16
Activity ID Activity Name Original Duration Start Finish Idaho College Idaho College of Osteopathic Medicine 955 06-Dec-16 19-Jul-19 Preconstruction | Preconstruction | Design Phase 133 06-Dec-16 17-Apr-17 Pre1000 CMAR RFQ | SOQ submittal 0 06-Dec-16* Pre1050 CMAR SOQ Review 5 06-Dec-16 12-Dec-16 Pre1100 CMAR Final Interview | Selection 0 16-Dec-16* Pre1150 CMAR | McAlvain Agreement 0 19-Dec-16* Pre1200 Design Development | 70% Completion 0 09-Jan-17* Pre1250 DD Phase Estimate I (70%) 15 09-Jan-17 27-Jan-17 Pre1300 DD Phase Value Analysis | Constructability Review 15 09-Jan-17 27-Jan-17 Pre1325 Project Management Plan - McAlvain 0 30-Jan-17 Pre1350 CoM Early Start Grading Permit Submittal 0 09-Jan-17* Pre1400 Idaho Power Design Agreement 15 09-Jan-17 27-Jan-17 Pre1425 SWPPP Plan Development 15 09-Jan-17 27-Jan-17 Pre1450 EPA Notice of Intent Filing | 10 Day wait 10 30-Jan-17 10-Feb-17 Pre1500 CoM Early Start Grading Permit Review | Issuance 16 09-Jan-17 30-Jan-17 Pre1525 Groundbreaking Ceremony 0 30-Jan-17* Pre1550 Phase I GMP Submit - Grading | Foundations 0 07-Feb-17 Pre1600 Phase I GMP Agreement | Owner Notice to Proceed 0 08-Feb-17 Pre2550 Construction Documents | 85% Completion 25 09-Jan-17 10-Feb-17 Pre2650 85% CD Phase Estimate 10 13-Feb-17 24-Feb-17 Pre2675 Quality Management Plan - McAlvain 0 06-Mar-17 Pre2700 Risk Management Plan - McAlvain 0 06-Mar-17 Pre2725 BIM Management Plan - McAlvain 0 06-Mar-17 Pre2775 Phase II GMP Submit - Early Procurement & Key Subs 0 13-Mar-17 Pre2825 Phase II GMP - Owner Approve | Contract Ammendment 0 16-Mar-17 Pre2875 Construction Documents - 100% Completion 11 13-Feb-17 27-Feb-17 Pre3750 CoM Building Permit Submittal | Review 35 28-Feb-17 17-Apr-17 Pre3775 CoM Building Permit | Fees Paid 0 17-Apr-17 Pre3825 Utility Service | ACHD Impact Fees Paid 10 28-Mar-17 10-Apr-17 Pre4000 Phase III GMP Submit - 100% CD | Permit Set Docs 0 11-Apr-17 Pre4500 Phase III GMP - Owner Approve | Contract Ammendment 0 14-Apr-17 Procurement Procurement 438 09-Jan-17 22-Mar-18 Bidding | Solicit Bidding | Solicitation 95 09-Jan-17 14-Apr-17 ProBid1000 Advertising | Marketing | Subcontractor Prequalification 45 09-Jan-17 10-Mar-17 ProBid1050 Bid Packaging | Instructions 45 09-Jan-17 10-Mar-17 ProBid1100 Phase I Bid Solicitation - Grading | Foundations 12 18-Jan-17 02-Feb-17 ProBid1300 Phase I Pre-Award Meetings | Notices of Intent 2 03-Feb-17 06-Feb-17 ProBid1350 Phase I Bid Awards | Notices to Proceed 0 07-Feb-17 ProBid1400 Phase II Bid Solicitation - Early Procurement | Key Subs 15 13-Feb-17 03-Mar-17 ProBid1450 Phase II Pre-Bid Meeting 1 27-Feb-17 27-Feb-17 ProBid1600 Phase II Pre-Award Meetings | Notices of Intent 5 06-Mar-17 10-Mar-17 ProBid1650 Phase II Bid Awards | Notices to Proceed 0 16-Mar-17 ProBid1700 Phase III Bid Solicitation | Final Pricing - 100% CDs 20 28-Feb-17 27-Mar-17 ProBid1750 Phase III Pre-Bid Meeting | Addenda 10 07-Mar-17 20-Mar-17 ProBid1800 Phase III Bid Review | Pre-Award | Notice of Intent 10 21-Mar-17 03-Apr-17 ProBid1850 Phase III Bid Award | Notices to Proceed 0 14-Apr-17 Contracting | S Contracting | Submittals 409 07-Feb-17 22-Mar-18 Subcontracts | P Subcontracts | Purchase & Rental Agreements 157 07-Feb-17 13-Jul-17 Div. 01 | General Div. 01 | General 7 07-Feb-17 13-Feb-17 ProSPA.01.1000 Portable Toilets - RA 5 07-Feb-17 13-Feb-17 ProSPA.01.1050 Office Trailer - RA 5 07-Feb-17 13-Feb-17 ProSPA.01.1100 Forklift - RA 5 07-Feb-17 13-Feb-17 ProSPA.01.1150 Surveyor - Subc 0 07-Feb-17 Div. 02 | Existing C Div. 02 | Existing Conditions 0 07-Feb-17 07-Feb-17 ProSPA.02.1000 Sawcutting | Core Drilling - PA 0 07-Feb-17 Div. 03 | Concrete Div. 03 | Concrete 87 14-Feb-17 11-May-17 ProSPA.03.1000 Concrete Foundations | Flatwork - Subc 5 14-Feb-17 20-Feb-17 ProSPA.03.1050 Concrete Reinforcement - Subc 5 14-Feb-17 20-Feb-17 ProSPA.03.1100 Concrete Grind | polish - Subc 5 05-May-17 11-May-17 ProSPA.03.1150 Concrete Curb & Gutter - Subc 5 05-May-17 11-May-17 ProSPA.03.1200 Precast Concrete - Subc 5 05-May-17 11-May-17 Div. 04 | Masonry Div. 04 | Masonry 21 28-Apr-17 18-May-17 ProSPA.04.1000 Masonry - Subc 5 28-Apr-17 04-May-17 ProSPA.04.1050 Scaffold - RA 5 12-May-17 18-May-17 Div. 05 | Metals Div. 05 | Metals 57 16-Mar-17 11-May-17 ProSPA.05.1000 Structural | Misc. Steel Supply - Subc 0 16-Mar-17 ProSPA.05.1050 Structural Steel Erect - Subc 0 16-Mar-17 ProSPA.05.1100 Metal Flashings | Coping - Subc 5 05-May-17 11-May-17 ProSPA.05.1150 Metal Framing - Subc 5 28-Apr-17 04-May-17 Div. 06 | Woods, P Div. 06 | Woods, Plastics & Composites 14 28-Apr-17 11-May-17 ProSPA.06.1000 Rough Carpentry - Subc 5 05-May-17 11-May-17 ProSPA.06.1050 Architectural Woodwork - Subc 5 28-Apr-17 04-May-17 ProSPA.06.1100 Millworks | Cabinetry | Countertops - Subc 5 28-Apr-17 04-May-17 Div. 07 | Thermal & Div. 07 | Thermal & Moisture Protection 87 14-Feb-17 11-May-17 ProSPA.07.1000 Insulation - Subc 5 05-May-17 11-May-17 ProSPA.07.1050 Rigid Insulation - PA 5 14-Feb-17 20-Feb-17 ProSPA.07.1100 Dampproofing | Waterproofing - Subc 5 14-Feb-17 20-Feb-17 ProSPA.07.1150 TPO Roofing - Subc 5 05-May-17 11-May-17 ProSPA.07.1200 Metal Wall | Roof Paneling - Subc 5 28-Apr-17 04-May-17 ProSPA.07.1250 Fluid Applied Air Barrier - Subc 5 28-Apr-17 04-May-17 Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Qtr 4, 2016 Qtr 1, 2017 Qtr 2, 2017 Qtr 3, 2017 Qtr 4, 2017 Qtr 1, 2018 Qtr 2, 2018 Qtr 3, 2018 Qtr 4, 2018 06-Dec-16 06-Dec-16 17-Apr-17, Preconstruction | Design Phase 06-Dec-16* CMAR RFQ | SOQ submittal 06-Dec-16 CMAR SOQ Review 16-Dec-16* CMAR Final Interview | Selection 19-Dec-16* CMAR | McAlvain Agreement 09-Jan-17* Design Development | 70% Completion 09-Jan-17 DD Phase Estimate I (70%) 09-Jan-17 DD Phase Value Analysis | Constructability Review 30-Jan-17 Project Management Plan - McAlvain 09-Jan-17* CoM Early Start Grading Permit Submittal 09-Jan-17 Idaho Power Design Agreement 09-Jan-17 SWPPP Plan Development 30-Jan-17 EPA Notice of Intent Filing | 10 Day wait 09-Jan-17 CoM Early Start Grading Permit Review | Issuance 30-Jan-17* Groundbreaking Ceremony 07-Feb-17 Phase I GMP Submit - Grading | Foundations 08-Feb-17 Phase I GMP Agreement | Owner Notice to Proceed 09-Jan-17 Construction Documents | 85% Completion 13-Feb-17 85% CD Phase Estimate 06-Mar-17 Quality Management Plan - McAlvain 06-Mar-17 Risk Management Plan - McAlvain 06-Mar-17 BIM Management Plan - McAlvain 13-Mar-17 Phase II GMP Submit - Early Procurement & Key Subs 16-Mar-17 Phase II GMP - Owner Approve | Contract Ammendment 13-Feb-17 Construction Documents - 100% Completion 28-Feb-17 CoM Building Permit Submittal | Review 17-Apr-17 CoM Building Permit | Fees Paid 28-Mar-17 Utility Service | ACHD Impact Fees Paid 11-Apr-17 Phase III GMP Submit - 100% CD | Permit Set Docs 14-Apr-17 Phase III GMP - Owner Approve | Contract Ammendment 09-Jan-17 22-Mar-18, Procurement 09-Jan-17 14-Apr-17, Bidding | Solicitation 09-Jan-17 Advertising | Marketing | Subcontractor Prequalification 09-Jan-17 Bid Packaging | Instructions 18-Jan-17 Phase I Bid Solicitation - Grading | Foundations 03-Feb-17 Phase I Pre-Award Meetings | Notices of Intent 07-Feb-17 Phase I Bid Awards | Notices to Proceed 13-Feb-17 Phase II Bid Solicitation - Early Procurement | Key Subs 27-Feb-17 Phase II Pre-Bid Meeting 06-Mar-17 Phase II Pre-Award Meetings | Notices of Intent 16-Mar-17 Phase II Bid Awards | Notices to Proceed 28-Feb-17 Phase III Bid Solicitation | Final Pricing - 100% CDs 07-Mar-17 Phase III Pre-Bid Meeting | Addenda 21-Mar-17 Phase III Bid Review | Pre-Award | Notice of Intent 14-Apr-17 Phase III Bid Award | Notices to Proceed 07-Feb-17 22-Mar-18, Contracting | Submittals 07-Feb-17 13-Jul-17, Subcontracts | Purchase & Rental Agreements 07-Feb-17 13-Feb-17, Div. 01 | General 07-Feb-17 Portable Toilets - RA 07-Feb-17 Office Trailer - RA 07-Feb-17 Forklift - RA 07-Feb-17 Surveyor - Subc 07-Feb-17 07-Feb-17, Div. 02 | Existing Conditions 07-Feb-17 Sawcutting | Core Drilling - PA 14-Feb-17 11-May-17, Div. 03 | Concrete 14-Feb-17 Concrete Foundations | Flatwork - Subc 14-Feb-17 Concrete Reinforcement - Subc 05-May-17 Concrete Grind | polish - Subc 05-May-17 Concrete Curb & Gutter - Subc 05-May-17 Precast Concrete - Subc 28-Apr-17 18-May-17, Div. 04 | Masonry 28-Apr-17 Masonry - Subc 12-May-17 Scaffold - RA 16-Mar-17 11-May-17, Div. 05 | Metals 16-Mar-17 Structural | Misc. Steel Supply - Subc 16-Mar-17 Structural Steel Erect - Subc 05-May-17 Metal Flashings | Coping - Subc 28-Apr-17 Metal Framing - Subc 28-Apr-17 11-May-17, Div. 06 | Woods, Plastics & Composites 05-May-17 Rough Carpentry - Subc 28-Apr-17 Architectural Woodwork - Subc 28-Apr-17 Millworks | Cabinetry | Countertops - Subc 14-Feb-17 11-May-17, Div. 07 | Thermal & Moisture Protection 05-May-17 Insulation - Subc 14-Feb-17 Rigid Insulation - PA 14-Feb-17 Dampproofing | Waterproofing - Subc 05-May-17 TPO Roofing - Subc 28-Apr-17 Metal Wall | Roof Paneling - Subc 28-Apr-17 Fluid Applied Air Barrier - Subc Idaho College of Osteopathic Medicine | Boise, Idaho Conceptual Project Delivery Schedule Date Revision Checked Approved 01-Dec-16 DRAFT - Conceptual JN JN 05-Dec-16 DRAFT - Conceptual Rev.1 JN CG Page 1 of 13 Information is Proprietary & Confidential - Redistribution or use without prior written authorization is prohibited. Schedule is preliminary and conceptual - intended to provide a general understanding of potential pathway to completion. Schedule is not intended to capture all task items necessary for completion of project scope.

Transcript of ICOM Schedule & Logistics (1)

Page 1: ICOM Schedule & Logistics (1)

Activity ID Activity Name Original

Duration

Start Finish

Idaho College of Osteopathic MedicineIdaho College of Osteopathic Medicine 955 06-Dec-16 19-Jul-19

Preconstruction | Design PhasePreconstruction | Design Phase 133 06-Dec-16 17-Apr-17

Pre1000 CMAR RFQ | SOQ submittal 0 06-Dec-16*

Pre1050 CMAR SOQ Review 5 06-Dec-16 12-Dec-16

Pre1100 CMAR Final Interview | Selection 0 16-Dec-16*

Pre1150 CMAR | McAlvain Agreement 0 19-Dec-16*

Pre1200 Design Development | 70% Completion 0 09-Jan-17*

Pre1250 DD Phase Estimate I (70%) 15 09-Jan-17 27-Jan-17

Pre1300 DD Phase Value Analysis | Constructability Review 15 09-Jan-17 27-Jan-17

Pre1325 Project Management Plan - McAlvain 0 30-Jan-17

Pre1350 CoM Early Start Grading Permit Submittal 0 09-Jan-17*

Pre1400 Idaho Power Design Agreement 15 09-Jan-17 27-Jan-17

Pre1425 SWPPP Plan Development 15 09-Jan-17 27-Jan-17

Pre1450 EPA Notice of Intent Filing | 10 Day wait 10 30-Jan-17 10-Feb-17

Pre1500 CoM Early Start Grading Permit Review | Issuance 16 09-Jan-17 30-Jan-17

Pre1525 Groundbreaking Ceremony 0 30-Jan-17*

Pre1550 Phase I GMP Submit - Grading | Foundations 0 07-Feb-17

Pre1600 Phase I GMP Agreement | Owner Notice to Proceed 0 08-Feb-17

Pre2550 Construction Documents | 85% Completion 25 09-Jan-17 10-Feb-17

Pre2650 85% CD Phase Estimate 10 13-Feb-17 24-Feb-17

Pre2675 Quality Management Plan - McAlvain 0 06-Mar-17

Pre2700 Risk Management Plan - McAlvain 0 06-Mar-17

Pre2725 BIM Management Plan - McAlvain 0 06-Mar-17

Pre2775 Phase II GMP Submit - Early Procurement & Key Subs 0 13-Mar-17

Pre2825 Phase II GMP - Owner Approve | Contract Ammendment 0 16-Mar-17

Pre2875 Construction Documents - 100% Completion 11 13-Feb-17 27-Feb-17

Pre3750 CoM Building Permit Submittal | Review 35 28-Feb-17 17-Apr-17

Pre3775 CoM Building Permit | Fees Paid 0 17-Apr-17

Pre3825 Utility Service | ACHD Impact Fees Paid 10 28-Mar-17 10-Apr-17

Pre4000 Phase III GMP Submit - 100% CD | Permit Set Docs 0 11-Apr-17

Pre4500 Phase III GMP - Owner Approve | Contract Ammendment 0 14-Apr-17

ProcurementProcurement 438 09-Jan-17 22-Mar-18

Bidding | SolicitationBidding | Solicitation 95 09-Jan-17 14-Apr-17

ProBid1000 Advertising | Marketing | Subcontractor Prequalification 45 09-Jan-17 10-Mar-17

ProBid1050 Bid Packaging | Instructions 45 09-Jan-17 10-Mar-17

ProBid1100 Phase I Bid Solicitation - Grading | Foundations 12 18-Jan-17 02-Feb-17

ProBid1300 Phase I Pre-Award Meetings | Notices of Intent 2 03-Feb-17 06-Feb-17

ProBid1350 Phase I Bid Awards | Notices to Proceed 0 07-Feb-17

ProBid1400 Phase II Bid Solicitation - Early Procurement | Key Subs 15 13-Feb-17 03-Mar-17

ProBid1450 Phase II Pre-Bid Meeting 1 27-Feb-17 27-Feb-17

ProBid1600 Phase II Pre-Award Meetings | Notices of Intent 5 06-Mar-17 10-Mar-17

ProBid1650 Phase II Bid Awards | Notices to Proceed 0 16-Mar-17

ProBid1700 Phase III Bid Solicitation | Final Pricing - 100% CDs 20 28-Feb-17 27-Mar-17

ProBid1750 Phase III Pre-Bid Meeting | Addenda 10 07-Mar-17 20-Mar-17

ProBid1800 Phase III Bid Review | Pre-Award | Notice of Intent 10 21-Mar-17 03-Apr-17

ProBid1850 Phase III Bid Award | Notices to Proceed 0 14-Apr-17

Contracting | SubmittalsContracting | Submittals 409 07-Feb-17 22-Mar-18

Subcontracts | Purchase & Rental AgreementsSubcontracts | Purchase & Rental Agreements 157 07-Feb-17 13-Jul-17Div. 01 | GeneralDiv. 01 | General 7 07-Feb-17 13-Feb-17

ProSPA.01.1000 Portable Toilets - RA 5 07-Feb-17 13-Feb-17

ProSPA.01.1050 Office Trailer - RA 5 07-Feb-17 13-Feb-17

ProSPA.01.1100 Forklift - RA 5 07-Feb-17 13-Feb-17

ProSPA.01.1150 Surveyor - Subc 0 07-Feb-17Div. 02 | Existing ConditionsDiv. 02 | Existing Conditions 0 07-Feb-17 07-Feb-17

ProSPA.02.1000 Sawcutting | Core Drilling - PA 0 07-Feb-17Div. 03 | ConcreteDiv. 03 | Concrete 87 14-Feb-17 11-May-17

ProSPA.03.1000 Concrete Foundations | Flatwork - Subc 5 14-Feb-17 20-Feb-17

ProSPA.03.1050 Concrete Reinforcement - Subc 5 14-Feb-17 20-Feb-17

ProSPA.03.1100 Concrete Grind | polish - Subc 5 05-May-17 11-May-17

ProSPA.03.1150 Concrete Curb & Gutter - Subc 5 05-May-17 11-May-17

ProSPA.03.1200 Precast Concrete - Subc 5 05-May-17 11-May-17Div. 04 | MasonryDiv. 04 | Masonry 21 28-Apr-17 18-May-17

ProSPA.04.1000 Masonry - Subc 5 28-Apr-17 04-May-17

ProSPA.04.1050 Scaffold - RA 5 12-May-17 18-May-17Div. 05 | MetalsDiv. 05 | Metals 57 16-Mar-17 11-May-17

ProSPA.05.1000 Structural | Misc. Steel Supply - Subc 0 16-Mar-17

ProSPA.05.1050 Structural Steel Erect - Subc 0 16-Mar-17

ProSPA.05.1100 Metal Flashings | Coping - Subc 5 05-May-17 11-May-17

ProSPA.05.1150 Metal Framing - Subc 5 28-Apr-17 04-May-17Div. 06 | Woods, Plastics & CompositesDiv. 06 | Woods, Plastics & Composites 14 28-Apr-17 11-May-17

ProSPA.06.1000 Rough Carpentry - Subc 5 05-May-17 11-May-17

ProSPA.06.1050 Architectural Woodwork - Subc 5 28-Apr-17 04-May-17

ProSPA.06.1100 Millworks | Cabinetry | Countertops - Subc 5 28-Apr-17 04-May-17Div. 07 | Thermal & Moisture ProtectionDiv. 07 | Thermal & Moisture Protection 87 14-Feb-17 11-May-17

ProSPA.07.1000 Insulation - Subc 5 05-May-17 11-May-17

ProSPA.07.1050 Rigid Insulation - PA 5 14-Feb-17 20-Feb-17

ProSPA.07.1100 Dampproofing | Waterproofing - Subc 5 14-Feb-17 20-Feb-17

ProSPA.07.1150 TPO Roofing - Subc 5 05-May-17 11-May-17

ProSPA.07.1200 Metal Wall | Roof Paneling - Subc 5 28-Apr-17 04-May-17

ProSPA.07.1250 Fluid Applied Air Barrier - Subc 5 28-Apr-17 04-May-17

Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

Qtr 4, 2016 Qtr 1, 2017 Qtr 2, 2017 Qtr 3, 2017 Qtr 4, 2017 Qtr 1, 2018 Qtr 2, 2018 Qtr 3, 2018 Qtr 4, 2018

06-Dec-16

06-Dec-16 17-Apr-17, Preconstruction | Design Phase

06-Dec-16* CMAR RFQ | SOQ submittal

06-Dec-16 CMAR SOQ Review

16-Dec-16* CMAR Final Interview | Selection

19-Dec-16* CMAR | McAlvain Agreement

09-Jan-17* Design Development | 70% Completion

09-Jan-17 DD Phase Estimate I (70%)

09-Jan-17 DD Phase Value Analysis | Constructability Review

30-Jan-17 Project Management Plan - McAlvain

09-Jan-17* CoM Early Start Grading Permit Submittal

09-Jan-17 Idaho Power Design Agreement

09-Jan-17 SWPPP Plan Development

30-Jan-17 EPA Notice of Intent Filing | 10 Day wait

09-Jan-17 CoM Early Start Grading Permit Review | Issuance

30-Jan-17* Groundbreaking Ceremony

07-Feb-17 Phase I GMP Submit - Grading | Foundations

08-Feb-17 Phase I GMP Agreement | Owner Notice to Proceed

09-Jan-17 Construction Documents | 85% Completion

13-Feb-17 85% CD Phase Estimate

06-Mar-17 Quality Management Plan - McAlvain

06-Mar-17 Risk Management Plan - McAlvain

06-Mar-17 BIM Management Plan - McAlvain

13-Mar-17 Phase II GMP Submit - Early Procurement & Key Subs

16-Mar-17 Phase II GMP - Owner Approve | Contract Ammendment

13-Feb-17 Construction Documents - 100% Completion

28-Feb-17 CoM Building Permit Submittal | Review

17-Apr-17 CoM Building Permit | Fees Paid

28-Mar-17 Utility Service | ACHD Impact Fees Paid

11-Apr-17 Phase III GMP Submit - 100% CD | Permit Set Docs

14-Apr-17 Phase III GMP - Owner Approve | Contract Ammendment

09-Jan-17 22-Mar-18, Procurement

09-Jan-17 14-Apr-17, Bidding | Solicitation

09-Jan-17 Advertising | Marketing | Subcontractor Prequalification

09-Jan-17 Bid Packaging | Instructions

18-Jan-17 Phase I Bid Solicitation - Grading | Foundations

03-Feb-17 Phase I Pre-Award Meetings | Notices of Intent

07-Feb-17 Phase I Bid Awards | Notices to Proceed

13-Feb-17 Phase II Bid Solicitation - Early Procurement | Key Subs

27-Feb-17 Phase II Pre-Bid Meeting

06-Mar-17 Phase II Pre-Award Meetings | Notices of Intent

16-Mar-17 Phase II Bid Awards | Notices to Proceed

28-Feb-17 Phase III Bid Solicitation | Final Pricing - 100% CDs

07-Mar-17 Phase III Pre-Bid Meeting | Addenda

21-Mar-17 Phase III Bid Review | Pre-Award | Notice of Intent

14-Apr-17 Phase III Bid Award | Notices to Proceed

07-Feb-17 22-Mar-18, Contracting | Submittals

07-Feb-17 13-Jul-17, Subcontracts | Purchase & Rental Agreements

07-Feb-17 13-Feb-17, Div. 01 | General07-Feb-17 Portable Toilets - RA

07-Feb-17 Office Trailer - RA

07-Feb-17 Forklift - RA

07-Feb-17 Surveyor - Subc

07-Feb-17 07-Feb-17, Div. 02 | Existing Conditions07-Feb-17 Sawcutting | Core Drilling - PA

14-Feb-17 11-May-17, Div. 03 | Concrete14-Feb-17 Concrete Foundations | Flatwork - Subc

14-Feb-17 Concrete Reinforcement - Subc

05-May-17 Concrete Grind | polish - Subc

05-May-17 Concrete Curb & Gutter - Subc

05-May-17 Precast Concrete - Subc

28-Apr-17 18-May-17, Div. 04 | Masonry28-Apr-17 Masonry - Subc

12-May-17 Scaffold - RA

16-Mar-17 11-May-17, Div. 05 | Metals16-Mar-17 Structural | Misc. Steel Supply - Subc

16-Mar-17 Structural Steel Erect - Subc

05-May-17 Metal Flashings | Coping - Subc

28-Apr-17 Metal Framing - Subc

28-Apr-17 11-May-17, Div. 06 | Woods, Plastics & Composites05-May-17 Rough Carpentry - Subc

28-Apr-17 Architectural Woodwork - Subc

28-Apr-17 Millworks | Cabinetry | Countertops - Subc

14-Feb-17 11-May-17, Div. 07 | Thermal & Moisture Protection05-May-17 Insulation - Subc

14-Feb-17 Rigid Insulation - PA

14-Feb-17 Dampproofing | Waterproofing - Subc

05-May-17 TPO Roofing - Subc

28-Apr-17 Metal Wall | Roof Paneling - Subc

28-Apr-17 Fluid Applied Air Barrier - Subc

Idaho College of Osteopathic Medicine | Boise, Idaho

Conceptual Project Delivery Schedule

Date Revision Checked Approved

01-Dec-16 DRAFT - Conceptual JN JN

05-Dec-16 DRAFT - Conceptual Rev.1 JN CG

Page 1 of 13 Information is Proprietary & Confidential - Redistribution or use without prior written authorization is prohibited. Schedule is preliminary and conceptual - intended to provide a general understanding of potential

pathway to completion. Schedule is not intended to capture all task items necessary for completion of project scope.

