dg
et
Environmental Management
To maintain a safe and healthy environment
B S D20
Strengthen Pound Management by 2016
Well maintained pounds sub-divided pound for keeping of impounded animals
Report from the Vet Doctor, Delivery Note, Security OB (Occurrence Book) entries
Boundary wall fencing for Ngqeleni and Libode Pounds
Two functional pounds
Co-facilitation for the registration of the bound wall fencing at both pounds Libode and Ngqeleni with Technical Department for (MIG Fund)
- Participation in steering committee for pound fencing with Technical Department
Closure and Handing over of the project
MIG
FU
ND
DEPARTMENT: COMMUNITY SERVICES 2015 / 2016 SDBIP
UNIT: COMMUNITY SERVICES
Targets for the Quarter
Strategic Focus Area
5 year objectives
Objective no.
Project title / strategy
Outcome / Output indicator
Means of verification
Annual Targets
Baseline Q 1 Q 2 Q 3 Q 4
Bu
dg
et
Designs of kraals for both Libode and Ngqeleni Pounds
Facilitation of advert for establishment of kraals both towns
Participation in the steering committee for construction of kraals both towns
Closure and Handing over of the project
R 2
74,6
93, 3
8
Maintain cemeteries throughout the year
Updated grave register
Burial register, photo, delivery note
Customer satisfactory survey through rate payers
Libode guardroom renovated, Ngqeleni guardroom constructed and ablution facilities built, fencing erected
Develop
ment of
question
naire
Distribution of questionnaire
Analysis of questionnaires
Closure-up report
R 1
04
, 80
0,
DEPARTMENT: COMMUNITY SERVICES 2015 / 2016 SDBIP
UNIT: COMMUNITY SERVICES
Targets for the Quarter
Strategic Focus Area
5 year objectives
Objective no.
Project title / strategy
Outcome / Output indicator
Means of verification
Annual Targets
Baseline Q 1 Q 2 Q 3 Q 4
Bu
dg
et
Installation of grave tags as need arises
Installation of grave tags as need arises
Installation of grave tags as need arises
Installation of grave tags as need arises
Installation of grave tags as need arises
Development of Parks & Open Spaces
One park and 1 open space established and operated
Copy of the designs
Establishment of one (1) open space at Ngqeleni and Application for funding of one (1) park at Ngqeleni
One eco park is under construction in Libode, one mini park established at Libode, one open space identified at Ngqeleni& one open space identified at Libode
Finalisation of identification of open space with Planning and Development
Facilitate drawing of specification and design for open space at Ngqeleni
Development of open space at Ngqeleni
-
R 1
69
77
6
Drafting of Business plan for funding
Lobby for funding for one (1) park at Ngqeleni
Lobby for funding for one (1) park at Ngqeleni
-
DEPARTMENT: COMMUNITY SERVICES 2015 / 2016 SDBIP
UNIT: COMMUNITY SERVICES
Targets for the Quarter
Strategic Focus Area
5 year objectives
Objective no.
Project title / strategy
Outcome / Output indicator
Means of verification
Annual Targets
Baseline Q 1 Q 2 Q 3 Q 4
Bu
dg
et
Provide infrastructure for landfill site
Operational landfill Site by 2015/16
Operational Licensed landfill Site.
Participate in the PSC for construction of Landfill site
Conditional Licensed Landfill Site at Libode is in place
Co-facilitation of the drafting of SLA with service provider
Monitoring of progress through PSC
Monitoring of progress through PSC
Closure and handing over of the project
MIG
FU
ND
ING
Operational Waste Transfer Station
Rehabilitation permit
Construction of the Transfer Station at Ngqeleni
There is a Waste Transfer Station Permit and designs in place though there is no operational transfer station
Facilitation of signing of SLA with DEDEAT
Participation in PSC with DEDEAT
Participation in PSC with DEDEAT
Closure and handing over.
DE
DE
AT
FU
ND
ING
DEPARTMENT: COMMUNITY SERVICES 2015 / 2016 SDBIP
UNIT: COMMUNITY SERVICES
Targets for the Quarter
Strategic Focus Area
5 year objectives
Objective no.
Project title / strategy
Outcome / Output indicator
Means of verification
Annual Targets
Baseline Q 1 Q 2 Q 3 Q 4
Bu
dg
et
Submission of specification for recycling containers for Ngqeleni Transfer Station
Monitoring the purchasing of recycling containers
Monitoring the purchasing of recycling containers
Monitoring the purchasing of recycling containers
R300,
00
0
Expansion of waste collection to peri – urban areas and Consultations (Thabo Mbeki, Mfenetyisa, Kop Shop,Corana, Ziphundzana and Ntlaza Rank)
Well established waste –collection plan and public facilities (Thabo Mbeki, Kopshop, Corana,Ziphunzana&Ntlaza)
Functional drop-off centre
Acquire 06 additional skip bins
Collection
centres
establishe
d(Ntlaza
Ziphundza
na,Corara
na and
Thabo
Mbeki,
Kop Shop)
Draw specification for skip bins
- Delivery to the identified areas
-
R 4
27
62
5
DEPARTMENT: COMMUNITY SERVICES 2015 / 2016 SDBIP
UNIT: COMMUNITY SERVICES
Targets for the Quarter
Strategic Focus Area
5 year objectives
Objective no.
Project title / strategy
Outcome / Output indicator
Means of verification
Annual Targets
Baseline Q 1 Q 2 Q 3 Q 4
Bu
dg
et
Steel Refuse Bins in place in both towns
Draw specification for cement bins
Follow-up on the appointment of service provider
Follow-up on the appointment of service provider
Delivery to the identified areas
R210 9
10
DEPARTMENT: COMMUNITY SERVICES 2015 / 2016 SDBIP
UNIT: COMMUNITY SERVICES
Targets for the Quarter
Strategic Focus Area
5 year objectives
Objective no.
Project title / strategy
Outcome / Output indicator
Means of verification
Annual Targets
Baseline Q 1 Q 2 Q 3 Q 4
Bu
dg
et
Implementation of IWMP by 2016
Number of awareness campaign and capacity building
Reports Implement priority project as per IWMP (twenty(20) awareness campaigns and two(2) capacity building trainings)
Approved IWMP in place
Conduct(5) awareness campaigns, Facilitate purchase
Conduct Five(5) awareness campaigns at identified areas Facilitate registration of Waste Information System (WIS)
Facilitate finalisation of appointment of WMO. Conduct Five(5) awareness campaigns at identified areas
Conduct Five(5) awareness campaigns at identified areas
In p
art
ners
hip
with O
R T
AM
BO
DM
DEPARTMENT: COMMUNITY SERVICES 2015 / 2016 SDBIP
UNIT: COMMUNITY SERVICES
Targets for the Quarter
Strategic Focus Area
5 year objectives
Objective no.
Project title / strategy
Outcome / Output indicator
Means of verification
Annual Targets
Baseline Q 1 Q 2 Q 3 Q 4
Bu
dg
et
Facilitate collection of refuse removal
HIV / AIDS & Health Matters
To contribute toward reduction & the spread of communicable diseases
BSD 21
20 Conduct awareness raising campaigns
Number of awareness Campaigns on HIV/AIDSconducted
Attendance registers and copy of reports
02 outreach and awareness Campaigns on HIV/AIDS
Functional HIV / AIDS Unit and awareness campaign are conducted
Two (2) Awareness campaigns
World Aids Day observation
Two (2) Awareness campaigns
Candle light Memorial observation
R 2
62
, 00
0
DEPARTMENT: COMMUNITY SERVICES 2015 / 2016 SDBIP
UNIT: COMMUNITY SERVICES
Targets for the Quarter
Strategic Focus Area
5 year objectives
Objective no.
Project title / strategy
Outcome / Output indicator
Means of verification
Annual Targets
Baseline Q 1 Q 2 Q 3 Q 4
Bu
dg
et
Engage with relevant departments, NGO’s and other relevant stakeholders through social needs cluster
Number of OVC’s(7)and support groups (7)supported
Copy of data base of Support groups, NGO'S and Orphans and Vulnerable Children (OVC)
Support 7 OVC’s and 7 Support Groups (Informed by assessment)
Data base of stakeholders is available
Information Sharing workshop with NGO’s
Assessment of livelihood of OVC’s in partnership with Dept. Of Educ ,Dept Of SocDev and NGO’s
Develop assessment report with recommendations on the support of 7 OVC’s
Develop assessment report with recommendations on the of 7 Support groups.
Convene 20 Local Aids Council (LAC) Activities
Number of LAC sittings convened
Minutes & attendance registers
Convene 4 LAC sittings
Functional Local Aids Council
LAC meeting to oversee Heritage Month celebration focusing on Programme
LAC meeting to oversee Circumcision programmes
LAC meeting to oversee Virginity Inspection
LAC meeting to oversee Circumcision programmes
DEPARTMENT: COMMUNITY SERVICES 2015 / 2016 SDBIP
UNIT: COMMUNITY SERVICES
Targets for the Quarter
Strategic Focus Area
5 year objectives
Objective no.
Project title / strategy
Outcome / Output indicator
Means of verification
Annual Targets
Baseline Q 1 Q 2 Q 3 Q 4
Bu
dg
et
Library & Information Services
To provide library infrastructure
BSD 22
To facilitate the construction of Libode Library by 2016
Number of libraries built
Attendance register and minutes of PSC
Participate in project steering Committee for Construction of Libode Library by DSRAC
Two functional libraries with inadequate infrastructure
Participate in the PSC meeting (Finalisation of plans)
Participate in the PSC meeting
Participate in the PSC meeting
Participate in the PSC meeting D
SR
AC
To provide library infrastructure
BSD 22
To facilitate the provision of modular libraries to remote rural areas by 2016
Number of modular container libraries handed over
Statistics and minutes
Monitoring of one modular Library rollout by DSRAC
There are three (3)functional modular libraries.
Participation in the PSC for functioning of modular Libraries (DSRAC)
Participation in the PSC for functioning of modular Libraries (DSRAC)
Participation in the PSC for functioning of modular Libraries (DSRAC)
Participation in the PSC for functioning of modular Libraries (DSRAC)
DS
RA
C
DEPARTMENT: COMMUNITY SERVICES 2015 / 2016 SDBIP
UNIT: COMMUNITY SERVICES
Targets for the Quarter
Strategic Focus Area
5 year objectives
Objective no.
Project title / strategy
Outcome / Output indicator
Means of verification
Annual Targets
Baseline Q 1 Q 2 Q 3 Q 4
Bu
dg
et
To provide Library information services
BSD23
Coordinate and celebrate Library activities
Number of library activities organized
Attendance registers and Concept documents
Coordinate four library activities
Four library activities are held annually
Literacy
&
National
Book
Week
Holiday
Programme
s
Library Week Celebrations
World Book and Poetry Day
R 3
14
40
0,0
0
Career Guidance / Exhibition
Provide support to school / community libraries
Number of school/community libraries assisted
Reports and invoices
Assist 02 School/ community Libraries
09 school /community libraries assisted
Assessment of 05 schools
Submission of assessment report to the standing committee for selection
Submission of the specification
Hand over and delivery of Library support material to selected schools.
DEPARTMENT: COMMUNITY SERVICES 2015 / 2016 SDBIP
UNIT: COMMUNITY SERVICES
Targets for the Quarter
Strategic Focus Area
5 year objectives
Objective no.
Project title / strategy
Outcome / Output indicator
Means of verification
Annual Targets
Baseline Q 1 Q 2 Q 3 Q 4
Bu
dg
et
Free Basic Services
To provide free basic services to the Indigent people
BSD 24
Implementation of indigent policy Provision of free basic services
Number of indigent households supported
Roll out of electricity and alternative energy for 5000 households
Ward 20: 1692 households, ward 25: 1567 households, ward 26: 2296 households, ward 28: 477 households provided with paraffin and 3333 households provided with electricity
Develop rollout plan and submission of list to benefit from free basic electricity to Eskom
Delivery of alternative energy to the beneficiaries.
Delivery of alternative energy to the beneficiaries.
Assessment of impact of alternative energy (Gas and burner stove) R
5, 0
00,
000
DEPARTMENT: COMMUNITY SERVICES 2015 / 2016 SDBIP
UNIT: COMMUNITY SERVICES
Targets for the Quarter
Strategic Focus Area
5 year objectives
Objective no.
Project title / strategy
Outcome / Output indicator
Means of verification
Annual Targets
Baseline Q 1 Q 2 Q 3 Q 4
Bu
dg
et
To contribute to national programs on eradication of poverty
BSD 25
Expanded Public Works
Number of people employed through EPWP
Appointment letters
Employ 124 for NLM, 49 Cokisa, 124 Trenz hired on EPWP
Employ 66 casual workers through EPWP
- Recruit and Hire of 66 Casuals
- -
Facilitation of intergovernmental programmes towards access to basic services
Number of social cluster meetings convened
Minutes and attendance registers
Coordinate 04 Ordinary Social needs Cluster meetings
Functional Social Needs Cluster Programme
One ordinary Social needs Cluster meeting
One ordinary Social needs Cluster meeting
One ordinary Social needs Cluster meeting
One ordinary Social needs Cluster meeting
R
Early Childhood & Development and Literacy
To provide Early Childhood Development Infrastructure
BSD 26
Construction of the Early Childhood Development Centres
Number of ECDC constructed
Progress reports and close out reports
Construction of Two Early Childhood Development Centres
15 Early Childhood Development Centre established
Identification of two Wards to benefit.
Drawing and submission of specification.
Facilitate appointment of service provider
Participate in PSC for the Construction of Early Childhood center
R 1
,600 0
00,
00
UNIT: PUBLIC SAFETY
DEPARTMENT: COMMUNITY SERVICES 2015 / 2016 SDBIP
UNIT: COMMUNITY SERVICES
Targets for the Quarter
Strategic Focus Area
5 year objectives
Objective no.
Project title / strategy
Outcome / Output indicator
Means of verification
Annual Targets
Baseline Q 1 Q 2 Q 3 Q 4
Bu
dg
et
Strategic Focus Area
5 year objectives
Objective no.
Project title / strategy
Outcome / Output indicator
Means of verification
Annual Targets
Baseline Q 1 Q 2 Q 3 Q 4
Bu
dg
et
Public Safety & Security
To facilitate Public Safety Programmes
BSD 27
Co – ordination 4 Community Safety Forums
Number of Community Safety Forum sittings
Attendance registers and minutes
Convene 04 community safety forum sittings
Well established CSF
One CSFmeeting (Development of Nyandeni Community Safety Plan_
One CSF prep meeting sitting for 16 Days of Activism(against women and children abuse)
Review of Community Safety Plan & One CSF sitting
One CSF prep meeting sitting for Youth month(drug abuse and crime)
R 5
6 0
67
Co – ordination of Nyandeni Transport Forum
Number of Transport Forum sittings
Attendance registers and minutes
Convene 04 NTF Sittings
Well established NTF
One Nyandeni Transport Forum Sitting
One Nyandeni Transport Forum Sitting for Arrive Alive Campaign
One Nyandeni Transport Forum Sitting
One Nyandeni Transport Forum Sitting for Arrive Alive Campaign
R 7
3 3
60
DEPARTMENT: COMMUNITY SERVICES 2015 / 2016 SDBIP
UNIT: COMMUNITY SERVICES
Targets for the Quarter
Strategic Focus Area
5 year objectives
Objective no.
