ICT LIBRARY UPDATE. to...ICT LIBRARY UPDATE ... 2 Reuse water for power plant : (Water Today : Jan....
Transcript of ICT LIBRARY UPDATE. to...ICT LIBRARY UPDATE ... 2 Reuse water for power plant : (Water Today : Jan....
1
Internal Circulation Only
ICT LIBRARY UPDATE
Bi-monthly Jan. – April 2013 Vol. X1 : No. 1&2
Contents
- Articles - Pages
(Subject wise alphabetically indexed) - 2-5
- Addition of Books - 6
- Reports - 7-22
Prepared by : Neeru Saini
Librarian
2
Articles
Asphalt
1 CE : Asphalt mix plant : New Technologies in focus .. (Master Builder : Feb. 2013)
Aviation
1 Lighting Concept – Chennai Airport (Architecture +Design : March 2013)
Architecture
1 Beyond amazing the coolest new building of 2012 (Master Builder : Dec. 2012)
Building
1 Innovative design and resources for green buildings : (Architecture + Design April 2013)
2 Vibration control system in Tall Buildings (Master builder : Dec. 2012)
3 Waterproofing for durable and sustainable buildings and infrastructure in India : (Master builder : March 2012)
Bridge
1 Seismic response of RCC Dam including dam foundation interaction : (Journal of Structural Engineering : Feb.–March 2013)
2 Design implications of IS 456 : 2000 for high performance concrete : (Journal of Structural Engineering : Feb.–March 2013)
3 Strengthening of Mithi River Bridge Under NI Taxiway at Mumbai International Airport (NBM & CW : Feb. 2013)
4 A signature cable stayed bridge in India : the Yamuna Bridge at Wazirabad (Structural Engineering International : Feb. 2013)
5 Factors affecting priority of maintenance for bridges (Indian Concrete Journal : Feb. 2013)
3
Business Development
1 Three rules for making a company truly great (Harvard Business Review : April 2013).
2 The best performing CEO’s in the World. (Harvard Business Review : Jan. Feb. 2013)
Concrete
1 Hear evolution of fly ash concrete : (Indian Concrete Journal : March 2013)
Environmental
1 Abatement for a better future (Environment Pollution control Journal : Jan. Feb. 2013)
2 Effect of biomedical waste generation and disposal on environmental status of Amravati City (Environment Pollution control
Journal : Jan. Feb. 2013)
Equipment
1 CE : Earthmoving Equipment : Road construction equipment continued policy thrust on road infrastructure development augurs
well for supplier … (Master Builder : Feb. 2013)
Human Resource
1 Make yourself an expert (Harvard Business Review : April 2013)
2 Working around a tight budget (Human Capital : April 2013)
Power
1 The well –know n lighting industry expert talks about the progress made by India in the area of energy efficient lighting (Energy
Next: : Feb. 2013)
4
2 Reuse water for power plant : (Water Today : Jan. 2013)
Railways
1 Fatigue damage of railway plate girder bridges a case study : (Journal of Structural Engineering : Feb.–March 2013)
Steel
1 Seismic behavior of steel frames (Steel structural & Metal Buildings : Feb. 2013)
2 Advanced high strength steels (Steel structural & Metal Building: Jan. 2013)
3 Structural steel for building (Steel structural & Metal Building: Jan. 2013)
4
Structures
1 Green buildings : role of energy efficiency on supporting (Gujarat Infrastructure: Jan.- March 2013)
Soil
