ICAR: INDIAN INSTITUTE SOIL & WATER CONSERVATION, …€¦ · Tender schedule: Tender No. F.No....

35
1 ICAR: INDIAN INSTITUTE SOIL & WATER CONSERVATION, RESEARCH CENTRE, ,KOTA-324002 PHONE- (o) 0744-2462642, (Fax) 0744-2460853 File No.AGAW/2019-20/Store/Kota Dated: 6.7.2019 Tender Notice ICAR-Indian Institute of Soil & Water Conservation IISWC, Research Centre, Kota hereby invited limited tender in two bid system (Technical Bid and Financial Bid separately) for outsourcing the job contract for providing various Field farm operational work at ICAR-IISWC, Research Centre, Kota for a period of one year which can be further extended for one/two year (Maximum period of contract not more than three years) subject to satisfactory performance of the Vendor and its willingness to continue on existing terms and conditions, as per requirement. 1. Details of Tender Deposits :- Tentative Value of Contract: Rs. 4.50 lakhs per annum Earnest Money Deposit: Rs. 13500/- (Rupees thirteen thousand five hundred only) Security Deposit : 8% of the total contract value. 2. Tender schedule: Tender No. F.No. AGAW/02/2019-20/Stores/ Date of release of Tender through 6 th July, 2019 Pre Bid meeting date/time/venue 20-07-2019 at 3.00 hrs. in Conference Room,ICAR-Indian Institute of Soil & Water Conservation, Research Centre, Kota Bid Submission Start date/time 6 th July, 2019 at 2.30 p.m. Last date & time for submission of bid 26 th July, 2019 at 2.30 p.m. Date & time for opening of technical bid 26 th July, 2019 at 4.00 p.m. Place of opening of Technical Bid ICAR-Indian Institute of Soil & Water Conservation, Research Centre, Kota Address for Communication Head, ICAR-Indian Institute of Soil & Water Conservation, Research Centre,Dadwara, Kota The tender document contains the following: Annexure-I Terms and Conditions. Annexure-II Details/specification of the work / job contract. Annexure-III - Technical Bid Annexure-III - Undertaking Annexure-IV - Financial Bid Annexure-V Draft specimen of Agreement to be executed on award of contract. In case, holiday is declared by the Government on the day of opening bids, the bids will be opened on the next working day at the same time.

Transcript of ICAR: INDIAN INSTITUTE SOIL & WATER CONSERVATION, …€¦ · Tender schedule: Tender No. F.No....

Page 1: ICAR: INDIAN INSTITUTE SOIL & WATER CONSERVATION, …€¦ · Tender schedule: Tender No. F.No. AGAW/02/2019-20/Stores/ Date of release of Tender through 6th July, 2019 Pre Bid meeting

1

ICAR: INDIAN INSTITUTE SOIL & WATER CONSERVATION, RESEARCH CENTRE,

,KOTA-324002

PHONE- (o) 0744-2462642, (Fax) 0744-2460853

File No.AGAW/2019-20/Store/Kota Dated: 6.7.2019

Tender Notice

ICAR-Indian Institute of Soil & Water Conservation IISWC, Research Centre, Kota hereby

invited limited tender in two bid system (Technical Bid and Financial Bid separately) for

outsourcing the job contract for providing various Field farm operational work at

ICAR-IISWC, Research Centre, Kota for a period of one year which can be further

extended for one/two year (Maximum period of contract not more than three years) subject

to satisfactory performance of the Vendor and its willingness to continue on existing terms

and conditions, as per requirement.

1. Details of Tender Deposits :- Tentative Value of Contract: Rs. 4.50 lakhs per annum Earnest Money Deposit: Rs. 13500/- (Rupees thirteen thousand five hundred only)

Security Deposit : 8% of the total contract value. 2. Tender schedule:

Tender No. F.No. AGAW/02/2019-20/Stores/ Date of release of Tender through 6th July, 2019 Pre Bid meeting date/time/venue 20-07-2019 at 3.00 hrs. in Conference Room,ICAR-Indian

Institute of Soil & Water Conservation, Research Centre, Kota

Bid Submission Start date/time 6th July, 2019 at 2.30 p.m. Last date & time for submission of bid 26th July, 2019 at 2.30 p.m. Date & time for opening of technical bid 26th July, 2019 at 4.00 p.m. Place of opening of Technical Bid ICAR-Indian Institute of Soil & Water Conservation,

Research Centre, Kota Address for Communication Head, ICAR-Indian Institute of Soil & Water Conservation,

Research Centre,Dadwara, Kota The tender document contains the following:

Annexure-I – Terms and Conditions.

Annexure-II – Details/specification of the work / job contract.

Annexure-III - Technical Bid

Annexure-III - Undertaking

Annexure-IV - Financial Bid

Annexure-V – Draft specimen of Agreement to be executed on award of

contract.

In case, holiday is declared by the Government on the day of opening bids, the bids will be

opened on the next working day at the same time.

Page 2: ICAR: INDIAN INSTITUTE SOIL & WATER CONSERVATION, …€¦ · Tender schedule: Tender No. F.No. AGAW/02/2019-20/Stores/ Date of release of Tender through 6th July, 2019 Pre Bid meeting

2

Annexure-III

Technical Bid

Sl. No

Particular Information/document to be provide by the firm

1 Name of the Firm / Agency 2 Full address with Post Box No. And Telephone No. if any

3 Constitution of the Firm/Agency (Attached copy) Indian Companies Act, 1956 Indian Partnership Act, 1932 (Please give names of partners) Any other Act, if not, the owners

4 For Partnership firms whether registered under the Indian Partnership Act, 1932, please state further whether by the partnership agreement to arbitration has been conferred on the partner who has signed the Tender.

i. If answer to the above is in negative whether there is any general power

of attorney executed by all the partners of the firm authorizing the partner

who has signed the Tenders to refer dispute condemning business of the partnership to arbitration.

ii. If the answer to above is in point one and two the affirmative please furnish a copy of either the partnership agreement or the general power of attorney as the case may be. The copy should be attested by a Notary Public or its execution would be admitted by affidavit on a properly stamped paper by all partner

5 Name and Full details of your Banker’s.

6 Copy of registration certificate of the firm undere the work contract of the State Government.

7 Copy of ESI/EPF valid registration certificate of the firm. 8. Copy of Licence under the contract labour (Regulation and abolition) Act,

1970.