Page 2: ICOM Schedule & Logistics (1)

Activity ID Activity Name Original

Duration

Start Finish

ProSPA.07.1300 Spray Applied Fire Proofing - Subc 5 21-Apr-17 27-Apr-17

ProSPA.07.1350 Joint Filler | Sealants - Subc 5 05-May-17 11-May-17

ProSPA.07.1400 Miscellaneous Sheet Metal - Subc 5 05-May-17 11-May-17Div. 08 | Doors & WindowsDiv. 08 | Doors & Windows 35 14-Apr-17 18-May-17

ProSPA.08.1000 Doors | Frames | Hardware - Subc 5 05-May-17 11-May-17

ProSPA.08.1050 Access Controls - Subc 5 05-May-17 11-May-17

ProSPA.08.1100 Storefront | Curtainwall - Subc 0 14-Apr-17

ProSPA.08.1150 Fire Doors - Subc 5 28-Apr-17 04-May-17

ProSPA.08.1200 Door | Hardware Install - Subc 5 12-May-17 18-May-17

ProSPA.08.1250 Specialty Doors - Subc 5 05-May-17 11-May-17Div. 09 | FinishesDiv. 09 | Finishes 7 05-May-17 11-May-17

ProSPA.09.1000 Painting - Subc 5 05-May-17 11-May-17

ProSPA.09.1050 Tile - Subc 5 05-May-17 11-May-17

ProSPA.09.1100 Carpet - Subc 5 05-May-17 11-May-17

ProSPA.09.1150 Specialty Flooring - Subc 5 05-May-17 11-May-17Div. 10 | SpecialtiesDiv. 10 | Specialties 14 05-May-17 18-May-17

ProSPA.10.1000 Visual Displays - PA 5 12-May-17 18-May-17

ProSPA.10.1050 Restroom Partitions | Accessories - PA 5 12-May-17 18-May-17

ProSPA.10.1100 Lockers | Post Boxes - PA 5 12-May-17 18-May-17

ProSPA.10.1150 DIRTT Partition Walls - Subc 5 05-May-17 11-May-17

ProSPA.10.1200 Signage - Subc 5 12-May-17 18-May-17Div. 11 | EquipmentDiv. 11 | Equipment 63 12-May-17 13-Jul-17

ProSPA.11.1000 Audio | Visual Package - Subc 5 12-May-17 18-May-17

ProSPA.11.1050 Audio-Video Package - FF&E 5 07-Jul-17 13-Jul-17

ProSPA.11.1100 Food Service Equipment - FF&E 5 07-Jul-17 13-Jul-17

ProSPA.11.1150 Healthcare Equipment - FF&E 5 07-Jul-17 13-Jul-17Div. 12 | FurnishingsDiv. 12 | Furnishings 64 16-Mar-17 18-May-17

ProSPA.12.1000 Roller Window Shades - Subc 5 12-May-17 18-May-17

ProSPA.12.1050 Lecterns - Subc 5 12-May-17 18-May-17

ProSPA.12.1100 Auditorium Seating - Subc 5 05-May-17 11-May-17

ProSPA.12.1150 Entrance Floor Mats & Frames - PA 5 16-Mar-17 22-Mar-17

ProSPA.12.1200 Bicycle Racks - PA 5 12-May-17 18-May-17

ProSPA.12.1250 Site Tables | Chairs | Trash Bins - PA 5 12-May-17 18-May-17Div. 13 | Specialty ConstructionDiv. 13 | Specialty Construction 7 12-May-17 18-May-17

ProSPA.13.1000 Water Feature | Fountain Equipment - PA 5 12-May-17 18-May-17Div. 14 | Conveying EquipmentDiv. 14 | Conveying Equipment 0 16-Mar-17 16-Mar-17

ProSPA.14.1000 Elevators - Subc 0 16-Mar-17Div. 21 | Fire SuppressionDiv. 21 | Fire Suppression 0 16-Mar-17 16-Mar-17

ProSPA.21.1000 Fire Sprinkler - Subc 0 16-Mar-17Div. 22 | PlumbingDiv. 22 | Plumbing 0 16-Mar-17 16-Mar-17

ProSPA.22.1000 Plumbing | Wet Mechanical - Subc 0 16-Mar-17Div. 23 | HVACDiv. 23 | HVAC 36 16-Mar-17 20-Apr-17

ProSPA.23.1000 Dry Mechanical - Subc 0 16-Mar-17

ProSPA.23.1050 Test & Balance - Subc 5 14-Apr-17 20-Apr-17Div. 25 | Integrated AutomationDiv. 25 | Integrated Automation 7 21-Apr-17 27-Apr-17

ProSPA.25.1000 Building Automation System - Subc 5 21-Apr-17 27-Apr-17Div. 26 | ElectricalDiv. 26 | Electrical 0 16-Mar-17 16-Mar-17

ProSPA.26.1000 Electrical - Subc 0 16-Mar-17Div. 27 | CommunicationsDiv. 27 | Communications 7 28-Apr-17 04-May-17

ProSPA.27.1000 Phone | Data - Subc 5 28-Apr-17 04-May-17

ProSPA.27.1050 Phone Service - PA 5 28-Apr-17 04-May-17Div. 28 | Electronic Safety & SecurityDiv. 28 | Electronic Safety & Security 14 21-Apr-17 04-May-17

ProSPA.28.1000 Security System - Subc 5 28-Apr-17 04-May-17

ProSPA.28.1050 Fire Alarm - Subc 5 21-Apr-17 27-Apr-17Div. 31 | EarthworkDiv. 31 | Earthwork 0 07-Feb-17 07-Feb-17

ProSPA.31.1000 Earthwork | Structural Excavation - Subc 0 07-Feb-17Div. 32 | Exterior ImprovementsDiv. 32 | Exterior Improvements 7 12-May-17 18-May-17

ProSPA.32.1000 Asphalt Paving - Subc 5 12-May-17 18-May-17

ProSPA.32.1050 Landscape | Irrigation - Subc 5 12-May-17 18-May-17

ProSPA.32.1100 Striping | Site Signage- Subc 5 12-May-17 18-May-17

ProSPA.32.1150 Brick Paving - Subc 5 12-May-17 18-May-17Div. 33 | UtilitiesDiv. 33 | Utilities 7 23-Mar-17 29-Mar-17

ProSPA.33.1000 Utilities - Subc 5 23-Mar-17 29-Mar-17

Submittals - Delivered | Reviewed | ApprovedSubmittals - Delivered | Reviewed | Approved 409 07-Feb-17 22-Mar-18Div. 01 | GeneralDiv. 01 | General 86 15-Feb-17 11-May-17

Sub.D.01.1000 01 29 73 | Schedule of Values 10 21-Apr-17 04-May-17

Sub.D.01.1050 01 31 19 | Pre-installation Meetings 10 21-Apr-17 04-May-17

Sub.D.01.1100 01 35 29 | Health, Safety, and Emergency Response Plan 10 15-Feb-17 28-Feb-17

Sub.D.01.1150 01 45 16 | Field Quality Control Procedures 10 15-Feb-17 28-Feb-17

Sub.D.01.1200 01 74 19 | Construction Waste Management & Disposal 10 15-Feb-17 28-Feb-17

Sub.D.01.1250 01 81 19 | Indoor Air Quality Requirements 10 28-Apr-17 11-May-17Div. 02 | Existing ConditionsDiv. 02 | Existing Conditions 7 07-Feb-17 13-Feb-17

Sub.D.02.1000 02 21 13 | Site Survey 5 07-Feb-17 13-Feb-17

Sub.D.02.1050 02 41 13 | Selective Site Demolition 5 07-Feb-17 13-Feb-17Div. 03 | ConcreteDiv. 03 | Concrete 206 21-Feb-17 14-Sep-17

Sub.D.03.1000 03 15 00 | Concrete Accessories 10 14-Mar-17 27-Mar-17

Sub.D.03.1050 03 20 00 | Concrete Reinforcing 15 14-Mar-17 03-Apr-17

Sub.D.03.1100 03 22 00 | Welded Wire Fabric Reinforcing 10 14-Mar-17 27-Mar-17

Sub.D.03.1150 03 30 00 | CIP Concrete Mix Designs 10 07-Mar-17 20-Mar-17

Sub.D.03.1200 03 39 00 | Concrete Curing 10 14-Mar-17 27-Mar-17

Sub.D.03.1250 03 40 00 | Precast Concrete 30 04-Aug-17 14-Sep-17

Sub.D.03.1300 03 60 00 | Grouting 15 21-Feb-17 13-Mar-17Div. 04 | MasonryDiv. 04 | Masonry 49 26-May-17 13-Jul-17

Sub.D.04.1000 04 05 16 | Masonry Grout 10 02-Jun-17 15-Jun-17

Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

Qtr 4, 2016 Qtr 1, 2017 Qtr 2, 2017 Qtr 3, 2017 Qtr 4, 2017 Qtr 1, 2018 Qtr 2, 2018 Qtr 3, 2018 Qtr 4, 2018

21-Apr-17 Spray Applied Fire Proofing - Subc

05-May-17 Joint Filler | Sealants - Subc

05-May-17 Miscellaneous Sheet Metal - Subc

14-Apr-17 18-May-17, Div. 08 | Doors & Windows05-May-17 Doors | Frames | Hardware - Subc

05-May-17 Access Controls - Subc

14-Apr-17 Storefront | Curtainwall - Subc

28-Apr-17 Fire Doors - Subc

12-May-17 Door | Hardware Install - Subc

05-May-17 Specialty Doors - Subc

05-May-17 11-May-17, Div. 09 | Finishes05-May-17 Painting - Subc

05-May-17 Tile - Subc

05-May-17 Carpet - Subc

05-May-17 Specialty Flooring - Subc

05-May-17 18-May-17, Div. 10 | Specialties12-May-17 Visual Displays - PA

12-May-17 Restroom Partitions | Accessories - PA

12-May-17 Lockers | Post Boxes - PA

05-May-17 DIRTT Partition Walls - Subc

12-May-17 Signage - Subc

12-May-17 13-Jul-17, Div. 11 | Equipment12-May-17 Audio | Visual Package - Subc

07-Jul-17 Audio-Video Package - FF&E

07-Jul-17 Food Service Equipment - FF&E

07-Jul-17 Healthcare Equipment - FF&E

16-Mar-17 18-May-17, Div. 12 | Furnishings12-May-17 Roller Window Shades - Subc

12-May-17 Lecterns - Subc

05-May-17 Auditorium Seating - Subc

16-Mar-17 Entrance Floor Mats & Frames - PA

12-May-17 Bicycle Racks - PA

12-May-17 Site Tables | Chairs | Trash Bins - PA

12-May-17 18-May-17, Div. 13 | Specialty Construction12-May-17 Water Feature | Fountain Equipment - PA

16-Mar-17 16-Mar-17, Div. 14 | Conveying Equipment16-Mar-17 Elevators - Subc

16-Mar-17 16-Mar-17, Div. 21 | Fire Suppression16-Mar-17 Fire Sprinkler - Subc

16-Mar-17 16-Mar-17, Div. 22 | Plumbing16-Mar-17 Plumbing | Wet Mechanical - Subc

16-Mar-17 20-Apr-17, Div. 23 | HVAC16-Mar-17 Dry Mechanical - Subc

14-Apr-17 Test & Balance - Subc

21-Apr-17 27-Apr-17, Div. 25 | Integrated Automation21-Apr-17 Building Automation System - Subc

16-Mar-17 16-Mar-17, Div. 26 | Electrical16-Mar-17 Electrical - Subc

28-Apr-17 04-May-17, Div. 27 | Communications28-Apr-17 Phone | Data - Subc

28-Apr-17 Phone Service - PA

21-Apr-17 04-May-17, Div. 28 | Electronic Safety & Security28-Apr-17 Security System - Subc

21-Apr-17 Fire Alarm - Subc

07-Feb-17 07-Feb-17, Div. 31 | Earthwork07-Feb-17 Earthwork | Structural Excavation - Subc

12-May-17 18-May-17, Div. 32 | Exterior Improvements12-May-17 Asphalt Paving - Subc

12-May-17 Landscape | Irrigation - Subc

12-May-17 Striping | Site Signage- Subc

12-May-17 Brick Paving - Subc

23-Mar-17 29-Mar-17, Div. 33 | Utilities23-Mar-17 Utilities - Subc

07-Feb-17 22-Mar-18, Submittals - Delivered | Reviewed | Approved

15-Feb-17 11-May-17, Div. 01 | General21-Apr-17 01 29 73 | Schedule of Values

21-Apr-17 01 31 19 | Pre-installation Meetings

15-Feb-17 01 35 29 | Health, Safety, and Emergency Response Plan

15-Feb-17 01 45 16 | Field Quality Control Procedures

15-Feb-17 01 74 19 | Construction Waste Management & Disposal

28-Apr-17 01 81 19 | Indoor Air Quality Requirements

07-Feb-17 13-Feb-17, Div. 02 | Existing Conditions07-Feb-17 02 21 13 | Site Survey

07-Feb-17 02 41 13 | Selective Site Demolition

21-Feb-17 14-Sep-17, Div. 03 | Concrete14-Mar-17 03 15 00 | Concrete Accessories

14-Mar-17 03 20 00 | Concrete Reinforcing

14-Mar-17 03 22 00 | Welded Wire Fabric Reinforcing

07-Mar-17 03 30 00 | CIP Concrete Mix Designs

14-Mar-17 03 39 00 | Concrete Curing

04-Aug-17 03 40 00 | Precast Concrete

21-Feb-17 03 60 00 | Grouting

26-May-17 13-Jul-17, Div. 04 | Masonry02-Jun-17 04 05 16 | Masonry Grout

Idaho College of Osteopathic Medicine | Boise, Idaho

Conceptual Project Delivery Schedule

Date Revision Checked Approved

01-Dec-16 DRAFT - Conceptual JN JN

05-Dec-16 DRAFT - Conceptual Rev.1 JN CG

Page 2 of 13 Information is Proprietary & Confidential - Redistribution or use without prior written authorization is prohibited. Schedule is preliminary and conceptual - intended to provide a general understanding of potential

pathway to completion. Schedule is not intended to capture all task items necessary for completion of project scope.

Page 3: ICOM Schedule & Logistics (1)

Activity ID Activity Name Original

Duration

Start Finish

Sub.D.04.1050 04 05 19 | Masonry Reinforcing 15 26-May-17 15-Jun-17

Sub.D.04.1100 04 05 23 | Masonry Accessories 10 26-May-17 08-Jun-17

Sub.D.04.1150 04 20 00 | Unit Masonry 15 26-May-17 15-Jun-17

Sub.D.04.1200 04 21 13 | Brick Masonry 20 16-Jun-17 13-Jul-17

Sub.D.04.1250 04 42 10 | Exterior Stone Cladding 20 16-Jun-17 13-Jul-17Div. 05 | MetalsDiv. 05 | Metals 85 23-Mar-17 15-Jun-17

Sub.D.05.0950 05 12 00 | Anchor Bolt Drawings 7 23-Mar-17 31-Mar-17

Sub.D.05.1000 05 12 00 | Structural Steel Framing 30 06-Apr-17 17-May-17

Sub.D.05.1050 05 30 00 | Metal Decking 10 13-Apr-17 26-Apr-17

Sub.D.05.1100 05 40 00 | Cold-Formed Metal Framing 15 26-May-17 15-Jun-17

Sub.D.05.1200 05 51 00 | Metal Stairs 15 20-Apr-17 10-May-17

Sub.D.05.1250 05 73 00 | Decorative Metal Railings 15 04-May-17 24-May-17Div. 06 | Woods, Plastics & CompositesDiv. 06 | Woods, Plastics & Composites 84 28-Jul-17 19-Oct-17

Sub.D.06.1000 06 10 53 | Miscellaneous Rough Carpentry 10 04-Aug-17 17-Aug-17

Sub.D.06.1050 06 16 43 | Gypsum Sheathing 10 28-Jul-17 10-Aug-17

Sub.D.06.1100 06 22 00 | Millwork 20 22-Sep-17 19-Oct-17

Sub.D.06.1150 06 40 00 | Architectural Woodwork 20 22-Sep-17 19-Oct-17

Sub.D.06.1200 06 41 13 | Wood-Veneer-Faced Architectural Cabinets 20 22-Sep-17 19-Oct-17

Sub.D.06.1250 06 42 16 | Wood Veneer Paneling 20 22-Sep-17 19-Oct-17

Sub.D.06.1300 06 61 16 | Solid Surfacing Fabrication 20 22-Sep-17 19-Oct-17Div. 07 | Thermal & Moisture ProtectionDiv. 07 | Thermal & Moisture Protection 248 07-Mar-17 09-Nov-17

Sub.D.07.1000 07 10 00 | Dampproofing and Waterproofing 10 07-Mar-17 20-Mar-17

Sub.D.07.1050 07 21 00 | Thermal Insulation 10 04-Aug-17 17-Aug-17

Sub.D.07.1100 07 22 00 | Roof & Deck Insulation 10 27-Oct-17 09-Nov-17

Sub.D.07.1150 07 26 16 | Below-Grade Vapor Retarders 10 07-Mar-17 20-Mar-17

Sub.D.07.1200 07 27 26 | Fluid-Applied Membrane Air Barriers 10 02-Jun-17 15-Jun-17

Sub.D.07.1250 07 41 13 | Metal Roof Panels 20 16-Jun-17 13-Jul-17

Sub.D.07.1300 07 42 13 | Metal Wall Panels 20 16-Jun-17 13-Jul-17

Sub.D.07.1350 07 54 00 | Thermoplastic Membrane Roofing 20 15-Sep-17 12-Oct-17

Sub.D.07.1400 07 60 00 | Flashing & Sheet Metal 15 09-Jun-17 29-Jun-17

Sub.D.07.1450 07 81 00 | Applied Fireproofing 10 12-May-17 25-May-17

Sub.D.07.1500 07 92 13 | Elastomeric Joint Sealants 10 23-Jun-17 06-Jul-17Div. 08 | Doors & WindowsDiv. 08 | Doors & Windows 140 12-May-17 28-Sep-17

Sub.D.08.1000 08 11 13 | Hollow Metal Doors & Frames 10 09-Jun-17 22-Jun-17

Sub.D.08.1050 08 12 16 | Aluminum Frames 15 12-May-17 01-Jun-17

Sub.D.08.1100 08 14 00 | Wood Doors 10 15-Sep-17 28-Sep-17

Sub.D.08.1150 08 31 00 | Access Doors & Panels 10 15-Sep-17 28-Sep-17

Sub.D.08.1200 08 33 00 | Coiling Doors & Grilles 15 14-Jul-17 03-Aug-17

Sub.D.08.1250 08 35 13 | Folding Fire Doors 15 14-Jul-17 03-Aug-17

Sub.D.08.1300 08 40 00 | Entrances, Storefronts, and Curtain Walls 45 16-Jun-17 17-Aug-17

Sub.D.08.1350 08 71 00 | Door Hardware 30 23-Jun-17 03-Aug-17

Sub.D.08.1400 08 81 00 | Glass Glazing 15 07-Jul-17 27-Jul-17Div. 09 | FinishesDiv. 09 | Finishes 175 02-Jun-17 23-Nov-17

Sub.D.09.1000 09 21 16 | Gypsum Board Assemblies 10 02-Jun-17 15-Jun-17

Sub.D.09.1050 09 22 16 | Non-Structural Metal Framing 15 02-Jun-17 22-Jun-17

Sub.D.09.1100 09 30 13 | Ceramic Tiling 20 29-Sep-17 26-Oct-17

Sub.D.09.1150 09 51 23 | Acoustical Tile Ceiling 15 22-Sep-17 12-Oct-17

Sub.D.09.1200 09 54 26 | Linear Wood Ceilings 20 22-Sep-17 19-Oct-17

Sub.D.09.1250 09 62 00 | Specialty Flooring 20 27-Oct-17 23-Nov-17

Sub.D.09.1300 09 68 13 | Tile Carpeting 20 27-Oct-17 23-Nov-17

Sub.D.09.1350 09 72 00 | Wall Coverings 15 27-Oct-17 16-Nov-17

Sub.D.09.1400 09 80 00 | Acoustical Treatment 10 23-Jun-17 06-Jul-17

Sub.D.09.1450 09 91 23 | Interior Painting 20 27-Oct-17 23-Nov-17

Sub.D.09.1500 09 96 00 | High Perfromance Coatings 20 27-Oct-17 23-Nov-17Div. 10 | SpecialtiesDiv. 10 | Specialties 147 30-Jun-17 23-Nov-17

Sub.D.10.1000 10 11 33 | Sliding Visual Display Units 15 01-Sep-17 21-Sep-17

Sub.D.10.1050 10 12 00 | Display Cases 15 18-Aug-17 07-Sep-17

Sub.D.10.1100 10 14 00 | Signage 15 03-Nov-17 23-Nov-17

Sub.D.10.1150 10 21 13 | Toilet Compartments 10 01-Sep-17 14-Sep-17

Sub.D.10.1200 10 22 19 | Demountable Partitions - DIRTT Wall System 30 25-Aug-17 05-Oct-17