1 Ground Engineering : Soil reinforcement (Master builder : Jan. 2013)
Traffic
1 CE : Heavy commercial vehicle : Medium and heavy commercial vehicles (MHCVs) India Continues to be Marquee Market for
..(Master Builder : Feb. 2013)
2 Urban Collective : Traffic management systems for the urban environment (Traffic technology International : Feb. –March 2013)
5
Water
1 Effective solution for recycle and reuse for treated wastewater (Environment Pollution Control Journal : Jan. Feb. 2013)
2 Solar Water Filter : Details about BARC’s foray into the field of clean and green energy technology (Energy Next L Feb. 2013)
3 Drinking Water Quality in Rural India (Water Today : Feb. 2013)
4 Industrial and municipal wastewater treatment (Water Today : Jan. 2013)
5 Nonlinear elastodynamics of concrete water tanks with shaft type staging (Indian Concrete Journal : Feb. 2013)
6 Building water proofing remediation applying (Master builder : Dec. 2012)
6
ADDITIONAL OF BOOKS
1 16201 : Standard Handbook for Electrical Engineer 16th
Ed. 2 16202 : Handbook for concrete bridges Vol. I
3 16203 : Handbook for concrete bridges Vol. 2 4 16204 : BSEN –ISO 22476- 2 : 2005 +Ai : 2011 (Geotechnical field testing part 2: Dynamic… 5 16205 : NAPF : 241 : standard for safeguarding construction alternation and demolition 2009.. 6 16206 : NAPF : 251 : standard methods of tests of fire resistance of building construction 7 16207 : NAPF : 252 : standard methods of fire tests of assemblies 8 16208 : Journal of coastal conservation planning and management coastal flood management…. 9 16253 : ISO : 16204 : Durability service life design of concrete structures 10 16254 : ISO : 39001 : Road traffic safety management systems requirement for guidance with use … 11 16255 : Map of Uttarakhand 12 16256 : Central public works accounts code. 13 16257 : IRC : 37 : 2012 : Tentative guidelines for the design of flexible pavements… 14 16258 : Traffic signs manual Ch.- 8: Part – 2 operations traffic safety manual and …. 15 16259 : Hand book on important checks for buildings and allied works… 16 16342 : Chandigarh Urban Development laws…. 17 16351- 16403 : RDSO Drawing 18 16411 : Seminar on training skill up gradation and competence development in building industry : Jan. 2013 19 16451 : Central Public Work Dept. Code 20 16452 : 2013 TCDPAP & FIDIC /ASPACK Conference Bangkok climate change challenge 7-8, March 2013 21 16489 : Indian Unveiled text and photograph 22 16490 : Technological innovation in India Retrospect & Prospect Seminar …… 23 16491 : Principal and practices of highway engineers 24 16492 : IS : 1622 : Methods of sampling and micro biological examination of water… 25 16593 : IS : 3025 (Part-1) : Methods of sampling and test .. 26 16494 : IS : 3025 (Part-46) : Methods of sampling and test for water.. 27 16495 : IS: 3025 (Part -35) : Methods of sampling and test for water… 28 16496 : IS 3025 (Part -60 ) : Methods of sampling and test for water… 29 16578 : Ministry of local govt. and provincial councils and project Implementation of World Bank 30 16579 : ITT K RDSO Guidelines on seismic design of railways 31 16580 : Road maintenance manual Mongolia
7
Project Report Sl. No. Projects Name Acc.