9. Copy of valid registration certificate issue by the National and Small Industries Corporation (NSIC), if applicable for expemption of EMD

10. Copies of last three years continous experience (Annexure –III-Part-II) of the firm in the field of providing such services in Central Govt. / Establishement / Autonomous bodies of the Govt. of India./ Corporation of Govt. of India/ Reputed Publlic or Private Organisation, with details in enclosed tabular form. In support of experience copy of work order will be required.

11. An undertaking (Annexure-III-Part-II) as per attached formate duly attested by Notary on a Non-judicial stamp paper of value of Rs. 100/- (Rs. One hundred only) regarding their non-back listing by any of the Govt. departments, Public Sector undertaking and / or by Central Vigilenace Commission during the last three years.

12. Copy of PAN Card, GST Regisration Certificate, TIN Registration. 13. Any other relevant information 14. Earnest Money Deposited (To be attached with Technical Bid) Yes/No (alongwith

details) 15 Name and Address of the Firm’s Representative who will attend the meeting of

opening of technical and financial bid

16. Name of the Permanent Representative to be visiting ICAR-IISWC, Research Centre Kota regarding the contract

All the documents related to Part-I, II & III of Technical Bid must be kept in the separate sealed

cover envelop super scribed as Technical Bid. All supporting documents of Technical Bid should

contain seal and signature of authorized signatory. If these documents are not found attached with

technical bid, the tender shall be treated as unresponsive and will be rejected.

Date:_______________

Place : ___________________ Authorised Signatory

Page 3: ICAR: INDIAN INSTITUTE SOIL & WATER CONSERVATION, …€¦ · Tender schedule: Tender No. F.No. AGAW/02/2019-20/Stores/ Date of release of Tender through 6th July, 2019 Pre Bid meeting

3

Annexure-III

Part-II

Details of the Minimum 3 years experience/work done.

Sl No.

Name of the Deptt./Organisation & Name

of contact Person with Ph.No.

Period No. of Staff deployed

Remarks

From To

(Authorised Signatory)

Page 4: ICAR: INDIAN INSTITUTE SOIL & WATER CONSERVATION, …€¦ · Tender schedule: Tender No. F.No. AGAW/02/2019-20/Stores/ Date of release of Tender through 6th July, 2019 Pre Bid meeting

4

Annexure-III

Part-III

UNDERTAKING

( to be submitted in Non-judicial stamp paper of Rs.100/- alongwith hard copy of

technical bid)

I/We have read and understood general terms and conditions contained in the

document of “Field Farm Operational Work”. I/We do hereby declare that all the details

provided in this tender document are true to the best of my/our knowledge and belief and

any misrepresentation of facts will render me/us liable to any action as may be deemed fit

by ICAR-IISWC, Research Centre, Kota.

I/We do hereby also accept ICAR-IISWC, Research Centre, Kota have the right to

accept or reject this tender and not to issue invitation to Tender to me/us.

I/We undertake to communicate promptly to ICAR-IISWC, Research Centre, Kota

any changes in the condition or working of the firm. It is certified that we have not been

blacklisted by any organization of Government of India including Central Vigilance

Commission (CVC) in the last three years. The undersigned is fully authorized to sign and

submit this application form on behalf of the organization, he/she represent. We authorize

ICAR-IISWC, Research Centre, Kota to approach Individuals, employees, firm and

corporations to verify our competence and general reputation.

Name & Signature of Authorized signatory ……

Seal of the firm………………..……

Full Address: ...................................

Page 5: ICAR: INDIAN INSTITUTE SOIL & WATER CONSERVATION, …€¦ · Tender schedule: Tender No. F.No. AGAW/02/2019-20/Stores/ Date of release of Tender through 6th July, 2019 Pre Bid meeting

5

FINANCIAL BID Annexure-IV

(Financial bid to be enclosed in separate envelope with seal )

Hkkjrh; e`nk ,oa ty laj{k.k laLFkku] vuqla/kku dsUnz dksVkHkkjrh; e`nk ,oa ty laj{k.k laLFkku] vuqla/kku dsUnz dksVkHkkjrh; e`nk ,oa ty laj{k.k laLFkku] vuqla/kku dsUnz dksVkHkkjrh; e`nk ,oa ty laj{k.k laLFkku] vuqla/kku dsUnz dksVk Field Farm Operation Work

Format of Bid / Rate Schedule (Rate Contract)

foRr o’kZ foRr o’kZ foRr o’kZ foRr o’kZ 2019&202019&202019&202019&20

dk;Z dk fooj.kdk;Z dk fooj.kdk;Z dk fooj.kdk;Z dk fooj.k dqy dk;Zdqy dk;Zdqy dk;Zdqy dk;Z (Area of

work)

nnnnjjjj @@@@ bZdkbZbZdkbZbZdkbZbZdkbZ (Rate quoted by

the firm for per

operation)

dqy ykxrdqy ykxrdqy ykxrdqy ykxr

1. Jfedksa }kjk xsgWw rFkk ljlksa dh Qly esa moZjd Hkqjdko djuk A

46 gSDVs;j

:- @gSDVj

2. xsgWw] ,oa ljlksa dh Qly esa flapkbZ djuk A 48 gSDVs;j

:- @gSDVj

3. VsªDVj pfyr e”khu }kjk ljlksa rFkk xsgWw dh Qly esa [kjirokj uk”kd] dhVuk”kd] QaQwnhuk”kd ,oa lw{e iks’kd rRoksa dk fNMdko djuk A