Project title / strategy
Outcome / Output indicator
Means of verification
Annual Targets
Baseline Q 1 Q 2 Q 3 Q 4
Bu
dg
et
Driving Licence Testing Centre(DLTC) Programmes
Number of learners licenses, driving licenses and PrDP’s issued
Transactional and financial reports
Learners licences: 4000 New issued d/l and renewals: 2400 PrDP’s: 600
Registered and Operational Grade B DLTC
Learners licences: 1000 New issued d/l and renewals: 600 PrDP’s: 150
Learners licences: 1000 New issued d/l and renewals: 600 PrDP’s: 150
Learners licences: 1000 New issued d/l and renewals: 600 PrDP’s: 150
Learners licences: 1000 New issued d/l and renewals: 600 PrDP’s: 150
R 3
66
, 8
00
Registering Authority(RA) Programmes
Number of registered and licensed vehicles
Transactional and financial reports
Registration and Licensing of 1000 motor vehicles
Registered and fully operational RA
Registered and Licences vehicles: 250
Registered and Licences vehicles: 250
Registered and Licences vehicles: 250
Registered and Licences vehicles: 250
R 1
04
, 80
0
DEPARTMENT: COMMUNITY SERVICES 2015 / 2016 SDBIP
UNIT: COMMUNITY SERVICES
Targets for the Quarter
Strategic Focus Area
5 year objectives
Objective no.
Project title / strategy
Outcome / Output indicator
Means of verification
Annual Targets
Baseline Q 1 Q 2 Q 3 Q 4
Bu
dg
et
Support Arrive Alive Campaigns
Number of campaigns supported
Attendance register and reports
Support two Arrive Alive launch campaigns
2 arrive alive campaigns are held annually
Develop a plan for arrive alive launch in April
Arrive Alive Launch
Develop a plan for arrive alive launch in December
Arrive Alive Launch.
R 8
3,
840
, 00
DEPARTMENT: COMMUNITY SERVICES 2015 / 2016 SDBIP
UNIT: COMMUNITY SERVICES
Targets for the Quarter
Strategic Focus Area
5 year objectives
Objective no.
Project title / strategy
Outcome / Output indicator
Means of verification
Annual Targets
Baseline Q 1 Q 2 Q 3 Q 4
Bu
dg
et
Enforcement of Municipal By - Laws
Report on the number of by-laws enforced
Copy of Enforcement report indicating transgressions.
Enforcement of 13 by-laws (waste management by-law, pound by-law, street trading, Environmental Health by-laws, stray animals, parking violation, nuisance by-laws, illegal connection by-laws, Encroachment on property by-law, Funeral Undertaker by-law, Parking ground by-law, Public meeting and gathering by-law, Public sewerage by-law)
18 By-laws are in place but were not enforced fully Out of 18 there are 11 by laws that are enforced
Enforcement of by-laws and transgression register maintained
Enforcement of by-laws and transgression register maintained
Enforcement of by-laws and transgression register maintained
Enforcement of by-laws and transgression register maintained
DEPARTMENT: COMMUNITY SERVICES 2015 / 2016 SDBIP
UNIT: COMMUNITY SERVICES
Targets for the Quarter
Strategic Focus Area
5 year objectives
Objective no.
Project title / strategy
Outcome / Output indicator
Means of verification
Annual Targets
Baseline Q 1 Q 2 Q 3 Q 4
Bu
dg
et
To safeguard and secure municipal facilities
Security report on safeguarding of Municipal facilities
Reports per facility
Safeguard all eight municipal facilities
51 security are guarding municipal assets.
Safe guard municipal facilities & monitoring of CCTV cameras
Safe guard municipal facilities & monitoring of CCTV cameras
Safe guard municipal facilities & monitoring of CCTV cameras
Safe guard municipal facilities & monitoring of CCTV cameras
R
LOCAL ECONOMIC DEVELOPMENT
DEPARTMENT: PLANNING AND DEVELOPMENT
Strategic
Focus
Area
IDP
OBJECTIVE
OBJ
ECTI
VE
NO
STRATEGY/PR
OJECT TITLE
Indicator ANNUAL TARGET MEANS
OF
VERIFICA
TION
Baseline Q1 Q2 Q3 Q4 BUDGET
SMME
Supp
ort
and
Devel
opme
nt
To promote
entrepreneurs
hip and
access to
markets
LED
28
By developing a
data base of all
SMMEs and
Co-operatives
and develop
and implement
SMME/co-
operative
Strategy
Flea
Market
hosted
Implementation of
SMME/Cooperatives
Strategy(Host one
Flea market)
Attendanc
e register
and
photos
LED
Strategy
,SMME’s
and co-
operative
strategie
s are in
place in
place
Host
Flea
market
- - - - - - 104 800
No of LED
Fora held
Holding 4 LED Fora Attendanc
e
Registers
4 LED
Fora
held in
2014/15
financial
year
1 LED
Forum
held
2nd LED
Forum
held
3rd LED
Forum
held
4th LED
Forum held
Capacity
building and
skills
development
No of
SMME’s
and Co-
operatives
60 SMME’s to be
capacitated by
providing trainings.
Attendanc
e registers
356
SMME’s
have
received
15
SMME
s and
Cooper
15
SMMEs
and
Cooperat
15
SMMEs
and
Cooperat
15 SMMEs
and
Cooperative
s provided
440 160
capacity training
atives
provide
d with
capacit
y and
skills
ives
provided
with
capacity
and skills
ives
provided
with
capacity
and skills
with
capacity and
skills
By creating
strategic
partnership with
institutions of
higher learning
and funding
institutions
No of
monitoring
reports
compiled
Monitor the
implementation of
MOUs
Monitoring
report
3 MOUs
signed
with
Institutio
ns of
Higher
Learning
- - Produce
progress
report on
impleme
ntation of
existing
MoU’s
Produce
final
progress
report on
implementati
on of
existing
MoU’s
104 800
Report on
Nyandeni
study
Through MOU with
universities
municipality request
students to conduct
study about the
History of Nyandeni
Attendanc
e Register
DVD and
Brochure
on
Nyanden
i History
Engag
e with
WSU
- - - - ------
Development of
Sector Strategy
for Retail
&hawker
business case
Retail
Sector
Strategy
developed
Development of
Sector Strategy for
Retail
Draft
Retail
Sector
Strategy
Retail
Sector
Situation
al
Analysis
in place
Develop
terms of
reference
and
facilitate
appointm
ent
- - Draft Retail
Sector
Strategy
produced
52 400
Mining To
explore
the
potential
of clay
mining for
developm
ent
LED
29
Implementation
of Malungeni
Clay Study
Geo-tech
study
document
Completion and
analysis of Geo-
techstudies.
Geo-tech
study
document
Feasibilit
y and
business
plan in
place
- - Produce
complete
d Geo-
Tech
study
- - - - 157 200
AGRICULT
URAL
DEVELOPM
ENT
To
support
and
promote
developm
ent of
agricultur
LED
30
Promoting dairy
farming
initiatives
Pre-
feasibility
study
developed,
agreement
signed
Site
Finalize the
feasibility study
Copy of
feasibility
study
document
Dairy
Farm
Business
Plan in
place
Contin
ue with
the
dairy
feasibili
ty
study
Produce
final
report on
feasibility
- - Sign
Agreements
with
partners and
communities
300 000
al
initiatives
fenced and
comple
te
fencing
By assisting
Farmers
through crop
production
Number of
hectares
ploughed
and
harvested
Purchase agricultural
inputs to support
farmers through
DRDAR’s planned
2500 hectors
Photos
inputs to
the sites.
Invoices
and
delivery
notes.
1128
haplante
d during
the
previous
year
Deliver
inputs
Ploughin
g starts
- - Compile
report on
crop
harvesting
1,5m
By promoting
small scale
farming
Number of
small
scale
farming
projects
supported
for the
next 5
years
10 projects
supported
(Crop, poultry,
piggery, SMME and
Tourism projects)
Photos
inputs to
the sites.
Invoices
and
delivery
notes.
10
projects
were
funded
during
the
previous
year
Receiv
e
request
s of
project
support
and
undert
ake
selecti
on
Delivery
of inputs
to
projects
- - Assessment
report on
funded
projects
300 000
Promoting
farmer access
to markets
Exposure
of farmers
to markets
Host one agricultural
show
Attendanc
e Register
and
photos
None - - Consultat
ion with
stakehold
ers
Host
Agricultu
ral show/
Farmers
Indaba
- -
By developing
an agricultural
sector plan
No of ha
planted
with hemp
Implement specific
projects identified in
the Plan
(Hemp Production 2
ha)
Photos of
Hemp
yield and a
report.
Agricultu
ral
Sector
Plan
- - Start
Productio
n of
Hemp
Start
Harvesti
ng of
Hemp
Harvesting
of Hemp
And
developmen
t of report
on hemp
yield.
100 000
By developing
feasibility study
on essential oil
One
hector
piloted on
essential
oils
Conduct trials on
essential oils at
Malungeni (1ha)
Photos of
haverst
and report
on
essential
oil
Pre-
feasibility
study
conducte
d
I hectare
site has
been
fenced
and
Installa
tion of
irrigatio
n
system
and
plannin
g starts
Planting
of
essential
oils
Progress
report of
the trials
Harvesting
104 800
irrigation
system
purchase
d
By Developing
Forest
Development
Plan.
Draft
Business
Plan
developed.
Develop Business
Plan for the identified
projects
Completed
business
plan
Draft
Forest
Develop
ment
Plan in
place.
- - - - Obtain
service
provider
to
develop
business
plan for
identified
sites
Produce
Final Draft
Business
Plan
TOURISM
DEVELOPME
NT
To
Promote
and
develop
Nyandeni
as a
Tourism
Destinatio
n of
LED
31
By Promoting
health, safety
and security
during
December and
Easter Holidays
Number of
life guards
appointed
per
annum.
34 Life guards
recruited, trained,
equipped and placed
in 6 beaches.
Appointme
nt letters
34
lifeguard
s
recruited
and
placed in
6
beaches
- Start and
complete
recruitme
nt
processe
s for
Festive
season
Recruit
new life
guards
for
Easter
and
monitorin
g of
lifeguard’
Produce
reports on
incidents
700 000
choice soperatio
ns
To
facilitate
tourism
education
&
awarenes
s
program
mes to
Local
communit
ies.
LED
32
By conducting
public debate
on Tourism
One
learners
dialogue
/debate on
Tourism
To host one
Dialogue on Tourism
Learners debate
Concept
document
on the
debate
5 out of
6
schools
participat
ed in the
2014/15
Tourism
Learners
Debate
Host
debate
on
tourism
- - - - - - 104 800
To
promote
safety
and
security
of tourists
LED
33
By holding
Tourism Safely
and security
awareness
campaigns
One
Tourism
safety and
security
campaig
To organise one
inland tourism
awareness campaign
Attendanc
e registers
1
Tourism
Awarene
ss
campaig
n held at
Mdumbi
in the
- Conduct
inland
tourism
awarene
ss
campaig
n
- - - - 52 400
previous
financial
year
To
expand
Tourism
products
and
operation
s through
marketing
and
branding
in
partnershi
p with
LTO
LED
34
By showcasing
tourism
products at the
Tourism Indaba
Attendanc
e to
Tourism
Indaba
Marketing
ofNyandenitourismpr
oducts in the
Tourism Indaba
Report on
Tourism
Indaba
5
Tourism
Indaba
have
been
attended
- - - - - - Exhibition
and
marketingNy
andeni
Tourism
products
104 800
Branding,
marketing and
signage
4 sign
posts
installed.
Install 4 additional
signage for inland
and coastal areas
Photos of
4 new
signage
and
invoices.
10
signage’
s have
been
installed
- - Request
approval
from
SANRAL
to install
Installati
on of
signage
- - 52 400
signage
Marketing and
promotion of
tourism in
partnership with
LTO
A
resuscitate
d heritage
site
Revival of S.S.
Mendiheritage site
Photos
illustrating
site before
and after
revival
SS
Mendi
Memorial
Monume
nt
Landsc
aping
and
fencing
of site
- - - - - - 262 000
To
promote
Visual
Arts; craft
and
Heritage
developm
ent
LED
35
By showcasing
Tourism
products on
Exhibition
shows
Participati
on in the
Grahamst
own Arts
Festival
Showcasing local art
and craft products in
Grahamstown
festival
Report
and
exhibition
photos
5
Grahams
town
festival
attendan
t
Showc
asing
local
art and
craft
product
s in
Graha
mstow
n
festival
- - - - - -
262
000
Strategic
Focus Area
IDP
Objectiv
e
OBJ
ECTI
VE
TRATEGY
AND PROJECT
TITLE
Indicator ANNUAL TARGET MEANS
OF
VERIFICA
Baseline Q1 Q2 Q3 Q4 BUDGET
N0 TION
To
promote
tourism
developm
ent along
the Wild
Coast
LED
36
By developing
public amenities
along the coast
EIA results
and
recommen
dations for
ablution
facilities
Conduct
environmental
Impact Assessment
Record of
Decision
from
DEDEAT
Six
active
beaches
Comm
ence
with
EIA
Continue
with EIA
and
produce
progress
report
Obtain
ROD
from
DEDEAT
- - 150 000
Forward
Planning
To exploit
opportunit
ies
offered by
our
coastal
area
SDF
37
Development of
Mthatha and
Mdumbi coastal
LSDF
Approved
LSDF in
terms of
SPLUMA
Approval and
implementation of
Mthatha Mouth
Mdumbi LSDF
Approved
LSDF for
Mthatha
Mouth/Md
umbi
Ngqeleni
Precinct
Plan and
NML
SDF
Presen
t Draft
LSDF
to
Plannin
g
Standi
ng
Commi
ttee
Present
LSDF to
Council
for
approval
- - - - 419 200
Forward
Planning
To
develop
integrated
urban
nodes
that form
a direct
link to
rural
nodes
and
settlemen
ts
SDF
38
Development of
Canzibe LSDF
Approved
Canzibe
LSDF
Approval of Canzibe
precinct plan.
Approved
LSDF for
Canzibe
Ngqeleni
Precinct
Plan and
NML
SDF
Presen
t Draft
LSDF
to
Plannin
g
Standi
ng
Commi
ttee
Present
LSDF to
Council
for
approval
- - - -
Spatial
Planning
Settlement
Planning
To
increase
the
number
of middle
income
housing
stock and
business
sites for
SDF
39
Township
Establishment
of a portion of
Erf 90 (82 units)
Approved
and
proclaimed
new
Township
(human
settlement
)
Facilitate approval of
a township by MEC
MEC
approval
letter
Libode
LSDF
- - Organise
session
with
COGTA
EC to
fast track
township
establish
ment
- - - -
the
growth of
both
towns of
Libode
and
Ngqeleni
approval
Establishment
of new township
20 units on
Libode
commonage
Approved
layout plan
and
planning
report
Develop general plan
and obtain approval
From SG
Approved
SG
diagram
and
General
Plan
Libode
LSDF
Develo
p
project
specific
ation
for land
survey
or
service
s
- - - - Start with
project
survey,
developmen
t and
approvalof
General
Plan
Initiate
subdivision and
rezoning of FET
site, Libode
Approved
subdivisio
n plan
Prepare subdivision
and rezoning
application for KSD
FET site and submit
for approval
Subdivisio
n and
rezoning
report and
plan
The site
is
currently
not
subdivid
ed
Develo
p
project
specific
ation to
obtain
town
plannin
g
service
s
- - Start
with
project,
develop
draft
layout
and
report.
