ICT-Emissions D7.3 Website SEVENTH FRAMEWORK PROGRAMME FP7-ICT-2011-7 COLLABORATIVE PROJECT GRANT AGREEMENT N°: 288568 Deliverable number (D.7.3) Delivery date (planned): 31/03/2012 (Month 6) Delivery date (actual): 18/03/2013 (Month 18) Author(s): Florinda Boschetti (1), Sylvain Haon (1) Author’(s’) affiliation (Partner short name): 1. POLIS

Transcript of ICT-Emissions - CORDIS · Filename: D7.3 ICT-Emissions website - Final - 18-03-2013.docx 6 1...

Page 1: ICT-Emissions - CORDIS · Filename: D7.3 ICT-Emissions website - Final - 18-03-2013.docx 6 1 Introduction 1.1. OBJECTIVES OF THE DOCUMENT The main objective of this document is to

ICT-Emissions

D7.3 Website

SEVENTH FRAMEWORK PROGRAMME

FP7-ICT-2011-7

COLLABORATIVE PROJECT – GRANT AGREEMENT N°: 288568

Deliverable number (D.7.3)

Delivery date (planned): 31/03/2012 (Month 6)

Delivery date (actual): 18/03/2013 (Month 18)

Author(s): Florinda Boschetti (1), Sylvain Haon (1)

Author’(s’) affiliation (Partner short name): 1. POLIS

Page 2: ICT-Emissions - CORDIS · Filename: D7.3 ICT-Emissions website - Final - 18-03-2013.docx 6 1 Introduction 1.1. OBJECTIVES OF THE DOCUMENT The main objective of this document is to

Filename: D7.3 ICT-Emissions website - Final - 18-03-2013.docx

2

Document Control Page

Title Methodology to evaluate the impacts of ITC/ITS measures on mobility, vehicle energy consumption and CO2 emissions

Creator Florinda Boschetti (POLIS)

Editor Florinda Boschetti (POLIS)

Brief Description The main objective of this document is to present the ICT-Emissions website.

Publisher ICT-EMISSIONS Consortium

Contributors Sylvain Haon (POLIS)

Type (Deliverable/Milestone) Deliverable

Format

Creation date 15

th February 2013

Version number 0.1

Version date 14

th March 2013

Last modified by Florinda Boschetti (POLIS)

Rights

Copyright “ICT-EMISSIONS Consortium”. During the drafting process, access is generally limited to the ICT-EMISSIONS Partners.

Audience

internal public restricted, access granted to: EU Commission

Action requested

to be revised by Partners involved in the preparation of the deliverable

for approval of the WP Manager for approval of the Internal Reviewer (if required) for approval of the Project Co-ordinator

Deadline for approval

Version Date Modified by Comments

0.1 15th February 2013 Florinda Boschetti

(POLIS) 1

st Draft version of ICT-Emissions

D7.3 for partners comments

0.2 14th March 2013

Florinda Boschetti (POLIS)

Final version ICT-Emissions D7.3 for quality control

Final 0.1 Submission of ICT-Emissions D7.3 final version to the EC

Page 3: ICT-Emissions - CORDIS · Filename: D7.3 ICT-Emissions website - Final - 18-03-2013.docx 6 1 Introduction 1.1. OBJECTIVES OF THE DOCUMENT The main objective of this document is to

Filename: D7.3 ICT-Emissions website - Final - 18-03-2013.docx

3

Contents

Executive summary ............................................................................................. 5

1 Introduction ................................................................................................... 6

1.1. Objectives of the document............................................................................... 6

1.2. Structure of the deliverable ............................................................................... 6

2 Website ........................................................................................................ 7

2.1. Home page ....................................................................................................... 7

2.2. News ................................................................................................................ 8

2.3. Events .............................................................................................................. 9

2.4. About ICT-Emissions ...................................................................................... 10

2.5. Methodology ................................................................................................... 13

2.6. Join the Exploitation Group ............................................................................. 14

2.7. Deliverable and results ................................................................................... 15

2.8. Partner’s area ................................................................................................. 17

List of figures

Figure 1: Home page ..................................................................................................... 8

Figure 2: News page ..................................................................................................... 8

Figure 3: Event page ..................................................................................................... 9

Figure 4: About ICT-Emissions page ........................................................................... 10

Figure 5: Objectives description page.......................................................................... 11

Figure 6: Presentation of the consortium ..................................................................... 11

Figure 7: Workplan description page ........................................................................... 12

Figure 8: Contact us page ........................................................................................... 12

Figure 9: Methodology description page ...................................................................... 13

Figure 10: Exploitation group description page ............................................................ 14

Figure 11: Exploitation Group meetings page ............................................................. 15

Figure 12: Restricted area for Exploitation Group members ........................................ 15

Figure 13: Deliverable & Results page ........................................................................ 16