30 gSDVs;j

:- @gSDVj

4. gLr pfyr e”khu }kjk izk;ksfxd {ks= esa lks;kchu ,oa ljlksa dh Qly ij [kjirokj uk”kd] dhVuk”kd] QaQwnhuk”kd ,oa lw{e iks’kd rRoksa dk fNMdko djuk A

8 gSSDVs;j

:- @gSDVj

5. ljlksa dh Qly dks Jfedkss }kjk dkVuk ,oa Fkszflax djuk A Fkszflax dk;Z ds fy;s Fkszlj] VsªsDVj ,oa MªkbZoj Bsdsnkj dk gksxk A

12 gSDVs;j :- @gSDVj

6. fdlkuks ds [ksrks esa e; VsªDVj [kjhQ Qlyks esa o’kkZ ueh laj{k.k ,oa lqjf{kr ty fudkl gsrq izR;sd 6 eh0 dh nwjh ij 30 lseh pkSMh rFkk 20 lseh xgjh leksP; ukfy;ka cukus dk dk;Z A

20 gSDVs;j :- @gSDVj

7. dsUnz ifjlj esa lM+d o jkLrksa ds nksuks rjQ yxHkx 4 gSDVj esa mxh vaokNuh; ouLifr dks ryokj o dqYgkMh }kjk lQkbZ dk;Z ¼o’kZ esa 6 ckj½

4 gSSDVj @gSDVj

8. 800 Qynkj isMks ds Fkkyksa esa 6 ckj flapkbZ djus dk dk;Z ¼800 x 6=4800 ikS/ks½

4800 ikS/ks : @ikS/kk

9. dPph o lMh gqbZ xkscj dh [kkn e; VªsDVj Vªksyh ¼100 ?ku QqV½ yksfMax o vuyksfMax lfgr vkiwfrZ djuk ½

20 Vªksyh :- @Vªksyh

10. fdjk;s dh dEckbZu e”khu }kjk 06 gSDVj xsgWwa dh Qly dh dVkbZ] eM+kbZ dj Hk.Mkj esa Hkjuk

06 gSDVj :- @gSDVj

11. phdww ] uhcw] vkaoyk Cykd ds yxHkx 6 gSDVj Cykd esa 6 flapkbZ

30 gSDVj :- @gSDVj

Page 6: ICAR: INDIAN INSTITUTE SOIL & WATER CONSERVATION, …€¦ · Tender schedule: Tender No. F.No. AGAW/02/2019-20/Stores/ Date of release of Tender through 6th July, 2019 Pre Bid meeting

6

Annexure V DRAFT SPECIMEN AGREEMENT

This agreement is made at …………… (place) ……………..on (month/year)…………… day

of between ICAR-Indian Institute of Soil & Water Conservation, Research Centre, Kota (hereinafter called IISWC RC Kota) through……………… (designation of the competent authority in IISWC RC Kota) ………………which term shall include its successors, assignees etc. on the first part and ………………….(name & address of the firm) (hereinafter called the firm) which term shall include its authorized representatives, successor, assignees etc. on the other part.

Whereas the IISWC RC Kota has decided to assign the annual contract for providing………….. (nature of job) :............at IISWC RC Kota to the firm on the terms and conditions hereinafter contained. NOW IT IS HEREBY AGREED by and between the parties hereto as follows :- 1. This agreement shall come into force w.e.f. …………..(date)…………… and will remain in force for a period for one year or the period of contract if extended on mutual consent but can be terminated by IISWC RC Kota by giving one calendar months notice in writing of its intentions to terminate the agreement. 2. The firm shall be responsible for annual job work contract for providing ………......... (nature of job)................ at ........... (location). 3. The firm will provide full particulars of every worker deployed by it for providing the services and gate security purposes and get their character and antecedents verified from the police authorities. 4. All personnel posted at premises shall at all times and for all purposes be deemed to be employees of the firm and the IISWC RC Kota shall have no liability on this account in any manner. 5. That the Firm shall ensure that all persons deployed at IISWC RC Kota premises are of good character, well behaved and otherwise competent and qualified to perform the work for which they are deployed. 6. The IISWC RC Kota shall have the right to ask for the removal from its premises any personnel considered by them to be incompetent, disorderly or any other reason and such person shall not again be deployed without the consent of the IISWC RC Kota . 7. The manpower deployed by the agency should work as per the working days and timings of the IISWC RC Kota and the working shift for which contract is awarded. No extra wages will be paid for attending office on weekends, holidays and late -sitting. 8. Wages to be paid to the contractual manpower will be as per Minimum Wages prescribed by Govt. of Indian/Govt.of Kota/Haryana, whichever is higher. Current wages etc. shall be as per Annexure-IV-A of the tender document. 9. Monthly consolidated charges for job/ work contract for providing sweeping & cleaning services at IISWC RC Kota is as per terms and conditions specified and scope of work as per Annexure-IVA in the tender document including all the taxes viz. GST and other taxes as applicable will be paid to the firm by the Institute. The firm will raise a bill of this amount as per terms & conditions of the tender document and the payment released by the Institute in the form of crossed cheque payment/online payment/RTGS whatever is feasible to the firm subject to satisfactory performance / delivery of contracted job / work/ services. Copies of documents such as deposit challan along with list of persons showing deposit of ESIC, EPF, GST with the concerned agencies are also to be deposited with the bill.