Advertise
and obtain
approval
419
200
By initiating a
middle income
township,
Ngqeleni
Approved
layout plan
and
planning
report
Facilitate entire
application process
for township
establishment
Ngqeleni
precinct
plan and
LSDF
Proclaim
ed
Extensio
n 4,
Ngqeleni
Develo
p
project
specific
ation to
obtain
town
plannin
g
service
s
- - Start
with
project,
develop
draft
layout
and
report
Advertise
and obtain
approval
157 200
Property
Geomatics
and Survey
To
survey,
develop
general
plans and
relocate
peg
boundarie
s in order
to shape
the built
form
SDF
41
By surveying
and developing
General Plan
for 1328 units
Approved
General
plan
Develop General
Plan for 1328 low
cost units, Libode
Approved
town
planning
layout
Approve
d town
planning
layout
Develo
p
project
specific
ation to
obtain
town
land
survey
service
s
Survey of
property
and
develop
ment of
draft GP
- - Obtain
approval of
GP from SG
By conducting a
needs
assessment on
Geographic
information
System
Assessme
nt report
on GIS
Conduct needs
assessment for GIS
Assessme
nt report
Available
relevant
data
Develo
p
project
specific
ation to
obtain
service
provide
r to
conduc
t needs
- - Obtain
final
assessm
ent
report
- - 200 000
assess
ment
Land
Development
To
facilitate
the
developm
ent of
strategic
areas for
commerci
al
developm
ent
SDF
42
By facilitating
development of
Nyandeni office
park.
Number of
quarterly
progress
meetings
held
Finalize all
outstanding
development
matters.
Signed
copies of
developme
nt and
lease
agreement
s
Develop
ment
concept
Organi
se first
quarter
ly
meetin
g
Organise
second
quarterly
meeting
Organise
third
quarterly
meeting
Organise
fourth
quarterly
meeting
52 400
Facilitate the
development of
a shopping
centre at Erf
914, Ngqeleni
Number of
quarterly
progress
meetings
held
Finalise development
and lease
agreements
Signed
copies of
developme
nt and
lease
agreement
s
Draft
develop
ment
and
lease
agreeme
nt
Organi
se first
quarter
ly
meetin
g
(Devel
opment
of draft
Organise
second
quarterly
meeting
(Develop
ment of
draft
lease
agreeme
Organise
third
quarterly
meeting
(Finalise
lease
agreeme
nts)
Progress
report on
site
establishme
nt.
lease
agree
ments)
nts)
Facilitate the
development of
Erf 88 for
commercial
purposes
Developer
appointed
and
developme
nt contract
signed
Finalise development
and lease
agreements
Commence with
construction
Signed
copies of
developme
nt and
lease
agreement
Copies
of signed
lease
agreeme
nt
Organi
se first
quarter
ly
meetin
g
(Devel
opment
of draft
lease
agree
ments)
Organise
second
quarterly
meeting(
Finalise
lease
agreeme
nts)
Progress
report on
Construction
HUMAN
SETTLEMEN
TS
To
coordinat
e the
provision
of
sustainab
le rural
HS4
3
By development
and approval of
Housing Sector
Plan
Number
housing of
projects
implement
ed
Implementation of 2
projects from
Housing Sector plan
Copy of
letter
written to
DOHS
Approve
d
Housing
Sector
Plan
Hold
stakeh
older
meetin
g on
project
to be
- Hold
stakeholder
meeting on
project to be
implemente
d
104 800
and
urban
human
settlemen
ts
implem
ented
By Facilitating
housing
development
through housing
fora
Number of
housing
forums
conducted
Conduct 4 housing
fora
Attendanc
e registers
4
housing
sector
fora
have
been
conducte
d
Condu
ct 1
housin
g
sector
forum
Conduct
1
housing
sector
forum
Conduct
1
housing
sector
forum
Conduct 1
housing
sector forum
209 600
By providing
awareness on
the roles of
community in
human
settlements
development
Number of
awareness
workshops
organized
through
housing
consumer
education
6 Housing consumer
education to be
conducted
Attendanc
e registers
13
Consum
er
educatio
ns have
been
held
Condu
ct 1
housin
g
consu
mer
educati
on
awaren
Conduct
1
housing
consume
r
educatio
n
awarene
ss
Conduct
2
housing
consume
r
educatio
n
awarene
ss
Conduct 2
housing
consumer
education
awareness
104 800
ess
By ensuring
that there is a
data for
qualifying
beneficiaries for
human
settlements
Updated
Housing
Needs
Register
Update information
on Housing Needs
Register
Appointme
nt letters
and
capturing
report.
Attendanc
e
Registers
Housing
Needs
Data
informati
on
collected
Recruit
ment
and
provide
training
Data
capturing
and
compiling
of report
Data
capturing
and
compilin
g report
Data
capturing
and
compiling
report
300 000.
By conducting
EIA for 1328
units,Libode
Approved
EIA for
Libode
1328 units
Initiate EIA
processes for 1328
units in Libode
ROD (EIA
approval)
Town
Planning
layout
Develo
p
project
specific
ation to
obtain
service
provide
r to
conduc
t EIA
- - Obtain
ROD
from
DEDEAT
- - 200 000
BUILDING
PLAN
To
regulate
HS4 By
administering
Number of
submitted
Administration of
building plans and
Building
plan
Existing
building
Admini
stration
Administr
ation of
Administ
ration of
Administrati
on of
APPROVAL
Control
and
complian
ce with
regulation
s on
building
standard
4 building plan
approval
and
routine
inspection
s
conducted
conduct routine
inspections
submissio
n register
plan
register
of
buildin
g plans
submitt
ed,
conduc
t
routine
inspect
ions
and
produc
e
report
building
plans
submitte
d,
conduct
routine
inspectio
ns and
produce
report
building
plans
submitte
d,
conduct
routine
inspectio
ns and
produce
report
building
plans
submitted,
conduct
routine
inspections
and produce
report
DISASTER
MANAGEME
NT
To
ensure
effective
disaster
risk
managem
ent
DM
45
To ensure
effective
response to
disaster victims
Number of
disaster
incidents
attended
to and
supported
Assessment and
provision of
response material on
disaster incidents
Distributio
n forms,
Report
and
photos
Assessm
ent
conducte
d on
househol
ds
affected
by strong
Assess
ment
and
provisi
on of
respon
se
materia
l to
Assessm
ent and
provision
of
response
material
to
disaster
Assessm
ent and
provision
of
response
material
to
disaster
Assessment
and
provision of
response
material to
disaster
victims
252 400
winds disaste
r
victims
victims victims
To
ensure
effective
disaster
risk
managem
ent
DM
46
By conducting
community
awareness
campaigns in all
wards
Number of
community
awareness
campaigns
Conduct 384
community
awareness
Campaigns in all
wards
Attendanc
e registers
and
photos
384
awarene
ss
campaig
ns
Condu
ct 96
commu
nity
awaren
ess
campai
gns
Conduct
96
communi
ty
awarene
ss
campaig
ns
Conduct
96
communi
ty
awarene
ss
campaig
ns
Conduct 96
community
awareness
campaigns
By conducting
capacity
building
workshops
(CERT
volunteers)
Number of
capacity
building
workshops
conducted
4 Capacity building
and empowerment of
volunteers
Attendanc
e registers
4
volunteer
s
worksho
p have
been
capacitat
ed
Condu
ct 1
capacit
y
buildin
g
worksh
op for
CERT
volunte
ers
Conduct
1
capacity
building
workshop
for CERT
volunteer
s
Conduct
1
capacity
building
worksho
p for
CERT
volunteer
s
Conduct 1
capacity
building
workshop
for CERT
volunteers
To
ensure
effective
disaster
risk
managem
ent
DM
47
By conducting
Local advisory
forum
Number of
informatio
n sharing
sessions
held
4 Information sharing
sessions held
Attendanc
e registers
3
advisory
for a
have
been
conducte
d
Hold 1
informa
tion
sharing
sessio
n
Hold 1
informati
on
sharing
session
Hold 1
informati
on
sharing
session
Hold 1
information
sharing
session
By development
of Nyandeni
disaster risk
management
plan
Final
Nyandeni
Disaster
Risk
Managem
ent Plan
implement
ed
Implementation of
the disaster plan
Attendanc
e
Registers
Approval
of
Disaster
Risk
Plan
- Conduct
awarene
ss
campaig
ns in 2
wards
- R200 000
INSTITUTIONAL DEVELOPMENT AND TRANSFORMATION
Fo
cu
s
Are
a
IDP Objectives
Objective number
Strategy/Project Title
Indicator Annual Target
Means of verification
Baseline Q1 Q2 Q3 Q4
Bu
dg
et
Am
ou
nt
PO
LIC
Y D
EV
EL
OP
ME
NT
&
RE
VIE
W
To ensure effective compliance and sound management practices within the institution
ID 48
Develop Institutional policies
No. of Policies developed
Develop new 5 Policies
Council resolution
5 policies developed in 2015/2016
1 draft policies in place
2 draft policies in place
2 Draft Policies Present to Management and Standing Committee
Induction of Employees and Adoption by Council
R0 0
00
Review Institutional policies
No of Policies reviewed and adopted by Council
Review all 39 policies
Council Resolution
39 Policies in place 2015/ 2016
-
Review identified HR Policies with gaps
Present to Management and Standing Committee
Induction of employees and Adoption by council
R0 0
00
OR
GA
NIS
AT
ION
AL
DE
SIG
N
To ensure alignment of the Organogram with the assigned powers and functions
ID 49 Review the Organogram annually
Approved organogram by Council
Review the Organogram
annually
Signed Organogram and Council resolution
2015/ 2016 reviewed organogram Approved by council
Update Promun with the revised organogram (15/16
_ Initiate organogram review process
Table revised organogram for approval by council
R0 0
00
.
Develop Job Description for each post
% of signed job descriptions for all positions in the approved organogram
100% of posts to be
in possession of signed
job descriptions
Signed job descriptions
Not all Job descriptions are signed by incumbents
Identify postsin the organogram that do not have job descriptions.
Facilitate the writing of job descriptions for the identified posts
- Sign all Job Description
R 0
000
Fo
cu
s
Are
a
IDP Objectives
Objective number
Strategy/Project Title
Indicator Annual Target
Means of verification
Baseline Q1 Q2 Q3 Q4
Bu
dg
et
Am
ou
nt
Filling of all funded vacant posts
% Of funded posts filled
5 % vacancies filled.
15 Appointment letters.
Current vacancy rate 5% (15 vacant posts)
3 posts to be filled
4 posts to be filed
4 posts to be filled
4 posts to be filled
R00 0
00
0000
00.0
0
PE
RF
OR
MA
NC
E
MA
NA
GE
ME
NT
SY
ST
EM
To ensure that individual assessments are conducted for Senior Managers
ID 50 Conduct quarterly, mid-year and annual performance assessment for senior managers
PMS Assessment reports
100% of senior managers assessed
Assessment reports
Performance Agreements by Senior Management in place 2014/2015
Conduct informal review
Conduct assessment for annual performance 2014/2015 Conduct assessment reviews for mid-year performance (2015/16)
Conduct informal reviews
R 5
2 4
00.0
0
Facilitate the submission of Performance Agreements by Senior Managers
To ensure that individual assessments are conducted for Managers
ID 51 Managers below Sec 56 to sign performance agreements and
Signed Performance Agreements for managers below s56.
All Managers below Senior Managers to sign Performance agreements by end July
Signed performance agreements and work plans
All Senior Managers have signed Performance Agreements
Facilitate the submission of Performance Agreements by middle managers
Conduct informal review
Conduct assessment reviews for mid-year performance (2015/16))
Conduct informal reviews
R 0
000.0
0
Fo
cu
s
Are
a
IDP Objectives
Objective number
Strategy/Project Title
Indicator Annual Target
Means of verification
Baseline Q1 Q2 Q3 Q4
Bu
dg
et
Am
ou
nt
The rest of staff to be in possession of signed work plans
Signed work plans for officer level employees
Develop work plans for all employees at Officer level (below middle manager
Signed work plans
All Middle Managers have signed Performance Agreements
Facilitate the submission of Work Plan by officials below middle manager
Conduct informal review
Conduct assessment reviews for mid-year performance (2015/16)
Conduct informal reviews
SK
ILL
S D
EV
EL
OP
ME
NT
To ensure that all employees have the required competency levels
ID 52
Implement Workplace Skills Plan
No of employees and Cllrs trained
150 employee to be trained per WSP.
Annual training report, WSP
200 employees Trained in 2014/15 FY
50 employees to be trained
50 employees to be trained
25 employees to be trained
25 employees to be trained
R 3
000 0
00.0
0
Capacitate training and development
committee Develop schedule of
meetings for skills development committee.
Strengthning of skills development
committee
4 skills development committee meetings convened
Conduct 4 meetings.
Minutes and attendance register
Training committee is in place
Convene 1 meeting
Convene 1 meeting
Convene 1 meeting
Convene 1 meeting
R0 0
00
Fo
cu
s
Are
a
IDP Objectives
Objective number
Strategy/Project Title
Indicator Annual Target
Means of verification
Baseline Q1 Q2 Q3 Q4
Bu
dg
et
Am
ou
nt
To provide opportunities to new entrants to the labour market
ID53 Create opportunities for practical work exposure for interns
Number of Interns recruited
Recruitment of Internsas per need
Appointment letters and log books
Internship Policy approved by Council 38 interns recruited in 2014/15 FY
Recruit interns as per need
Recruit interns as per need
Recruit interns as per need
Recruit
interns as
per need
R 1
04
80
0.0
0
To provide Skills to the unemployed
ID 54 Mainstream skills development within the service delivery and infrastructure programmes
Number of unemployed trained.
300 Training reports ,Training Certificates and attendance register
291 unemploye
d trained
50 Unemploye
d to be trained
75 Unemployed to be trained
100 Unemployed to be trained
75 Unemploye
d to be trained
R000 0
00
BE
NE
FIT
S
AD
MIN
IST
RA
TIO
N
Ensure proper administration of benefits
ID 55
Regular inductions for newly appointed employees.
Number of newly appointed employees Inducted.