No. Title of the Report (Hard CopRe Soft
Copy Year
1 NH-77 (HM) : Four laning of Hajipur - Muzaffarpur section of …….
16187 Inspection Report : Dec. 2012
16226 MPR No. 25 : Nov. 2012
16260 MPR No. 26 : Dec. 2013
16261 Inspection Report : Jan. 2013
16465 MPR No.27: 2013
16466 Inspection Report : Feb. 2013
16531 MPR No. 28 : Feb. 2013
16532 Inspection Report : March 2013
16533 QPR No. 9 : Jan. 2013
2 VME : Preparation of Detailed engineering design of Vadodara Mumbai Expressway including …..
16467 FDPR : Vol. IX: Drawing part B-1 : Drawing of bridges/structures Sub : …..
16468 FDPR : Vol. IX: Drawing sub part 2 of 9 bridges over ….
16469 FDPR : Vol. IX: Drawing sub part 3 of 9 Minor bridges ….
16470 FDPR : Vol. IX: Drawing sub part 4 of 9 Minor bridges 2 ..….
16471 FDPR : Vol. IX: Drawing sub part 6 of 9 interchanges ….
16472 FDPR : Vol. IX: Drawing sub part 8 of 9 flyovers
3 NH-10 (Hary.) : Independent engineering services for 4/6 laning of Delhi/Haryana…….
16295 QPR : Dec. 2012
16296 MPR : Dec. 2012
16434 MPR : Jan. 2013
16435 MPR : Feb. 2013
8
16562 QPR : March 2013
16577 MPR : March 2013
4 NH-15 (PA) : Independent engineer for 4 laning of Pathanko t- Amritsar section from …..
16227 Monthly Inspection Report No .19 : Dec. 2012
16322 QPR : No. 9 : Dec. 2012
16323 MPR No. 28 : Dec. 2013
16324 MPR No. 29 : Jan. 2013
16421 MPR No. 30 : Feb. 2013
16475 MIR : No. 21 : Feb. 2013
16565 MPR No. 31 : March 2013
16566 Monthly Inspection report No. 22 : March 2013
16583 QPR No. 10 : March 2013
5 NH-8 (SD) : Six laning of Surat –Dahisar section of NH-8 from km 263.000 to km. 502.000…..
16266 MPR : Dec. 2012
16448 MPR : Jan. 2013
16534 QPR : Feb. 2013
16535 MPR : Feb. 2013
16590 MPR : March 2013
6 NH-77 (MS) : Independent engineer services for two laning of Muzaffarpur –Sonbarsa section of NH-77 ……
16223 MPR : Nov. 2012
16224 Quarterly Inspection report No. 5 : Nov. 2012
16225 Monthly Inspection Report Nov. 2012
16262 MPR : Dec. 2012
16263 Monthly Inspection Report No. 16 : Dec. 2012
16463 MPR : Jan. 2013
16464 MIR No. 17 : Jan. 2013
16527 MIR No. 18 : Feb. 2013
16528 MPR : Feb. 2013
16529 Quarterly Inspection Report No. 6 :
9
Feb. 2013
16530 Progress Report : April 2013
7 NH-2 (UP) : Consultancy Package GTRIP/SC/1 for the construction supervision for four laning and strengthening of the existing two ….
16301 Engineering Report No. 125 : Dec. 2012
16302 MPR : No. 130 : Dec. 2012
16303 QPR : Dec. 2012
16430 Engineering Report No. 126 : Jan. 2013
16431 MPR No. 131 : Jan. 2013
16432 MPR No. 132 : Feb. 2013
16556 MPR No. 133 : March 2013
16557 Engineering Report No. 127 : Feb. 2013
16584 Engineering Report No. 128 : March 2013
16585 QPR : March 2013
8 NH-21 (Punjab) :Independent consultancy services for 4 laning of Kurali) kiratpur section ……
16427 Monthly Report No. 65 : Feb. 2013
16554 Monthly Report No. 66 : March 2013
16555 QPR No. 22 : March 2013
9 NH-6 (Orissa) : Consultancy services for preparation of DPR for rehabilitation and upgradation of Baharagora to Sambalpur ……
16272 MPR : No. 12 : Nov. 2012
16328 Progress Report : Jan. 2013
16273 MPR No. 13 : Dec. 2012
16460 Progress report : Feb. 2013
16539 Progresso Report : March 2013
10 NH-1 A (2151) : Multi sector project for infrastructures rehabilitation in Jummu ….
16278 MPR : Jan. 2013
16425 MPR : Feb. 2013
16571 MPR : March 2013
11 NH-9 (HV) : Independent consultancy services for design, engineering, construction, development ….
16289 Monthly Report : Dec. 2012
16290 MPR. Dec. 2012
16291 MPR : Jan. 2013
10
16337 Monthly Report : Jan. 2012
16436 Monthly Report : Feb. 2013
16476 Quarterly Report : Feb. 2013
16575 Monthly Report : March 2013
16576 MPR : Feb. 2013
12 NH-47 (KL-1) : 4/6 laning of NH from Thrissur to Edapally section of NH-47 …..
16190 MPR : Oct. 2012
16284 MPR : Nov. 2012
16285 MPR : Dec. 2012
16405 Operation & Maintenance Inspection Report : Jan. 2013
16567 Operation and maintenance inspection report : Feb. 2013
13 NH-47 (KL-3) : Independent engineering services for design, construction, development, finance, operation and maintenance of 6 laning of Vadakanchery t…..