Page 7: ICAR: INDIAN INSTITUTE SOIL & WATER CONSERVATION, …€¦ · Tender schedule: Tender No. F.No. AGAW/02/2019-20/Stores/ Date of release of Tender through 6th July, 2019 Pre Bid meeting

7

10. The deduction of income tax from the bills of the agency will be made at source as per rates applicable from time to time. 11. In case of dispute between the parties, the matter shall be referred to the sole arbitrator appointed by the Secretary, ICAR. The decision of the sole arbitrator shall be final and binding in any respect of any dispute between the parties. Arbitration proceeding shall be governed by the Arbitration & Conciliation Act, 1996 as amended from time to time. 12. That the firm shall provide uniform to its Security Personnel and will issue identity card to each of the workers engaged for entry in IISWC RC Kota premises. 13. That the firm shall ensure the successful implementation of the terms and conditions of the agreement by proper control and supervision of the work. 14. That in case the firm fails to perform any of the terms and conditions of this agreement or commits any breach of the contract, IISWC RC Kota shall cancel the contract. 15. That the firm agrees to discharge all their legal obligations in respect of their workers in respect of their wages and services conditions and shall also comply with all the rules and regulations and provisions of law in force that may be applicable to them from time to time, viz. obligations under Contract labour (Regulation & Abolition) Act. 1970, Employees Compensation Act, 1923, EPF., ESI & MP Act, 1952 etc. Firm agrees to indemnify and keep indemnified the IISWC on account of any failure to comply with the obligations under various laws or damage to IISWC due to acts/omissions of Firm. 16. It is also agreed that under no circumstances, the employees/ workmen of the firm shall be treated, regarded or considered or deemed to be the employees of the ICAR-IISWC RC Kota and the firm alone shall be responsible for their remuneration, wages and other benefits etc. Firm shall indemnify and keep indemnified the ICAR- IISWC RC Kota against any claim that it may have to meet towards the employees/ workmen of the firm. Firm's employees/workmen shall have no claim to absorption/ regularization. 17. The contract is subject to the conditions that the firm shall comply with all the laws and bye-laws of Central Govt./ State Govt. as applicable relating to this contract. 18. In case of any loss or damage to the property of the Institute which is attributable to the firm, the full damages will be recovered from the firm as decided by Institute. 19. The firm shall not transfer its right or sub- contract to anyone else. 20. The firm or its workers shall not misuse the premises allotted to them for any purpose other than for which contract is awarded. 21. The firm shall devote its full attention in service to ensure highest quality in all aspects and discharge its obligations under the contract with trust, diligence and honesty. 22. Compensation to the workers in case of any accident, loss of life during discharge of their duties shall be borne by the firm and not by Institute in any manner. 23. There may be frequent surprise checking by an Officer. Shortcomings, if any, pointed out by him shall be rectified by the contractor within 24 hours of its bringing to his notice. 24. The firm shall provide a Co-ordinator for immediate interaction with the organization. 25. The terms and conditions as stipulated in the tender documents and enclosed herewith, shall be part of the agreement.

Page 8: ICAR: INDIAN INSTITUTE SOIL & WATER CONSERVATION, …€¦ · Tender schedule: Tender No. F.No. AGAW/02/2019-20/Stores/ Date of release of Tender through 6th July, 2019 Pre Bid meeting

8

27. The Service charges quoted by the Bidder, shall remain firm/unchanged during the entire contract and no request, on whatsoever ground, shall be considered for any increase in the service charges. LIQUIDATED DAMAGES CLAUSES : - 1.An amount of Rs. 1000/- day will be levied as liquidated damage for delay of work after fixed time period of the job. 2. Any misconduct and misbehavior on the part of the manpower deployed by the agency will not be tolerated and such person will have to be replaced immediately. 3. The decision of the competent authority at ICAR-IISWC, Resarch Centre,, Kota shall be final on the binding on the contractor / agency in respect of any clause covered under the contract and any matter incidental to the contract. IN WITNESS whereof the parties have executed those present on the day, month and year mentioned above.

Not with-standing anything above, the Head, ICAR-IISWC, Research Centre, Kota

reserves the right to reject any or all tenders in whole or in part without assigning reasons

therefore. The decision of Head, ICAR-IISWC, RC Kota shall be final and binding on the

contractor/agency in respect of any clause covered under the Contract.

(Name & Address of the firm) (For the ICAR-IISWC) Witness : -

1. ............................................................. 2..........................................................

Page 9: ICAR: INDIAN INSTITUTE SOIL & WATER CONSERVATION, …€¦ · Tender schedule: Tender No. F.No. AGAW/02/2019-20/Stores/ Date of release of Tender through 6th July, 2019 Pre Bid meeting

9

1. The following document/vouchers are required to be uploaded with the Technical Bid in following manner:-

i. Scanned copy of Earnest Money Deposit (EMD)

ii. Scanned copies of Income Tax Registration (PAN Card), GST Registration

Certificates.

iii. Scanned copies of EPF and ESI Registration Certificate(s) issued by the appropriate

authority.

iv. Scanned copy of valid Licence under the Contract Labour (Registration & Abolition)

Act, 1970.

v. Scanned copy of valid registration certificate issued by NSIC/MSME. if applicable for

exemption of EMD.

vi. Scanned copy of valid licence under the Private Security Agencies (Regulation)

Act,2005 or the similar Act/ Rules promulgated by the Govt. of Rajasthan.

vii. Scanned copy of a certificate issued by the firm showing the total monetary value of

security services performed by the firm during last 5(five) years.

viii. Scanned copies of proofs of minimum last three year's continuous experience of the

firm in the field of providing such services in Central Govt. establishments/

autonomous bodies/corporations / reputed public or private organizations, with details

in enclosed tabular form in chronological order and Scanned copies of the satisfactory

services where the tenderer is providing the services for each of the last three or more

financial years.

ix. Scanned copy of Audited Balance Sheet of the firm for last 3 (three ) financial years

2015-16, 2016-17 & 2017-18) prepared by the Chartered Accountant.

x. Scanned copy of bank account details.

xi. Scanned copy of an authority letter for seeking reference from the bidder’s bankers, if

required.

xii. The firm/agency must enclose a certificate indicating that there is no criminal legal

suit pending or contemplated against it.

xiii. An Undertaking as per attached Format duly attested by Notary on a non-judicial

stamp paper of value of Rs.100/- (Rupees One Hundred Only) regarding their non-

blacklisting by any of the Govt. Departments, Public Sector Undertakings and/or by

Central Vigilance Commission during the last three years.