Conduct two induction sessions
Attendance register
Annually induction of all employees on municipal environment and governance
- - Conduct induction for all employees
Conduct induction for all employees
R000
0
To attract and retain competent personnel
ID 56
Implement Human Resource Plan
Approved HR plan
Review of HR Plan
Council Resolution
Draft HR plan in place
Implement HR Plan
Implement HR Plan
Present to
Management
and Standing
Committee
Induction
of
Employees
Adoption by
Council
R00 0
00
Fo
cu
s
Are
a
IDP Objectives
Objective number
Strategy/Project Title
Indicator Annual Target
Means of verification
Baseline Q1 Q2 Q3 Q4
Bu
dg
et
Am
ou
nt
Improve municipal recruitment system and processes
Average time taken to fill funded vacant posts
Report on turnaround time for filling of funded vacant posts (3 months)
Report 6 months Compliance report on filling of posts
Compliance
report on filling
of posts
Compliance
report on filling
of posts
Compliance
report on
filling of
posts R00
000
CO
MP
LIA
NC
E W
ITH
LA
BO
UR
LE
GIS
LA
TIO
N A
ND
CO
LL
EC
TIV
E A
GR
RE
ME
NT
S
To ensure compliance with Labour related Legislation and SALGBC Main Collective Agreement
ID 57
Implementation of Employment Equity Plan
Number of women employed
6 women employed
Report on monthly Employee statistics
42% (123 women employees)
- 2 women
person to be
employed
3 women person to be
employed
1 women person to be employed
R 0
.00
Number of disabled employees
1 Report on monthly Employee statistics
Currently 2.43% (7) of disabled employed
- - - 1 disabled employee
R 0
.00
Number of coloured employees
1 Report on monthly Employee statistics
Currently 0.34 (1) of coloureds employed
- - - 1 coloured person
employed R 0
.00
Fo
cu
s
Are
a
IDP Objectives
Objective number
Strategy/Project Title
Indicator Annual Target
Means of verification
Baseline Q1 Q2 Q3 Q4
Bu
dg
et
Am
ou
nt
Number of Indians employed
1 Report on monthly Employee statistics
- - - - 1
Number of whites employees
1 Report on monthly Employee statistics
- - - - 1
Submission of Employment Equity Report to Department of Labour
Confirmation of receipt by DoL
By 15 January annually
Confirmation of receipt by DoL
EE Report is submitted annually
Submit quarterly statistics as part of EE Plan implementation
Submit quarterly statistics as part of EE Plan implementation
Submit annual report to Department of Labour
Submit quarterly statistics as part of EE Plan implementation
R 0
.00
Convene monthly Local Labour Forum Meetings
No. Of Meetings held
4 sittings per annum
Minutes and attendance register
9 Meetings sat in 2014/2015
1 sitting 1 sitting 1 sitting 1 sitting
R000
0
Fo
cu
s
Are
a
IDP Objectives
Objective number
Strategy/Project Title
Indicator Annual Target
Means of verification
Baseline Q1 Q2 Q3 Q4
Bu
dg
et
Am
ou
nt
Online submission of Return of Earnings to Department of Labour
Receipt of invoice confirming institutional assessment by DoL
100%
Receipt of invoice confirming institutional assessment by DoL
Return of earnings submitted annually
Not applicable
Not applicable Submit returns to DoL
Not applicable
R0.0
00
Conduct regular inspections of municipal facilities and construction sites
Quarterly Inspection reports
All facilities and sites to be inspected on a monthly basis
Quarterly Inspection reports
Irregular reports
3 inspection to be conducted
3 inspection to be conducted
3 inspection to be conducted
3 inspection to be conducted
R 0
.00
Regular sitting of Occupational Health & Safety Committee
Number of OHS meetings held
Quarterly sitting of OHS meetings
Attendance registers and Minutes
Two meetings convened in 2014/15
1 meeting to be
conducted
1 meeting to be conducted
1 meeting to be conducted
1 meeting to be
conducted
R524 0
00
Fo
cu
s
Are
a
IDP Objectives
Objective number
Strategy/Project Title
Indicator Annual Target
Means of verification
Baseline Q1 Q2 Q3 Q4
Bu
dg
et
Am
ou
nt
EM
PL
OY
EE
HE
AL
TH
AN
D
WE
LL
NE
SS
To create a working environment that promotes employee health and wellbeing
ID 58 Integration of Employee Assistance Program, Occupational Health and Safety and managing HIV and AIDS in the Workplace
Improved performance and reduced absenteeism and healthy employees
Host World
Aids Day,
Health
Screening
Days,
Spring day,
team
building and
sporting
activities
Attendance register and reports
Employee Health and Wellness, OHS and HIV/AIDS Policies are in place
Awareness workshop for all employee on Safety issues, Spring day event, secretaries day Implementation of sports plan
World Aids Day and Workshops on Financial Planning and Employee wellness workshop for councillors Implementation of the sports plan
Workshop focusing on men's health issues Implementation of sports plan
Health Screening Day Implementation of sports plan
R524 0
00
Establish and Capacitate Wellness Advisory Committee to manage and administer the
Number of Wellness advisory committee meetings convened.
Quarterly meetings held
Attendance register
Advisory committee has been established
1 Advisory committee meeting to
be conducted
1 Advisory
committee
meeting to be
conducted
1 Advisory
committee
meeting to be
conducted
1 Advisory
committee
meeting to
be
conducted
R0.0
00
Fo
cu
s
Are
a
IDP Objectives
Objective number
Strategy/Project Title
Indicator Annual Target
Means of verification
Baseline Q1 Q2 Q3 Q4
Bu
dg
et
Am
ou
nt
INF
OR
MA
TIO
N A
ND
KN
OW
LE
DG
E M
AN
AG
EM
EN
T To ensure
a
functional
,reliable
network,
and
integrated
network
applicatio
ns that
will be
policy
driven by
2017.
ID 59 To have an integrated Information Management System
Number of end user capacitated on systems functionally (Promun, website and intranet, network connectivity)
To capacitate End Users to utilise the system optimally and provide timely support
Attendance registers
Data and voice infrastructure connecting all the three municipal sites in place
Training of 30 users
Training of 30 users
Training of 30 users
Training of 30 users
R 1
04
80
0
Systems producing quality reports on its overall usage
Review our network connections and system reliability
Audit Report Data and voice infrastructure connecting all the three municipal sites in place
-
Conduct system audit with Telkom
Conduct system audit with Vodacom
-
Fo
cu
s
Are
a
IDP Objectives
Objective number
Strategy/Project Title
Indicator Annual Target
Means of verification
Baseline Q1 Q2 Q3 Q4
Bu
dg
et
Am
ou
nt
Maintain the backup server to eliminate the loss of information
Number of workshop conducted Functional Disaster Recovery and backup system
All
stakeholders
work
shopped on
the Disaster
Recovery
and
Business
Continuity
PlansAware
ness
workshops
for all our
employees
on municipal
information
security
Disaster Recovery and Business Continuity Plans adopted by Council
CIBEX backup in place
Procure an offsite disaster recovery system that produce automated reports and identify an offsite disaster recovery site,
Capacitation of ICT staff on the disaster recovery system.
Awareness workshop for all our employees on municipal information security
All stakeholders work shopped on the Disaster Recovery and Business Continuity Plans
R209 6
00
Audit
Findings
report on IT
Matters
Develop and
implement
Audit Action
Plan
Audit Report IT Audit Conducted in the 2013/14 Fin year
Quarterly progress report
Quarterly progress report
Develop Audit Action Plan
Monitoring progress Action Plan
Fo
cu
s
Are
a
IDP Objectives
Objective number
Strategy/Project Title
Indicator Annual Target
Means of verification
Baseline Q1 Q2 Q3 Q4
Bu
dg
et
Am
ou
nt
Facilitate the website update on a monthly basis
Website Update register
Provide access & update information about the Municipality for internal and external stakeholders
Information upload requests register
Information in the website updated.
Develop a checklist and register in term of Municipal Information for website Website Update register
Website Update register
Website Update register
Website Update register
R109 6
00
Capacity building on the utilization of Registry
No training taking place for registry utilization
Facilitate
training of all
office
employees
Attendance registers
Attendance registers
Training of the registry personnel on records management
Conduct training for all secretaries
Conduct training for all employees
Conduct training for all employees
R
FA
CIL
ITIE
S
MA
NA
GE
ME
NT
To ensure municipal buildings are kept in a pristine condition
ID 60
Implementation of maintenance plan
maintenance plan
Conduct Facilities Maintenance
Maintenance plan Reports
Maintenance done on an ad hoc basis
Conduct preventative and scheduled maintenance
Conduct preventative and scheduled maintenance
Conduct preventative and scheduled maintenance
Conduct preventative and scheduled maintenance
R1 0
48 0
00
Fo
cu
s
Are
a
IDP Objectives
Objective number
Strategy/Project Title
Indicator Annual Target
Means of verification
Baseline Q1 Q2 Q3 Q4
Bu
dg
et
Am
ou
nt
Develop internal capacity to do own maintenance
Turnaround time in doing repairs
Train 5 handymen
Fault reporting register
Repairs done on an Ad Hoc basis
Repairs done according to Fault reporting register within two days.
Train handymen
Repairs done according to Fault reporting register within two days.
Repairs done according to Fault reporting register within two days.
R
CU
ST
OM
ER
CA
RE
To ensure implementation of Batho Pele Principles
ID 61 Develop Service Standard Charter
Approved Service Standard Charter
Conduct client satisfaction survey annually
Survey Report Customer care
- - Conduct satisfaction survey
- R
INFRASTRUCTURE AND TECHNICAL SERVICES
Fu
nct
ion
al
Are
a
IDP
Objectiv
e
Ob
ject
ive
IDP
Nu
mb
er
Strate
gy/Pro
ject
Title
Indicator
Annual
Target
Mea
ns
of
Ver
ific
atio
n
Bas
elin
e
Q1 Q2 Q3 Q4
Bu
dg
et
Pro
visi
on
of
Acc
ess
road
s an
d
road
mai
nte
nan
ce
To
construct
and
maintain
roads to
service
centre’s
and
economic
developme
BSD 62 Inter-
grated
Transpo
rt Plan
Approved Inter grated Transport Plan
Implementation of Inter grated Transport Plan
ITP Document
NO ITP Approval of
ITP by Council
Identification
and
prioritization
of ITP
Implementation
and compliance
enforcement of
ITP
Finalizing of
Business plan
for ITP
0.00
m
Roads
Master
Plan
Develop Roads Master Plan
Implement projects identified on Roads Master Plan
Roads Master Plan Document
No Roads
Master
Plan
Approval of
Roads Master
plan by
Council.
Identification
and
prioritization
of Roads
Master Plan
Implementation
and compliance
enforcement of
Roads Master
Plan
Finalizing of
Business plan
for Roads
Master Plan
R 0
.00
m
nt nodes
Reportin
g on
MIG,
ISD,
Health
and
Safety
Kilometers constructed to public amenities and economic development centre’s Number of roads forums. Number of
people
trained and
employed
100%
Expenditur
e; 50 km
constructe
d (Refer to
projects
below); 200
jobs
created.
ISD and
Social
Facilitation
Completion
Certificates;
Signed
Expenditure
Report;
Close out
Reports; ISD
and Health
and Safety
Reports
100 km
maintaine
d and 50
km
constructio
n
30%
Expenditure;
Produce
quarterly
Report;
50 jobs
created.
50%
Expenditure;
Produce
quarterly
Report;
assess and
plan for next
financial year
50 jobs
created
80%
Expenditure;
Produce
quarterly
Report; assess
and plan for
next financial
year
50 jobs created
100%
Expenditure;
50 km
constructed;
Produce
quarterly
Report;
50 jobs created
R 0
.00
m
Mafusini
to
Zincuku
thwini
A/R
(Ward
26)
Developme
nt
of
Completion
certificate
5 km
constructe
d
Completion
Certificate;
Close out
Report
Poor state
of access
road
Site
Establishment
Project 70%
Complete
Road bed 2
km Complete;
Layer works
2 km
complete
Project 100%
Complete
Drainage 100%
complete
Release
Retention
R4.
74 m
Pro
visi
on
of
Acc
ess
road
s an
d r
oad
mai
nte
nan
ce
To
construct
and
maintain
roads to
service
centre’s
and
economic
developme
nt nodes
BSD 62 Mdzwin
a
Internal
Roads(
ward 20)
Developme
nt
of
Completion
certificate
11 km
constructe
d
(Continuati
on from
prior years)
Completion
Certificate;
Close out
Report
Poor state
of access
road
Prepare
contract
document and
site handover.
Clear and
grubbing
100%
complete
(8km)
-Tipping 40%
complete
(8km)
Project 100%
complete
Processing
20%
complete
(8km )
-Storm water
control 100%
complete
(8km)
Release
Retention
R 2
,27
m
Mpindw
eni W04
(Phase
2) A/R
(Ward
05)
Reports for
Social
Facilitation
Finalize
Relocation
of
community
people
Completion
Certificate;
Close out
Report
Poor state
of access
road
Follow ups
with relevant
stakeholders
Facilitate in
engaging with
communities
Facilitate in
engaging with
communities
Finalization of
relocation
process
R 0
.00
Pro
visi
on
of
Acc
ess
road
s an
d r
oad
mai
nte
nan
ce
To
construct
and
maintain
roads to
service
centre’s
and
BSD 62 Dungu
to
Mbhobh
eleni
A/R
(ward
04)
Developme
nt
of
Completion
Certificate
6 km
(Continuati
on from
prior years)
Completion
Certificate;
Close out
Report
Accessible
Road
Close out
Report
Release
Retention
Project
Finalized on Q1
Project
Finalized on
Q1
R 1
00 0
00.0
0
economic
developme
nt nodes
Ncambe
dlana to
Manzim
ahle A/R
(Ward
14)
Developme
nt
of
Completion
Certificate
10.1 km
Completion
Certificate;
Close out
Report
Poor state
of access
road
Prepare SLA’s
and facilitate
contract
document to
be signed by
Contractor and
Municipality
Project 30%
complete
Clear and
grubbing 50%
complete
Tipping 40%
completed
Project 70%
complete
Processing
100% complete
Bridge
Construction
Completed
Project 100%
complete
Storm water
control 80%
complete
R 5
,29
m
Ndayini
access
road
Phase 2
(Ward
05)
Developme
nt
of
Completion
Certificate
6 km
Completion
Certificate;
Close out
Report
Poor state
of access
road
Approval of
Design Report
Prepare
specification
for
construction
Project 50%
complete.
Tipping 100%
Complete
Processing
30% complete
Project 100%
Complete
Layer works
Complete
R5.
00 m
Dalagub
ha A/R
(Ward
16)
SLA and
Monthly
Reports
13 km
Completion
Certificate;
Close out
Report
Poor state
of access
road
Finalize scope
of works for
construction
Project
registration
and
specification
for
Construction
Project
implementation;
contract signing
between
Municipality and
Contractor
Project 50%
Complete
Roadbed
100%,
Tipping 80%
Processing
20%
OR
T D
M a
nd
MIG
Maqany
eni to
Mgungu
ndlovu
(Ward
18)
Developme
nt
of
Completion
Certificate
6.2 km
Completion
Certificate;
Close out
Report
Poor state
of access
road
Appoint
contractor for
construction
Clear and
grubbing 50%
complete
-Tipping 40%
complete
Project 30%
complete
Processing
40%
complete
-Storm water
control20%
complete
Project 100%
complete
Processing
100% complete
-Storm water
control 100%
complete.
R 3
,69m
Sezela
to
Njezwen
i (Ward
29)
Developme
nt
of
Completion
Certificate
6,1 km
Completion
Certificate;
Close out
Report
Poor state
of access
road
Appoint
contractor for
construction
Project 30%
complete
Clear and
grubbing 50%
complete
Tipping 40%
complete
Project 70%
complete
Clear and
grubbing 100%
complete
Tipping 100%
complete
Project 100%
complete
Processing
100% complete
Bridge
Construction
Completed
R5,
29 m
Jojozi to
Ncithwa
(Ward
02)
Developme
nt
of
Completion
Certificate
Completion
Certificate
Completion
Certificate;
Close out
Report
Poor state
of access
road
Prepare scope
of works for
construction.
Advertise for
construction
Site
Establishmen
t.
Project 20%
Complete
Clear and
grubbing
100%
complete
Tipping 100%
complete
Project 70%
complete
Processing
100% complete
Storm water
control 80%
complete.