Sub.D.10.1250 10 28 13 | Toilet Accessories 10 30-Jun-17 13-Jul-17

Sub.D.10.1300 10 51 16 | Wood Lockers 15 08-Sep-17 28-Sep-17

Sub.D.10.1350 10 55 00 | Postal Specialties 15 11-Aug-17 31-Aug-17

Sub.D.10.1400 10 71 13 | Exterior Sun Control Devices 30 07-Jul-17 17-Aug-17Div. 11 | EquipmentDiv. 11 | Equipment 84 05-May-17 27-Jul-17

Sub.D.11.1000 11 14 53 | Pedestrian Security Equipment 10 05-May-17 18-May-17

Sub.D.11.1050 11 40 00 | Food Service Equipment 10 14-Jul-17 27-Jul-17

Sub.D.11.1100 11 52 00 | Audio-Visual Equipment 10 14-Jul-17 27-Jul-17

Sub.D.11.1150 11 70 00 | Healthcare Equipment 10 14-Jul-17 27-Jul-17Div. 12 | FurnishingsDiv. 12 | Furnishings 239 30-Mar-17 23-Nov-17

Sub.D.12.1000 12 24 13 | Roller Window Shades 10 03-Nov-17 16-Nov-17

Sub.D.12.1150 12 36 61 | Simulated Stone Countertops 15 08-Sep-17 28-Sep-17

Sub.D.12.1200 12 48 13 | Entrance Floor Mats & Frames 10 30-Mar-17 12-Apr-17

Sub.D.12.1250 12 56 39 | Lecterns 15 22-Sep-17 12-Oct-17

Sub.D.12.1300 12 61 00 | Fixed Audience Seating 30 15-Sep-17 26-Oct-17

Sub.D.12.1350 12 93 00 | Site Furnishings 15 03-Nov-17 23-Nov-17

Sub.D.12.1400 12 93 13 | Bicycle Racks 10 03-Nov-17 16-Nov-17Div. 13 | Special ConstructionDiv. 13 | Special Construction 42 22-Sep-17 02-Nov-17

Sub.D.13.1000 13 12 13 | Exterior Fountains 30 22-Sep-17 02-Nov-17Div. 14 | Conveying EquipmentDiv. 14 | Conveying Equipment 28 13-Apr-17 10-May-17

Sub.D.14.1000 14 20 00 | Elevators 20 13-Apr-17 10-May-17

Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

Qtr 4, 2016 Qtr 1, 2017 Qtr 2, 2017 Qtr 3, 2017 Qtr 4, 2017 Qtr 1, 2018 Qtr 2, 2018 Qtr 3, 2018 Qtr 4, 2018

26-May-17 04 05 19 | Masonry Reinforcing

26-May-17 04 05 23 | Masonry Accessories

26-May-17 04 20 00 | Unit Masonry

16-Jun-17 04 21 13 | Brick Masonry

16-Jun-17 04 42 10 | Exterior Stone Cladding

23-Mar-17 15-Jun-17, Div. 05 | Metals23-Mar-17 05 12 00 | Anchor Bolt Drawings

06-Apr-17 05 12 00 | Structural Steel Framing

13-Apr-17 05 30 00 | Metal Decking

26-May-17 05 40 00 | Cold-Formed Metal Framing

20-Apr-17 05 51 00 | Metal Stairs

04-May-17 05 73 00 | Decorative Metal Railings

28-Jul-17 19-Oct-17, Div. 06 | Woods, Plastics & Composites04-Aug-17 06 10 53 | Miscellaneous Rough Carpentry

28-Jul-17 06 16 43 | Gypsum Sheathing

22-Sep-17 06 22 00 | Millwork

22-Sep-17 06 40 00 | Architectural Woodwork

22-Sep-17 06 41 13 | Wood-Veneer-Faced Architectural Cabinets

22-Sep-17 06 42 16 | Wood Veneer Paneling

22-Sep-17 06 61 16 | Solid Surfacing Fabrication

07-Mar-17 09-Nov-17, Div. 07 | Thermal & Moisture Protection07-Mar-17 07 10 00 | Dampproofing and Waterproofing

04-Aug-17 07 21 00 | Thermal Insulation

27-Oct-17 07 22 00 | Roof & Deck Insulation

07-Mar-17 07 26 16 | Below-Grade Vapor Retarders

02-Jun-17 07 27 26 | Fluid-Applied Membrane Air Barriers

16-Jun-17 07 41 13 | Metal Roof Panels

16-Jun-17 07 42 13 | Metal Wall Panels

15-Sep-17 07 54 00 | Thermoplastic Membrane Roofing

09-Jun-17 07 60 00 | Flashing & Sheet Metal

12-May-17 07 81 00 | Applied Fireproofing

23-Jun-17 07 92 13 | Elastomeric Joint Sealants

12-May-17 28-Sep-17, Div. 08 | Doors & Windows09-Jun-17 08 11 13 | Hollow Metal Doors & Frames

12-May-17 08 12 16 | Aluminum Frames

15-Sep-17 08 14 00 | Wood Doors

15-Sep-17 08 31 00 | Access Doors & Panels

14-Jul-17 08 33 00 | Coiling Doors & Grilles

14-Jul-17 08 35 13 | Folding Fire Doors

16-Jun-17 08 40 00 | Entrances, Storefronts, and Curtain Walls

23-Jun-17 08 71 00 | Door Hardware

07-Jul-17 08 81 00 | Glass Glazing

02-Jun-17 23-Nov-17, Div. 09 | Finishes02-Jun-17 09 21 16 | Gypsum Board Assemblies

02-Jun-17 09 22 16 | Non-Structural Metal Framing

29-Sep-17 09 30 13 | Ceramic Tiling

22-Sep-17 09 51 23 | Acoustical Tile Ceiling

22-Sep-17 09 54 26 | Linear Wood Ceilings

27-Oct-17 09 62 00 | Specialty Flooring

27-Oct-17 09 68 13 | Tile Carpeting

27-Oct-17 09 72 00 | Wall Coverings

23-Jun-17 09 80 00 | Acoustical Treatment

27-Oct-17 09 91 23 | Interior Painting

27-Oct-17 09 96 00 | High Perfromance Coatings

30-Jun-17 23-Nov-17, Div. 10 | Specialties01-Sep-17 10 11 33 | Sliding Visual Display Units

18-Aug-17 10 12 00 | Display Cases

03-Nov-17 10 14 00 | Signage

01-Sep-17 10 21 13 | Toilet Compartments

25-Aug-17 10 22 19 | Demountable Partitions - DIRTT Wall System

30-Jun-17 10 28 13 | Toilet Accessories

08-Sep-17 10 51 16 | Wood Lockers

11-Aug-17 10 55 00 | Postal Specialties

07-Jul-17 10 71 13 | Exterior Sun Control Devices

05-May-17 27-Jul-17, Div. 11 | Equipment05-May-17 11 14 53 | Pedestrian Security Equipment

14-Jul-17 11 40 00 | Food Service Equipment

14-Jul-17 11 52 00 | Audio-Visual Equipment

14-Jul-17 11 70 00 | Healthcare Equipment

30-Mar-17 23-Nov-17, Div. 12 | Furnishings03-Nov-17 12 24 13 | Roller Window Shades

08-Sep-17 12 36 61 | Simulated Stone Countertops

30-Mar-17 12 48 13 | Entrance Floor Mats & Frames

22-Sep-17 12 56 39 | Lecterns

15-Sep-17 12 61 00 | Fixed Audience Seating

03-Nov-17 12 93 00 | Site Furnishings

03-Nov-17 12 93 13 | Bicycle Racks

22-Sep-17 02-Nov-17, Div. 13 | Special Construction22-Sep-17 13 12 13 | Exterior Fountains

13-Apr-17 10-May-17, Div. 14 | Conveying Equipment13-Apr-17 14 20 00 | Elevators

Idaho College of Osteopathic Medicine | Boise, Idaho

Conceptual Project Delivery Schedule

Date Revision Checked Approved

01-Dec-16 DRAFT - Conceptual JN JN

05-Dec-16 DRAFT - Conceptual Rev.1 JN CG

Page 3 of 13 Information is Proprietary & Confidential - Redistribution or use without prior written authorization is prohibited. Schedule is preliminary and conceptual - intended to provide a general understanding of potential

pathway to completion. Schedule is not intended to capture all task items necessary for completion of project scope.

Page 4: ICOM Schedule & Logistics (1)

Activity ID Activity Name Original

Duration

Start Finish

Div. 21 | Fire SuppressionDiv. 21 | Fire Suppression 42 30-Mar-17 10-May-17Sub.D.21.1000 21 13 13 | Wet-Pipe Sprinkler System 30 30-Mar-17 10-May-17

Div. 22 | PlumbingDiv. 22 | Plumbing 224 23-Mar-17 01-Nov-17Sub.D.22.1000 22 05 29 | Hangers & Supports for Plumbing Piping & Equipment 15 06-Apr-17 26-Apr-17

Sub.D.22.1050 22 10 00 | Plumbing Piping & Pumps 15 12-Oct-17 01-Nov-17

Sub.D.22.1100 22 11 16 | Domestic Water Piping 15 23-Mar-17 12-Apr-17

Sub.D.22.1150 22 13 16 | Sanitary Waste & Vent Piping 15 23-Mar-17 12-Apr-17

Sub.D.22.1200 22 14 13 | Facility Storm Drainage Piping 15 23-Mar-17 12-Apr-17

Sub.D.22.1250 22 34 00 | Fuel-Fired Domestic Water Heaters 15 06-Apr-17 26-Apr-17

Sub.D.22.1300 22 40 00 | Plumbing Fixtures 15 27-Apr-17 17-May-17

Sub.D.22.1350 22 52 00 | Fountain Plumbing System 15 08-Jun-17 28-Jun-17Div. 23 | HVACDiv. 23 | HVAC 63 13-Apr-17 14-Jun-17

Sub.D.23.1000 23 09 13 | Instrumentation and Control Devices for HVAC 20 18-May-17 14-Jun-17

Sub.D.23.1050 23 09 93 | Sequence of Operations for HVAC Controls 20 18-May-17 14-Jun-17

Sub.D.23.1100 23 11 23 | Natural-Gas Piping 10 13-Apr-17 26-Apr-17

Sub.D.23.1150 23 31 13 | Metal Ducts 15 27-Apr-17 17-May-17

Sub.D.23.1200 23 32 33 | Air-Distribution Ceiling Plenums 15 27-Apr-17 17-May-17

Sub.D.23.1250 23 36 16 | Variable-Air-Volume Units 20 27-Apr-17 24-May-17

Sub.D.23.1300 23 37 13 | Diffusers, Registers, and Grilles 15 18-May-17 07-Jun-17

Sub.D.23.1350 23 52 00 | Heating Boilers 20 27-Apr-17 24-May-17

Sub.D.23.1400 23 74 00 | Packaged Outdoor HVAC Equipment 20 27-Apr-17 24-May-17

Sub.D.23.1450 23 81 26 | Split-System Air-Conditioners 20 18-May-17 14-Jun-17Div. 25 | Integrated AutomationDiv. 25 | Integrated Automation 42 13-Oct-17 23-Nov-17

Sub.D.25.1000 Conductors & Cables for Integrated Automation 10 13-Oct-17 26-Oct-17

Sub.D.25.1050 25 10 00 | Integrated Automation Network Equipment 15 13-Oct-17 02-Nov-17

Sub.D.25.1100 25 90 00 | Integrated Automation Control Sequences 30 13-Oct-17 23-Nov-17Div. 26 | ElectricalDiv. 26 | Electrical 91 06-Apr-17 05-Jul-17

Sub.D.26.1000 26 05 33 | Raceway & Boxes for Electrical System 10 13-Apr-17 26-Apr-17

Sub.D.26.1050 26 05 73 | Overcurrent Protective Devices Coordination Study 20 18-May-17 14-Jun-17

Sub.D.26.1100 26 09 23 | Lighting Control Devices 15 27-Apr-17 17-May-17

Sub.D.26.1150 26 12 00 | Medium-Voltage Transformers 15 06-Apr-17 26-Apr-17

Sub.D.26.1200 26 13 13 | Medium-Voltage Circuit Breaker Switchgear 15 06-Apr-17 26-Apr-17

Sub.D.26.1250 26 24 13 | Switchboards | gear 15 27-Apr-17 17-May-17

Sub.D.26.1300 26 24 16 | Panelboards 15 27-Apr-17 17-May-17

Sub.D.26.1350 26 51 13 | Interior Lighting Fixtures, Lamps & Ballasts 20 08-Jun-17 05-Jul-17Div. 27 | CommunicationsDiv. 27 | Communications 0Div. 28 | Electronic Safety & SecurityDiv. 28 | Electronic Safety & Security 63 16-Jun-17 17-Aug-17

Sub.D.28.1000 28 13 00 | Access Control 30 16-Jun-17 27-Jul-17

Sub.D.28.1050 28 16 00 | Intrusion Detection 30 16-Jun-17 27-Jul-17

Sub.D.28.1100 28 20 00 | Electronic Surveilance 30 16-Jun-17 27-Jul-17

Sub.D.28.1150 28 31 00 | Fire Detection & Alarm 20 21-Jul-17 17-Aug-17Div. 31 | EarthworkDiv. 31 | Earthwork 0Div. 32 | Exterior ImprovementsDiv. 32 | Exterior Improvements 388 28-Feb-17 22-Mar-18

Sub.D.32.1000 32 11 00 | Base Courses 10 28-Feb-17 13-Mar-17

Sub.D.32.1050 32 12 16 | Asphalt Paving 10 15-Dec-17 28-Dec-17

Sub.D.32.1100 32 13 16 | Concrete Paving 10 08-Aug-17 21-Aug-17

Sub.D.32.1150 32 13 16 | Decorative Concrete Paving 30 08-Aug-17 18-Sep-17

Sub.D.32.1200 32 14 16 | Brick Unit Paving 15 03-Nov-17 23-Nov-17

Sub.D.32.1250 32 16 00 | Concrete Curb & Gutter 10 08-Dec-17 21-Dec-17

Sub.D.32.1300 32 17 23 | Pavement Markings 10 15-Dec-17 28-Dec-17

Sub.D.32.1350 32 17 26 | Tactile Warning Surfacing 10 27-Jun-17 10-Jul-17

Sub.D.32.1400 32 80 00 | Irrigation 15 15-Dec-17 04-Jan-18

Sub.D.32.1450 32 91 13 | Soil Preparation 10 15-Dec-17 28-Dec-17

Sub.D.32.1500 32 93 43 | Trees 20 23-Feb-18 22-Mar-18Div. 33 | UtilitiesDiv. 33 | Utilities 14 06-Apr-17 19-Apr-17

Sub.D.33.1000 33 11 00 | Water Utility Distribution Piping 10 06-Apr-17 19-Apr-17

Sub.D.33.1050 33 31 00 | Sanitary Utility Sewerage Piping 10 06-Apr-17 19-Apr-17

Sub.D.33.1100 33 41 00 | Storm Utility Drainage Piping 10 06-Apr-17 19-Apr-17

Material Lead Time | DeliveryMaterial Lead Time | Delivery 0Div. 03 | ConcreteDiv. 03 | Concrete 0Div. 04 | MasonryDiv. 04 | Masonry 0Div. 05 | MetalsDiv. 05 | Metals 0Div. 06 | Woods, Plastics & CompositesDiv. 06 | Woods, Plastics & Composites 0Div. 07 | Thermal & Moisture ProtectionDiv. 07 | Thermal & Moisture Protection 0Div. 08 | Doors & WindowsDiv. 08 | Doors & Windows 0Div. 09 | FinishesDiv. 09 | Finishes 0Div. 10 | SpecialtiesDiv. 10 | Specialties 0Div. 11 | EquipmentDiv. 11 | Equipment 0Div. 12 | FurnishingsDiv. 12 | Furnishings 0Div. 13 | Special ConstructionDiv. 13 | Special Construction 0Div. 14 | Conveying EquipmentDiv. 14 | Conveying Equipment 0Div. 21 | Fire SuppressionDiv. 21 | Fire Suppression 0Div. 22 | PlumbingDiv. 22 | Plumbing 0Div. 23 | HVACDiv. 23 | HVAC 0Div. 25 | Integrated AutomationDiv. 25 | Integrated Automation 0Div. 26 | ElectricalDiv. 26 | Electrical 0Div. 27 | CommunicationsDiv. 27 | Communications 0Div. 28 | Electronic Safety & SecurityDiv. 28 | Electronic Safety & Security 0Div. 31 | EarthworkDiv. 31 | Earthwork 0Div. 32 | Exterior ImprovementsDiv. 32 | Exterior Improvements 0Div. 33 | UtilitiesDiv. 33 | Utilities 0

ConstructionConstruction 548 08-Feb-17 10-Aug-18

Pre-Installation | Mock-Up | CoordinationPre-Installation | Mock-Up | Coordination 463 09-Feb-17 18-May-18

Div. 01 | GeneralDiv. 01 | General 96 30-Mar-17 04-Jul-17

ConPIC.01.1000 BIM Coordination Kick-Off Meeting 0 30-Mar-17

ConPIC.01.1050 BIM Clash Detection | Resolution Meetings 30 06-Apr-17 17-May-17

ConPIC.01.1100 BIM Field Coordination Meeting - 1st Floor East 0 06-Jun-17

Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

Qtr 4, 2016 Qtr 1, 2017 Qtr 2, 2017 Qtr 3, 2017 Qtr 4, 2017 Qtr 1, 2018 Qtr 2, 2018 Qtr 3, 2018 Qtr 4, 2018

30-Mar-17 10-May-17, Div. 21 | Fire Suppression30-Mar-17 21 13 13 | Wet-Pipe Sprinkler System

23-Mar-17 01-Nov-17, Div. 22 | Plumbing06-Apr-17 22 05 29 | Hangers & Supports for Plumbing Piping & Equipment

12-Oct-17 22 10 00 | Plumbing Piping & Pumps

23-Mar-17 22 11 16 | Domestic Water Piping

23-Mar-17 22 13 16 | Sanitary Waste & Vent Piping

23-Mar-17 22 14 13 | Facility Storm Drainage Piping

06-Apr-17 22 34 00 | Fuel-Fired Domestic Water Heaters

27-Apr-17 22 40 00 | Plumbing Fixtures

08-Jun-17 22 52 00 | Fountain Plumbing System

13-Apr-17 14-Jun-17, Div. 23 | HVAC18-May-17 23 09 13 | Instrumentation and Control Devices for HVAC

18-May-17 23 09 93 | Sequence of Operations for HVAC Controls

13-Apr-17 23 11 23 | Natural-Gas Piping

27-Apr-17 23 31 13 | Metal Ducts

27-Apr-17 23 32 33 | Air-Distribution Ceiling Plenums

27-Apr-17 23 36 16 | Variable-Air-Volume Units

18-May-17 23 37 13 | Diffusers, Registers, and Grilles

27-Apr-17 23 52 00 | Heating Boilers

27-Apr-17 23 74 00 | Packaged Outdoor HVAC Equipment

18-May-17 23 81 26 | Split-System Air-Conditioners

13-Oct-17 23-Nov-17, Div. 25 | Integrated Automation13-Oct-17 Conductors & Cables for Integrated Automation

13-Oct-17 25 10 00 | Integrated Automation Network Equipment

13-Oct-17 25 90 00 | Integrated Automation Control Sequences

06-Apr-17 05-Jul-17, Div. 26 | Electrical13-Apr-17 26 05 33 | Raceway & Boxes for Electrical System

18-May-17 26 05 73 | Overcurrent Protective Devices Coordination Study

27-Apr-17 26 09 23 | Lighting Control Devices

06-Apr-17 26 12 00 | Medium-Voltage Transformers

06-Apr-17 26 13 13 | Medium-Voltage Circuit Breaker Switchgear

27-Apr-17 26 24 13 | Switchboards | gear

27-Apr-17 26 24 16 | Panelboards

08-Jun-17 26 51 13 | Interior Lighting Fixtures, Lamps & Ballasts

16-Jun-17 17-Aug-17, Div. 28 | Electronic Safety & Security16-Jun-17 28 13 00 | Access Control

16-Jun-17 28 16 00 | Intrusion Detection

16-Jun-17 28 20 00 | Electronic Surveilance

21-Jul-17 28 31 00 | Fire Detection & Alarm

28-Feb-17 22-Mar-18, Div. 32 | Exterior Improvements28-Feb-17 32 11 00 | Base Courses

15-Dec-17 32 12 16 | Asphalt Paving

08-Aug-17 32 13 16 | Concrete Paving

08-Aug-17 32 13 16 | Decorative Concrete Paving

03-Nov-17 32 14 16 | Brick Unit Paving

08-Dec-17 32 16 00 | Concrete Curb & Gutter

15-Dec-17 32 17 23 | Pavement Markings

27-Jun-17 32 17 26 | Tactile Warning Surfacing

15-Dec-17 32 80 00 | Irrigation

15-Dec-17 32 91 13 | Soil Preparation

23-Feb-18 32 93 43 | Trees

06-Apr-17 19-Apr-17, Div. 33 | Utilities06-Apr-17 33 11 00 | Water Utility Distribution Piping

06-Apr-17 33 31 00 | Sanitary Utility Sewerage Piping

06-Apr-17 33 41 00 | Storm Utility Drainage Piping

08-Feb-17 10-Aug-18, Construction

09-Feb-17 18-May-18, Pre-Installation | Mock-Up | Coordination

30-Mar-17 04-Jul-17, Div. 01 | General

30-Mar-17 BIM Coordination Kick-Off Meeting

06-Apr-17 BIM Clash Detection | Resolution Meetings

06-Jun-17 BIM Field Coordination Meeting - 1st Floor East

Idaho College of Osteopathic Medicine | Boise, Idaho

Conceptual Project Delivery Schedule

Date Revision Checked Approved

01-Dec-16 DRAFT - Conceptual JN JN

05-Dec-16 DRAFT - Conceptual Rev.1 JN CG

Page 4 of 13 Information is Proprietary & Confidential - Redistribution or use without prior written authorization is prohibited. Schedule is preliminary and conceptual - intended to provide a general understanding of potential

pathway to completion. Schedule is not intended to capture all task items necessary for completion of project scope.