Yours faithfully,

Admn. Officer

ICAR-IISWC, RC,KOTA

Page 10: ICAR: INDIAN INSTITUTE SOIL & WATER CONSERVATION, …€¦ · Tender schedule: Tender No. F.No. AGAW/02/2019-20/Stores/ Date of release of Tender through 6th July, 2019 Pre Bid meeting

10

Terms & Conditions of Job Contract fufonk dh fu;e ,oa “krsZ %&fufonk dh fu;e ,oa “krsZ %&fufonk dh fu;e ,oa “krsZ %&fufonk dh fu;e ,oa “krsZ %& 1- bPNqd fufonknkrk dk;kZy; esa fufonk izsf’kr djus ls igys lEcfU/kr ;wfuV dk fujh{k.k lEcfU/kr ;wfuV ds

izHkkjh ls lEidZ djds dj ldrk gSA

2- fufonk QkeZ ds lkFk :i;s 13]500@& ¼:Ik;s rsjg gtkj ikap lkS ek=½ dh jkf”k /kjksgj jkf”k ds :i esa tek djkuh gksxh rFkk blds vfrfjDr dk;Z vkns”k gksus dh fLFkfr esa iwjs dk;Z dh /kujkf”k dk 10 izfr”kr vfxze /kujkf”k Performance Security 7 fnu ds vUnj dk;kZy; eas tek djkuk gksxkA ;g jkf”k OIC,CSWCRTI, KOTA ds uke Hkkjrh; LVsV cSad eas ns; cSad fMek.M Mªk¶V@cSadlZ pSd@is&vkMZj ds :i eas izkIr dh tk;sxhA

3- fufonk izi= ds fu;eksa o “krksZa tkudkjh lfgr laLFkku dh osclkbZV www.cswcrtiweb.org as well as Central

Public Procurement Portal ls Kkr fd;s tk ldrs gS A fufonk izkIr gksus dh vfUre frfFk fnaukd 22226666----07070707----2012012012019999 vijkUg vijkUg vijkUg vijkUg 3333----00000000 cts rd gS A

4- fufonkdrkZ dks dk;Z vkns”k (Work Order) feyus ds i”pkr~ dk;Z izkjEHk djus ls igys 07 fnukas ds vUnj

VS.Mj ds lkFk esa yxk foLr`r ,xzhes.V QkeZ dk;kZy; es vkdj :- 100@& ds ukWu tqfMf”k;y LVSEi isij ij Hkjdj tek djuk gksxkA ;fn fufonkdrkZ ,slk djus esa vlQy gksrk gS rks ,slh fLFkfr esa Bsdk fujLr dj fn;k tk;sxk vkSj dk;kZy; esa tek /kjksgj jkf”k tCr dj yh tk;sxh vkSj dk;Z djkus dk vkWQj vxys lQy fufonkdrkZ@QeZ dks ns fn;k tk;sxkA

5- fufonkdrkZ dks dsUnz ds QkeZ ij dk;Z vkjEHk djus ls igys dsUnzk/;{k dk;kZy; dks lqijokbZtj dk uke o irk crkuk gksxk rFkk mldk vkbZ- Mh- izqQ Hkh dk;kZy; esa tek djuk gksxkA rFkk lqijokbZtj dks dk;Z vof/k esa QkeZ ij mifLFkr jguk gksxk ,oa izfrfnu ds dk;Z ds C;kSjs dk irk djds dk;Z dks fuf”pr vof/k eas iwjk djkuk gksxkA

6- fufonkdrkZ@lqijokbZtj fdlh Hkh ljdkjh vf/kdkjh@deZpkjh ds lkFk O;fDrxr laca/k ugha cuk;sxkA

7- fufonkdrkZ ;g lqfuf”pr djsaxs fd mlds }kjk j[ks x;s lHkh Jfed 20 ls 50 o’kZ dh mez ds chp ds gks tks “kkjhfjd :i ls LoLFk] jksxeqDr] ?kko jfgr ,oa laØked jksx jfgr gks ftlls os vius drZO;ksa dk fu’iknu djus eas l{ke gksxsaA ;fn dksbZ Jfed ;ksX; ugha ik;k tkrk gS rks dsUnz dks ;g vf/kdkj gksxk fd fcuk dkj.k crk;s ml Jfed dks cnyus ds fy, dg ldrk ftls cnyus ds fy, fufonkdrkZ ck/; gksxkA

8- fufonkdrkZ dks dsoy o;Ld Jfed gh dk;Z esa yxkus gksaxsA cky Jfedksa dks jkstxkj ij j[ks tkus ij Bsdk fujLr dj fn;k tk;sxkA

9- bl Bsds ds rgr~ fufonkdrkZ }kjk miyC/k djk;s x;s O;fDr dsUnz ds deZpkjh ugha gksus pkfg, rFkk mijksDr lsokvksa ds fy, fufonkdrkZ }kjk yxk;s x;s O;fDr;kas vkSj laLFkku ds e/; fu;ksDrk ,oa deZpkjh dk lEcU/k ugha gksxkA

10- fufonkdrkZ ;k mlds }kjk miyC/k djk;s x;s fdlh Hkh Jfed dk dsUnz ls dksbZ lEcU/k ugha gksxkA 11- fufonkdrkZ vius vf/kdkjksa dks fdlh vU; dks LFkkukUrfjr ugha djsxkA