Project 100%
complete
Processing
100% complete
R T
o C
ost
(T
C)
Pro
visi
on
of
Acc
ess
road
s an
d
road
mai
nte
nan
ce
To
construct
and
maintain
roads to
service
centre’s
and
economic
developme
nt nodes
BSD 62
Makwal
weni to
Mzimvu
bu
(Ward
27)
Developme
nt of Design
Report
Design
Report
Design
Report; and
EIA Report
Inaccessib
le roads
EIA Report
Approval
Draw
specification
for Engineers
SLA for
Engineers
Approval of
Design Report
To
be
Co
sted
Pro
visi
on
of
Acc
ess
road
s an
d r
oad
mai
nte
nan
ce To
construct
and
maintain
roads to
service
centre’s
and
economic
developme
nt nodes
BSD 62
Cibeni
to
Ngojini
Bridge (
Ward
06)
Developme
nt of
Progress
Reports
Project
80%
Complete
Design
Report,
Appointment
Letter, and
Progress
Reports
Access
through
footpath
Approval of
Design Report
Specification
for
Construction
SLA
Project 20%
complete Clear
and grubbing
20% complete
Project 80%
complete
Clear and
grubbing 100%
complete,
Excavations
50%
To
be
Co
sted
(TB
C)
Bukhwe
zeni
access
road (
Ward
23)
Developme
nt of
Progress
Reports
Project
80%
Complete
Design
Report,
Appointment
Letter, and
Progress
Reports
Access
through
footpath
Approval of
Design Report
Specification
for
Construction
SLA
Project 20%
complete Clear
and grubbing
20% complete
Project 80%
complete
Clear and
grubbing 100%
complete,
Excavations
50%
TB
C
Pro
visi
on
of
Acc
ess
road
s an
d r
oad
mai
nte
nan
ce To
construct
and
maintain
roads to
service
centre’s
and
economic
developme
nt nodes
BSD 62
Mzonya
ne
access
road (
Ward 25
)
Developme
nt
of
Completion
Certificate
6,5 km
(Continuati
on from
prior years)
Completion
Certificate;
Close out
Report
Poor state
of access
road
Project 100%
complete
Processing
100%
complete
Project
completed in
Q2
Release
Retention
R 5
00 0
00
Thembe
ni
access
road (
Ward 01
)
Developme
nt
of
Completion
Certificate
13 km
(Continuati
on from
prior years)
Completion
Certificate;
Close out
Report
Poor state
of access
road
Project 50%
Complete
Project 100%
complete
Processing
100%
complete
Project
completed in
Q2
Release
Retention
R 1
.00m
Church
of God
to
Belmont
( Ward
07 )
Developme
nt
of
Completion
Certificate
8 km
(Continuati
on from
prior years)
Completion
Certificate;
Close out
Report
Poor state
of access
road
Project 100%
complete
Processing
100%
complete
Release
Retention
R 8
00 0
00
Pro
visi
on
of
Acc
ess
road
s an
d r
oad
mai
nte
nan
ce
To
construct
and
maintain
roads to
service
centre’s
and
economic
developme
nt nodes
BSD 62
Zindune
ni to
Bandla
Access
Road(
Ward 19
)
Developme
nt
of
Completion
Certificate
14 km
(Continuati
on from
prior years)
Completion
Certificate;
Close out
Report
Poor state
of access
road
Project 50%
Complete
Road bed
complete
Tipping 100%
Complete
Project 100%
complete
Processing
100%
complete
Release
Retention
R4.
00m
Moyeni
to
Ngqwan
gi
(Lukhan
yisweni)
Access
Road (
Ward
11)
Developme
nt
of
Completion
Certificate
6,5 km
(Continuati
on from
prior years)
Completion
Certificate;
Close out
Report
Poor state
of access
road
Project 50%
Complete
Road bed
complete
Tipping 100%
Complete
Project 100%
complete
Processing
100%
complete
Project
completed in
Q3
Release
Retention
R 2
.42m
Pro
visi
on
of
Acc
ess
road
s an
d
road
mai
nte
nan
ce
To
construct
and
maintain
roads to
service
centre’s
and
economic
developme
Lower
Malahle
to
Mlatha
(Mgono
ndi)
Access
Road(
Ward
22)
Developme
nt
of
Completion
Certificate
6 km
Completion
Certificate;
Close out
Report
Poor state
of access
road
Design Report;
Prepare
Specification
for
Construction
Prepare
Contract for
construction
Project 20%
complete Clear
and grubbing
20% complete
Project 100%
complete
Tipping 100%
complete,
Processing
100%,
Drainage 100%
TB
C
nt nodes Magcaki
ni
Access
Road (
Ward 8)
Developme
nt of
Progress
Reports
5,7 Km
constructe
d
Completion
Certificate;
Close out
Report
Poor state
of access
road
Specification
for
Construction
Contract
Signing
between
Municipality
and
Contractor
Project 20%
complete Clear
and grubbing
20% complete
Project 100%
complete
Tipping 100%
complete,
Processing
100%,
Drainage 100% R 5
,13
m
Dumase
to
Mangwa
neni (
Ward
13)
Developme
nt of
Progress
Reports
6 Km
constructe
d
Completion
Certificate;
Close out
Report
Poor state
of access
road
Specification
for
Construction
Contract
Signing
between
Municipality
and
Contractor
Project 20%
complete Clear
and grubbing
20% complete
Project 100%
complete
Tipping 100%
complete,
Processing
100%,
Drainage 100%
R 4
,56
m
Renny
access
road (
Ward
31)
Developme
nt of
Progress
Reports
14,2 Km
constructe
d
Completion
Certificate;
Close out
Report
Poor state
of access
road
Specification
for
Construction
Contract
Signing
between
Municipality
and
Contractor
Project 20%
complete Clear
and grubbing
20% complete
Project 100%
complete
Tipping 100%
complete,
Processing
100%,
Drainage 100%
R 7
,42
m
Polar
Park
access
road (
Ward 26
)
Developme
nt of Design
Report
6 km
Design
Report; and
EIA Report
Inaccessib
le roads
EIA Report
Approval
Draw
specification
for Engineers
SLA for
Engineers
Approval of
Design Report
R 6
,68
m
Pro
visi
on
of
Acc
ess
road
s an
d r
oad
mai
nte
nan
ce
To
construct
and
maintain
roads to
service
centre’s
and
economic
developme
nt nodes
BSD 62 Mgojwe
ni to
Mabhets
he A/R (
Ward 24
)
Developme
nt of
Progress
Reports
Project
80%
Complete
Design
Report,
Appointment
Letter, and
Progress
Reports
Access
through
footpath
Approval of
Design Report
Specification
for
Construction
SLA
Project 20%
complete Clear
and grubbing
20% complete
Project 80%
complete
Clear and
grubbing 100%
complete,
Excavations
50%
TB
C
Msuzwa
neni to
Thekwin
i A/R (
Ward 28
)
Developme
nt of
Progress
Reports
Project
80%
Complete
of 11,5 km
Design
Report,
Appointment
Letter, and
Progress
Reports
Access
through
footpath
Approval of
Design Report
Specification
for
Construction
SLA
Project 20%
complete Clear
and grubbing
20% complete
Project 80%
complete
Clear and
grubbing 100%
complete,
Excavations
50%
R 6
,36
m
Pro
visi
on
of
Acc
ess
road
s
and
ro
ad m
ain
ten
ance
To
construct
and
maintain
roads to
service
centre’s
and
economic
BSD 62
Zanokha
nyo to
Lutshek
o A/R
Developme
nt of
Completion
Certificate
6,8 km
Completion
Certificate,
Close out
Reports
Access
through
footpath
Langaka
zi Low
Volume
A/R
Developme
nt of Design
Report,
RoD for EIA
Design
Report
Design
Report; and
EIA Report
Inaccessib
le roads
Specification
for EIA
Draw
specification
for Engineers
SLA for
Engineers
Approval of
Design Report
TB
C
developme
nt nodes
Mabomv
ini to
Nkunzi
mbini
A/R
Developme
nt of Design
Report,
RoD for EIA
Design
Report
Design
Report; and
EIA Report
Inaccessib
le roads
EIA Report
Approval
Draw
specification
for Engineers
SLA for
Engineers
Approval of
Design Report
TB
C
Mainten
ance of
Provinci
al roads
and
other
infrastru
cture
Conduct 4
Roads
Forum
Conduct 4
Roads
Forum
Attendance
Register
100 km
maintaine
d and 50
km
constructio
n
Roads Forum
and
infrastructure
Forum
Roads Forum
and
infrastructure
Forum
Roads Forum
and
infrastructure
Forum
Roads Forum
and
infrastructure
Forum
R 0
.00
m
Road
mainten
ance
(Mainten
ance
Plan to
be
Attache
d)
Maintenanc
e of 100 km
100 km
Maintained
(Refer to
Projects
below) and
Maintenanc
e Plan
approved
Completion
Certificates,
close out
Reports,
progress
Reports,
Maintenance
Plan
100 km
maintaine
d and 50
km
constructio
n
25 km
maintained
R5m
Approval of
maintenance
plan by
Council
30 km
maintained
R5m
Update
maintenance
plan quarterly
15 km
maintained
R5m
Update
maintenance
plan quarterly
30 km
maintained
R5 m
Update
maintenance
plan quarterly R 2
0.00
m
Pro
visi
on
of
Acc
ess
road
s an
d r
oad
mai
nte
nan
ce
To
construct
and
maintain
roads to
service
centre’s
and
economic
developme
nt nodes
BSD 62 Manqab
eni
Alternati
ve
Surfacin
g
Developme
nt of
Completion
Certificate
3 km
Completion
Certificate;
Close out
Report
Poor state
of access
road
Finalization of
specification
Site
Establishmen
t, Contract
Agreement
Project 75%
Complete
Roadbed 100%
Complete
Sub-base 60%
Complete
Project 100%
Complete
Sub-base
100%
Complete
Base Course
100%
TB
C
Storm
Water
Manage
ment
Implementa
tion of
Storm water
projects
Completed
storm
water.
Completion
Certificate;
Close out
Report
Poor/
inexistent
storm
water
structures
Prepare scope
of works for
identified
projects
Implement
projects
identified on
maintenance
plan
Supervision and
Monitoring of
implemented
projects
Completion of
implemented
projects as per
maintenance
plan R 1
,00
m
Plant
and
Equipm
ent
Maintained
of plant and
equipment
Maintananc
e of plant
Mechanical
report
Poor state
of access
road
Prepare
specification
for additional
machinery
Continuous
Maintenance
of existing
plant.
Continuous
Maintenance of
existing plant.
Continuous
Maintenance of
existing plant.
R3.
00m
Pro
visi
on
of
Acc
ess
road
s an
d
road
mai
nte
nan
ce
To
construct
and
maintain
roads to
service
centre’s
and
economic
developme
BSD 62 Gqwarh
u
Access
road
3 km
Completion
Certificate;
Close out
Report
Poor state
of access
road
Release of
retention.
Project
Completed
on 1st Quarter
Project
Completed on
1st Quarter
Project
Completed on
1st Quarter
R50
000
Lower
Mngamn
ye
Access
road
Developme
nt of
Completion
Certificate
4 km
Completion
Certificate;
Close out
Report
Poor state
of access
road
Release of
retention
Project
Completed
on 1st Quarter
Project
Completed on
1st Quarter
Project
Completed on
1st Quarter
R74
000
.00
nt nodes
Makhoty
ana to
Makaziw
e
Developme
nt of
Completion
Certificate
6 km
Completion
Certificate;
Close out
Report
Poor state
of access
road
Project 30%
Complete
Road bed
100%
Tipping 60%
Processing
30%
Project 100%
Complete
Close out
Report
Completion
Certificate
Release of
retention
R1,
70 m
Mdina
Access
road
Developme
nt of
Completion
Certificate
5 km
Completion
Certificate;
Close out
Report
Poor state
of access
road
Prepare
specification
for
construction
Site
Establishmen
t
Project 30%
Complete
Project 100%
Complete
Close out
Report
Completion
Certificate
Release of
retention
R3.
00 m
Pro
visi
on
of
Acc
ess
road
s an
d r
oad
mai
nte
nan
ce
To
construct
and
maintain
roads to
service
centre’s
and
economic
developme
nt nodes
BSD 62 Misty
Mount
Access
Road
Developme
nt of
Completion
Certificate
6 km Completion
Certificate;
Close out
Report
Poor state
of access
road
Site
Establishment
Project 30%
Complete
Project 100%
Complete
Close out
Report
Completion
Certificate
Release of
retention
R 1
,00
m
Thakath
a to
Magoze
ni
Access
road
Developme
nt of
Completion
Certificate
11.2 km Completion
Certificate;
Close out
Report
Poor state
of access
road
Project 100%
Complete
Close out
Report
Completion
Certificate
Release
Retention
R 1
, 00
m
Thekwin
i Access
Road
Developme
nt of
Completion
Certificate
6 km Completion
Certificate;
Close out
Report
Poor state
of access
road
Prepare
specification
for
construction
Site
Establishmen
t
Project 30%
Complete
Project 100%
Complete
Close out
Report
Completion
Certificate
Release of
retention
R 2
.78
m
Mathayi
Access
Road
Developme
nt of
Completion
Certificate
3 km Completion
Certificate;
Close out
Report
Poor state
of access
road
Prepare
specification
for
construction
Site
Establishmen
t
Project 30%
Complete
Project 100%
Complete
Close out
Report
Completion
Certificate
Release of
retention
R 1
.35
m
Pro
visi
on
of
Acc
ess
road
s an
d r
oad
mai
nte
nan
ce
To
construct
and
maintain
roads to
service
centre’s
and
economic
developme
nt nodes
BSD 62
Mputsha
neAcces
s Road
Developed
technical
report
Develop
technical
report
Technical
Report, and
Monthly
Progress
Report
Poor state
of access
road
Approval of
technical
Report
Specification
for
Construction
SLA for
contractor
Site
Establishment
Ntibane
access
road
Developed
technical
report
Develop
technical
report
Technical
Report, and
Monthly
Progress
Report
Poor state
of access
road
Approval of
technical
Report
Specification
for
Construction
SLA for
contractor
Site
Establishment
Kalando
da
access
road
Developed
technical
report
Develop
technical
report
Technical
Report, and
Monthly
Progress
Report
Poor state
of access
road
Approval of
technical
Report
Specification
for
Construction
SLA for
contractor
Site
Establishment
Luqolo
access
road
Developed
technical
report
Develop
technical
report
Technical
Report, and
Monthly
Progress
Report
Poor state
of access
road
Approval of
technical
Report
Specification
for
Construction
SLA for
contractor
Site
Establishment
Gqweza
A/R
Developed
technical
report
Develop
technical
report
Technical
Report, and
Monthly
Progress
Report
Poor state
of access
road
Approval of
technical
Report
Specification
for
Construction
SLA for
contractor
Site
Establishment
Pro
visi
on
of
Acc
ess
road
s an
d r
oad
mai
nte
nan
ce
To
construct
and
maintain
roads to
service
centre’s
and
economic
developme
nt nodes
BSD 62 Egxeni
to
Mangwa
neni A/R
Developed
technical
report
Develop
technical
report
Technical
Report, and
Monthly
Progress
Report
Poor state
of access
road
Approval of
technical
Report
Specification
for
Construction
SLA for
contractor
Site
Establishment
Planning
for
identified
projects as
per three
year plan
EIA
application
and
specificatio
ns.
