Ichthys Development
A Major LNG Project
Antoine Moreau – Ichthys CPF Manager
Yves Pouradier – TOTAL E&P, Projects and Construction
1
General • INPEX 76% Operator - TOTAL 24%
• Browse Basin, 200 km offshore Western Australia; Water depth 235 to 275 m;
• Condensate gas
• Production of Condensate (offshore) + LNG, LPG and Condensate (Darwin)
2
3
Overall Field Layout
3
Field approx. 40 x 20 km Phased development of the two reservoirs • Brewster • Plover
4
All project facilities have 40 year design life Cyclonic conditions CPF and FPSO permanently moored for 40 years
Offshore Facilities
5
SURF Overview
A major subsea development • 13 Drill Centres, 50 X-mas Trees • Hydrate inhibition by MEG loop • Dual 18’’ CRA flowlines + CS MEG lines • 18 Flexibles Risers + 6 Umbilicals • Large Riser Support Structure + other subsea structures • Power interconnection umbilical CPF-FPSO
6
7
CPF: A World Record Semi-Sub
Gas-Liquid Separation / Boosters / Dehydration / Gas Export
8
4 leg semi-sub Operates 200-year storm; survives 10,000-year storm Process • 1.8 BSCFD feed gas • 3 x 33% Trains : inlet separation, liquids transfer to FPSO, booster comp (future), TEG dehydration • Export Compression (4) • Flare stack 150 m Utilities • Power generation with FPSO interconnection Topsides • 115 x 145 m LQ 200 POB Hull • 110.3 x 110.3 m • Spread moored, 4 x 7 chains • Displacement ~155,000 m3
• Integrated deck, erection by lifting
CPF
9
Condensate Stabilization, Storage and Offloading MEG Regeneration / Water Treatment and Disposal
FPSO
10
Ship shaped new build FPSO Operates 200-year storm, survives 10,000-year storm 336 x 59 m Weathervaning turret mooring
Process • 2 trains (Cond-Water separation, Flash Gas Compression) • 80,000 bopd • Cond / Water Mercury removal • MEG Regeneration / Storage • Water Treatment / Disposal
Storage 1.1 Mb; tandem offloading
Utilities • Heating Medium (MEG regen) • Power generation with CPF interconnection
LQ 200 POB
FPSO
Gas Export Pipeline
11
• 885 km • Water depth 0-250 m • 42’’; 202 bar
• Capacity 1,8 MSCFD; dense phase or multiphase operation
• Internal coating
• 3 x 42’’ diverless connectors • Steel ~700,000 t
• Rocks ~700,000 t
12
LNG Plant
LNG Plant
13
APCI Process C3/MR LNG : 2 x 4.2 MTPA LPG : 1.6 MTPA Cond : 15,000 b/d
Refrigeration: 4 x Frame 7 + helpers; WHR
CCPP : 450 MW Storage • LNG 2 x 165,000 m3
• C3/C4 85,000 + 65,000 m3
• Cond 2 x 60,000 m3
LNG Loading Jetty LPG + Cond. Jetty
Modular construction (except tanks, tall vessels, large rotating equipment) Massive dredging works
A Very Challenging Project
• Development of major magnitude in all perspectives
• Largest ever built CPF
• Cyclonic environment
• Several components beyond current state of the art, will be qualified
• 40 year design life
• Highest HSE expectations
Build a project for 40 years of
safe and reliable operation