12- fufonkdrkZ ;k mlds deZpkjh] ftl mns”; ds fy, Bsdk lkSaik x;k gS] ds vykok fdlh vU; mns”; ds fy;s

ifjlj dk nq:i;ksx ugha djsaxsA

13- fdlh dkj.ko”k ;fn fufonkdrkZ fuf”pr vof/k eas Ñf’k dk;Z iwjk djkus ds fy;s i;kZIr la[;k eas etnwj ugha yk ik jgk gS rc ,slh fLFkfr esa QkeZ bUpktZ vfrfjDr etnwjksa dks cqykdj muls le; ij dke djk ldrs gSa rFkk bu etnwjksa dh etnwjh dk Hkqxrku fufonkdrkZ dks ljdkjh jsV ij djuk gksxkA ;fn fufonkdrkZ bu etnwjksa dh etnwjh ugha nsrk gS rc lEcfU/kr fufonkdrkZ ds fcy ls dsUnz@laLFkku }kjk iSlk dkVdj vkgj.k ,oa forj.k vf/kdkjh ¼Mh-Mh-vks-½ ds ek/;e ls etnwjkas dks ns fn;k tk;sxkA

14- ifjlj ij igys ls dk;Zjr~ Jfedkas dks vfuok;Z :i ls izkFkfedrk o ofj’Brk ds vk/kkj ij dk;Z ij j[kuk gksxk ftuds uke vkidks Bsdk feyus ij ns fn;s tk;saxsA

15- dk;Z ds fy;s vko”;d vuqekfur Jfedksa dh la[;k Bsdsnkj dks nks ls rhu fnu igys lwfpr dj nh tk;sxhA ;fn le; ij Jfed miyC/k ugha djk;saxs rks fufonk fujLr djus dk vf/kdkj dsUnz dk gksxkA

Page 11: ICAR: INDIAN INSTITUTE SOIL & WATER CONSERVATION, …€¦ · Tender schedule: Tender No. F.No. AGAW/02/2019-20/Stores/ Date of release of Tender through 6th July, 2019 Pre Bid meeting

11

16- dk;Z ds vuqlkj le; le; ij Jfedkas dh la[;k de o T;knk gks ldrh gSA 17- Ñf’k dk;Z ds fy;s dsUnz }kjk [kqjik] QkoMk] njkarh] ify;k@Vksdjh vkfn ugha fn;k tk;sxkA ;s lHkh lkeku

fufonkdrkZ ds gh gksaxsA 18- lHkh Ñf’k dk;Z fu/kkZfjr le; lhek ds vUrxZr iw.kZ djkus gksaxsA le; lhek dk fu/kkZj.k izHkkjh

oSKkfud@izHkkjh iz{ks= }kjk gksxkA le; lhek esa dk;Z lEiUu u gksus ds dkj.k gq;s vkfFkZd uqdlku dh HkjikbZ Bsdsnkj dks djuh gksxhA uqdlku gksus dh fLFkfr esa] uqdlku dk vkadyu dsUnzk/{kd }kjk xfBr desVh djsxhA uqdlku dh HkjikbZ fufonkdrkZ ds fcy ls dkVdj dh tk;sxhA

19- lHkh Ñf’k dk;Z izHkkjh oSKkfudkas@QkeZ bapktZ dh vko”;drkuqlkj ,oa muds fn”kk funsZ”kksa ds vuqlkj djkus gksaxsA

20- fufonkdrkZ dks dk;Z LFky ij izkFkfed fpfdRlk ckWDl miyC/k djuk gksxk vkSj mldk yxkrkj j[k j[kko Hkh djuk gksxkA

21- fufonkdrkZ }kjk miyC/k djk;s x;s Jfedksa dks dk;Z ds le;] ;fn dksbZ nq?kZVuk ?kVrh gS rks ml ?kVuk dk gtkZuk Hkh lEcfU/kr fufonkdrkZ dks gh nsuk gksxkA

22- Ñf’k Jfedksa ls lEcfU/kr lHkh nkf;Ro fufonkdrkZ ds gksaxsA 23- Bsds ls lEcfU/kr lHkh fjdkMZ tSls U;wure etnwjh] bZ-ih-,Q-] SGST, CGST, dk;Z ds ?kaVs] dk;Z dh vof/k]

/kujkf”k ,oa Hkqxrku dh frfFk bR;kfn dks j[kus dh ftEesnkjh fufonkdrkZ dh gksxh vkSj ftUgsa lEcfU/kr iz{ks= ds izHkkjh ls lR;kfir djkuk gksxk vkSj tc dHkh Hkh bu fjdkMksZa dks ns[kus ds fy, ekaxk tk;sxk rks miyC/k djkuk gksxkA

24- VS.Mj eas fn;k x;k Qlykas dk dk;Z rFkk {ks=Qy de ;k vf/kd gks ldrk gS ftls ekuus ds fy, fufonkdrkZ ck/; gksxkA

25- Long terms Experiments ds rgr Qlyksa ds dk;Z Qlykof/k rd iwjs djus gksaxs vkSj mudk Hkqxrku Hkh Qlykof/k lekIr gksus ij gh fd;k tk;sxkA

26- fufonkdrkZ le;≤ ij Qlykas ls lEcfU/kr dk;Z ,oa {ks=Qy ds cnyko dks ekuus ds fy, ck/; gksxkA 27- Bsds ls lEcfU/kr mijksDr lHkh funsZ”kksa] fu;e ,oa “krksZa ds vfrfjDr le;≤ ij dk;kZy; }kjk vU; tkjh

gksus okys funsZ”kksa] fu;e ,oa “krksZa dks ekuus ds fy, Hkh fufonkdrkZ ck/; gksxkA 28- lHkh Qlyksa ls lEcfU/kr dk;ksZa dks fuf”pr vof/k esa lEiUu djkus gsrq pkyd ,oa Jfed fufonkdrkZ }kjk

miyC/k djkus gksxsaA 29- Bsdsnkj dks fu;ekuqklkj lHkh ykxw ns;] dj ,oa izHkkj tek djds rFkk Jfed mifLFkr jkftLVj] Labour