16198 Monthly Inspection Report : Nov. 2012
16286 Monthly Inspection Report : Dec. 2012
16287 Quarterly Inspection Report : Dec. 2012
16288 Monthly Inspection Report : Jan. 2013
16420 Monthly Inspection Report : Feb. 2013
16550 MPR : March 2013
14 NH-50 (BH) : Four laning of Bijapur ……
16317 QPR : Dec. 2012
16318 Operation & Maintenance Report No. 6 : Dec. 2012
16319 Operation & Maintenance Report No. 7 : Jan. 2013
16426 Operation & Maintenance Report No. 8 : Feb. 2013
16581 Operation & Maintenance Report No. 9: Feb. 2013
15 MP : (2736) : Construction of ADB Assisted Nine highway corridors under ADB Loan No. 2736
16320 MPR No. 17 : Dec. 2012
16321 MPR No. 68 : Jan. 2013
16410 MPR No. 19 : Feb. 2013
16558 MPR No. 20 : March 2013
11
16582 MPR No. 16 : Feb. 2013
16 NH-4 (TH) : NHAI Western Transport corridor …..
16299 Maintenance Manual 2012 Package 5
16300 Maintenance Manual 2012 Package 4
16335 MPR No. 50 : Dec. 2012 Package 4
16336 MPR No. 50 : Dec. 2012 Package 5
17 NH-22 : independent consultancy services for 4/6 laning of Zirakpur – Parwanoo section ….
16196 MPR No. 56 : Nov. 2012
16274 QPR : No. 19 : Dec. 2012
16275 MPR No. 57 : Dec. 2012
16428 MPR No. 58 : Jan. 2013
16429 MOR No. 59 : Feb. 2013
18 MP (2154) : Consultancy services for construction supervision of package No. 2…..
16244 MPR No. 70 : August 2012
19 NH-8 (D) : Independent engineering services for the four langin of Jetpur somnath section from …..
16199 MPR No. 13 : Nov. 2012
16311 QPR No. 4 : Dec. 2012
16313 MPR No. 14 : Dec. 2012
16450 MPR :No. 15 : Jan. 2013
16473 QPR : Dec. 2013
16474 MPR No. 76 : Feb. 2013
16563 MPR No.16 : Frb.2013
20 NH-30 (Mohani) : Independent engineering services for the work of four laning of Mohaniara section of NH-30 ………
16200 QPR : Sept. 2012
16292 MPR : Jan. 2012
16293 QPR : Dec. 2012
16294 MPR : Jan. 2013
16453 MPR : Feb. 2013
16572 MPR : March 2013
16588 QPR : March 2013
21 NH-47 (08) : Design, engineering, finance, construction, and maintenance of 6 laning from
16279 Various other report : Oct. 2012
16280 Various other report : Nov. 2012
12
Chengapalli to start of Coimbatore …..