Page 5: ICOM Schedule & Logistics (1)

Activity ID Activity Name Original

Duration

Start Finish

ConPIC.01.1150 BIM Field Coordination Meeting - 1st Floor North 0 09-Jun-17

ConPIC.01.1200 BIM Field Coordination Meeting - 2nd Floor North 0 19-Jun-17

ConPIC.01.1250 BIM Field Coordination Meeting - 3rd Floor North 0 04-Jul-17

Div. 02 | Existing ConditionsDiv. 02 | Existing Conditions 0 09-Feb-17 09-Feb-17

ConPIC.02.1000 Surveyor Pre-Start Meeting 0 09-Feb-17

Div. 03 | ConcreteDiv. 03 | Concrete 399 12-Apr-17 16-May-18

ConPIC.03.0950 Concrete Foundations Pre-install Meeting 0 12-Apr-17

ConPIC.03.1000 Slab On Grade Pre-Install Meeting 0 02-Jun-17

ConPIC.03.1050 Slab on Deck Pre-Install Meeting 0 26-May-17

ConPIC.03.1100 Decorative Concrete Paving Mock-Up Panels 0 27-Apr-18

ConPIC.03.1150 Decorative Concrete Paving Pre-Install Meeting 0 16-May-18

Div. 04 | MasonryDiv. 04 | Masonry 14 09-Aug-17 23-Aug-17

ConPIC.04.1000 Stone Veneer Mock-Up Wall Panel 0 09-Aug-17

ConPIC.04.1050 Stone Veneer Pre-Install Meeting 0 23-Aug-17

Div. 05 | MetalsDiv. 05 | Metals 91 06-Apr-17 06-Jul-17

ConPIC.05.1000 Steel Fab Plant Inspection | Mill Certs 0 13-Apr-17

ConPIC.05.1050 Pre-Fabrication Sequence Loading Coordination Meeting 0 06-Apr-17

ConPIC.05.1100 Steel Erection Pre-Install Meeting 0 18-Apr-17

ConPIC.05.1150 Structural Framing Pre-Install Meeting 0 20-Jun-17

ConPIC.05.1200 Decorative Metal Railing Mock-Up 0 06-Jul-17

Div. 06 | Woods, Plastics & CompositesDiv. 06 | Woods, Plastics & Composites 19 10-Nov-17 29-Nov-17

ConPIC.06.1000 Architectural Millwork Pre-Fab Meeting 0 10-Nov-17

ConPIC.06.1050 Wood Panel Pre-Install Meeting 0 29-Nov-17

Div. 07 | Thermal & Moisture ProtectionDiv. 07 | Thermal & Moisture Protection 199 06-Mar-17 21-Sep-17

ConPIC.07.1050 Waterproofing Pre-Install Meeting 0 06-Mar-17

ConPIC.07.1100 Fluid Applied Air Barrier Pre-Install Meeting | Mock-Up 0 14-Jul-17

ConPIC.07.1150 Spray Applied Fire Proofing Pre-Install Meeting 0 13-Jun-17

ConPIC.07.1200 Metal Wall Panel Mock-Up 0 07-Sep-17

ConPIC.07.1250 Metal Wall Panel Pre-Install Meeting 0 21-Sep-17

ConPIC.07.1300 TPO Roofing Pre-Install Meeting 0 31-Aug-17

ConPIC.07.1350 Metal Flashings Pre-Install Meeting 0 10-Jul-17

Div. 08 | Doors & WindowsDiv. 08 | Doors & Windows 78 03-Aug-17 20-Oct-17

ConPIC.08.1000 Storefront | Curtainwall Pre-Install Meeting 0 13-Oct-17

ConPIC.08.1050 Interior Door Frames Pre-Install Meeting 0 03-Aug-17

ConPIC.08.1100 Doors | Hardware Pre-Install Meeting 0 20-Oct-17

ConPIC.08.1150 Access Controls Rough-in Coordination Kick-Off Meeting 0 18-Aug-17

Div. 09 | FinishesDiv. 09 | Finishes 180 13-Sep-17 12-Mar-18

ConPIC.09.1000 Tile Pre-Install Meeting 0 18-Sep-17

ConPIC.09.1050 Paint Pre-Install Meeting 0 13-Sep-17

ConPIC.09.1100 Carpet Pre-Install Meeting 0 12-Mar-18

Div. 10 | SpecialtiesDiv. 10 | Specialties 24 20-Oct-17 13-Nov-17

ConPIC.10.1000 DIRTT Partition Wall Pre-Install Meeting 0 20-Oct-17

ConPIC.10.1050 Restroom Partitions | Accessories Pre-Install Meeting 0 13-Nov-17

Div. 11 | SpecialtiesDiv. 11 | Specialties 0Div. 12 | FurnishingsDiv. 12 | Furnishings 68 17-Jan-18 26-Mar-18

ConPIC.12.1000 Lecture Hall Stadium Seating Coordination Meeting 0 17-Jan-18

ConPIC.12.1050 Lecture Hall Stadium Seating Pre-Install Meeting 0 26-Mar-18

Div. 13 | Special ConstructionDiv. 13 | Special Construction 0Div. 14 | Conveying EquipmentDiv. 14 | Conveying Equipment 146 21-Sep-17 14-Feb-18

ConPIC.14.1000 DBS Elevator Shaft Inspection 0 21-Sep-17

ConPIC.14.1050 Elevator Pre-Install Checklist 0 06-Nov-17

ConPIC.14.1100 Elevator Pre-Install Meeting 0 14-Feb-18

Div. 21 | Fire SuppressionDiv. 21 | Fire Suppression 89 30-Mar-17 27-Jun-17

ConPIC.21.1000 Fire Flow Verification 0 30-Mar-17

ConPIC.21.1050 Fire Sprinkler Pre-Install Meeting 0 27-Jun-17

Div. 22 | PlumbingDiv. 22 | Plumbing 149 08-May-17 04-Oct-17

ConPIC.22.1000 Below Grade Plumbing Pre-Install Meeting 0 08-May-17

ConPIC.22.1050 Above Grade | Suspended Plumbing Pre-Install Meeting 0 03-Aug-17

ConPIC.22.1100 Restroom Fixtures Pre-Install Meeting 0 04-Oct-17

Div. 23 | HVACDiv. 23 | HVAC 295 11-Jul-17 02-May-18

ConPIC.23.1000 HVAC Ductwork | Installation Pre-Install Meeting 0 11-Jul-17

ConPIC.23.1050 Roof Top Equipment Pre-Install Meeting 0 25-Sep-17

ConPIC.23.1100 TAB Pre-Start Meeting 0 02-May-18

Div. 25 | Integrated AutomationDiv. 25 | Integrated Automation 7 09-May-18 16-May-18

ConPIC.25.1000 Sequence of Controls Coordination Meetings 0 09-May-18

ConPIC.25.1050 BAS | Programming Pre-Install Meeting 0 16-May-18

Div. 26 | ElectricalDiv. 26 | Electrical 233 08-May-17 27-Dec-17

ConPIC.26.1000 Electrical Underground Pre-Install Meeting 0 08-May-17

ConPIC.26.1050 Electrical Rough-In Pre-Install Meeting 0 13-Jul-17

ConPIC.26.1100 Pre-Building Energize Coordination Meeting 0 27-Dec-17

Div. 27 | CommunicationsDiv. 27 | Communications 62 09-Aug-17 10-Oct-17

ConPIC.27.1000 Communications Rough-In Coordination Meeting 0 09-Aug-17

ConPIC.27.1050 Communications Cabling Pre-Install Meeting 0 10-Oct-17

Div. 28 | Electronic Safety & SecurityDiv. 28 | Electronic Safety & Security 282 09-Aug-17 18-May-18

ConPIC.28.1000 Access Controls | Door Hardware Coordination Meetings 0 09-Aug-17

ConPIC.28.1050 Security Rough-In Coordination Meeting 0 09-Aug-17

ConPIC.28.1100 Security Pre-Install Meeting 0 18-May-18

Div. 31 | EarthworkDiv. 31 | Earthwork 0 13-Feb-17 13-Feb-17

ConPIC.31.1000 Mass Excavation Pre-Start Coordination Meeting 0 13-Feb-17

Div. 32 | Exterior ImprovementsDiv. 32 | Exterior Improvements 0 17-Apr-18 17-Apr-18

ConPIC.32.1000 Water Feature | Fountain Pre-install Meeting 0 17-Apr-18

Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

Qtr 4, 2016 Qtr 1, 2017 Qtr 2, 2017 Qtr 3, 2017 Qtr 4, 2017 Qtr 1, 2018 Qtr 2, 2018 Qtr 3, 2018 Qtr 4, 2018

09-Jun-17 BIM Field Coordination Meeting - 1st Floor North

19-Jun-17 BIM Field Coordination Meeting - 2nd Floor North

04-Jul-17 BIM Field Coordination Meeting - 3rd Floor North

09-Feb-17 09-Feb-17, Div. 02 | Existing Conditions

09-Feb-17 Surveyor Pre-Start Meeting

12-Apr-17 16-May-18, Div. 03 | Concrete

12-Apr-17 Concrete Foundations Pre-install Meeting

02-Jun-17 Slab On Grade Pre-Install Meeting

26-May-17 Slab on Deck Pre-Install Meeting

27-Apr-18 Decorative Concrete Paving Mock-Up Panels

16-May-18 Decorative Concrete Paving Pre-Install Meeting

09-Aug-17 23-Aug-17, Div. 04 | Masonry

09-Aug-17 Stone Veneer Mock-Up Wall Panel

23-Aug-17 Stone Veneer Pre-Install Meeting

06-Apr-17 06-Jul-17, Div. 05 | Metals

13-Apr-17 Steel Fab Plant Inspection | Mill Certs

06-Apr-17 Pre-Fabrication Sequence Loading Coordination Meeting

18-Apr-17 Steel Erection Pre-Install Meeting

20-Jun-17 Structural Framing Pre-Install Meeting

06-Jul-17 Decorative Metal Railing Mock-Up

10-Nov-17 29-Nov-17, Div. 06 | Woods, Plastics & Composites

10-Nov-17 Architectural Millwork Pre-Fab Meeting

29-Nov-17 Wood Panel Pre-Install Meeting

06-Mar-17 21-Sep-17, Div. 07 | Thermal & Moisture Protection

06-Mar-17 Waterproofing Pre-Install Meeting

14-Jul-17 Fluid Applied Air Barrier Pre-Install Meeting | Mock-Up

13-Jun-17 Spray Applied Fire Proofing Pre-Install Meeting

07-Sep-17 Metal Wall Panel Mock-Up

21-Sep-17 Metal Wall Panel Pre-Install Meeting

31-Aug-17 TPO Roofing Pre-Install Meeting

10-Jul-17 Metal Flashings Pre-Install Meeting

03-Aug-17 20-Oct-17, Div. 08 | Doors & Windows

13-Oct-17 Storefront | Curtainwall Pre-Install Meeting

03-Aug-17 Interior Door Frames Pre-Install Meeting

20-Oct-17 Doors | Hardware Pre-Install Meeting

18-Aug-17 Access Controls Rough-in Coordination Kick-Off Meeting

13-Sep-17 12-Mar-18, Div. 09 | Finishes

18-Sep-17 Tile Pre-Install Meeting

13-Sep-17 Paint Pre-Install Meeting

12-Mar-18 Carpet Pre-Install Meeting

20-Oct-17 13-Nov-17, Div. 10 | Specialties

20-Oct-17 DIRTT Partition Wall Pre-Install Meeting

13-Nov-17 Restroom Partitions | Accessories Pre-Install Meeting

17-Jan-18 26-Mar-18, Div. 12 | Furnishings

17-Jan-18 Lecture Hall Stadium Seating Coordination Meeting

26-Mar-18 Lecture Hall Stadium Seating Pre-Install Meeting

21-Sep-17 14-Feb-18, Div. 14 | Conveying Equipment

21-Sep-17 DBS Elevator Shaft Inspection

06-Nov-17 Elevator Pre-Install Checklist

14-Feb-18 Elevator Pre-Install Meeting

30-Mar-17 27-Jun-17, Div. 21 | Fire Suppression

30-Mar-17 Fire Flow Verification

27-Jun-17 Fire Sprinkler Pre-Install Meeting

08-May-17 04-Oct-17, Div. 22 | Plumbing

08-May-17 Below Grade Plumbing Pre-Install Meeting

03-Aug-17 Above Grade | Suspended Plumbing Pre-Install Meeting

04-Oct-17 Restroom Fixtures Pre-Install Meeting

11-Jul-17 02-May-18, Div. 23 | HVAC

11-Jul-17 HVAC Ductwork | Installation Pre-Install Meeting

25-Sep-17 Roof Top Equipment Pre-Install Meeting

02-May-18 TAB Pre-Start Meeting

09-May-18 16-May-18, Div. 25 | Integrated Automation

09-May-18 Sequence of Controls Coordination Meetings

16-May-18 BAS | Programming Pre-Install Meeting

08-May-17 27-Dec-17, Div. 26 | Electrical

08-May-17 Electrical Underground Pre-Install Meeting

13-Jul-17 Electrical Rough-In Pre-Install Meeting

27-Dec-17 Pre-Building Energize Coordination Meeting

09-Aug-17 10-Oct-17, Div. 27 | Communications

09-Aug-17 Communications Rough-In Coordination Meeting

10-Oct-17 Communications Cabling Pre-Install Meeting

09-Aug-17 18-May-18, Div. 28 | Electronic Safety & Security

09-Aug-17 Access Controls | Door Hardware Coordination Meetings

09-Aug-17 Security Rough-In Coordination Meeting

18-May-18 Security Pre-Install Meeting

13-Feb-17 13-Feb-17, Div. 31 | Earthwork

13-Feb-17 Mass Excavation Pre-Start Coordination Meeting

17-Apr-18 17-Apr-18, Div. 32 | Exterior Improvements

17-Apr-18 Water Feature | Fountain Pre-install Meeting

Idaho College of Osteopathic Medicine | Boise, Idaho

Conceptual Project Delivery Schedule

Date Revision Checked Approved

01-Dec-16 DRAFT - Conceptual JN JN

05-Dec-16 DRAFT - Conceptual Rev.1 JN CG

Page 5 of 13 Information is Proprietary & Confidential - Redistribution or use without prior written authorization is prohibited. Schedule is preliminary and conceptual - intended to provide a general understanding of potential

pathway to completion. Schedule is not intended to capture all task items necessary for completion of project scope.

Page 6: ICOM Schedule & Logistics (1)

Activity ID Activity Name Original

Duration

Start Finish

Div. 33 | UtilitiesDiv. 33 | Utilities 0 13-Apr-17 13-Apr-17

ConPIC.33.1000 Underground Utilities Pre-Install Meeting 0 13-Apr-17 13-Apr-17

Building PadBuilding Pad 79 08-Feb-17 27-Apr-17

ConBP1000 On-site mobilization | Trailer Set-up 2 08-Feb-17 09-Feb-17

ConBP1050 Site Fencing | SWPPP BMPs 2 09-Feb-17 10-Feb-17

ConBP1100 Site Signage | Postings 2 09-Feb-17 10-Feb-17

ConBP1150 Control | Surface Demo Survey 2 10-Feb-17 13-Feb-17

ConBP1200 Surface Structure Demolition | Decommission 4 14-Feb-17 17-Feb-17

ConBP1250 Building Pad Over-excavation (5') | Subgrade Compaction 12 20-Feb-17 07-Mar-17

ConBP1275 Elevator Pit Foundation Waterproofing Membrane 1 08-Mar-17 08-Mar-17

ConBP1300 Elevator Pit Foundations | Walls 7 09-Mar-17 17-Mar-17

ConBP1350 Building Pad Structural Fill | Partial Subgrade 6 16-Mar-17 23-Mar-17

ConBP1375 East Wing Footing | Foundation Waterproofing Mebrane 3 24-Mar-17 28-Mar-17

ConBP1400 East Wing Spread | Continuous Footings 7 03-Apr-17 11-Apr-17

ConBP1450 East Wing Concrete Stem Walls | Rigid Insulation 5 07-Apr-17 13-Apr-17

ConBP1500 East Wing Structural Fill | Finish Subgrade 6 12-Apr-17 19-Apr-17

ConBP1550 East Wing Pad Certification | Grade & Compaction 2 19-Apr-17 20-Apr-17

ConBP1600 North Wing Footing | Foundation Waterproofing Membrane 3 29-Mar-17 31-Mar-17

ConBP1650 North Wing Spread | Continuous Footings 8 10-Apr-17 19-Apr-17

ConBP1700 North Wing Concrete Stem Walls | Rigid Insulation 6 17-Apr-17 24-Apr-17

ConBP1750 North Wing Structural Fill | Finish Subgrade 5 21-Apr-17 27-Apr-17

ConBP1800 North Wing Pad Certification | Grade & Compaction 0 27-Apr-17

Site DevelopmentSite Development 416 17-Apr-17 06-Jun-18

ConSD1000 Utilies Survey 1 17-Apr-17 17-Apr-17

ConSD1050 Idaho Power Service | Joint Trench 9 17-Apr-17 27-Apr-17

ConSD1100 Idaho Power Temporary Service Set 5 28-Apr-17 04-May-17

ConSD1150 Intermountain Gas Service Line 5 28-Apr-17 04-May-17

ConSD1200 Sanitary Sewerage Trench | Piping - 5' outside 5 18-Apr-17 24-Apr-17

ConSD1250 Storm Service Trench | Piping - 5' outside 5 25-Apr-17 01-May-17

ConSD1300 Building Water Main Service - 5' outside 5 02-May-17 08-May-17

ConSD1350 Fire Service Line | Hydrant Risers - Inside Building Manifold 5 09-May-17 15-May-17

ConSD1400 Idaho Power Building Transformer Set 0 09-Jun-17

ConSD1450 Intermountain Gas Manifold | Meter Set 0 08-Sep-17

ConSD1800 East Site Finish Subgrade 3 14-Feb-18 16-Feb-18

ConSD1850 East Site Electrical Rough-In | Lighting 4 19-Feb-18 22-Feb-18

ConSD1900 East Site Irrigation Rough-In 4 19-Feb-18 22-Feb-18

ConSD1950 East Site Curb & Gutter 4 23-Feb-18 28-Feb-18

ConSD2000 East Site Sidewalk Fine Grade | Concrete Placement 7 01-Mar-18 09-Mar-18

ConSD2750 North Site Finish Subgrade 3 19-Feb-18 21-Feb-18

ConSD2800 North Site Utility Grade Set 1 22-Feb-18 22-Feb-18

ConSD2850 North Site Electrical Rough-In | Lighting 4 22-Feb-18 27-Feb-18

ConSD2900 North Site Irrigation Rough-In 4 22-Feb-18 27-Feb-18

ConSD2950 North Site Curb & Gutter | Concrete Landscape Edging 5 28-Feb-18 06-Mar-18

ConSD3000 North Site Sidewalk Fine Grade | Concrete Placement 9 07-Mar-18 19-Mar-18

ConSD3050 North Site Sidewalk Runnels 3 20-Mar-18 22-Mar-18

ConSD3100 North Site Landscape Topsoil | Irrigation 5 07-Mar-18 13-Mar-18

ConSD3150 North Site Landscape Sod | Plantings | Ground Cover 5 14-Mar-18 20-Mar-18

ConSD4200 West Site Finish Subgrade 4 11-Apr-18 16-Apr-18

ConSD4250 West Site Utility Grade Set 2 17-Apr-18 18-Apr-18

ConSD4300 West Site Electrical Rough-In | Lighting 4 17-Apr-18 20-Apr-18

ConSD4350 West Site Irrigation Rough-In 4 17-Apr-18 20-Apr-18

ConSD4400 West Site Curb & Gutter | Concrete Landscape Edging 5 23-Apr-18 27-Apr-18

ConSD4450 West Site Sidewalk Fine Grading | Concrete Placement 8 30-Apr-18 09-May-18

ConSD4500 West Site Sidewalk Runnels 2 10-May-18 11-May-18

ConSD4550 West Site Landscape Topsoil | Irrigation 5 10-May-18 16-May-18

ConSD4600 West Site Landscape Sod | Plantings | Ground Cover 5 17-May-18 23-May-18

ConSD5000 South Site Finish Subgrade 3 21-Mar-18 23-Mar-18

ConSD5050 South Site Utility Grade Set 2 26-Mar-18 27-Mar-18

ConSD5100 South Site Electrical Rough-In | Lighting 4 26-Mar-18 29-Mar-18

ConSD5150 South Site Irrigation Rough-In 4 26-Mar-18 29-Mar-18

ConSD5200 South Site Curb & Gutter |Concrete Landscape Edging 6 30-Mar-18 06-Apr-18

ConSD5250 South Site Sidewalk Fine Grading | Concrete Placement 7 09-Apr-18 17-Apr-18

ConSD5300 South Site Sidewalk Runnels 2 18-Apr-18 19-Apr-18

ConSD5350 South Site Landscape Topsoil | Irrigation 5 18-Apr-18 24-Apr-18

ConSD5400 South Site Landscape Sod | Plantings | Ground Cover 5 18-Apr-18 24-Apr-18

ConSD6000 Site Boundary Blue Top | Fine Grade 6 24-May-18 31-May-18

ConSD6050 Site Asphalt Paving 0 01-Jun-18

ConSD6100 Parking Striping | Signage | Wheel Stops 4 01-Jun-18 06-Jun-18

CourtyardCourtyard 66 17-Apr-18 21-Jun-18

ConCy1000 Finish Subgrade Prep | Utility Grade Adjustments 9 17-Apr-18 27-Apr-18

ConCy1050 Site Electrical Rough-In | Lighting & Power 6 24-Apr-18 01-May-18

ConCy1100 Site Irrigation Rough-In 6 24-Apr-18 01-May-18

ConCy1150 Concrete Landscape Edging 5 01-May-18 07-May-18

ConCy1200 Water Feature UG Plumbing 8 26-Apr-18 07-May-18

ConCy1250 Concrete Seating | Fountain Walls 6 08-May-18 15-May-18

ConCy1300 Concrete Paving | Stone Paver Fine Grade Prep 4 16-May-18 21-May-18

ConCy1325 Bicycle Racks 2 16-May-18 17-May-18

ConCy1350 Standard Concrete Sidewalk Placement 5 18-May-18 24-May-18

Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

Qtr 4, 2016 Qtr 1, 2017 Qtr 2, 2017 Qtr 3, 2017 Qtr 4, 2017 Qtr 1, 2018 Qtr 2, 2018 Qtr 3, 2018 Qtr 4, 2018

13-Apr-17 13-Apr-17, Div. 33 | Utilities

Underground Utilities Pre-Install Meeting

08-Feb-17 27-Apr-17, Building Pad

08-Feb-17 On-site mobilization | Trailer Set-up

09-Feb-17 Site Fencing | SWPPP BMPs

09-Feb-17 Site Signage | Postings

10-Feb-17 Control | Surface Demo Survey

14-Feb-17 Surface Structure Demolition | Decommission

20-Feb-17 Building Pad Over-excavation (5') | Subgrade Compaction

08-Mar-17 Elevator Pit Foundation Waterproofing Membrane

09-Mar-17 Elevator Pit Foundations | Walls

16-Mar-17 Building Pad Structural Fill | Partial Subgrade

24-Mar-17 East Wing Footing | Foundation Waterproofing Mebrane

03-Apr-17 East Wing Spread | Continuous Footings

07-Apr-17 East Wing Concrete Stem Walls | Rigid Insulation

12-Apr-17 East Wing Structural Fill | Finish Subgrade

19-Apr-17 East Wing Pad Certification | Grade & Compaction

29-Mar-17 North Wing Footing | Foundation Waterproofing Membrane

10-Apr-17 North Wing Spread | Continuous Footings

17-Apr-17 North Wing Concrete Stem Walls | Rigid Insulation

21-Apr-17 North Wing Structural Fill | Finish Subgrade

27-Apr-17 North Wing Pad Certification | Grade & Compaction

17-Apr-17 06-Jun-18, Site Development

17-Apr-17 Utilies Survey

17-Apr-17 Idaho Power Service | Joint Trench

28-Apr-17 Idaho Power Temporary Service Set

28-Apr-17 Intermountain Gas Service Line

18-Apr-17 Sanitary Sewerage Trench | Piping - 5' outside

25-Apr-17 Storm Service Trench | Piping - 5' outside

02-May-17 Building Water Main Service - 5' outside

09-May-17 Fire Service Line | Hydrant Risers - Inside Building Manifold

09-Jun-17 Idaho Power Building Transformer Set

08-Sep-17 Intermountain Gas Manifold | Meter Set

14-Feb-18 East Site Finish Subgrade

19-Feb-18 East Site Electrical Rough-In | Lighting

19-Feb-18 East Site Irrigation Rough-In

23-Feb-18 East Site Curb & Gutter

01-Mar-18 East Site Sidewalk Fine Grade | Concrete Placement

19-Feb-18 North Site Finish Subgrade

22-Feb-18 North Site Utility Grade Set

22-Feb-18 North Site Electrical Rough-In | Lighting

22-Feb-18 North Site Irrigation Rough-In

28-Feb-18 North Site Curb & Gutter | Concrete Landscape Edging

07-Mar-18 North Site Sidewalk Fine Grade | Concrete Placement

20-Mar-18 North Site Sidewalk Runnels

07-Mar-18 North Site Landscape Topsoil | Irrigation

14-Mar-18 North Site Landscape Sod | Plantings | Ground Cover

11-Apr-18 West Site Finish Subgrade

17-Apr-18 West Site Utility Grade Set

17-Apr-18 West Site Electrical Rough-In | Lighting

17-Apr-18 West Site Irrigation Rough-In

23-Apr-18 West Site Curb & Gutter | Concrete Landscape Edging

30-Apr-18 West Site Sidewalk Fine Grading | Concrete Placement

10-May-18 West Site Sidewalk Runnels

10-May-18 West Site Landscape Topsoil | Irrigation

17-May-18 West Site Landscape Sod | Plantings | Ground Cover

21-Mar-18 South Site Finish Subgrade

26-Mar-18 South Site Utility Grade Set

26-Mar-18 South Site Electrical Rough-In | Lighting

26-Mar-18 South Site Irrigation Rough-In

30-Mar-18 South Site Curb & Gutter |Concrete Landscape Edging

09-Apr-18 South Site Sidewalk Fine Grading | Concrete Placement

18-Apr-18 South Site Sidewalk Runnels

18-Apr-18 South Site Landscape Topsoil | Irrigation

18-Apr-18 South Site Landscape Sod | Plantings | Ground Cover

24-May-18 Site Boundary Blue Top | Fine Grade

01-Jun-18 Site Asphalt Paving

01-Jun-18 Parking Striping | Signage | Wheel Stops

17-Apr-18 21-Jun-18, Courtyard

17-Apr-18 Finish Subgrade Prep | Utility Grade Adjustments

24-Apr-18 Site Electrical Rough-In | Lighting & Power

24-Apr-18 Site Irrigation Rough-In

01-May-18 Concrete Landscape Edging

26-Apr-18 Water Feature UG Plumbing

08-May-18 Concrete Seating | Fountain Walls

16-May-18 Concrete Paving | Stone Paver Fine Grade Prep

16-May-18 Bicycle Racks

18-May-18 Standard Concrete Sidewalk Placement

Idaho College of Osteopathic Medicine | Boise, Idaho

Conceptual Project Delivery Schedule

Date Revision Checked Approved

01-Dec-16 DRAFT - Conceptual JN JN

05-Dec-16 DRAFT - Conceptual Rev.1 JN CG

Page 6 of 13 Information is Proprietary & Confidential - Redistribution or use without prior written authorization is prohibited. Schedule is preliminary and conceptual - intended to provide a general understanding of potential

pathway to completion. Schedule is not intended to capture all task items necessary for completion of project scope.