Figure 14: Subscription newsletter page ...................................................................... 16

Figure 15: Password access to member’s area ........................................................... 17

Figure 16: Deliverables protected page ....................................................................... 17

Page 4: ICT-Emissions - CORDIS · Filename: D7.3 ICT-Emissions website - Final - 18-03-2013.docx 6 1 Introduction 1.1. OBJECTIVES OF THE DOCUMENT The main objective of this document is to

Filename: D7.3 ICT-Emissions website - Final - 18-03-2013.docx

4

Figure 17: Working documents protected page ........................................................... 18

Page 5: ICT-Emissions - CORDIS · Filename: D7.3 ICT-Emissions website - Final - 18-03-2013.docx 6 1 Introduction 1.1. OBJECTIVES OF THE DOCUMENT The main objective of this document is to

Filename: D7.3 ICT-Emissions website - Final - 18-03-2013.docx

5

Executive summary

The project website is a key dissemination tool for the success of ICT-Emissions. A dedicated site has been set up at the url http://www.ict-emissions.eu/ with the aim to allow the internal (project partners) and external community (stakeholders interested in the project outcome) to follow up on new developments and results.

The website has publicly accessible webpages which offer a general overview on the project, its methodology, workflow, partnership, and exploitation group. Whilst the member’s area is meant for consortium members and members of the exploitation group.

The website will be active during the 3-year project lifetime and will be updated on a regular basis. Polis is in charge of managing and updating the website with input from all partners on project news and relevant events.

It should be noted that the project website was submitted in time, but this report was prepared as a response to the comments from the 1st Annual Technical Project review.

Page 6: ICT-Emissions - CORDIS · Filename: D7.3 ICT-Emissions website - Final - 18-03-2013.docx 6 1 Introduction 1.1. OBJECTIVES OF THE DOCUMENT The main objective of this document is to

Filename: D7.3 ICT-Emissions website - Final - 18-03-2013.docx

6

1 Introduction

1.1. OBJECTIVES OF THE DOCUMENT

The main objective of this document is to present the ICT-Emissions website.

1.2. STRUCTURE OF THE DELIVERABLE

This deliverable aims to describe a key dissemination tool for the success of ICT-Emissions Project, more specifically, Chapter 2 introduces the ICT-Emissions website, providing an overview of the content. It should be acknowledge that a website is dynamic and the content will be continuously update during the project. Therefore in order to get the most update content please refer to: http://www.ict-emissions.eu/.

Page 7: ICT-Emissions - CORDIS · Filename: D7.3 ICT-Emissions website - Final - 18-03-2013.docx 6 1 Introduction 1.1. OBJECTIVES OF THE DOCUMENT The main objective of this document is to

Filename: D7.3 ICT-Emissions website - Final - 18-03-2013.docx

7

2 Website

A dedicated project website has been set up (http://www.ict-emissions.eu/). As previously acknowledge a website is dynamic and the content will be continuously update during the project. Therefore in order to get the most update content please refer directly to the website.

The purpose of the website is to allow the internal and external community to follow up on new developments and results. The website has a number of tools allowing partners and the public to disseminate the results to all potential stakeholders from industry and operators, public authorities, infrastructure managers and academia. Below is an illustration of the ICT-Emissions Home page (Figure 1). The following sub-sections will briefly outline the purpose of the main content on the ICT-Emissions website.

2.1. HOME PAGE

The website home page http://www.ict-emissions.eu features a rotating news items box where latest news about the project alternate. There is additional information about Events, and News located on a menu on the top right of all website pages. This will allow users to easily access content about the project from anywhere on the site or return to Home page.

Web links to relevant EU projects which cooperate with ICT-Emissions are listed in a box in the lower left hand side. These projects are: AMITRAN, ECOSTAND, and COST action TU0903 MULTITUDE. Social media messages posted on the ICT-Emissions’ Twitter account are displayed in a box on the right hand side.

The website has publicly accessible webpages which offer a general overview on the project, its methodology, workflow, partnership, and exploitation group. The member’s area is meant for consortium members and members of the exploitation group. Here they have access to restricted material such meeting minutes, project deliverables, etc.

Page 8: ICT-Emissions - CORDIS · Filename: D7.3 ICT-Emissions website - Final - 18-03-2013.docx 6 1 Introduction 1.1. OBJECTIVES OF THE DOCUMENT The main objective of this document is to

Filename: D7.3 ICT-Emissions website - Final - 18-03-2013.docx

8

Figure 1: Home page

2.2. NEWS

The home page displays a roating News items module. The project will publish the latest news and related events.