16281 Various other report : Dec. 2012
16282 MPR : Nov. 2012
16283 MPR : Dec. 2012
16568 Various other report : Feb. 20132
22 SH-80 (Bihar) : Bhabhua-Adhaura
16153 Bidding documents Vol. I : conditions of contract : Dec. 2012
16154 Bidding documents Vol. II : Technical specification : Dec. 2012
16155 Bidding documents Vol. III : Bill of quantities : Dec. 2012
16156 MFDPR: Vol. I : Main Report : Dec. 2012
CD
16157 MFDPR: Vol. I (A) : Appendices to main report : Dec. 2012
16158 MFDPR : Vol. II : Design Report : Dec. 2012.
16159 MFDPR : Vol. II(A) : Bridge design calculation : Dec. 2012
16160 MFDPR : Vol. II(B) : Sub-soil exploration report : Dec. 2012
16161 MFDPR : Vol. III : Material Report : Dec. 2012
16162 MFDPR : Vol. IV : Cost estimate : Dec. 2012
16163 MFDPR : Vol. V : Rate analysis : Dec. 2012
16164 MFDPR : Vol. VI I (B) : Environmental Impact assessment report : Dec. 2012
16165 MFDPR : Vol. VII (A) : Poverty and social assessment including resettlement plan report. : Dec. 2012
23 SH-82 (Bihar) : rehabilitation upgrading and strengthening of SH-82, Bhabhua –Adhaura …..
16166 Bidding documents : Vol. I : conditions of contracts : Dec. 2012
16167 Bidding documents : Vol. II : Technical specification : Dec. 2012
16168 Bidding documents : Vol. III : Bill of
13
quantities : Dec. 2012
16169 MFDPR : Vol. I : Main Report : Dec. 2012
CD
16170 MFDPR : Vol. I (A) : Appendices to main report : Dec. 2012
16171 MFDPR : Vol. II : Design Report : Dec. 2012
16172 MFDPR : Vol. II(A) Bridge design calculation (Part 1 of II): Dec. 2012
16173 MFDPR : Vol. II(A) Bridge design calculation (Part II of II ) Dec. 2012
16174 MFDPR : Vol. II (B) : Sub soil exploration report : Dec. 2012
16175 MFDPR : Vol. III : Material Report : Dec. 2012
16176 MFDPR : Vol. IV : Cost estimate : Dec. 2012
16177 MFDPR : Vol. V : Rate Analysis : Dec. 2012
16178 MFDPR : Vol. VII(A) : Poverty and social assessment including resettlement plan. Dec. 2012
16179 MFDPR : Vol. II(B) : Environmental Impact assessment report : Dec. 2012
24 NH-43 : Consultancy services for preparation of detailed project report for rehabilitation and upgrading to 2 laning ….