Page 7: ICOM Schedule & Logistics (1)

Activity ID Activity Name Original

Duration

Start Finish

ConCy1400 Stone Drainage Runnels 2 25-May-18 28-May-18

ConCy1450 Decorative Concrete | Stone Paver Installation 12 23-May-18 07-Jun-18

ConCy1500 Landscaping Topsoil & Irrigation 6 31-May-18 07-Jun-18

ConCy1550 Landscape Sod | Planting | Ground Cover 7 08-Jun-18 18-Jun-18

ConCy1600 Water Feature Detail Finish | Start-Up 10 08-Jun-18 21-Jun-18

ConCy1650 Site Furnishings | Flagpoles | Signage 8 08-Jun-18 19-Jun-18

Core | StructureCore | Structure 95 21-Apr-17 24-Jul-17

East WingEast Wing 74 21-Apr-17 03-Jul-17

ConCSe1000 Anchor Bolt Survey | Certification 2 21-Apr-17 24-Apr-17

ConCSe1050 Structural Steel Columns | Beams | Joist 7 25-Apr-17 03-May-17

ConCSe1100 Metal Roof Low | High Decking 7 02-May-17 10-May-17

ConCSe1150 Structural Steel Welding | Final Bolt-Up 5 09-May-17 15-May-17

ConCSe1200 Plumbing Undergound 7 11-May-17 19-May-17

ConCSe1250 Electrical Underground 7 11-May-17 19-May-17

ConCSe1300 Finish Fine Grading 4 18-May-17 23-May-17

ConCSe1350 SOG Vapor Barrier | WWM Reinforcement 4 23-May-17 26-May-17

ConCSe1400 Slab On Grade Concrete Placements 6 25-May-17 01-Jun-17

ConCSe1450 SOG Wet Cure 10 30-May-17 12-Jun-17

ConCSe1500 Column Base Grouting | Pour Back 3 13-Jun-17 15-Jun-17

ConCSe1550 Overhead Mechanical Hangers 8 08-Jun-17 19-Jun-17

ConCSe1575 TOW Metal Track | Exterior Wall Clips 8 08-Jun-17 19-Jun-17

ConCSe1600 Lecture Hall - Composite Concrete Roof 10 23-May-17 05-Jun-17

ConCSe2000 Spray Applied Fire Proofing 10 20-Jun-17 03-Jul-17

North WingsNorth Wings 89 27-Apr-17 24-Jul-17

ConCSn1000 Anchor Bolt Survey | Certification 2 27-Apr-17 28-Apr-17

ConCSn1050 Structural Steel Columns | Beams 15 01-May-17 19-May-17

ConCSn1100 2nd Floor - Metal Decking | Slab Edge Angle | Stud Welding 5 11-May-17 17-May-17

ConCSn1150 2nd Floor - Perimeter Safety Cabling 1 18-May-17 18-May-17

ConCSn1200 1st-2nd Floor Moment Frame Welding | Bolt Torque 5 18-May-17 24-May-17

ConCSn1250 1st-2nd Floor Stair Stringers | Landings 3 22-May-17 24-May-17

ConCSn2000 3rd Floor - Metal Decking | Slab Edge Angle | Stud Welding 5 18-May-17 24-May-17

ConCSn2050 3rd Floor - Perimeter Safety Cabling 1 25-May-17 25-May-17

ConCSn2100 2nd-3rd Floor Moment Frame Welding | Bolt Torque 5 25-May-17 31-May-17

ConCSn2150 2nd-3rd Stair Stringers | Landings 3 01-Jun-17 05-Jun-17

ConCSn3000 Roof Level - Metal Decking | Mechanical Frames 5 01-Jun-17 07-Jun-17

ConCSn3050 3rd-Roof Moment Frame Welding | Bolt Torque 5 08-Jun-17 14-Jun-17

ConCSn4000 Plumbing Underground - 1st Floor 8 18-May-17 29-May-17

ConCSn4050 Electrical Underground - 1st Floor 8 18-May-17 29-May-17

ConCSn4100 Finish Fine Grading | Vapor Barrier - 1st Floor 6 26-May-17 02-Jun-17

ConCSn4150 WWM Reinforcement | Concrete SOG Placements - 1st Floor 9 31-May-17 12-Jun-17

ConCSn4175 Wet Cure Concrete SOG - 1st Floor 14 08-Jun-17 27-Jun-17

ConCSn4200 Overhead Mechanical Hangers | Supports - 1st Floor 10 26-May-17 08-Jun-17

ConCSn4250 TOW Metal Track | Exterior Wall Clips - 1st Floor 9 19-Jun-17 29-Jun-17

ConCSn4300 Elevator Support Columns - 1st Floor 2 28-Jun-17 29-Jun-17

ConCSn4400 Spray Applied Fire Proofing - 1st Floor 8 30-Jun-17 11-Jul-17

ConCSn5000 Through Deck Sleeves | Hanger Drops - 2nd Floor 5 25-May-17 31-May-17

ConCSn5050 Plumbing | Electrical Floor Boxes, Drains & Conduit - 2nd Floor 5 25-May-17 31-May-17

ConCSn5100 Slab Edge Curtain Wall Embeds | Welded Dowels - 2nd Floor 5 25-May-17 31-May-17

ConCSn5150 Slab on Deck Reinforcement - 2nd Floor 5 30-May-17 05-Jun-17

ConCSn5200 SOD Concrete Placements - 2nd Floor 4 02-Jun-17 07-Jun-17

ConCSn5250 Stair Tread | Landing Concrete Placement - 2nd Floor 2 08-Jun-17 09-Jun-17

ConCSn5350 Wet Cure Concrete SOD - 2nd Floor 9 06-Jun-17 16-Jun-17

ConCSn5400 Elevator Support Columns - 2nd Floor 2 16-Jun-17 19-Jun-17

ConCSn5450 Overhead Mechanical Hangers | Supports - 2nd Floor 5 19-Jun-17 23-Jun-17

ConCSn5500 TOW Metal Track | Exterior Wall Clips - 2nd Floor 8 19-Jun-17 28-Jun-17

ConCSn5550 Spray Applied Fire Proofing - 2nd Floor 7 04-Jul-17 12-Jul-17

ConCSn6050 Through Deck Sleeves | Hanger Drops - 3rd Floor 5 08-Jun-17 14-Jun-17

ConCSn6100 Plumbing Floor Drains | Electrical Foor Boxes & Conduit - 3rd Floor 5 08-Jun-17 14-Jun-17

ConCSn6150 Slab Edge Curtain Wall Embeds | Welded Dowels - 3rd Floor 5 08-Jun-17 14-Jun-17

ConCSn6200 Slab on Deck Reinforcement - 3rd Floor 4 15-Jun-17 20-Jun-17

ConCSn6250 SOD Concrete Placements - 3rd Floor 4 19-Jun-17 22-Jun-17

ConCSn6300 Stair Tread | Landing Concrete Placement - 3rd Floor 2 23-Jun-17 26-Jun-17

ConCSn6350 Wet Cure Concrete SOD - 3rd Floor 9 21-Jun-17 03-Jul-17

ConCSn6400 Elevator Support Columns - 3rd Floor 2 03-Jul-17 04-Jul-17

ConCSn6450 Overhead Mechanical Hangers | Supports - 3rd Floor 5 04-Jul-17 10-Jul-17

ConCSn6500 TOW Metal Track | Exterior Wall Clips - 3rd Floor 8 04-Jul-17 13-Jul-17

ConCSn6550 Spray Applied Fire Proofing - 3rd Floor 7 14-Jul-17 24-Jul-17

East Wing - Shell | EggEast Wing - Shell | Egg 356 11-May-17 01-May-18

Exterior Finish | SystemsExterior Finish | Systems 315 11-May-17 21-Mar-18East ElevationEast Elevation 156 27-Jun-17 29-Nov-17

ConEwEfE1000 Exterior Wall Framing 10 27-Jun-17 10-Jul-17

ConEwEfE1050 Exterior Wall Sheathing 8 07-Jul-17 18-Jul-17

ConEwEfE1100 Metal Flashings 4 18-Jul-17 21-Jul-17

ConEwEfE1150 Fluid Applied Air Barrier 6 20-Jul-17 27-Jul-17

ConEwEfE1200 Z-furring & Rigid Insulation 6 26-Jul-17 02-Aug-17

ConEwEfE1250 Stone Veneer 13 25-Aug-17 12-Sep-17

ConEwEfE1300 Storefront Window Frames 11 20-Oct-17 03-Nov-17

ConEwEfE1350 Exterior Doors 6 13-Sep-17 20-Sep-17

ConEwEfE1450 Elastomeric Joint Sealants 5 06-Nov-17 10-Nov-17

Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

Qtr 4, 2016 Qtr 1, 2017 Qtr 2, 2017 Qtr 3, 2017 Qtr 4, 2017 Qtr 1, 2018 Qtr 2, 2018 Qtr 3, 2018 Qtr 4, 2018

25-May-18 Stone Drainage Runnels

23-May-18 Decorative Concrete | Stone Paver Installation

31-May-18 Landscaping Topsoil & Irrigation

08-Jun-18 Landscape Sod | Planting | Ground Cover

08-Jun-18 Water Feature Detail Finish | Start-Up

08-Jun-18 Site Furnishings | Flagpoles | Signage

21-Apr-17 24-Jul-17, Core | Structure

21-Apr-17 03-Jul-17, East Wing

21-Apr-17 Anchor Bolt Survey | Certification

25-Apr-17 Structural Steel Columns | Beams | Joist

02-May-17 Metal Roof Low | High Decking

09-May-17 Structural Steel Welding | Final Bolt-Up

11-May-17 Plumbing Undergound

11-May-17 Electrical Underground

18-May-17 Finish Fine Grading

23-May-17 SOG Vapor Barrier | WWM Reinforcement

25-May-17 Slab On Grade Concrete Placements

30-May-17 SOG Wet Cure

13-Jun-17 Column Base Grouting | Pour Back

08-Jun-17 Overhead Mechanical Hangers

08-Jun-17 TOW Metal Track | Exterior Wall Clips

23-May-17 Lecture Hall - Composite Concrete Roof

20-Jun-17 Spray Applied Fire Proofing

27-Apr-17 24-Jul-17, North Wings

27-Apr-17 Anchor Bolt Survey | Certification

01-May-17 Structural Steel Columns | Beams

11-May-17 2nd Floor - Metal Decking | Slab Edge Angle | Stud Welding

18-May-17 2nd Floor - Perimeter Safety Cabling

18-May-17 1st-2nd Floor Moment Frame Welding | Bolt Torque

22-May-17 1st-2nd Floor Stair Stringers | Landings

18-May-17 3rd Floor - Metal Decking | Slab Edge Angle | Stud Welding

25-May-17 3rd Floor - Perimeter Safety Cabling

25-May-17 2nd-3rd Floor Moment Frame Welding | Bolt Torque

01-Jun-17 2nd-3rd Stair Stringers | Landings

01-Jun-17 Roof Level - Metal Decking | Mechanical Frames

08-Jun-17 3rd-Roof Moment Frame Welding | Bolt Torque

18-May-17 Plumbing Underground - 1st Floor

18-May-17 Electrical Underground - 1st Floor

26-May-17 Finish Fine Grading | Vapor Barrier - 1st Floor

31-May-17 WWM Reinforcement | Concrete SOG Placements - 1st Floor

08-Jun-17 Wet Cure Concrete SOG - 1st Floor

26-May-17 Overhead Mechanical Hangers | Supports - 1st Floor

19-Jun-17 TOW Metal Track | Exterior Wall Clips - 1st Floor

28-Jun-17 Elevator Support Columns - 1st Floor

30-Jun-17 Spray Applied Fire Proofing - 1st Floor

25-May-17 Through Deck Sleeves | Hanger Drops - 2nd Floor

25-May-17 Plumbing | Electrical Floor Boxes, Drains & Conduit - 2nd Floor

25-May-17 Slab Edge Curtain Wall Embeds | Welded Dowels - 2nd Floor

30-May-17 Slab on Deck Reinforcement - 2nd Floor

02-Jun-17 SOD Concrete Placements - 2nd Floor

08-Jun-17 Stair Tread | Landing Concrete Placement - 2nd Floor

06-Jun-17 Wet Cure Concrete SOD - 2nd Floor

16-Jun-17 Elevator Support Columns - 2nd Floor

19-Jun-17 Overhead Mechanical Hangers | Supports - 2nd Floor

19-Jun-17 TOW Metal Track | Exterior Wall Clips - 2nd Floor

04-Jul-17 Spray Applied Fire Proofing - 2nd Floor

08-Jun-17 Through Deck Sleeves | Hanger Drops - 3rd Floor

08-Jun-17 Plumbing Floor Drains | Electrical Foor Boxes & Conduit - 3rd Floor

08-Jun-17 Slab Edge Curtain Wall Embeds | Welded Dowels - 3rd Floor

15-Jun-17 Slab on Deck Reinforcement - 3rd Floor

19-Jun-17 SOD Concrete Placements - 3rd Floor

23-Jun-17 Stair Tread | Landing Concrete Placement - 3rd Floor

21-Jun-17 Wet Cure Concrete SOD - 3rd Floor

03-Jul-17 Elevator Support Columns - 3rd Floor

04-Jul-17 Overhead Mechanical Hangers | Supports - 3rd Floor

04-Jul-17 TOW Metal Track | Exterior Wall Clips - 3rd Floor

14-Jul-17 Spray Applied Fire Proofing - 3rd Floor

11-May-17 01-May-18, East Wing - Shell | Egg

11-May-17 21-Mar-18, Exterior Finish | Systems

27-Jun-17 29-Nov-17, East Elevation27-Jun-17 Exterior Wall Framing

07-Jul-17 Exterior Wall Sheathing

18-Jul-17 Metal Flashings

20-Jul-17 Fluid Applied Air Barrier

26-Jul-17 Z-furring & Rigid Insulation

25-Aug-17 Stone Veneer

20-Oct-17 Storefront Window Frames

13-Sep-17 Exterior Doors

06-Nov-17 Elastomeric Joint Sealants

Idaho College of Osteopathic Medicine | Boise, Idaho

Conceptual Project Delivery Schedule

Date Revision Checked Approved

01-Dec-16 DRAFT - Conceptual JN JN

05-Dec-16 DRAFT - Conceptual Rev.1 JN CG

Page 7 of 13 Information is Proprietary & Confidential - Redistribution or use without prior written authorization is prohibited. Schedule is preliminary and conceptual - intended to provide a general understanding of potential

pathway to completion. Schedule is not intended to capture all task items necessary for completion of project scope.

Page 8: ICOM Schedule & Logistics (1)

Activity ID Activity Name Original

Duration

Start Finish

ConEwEfE1500 Exterior Wall Lighting 5 23-Nov-17 29-Nov-17South ElevationSouth Elevation 148 11-Jul-17 05-Dec-17

ConEwEfS1000 Exterior Wall Framing 5 11-Jul-17 17-Jul-17

ConEwEfS1050 Exterior Wall Sheathing 5 11-Jul-17 17-Jul-17

ConEwEfS1100 Metal Flashings 2 19-Jul-17 20-Jul-17

ConEwEfS1150 Fluid Applied Air Barrier 4 24-Jul-17 27-Jul-17

ConEwEfS1200 Z-furring & Rigid Insulation 6 28-Jul-17 04-Aug-17

ConEwEfS1250 Stone Veneer 8 13-Sep-17 22-Sep-17

ConEwEfS1300 Storefront Window Frames 4 06-Nov-17 09-Nov-17

ConEwEfS1350 Metal Wall Paneling 13 25-Sep-17 11-Oct-17

ConEwEfS1750 Elastomeric Joint Sealants 4 12-Oct-17 17-Oct-17

ConEwEfS1800 Exterior Wall Lighting 4 30-Nov-17 05-Dec-17West ElevationWest Elevation 246 19-Jul-17 21-Mar-18

ConEwEfW1000Exterior Wall Framing 10 19-Jul-17 01-Aug-17

ConEwEfW1050Exterior Wall Sheathing 9 27-Jul-17 08-Aug-17

ConEwEfW1100Metal Flashings 5 07-Aug-17 11-Aug-17

ConEwEfW1150Fluid Applied Air Barrier 8 14-Aug-17 23-Aug-17

ConEwEfW1200Z-furring & Rigid Insulation 7 21-Aug-17 29-Aug-17

ConEwEfW1250Stone Veneer 13 06-Oct-17 24-Oct-17

ConEwEfW1300Storefront Window Frames 16 25-Oct-17 15-Nov-17

ConEwEfW1350Canopied Walkway | Lighting Rough-In 6 25-Oct-17 01-Nov-17

ConEwEfW1400Canopied Walkway | Metal Soffit 11 02-Nov-17 16-Nov-17

ConEwEfW1450Canopied Walkway Rigid Insulation | Pro-board 9 02-Nov-17 14-Nov-17

ConEwEfW1650Canopied Walkway Metal Wall | Roof Paneling 11 09-Nov-17 23-Nov-17

ConEwEfW1700Storefront Doors | Operators 9 24-Nov-17 06-Dec-17

ConEwEfW1850Elastomeric joint Sealants 5 24-Nov-17 30-Nov-17

ConEwEfW1900Exterior Wall Lighting 5 06-Dec-17 12-Dec-17

ConEwEfW1950Stainless Steel Solar Fabric 11 07-Mar-18 21-Mar-18

ConEwEfW2000Exposed Column Covers 10 07-Mar-18 20-Mar-18North ElevationNorth Elevation 155 11-Jul-17 12-Dec-17

ConEwEfN1000 Exterior Wall Framing 6 11-Jul-17 18-Jul-17

ConEwEfN1050 Exterior Wall Sheathing 6 19-Jul-17 26-Jul-17

ConEwEfN1100 Metal Flashings 3 27-Jul-17 31-Jul-17

ConEwEfN1150 Fluid Applied Air Barrier 4 01-Aug-17 04-Aug-17

ConEwEfN1200 Z-furring & Rigid Insulation 6 07-Aug-17 14-Aug-17

ConEwEfN1250 Stone Veneer 9 25-Sep-17 05-Oct-17

ConEwEfN1350 Elastomeric Joint Sealants 5 06-Oct-17 12-Oct-17

ConEwEfN1400 Exterior Wall Lighting 5 06-Dec-17 12-Dec-17Roof AreaRoof Area 182 11-May-17 08-Nov-17

ConEwEfR1000 Parapet Wall Electrical Rough-In 8 02-Aug-17 11-Aug-17

ConEwEfR1050 Parapet Wall Sheathing 11 14-Aug-17 28-Aug-17

ConEwEfR1100 Roof Deck Penetrations | Drain Bodies | Curbs 9 11-May-17 23-May-17

ConEwEfR1250 Roof Hatch | Reglets & Flashings 7 29-Aug-17 06-Sep-17

ConEwEfR1450 80mil TPO Membrane | Insulation | Pro-board 17 07-Sep-17 29-Sep-17

ConEwEfR1500 TPO Walk-pads 5 02-Oct-17 06-Oct-17

ConEwEfR1550 Prefinished Metal Coping Cap 11 25-Oct-17 08-Nov-17

ConEwEfR1800 Roof Top Mechanical Equipment Set 5 02-Oct-17 06-Oct-17

ConEwEfR1850 Satellite Dishes | Antenna 3 02-Oct-17 04-Oct-17

Interior Finish | SystemsInterior Finish | Systems 302 04-Jul-17 01-May-18Instructional SpacesInstructional Spaces 302 04-Jul-17 01-May-18

ConEwIfIS1000 Fire Sprinkler Main | Branch Piping 10 04-Jul-17 17-Jul-17

ConEwIfIS1050 HVAC Ductwork | Insulation 15 18-Jul-17 07-Aug-17

ConEwIfIS1100 Mechanical Overhead Piping 15 08-Aug-17 28-Aug-17

ConEwIfIS1150 Electrical Overhead Rough-In 15 18-Jul-17 07-Aug-17

ConEwIfIS1200 Interior Wall Framing | Furring 12 08-Aug-17 23-Aug-17

ConEwIfIS1250 Interior Wall Rough-In | MEP 9 24-Aug-17 05-Sep-17

ConEwIfIS1300 Interior Wall Insulation | Blocking | Backing 6 06-Sep-17 13-Sep-17

ConEwIfIS1350 Drywall Sheathing 9 14-Sep-17 26-Sep-17

ConEwIfIS1400 Acoustical Sealant | Drywall Taping 14 27-Sep-17 16-Oct-17

ConEwIfIS1450 Lecture Hall Ceiling Framing | MEP Rough-In | Data Cabling 15 17-Oct-17 06-Nov-17

ConEwIfIS1475 Lecture Hall Ceiling | Project Screens 6 01-Nov-17 08-Nov-17

ConEwIfIS1500 Lecture Hall Ceiling | Drywall & Taping 20 15-Nov-17 12-Dec-17

ConEwIfIS1550 Lecture Hall Ceiling | Wood Panel & Trim 20 13-Dec-17 09-Jan-18

ConEwIfIS1575 Lecture Hall Ceiling | Acoustical Ceiling 15 03-Jan-18 23-Jan-18

ConEwIfIS1600 Lecture Hall Ceiling | Fixtures & Trim 10 17-Jan-18 30-Jan-18

ConEwIfIS1650 Lecture Hall Raised Stadium Floor Framing 15 24-Jan-18 13-Feb-18

ConEwIfIS1700 Lecture Hall Raised Floor MEP Rough-In | Sheathing 10 07-Feb-18 20-Feb-18

ConEwIfIS1750 Lecture Hall Wall Paneling | Woodwork 20 21-Feb-18 20-Mar-18

ConEwIfIS1800 Lecture Hall Visual Displays | Whiteboards 8 15-Mar-18 26-Mar-18

ConEwIfIS1850 Lecture Hall Carpet Flooring 8 21-Mar-18 30-Mar-18

ConEwIfIS1900 Lecture Hall Stadium Seating 12 02-Apr-18 17-Apr-18

ConEwIfIS1950 Lecture Hall Doors & Hardware 10 18-Apr-18 01-May-18General Building SpacesGeneral Building Spaces 135 18-Jul-17 29-Nov-17