RoD’s for
EIA’s and
adverts for
projects of
the following
year
Projects
identified
on IDP
Prepare
business plan
for projects on
IDP and
Maintenance
plan
Environmenta
l Impact
Assessments
for projects
requiring
EIA’s
Specification
for
Engineering
projects
Specification for
construction of
the following
year projects
Continuous
planning for
identified
projects
Urb
an c
entr
e In
fras
tru
ctu
re
To improve
livelihoods
in urban
centre’s
through
infrastructu
re
developme
nt
BSD 63 Pedestri
an
Sidewal
ks, 190
jobs
created.
Kilometers
Surfaced
and
sidewalks
paved
3 km
paved, 190
jobs
created
through
EPWP
Signed
Monthly
Reports
105 jobs
created
4 km
paved
70 Jobs
created,
R 500 000.00
expenditure
EPWP
monthly
reports
500m paved
60 Jobs
R
1 000 000.00
expenditure
1 km paved
60 Jobs
R1 000 000.00
expenditure
Monthly
Reports,
Supervision and
Monitoring
1 km paved
Material
quantification
and
specification
preparation
R 500 000.00
expenditure
500m of
sidewalks
paved
R 3
,00
m
Urb
an c
entr
e In
fras
tru
ctu
re
To improve
livelihoods
in urban
centre’s
through
infrastructu
re
developme
nt
BSD 63 Lifeguar
ds and
Greenin
g
Implement
EPWP
business
plan.
Monthly
Reports on
EPWP
Funds
100%
Expenditur
e
Signed
Monthly
Reports
Monthly
reports
submitted
Council
Approval of
business plan
Implement
projects and
submit
monthly
reports
Monthly
reports
captured on
MIS and
expenditure
at 50%
Complete
Monthly reports
captured on
MIS and
expenditure at
80% Complete
Monthly reports
captured on
MIS and
expenditure at
100%
Complete
Libode
Landfill
site
(Ward
07)
Developme
nt of
Completion
Certificate
Implement
Libode
landfill site
project
Completion
Certificate;
Close out
Report
Conditiona
lly
Approved
Licence
for Landfill
site
Finalise
Designs and
scope of work,
Specification
for
construction
and appoint
contractor
Project 20%
complete Clear
and grubbing
20% complete
Project 100%
complete
Clear and
grubbing 100%
complete,
Excavations
100%
Ancillary Works
100%
Complete
R 4
.70m
Infrastru
cture for
Informal
Traders
Projects
Number of
Informal
Traders
accommodat
ed
Planning
and
registration
Design
Report/
business
plan
prepared
No
designed
hawker
stalls
Planning and
business plans
prepared
Project
Registration
Specification for
Engineers and
advert issued
Specification
and advert for
construction
prepared
To
be
Co
sted
Upgrade
internal
road
network
to all
weather
surface
Kilometers
surfaced
5 km
surfacing or
resurfacing
in each
town per
financial
year (Refer
to projects
below)
Completion
certificates
2kms
surfaced
and
maintaine
d
Implementatio
n of identified
projects
Overall
projects 50%
complete
Overall projects
80% complete
Projects 100%
complete.
Layer works
100%
complete,
surfacing
complete,
Road markings
100%complete
Ngqelen
iExtenti
on 2
Internal
Roads
(Ward
21)
Develop
Design
Report and
Progress
Reports
Design
Report
Design
Report and
appointment
letter
Gravel
surfaced
Prepare
contract
document.
Approval of
design report
Specification for
construction
Site
establishment,
and SLA
contract R
Ngqelen
i
Alternati
ve
Surfacin
g Pilot
at
Extensi
on 4
Develop
Completion
Certificate
6 km
upgraded
Completion
Certificate;
close out
Report
Gravel
Roads
Project
Implementatio
n 30%
Complete
Box Cutting
and in-situ
layer complete
Project 80%
Complete
Layer works
100%
Complete;
Surfacing
100%
Complete
Project 100%
Complete
Completion
certificate
Issued
Road Markings
and signage
completed
R3,
0 m
Libode
Resurfa
cing
Develop
Completion
Certificate
3 km
surfaced
Completion
Certificate;
close out
Report
Pot holes
within
driving
lanes
Develop scope
of works for
maintenance
route
Prepare
specification
for
construction
Prepare
Contract and
site
establishment
Project 100%
Complete
Sub-base
100%
Complete
Base Course
100%
R 2
.9 m
Libode
500
units
internal
roads
alternati
ve
surfacin
g ( Ward
07)
Develop
Design
Report
km
constructe
d
RoD for EIA,
Design
Report
Inaccessib
le roads
Specification
for
Environmental
Impact
Assessment
(EIA)
Record of
decision for
EIA
SLA and
contract for
Engineers
Approval of
Design Report
TB
C
Ngqelen
i Street
Surfacin
g
Develop
Completion
Certificate
3 km
surfaced
Completion
Certificate;
close out
report
Gravel
road
Project 80%
Complete
Layer works
100%
Complete;
Surfacing
100%
Complete
Project 100%
Complete
Practical
Completion
certificate
Issued
R 2
,25
m
Libode
Extentio
n 1
internal
Roads
(ward 7)
Develop
Design
Report and
Progress
Reports
3 km
Completion
Certificate;
close out
report
Gravel
road
Prepare
contract
document and
site handover.
Project 40%
complete
Clear and
grubbing
100%
complete,
Box cutting
50%
complete.
Project 100%
Complete
Layer works
100% Complete
Surfacing 100%
Complete
Road Marking
and Signage
Complete
Project
Completed on
Q3
R2,
00 m
Sto
rm W
ater
co
ntr
ol
To improve
storm
water
system so
as to
achieve life
span of
road
network
BSD 64 Develop
storm
water
master
plan.
Impleme
ntation of
Storm
water
master
plan
Developme
nt of Design
Reports
Implement
budgeted
projects
(storm
water
master
plan)
Storm
water
master
plan
approved
1st phase
implement
ed
Finalise
specification
for
Construction
and issue
advert for
identified area.
Contract
agreement
signed
Project 40%
Complete
Trenches 60%
Complete
Pipe Laying
20%
Project 90%
Complete
Pipe laying
100%
Complete
Backfilling 90%
Complete
Junction Boxes
50% Complete
R 1
.00
m
Ele
ctri
fica
tio
n
To provide
electricity
to all
outstandin
g
household
s and new
settlements
BSD 65 Ngqelen
i Phase
3
1424
Households
Electrified
with test
certificates
Electrificati
on of
extensions
and
maintenan
ce
Progress
Reports
1900
household
s
electrified
Finalize and
sign service
level
agreement for
Engineers and
Contractors.
Site
Establishment
Monthly
Reports;
Supervision and
Monitoring;
Monthly
Reports to DoE.
1424
Households
Electrified
100%
Expenditure on
DoE funding
Project 100%
Complete
Monthly
Reports
R 2
5,00
m
High
mast
Street
lights 6
Constructio
n of Street
Lights
6 high
mast
Completion
Certificate
No data
on existing
street
lights
Advert for
Construction
of high mast
Signed
Contract;
Site
Establishmen
t
Monthly
Supervision and
Monitoring
Close out of
project
R 2
,00m
Mainten
ance of
Street
Lights
Maintenanc
e Street
Lights
Maintenanc
e of 100
street
lights
Progress
Reports
Continuou
s routine
maintenan
ce
Routine
Maintenance
(Maintenance
of 15 street
lights for both
Libode and
Ngqeleni)
R50000.00
Routine
Maintenance
(Maintenance
of 30 street
lights for both
Libode and
Ngqeleni)
R 200 000.00
Routine
Maintenance
(Maintenance of
30 street lights
for both Libode
and Ngqeleni)
R 350 000.00
Routine
Maintenance
(Maintenance
of 25 street
lights for both
Libode and
Ngqeleni)
R 400 000.00
R40
0 00
0
Mainten
ance of
Municip
al
Ameniti
es
Reliability
of
Municipal
Electrical
System
Progress
Report on
maintenan
ce
Progress
Reports
Continuou
s routine
maintenan
ce
Routine
Maintenance
(Maintain
Libode and
Ngqeleni
Offices; traffic
Department;
town halls;
cemeteries;
pounds)
Routine
Maintenance
(Maintain
Libode and
Ngqeleni
Offices; traffic
Department;
town halls;
cemeteries;
pounds)
Routine
Maintenance
(Maintain
Libode and
Ngqeleni
Offices; traffic
Department;
town halls;
cemeteries;
pounds)
Routine
Maintenance
(Maintain
Libode and
Ngqeleni
Offices; traffic
Department;
town halls;
cemeteries;
pounds)
Ele
ctri
fica
tio
n
To provide
electricity
to all
outstandin
g
household
s and new
settlements
BSD 65 As per
ESKOM
projects
on IDP
ESKOM
Electrificati
on reports
4 progress
reports
from
ESKOM
Quarterly
Reports
Reports
attained
from
ESKOM
Quarterly
Report from
ESKOM and
Progress
Meetings with
ESKOM
Quarterly
Report from
ESKOM and
Progress
Meetings with
ESKOM
Quarterly
Report from
ESKOM and
Progress
Meetings with
ESKOM
Quarterly
Report from
ESKOM and
Progress
Meetings with
ESKOM ES
KO
M
Wat
er a
nd
San
itat
ion
To facilitate
provision
of access
to Portable
water and
Sanitation
to all
communiti
es
BSD 66
Bulk
Water
Supply
Project
(Roseda
le to
Libode
Bulk
Water
Supply)
Progress
reports from
OR Tambo
DM.
Households
with access
to portable
water.
4 Progress
Reports
Progress
Reports
Reports
attained
from OR
Tambo
DM
Quarterly
Report and
progress
reported
provided
through
Standing
Committee/
Municipal
Workshops/
District
Forums.
Quarterly
Report and
progress
reported
provided
through
Standing
Committee/
Municipal
Workshops/
District
Forums.
Quarterly
Report and
progress
reported
provided
through
Standing
Committee/
Municipal
Workshops/
District Forums.
Quarterly
Report and
progress
reported
provided
through
Standing
Committee/
Municipal
Workshops/
District
Forums.
OR
T D
M
Ward
Based
Sanitati
on
Projects
Libode
Waste
Water
Treatme
nt Plant
Progress
reports from
OR Tambo
DM.
Households
with access
to sanitation.
4Progress
Reports
Progress
Reports
Reports
attained
from OR
Tambo
DM
Quarterly
Report and
progress
reported
provided
through
Standing
Committee/
Municipal
Workshops/
District
Forums
Quarterly
Report and
progress
reported
provided
through
Standing
Committee/
Municipal
Workshops/
District
Forums
Quarterly
Report and
progress
reported
provided
through
Standing
Committee/
Municipal
Workshops/
District Forums
Quarterly
Report and
progress
reported
provided
through
Standing
Committee/
Municipal
Workshops/
District Forums
OR
T D
M
Mu
nic
ipal
Pu
blic
Am
enit
ies
To provide
and
maintain
local
amenities
and
community
facilities
BSD 67
Libode
Transpo
rt hub
(ward
07)
Developme
nt of
Completion
Certificate
Completed
Libode
Transport
Hub
Constructio
n of
Ngqeleni
Transport
Hubs
Completion
Certificate
and Close
Out report
40%
constructio
n
New
Contractor
established on
site
Project 50%
Complete
Ablutions
Complete
Project 100%
Complete
Layer works
complete;
Structures
Complete
R 6
,00m
Ngqelen
i
Transpo
rt hub
(Ward
21)
Developme
nt of Design
Report
Constructio
n of
Ngqeleni
Transport
Hubs
Monthly
reports and
Minutes of site
meetings
Underdev
eloped taxi
rank
Feasibility
Studies
Business
Plans and
Registrations
Designs and
Consultation
of
stakeholders.
Tender
Advert and
preparation.
Contract
agreement for
Contractor
Project 40%
Complete
R T
BC
Upgrade
access
to
parks,
cemeteri
es, and
pounds
Paved
access to
public
amenities
Upgrade
access to
parks,
cemeteries,
and pounds
Progress
reports
Unsurface
d turfs for
access
Scope of
works for
public
amenities
Recruitment
process and
implementati
on
Supervision and
monitoring
Close out of
projects
R1,
50 m
Libode
Sports
field and
Recreati
onal
centre
(Ward
07)
Business
Plans for
transport
hubs, sports
field.
Appointment
Letters for
projects.
Completion
Certificates.
(Special
Programme
s)
Constructio
n of Libode
sports field.
Completion
Certificate
90%
Completio
n
Release of
Retention
Final Issues of
retention
R 7
,00m
Municip
al
Worksh
op
Progress
Reports on
workshop
developme
nts.
Design
Reports
and
implement
ation
Design
Reports
No
existing
workshop
Prepare
specification
and advert for
professional
service
providers
Approval by
Council of
proposed
structure
Contract
agreement
between
Municipality and
Contractor
Project 50%
Complete
Excavations
100%
Complete;
Foundation
100%
Complete;
Walls 100%
Complete
R 5
.00m
Mu
nic
ipal
Pu
blic
Am
enit
ies
To provide
and
maintain
local
amenities
and
community
facilities
BSD 67
Ward 03
Multipur
pose
Centre
and
Sports
field
Appointme
nt of
Contractor
for
constructio
n of ward 3
multi-
purpose
center
Project
Implement
ation
Design
Report
No
designed
hall
Specification
for engineering
consultants
Contract
agreement
Specification for
construction
Site
Establishment
TB
C
Mu
nic
ipal
Pu
blic
Am
enit
ies
To provide
and
maintain
local
amenities
and
community
facilities
BSD 67
Ward 17
Multipur
pose
Centre
and
Sports
field
Appointme
nt of
Contractor
for
constructio
n of ward
17 multi-
purpose
center
Appointme
nt Letter
Design
Report
No
designed
hall
Specification
for engineering
consultants
Contract
agreement
Specification for
construction
Site
Establishment
TB
C
Bri
dg
es
To improve
accessibilit
y of
communiti
es through
safe
bridges
BSD 68 Projects
as per
roads
list.