16180 MPR : Dec. 2012.
16193 MPR : Nov. 2012
16462 MPR : Feb. 2013
16325 MPR : Jan. 2013
25 NH-15 (PJ) : Consultancy services for preparation of detailed project report for phalodi-jaisalmer section of …..
16182 MPR : Dec. 2012
16194 MPR : Nov. 2012
16461 MPR : Feb. 2013
16326 MPR : Jan .2013
16343 Final Feasibility Report : Vol. I Main Report : Feb. 2013
CD
14
16344 Final Feasibility Report :Vol. II : Appendices to main report : Feb. 2013
16345 Final Feasibility Report :Vol. III : Traffic survey & Analysis : Feb. 2013
16346 Final Feasibility Report :Vol. IV : Technical Specification : Feb. 2013
16347 Final Feasibility Report : Vol. V : Rate Analysis : Feb. 2013
16348 Final Feasibility Report : Vol. VI : Cost Estimate : Feb. 2013
16349 Final Feasibility Report : Vol. VII : Civil work contract agreement EPC: Agreement : Feb. 2013
16350 Final Feasibility Report : Vol. VIII : Drawings. : Feb. 2013
16182 MPR : Dec. 2013
26 Bihar (SPUR) : Support programme for Urban reforms in Bihar …….City Business plan for Patna Town ….
16183 Final report : for Khagaul : Dec. 2012
16184 Final report : for Phulwarisharif : Dec. 2012
16185 Final report : for Dhanpur : Dec. 2012
16186 Final report : for Patna : Dec. 2012
27 NH-54 (MN) : Four laning from km. 126/450 to km. 140/700 and km. 164 /080 to km. 165/400 Section of
16188 MPR : Nov. 2012
16457 MPR : Jan. 2013
16570 MPR : Dec. 2013
16589 MPR : March 2013
28 NH-25/26 : Jhansi to Lalitpur in the state of Uttar Pradesh ….
16189 MPR : Nov. 2012
16314 MPR : Dec. 2012
16315 QPR : Dec. 2012
16316 MPR : Jan. 2013
16573 MPR : March 2013
29 NH-58/72 (Haridwar) Independent engineering services 16191 MPR : Nov. 2012
15
for 4 laning of Haridwar Dehradun section…. 16297 MPR : Sept. 2012
16298 QPR : Dec. 2012
16547 MPR : Jan. 2013
16548 MPR : Feb. 2013
16549 Alternate pavement design proposal with RBI Grande…..
30 NH-1 (Panipat) : Preparation of detailed project report of for safer greener highway on …..
16195 MPR : Nov. 2012
16215 Final Preliminary Project Report : Vol. I : Preliminary Design Report . Dec. 2012
16216 Final Preliminary Project Report : Vol. II : Design report : Dec. 2012
16217 Final Preliminary Project Report : Vol. II (A) : appendices to design report : Dec. 2012
16218 Final Preliminary Project Report : Vol. III : Drawings : Dec. 2012
16219 Final Preliminary Project Report : Vol. IV : utility relocation plan : hand pump, water tank, : Dec. 2012
16220 Final Preliminary Project Report : Vol. V : Cost estimate : Dec. 2012
16458 MPR : Feb. 2013
16327 MPR : Jan. 2013
16540 MPR : March 2013
31 Odisha (SRP –WB : 7577) Consultancy services for road sector institutional development ……
16197 Inception Report : June 2012
32 NH-15 (BSG) : consultancy services of preparation of detailed project report for upgrading of Barmer- Sanchar-Gujrat…..
16209 Final feasibility Vol. II : Appendices to main report : Dec 2012
CD
16210 Final feasibility Vol. III : Traffic survey and analysis : Dec. 2012
16
16211 Final feasibility Vol. IV : Environment Impact assessment report : Dec. 2012
16212 Final feasibility Vol. V : Social impact screening report : Dec. 2012
16213 Final feasibility Vol. VI: Drawings : Dec. 2012
16214 Final Feasibility Vol. VII : Cost estimate : Dec. 2012
16228 Final Feasibility Vol. I : Main Report : Dec. 2012
33 Nippo : MSIL Proving Ground Project Rohtak ……
16221 MPR : Oct. 2012
16222 MPR : Nov. 2012
16540 MPR : Dec. 2012
16536 Jan. 2013
16537 Fen. 2013
34 NH-8 (Gomti): Independent engineering services for development and operation of beawar- gomti section of …..
16229 Q & M Inspection report No. 37 : Nov. 2012
16309 Q & M Inspection report No. 38 : Dec. 2012
16564 O & M Inspection Report No. 40 : Feb. 2013
35 NH-9 (PS) : Four laning of Pune –solapur section of NH-9 From km. 144.400 to km 249 . 000 in the state of Maharashtra under NHDAP…..
16230 QPR No .8 : Sept. 2012
16231 MPR No. 24 : Oct. 2012
16232 MPR : No. 25 : Nov. 2012
16437 O & M Inspection Report – 39 : Jan. 2013
16438 Quarterly/ Inspection -Progress Report No. 13 : Jan. 2013
16454 MPR No. 26 : Dec. 2012
36 NAM (AP) : Design construction finance operation and maintenance of found laning of narketpally ……
16233 QPR No. 7 : Sept. 2012
16234 MPR No. 21 : Nov, 2012
16446 QPR : No. 08 : Dec. 2012
37 NH-59 (MP) : Independent engineering services for 4 16235 QPR No. 8 : August 2012
17
laning of Godhra to Gujarat/MP Section of NH-59 ….. 16236 MPR No. 24 : Oct. 2012
16237 Inspection Report No. 23 : Nov. 2012
16238 Inspection Report No. 21 : Dec. 2012
16407 QPR No. 9 : Dec. 2012
16408 MPR No. 26 : Dec. 2012
16423 Inspection Report No. 26 : Feb. 2013
16424 Inspection Report No. 25 : Jan. 2013
38 NH-5 (CN) : Independent engineer services for design engineering construction development finance operation and maintenance of chilakaluripet ….