ConEwIfGBS1000Fire Sprinkler Main | Branch Piping 4 18-Jul-17 21-Jul-17

ConEwIfGBS1050HVAC Ductwork | Insulation 7 24-Jul-17 01-Aug-17

ConEwIfGBS1100Mechanical Overhead Piping 7 02-Aug-17 10-Aug-17

ConEwIfGBS1150Electrical Overhead Rough-In 7 24-Jul-17 01-Aug-17

ConEwIfGBS1200Interior Wall Framing | Furring 8 02-Aug-17 11-Aug-17

ConEwIfGBS1250Interior Wall Rough-In | MEP 7 14-Aug-17 22-Aug-17

ConEwIfGBS1300Interior Wall Insulation | Blocking | Backing 4 23-Aug-17 28-Aug-17

Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

Qtr 4, 2016 Qtr 1, 2017 Qtr 2, 2017 Qtr 3, 2017 Qtr 4, 2017 Qtr 1, 2018 Qtr 2, 2018 Qtr 3, 2018 Qtr 4, 2018

23-Nov-17 Exterior Wall Lighting

11-Jul-17 05-Dec-17, South Elevation11-Jul-17 Exterior Wall Framing

11-Jul-17 Exterior Wall Sheathing

19-Jul-17 Metal Flashings

24-Jul-17 Fluid Applied Air Barrier

28-Jul-17 Z-furring & Rigid Insulation

13-Sep-17 Stone Veneer

06-Nov-17 Storefront Window Frames

25-Sep-17 Metal Wall Paneling

12-Oct-17 Elastomeric Joint Sealants

30-Nov-17 Exterior Wall Lighting

19-Jul-17 21-Mar-18, West Elevation19-Jul-17 Exterior Wall Framing

27-Jul-17 Exterior Wall Sheathing

07-Aug-17 Metal Flashings

14-Aug-17 Fluid Applied Air Barrier

21-Aug-17 Z-furring & Rigid Insulation

06-Oct-17 Stone Veneer

25-Oct-17 Storefront Window Frames

25-Oct-17 Canopied Walkway | Lighting Rough-In

02-Nov-17 Canopied Walkway | Metal Soffit

02-Nov-17 Canopied Walkway Rigid Insulation | Pro-board

09-Nov-17 Canopied Walkway Metal Wall | Roof Paneling

24-Nov-17 Storefront Doors | Operators

24-Nov-17 Elastomeric joint Sealants

06-Dec-17 Exterior Wall Lighting

07-Mar-18 Stainless Steel Solar Fabric

07-Mar-18 Exposed Column Covers

11-Jul-17 12-Dec-17, North Elevation11-Jul-17 Exterior Wall Framing

19-Jul-17 Exterior Wall Sheathing

27-Jul-17 Metal Flashings

01-Aug-17 Fluid Applied Air Barrier

07-Aug-17 Z-furring & Rigid Insulation

25-Sep-17 Stone Veneer

06-Oct-17 Elastomeric Joint Sealants

06-Dec-17 Exterior Wall Lighting

11-May-17 08-Nov-17, Roof Area02-Aug-17 Parapet Wall Electrical Rough-In

14-Aug-17 Parapet Wall Sheathing

11-May-17 Roof Deck Penetrations | Drain Bodies | Curbs

29-Aug-17 Roof Hatch | Reglets & Flashings

07-Sep-17 80mil TPO Membrane | Insulation | Pro-board

02-Oct-17 TPO Walk-pads

25-Oct-17 Prefinished Metal Coping Cap

02-Oct-17 Roof Top Mechanical Equipment Set

02-Oct-17 Satellite Dishes | Antenna

04-Jul-17 01-May-18, Interior Finish | Systems

04-Jul-17 01-May-18, Instructional Spaces04-Jul-17 Fire Sprinkler Main | Branch Piping

18-Jul-17 HVAC Ductwork | Insulation

08-Aug-17 Mechanical Overhead Piping

18-Jul-17 Electrical Overhead Rough-In

08-Aug-17 Interior Wall Framing | Furring

24-Aug-17 Interior Wall Rough-In | MEP

06-Sep-17 Interior Wall Insulation | Blocking | Backing

14-Sep-17 Drywall Sheathing

27-Sep-17 Acoustical Sealant | Drywall Taping

17-Oct-17 Lecture Hall Ceiling Framing | MEP Rough-In | Data Cabling

01-Nov-17 Lecture Hall Ceiling | Project Screens

15-Nov-17 Lecture Hall Ceiling | Drywall & Taping

13-Dec-17 Lecture Hall Ceiling | Wood Panel & Trim

03-Jan-18 Lecture Hall Ceiling | Acoustical Ceiling

17-Jan-18 Lecture Hall Ceiling | Fixtures & Trim

24-Jan-18 Lecture Hall Raised Stadium Floor Framing

07-Feb-18 Lecture Hall Raised Floor MEP Rough-In | Sheathing

21-Feb-18 Lecture Hall Wall Paneling | Woodwork

15-Mar-18 Lecture Hall Visual Displays | Whiteboards

21-Mar-18 Lecture Hall Carpet Flooring

02-Apr-18 Lecture Hall Stadium Seating

18-Apr-18 Lecture Hall Doors & Hardware

18-Jul-17 29-Nov-17, General Building Spaces18-Jul-17 Fire Sprinkler Main | Branch Piping

24-Jul-17 HVAC Ductwork | Insulation

02-Aug-17 Mechanical Overhead Piping

24-Jul-17 Electrical Overhead Rough-In

02-Aug-17 Interior Wall Framing | Furring

14-Aug-17 Interior Wall Rough-In | MEP

23-Aug-17 Interior Wall Insulation | Blocking | Backing

Idaho College of Osteopathic Medicine | Boise, Idaho

Conceptual Project Delivery Schedule

Date Revision Checked Approved

01-Dec-16 DRAFT - Conceptual JN JN

05-Dec-16 DRAFT - Conceptual Rev.1 JN CG

Page 8 of 13 Information is Proprietary & Confidential - Redistribution or use without prior written authorization is prohibited. Schedule is preliminary and conceptual - intended to provide a general understanding of potential

pathway to completion. Schedule is not intended to capture all task items necessary for completion of project scope.

Page 9: ICOM Schedule & Logistics (1)

Activity ID Activity Name Original

Duration

Start Finish

ConEwIfGBS1350Restroom Ceiling Framing 8 14-Aug-17 23-Aug-17

ConEwIfGBS1400Restroom Ceiling MEP Rough-In 8 24-Aug-17 04-Sep-17

ConEwIfGBS1450Restroom Wall | Ceiling Sheathing & Taping 10 05-Sep-17 18-Sep-17

ConEwIfGBS1500Restroom Prime & One-Coat 4 19-Sep-17 22-Sep-17

ConEwIfGBS1525Restroom Countertops 5 20-Oct-17 26-Oct-17

ConEwIfGBS1550Restroom Floor | Wall Tile 10 25-Sep-17 06-Oct-17

ConEwIfGBS1650Restroom Plumbing Fixtures 6 09-Oct-17 16-Oct-17

ConEwIfGBS1700Restroom Lighting Fixtures | mechanical Trim 6 17-Oct-17 24-Oct-17

ConEwIfGBS1750Restroom Partitions | Accessories 6 17-Nov-17 24-Nov-17

ConEwIfGBS1800Restroom Doors 3 27-Nov-17 29-Nov-17

ConEwIfGBS1850Fire Riser Manifold 3 24-Jul-17 26-Jul-17

ConEwIfGBS1900Concrete Floor Grind | Sealer 3 03-Oct-17 05-Oct-17

ConEwIfGBS1950Suspended Lighting 3 06-Oct-17 10-Oct-17

ConEwIfGBS2000Mop Sinks | FRP Wall Wrap 6 06-Oct-17 13-Oct-17

ConEwIfGBS2050MEP Trim-out 15 04-Oct-17 24-Oct-17

ConEwIfGBS2100Doors & Hardware 10 25-Oct-17 07-Nov-17Student Support SpaceStudent Support Space 267 24-Jul-17 16-Apr-18

ConEwIfSSS1000Fire Sprinkler Branch Piping 2 24-Jul-17 25-Jul-17

ConEwIfSSS1050HVAC Ductwork | Insulation 4 26-Jul-17 31-Jul-17

ConEwIfSSS1100Mechanical Overhead Piping 4 01-Aug-17 04-Aug-17

ConEwIfSSS1150Electrical Overhead Rough-In 4 26-Jul-17 31-Jul-17

ConEwIfSSS1200Interior Wall Framing | Furring 5 01-Aug-17 07-Aug-17

ConEwIfSSS1250Interior Wall Rough-In | MEP 4 08-Aug-17 11-Aug-17

ConEwIfSSS1300Interior Wall Insulation | Blocking | Backing 3 14-Aug-17 16-Aug-17

ConEwIfSSS1350Ceiling Framing | MEP Rough-In 9 17-Aug-17 29-Aug-17

ConEwIfSSS1400Ceiling Sheathing | Taping | Painting 12 30-Aug-17 14-Sep-17

ConEwIfSSS1450Acoustical Ceiling Grid 7 15-Sep-17 25-Sep-17

ConEwIfSSS1500Lockers | Architectural Woodwork 12 21-Mar-18 05-Apr-18

ConEwIfSSS1550Carpet Flooring | Rubber Base 7 06-Apr-18 16-Apr-18Corridors | VestibulesCorridors | Vestibules 289 10-Jul-17 24-Apr-18

ConEwIfCV1000MEP Overhead | BIM Coordination 12 10-Jul-17 25-Jul-17

ConEwIfCV1050Pilaster | soffit Framing 15 07-Feb-18 27-Feb-18

ConEwIfCV1100Drywall Sheathing | Taping 15 21-Feb-18 13-Mar-18

ConEwIfCV1150Wood Pilaster Wrap | Ceiling Panels 15 07-Mar-18 27-Mar-18

ConEwIfCV1200Acoustical Ceiling Grid 10 21-Mar-18 03-Apr-18

ConEwIfCV1250MEP Ceiling Trim | Devices 10 28-Mar-18 10-Apr-18

ConEwIfCV1300Corridor | Vestibule Flooring 10 11-Apr-18 24-Apr-18

North Wing - Shell | EggNorth Wing - Shell | Egg 322 11-Jul-17 28-May-18

Exterior Finish | SystemsExterior Finish | Systems 310 11-Jul-17 16-May-18East ElevationEast Elevation 196 25-Jul-17 05-Feb-18

ConNwEfE1000 Exterior Wall Framing 12 25-Jul-17 09-Aug-17

ConNwEfE1050 Exterior Wall Sheathing 10 10-Aug-17 23-Aug-17

ConNwEfE1100 Metal Flashings 5 24-Aug-17 30-Aug-17

ConNwEfE1150 Fluid Applied Air Barrier 10 31-Aug-17 13-Sep-17

ConNwEfE1200 Z-furring & Rigid Insulation 7 14-Sep-17 22-Sep-17

ConNwEfE1250 Stone Veneer 14 25-Oct-17 13-Nov-17

ConNwEfE1300 Storefront Window Frames | Glazing 7 14-Nov-17 22-Nov-17

ConNwEfE1400 Exterior Doors 6 14-Nov-17 21-Nov-17

ConNwEfE1450 Rigid Insulation | Pro-board 7 23-Nov-17 01-Dec-17

ConNwEfE1500 Metal Wall | Roof Paneling 13 04-Dec-17 20-Dec-17

ConNwEfE1550 Elastomeric Joint Sealants 5 21-Dec-17 27-Dec-17

ConNwEfE1600 Exterior Wall Lighting 3 01-Feb-18 05-Feb-18North ElevationNorth Elevation 260 10-Aug-17 26-Apr-18

ConNwEfN1000Exterior Wall Framing 20 10-Aug-17 06-Sep-17

ConNwEfN1050Exterior Wall Sheathing 14 07-Sep-17 26-Sep-17

ConNwEfN1100Metal Flashings 7 27-Sep-17 05-Oct-17

ConNwEfN1150Fluid Applied Air Barrier 13 06-Oct-17 24-Oct-17

ConNwEfN1200Z-furring & Rigid Insulation 13 25-Oct-17 10-Nov-17

ConNwEfN1250Stone Veneer 22 14-Nov-17 13-Dec-17

ConNwEfN1300Storefront Window Frames | Glazing 7 14-Dec-17 22-Dec-17

ConNwEfN1350Curtain Wall Frames | Glazing | Spandrel 22 14-Dec-17 12-Jan-18

ConNwEfN1400Curtain Wall Slab Edge Firestop 8 15-Jan-18 24-Jan-18

ConNwEfN1450Rigid Insulation | Pro-Board 8 15-Jan-18 24-Jan-18

ConNwEfN1500Metal Wall | Soffit | Roof Paneling 14 25-Jan-18 13-Feb-18

ConNwEfN1550Exterior Storefront Doors & Operators 8 25-Dec-17 03-Jan-18

ConNwEfN1600Exposed Column Cover Wraps 9 14-Feb-18 26-Feb-18

ConNwEfN1650Elastomeric Joint Sealants 8 27-Feb-18 08-Mar-18

ConNwEfN1700Exterior Wall | Soffit Lighting 6 14-Mar-18 21-Mar-18

ConNwEfN1750Building Signage 5 20-Apr-18 26-Apr-18South ElevationSouth Elevation 209 24-Aug-17 20-Mar-18

ConNwEfS1000 Exterior Wall Framing 20 24-Aug-17 20-Sep-17

ConNwEfS1050 Exterior Wall Sheathing 12 21-Sep-17 06-Oct-17

ConNwEfS1100 Metal Flashings 6 09-Oct-17 16-Oct-17

ConNwEfS1150 Fluid Applied Air Barrier 12 17-Oct-17 01-Nov-17

ConNwEfS1200 Z-furring & Rigid Insulation 12 02-Nov-17 17-Nov-17

ConNwEfS1250 Stone Veneer 21 20-Nov-17 18-Dec-17

ConNwEfS1450 Storefront Window Frames | Glazing 10 19-Dec-17 01-Jan-18

ConNwEfS1500 Curtain Wall Frames | Glazing | Spandrel 32 15-Jan-18 27-Feb-18

ConNwEfS1550 Curtain Wall Slab Edge Firestop 15 28-Feb-18 20-Mar-18

ConNwEfS1575 Rigid Insulation | Pro-board 8 02-Jan-18 11-Jan-18

Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

Qtr 4, 2016 Qtr 1, 2017 Qtr 2, 2017 Qtr 3, 2017 Qtr 4, 2017 Qtr 1, 2018 Qtr 2, 2018 Qtr 3, 2018 Qtr 4, 2018

14-Aug-17 Restroom Ceiling Framing

24-Aug-17 Restroom Ceiling MEP Rough-In

05-Sep-17 Restroom Wall | Ceiling Sheathing & Taping

19-Sep-17 Restroom Prime & One-Coat

20-Oct-17 Restroom Countertops

25-Sep-17 Restroom Floor | Wall Tile

09-Oct-17 Restroom Plumbing Fixtures

17-Oct-17 Restroom Lighting Fixtures | mechanical Trim

17-Nov-17 Restroom Partitions | Accessories

27-Nov-17 Restroom Doors

24-Jul-17 Fire Riser Manifold

03-Oct-17 Concrete Floor Grind | Sealer

06-Oct-17 Suspended Lighting

06-Oct-17 Mop Sinks | FRP Wall Wrap

04-Oct-17 MEP Trim-out

25-Oct-17 Doors & Hardware

24-Jul-17 16-Apr-18, Student Support Space24-Jul-17 Fire Sprinkler Branch Piping

26-Jul-17 HVAC Ductwork | Insulation

01-Aug-17 Mechanical Overhead Piping

26-Jul-17 Electrical Overhead Rough-In

01-Aug-17 Interior Wall Framing | Furring

08-Aug-17 Interior Wall Rough-In | MEP

14-Aug-17 Interior Wall Insulation | Blocking | Backing

17-Aug-17 Ceiling Framing | MEP Rough-In

30-Aug-17 Ceiling Sheathing | Taping | Painting

15-Sep-17 Acoustical Ceiling Grid

21-Mar-18 Lockers | Architectural Woodwork

06-Apr-18 Carpet Flooring | Rubber Base

10-Jul-17 24-Apr-18, Corridors | Vestibules10-Jul-17 MEP Overhead | BIM Coordination

07-Feb-18 Pilaster | soffit Framing

21-Feb-18 Drywall Sheathing | Taping

07-Mar-18 Wood Pilaster Wrap | Ceiling Panels

21-Mar-18 Acoustical Ceiling Grid

28-Mar-18 MEP Ceiling Trim | Devices

11-Apr-18 Corridor | Vestibule Flooring

11-Jul-17 28-May-18, North Wing - Shell | Egg

11-Jul-17 16-May-18, Exterior Finish | Systems

25-Jul-17 05-Feb-18, East Elevation25-Jul-17 Exterior Wall Framing

10-Aug-17 Exterior Wall Sheathing

24-Aug-17 Metal Flashings

31-Aug-17 Fluid Applied Air Barrier

14-Sep-17 Z-furring & Rigid Insulation

25-Oct-17 Stone Veneer

14-Nov-17 Storefront Window Frames | Glazing

14-Nov-17 Exterior Doors

23-Nov-17 Rigid Insulation | Pro-board

04-Dec-17 Metal Wall | Roof Paneling

21-Dec-17 Elastomeric Joint Sealants

01-Feb-18 Exterior Wall Lighting

10-Aug-17 26-Apr-18, North Elevation10-Aug-17 Exterior Wall Framing

07-Sep-17 Exterior Wall Sheathing

27-Sep-17 Metal Flashings

06-Oct-17 Fluid Applied Air Barrier

25-Oct-17 Z-furring & Rigid Insulation

14-Nov-17 Stone Veneer

14-Dec-17 Storefront Window Frames | Glazing

14-Dec-17 Curtain Wall Frames | Glazing | Spandrel

15-Jan-18 Curtain Wall Slab Edge Firestop

15-Jan-18 Rigid Insulation | Pro-Board

25-Jan-18 Metal Wall | Soffit | Roof Paneling

25-Dec-17 Exterior Storefront Doors & Operators

14-Feb-18 Exposed Column Cover Wraps

27-Feb-18 Elastomeric Joint Sealants

14-Mar-18 Exterior Wall | Soffit Lighting

20-Apr-18 Building Signage

24-Aug-17 20-Mar-18, South Elevation24-Aug-17 Exterior Wall Framing

21-Sep-17 Exterior Wall Sheathing

09-Oct-17 Metal Flashings

17-Oct-17 Fluid Applied Air Barrier

02-Nov-17 Z-furring & Rigid Insulation

20-Nov-17 Stone Veneer

19-Dec-17 Storefront Window Frames | Glazing

15-Jan-18 Curtain Wall Frames | Glazing | Spandrel

28-Feb-18 Curtain Wall Slab Edge Firestop

02-Jan-18 Rigid Insulation | Pro-board

Idaho College of Osteopathic Medicine | Boise, Idaho

Conceptual Project Delivery Schedule

Date Revision Checked Approved

01-Dec-16 DRAFT - Conceptual JN JN

05-Dec-16 DRAFT - Conceptual Rev.1 JN CG

Page 9 of 13 Information is Proprietary & Confidential - Redistribution or use without prior written authorization is prohibited. Schedule is preliminary and conceptual - intended to provide a general understanding of potential

pathway to completion. Schedule is not intended to capture all task items necessary for completion of project scope.

Page 10: ICOM Schedule & Logistics (1)

Activity ID Activity Name Original

Duration

Start Finish

ConNwEfS1600 Metal Wall | Soffit |Roof Paneling 16 12-Jan-18 02-Feb-18

ConNwEfS1650 Storefront Doors & Operators 8 02-Jan-18 11-Jan-18

ConNwEfS1700 Solar Shades | Louvers 15 28-Feb-18 20-Mar-18

ConNwEfS1750 Exposed Column Cover Wraps 9 05-Feb-18 15-Feb-18

ConNwEfS1800 Elastomeric Joint Sealants 5 16-Feb-18 22-Feb-18

ConNwEfS1850 Exterior Wall | Soffit Lighting 7 05-Mar-18 13-Mar-18West ElevationWest Elevation 252 07-Sep-17 16-May-18

ConNwEfW1000Exterior Wall Framing 12 07-Sep-17 22-Sep-17

ConNwEfW1050Exterior Wall Sheathing 9 25-Sep-17 05-Oct-17

ConNwEfW1150Metal Flashings 4 06-Oct-17 11-Oct-17

ConNwEfW1200Fluid Applied Air Barrier 7 12-Oct-17 20-Oct-17

ConNwEfW1250Z-furring & Rigid Insulation 7 23-Oct-17 31-Oct-17

ConNwEfW1300Stone Veneer 13 19-Dec-17 04-Jan-18

ConNwEfW1350Curtain Wall Frames | Glazing | Spandrell 24 21-Feb-18 26-Mar-18

ConNwEfW1400Curtain Wall Slab Edge Firestop 8 27-Mar-18 05-Apr-18

ConNwEfW1450Rigid Insulation | Pro-board 6 19-Mar-18 26-Mar-18

ConNwEfW1500Metal Wall | Soffit | Roof Paneling 14 22-Mar-18 10-Apr-18

ConNwEfW1550Exposed Column Cover Wraps 8 11-Apr-18 20-Apr-18

ConNwEfW1600Elastomeric Joint Sealants 8 23-Apr-18 02-May-18

ConNwEfW1650Stainless Steel Fabic Solar Shades 7 08-May-18 16-May-18

ConNwEfW1700Exterior Wall | Soffit Lighting 8 11-Apr-18 20-Apr-18Roof AreaRoof Area 186 11-Jul-17 12-Jan-18

ConNwEfR1150 Parapet Wall Electrical Rough-In 9 12-Sep-17 22-Sep-17

ConNwEfR1200 Parapet Wall Sheathing 9 25-Sep-17 05-Oct-17

ConNwEfR1300 Roof Deck Penetrations | Drain Bodies | Curbs 7 11-Jul-17 19-Jul-17

ConNwEfR1350 Roof Hatch | Reglets & Flashings 7 20-Jul-17 28-Jul-17

ConNwEfR1600 80mil TPO Membrane | Insulation | Pro-board 20 06-Oct-17 02-Nov-17

ConNwEfR1650 TPO Walk-pads 4 03-Nov-17 08-Nov-17

ConNwEfR1700 Prefinished Metal Coping Cap 6 05-Jan-18 12-Jan-18

ConNwEfR1900 Roof Top Mechanical Equipment Set 4 03-Nov-17 08-Nov-17

ConNwEfR1950 Satellite Dishes | Antenna 2 21-Dec-17 22-Dec-17

1st Floor - Interior Finish | Systems1st Floor - Interior Finish | Systems 314 19-Jul-17 28-May-18AdmissionsAdmissions 99 19-Jul-17 25-Oct-17

ConNwIfA1000 Fire Sprinkler Piping 6 19-Jul-17 26-Jul-17

ConNwIfA1050 Mechanical Ductwork | Insulation 7 19-Jul-17 27-Jul-17

ConNwIfA1100 Electrical | Plumbing Overhead 7 27-Jul-17 04-Aug-17

ConNwIfA1150 Interior Wall Framings | MEP Rough-In 9 28-Jul-17 09-Aug-17

ConNwIfA1200 Interior Wall Insulation | Blocking | Backing 4 10-Aug-17 15-Aug-17

ConNwIfA1250 Soffit Ceiling Framings | MEP Rough-In 9 10-Aug-17 22-Aug-17

ConNwIfA1300 Interior Wall | soffit Drywall 9 23-Aug-17 04-Sep-17

ConNwIfA1350 Acoustical Sealants | Drywall Taping 9 05-Sep-17 15-Sep-17

ConNwIfA1400 Prime and One-Coat Paint 4 18-Sep-17 21-Sep-17

ConNwIfA1450 Acoustical Ceiling Grid | MEP Trim 6 22-Sep-17 29-Sep-17

ConNwIfA1500 Millworks | Casework | Countertops & Sills 8 02-Oct-17 11-Oct-17

ConNwIfA1550 Carpet Flooring | Base 6 12-Oct-17 19-Oct-17

ConNwIfA1600 Doors & Hardware 4 20-Oct-17 25-Oct-17Library | Quiet StudyLibrary | Quiet Study 114 27-Jul-17 17-Nov-17