Wages Sheet, fcy rFkk mudh izfrfyfi dks lEcfU/kr iz{ks= ds izHkkjh ls lR;kfir vkfn vkSipkfjdrk iwjh djds dk;Z ds Hkqxrku gsrq viuk fcy dk;kZy; esa tek djkuk gksxkA bu lHkh vkSipkfjdrkvksa dks iwjh djus ds ckn gh fcy dk Hkqxrku fd;s x;s dk;Z ds vuqikr ds vk/kkj ij fd;k tk;sxkA Bsdsnkj dk;kZy; dks ;g fo”okl fnyk;sxk fd Bsds ls lEcfU/kr lHkh nkf;Ro tSls Minimum wages,EPF, ESI, VDA, CGST & SGST ,oa lHkh Govt. Levies iwjs dj fn;s gSaA

30- lQy fufonknkrk@QeZ dks Bsds dh dqy jkf”k dk 10 izfr”kr performance security ds :i eas dk;Z vkns”k tkjh gksus ,oa Bsdsnkj }kjk dk;kZy; eas lgefr izLrqr djus ds ckn rFkk dk;Z izkjHk djus dh frfFk ls lkr fnuksa ds vUnj tek djuh gksxh tks dk;kZy; esa Bsds dk dk;Zdky larks’ktud lekIr gksus ,oa Bsds ls lEcfU/kr lHkh vkSiopkfjrk iwjh djus rd tek jgsxh ftl ij dk;kZy; }kjk dksbZ C;kt ugha fn;k tk;sxkA ;fn lQy fufonknkrk@QeZ fu/kkZfjr ns; frfFk rd tek djusa esa vlQy gksrk gS rks ;g le>k tk tk;sxk fd Bsdsnkj@QeZ dk;Z djkus esa bPNqd ugha gSA ,slh fLFkfr esa mudks fn;k gqvk vkWQj fujLr dj fn;k tk;sxk vkSj mudh /kjksgj jkf”k tCr dj yh tk;sxh vkSj Bsds dk vkWQj vxys lQy Qe@Bsdsnkj dks ns fn;k tk;sxkA

31- fu;ekuqlkj lHkh ykxw ns;] dj ,oa izHkkj Hkh Bsdsnkj ds fcy ls dkVs tk;saxsA ;fn ykxw ns;] dj ,oa izHkkj eas

ljdkj }kjk le;≤ ij dksbZ cnyko gksrk gS ;k ljdkj }kj u;k ns;] dj] izHkkj ykxw gksrk gS rks mls ekuus ,oa tek djus ds fy, Bsdsnkj ck/; gksxkA

32- lHkh Qlykas ls lEcfU/kr jsV~l izfr gSDVsvj] gSt dfVax ,oa QsfUlax ejEer izfr bdkbZ 100 jfuax ehVj ,oa

ckxokuh dk;ksZ esa izfr 1000 oxZ eh0 ds fglkc ls ekaxs x;s gSaA blfy, ftrus {ks=Qy esa Qly dh cqokbZ o dk;Z gksxk mlh {ks=Qy ds vuqlkj dk;Z dk Hkqxrku fd;k tk;sxk ftls ekuus ds fy, Bsdsnkj ck/; gksxkA

33- Ñf’k Jfedksa dks nSfud osru dk Hkqxrku dsnzh; ljdkj vFkok jkT; ljdkj }kjk fu/kkZfjr njksa] ¼tks Hkh

vf/kdre gksa½ ij izR;sd ekg dh 7 rkjh[k ls igys djuk gksxkA dsUnzh; ljdkj@jkT; ljdkj }kjk nSfud osru c<+k;s tkus ij Jfedks dks c<+k gqvk osru nsuk gksxkA lHkh nSfud Jfedksa dks etnwjh dk Hkqxrku le; ls ,oa fu;ekuqlkj djuk gksxk vkSj labour wages sheet Hkh Jfed mifLFkr iaftdk ds lkFk lEcfU/kr iz{ks= ds izHkkjh ls lR;kfir djkdj dk;kZy; esa izLrqr djuh gksxhA

34- Bsdsnkj dks Jfedksa ds fiNys ekg ds osru dk Hkqxrku vxys ekg ds izFke lIrkg eas djuk t:jh gSA

Page 12: ICAR: INDIAN INSTITUTE SOIL & WATER CONSERVATION, …€¦ · Tender schedule: Tender No. F.No. AGAW/02/2019-20/Stores/ Date of release of Tender through 6th July, 2019 Pre Bid meeting

12

35- Bsdsnkj }kjk mlds deZpkfj;ksa nSfud Jfedksa dks fd;k tkus okyk leLr Hkqxrku mlds vius L=ksrksa ls djuk gksxkA

36- ;fn Bsdsnkj@QeZ mlds }kjk dk;Z ij yxk;s x;s Jfedksa dks le; ij mudh nSfud osru ugha nsrk gS rks

dsUnz dks ;g vf/kdkj gksxk fd Bsdsnkj@QeZ ds fcy ls laLFkku }kjk iSlk dkVdj vkgj.k ,oa lforj.k vf/kdkjh ds ek/;e ls Jfedksa dks ns fn;k tk;sA bl lEcU/k eas Bsdsnkj@QeZ dks dksbZ Hkh vkifÙk Lohdk;Z ugha gksxhA

37 fufonk ekU; gksus dh n”kk esa ;fn ml Bsdsnkj dks dk;Z djkus o vU; vkSipkfjdrk,a iwjh djus dk vkns”k

fn;k tkrk gS vkSj ;fn og Bsdsnkj ml vksn”k dks ysus ls euk djrk gS ;k dksbZ Hkh vkSipkfjdrk iwjh ugha djrk gS rks ,slh fLFkfr es mldks fn;k x;k vkWQj fujLr dj fn;k tk;sxk vkSj mldh /kjksgj@flD;ksfjVh jkf”k tCr dj yh tk;sxhA