16242 MPR : Oct. 2012
16243 MPR : Nov. 2012
16409 MPR : Jan. 2013
16443 QPR : Dec. 2012
16445 MPR : Dec. 2012
39 NH-45 (TK) : Independent engineer services for two laning with paved shoulder of ….
16245 MPR : Oct. 2012
16246 Inspection Report No.10 : Oct. 2012
16247 Inspection Report No .11: Nov. 2012
16248 MPR : Nov. 2012
16404 MPR : Dec. 2012
16441 QPR : Dec. 2013
16442 MPR : Jan. 2013
40 NH-4 (TC) : six laning of Tumkur Chitradurga section of NH- 4 ……
16249 MPR : Oct. 2012
16250 Monthly Inspection Report : Oct. 2012
16251 Monthly Inspection Report : Nov. 2012
16252 MPR : Nov. 2012
16422 Monthly Inspection Report : Dec, 2012
41 NH-54 (E) : 4 – laning of national highway from maibang …..
16264 MPR : Dec. 2012 EW-IIB (SC-I): Dec. 2012
16265 QPR : Dec. 2012 EW-IIB (SC-I) : Dec. 2012
18
16449 MPR : Jan. 2013
42 SH-10 (Deh-ISH) : Intermediate/two laning with without paved shoudlers of
16267 MPR : Nov. 2012
16542 Lender’s engineer Report : Feb. 2013
43 SH-18 (MP) : Intermediate/two lanign with/without paved shoulders fo Thandla Limdi …..
16268 MPR : Jan. 2013
16545 MPR : Feb. 2013
16546 MPR : March 2013
44 SH-39 (Jhabua Jobat) : Two laning with/without paved shoudlers of Jhabua-Jobat Kukshi road ….
16269 MPR : Nov. 2012
16270 MPR : Dec. 2012
16271 MPR : Jan. 2013
16543 MPR : Feb. 2013
16544 MPR : March 2013
45 NH-54 (Assam) :
16276 MPR : Dec. 2012
16312 MPR : Jan. 2013
16277 QPR : Dec. 2012
46 NH-25 (EW-3B) : North-south & East West corridors
16304 MPR : August 2012
16305 MPR : Sept. 2012
16306 MPR : Oct. 2012
16307 MPR : Nov. 2012
16308 MPR : Dec. 2012
16559 MPR : Jan. 2013
16560 MPR : Feb. 2013
16561 MPR : March 2013
47 Bihar (SH) 16310 MPR : May 2012
48 Bihar (BSRDC) : Civil works contracts for Bihar State highways …….
16330 QPR : Sept. 2012
16331 MPR : Oct. 2012
16332 MPR : Nov. 2012
16333 MPR : Dec. 2012
19
16334 QPR : Dec. 2012
16574 MPR : Feb. 2013
49 Metro : owner Delhi Metro Rail corporation (Jaipur Metro) :…..
16406 Design of pile foundation & Pile cap for ….
50 Ghana (NWAR) : Consultancy services for feasibility and detailed design studies for north west accra roads
16413 Draft Final Report : Vol. I : Engineering Report Part – I : Main Report : Dec. 2012
16414 Draft Final Report : Vol. I : – 2 : open space system design guidelines and recommendation report. Dec. 2012
16415 Draft Final Report : Vol. I Part 3 : annexures to main report : Dec. 2012
16416 Draft Final Report : Vol. II : Design Drawings: Dec. 2012
16417 Draft Final Report : Vol. III : Price bill of quantities report : Dec. 2013
16418 Draft Final Report : Vol. IV : Environmental Impact assessment report : Dec. 2012
16419 Draft Final Report : Vol. V : Demographic and sociological survey report : Dec. 2012
51 NH-26 (JB) : Maintenance and repair of existing two lane road from km . 0.000 to km. 28.135…..
16447 E-Tender (Nit, Bid documents & BOQ) : Jan. 2013
52 NH-31 (PB) : Consultancy services for the preparation of detailed project report for rehabilitation and up gradation of Pundibari to …..