Number of
bridges
constructed,
Business
Plans
prepared
and
submitted for
funding
Constructi
on of 6
Bridges
Progress
Reports
Bridges
implement
ed with
projects
Specification
for
construction
and advert
issued
Site
establishment
and project
40%
complete
Project 100%
Complete
Bottom Slab
complete;
approaches
complete;
structure
complete; wing
walls complete;
top slab and
signage
complete
Release of
50% retention,
Issue of Final
Approval
certificate
Incl
ud
ed
DIAGRAM 3
Monthly
Projections of Revenue by
Source
TOTAL BUDGET 2015/16
QUATER 1 QUATER 2 QUATER 3 QUATER 4
JULY AUGUST SEPTEMBER
OCTOBER
NOVEMBER
DECEMBER
JANUARY
FEBRUARY MARCH APRIL MAY JUNE
Regional Levies
-
-
-
-
-
-
-
-
-
-
-
-
-
Property Rates
5 317 061.00
443 088.42
443 088.42
443 088.42
443 088.42
443 088.42
443 088.42
443 088.42
443 088.42
443 088.42
443 088.42
443 088.42
443 088.42
Property Rates - Penalties Imposed & Collection Charges
-
-
-
-
-
-
-
-
-
-
-
-
-
Electricity Revenue from Tariff
-
-
-
-
-
-
-
-
-
-
-
-
-
Billings
Water Revenue from Tariff Billings
-
-
-
-
-
-
-
-
-
-
-
-
-
Sanitation Revenue from Tariff Billings
-
-
-
-
-
-
-
-
-
-
-
-
-
Refuse Removal from Tariff Billings
212 000.00
17 666.67
17 666.67
17 666.67
17 666.67
17 666.67
17 666.67
17 666.67
17 666.67
17 666.67
17 666.67
17 666.67
17 666.67
Grants
304 626 000.00
103 122 666.67
-
318 000.00
-
100 592 666.67
-
-
100 592 666.67
-
-
-
Interest & Investment Income
5 300 000.00
441 666.67
441 666.67
441 666.67
441 666.67
441 666.67
441 666.67
441 666.67
441 666.67
441 666.67
441 666.67
441 666.67
441 666.67
Rent of Facilities and Equipment
174 900.00
14 575.00
14 575.00
14 575.00
14 575.00
14 575.00
14 575.00
14 575.00
14 575.00
14 575.00
14 575.00
14 575.00
14 575.00
Interest Earned Outstanding Debtors
-
-
-
-
-
-
-
-
-
-
-
-
-
Fines 53 000.00
4 416.67
4 416.67
4 416.67
4 416.67
4 416.67
4 416.67
4 416.67
4 416.67
4 416.67
4 416.67
4 416.67
4 416.67
Licenses and Permits
5 300 000.00
441 666.67
441 666.67
441 666.67
441 666.67
441 666.67
441 666.67
441 666.67
441 666.67
441 666.67
441 666.67
441 666.67
441 666.67
Registration Authority
3 590 000.00
299 166.67
299 166.67
299 166.67
299 166.67
299 166.67
299 166.67
299 166.67
299 166.67
299 166.67
299 166.67
299 166.67
299 166.67
Income from Agency Services
212 000.00
17 666.67
17 666.67
17 666.67
17 666.67
17 666.67
17 666.67
17 666.67
17 666.67
17 666.67
17 666.67
17 666.67
17 666.67
Other
1 189 900.00
99 158.33
99 158.33
99 158.33
99 158.33
99 158.33
99 158.33
99 158.33
99 158.33
99 158.33
99 158.33
99 158.33
99 158.33
GRAND TOTAL
325 974 861.00
104 901 738.42
1 779 071.75
2 097 071.75
1 779 071.75
102 371 738.42
1 779 071.75
1 779 071.75
1 779 071.75
102 371 738.42
1 779 071.75
1 779 071.75
1 779 071.75
DIAGRAM 4
EXPENDITURE AND REVENUE BY VOTE
TOTAL BUDGET 2015/16
JULY AUGUST SEPTEMBER
Opex Capex Revenue Opex Capex Revenue Opex Capex Revenue
Department - Municipal Managers Office
Vote: Executive and Council
62 214 134.78
5 076 177.90
-
-
5 076 177.90
500 000.00
-
5 076 177.90
500 000.00
-
Department - Budget & Treasury
Vote: Finance & Administration (Finance)
81 153 247.76
5 794 434.34
-75 803 322.76
6 805 346.67
500 000.00
-1 023 322.76
6 805 346.67
-1 023 322.76
Department - Corporate Services
Vote: Finance & Administration (HR, IT,etc)
31 157 473.14
2 233 464.43
362 991.67
-187 500.00
2 233 464.43
362 991.67
2 233 464.43
362 991.67
Department - Planning &
Development
Vote: Planning and Development
16 525 447.10
1 377 120.59
-
-3 091.67
1 377 120.59
-
-3 091.67
1 377 120.59
-
-3 091.67
Vote: Housing 1 941 680.00
161 806.67
161 806.67
161 806.67
Department - Community Services
Vote: Community & Social Services
46 422 737.06
3 859 828.09
-
-11 483.33
3 859 828.09
-
-11 483.33
3 859 828.09
202 950.00
-329 483.33
Vote: Public Safety 2 532 176.00
121 833.33
16 666.67
-745 250.00
121 833.33
-745 250.00
121 833.33
416 666.67
-745 250.00
Vote: Waste Management
3 193 269.49
96 407.79
-
-17 666.67
96 407.79
8 825.00
-17 666.67
96 407.79
8 825.00
-17 666.67
Department - Infrastructure
Vote: Road Transport 131 427 539.51
2 404 535.46
6 160 191.67
-20 498 666.67
2 404 535.46
6 160 191.67
-
2 404 535.46
6 160 191.67
GRAND BUDGET TOTAL 376 567 704.83
21 125 608.60
6 539 850.00
-97 266 981.09
25 015 891.29
7 532 008.34
-1 800 814.42
25 015 891.29
7 651 625.00
-2 118 814.42
DIAGRAM 4 – Q2
EXPENDITURE AND REVENUE BY VOTE
TOTAL BUDGET 2015/16
OCTOBER NOVEMBER DECEMBER
Opex Capex Revenue Opex Capex Revenue Opex Capex Revenue
Department - Municipal Managers Office
Vote: Executive and Council
62 214 134.78
5 076 177.90
300 000.00
-
5 076 177.90
-
-
5 076 177.90
-
-
Department - Budget & Treasury
Vote: Finance & Administration (Finance)
81 153 247.76
6 805 346.67
-1 023 322.76
6 805 346.67
-73 273 322.76
6 805 346.67
-
-1 023 322.76
Department - Corporate Services
Vote: Finance & Administration (HR, IT,etc)
31 157 473.14
2 233 464.43
362 991.67
-187 500.00
2 233 464.43
362 991.67
2 233 464.43
362 991.67
-187 500.00
Department - Planning & Development
Vote: Planning and Development
16 525 447.10
1 377 120.59
-
-3 091.67
1 377 120.59
-
-3 091.67
1 377 120.59
-
-3 091.67
Vote: Housing 1 941 680.00
161 806.67
-
161 806.67
161 806.67
Department - Community Services
Vote: Community & Social Services
46 422 737.06
3 859 828.09
-
-11 483.33
3 859 828.09
202 950.00
-11 483.33
3 859 828.09
-
-11 483.33
Vote: Public Safety 2 532 176.00
127 681.33
200 000.00
-745 250.00
127 681.33
800 000.00
-745 250.00
127 681.33
16 666.67
-745 250.00
Vote: Waste 3 96 1 500 -17 96 8 -17 96 -17
Management 193 269.49 407.79 000.00 666.67 407.79 825.00 666.67 407.79 666.67
Department - Infrastructure
Vote: Road Transport 131 427 539.51
2 404 535.46
6 160 191.67
2 404 535.46
6 160 191.67
-20 498 666.67
2 404 535.46
6 160 191.67
GRAND BUDGET TOTAL 376 567 704.83
22 142 368.93
8 523 183.34
-1 988 314.42
25 021 739.29
7 534 958.34
-94 549 481.09
25 021 739.29
6 539 850.00
-1 988 314.42
DIAGRAM 4 –Q3
EXPENDITURE AND REVENUE BY VOTE
TOTAL BUDGET 2015/16
JANUARY FEBRUARY MARCH
Opex Capex Revenue Opex Capex Revenue Opex Capex Revenue
Department - Municipal Managers Office
Vote: Executive and Council
62 214 134.78
5 076 177.90
-
-
5 076 177.90
-
-
5 076 177.90
-
-
Department - Budget & Treasury
Vote: Finance & Administration (Finance)
81 153 247.76
6 805 346.67
6 805 346.67
-1 023 322.76
6 805 346.67
-73 273 322.76
Department - Corporate Services
Vote: Finance & Administration (HR,
31 157 473.14
2 233 464.43
362 991.67
2 233 464.43
362 991.67
2 233 464.43
362 991.67
-187 500.00
IT,etc)
Department - Planning & Development
Vote: Planning and Development
16 525 447.10
1 377 120.59
-
-3 091.67
1 377 120.59
-
-3 091.67
1 377 120.59
-
-3 091.67
Vote: Housing 1 941 680.00
161 806.67
161 806.67
161 806.67
-
Department - Community Services
Vote: Community & Social Services
46 422 737.06
3 859 828.09
-
-11 483.33
3 859 828.09
-
-11 483.33
3 859 828.09
-
-11 483.33
Vote: Public Safety 2 532 176.00
127 681.33
-745 250.00
127 681.33
16 666.67
-745 250.00
127 681.33
416 666.67
-745 250.00
Vote: Waste Management
3 193 269.49
96 407.79
235 276.00
-17 666.67
96 407.79
8 825.00
-17 666.67
96 407.79
8 825.00
-17 666.67
Department - Infrastructure
Vote: Road Transport 131 427 539.51
2 404 535.46
6 160 191.67
2 404 535.46
6 160 191.67
2 404 535.46
6 160 191.67
-20 498 666.67
GRAND BUDGET TOTAL 376 567 704.83
25 021 739.29
6 758 459.34
-777 491.66
25 021 739.29
6 548 675.00
-1 800 814.42
25 021 739.29
6 948 675.00
-94 736 981.09
DIAGRAM 4 –QUARTER 4
EXPENDITURE AND REVENUE BY VOTE
TOTAL BUDGET 2015/16
APRIL MAY JUNE
Opex Capex Revenue Opex Capex Revenue Opex Capex Revenue
Department - Municipal Managers Office
Vote: Executive and Council
62 214 134.78
5 076 177.90
-
-
5 076 177.90
-
-
5 076 177.90
-
-
Department - Budget & Treasury
Vote: Finance & Administration (Finance)
81 153 247.76
6 805 346.67
-1 023 322.76
6 805 346.67
-1 023 322.76
6 805 346.67
-1 035 733.18
Department - Corporate Services
Vote: Finance & Administration (HR, IT,etc)
31 157 473.14
2 233 464.43
362 991.67
2 233 464.43
362 991.67
2 233 464.43
362 991.67
Department - Planning & Development
Vote: Planning and Development
16 525 447.10
1 377 120.59
-
-3 091.67
1 377 120.59
-
-3 091.67
1 377 120.59
-
-3 091.67
Vote: Housing 1 941 680.00
161 806.67
-
161 806.67
-
161 806.67
-
Department - Community Services
Vote: Community & Social Services
46 422 737.06
3 859 828.09
-
-11 483.33
3 859 828.09
-
-11 483.33
2 890 105.84
-
-11 483.33
Vote: Public Safety 2 532 176.00
127 681.33
-
-745 250.00
127 681.33
16 666.67
-745 250.00
127 681.33
16 666.67
-745 250.00
Vote: Waste Management 3 193 269.49
96 407.79
8 825.00
-17 666.67
96 407.79
8 825.00
-17 666.67
96 407.79
8 825.00
-17 666.67
Department - Infrastructure
Vote: Road Transport 131 427 539.51
2 404 535.46
6 160 191.67
-
2 404 535.46
6 160 191.67
-
2 404 535.46
6 160 191.67
-
GRAND BUDGET TOTAL 376 567 704.83
25 021 739.29
6 532 008.34
-1 800 814.42
25 039 283.25
6 548 675.00
-1 800 814.42
21 172 646.68
6 548 675.00
-1 813 224.84
THREE YEAR CAPITAL PLAN
CAPITAL PROJECTS
CAPITAL PROJECTS 2012/13 FINANCIAL YEAR
FOCUS
AREA
Indicator WARD
NO
PROJECT DESCRIPTION FUNDING
SOURCE
ESTIMATED
BUDGET
COMMENT
Access
roads
9,6 km 19 Mvilo to Mnyameni Access
Road (A/R)
MIG R4.90m Completed
8,5 km 23 Phalo to Sizani A/R MIG R3.00m Completed
4,8 km 27 Mseleni to Ludeke A/R MIG R4.50m Completed
2 km 7 Libode internal roads MIG R2.00m Completed
2 km 21 Ngqeleni Street Surfacing MIG R 5.00m Construction
8 km 20 Mdzwina A/R MIG R3.00m Advert for
Construction
16 km and
Bridge
20 Nothintsila to Mvilo A/R MIG R3.00m Completed
6 km and
Bridge
04 Dungu to Mbhobheleni A/R MIG R3.20m Construction
13 km 28 Sidanda A/R MIG R6.00m Completed
7 km 13 Ntsaka to Mantanjeni A/R MIG R3.90m Completed
7 km and
Bridge
17 Mthonjana A/R MIG R3.10m Completed
13 km 10 Zikhoveni to Ntilini A/R MIG R5.00m Completed
4,8 km 24 Malungeni A/R MIG R2.80m Completed
Access
roads
11,6 km 18 Mlengana A/R MIG R3.70m Completed
5,4 km and
Bridge
26 Mafusini to Zincukuthwini
A/R
MIG R2.00m Complete 1st Phase
Advert for 2nd
Phase on advert for
Engineers
CAPITAL PROJECTS 2013/14 FINANCIAL YEAR
FOCUS
AREA
Indicator WARD
NO
PROJECT NAME FUNDING
SOURCE
ESTIMATED
BUDGET
COMMENT
Public
Transport
Public transport 7 Libode transport hub MIG/Equitable
Share
R11.80m Construction
Special
Program
mes
7 Libode Sports and
Recreational Centre
MIG R9.00m Construction
Access 3 km 21 Ngqeleni Street Surfacing MIG R3.00m Construction
roads
7.8 km and
Bridge
30 Dikela Springs to Mngamnye
A/R
MIG R2.00m Completed
17 km 12 Mdeni to Ngobozi A/R MIG R5.98m Completed
11.5 km and
Bridge
22 Bomvana A/R MIG R4.00m Completed
10,2 km and
Bridge
06 Nduna to Ngojini A/R MIG R5.40m Completed
2.6 km 05 Ndayini access road Phase 1 MIG R3.15m Construction
9.3 km 14 Mqwangqweni to Siqikini A/R MIG R5.70m Completed
7 km 15 Didi to Ntlaza A/R MIG R3.50m Completed
8,8 km and
Bridge
14 Ncambedlana to Manzamahle
A/R
MIG R7.47m Design Stage
Access
roads
9,6 km and
Bridges
17 Magozeni to Guqa A/R MIG R2.75m Construction
13 km 16 Dalagubha A/R MIG/OR Tambo DM R
9.8 km 24 Buthongweni A/R MIG R4.00m Completed
13 km 02 Zibungu to Madwaleni A/R MIG R7.84m Completed
7.9 km 15 Dokodela A/R MIG R4.47m Completed
CAPITAL PROJECTS 2014/15 FINANCIAL YEAR
FOCUS
AREA
Indicator WARD
NO
PROJECT NAME FUNDING
SOURCE
ESTIMATED
BUDGET
COMMENT
Access
roads
5 km 07 Libode Extension Internal
roads (Extension 1&2)
MIG R2.0m Advert for
Engineers
5 km 21 Ngqeleni Extension 2 Internal
roads
MIG R3.00m Advert for
Engineers
6 km 21 Alternative Surfacing Pilot at
Extension 4 Ngqeleni
MIG R7.26m Advert for
Construction