ConNwIfL1650 Fire Sprinkler Piping 6 27-Jul-17 03-Aug-17

ConNwIfL1700 Mechanical Ductwork | Insulation 7 04-Aug-17 14-Aug-17

ConNwIfL1750 Electrical | Plumbing Overhead 7 04-Aug-17 14-Aug-17

ConNwIfL1800 Interior Wall Framings | MEP Rough-In 9 15-Aug-17 25-Aug-17

ConNwIfL1850 Interior Wall Insulation | Blocking | Backing 4 28-Aug-17 31-Aug-17

ConNwIfL1900 Soffit Ceiling Framings | MEP Rough-In 9 28-Aug-17 07-Sep-17

ConNwIfL1950 Interior Wall | soffit Drywall 9 08-Sep-17 20-Sep-17

ConNwIfL2000 Acoustical Sealants | Drywall Taping 9 21-Sep-17 03-Oct-17

ConNwIfL2050 Prime and One-Coat Paint 5 04-Oct-17 10-Oct-17

ConNwIfL2100 Acoustical Ceiling Grid | MEP Trim 8 11-Oct-17 20-Oct-17

ConNwIfL2150 Millworks | Casework | Countertops & Sills 8 23-Oct-17 01-Nov-17

ConNwIfL2200 Carpet Flooring | Base 7 02-Nov-17 10-Nov-17

ConNwIfL2250 Doors & Hardware 5 13-Nov-17 17-Nov-17IT | General Building SpacesIT | General Building Spaces 298 04-Aug-17 28-May-18

ConNwIfITG1000Mechanical | Electrical Overhead 4 04-Aug-17 09-Aug-17

ConNwIfITG1050Interior Wall Framing | MEP Rough-In 5 10-Aug-17 16-Aug-17

ConNwIfITG1100Interior Wall Insulation | Blocking | Backing 3 17-Aug-17 21-Aug-17

ConNwIfITG1150Electrical Room Drywall | Taping 5 22-Aug-17 28-Aug-17

ConNwIfITG1200Electrical Room Paint | Plywood Backboard 3 29-Aug-17 31-Aug-17

ConNwIfITG1250Electrical Room Concrete Floor Grind | Sealer 3 01-Sep-17 05-Sep-17

ConNwIfITG1300Electrical Room Transformer | Panels | Switchgear 12 06-Sep-17 21-Sep-17

ConNwIfITG1350Restroom Ceiling Framing | MEP Rough-In 8 17-Aug-17 28-Aug-17

ConNwIfITG1400Restroom Wall | Ceiling Sheathing 4 29-Aug-17 01-Sep-17

ConNwIfITG1450Restroom Drywall Taping | One-Coat Painting 7 04-Sep-17 12-Sep-17

ConNwIfITG1500Restroom Countertops 2 13-Sep-17 14-Sep-17

ConNwIfITG1550Restroom Floor | Wall Tile 8 15-Sep-17 26-Sep-17

ConNwIfITG1600Restroom Plumbing | Lighting Fixtures 6 27-Sep-17 04-Oct-17

ConNwIfITG1650Restroom Partitions | Accessories 5 05-Oct-17 11-Oct-17

ConNwIfITG1700Restroom | Storage Room Doors 2 12-Oct-17 13-Oct-17

ConNwIfITG1750Lobby Drywall | Taping | Painting 9 11-Apr-18 23-Apr-18

ConNwIfITG1800Lobby Precast Stair Treades 5 15-Sep-17 21-Sep-17

ConNwIfITG1850Lobby Decorative Stair Railings 9 07-Sep-17 19-Sep-17

ConNwIfITG1875Lobby Lighting | Mechanical Trim 10 24-Apr-18 07-May-18

Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

Qtr 4, 2016 Qtr 1, 2017 Qtr 2, 2017 Qtr 3, 2017 Qtr 4, 2017 Qtr 1, 2018 Qtr 2, 2018 Qtr 3, 2018 Qtr 4, 2018

12-Jan-18 Metal Wall | Soffit |Roof Paneling

02-Jan-18 Storefront Doors & Operators

28-Feb-18 Solar Shades | Louvers

05-Feb-18 Exposed Column Cover Wraps

16-Feb-18 Elastomeric Joint Sealants

05-Mar-18 Exterior Wall | Soffit Lighting

07-Sep-17 16-May-18, West Elevation07-Sep-17 Exterior Wall Framing

25-Sep-17 Exterior Wall Sheathing

06-Oct-17 Metal Flashings

12-Oct-17 Fluid Applied Air Barrier

23-Oct-17 Z-furring & Rigid Insulation

19-Dec-17 Stone Veneer

21-Feb-18 Curtain Wall Frames | Glazing | Spandrell

27-Mar-18 Curtain Wall Slab Edge Firestop

19-Mar-18 Rigid Insulation | Pro-board

22-Mar-18 Metal Wall | Soffit | Roof Paneling

11-Apr-18 Exposed Column Cover Wraps

23-Apr-18 Elastomeric Joint Sealants

08-May-18 Stainless Steel Fabic Solar Shades

11-Apr-18 Exterior Wall | Soffit Lighting

11-Jul-17 12-Jan-18, Roof Area12-Sep-17 Parapet Wall Electrical Rough-In

25-Sep-17 Parapet Wall Sheathing

11-Jul-17 Roof Deck Penetrations | Drain Bodies | Curbs

20-Jul-17 Roof Hatch | Reglets & Flashings

06-Oct-17 80mil TPO Membrane | Insulation | Pro-board

03-Nov-17 TPO Walk-pads

05-Jan-18 Prefinished Metal Coping Cap

03-Nov-17 Roof Top Mechanical Equipment Set

21-Dec-17 Satellite Dishes | Antenna

19-Jul-17 28-May-18, 1st Floor - Interior Finish | Systems

19-Jul-17 25-Oct-17, Admissions19-Jul-17 Fire Sprinkler Piping

19-Jul-17 Mechanical Ductwork | Insulation

27-Jul-17 Electrical | Plumbing Overhead

28-Jul-17 Interior Wall Framings | MEP Rough-In

10-Aug-17 Interior Wall Insulation | Blocking | Backing

10-Aug-17 Soffit Ceiling Framings | MEP Rough-In

23-Aug-17 Interior Wall | soffit Drywall

05-Sep-17 Acoustical Sealants | Drywall Taping

18-Sep-17 Prime and One-Coat Paint

22-Sep-17 Acoustical Ceiling Grid | MEP Trim

02-Oct-17 Millworks | Casework | Countertops & Sills

12-Oct-17 Carpet Flooring | Base

20-Oct-17 Doors & Hardware

27-Jul-17 17-Nov-17, Library | Quiet Study27-Jul-17 Fire Sprinkler Piping

04-Aug-17 Mechanical Ductwork | Insulation

04-Aug-17 Electrical | Plumbing Overhead

15-Aug-17 Interior Wall Framings | MEP Rough-In

28-Aug-17 Interior Wall Insulation | Blocking | Backing

28-Aug-17 Soffit Ceiling Framings | MEP Rough-In

08-Sep-17 Interior Wall | soffit Drywall

21-Sep-17 Acoustical Sealants | Drywall Taping

04-Oct-17 Prime and One-Coat Paint

11-Oct-17 Acoustical Ceiling Grid | MEP Trim

23-Oct-17 Millworks | Casework | Countertops & Sills

02-Nov-17 Carpet Flooring | Base

13-Nov-17 Doors & Hardware

04-Aug-17 28-May-18, IT | General Building Spaces04-Aug-17 Mechanical | Electrical Overhead

10-Aug-17 Interior Wall Framing | MEP Rough-In

17-Aug-17 Interior Wall Insulation | Blocking | Backing

22-Aug-17 Electrical Room Drywall | Taping

29-Aug-17 Electrical Room Paint | Plywood Backboard

01-Sep-17 Electrical Room Concrete Floor Grind | Sealer

06-Sep-17 Electrical Room Transformer | Panels | Switchgear

17-Aug-17 Restroom Ceiling Framing | MEP Rough-In

29-Aug-17 Restroom Wall | Ceiling Sheathing

04-Sep-17 Restroom Drywall Taping | One-Coat Painting

13-Sep-17 Restroom Countertops

15-Sep-17 Restroom Floor | Wall Tile

27-Sep-17 Restroom Plumbing | Lighting Fixtures

05-Oct-17 Restroom Partitions | Accessories

12-Oct-17 Restroom | Storage Room Doors

11-Apr-18 Lobby Drywall | Taping | Painting

15-Sep-17 Lobby Precast Stair Treades

07-Sep-17 Lobby Decorative Stair Railings

24-Apr-18 Lobby Lighting | Mechanical Trim

Idaho College of Osteopathic Medicine | Boise, Idaho

Conceptual Project Delivery Schedule

Date Revision Checked Approved

01-Dec-16 DRAFT - Conceptual JN JN

05-Dec-16 DRAFT - Conceptual Rev.1 JN CG

Page 10 of 13 Information is Proprietary & Confidential - Redistribution or use without prior written authorization is prohibited. Schedule is preliminary and conceptual - intended to provide a general understanding of potential

pathway to completion. Schedule is not intended to capture all task items necessary for completion of project scope.

Page 11: ICOM Schedule & Logistics (1)

Activity ID Activity Name Original

Duration

Start Finish

ConNwIfITG1900Lobby Flooring 5 08-May-18 14-May-18

ConNwIfITG1950Lobby Wall Paneling | Millworks 5 15-May-18 21-May-18

ConNwIfITG2000Lobby Directories | Furnishings 5 22-May-18 28-May-18Instructional | student Support SpacesInstructional | student Support Spaces 259 04-Aug-17 19-Apr-18

ConNwIfIS2300 Fire Sprinkler Piping 4 04-Aug-17 09-Aug-17

ConNwIfIS2350 Mechanical Ductwork | Insulation 4 10-Aug-17 15-Aug-17

ConNwIfIS2400 Electrical | Plumbing Overhead 4 10-Aug-17 15-Aug-17

ConNwIfIS2450 Interior Wall Framings | MEP Rough-In 8 07-Feb-18 16-Feb-18

ConNwIfIS2500 Interior Wall Insulation | Blocking | Backing 4 19-Feb-18 22-Feb-18

ConNwIfIS2550 Soffit Ceiling Framings | MEP Rough-In 8 19-Feb-18 28-Feb-18

ConNwIfIS2600 Interior Wall | soffit Drywall 7 01-Mar-18 09-Mar-18

ConNwIfIS2650 Acoustical Sealants | Drywall Taping 9 12-Mar-18 22-Mar-18

ConNwIfIS2700 Prime and One-Coat Paint 4 23-Mar-18 28-Mar-18

ConNwIfIS2750 Acoustical Ceiling Grid | MEP Trim 6 29-Mar-18 05-Apr-18

ConNwIfIS2800 Millworks | Casework | Countertops & Sills 5 23-Mar-18 29-Mar-18

ConNwIfIS2850 Carpet Flooring | Base 5 30-Mar-18 05-Apr-18

ConNwIfIS2900 Doors & Hardware 5 06-Apr-18 12-Apr-18

ConNwIfIS2950 Markerboards - Finish Trim 5 13-Apr-18 19-Apr-18Corridors | VestibulesCorridors | Vestibules 302 19-Jul-17 16-May-18

ConNwIfCV1400MEP Overhead | BIM Coordination 8 19-Jul-17 28-Jul-17

ConNwIfCV1450Pilaster | soffit Framing 8 19-Feb-18 28-Feb-18

ConNwIfCV1500Elevator | Stairwell Shaft Walls 6 31-Jul-17 07-Aug-17

ConNwIfCV1700Drywall Sheathing | Taping 13 01-Mar-18 19-Mar-18

ConNwIfCV1750Wood Pilaster Wrap | Ceiling Panels 10 20-Mar-18 02-Apr-18

ConNwIfCV1800Acoustical Ceiling Grid 6 03-Apr-18 10-Apr-18

ConNwIfCV1850Painting 5 11-Apr-18 17-Apr-18

ConNwIfCV1950MEP Ceiling Trim | Devices 7 18-Apr-18 26-Apr-18

ConNwIfCV2000Corridor | Vestibule Flooring 9 27-Apr-18 09-May-18

ConNwIfCV2050Railings | Wainscott 5 10-May-18 16-May-18

2nd Floor - Interior Finish | Systems2nd Floor - Interior Finish | Systems 230 24-Aug-17 10-Apr-18OMM SpaceOMM Space 96 24-Aug-17 27-Nov-17

ConNwIf2OMM3000Fire Sprinkler Piping 5 24-Aug-17 30-Aug-17

ConNwIfI2OMM3050Mechanical Ductwork | Insulation 5 31-Aug-17 06-Sep-17

ConNwIfI2OMM3100Electrical | Plumbing Overhead 5 31-Aug-17 06-Sep-17

ConNwIfI2OMM3150Interior Wall Framings | MEP Rough-In 5 07-Sep-17 13-Sep-17

ConNwIfI2OMM3200Interior Wall Insulation | Blocking | Backing 3 14-Sep-17 18-Sep-17

ConNwIfI2OMM3250Soffit Ceiling Framings | MEP Rough-In 6 14-Sep-17 21-Sep-17

ConNwIfI2OMM3300Interior Wall | soffit Drywall 4 22-Sep-17 27-Sep-17

ConNwIfI2OMM3350Acoustical Sealants | Drywall Taping 8 28-Sep-17 09-Oct-17

ConNwIfI2OMM3400Prime and One-Coat Paint 4 10-Oct-17 13-Oct-17

ConNwIfI2OMM3450Acoustical Ceiling Grid | MEP Trim 9 16-Oct-17 26-Oct-17

ConNwIfI2OMM3500Millworks | Casework | Countertops & Sills 7 27-Oct-17 06-Nov-17

ConNwIfI2OMM3550Carpet | Laminate Flooring & Base 7 07-Nov-17 15-Nov-17

ConNwIfI2OMM3600Doors & Hardware 5 16-Nov-17 22-Nov-17

ConNwIfI2OMM3650Markerboards | Finish trim 3 23-Nov-17 27-Nov-17OSCE SpacesOSCE Spaces 139 31-Aug-17 16-Jan-18

ConNwIfI2OSCE3700Fire Sprinkler Piping 5 31-Aug-17 06-Sep-17

ConNwIfI2OSCE3750Mechanical Ductwork | Insulation 8 07-Sep-17 18-Sep-17

ConNwIfI2OSCE3800Electrical | Plumbing Overhead 8 07-Sep-17 18-Sep-17

ConNwIfI2OSCE3850Interior Wall Framings | MEP Rough-In 13 19-Sep-17 05-Oct-17

ConNwIfI2OSCE3900Interior Wall Insulation | Blocking | Backing 6 06-Oct-17 13-Oct-17

ConNwIfI2OSCE3950Soffit Ceiling Framings | MEP Rough-In 11 06-Oct-17 20-Oct-17

ConNwIfI2OSCE4000Interior Wall | soffit Drywall 9 23-Oct-17 02-Nov-17

ConNwIfI2OSCE4050Acoustical Sealants | Drywall Taping 11 03-Nov-17 17-Nov-17

ConNwIfI2OSCE4100Prime and One-Coat Paint 6 20-Nov-17 27-Nov-17

ConNwIfI2OSCE4150Acoustical Ceiling Grid | MEP Trim 9 28-Nov-17 08-Dec-17

ConNwIfI2OSCE4200Millworks | Casework | Countertops & Sills 8 11-Dec-17 20-Dec-17

ConNwIfI2OSCE4250Carpet | Laminate Flooring & Base 9 21-Dec-17 02-Jan-18

ConNwIfI2OSCE4300Doors & Hardware 6 03-Jan-18 10-Jan-18

ConNwIfI2OSCE4350Markerboards | Finish Trim 4 11-Jan-18 16-Jan-18Instructional | Student Support SpaceInstructional | Student Support Space 110 07-Sep-17 25-Dec-17

ConNwIfI2ISSS3000Fire Sprinkler Piping 5 07-Sep-17 13-Sep-17

ConNwIfI2ISSS3050Mechanical Ductwork | Insulation 6 14-Sep-17 21-Sep-17

ConNwIfI2ISSS3100Electrical | Plumbing Overhead 6 14-Sep-17 21-Sep-17

ConNwIfI2ISSS3150Interior Wall Framings | MEP Rough-In 9 22-Sep-17 04-Oct-17

ConNwIfI2ISSS3200Interior Wall Insulation | Blocking | Backing 4 05-Oct-17 10-Oct-17

ConNwIfI2ISSS3250Soffit Ceiling Framings | MEP Rough-In 7 05-Oct-17 13-Oct-17

ConNwIfI2ISSS3300Interior Wall | soffit Drywall 7 16-Oct-17 24-Oct-17

ConNwIfI2ISSS3350Acoustical Sealants | Drywall Taping 9 25-Oct-17 06-Nov-17

ConNwIfI2ISSS3400Prime and One-Coat Paint 4 07-Nov-17 10-Nov-17

ConNwIfI2ISSS3450Acoustical Ceiling Grid | MEP Trim 7 13-Nov-17 21-Nov-17

ConNwIfI2ISSS3500Millworks | Casework | Countertops & Sills 8 22-Nov-17 01-Dec-17

ConNwIfI2ISSS3550Carpet | Laminate Flooring & Base 9 04-Dec-17 14-Dec-17

ConNwIfI2ISSS3600Doors & Hardware 4 15-Dec-17 20-Dec-17

ConNwIfI2ISSS3650Markerboards | Finish Trim 3 21-Dec-17 25-Dec-17IT | General Building SpacesIT | General Building Spaces 229 25-Aug-17 10-Apr-18

ConNwIf2ITGBS1950Mechanical | Electrical Overhead 4 25-Aug-17 30-Aug-17

ConNwIf2ITGBS2000Interior Wall Framing | MEP Rough-In 5 31-Aug-17 06-Sep-17

ConNwIf2ITGBS2050Interior Wall Insulation | Blocking | Backing 2 07-Sep-17 08-Sep-17

ConNwIf2ITGBS2100Electrical | TDR Room Drywall | Taping 6 11-Sep-17 18-Sep-17

Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

Qtr 4, 2016 Qtr 1, 2017 Qtr 2, 2017 Qtr 3, 2017 Qtr 4, 2017 Qtr 1, 2018 Qtr 2, 2018 Qtr 3, 2018 Qtr 4, 2018

08-May-18 Lobby Flooring

15-May-18 Lobby Wall Paneling | Millworks

22-May-18 Lobby Directories | Furnishings

04-Aug-17 19-Apr-18, Instructional | student Support Spaces04-Aug-17 Fire Sprinkler Piping

10-Aug-17 Mechanical Ductwork | Insulation

10-Aug-17 Electrical | Plumbing Overhead

07-Feb-18 Interior Wall Framings | MEP Rough-In

19-Feb-18 Interior Wall Insulation | Blocking | Backing

19-Feb-18 Soffit Ceiling Framings | MEP Rough-In

01-Mar-18 Interior Wall | soffit Drywall

12-Mar-18 Acoustical Sealants | Drywall Taping

23-Mar-18 Prime and One-Coat Paint

29-Mar-18 Acoustical Ceiling Grid | MEP Trim

23-Mar-18 Millworks | Casework | Countertops & Sills

30-Mar-18 Carpet Flooring | Base

06-Apr-18 Doors & Hardware

13-Apr-18 Markerboards - Finish Trim

19-Jul-17 16-May-18, Corridors | Vestibules19-Jul-17 MEP Overhead | BIM Coordination

19-Feb-18 Pilaster | soffit Framing

31-Jul-17 Elevator | Stairwell Shaft Walls

01-Mar-18 Drywall Sheathing | Taping

20-Mar-18 Wood Pilaster Wrap | Ceiling Panels

03-Apr-18 Acoustical Ceiling Grid

11-Apr-18 Painting

18-Apr-18 MEP Ceiling Trim | Devices

27-Apr-18 Corridor | Vestibule Flooring

10-May-18 Railings | Wainscott

24-Aug-17 10-Apr-18, 2nd Floor - Interior Finish | Systems

24-Aug-17 27-Nov-17, OMM Space24-Aug-17 Fire Sprinkler Piping

31-Aug-17 Mechanical Ductwork | Insulation

31-Aug-17 Electrical | Plumbing Overhead

07-Sep-17 Interior Wall Framings | MEP Rough-In

14-Sep-17 Interior Wall Insulation | Blocking | Backing

14-Sep-17 Soffit Ceiling Framings | MEP Rough-In

22-Sep-17 Interior Wall | soffit Drywall

28-Sep-17 Acoustical Sealants | Drywall Taping

10-Oct-17 Prime and One-Coat Paint

16-Oct-17 Acoustical Ceiling Grid | MEP Trim

27-Oct-17 Millworks | Casework | Countertops & Sills

07-Nov-17 Carpet | Laminate Flooring & Base

16-Nov-17 Doors & Hardware

23-Nov-17 Markerboards | Finish trim

31-Aug-17 16-Jan-18, OSCE Spaces31-Aug-17 Fire Sprinkler Piping

07-Sep-17 Mechanical Ductwork | Insulation

07-Sep-17 Electrical | Plumbing Overhead

19-Sep-17 Interior Wall Framings | MEP Rough-In

06-Oct-17 Interior Wall Insulation | Blocking | Backing

06-Oct-17 Soffit Ceiling Framings | MEP Rough-In

23-Oct-17 Interior Wall | soffit Drywall

03-Nov-17 Acoustical Sealants | Drywall Taping

20-Nov-17 Prime and One-Coat Paint

28-Nov-17 Acoustical Ceiling Grid | MEP Trim

11-Dec-17 Millworks | Casework | Countertops & Sills

21-Dec-17 Carpet | Laminate Flooring & Base

03-Jan-18 Doors & Hardware

11-Jan-18 Markerboards | Finish Trim

07-Sep-17 25-Dec-17, Instructional | Student Support Space07-Sep-17 Fire Sprinkler Piping

14-Sep-17 Mechanical Ductwork | Insulation

14-Sep-17 Electrical | Plumbing Overhead

22-Sep-17 Interior Wall Framings | MEP Rough-In

05-Oct-17 Interior Wall Insulation | Blocking | Backing

05-Oct-17 Soffit Ceiling Framings | MEP Rough-In

16-Oct-17 Interior Wall | soffit Drywall

25-Oct-17 Acoustical Sealants | Drywall Taping

07-Nov-17 Prime and One-Coat Paint

13-Nov-17 Acoustical Ceiling Grid | MEP Trim

22-Nov-17 Millworks | Casework | Countertops & Sills

04-Dec-17 Carpet | Laminate Flooring & Base

15-Dec-17 Doors & Hardware

21-Dec-17 Markerboards | Finish Trim

25-Aug-17 10-Apr-18, IT | General Building Spaces25-Aug-17 Mechanical | Electrical Overhead

31-Aug-17 Interior Wall Framing | MEP Rough-In

07-Sep-17 Interior Wall Insulation | Blocking | Backing

11-Sep-17 Electrical | TDR Room Drywall | Taping

Idaho College of Osteopathic Medicine | Boise, Idaho

Conceptual Project Delivery Schedule

Date Revision Checked Approved

01-Dec-16 DRAFT - Conceptual JN JN

05-Dec-16 DRAFT - Conceptual Rev.1 JN CG

Page 11 of 13 Information is Proprietary & Confidential - Redistribution or use without prior written authorization is prohibited. Schedule is preliminary and conceptual - intended to provide a general understanding of potential

pathway to completion. Schedule is not intended to capture all task items necessary for completion of project scope.