16477 RFDPR : Vol. I : Main report : March 2013
CD
16478 RFDPR : Vol. 2 : Design report (Part I Design of road features) : March 2013
16479 RFDPR : Vol. 2 : Design report (Part- II Design of road features) : March 2013
16480 RFDPR : Vol. 2 (A) : Appendices to design report : March 2013 : March 2013
16481 RFDPR : Vol. 3 : Material Report :March 2013
16482 RFDPR : Vol. IV (A) : Environmental Impact assessment and management plan : March 2013
20
16483 RFDPR : Vol. IV (B) : Social Impact assessment and resettlement action plan
16484 RFDPR : Vol. V : Technical specification. : March 2013
16485 RFDPR : Vol. VI : Rate Analysis : March 2013
16486 RFDPR : Vol. VII : Cost Estimate : March 2013
16487 RFDPR : Vol. VIII : Agreement and request for proposal : March : 2013
16488 RFDPR : Vol. X : Project Clearance : March 2013
53 NH-60 (A) Consultancy services for preparation of detailed project report for rehabilitation and upgrading to 2 ……
16511 FDPR Vol. Main Report : April 2013 CD
16512 FDPR Vol.(A) : Appendices to main report : April 2013
16513 FDPR Vol. II : Design Report (Part I : Roads) : March 2013
16514 FDPR Vol. II : Design Report (Part II Bridge and structures) March 2013
16515 FDPR Vol. II : Design Report (Part III: Geotechnical investigations for bridges and structures) March 2013
16516 FDPR Vol. II : Part IV : Bridges design calculation (Part I of 2) : March 2013
16517 FDPR Vol. II : Part IV : Bridges design calculation (Part 2 of 2) : March 2013
16518 FDPR Vol. II (A) : Appendices to design report (Part I : Road) March 2013
16519 FDPR Vol. III : Material Report :
16520 FDPR Vol. IV : Environment Impact assessment and EMP : March 2013
16521 FDPR Vol. V : Social Impact Assessment studies and rehabilitation action plan: March 2013
16522 FDPR Vol. VI : Technical Specification . March 2013
21
16523 FDPR Vol. VII : Rate Analysis : March 2013
16524 FDPR Vol. VIII : Cost Estimate : March 2013
16525 FDPR Vol. IX : Measurement Sheets. : March 2013
16526 FDPR Vol. XI : EPC Agreement : March 2013
16551 MPR : March 2013
16181 MPR : Dec. 2012.
16192 MPR : Nov. 2012
16329 MPR : Jan. 2013
16459 MPR : Feb. 2013
54 Ghana Kumasi Road …
16497 Details design report Ph.- II : (Draft) Vol. 1of 7 : Main Reports : March 2013
16498 Details design report : Vol. 2 of 7 : appendices to main report : March 2013
16499 Details design report : Vol. 3 of 7 : Cost estimates : March 2013
16500 Details design report : Vol. 4 of 7 : Environmental and social impact assessment report : March 2013
16501 Details design report : Vol. 5 of 7 : Environmental and social management plan : March 2013
16502 Details design report : Vol. 6 of 7 : Resettlement action plan: March 2013
16503 Details design report : Vol. 7 of 7 : Valuation Report : March 2013
16504 Vol. II : Preliminary environment and social impact assessment Ph.-I (Feasibility Report) March 2013
16505 Bidding documents Lot0 I : Lake road and Oforikram Ashowa Road Extension . March 2013
16506 Details cross sections drawings Lot I :
22
March 20132
16507 Bidding documents Lot : I Vol. 2 : Drawing : March 2013
16508 Bidding documents Lot 2…..
16509 Details cross section drawing lot1 Vol. 2 drawings : March 2013
16510 Bidding documents Lot 2: Drawing Vol.2 : March 2013
55 NH-31/28 (KT) : Independent engineering services for the project of development of greenfield bridge across river ganga and its approaches connecting …
16587 MPR : March 2013
56 NH-1 (JA): 6 laning of Jalandhar Amritsar section of NH-1 …..
16591 FDPR : Vol. I : Main Report : April 2013
16592 FDPR EPC : Agreement : April 2013
16593 FDPR EFC : Memorandum : April 2013
16594 FDPR Cost estimate : April 2013