Figure 2: News page

Page 9: ICT-Emissions - CORDIS · Filename: D7.3 ICT-Emissions website - Final - 18-03-2013.docx 6 1 Introduction 1.1. OBJECTIVES OF THE DOCUMENT The main objective of this document is to

Filename: D7.3 ICT-Emissions website - Final - 18-03-2013.docx

9

2.3. EVENTS

This section lists all relevant (internal and external) Events. Internal Events are meetings and workshops organised by ICT-Emissions (i.e. Exploitation Group workshops). External Events are networking opportunities for the consortium to present the methodology and project results.

Figure 3: Event page

Page 10: ICT-Emissions - CORDIS · Filename: D7.3 ICT-Emissions website - Final - 18-03-2013.docx 6 1 Introduction 1.1. OBJECTIVES OF THE DOCUMENT The main objective of this document is to

2.4. ABOUT ICT-EMISSIONS

This section offers a general overview on Project Objectives, the Consortium of European partners, and Project Workflow.

Figure 4: About ICT-Emissions page

Page 11: ICT-Emissions - CORDIS · Filename: D7.3 ICT-Emissions website - Final - 18-03-2013.docx 6 1 Introduction 1.1. OBJECTIVES OF THE DOCUMENT The main objective of this document is to

Filename: D7.3 ICT-Emissions website - Final - 18-03-2013.docx

11

Figure 5: Objectives description page

Figure 6: Presentation of the consortium

Page 12: ICT-Emissions - CORDIS · Filename: D7.3 ICT-Emissions website - Final - 18-03-2013.docx 6 1 Introduction 1.1. OBJECTIVES OF THE DOCUMENT The main objective of this document is to

Filename: D7.3 ICT-Emissions website - Final - 18-03-2013.docx

12

Figure 7: Workplan description page

Figure 8: Contact us page

Page 13: ICT-Emissions - CORDIS · Filename: D7.3 ICT-Emissions website - Final - 18-03-2013.docx 6 1 Introduction 1.1. OBJECTIVES OF THE DOCUMENT The main objective of this document is to

Filename: D7.3 ICT-Emissions website - Final - 18-03-2013.docx

13

2.5. METHODOLOGY

This section offers a description of the ICT-Emissions methodology for assessing the impact of advanced ICT -measures on transport.

Figure 9: Methodology description page

Page 14: ICT-Emissions - CORDIS · Filename: D7.3 ICT-Emissions website - Final - 18-03-2013.docx 6 1 Introduction 1.1. OBJECTIVES OF THE DOCUMENT The main objective of this document is to

2.6. JOIN THE EXPLOITATION GROUP

This section is dedicated to ICT-Emissions Exploitation Group. This area has public and restricted pages. The public page Meetings will display announcements of upcoming Exploitation Group workshops, agenda, and materials from completed activities. The restricted page Exploitation Group Restricted Area is available via subscription to members of the Exploitation group and partners only.

Figure 10: Exploitation group description page

Page 15: ICT-Emissions - CORDIS · Filename: D7.3 ICT-Emissions website - Final - 18-03-2013.docx 6 1 Introduction 1.1. OBJECTIVES OF THE DOCUMENT The main objective of this document is to

Filename: D7.3 ICT-Emissions website - Final - 18-03-2013.docx

15

Figure 11: Exploitation Group meetings page

Figure 12: Restricted area for Exploitation Group members

2.7. DELIVERABLE AND RESULTS

The download area of the website has public access. The public downloads section will be used to make documents such as the project leaflet, newsletter and public deliverables freely available to download in .pdf format.

Page 16: ICT-Emissions - CORDIS · Filename: D7.3 ICT-Emissions website - Final - 18-03-2013.docx 6 1 Introduction 1.1. OBJECTIVES OF THE DOCUMENT The main objective of this document is to

Filename: D7.3 ICT-Emissions website - Final - 18-03-2013.docx

16

The section Newsletter includes an on-line registration form allowing users to subscribe to ICT-Emissions newsletter.

Figure 13: Deliverable & Results page

Figure 14: Subscription newsletter page

Page 17: ICT-Emissions - CORDIS · Filename: D7.3 ICT-Emissions website - Final - 18-03-2013.docx 6 1 Introduction 1.1. OBJECTIVES OF THE DOCUMENT The main objective of this document is to

Filename: D7.3 ICT-Emissions website - Final - 18-03-2013.docx

17

2.8. PARTNER’S AREA

The member’s area is meant for consortium members and members of the Exploitation Group. Here they have access to restricted material such meeting minutes, project deliverables, etc. It includes pages for the project management, deliverables, logos and templates, and working documents.

Figure 15: Password access to member’s area

Figure 16: Deliverables protected page

Page 18: ICT-Emissions - CORDIS · Filename: D7.3 ICT-Emissions website - Final - 18-03-2013.docx 6 1 Introduction 1.1. OBJECTIVES OF THE DOCUMENT The main objective of this document is to

Filename: D7.3 ICT-Emissions website - Final - 18-03-2013.docx

18

Figure 17: Working documents protected page