Page 12: ICOM Schedule & Logistics (1)

Activity ID Activity Name Original

Duration

Start Finish

ConNwIf2ITGBS2150Electrical | TDR Room Paint | Plywood Backboard 3 19-Sep-17 21-Sep-17

ConNwIf2ITGBS2200Electrical | TDR Room Concrete Floor Grind | Sealer 3 22-Sep-17 26-Sep-17

ConNwIf2ITGBS2250Electrical Room Transformer | Panels 12 27-Sep-17 12-Oct-17

ConNwIf2ITGBS2300Restroom Ceiling Framing | MEP Rough-In 7 07-Sep-17 15-Sep-17

ConNwIf2ITGBS2350Restroom Wall | Ceiling Sheathing 5 18-Sep-17 22-Sep-17

ConNwIf2ITGBS2400Restroom Drywall Taping | One-Coat Painting 7 25-Sep-17 03-Oct-17

ConNwIf2ITGBS2450Restroom Countertops 2 04-Oct-17 05-Oct-17

ConNwIf2ITGBS2500Restroom Floor | Wall Tile 9 06-Oct-17 18-Oct-17

ConNwIf2ITGBS2550Restroom Plumbing | Lighting Fixtures 6 19-Oct-17 26-Oct-17

ConNwIf2ITGBS2600Restroom Partitions | Accessories 6 27-Oct-17 03-Nov-17

ConNwIf2ITGBS2650Restroom | Storage Room Doors 3 06-Nov-17 08-Nov-17

ConNwIf2ITGBS2700Open Lobby Drywall | Taping | Painting 15 21-Mar-18 10-Apr-18

ConNwIf2ITGBS2750Open Lobby Precast Stair Treads 5 22-Sep-17 28-Sep-17

ConNwIf2ITGBS2800Open Lobby Decorative Stair Railings 5 20-Sep-17 26-Sep-17

ConNwIf2ITGBS2850Open Lobby Flooring 8 28-Mar-18 06-Apr-18Corridors | VestibulesCorridors | Vestibules 167 25-Aug-17 07-Feb-18

ConNwIf2CV1550MEP Overhead | BIM Coordination 8 25-Aug-17 05-Sep-17

ConNwIf2CV1600Pilaster | soffit Framing 12 25-Oct-17 09-Nov-17

ConNwIf2CV1650Elevator | Stairwell | Mechanical Shaft Walls 6 06-Sep-17 13-Sep-17

ConNwIf2CV1850Drywall Sheathing | Taping 15 10-Nov-17 30-Nov-17

ConNwIf2CV1900Wood Pilaster Wrap | Ceiling Panels 12 01-Dec-17 18-Dec-17

ConNwIf2CV2150Acoustical Ceiling Grid 10 19-Dec-17 01-Jan-18

ConNwIf2CV2175Painting 6 02-Jan-18 09-Jan-18

ConNwIf2CV2200MEP Ceiling Trim | Devices 8 10-Jan-18 19-Jan-18

ConNwIf2CV2250Corridor | Vestibule Flooring 8 22-Jan-18 31-Jan-18

ConNwIf2CV2300Railings | Wainscott 5 01-Feb-18 07-Feb-18

3rd Floor - Interior Finish | Systems3rd Floor - Interior Finish | Systems 198 27-Sep-17 12-Apr-18Faculty Office SpaceFaculty Office Space 157 03-Oct-17 08-Mar-18

ConNwIf3FOS3000Fire Sprinkler Piping 6 03-Oct-17 10-Oct-17

ConNwIf3FOS3050Mechanical Ductwork | Insulation 8 11-Oct-17 20-Oct-17

ConNwIf3FOS3100Electrical | Plumbing Overhead 8 11-Oct-17 20-Oct-17

ConNwIf3FOS3150Interior Wall Framings | MEP Rough-In 14 23-Oct-17 09-Nov-17

ConNwIf3FOS3200Interior Wall Insulation | Blocking | Backing 6 10-Nov-17 17-Nov-17

ConNwIf3FOS3250Soffit Ceiling Framings | MEP Rough-In 12 10-Nov-17 27-Nov-17

ConNwIf3FOS3300Interior Wall | soffit Drywall 12 28-Nov-17 13-Dec-17

ConNwIf3FOS3350Acoustical Sealants | Drywall Taping 12 14-Dec-17 29-Dec-17

ConNwIf3FOS3400Prime and One-Coat Paint 6 01-Jan-18 08-Jan-18

ConNwIf3FOS3450Acoustical Ceiling Grid | MEP Trim 12 09-Jan-18 24-Jan-18

ConNwIf3FOS3500Millworks | Casework | Countertops & Sills 8 25-Jan-18 05-Feb-18

ConNwIf3FOS3550Carpet Flooring | Base 9 06-Feb-18 16-Feb-18

ConNwIf3FOS3600Doors & Hardware 8 19-Feb-18 28-Feb-18

ConNwIf3FOS3650Markerboards | Finish Trim 6 01-Mar-18 08-Mar-18Admin Office | Student Suppor SpaceAdmin Office | Student Suppor Space 129 11-Oct-17 16-Feb-18

ConNwIf3AOSSS3000Fire Sprinkler Piping 6 11-Oct-17 18-Oct-17

ConNwIf3AOSSS3050Mechanical Ductwork | Insulation 6 19-Oct-17 26-Oct-17

ConNwIf3AOSSS3100Electrical | Plumbing Overhead 6 19-Oct-17 26-Oct-17

ConNwIf3AOSSS3150Interior Wall Framings | MEP Rough-In 10 27-Oct-17 09-Nov-17

ConNwIf3AOSSS3200Interior Wall Insulation | Blocking | Backing 5 10-Nov-17 16-Nov-17

ConNwIf3AOSSS3250Soffit Ceiling Framings | MEP Rough-In 8 10-Nov-17 21-Nov-17

ConNwIf3AOSSS3300Interior Wall | soffit Drywall 12 22-Nov-17 07-Dec-17

ConNwIf3AOSSS3350Acoustical Sealants | Drywall Taping 12 08-Dec-17 25-Dec-17

ConNwIf3AOSSS3400Prime and One-Coat Paint 5 26-Dec-17 01-Jan-18

ConNwIf3AOSSS3450Acoustical Ceiling Grid | MEP Trim 9 02-Jan-18 12-Jan-18

ConNwIf3AOSSS3500Millworks | Casework | Countertops & Sills 8 15-Jan-18 24-Jan-18

ConNwIf3AOSSS3550Carpet Flooring | Base 8 25-Jan-18 05-Feb-18

ConNwIf3AOSSS3600Doors & Hardware 6 06-Feb-18 13-Feb-18

ConNwIf3AOSSS3650Markerboards | Finish Trim 3 14-Feb-18 16-Feb-18IT | General Building SpacesIT | General Building Spaces 182 27-Sep-17 27-Mar-18

ConNwIf3ITGBS2900Mechanical | Electrical Overhead 3 11-Oct-17 13-Oct-17

ConNwIf3ITGBS2950Interior Wall Framing | MEP Rough-In 4 16-Oct-17 19-Oct-17

ConNwIf3ITGBS3000Interior Wall Insulation | Blocking | Backing 2 20-Oct-17 23-Oct-17

ConNwIf3ITGBS3050Electrical | TDR Room Drywall | Taping 4 24-Oct-17 27-Oct-17

ConNwIf3ITGBS3100Electrical | TDR Room Paint | Plywood Backboard 3 30-Oct-17 01-Nov-17

ConNwIf3ITGBS3150Electrical | TDR Room Concrete Floor Grind | Sealer 2 02-Nov-17 03-Nov-17

ConNwIf3ITGBS3200Electrical Room Transformer | Panels | Switchgear 12 06-Nov-17 21-Nov-17

ConNwIf3ITGBS3250Restroom Ceiling Framing | MEP Rough-In 6 20-Oct-17 27-Oct-17

ConNwIf3ITGBS3300Restroom Wall | Ceiling Sheathing 2 30-Oct-17 31-Oct-17

ConNwIf3ITGBS3350Restroom Drywall Taping | One-Coat Painting 7 01-Nov-17 09-Nov-17

ConNwIf3ITGBS3400Restroom Countertops 2 10-Nov-17 13-Nov-17

ConNwIf3ITGBS3450Restroom Floor | Wall Tile 8 14-Nov-17 23-Nov-17

ConNwIf3ITGBS3500Restroom Plumbing | Lighting Fixtures 6 24-Nov-17 01-Dec-17

ConNwIf3ITGBS3550Restroom Partitions | Accessories 5 04-Dec-17 08-Dec-17

ConNwIf3ITGBS3600Restroom | Storage Room Doors 2 11-Dec-17 12-Dec-17

ConNwIf3ITGBS3650Open Lobby Drywall | Taping | Painting 15 28-Feb-18 20-Mar-18

ConNwIf3ITGBS3700Open Lobby Precast Stair Treads 5 29-Sep-17 05-Oct-17

ConNwIf3ITGBS3750Open Lobby Decorative Stair Railings 5 27-Sep-17 03-Oct-17

ConNwIf3ITGBS3800Open Lobby Flooring 5 21-Mar-18 27-Mar-18Corridors | VestibulesCorridors | Vestibules 191 04-Oct-17 12-Apr-18

ConNwIf3CV1700MEP Overhead | BIM Coordination 8 04-Oct-17 13-Oct-17

ConNwIf3CV1750Pilaster | soffit Framing 10 05-Jan-18 18-Jan-18

Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

Qtr 4, 2016 Qtr 1, 2017 Qtr 2, 2017 Qtr 3, 2017 Qtr 4, 2017 Qtr 1, 2018 Qtr 2, 2018 Qtr 3, 2018 Qtr 4, 2018

19-Sep-17 Electrical | TDR Room Paint | Plywood Backboard

22-Sep-17 Electrical | TDR Room Concrete Floor Grind | Sealer

27-Sep-17 Electrical Room Transformer | Panels

07-Sep-17 Restroom Ceiling Framing | MEP Rough-In

18-Sep-17 Restroom Wall | Ceiling Sheathing

25-Sep-17 Restroom Drywall Taping | One-Coat Painting

04-Oct-17 Restroom Countertops

06-Oct-17 Restroom Floor | Wall Tile

19-Oct-17 Restroom Plumbing | Lighting Fixtures

27-Oct-17 Restroom Partitions | Accessories

06-Nov-17 Restroom | Storage Room Doors

21-Mar-18 Open Lobby Drywall | Taping | Painting

22-Sep-17 Open Lobby Precast Stair Treads

20-Sep-17 Open Lobby Decorative Stair Railings

28-Mar-18 Open Lobby Flooring

25-Aug-17 07-Feb-18, Corridors | Vestibules25-Aug-17 MEP Overhead | BIM Coordination

25-Oct-17 Pilaster | soffit Framing

06-Sep-17 Elevator | Stairwell | Mechanical Shaft Walls

10-Nov-17 Drywall Sheathing | Taping

01-Dec-17 Wood Pilaster Wrap | Ceiling Panels

19-Dec-17 Acoustical Ceiling Grid

02-Jan-18 Painting

10-Jan-18 MEP Ceiling Trim | Devices

22-Jan-18 Corridor | Vestibule Flooring

01-Feb-18 Railings | Wainscott

27-Sep-17 12-Apr-18, 3rd Floor - Interior Finish | Systems

03-Oct-17 08-Mar-18, Faculty Office Space03-Oct-17 Fire Sprinkler Piping

11-Oct-17 Mechanical Ductwork | Insulation

11-Oct-17 Electrical | Plumbing Overhead

23-Oct-17 Interior Wall Framings | MEP Rough-In

10-Nov-17 Interior Wall Insulation | Blocking | Backing

10-Nov-17 Soffit Ceiling Framings | MEP Rough-In

28-Nov-17 Interior Wall | soffit Drywall

14-Dec-17 Acoustical Sealants | Drywall Taping

01-Jan-18 Prime and One-Coat Paint

09-Jan-18 Acoustical Ceiling Grid | MEP Trim

25-Jan-18 Millworks | Casework | Countertops & Sills

06-Feb-18 Carpet Flooring | Base

19-Feb-18 Doors & Hardware

01-Mar-18 Markerboards | Finish Trim

11-Oct-17 16-Feb-18, Admin Office | Student Suppor Space11-Oct-17 Fire Sprinkler Piping

19-Oct-17 Mechanical Ductwork | Insulation

19-Oct-17 Electrical | Plumbing Overhead

27-Oct-17 Interior Wall Framings | MEP Rough-In

10-Nov-17 Interior Wall Insulation | Blocking | Backing

10-Nov-17 Soffit Ceiling Framings | MEP Rough-In

22-Nov-17 Interior Wall | soffit Drywall

08-Dec-17 Acoustical Sealants | Drywall Taping

26-Dec-17 Prime and One-Coat Paint

02-Jan-18 Acoustical Ceiling Grid | MEP Trim

15-Jan-18 Millworks | Casework | Countertops & Sills

25-Jan-18 Carpet Flooring | Base

06-Feb-18 Doors & Hardware

14-Feb-18 Markerboards | Finish Trim

27-Sep-17 27-Mar-18, IT | General Building Spaces11-Oct-17 Mechanical | Electrical Overhead

16-Oct-17 Interior Wall Framing | MEP Rough-In

20-Oct-17 Interior Wall Insulation | Blocking | Backing

24-Oct-17 Electrical | TDR Room Drywall | Taping

30-Oct-17 Electrical | TDR Room Paint | Plywood Backboard

02-Nov-17 Electrical | TDR Room Concrete Floor Grind | Sealer

06-Nov-17 Electrical Room Transformer | Panels | Switchgear

20-Oct-17 Restroom Ceiling Framing | MEP Rough-In

30-Oct-17 Restroom Wall | Ceiling Sheathing

01-Nov-17 Restroom Drywall Taping | One-Coat Painting

10-Nov-17 Restroom Countertops

14-Nov-17 Restroom Floor | Wall Tile

24-Nov-17 Restroom Plumbing | Lighting Fixtures

04-Dec-17 Restroom Partitions | Accessories

11-Dec-17 Restroom | Storage Room Doors

28-Feb-18 Open Lobby Drywall | Taping | Painting

29-Sep-17 Open Lobby Precast Stair Treads

27-Sep-17 Open Lobby Decorative Stair Railings

21-Mar-18 Open Lobby Flooring

04-Oct-17 12-Apr-18, Corridors | Vestibules04-Oct-17 MEP Overhead | BIM Coordination

05-Jan-18 Pilaster | soffit Framing

Idaho College of Osteopathic Medicine | Boise, Idaho

Conceptual Project Delivery Schedule

Date Revision Checked Approved

01-Dec-16 DRAFT - Conceptual JN JN

05-Dec-16 DRAFT - Conceptual Rev.1 JN CG

Page 12 of 13 Information is Proprietary & Confidential - Redistribution or use without prior written authorization is prohibited. Schedule is preliminary and conceptual - intended to provide a general understanding of potential

pathway to completion. Schedule is not intended to capture all task items necessary for completion of project scope.

Page 13: ICOM Schedule & Logistics (1)

Activity ID Activity Name Original

Duration

Start Finish

ConNwIf3CV1800Elevator | Stairwell | Mechanical Shaft Walls 10 16-Oct-17 27-Oct-17

ConNwIf3CV1950Drywall Sheathing | Taping 13 19-Jan-18 06-Feb-18

ConNwIf3CV2000Wood Pilaster Wrap | Ceiling Panels 9 07-Feb-18 19-Feb-18

ConNwIf3CV2225Painting 6 20-Feb-18 27-Feb-18

ConNwIf3CV2400Acoustical Ceiling Grid 9 28-Feb-18 12-Mar-18

ConNwIf3CV2450MEP Ceiling Trim | Devices 9 13-Mar-18 23-Mar-18

ConNwIf3CV2500Corridor | Vestibule Flooring 9 26-Mar-18 05-Apr-18

ConNwIf3CV2550Railings | Wainscott 5 06-Apr-18 12-Apr-18

Services | Commissioning | ActivationServices | Commissioning | Activation 332 12-Sep-17 10-Aug-18

ConSCA1000 Main Switchgear Energized 5 03-Jan-18 09-Jan-18

ConSCA1050 Domestic Water Service Meter 5 12-Sep-17 18-Sep-17

ConSCA1100 Fire Sprinkler System Charged 5 16-Nov-17 22-Nov-17

ConSCA1150 Elevator Delivery | Installation 20 21-Feb-18 20-Mar-18

ConSCA1200 Phone Demark | Dial Tone 5 01-Feb-18* 07-Feb-18

ConSCA1250 Air Handling Unit Start-Ups 5 04-Apr-18 10-Apr-18

ConSCA1300 Boiler Start-Up 5 25-Apr-18 01-May-18

ConSCA1350 Exhaust | Supply Fans Start Up 5 02-May-18 08-May-18

ConSCA1400 Test Air & Balance 20 09-May-18 05-Jun-18

ConSCA1450 Building Purge | Duct Cleaning 10 06-Jun-18 19-Jun-18

ConSCA1500 ATC | BAS Controls Programming 30 23-May-18 03-Jul-18

ConSCA1525 Security System | Camera Equipment Install - FF&E 20 01-Jun-18* 28-Jun-18

ConSCA1550 Owner Occupancy Plan 0 02-Apr-18*

ConSCA1600 Fire Alarm Testing 15 16-Apr-18* 04-May-18

ConSCA1650 Elevator Inspection 5 02-May-18 08-May-18

ConSCA1700 DBS Life Safety | Trade Final Inspections 15 09-May-18 29-May-18

ConSCA1750 Punchlist Detailing 10 14-May-18* 25-May-18

ConSCA1800 Access Control Programming | Door Keying 10 01-May-18* 14-May-18

ConSCA1825 Final Construction Cleaning 5 21-May-18 25-May-18

ConSCA1850 Letters of Conformance 3 28-May-18 30-May-18

ConSCA1900 Certificate of Occupancy 0 31-May-18

ConSCA1950 Substantial Completion 0 01-Jun-18

ConSCA2000 Owner Benficial Occupancy | Move-In 20 01-Jun-18 28-Jun-18

ConSCA2050 Operational Monitoring | Testing 20 01-Jun-18 28-Jun-18

ConSCA2100 Move-In Repairs | Cleaning 10 29-Jun-18 12-Jul-18

ConSCA2150 Final Punchlist Completion | Verification 5 13-Jul-18 19-Jul-18

ConSCA2200 Notice of Final Completion 0 20-Jul-18

ConSCA2300 First Day of Class 0 10-Aug-18*

Post-ConstructionPost-Construction 444 01-May-18 19-Jul-19

PostC1000 O&M Manual Assembly | Delivery 20 01-May-18* 28-May-18

PostC1050 As-Built Drawings 20 01-Jun-18* 28-Jun-18

PostC1100 Operations & Maintenance Personnel Training 20 01-Jun-18* 28-Jun-18

PostC2150 Construction Contract Closeout 15 20-Jul-18 09-Aug-18

PostC2175 Final Retention Billing 0 24-Aug-18

PostC2250 Final Project Review | Report - Lessons Learned 0 07-Sep-18

PostC2350 11 Month Warranty Walk 0 19-Jul-19

Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

Qtr 4, 2016 Qtr 1, 2017 Qtr 2, 2017 Qtr 3, 2017 Qtr 4, 2017 Qtr 1, 2018 Qtr 2, 2018 Qtr 3, 2018 Qtr 4, 2018

16-Oct-17 Elevator | Stairwell | Mechanical Shaft Walls

19-Jan-18 Drywall Sheathing | Taping

07-Feb-18 Wood Pilaster Wrap | Ceiling Panels

20-Feb-18 Painting

28-Feb-18 Acoustical Ceiling Grid

13-Mar-18 MEP Ceiling Trim | Devices

26-Mar-18 Corridor | Vestibule Flooring

06-Apr-18 Railings | Wainscott

12-Sep-17 10-Aug-18, Services | Commissioning | Activation

03-Jan-18 Main Switchgear Energized

12-Sep-17 Domestic Water Service Meter

16-Nov-17 Fire Sprinkler System Charged

21-Feb-18 Elevator Delivery | Installation

01-Feb-18* Phone Demark | Dial Tone

04-Apr-18 Air Handling Unit Start-Ups

25-Apr-18 Boiler Start-Up

02-May-18 Exhaust | Supply Fans Start Up

09-May-18 Test Air & Balance

06-Jun-18 Building Purge | Duct Cleaning

23-May-18 ATC | BAS Controls Programming

01-Jun-18* Security System | Camera Equipment Install - FF&E

02-Apr-18* Owner Occupancy Plan

16-Apr-18* Fire Alarm Testing

02-May-18 Elevator Inspection

09-May-18 DBS Life Safety | Trade Final Inspections

14-May-18* Punchlist Detailing

01-May-18* Access Control Programming | Door Keying

21-May-18 Final Construction Cleaning

28-May-18 Letters of Conformance

31-May-18 Certificate of Occupancy

01-Jun-18 Substantial Completion

01-Jun-18 Owner Benficial Occupancy | Move-In

01-Jun-18 Operational Monitoring | Testing

29-Jun-18 Move-In Repairs | Cleaning

13-Jul-18 Final Punchlist Completion | Verification

20-Jul-18 Notice of Final Completion

10-Aug-18* First Day of Class

01-May-18

01-May-18* O&M Manual Assembly | Delivery

01-Jun-18* As-Built Drawings

01-Jun-18* Operations & Maintenance Personnel Training

20-Jul-18 Construction Contract Closeout

24-Aug-18 Final Retention Billing

07-Sep-18 Final Project Review | Report - Lessons Learned

Idaho College of Osteopathic Medicine | Boise, Idaho

Conceptual Project Delivery Schedule

Date Revision Checked Approved

01-Dec-16 DRAFT - Conceptual JN JN

05-Dec-16 DRAFT - Conceptual Rev.1 JN CG

Page 13 of 13 Information is Proprietary & Confidential - Redistribution or use without prior written authorization is prohibited. Schedule is preliminary and conceptual - intended to provide a general understanding of potential

pathway to completion. Schedule is not intended to capture all task items necessary for completion of project scope.

Page 14: ICOM Schedule & Logistics (1)

Staging area ­Option 1A

Gated entry point

Storage Trailers andSubcontractor Parking

­ Option 1B

Right ­ E. Corporate Drive

Right ­ E. Watertower Ln Right ­ S. Locust Grove Rd.

Construction Entrance ­Irrigation Canal

Maintenance Road

Right ­ S. Stratford Dr.

Storage Trailers andSubcontractor Parking

­ Option 1C

E. Central Drive

I­84 West

S. Meridian Rd

Idaho College of Osteopathic Medicine

Conceptual Logistics Plan ­ Delivery Travel Routing

E. Central Drive

Idaho Collegeof Osteopathic

Medicine

Page 15: ICOM Schedule & Logistics (1)

So. Locust Grove Rd | E. Central Drive

Idaho College of Osteopathic Medicine

Conceptual Logistics PlanAlternative Site Access | Irrigation Canal Maintenance Rood

Construction Site

Delivery Staging

Canal Bridge

Alternative Site Access Approach

Main site entry and exit will occur via irrigation canalmaintenance road, east of ISU parking lot entrance off E.Central Drive. Secondary delivery staging area is rentedfarm space with driveway access from So. Locust Grove.

Rented ACE bridge placed over irrigation canal forconnection of staging area with site access drive.

Intersection of South Locust Grove |

East Central Drive

Canal Road

Partial sidewalk removal

Driveway Approach

Grade Cut & Stabilize

Gated Site Entry

Canal Maintenance Road

Canal Maintenance Road

Page 16: ICOM Schedule & Logistics (1)

Idaho College ofOsteopathic medicine

Crane &Floor

Loading

Gates

Gates

6' screened chain­link fence

6' screened chain­link fence

Gates

Waste

Concrete

Wash

Toilets

Storage

Conex Boxes

Crushed RockDriveway

Toilets

Material Unloading& truck Turnaround

Construction

Office Trailer

ACE TempCanal Bridge

Gates

Inspector | Guest

Parking

Material Pre­Fab |

Secured Storage

Con

struc

tion

Offi

ce Tr

aile

r

Gen­Set

Fire Dept. Access

Fire Dept. Access

College of Osteopathic Medicine

Site Logistics Plan ­ Equipment | Materials | Processing

Prim

ary

Deliv

ery

Acce

ss R

oad