6 km 18 Maqanyeni to Mgungundlovu
A/R
MIG R3.69m Design Stage
6.5 km 27 Ntshele A/R MIG R3.90m Completed
9.6 km 03 Mhlanganisweni to Ngavu-
ngavu A/R
MIG R4.73m Completed
6 km and
Bridge
29 Sezela to Njezweni A/R MIG R5.29m Design Stage
02 Jojozi to Ncithwa A/R MIG To be costed Design Stage
10.1 km and
Bridge
09 Gxulu A/R MIG R6.96m Completed
6 km and
Bridge
05 Ndayini Phase 2 A/R MIG R5.00m Advert for
Engineers
5 km 26 Mafusini to Zincukutwini A/R MIG R1.50m Advert for
Engineers
27 Makwalweni to Mzimvubu
A/R
MIG To be costed EIA advert
6 km plus
bridge,
06 Cibeni to Ngojini Bridge MIG R3.00m Design Stage
6 km and
Bridge
23 Bukhwezeni A/R MIG To be costed Design Stage
Access
roads
6.5 km 25 Mzonyane A/R MIG R 3.20 m Construction
13 km and
Bridge
01 Thembeni A/R MIG R 4.70 m Construction
Waste
Management
7 Libode Landfill Site MIG R4.00m Design Stage
Public
transport
21 Ngqeleni Transport Hub MIG R8.00m Design Stage
Roads life
span
7 & 21 Storm water Libode and
Ngqeleni
MIG R5.00m Planning
8 km 07 Church of God to Belmont MIG R 3.20 m Construction
6.5 km 21 Polini A/R MIG R3.25 m Completed
14 km 19 Zinduneni to Bandla A/R MIG R 6.70 m Advert for
Construction
6,5 km 11 Moyeni to Ngqwangi
(Lukhanyisweni A/R)
MIG R 4.34 m Advert for
Construction
6 km and
Bridge
22 Lower Malahle to Mlatha
Access Road (Mgonondi
Access Road)
MIG To be costed Design Stage
11 km 20 Mdzwina Internal Roads MIG R 4.20 m Advert for
Construction
CAPITAL PROJECTS 2015/16 FINANCIAL YEAR
FOCUS
AREA
Indicator WARD
NO
PROJECT NAME FUNDING
SOURCE
ESTIMATED
BUDGET
COMMENT
Access
roads
5,7 km 8 Magcakini A/R MIG To be costed Planning
6 km 13 Dumase to Mangwaneni A/R MIG To be costed Planning
14,2 km 31 Renny A/R MIG To be costed Planning
6 km 26 Polar Park A/R MIG To be costed EIA advert
9,8 km 30 Zanokhanyo to Lutsheko A/R MIG To be costed Planning
13,5 km and
Bridge
24 Mgojweni to Mabhetshe A/R MIG To be costed Design Stage
11,5 km and
Bridge
28 Msuzwaneni to Thekwini A/R MIG To be costed Design Stage
km 27 Langakazi Low Volume A/R MIG To be costed Planning
km 22 Mabomvini to Nkunzimbini
A/R
MIG To be costed Planning
km 22 Manqabeni Alternative
Surfacing
Equitable Share Estimates
completed
km 07 Libode 500 units internal
roads alternative surfacing
MIG To be costed Planning
km 21 Ngqeleni Internal Roads MIG To be costed Planning
21 Municipal Workshop and
Offices
Equitable Share R 8.00 m Planning
Electrific
ation
07 Libode High Mast Lights MIG R 2.00 m Designed
SMME
Develop
ment
07 and
21
Informal Trading
Infrastructure
MIG To be costed Planning
Safety 07 and
21
Fencing of Libode and
Ngqeleni Pounds
MIG To be Costed Planning
Special
Program
mes
(Youth
Develop
ment)
03 Ward 03 Multipurpose Centre
and Sports field
MIG To be costed Planning
17 Ward 17 Multipurpose Centre
and Sports field
MIG To be costed Planning
CAPITAL PROJECTS 2016/17 FINANCIAL YEAR
FOCUS
AREA
Indicator WARD
NO
PROJECT NAME FUNDING
SOURCE
ESTIMATED
BUDGET
COMMENT
Special
Program
mes
(Youth
Develop
ment)
31 Ward 31 Multipurpose Centre
and Sports field
MIG To be costed Planning
16 Ward 16 Multipurpose Centre
and Sports field
MIG To be costed Planning
28 Ward 28 Multipurpose Centre
and Sports field
MIG To be costed Planning
Access
roads
and
Bridges
km 26 Tholeni A/R MIG To be costed Planning
km 25 Ludaka A/R with Bridge MIG To be costed Planning
km 19 Lusizini A/R MIG To be costed Planning
km 07 Thabo Mbeki Internal Streets MIG To be costed Planning
km 05 Nxukwebe to Mtombetsitsa
A/R
MIG To be costed Planning
km 08 Chizela to Moyeni A/R MIG To be costed Planning
km 27 and
05
Sompa to Ndzuluka A/R MIG To be costed Planning
km 21 Mngazana to Maqanyeni A/R MIG To be costed Planning
km 06 and
17
Ngqongweni Clinic Linkage
A/R
MIG To be costed Planning
km 07 & 30 Ndanya Clinic A/R MIG To be costed Planning
10 Lurhasini A/R MIG To be costed Planning
14 Mqwanqweni No. 1 to No. 2
with Magwaz’iphalitshi
bridges
MIG To be costed Planning
CAPITAL PROJECTS 2017/18 FINANCIAL YEAR
FOCUS
AREA
Indicator WARD
NO
PROJECT NAME FUNDING
SOURCE
ESTIMATED
BUDGET
COMMENT
Special
Program
mes
(Youth
Develop
ment)
08 Ward 08 Multipurpose Centre
and Sports field
MIG To be costed Planning
30 Ward 30 Multipurpose Centre
and Sports field
MIG To be costed Planning
10 Ward 10 Multipurpose Centre
and Sports field
MIG To be costed Planning
25 Ward 25 Multipurpose Centre
and Sports field
MIG To be costed Planning
22 Ward 22 Multipurpose Centre
and Sports field
MIG To be costed Planning
Electrific
ation
21 High Mast Street Lights MIG To be costed Planning
Access
Roads
and
km 15 Ngxokweni to Mtyu A/R MIG To be costed Planning
km 23 Ntshazi Bridge to Canzibe
Low volume Access road
MIG To be costed Planning
Bridges km 14 No. 1 to No. 5 A/R and
Bridge
MIG To be costed Planning
km 18 Ngidini to Khangisa A/R MIG To be costed Planning
km 24 Godini A/R MIG To be costed Planning
km 21 Bantini to Godini Bridge and
A/R
MIG To be costed Planning
MAINTENANCE PROJECTS 2012/13 FINANCIAL YEAR
FOCUS
AREA
Indicator WARD
NO
PROJECT NAME FUNDING
SOURCE
ESTIMATED
BUDGET
COMMENT
Access
roads
3 km 29 Mpendle to Nkawukazi A/R Equitable Share R1.17m Completed
5 km 08 Mdlankomo to Mamfengwini
A/R
Equitable Share R1.70m Completed
3 km 31 Luthubeni A/R Equitable Share R615 631.50 Completed
5 km 21 Bantini A/R Equitable Share R1.06m Completed
4 km 15 Mafini A/R Equitable Share R Completed
3 km 01 Daluxolo A/R Equitable Share R434 561.16 Completed
MAINTENANCE PROJECTS 2013-2014 FINANCIAL YEAR
FOCUS
AREA
Indicator WARD
NO
PROJECT NAME FUNDING
SOURCE
ESTIMATED
BUDGET
COMMENT
Access 3 km 02 Gqwarhu A/R Equitable Share R 905 000.00 Construction
roads
3,5 km 05 Ngolo to Dalibunga A/R Equitable Share R1.40m Construction
3,5 km 30 Lower Mngamnye A/R Equitable Share R 1.49m Construction
7 km 18 Bukwini A/R Equitable Share R 2.89m Completed
13 km 25 Mngcibe A/R Equitable Share R3.89m Completed
1,5 km 07 Callaway A/R Equitable Share R509 000.00 Completed
MAINTENANCE PROJECTS 2014-2015 FINANCIAL YEAR
FOCUS
AREA
Indicator WARD
NO
PROJECT NAME FUNDING
SOURCE
ESTIMATED
BUDGET
COMMENT
Access
roads
6 km 03 Makhotyana to Makaziwe A/R Equitable Share R 3.00 m Advert for
Construction
5 km 04 Mdina A/R Equitable Share R 2.99 m Planning
6 km 09 Misty Mount A/R Equitable Share R 2.02 m Advert for
Construction
11,2 km 13 Thakatha to Magozeni A/R Equitable Share R 3.10 m Construction
6 km 23 Thekwini A/R Equitable Share R 2.77 m Preparing
specification
3 km 22 Mathayi A/R Equitable Share R 1.35 m Preparing
specification
MAINTENANCE PROJECTS 2015-2016 FINANCIAL YEAR
FOCUS
AREA
Indicator WARD
NO
PROJECT NAME FUNDING
SOURCE
ESTIMATED
BUDGET
COMMENT
Access
roads
km 06 Mputshane A/R Equitable Share To be Costed Inception
km 28 Ntibane A/R Equitable Share To be Costed Inception
km 01 Kalandoda A/R Equitable Share To be Costed Inception
km 26 Luqolo A/R Equitable Share To be Costed Inception
km 27 Gqweza A/R Equitable Share To be Costed Inception
km 29 Egxeni to Mangwaneni A/R Equitable Share To be Costed Inception
MAINTENANCE PROJECTS 2016-2017 FINANCIAL YEAR
FOCUS
AREA
Indicator WARD
NO
PROJECT NAME FUNDING
SOURCE
ESTIMATED
BUDGET
COMMENT
Access
roads
km 01 Mjobeni A/R Equitable Share To be Costed Inception
km 16 Mkhankatho A/R Equitable Share To be Costed Inception
km 15 Mtyu A/R Equitable Share To be Costed Inception
km 10 Ntilini A/R Equitable Share To be Costed Inception
km 13 New Buntingville A/R Equitable Share To be Costed Inception
km 18 Ngidini to Khangisa JSS Equitable Share To be Costed Inception
km 20 Gangeni A/R Equitable Share To be Costed Inception
MAINTENANCE PROJECTS 2017/2018 FINANCIAL YEAR
FOCUS
AREA
Indicator WARD
NO
PROJECT NAME FUNDING
SOURCE
ESTIMATED
BUDGET
COMMENT
Access
roads
km 03 Chophetyeni to Luthubeni
A/R
Equitable Share To be Costed Inception
km 12 Mthebelezi to Ntapane A/R Equitable Share To be Costed Inception
km 20 Goli A/R Equitable Share To be Costed Inception
km 25 Lwandile A/R Equitable Share To be Costed Inception
km 27 Dungu to Bungu A/R Equitable Share To be Costed Inception
Electricity 2013/14 Financial Year
FOCUS
AREA
Indicator WARD
NO
PROJECT NAME FUNDING
SOURCE
ESTIMATED
BUDGET
COMMENT
Electrific
ation
Number of
households
electrified
Mtombe 239 Households
(HH)
ESKOM R6,51m Construction
11 Sun City 200 HH ESKOM R3,99m Construction
09 Gxulu 375 HH ESKOM R7,57m Construction
21 Ngqeleni Housing ESKOM R47,500.00 Pre-Eng.
Nyandeni Extensions ESKOM R787,000.00 Pre-Eng.
23 Mthatha Mouth 150 HH ESKOM R3,40m Construction
23 Mthatha Mouth L/Line
Infrastructure
ESKOM R600,000.00 Construction
Ngqeleni Phase 3 Electrification (R 10 million)
Electrific
ation
14 HH 20 Gangeni (14HH) INEP Construction
114 HH 20 KwaJange (114HH) INEP Construction
222 HH 20 Lucingweni (222HH) INEP Construction
09 HH 28 Ntibane (09HH) INEP Construction
84 HH 20 Ntsundwane (84HH) INEP Construction
88 HH 25 Ntengu (88HH) INEP Construction
66 HH 25 Mthwebula (66HH) INEP Construction
Electricity 2014/15 Financial Year
FOCUS
AREA
Indicator WARD
NO
PROJECT NAME FUNDING
SOURCE
ESTIMATED
BUDGET
COMMENT
Electrific
ation
400 HH 26 Mthatha Mouth 400 HH ESKOM R 7,20m Construction
241 HH Ncitwa 241 HH ESKOM R 4, 58m
129 HH 21 Ngqeleni Housing
Development 129 HH
ESKOM R 2,06m Completed
Ngqeleni Phase 3 Electrification
Electrific
ation
77 HH 28 Mpoza 77 HH INEP R1.33m Construction
77 HH 25 Mpoza 77 HH INEP R1.33m Construction
77 HH 20 Lucingweni 77 HH INEP R1.33m Construction
158 HH 20 Vanisini 158 HH (Vinitshi) INEP
20 Lucingweni INEP
25 Mpoza Equitable Share
28 Mpoza Equitable Share
Electricity 2015/16 Financial Year
FOCUS
AREA
Indicator WARD
NO
PROJECT NAME FUNDING
SOURCE
ESTIMATED
BUDGET
COMMENT
Electrific
ation
127 HH 25 MZONYANE 22028A3 (127 HH) INEP R 2.23 m Designs Completed
212 HH 28 MPOZA (B2) 21094 B2 Rem
(212 HH)
INEP R 3.72 m Designs Completed
63 HH 25 MPOZA (A1) (63 HH) INEP R 1.11 m Designs Completed
95 HH 25 MPOZA (A2) 22028A2 (95 HH) INEP R 1.67 m Designs Completed
Electrific
ation
170 HH 25 NGONJINI (170 HH) INEP R 2.98 m Designs Completed
233 HH 25 LWANDILE (B2) 22028B2 (233
HH)
INEP R 4.09 m Designs Completed
138 HH 25 LWANDILE (B3)22028 B1 (138
HH)
INEP R 2.42m Designs Completed
178 HH 25 MAMOLWENI (D2)2230D2 (178
HH)
INEP R 3.12 m Designs Completed
208 HH 25 MAMOLWENI (D3)2230D3 (208
HH)
INEP R 3.65 m Designs Completed
FOCUS
AREA
Indicator WARD
NO
PROJECT NAME FUNDING
SOURCE
ESTIMATED
BUDGET
COMMENT
Electrific
ation
290 Bomvana Extensions (Sezela,
Ngqinibeni, Bomvini)
ESKOM R 4.81 m
600 MTHATHA MOUTH 15/16
(Nyandeni, Ezincukutwini,
Meveni, Ntsimbini,
Ngawuza)
ESKOM R 10.00m
Link Line MTHATHA MOUTH 15/16 Link
Line
ESKOM R 2.40 m
260 Ncithwa Extensions (Siza,
Magqingeni, Mahahane,
Ncitwa, Ziphondo, Cibeni,
Mhlatyana, Tshakude)
ESKOM R 4.40 m
Infrastructure Ncithwa Link Line ESKOM R 2.10 m
Pre Engineering Nyandeni Extensions ESKOM R 250 000
Bridges
FOCUS
AREA
Indicator WARD
NO
PROJECT NAME FUNDING
SOURCE
ESTIMATED
BUDGET
COMMENT
04 Zinkumbini bridge
26 Zixambuzi bridge DoRPW
04 Dalaguba to Mncwili bridge Needs proper
assessment
14 Incorporated in
Mabhetshe
25 Mamolweni bridge DoRPW
31 Mthomde
FOCUS
AREA
Indicator WARD
NO
PROJECT NAME FUNDING
SOURCE
ESTIMATED
BUDGET
COMMENT
Municipal
Public
Works &
EPWP
Jobs Created 07 Nomandela Drive to Libode
Main Street Side Walks
EPWP R 1,1 million Planning
Jobs Created 07 Municipal Parking EPWP Planning
Jobs Created 21 Ngqeleni Armstrong Street
Side Walks
EPWP Planning
Jobs Created 07 Libode Main Road Side Walks Equitable Share R 1,5 million Planning
Municipal
Public
Works &
EPWP
59 Implement all municipal own civil and
maintenance works
OPEX R1m
Facilitate implementation of EPWP projects in our
areas
OPEX R0 000