38- ftl Bsdsnkj dh fufonk ekU; gksxh ;fn dk;Z vkns”k feyus ds ckn ml Bsdsnkj ls dksbZ i=kpkj fd;k tkrk

gS vkSj og ml i= dk tokc nsus ;k i= Lohdkj djus ls euk djrk gS ;k bl chp fdlh vf/kdkjh ;k deZpkjh ls vHknz O;ogkj djrk gS rks ,slh fLFkfr eas mldks fn;k x;k vkWQj fujLr dj fn;k tk;sxkA vkSj mldh /kjksgj@flD;ksfjVh jkf”k tCr dj yh tk;sxhA

39- dk;Z vkns”k feyus ds ckn ,d lIrkg ds vUn dk;Z izkjEHk u djus dh n”kk esa Hkh mldks fn;k vkWQj fujLr dj fn;k tk;sxk vkSj mldh /kjksgj@flD;ksfjVh jkf”k tCr dj yh tk,sxhA 40- dk;Z vkns”k feyus ds ckn ;fn Bsdsnkj dk;Z chp eas NksM+rk gS ;k etnwj nsus ls euk djrk gS ;k etnwj

de la[;k eas miyC/k djkrk gS ;k dk;Z djus eas foyEc djrk gS ;k yEcs l;e rd vuqifLFkr jgrk gS rks ,slh fLFkfr eas mldks fn;k x;k vkWQj fujLr dj fn;k tk;sxk vkSj mldh /kjksgj@flD;ksfjVh jkf”k tCr dj yh tk;sxhA

41- Bsds dk vkcaVu gksus ds ckn ;fn Bsdsnkj ;k mlds }kjk fu;qDr eq”kh ¼lqijokbZtj½ dk iqfyl }kjk lR;kiu

djkus ds ckn vijkf/kd fjdkMZ ik;k tkrk gS rks ,slh fLFkfr eas Hkh Bsdk fujLr dj /kjksgj@performance

security jkf”k tCr dh tk ldrh gSA 42- Bsdsnkj dsUnz }kjk fu/kkZfjr lHkh “krksaZ o funsZ”kksa dks ekuus ds fy, ck/; gksxkA Bsdk vkoaVu ds ckn fu;e o

“krsZa iwjh u gksus dh fLFkfr esa Bsdk fujLr dj fn;k tk,xk vkSj dk;kZy; esa tek /kjksgj@performance

security jkf”k tCr dj yh tk,xhA 43- dsUnzk/;{k] Hkkjrh; e`nk ,oa ty laj{k.k laLFkku] vuqla/kku dsUnz, dksVk fdlh Hkh fufonknkrk dks fcuk fdlh

U;k;laxr lwpuk ds Bsds dh vof/k dks de djus ;k fujLr djus ;k dsUnz ds fgr esa mldh vof/k dk foLrkj djus dk vf/kdkj lqjf{kr j[krs gSaA

44- Bsdsnkj }kjk fufonk rFkk djkj esa nh x;h lHkh fn”kk funsZ”k] fu;e ,oa “krksZa dks Bhd izdkj ls ikyu u

djus dh n”kk esa dsUnzk/;{k]Hkkjrh; e`nk ,oa ty laj{k.k laLFkku] vuqla/kku dsUnz] dksVk dks mudk Bsdk fujLr djus ,oa /kjksgj@performance security jkf”k Hkh tCr djus dk iw.kZ vf/kdkj gksxkA

45-- lHkh Ñf’k dk;Z fu/kkZfjr le; lhek ds vUrxZr iw.kZ djkus gksaxsA le; lhek dk fu/kkZj.k izHkkjh

oSKkfud@izHkkjh iz{ks= }kjk gksxkA le; lhek esa dk;Z lEiUu u gksus ds dkj.k gq;s vkfFkZd uqdlku dh HkjikbZ Bsdsnkj dks djuh gksxhA uqdlku gksus dh fLFkfr eas] uqdlku dk vkadyu dsUnzk/;{k }kjk xfBr desVh djsxhA uqdlku dh HkjikbZ Bsdsnkj ds fcy ls dkVdj dh tk;sxhA

46- Bsdsnkj@QeZ dks dk;Z vkns”k ¼Work Order½ feyus ds i”pkr~ dk;Z izkjEHk djus ls igys 07 fnuksa ds vUnj

Vs.Mj ds lkFk esa yxk foLr`r ,xzhesUV QkeZ dk;kZy; esa vkdj :- 100@& ds ukWu tqfMf”k;y LVsEi isij ij Hkjdj tek djuk gksxkA ;fn Bsdsnkj ,slk djus eas vlQy gksrk gS rks ,slh fLFkfr esa Bsdk fujLr dj fn;k tk;sxk vkSj dk;kZy; esa tek /kjksgj jkf”k tCr dj yh tk;sxh vkSj dk;Z djkus dk vkWQj vyx lQy Bsdsnkj@QeZ dks ns fn;k tk;sxkA

47 fufonk nLrkost eas fu/kkZfjr fu;e ,oa “krsZa rFkk blds lkFk yxs layXud] djkj Agreement dk Hkh Hkkx

gksaxsA ftudk ikyu djuk vfuok;Z gSA 48- lHkh Ñf’k dk;Z izHkjh oSKkfudksa@QkeZ bapktZ dh vko”;drkuqlkj ,oa muds fn”kk funsZ”kkas ds vuqlkj djkus gksaxsA

Page 13: ICAR: INDIAN INSTITUTE SOIL & WATER CONSERVATION, …€¦ · Tender schedule: Tender No. F.No. AGAW/02/2019-20/Stores/ Date of release of Tender through 6th July, 2019 Pre Bid meeting

13

49 Bsds ls lEcfU/kr lHkh fjdkMZ tSls U;wure etnwjh] bZ-ih-,Q-] bZ-,l-vkbZ (if applicable) dk;Z ds ?kaVs] dk;Z

dh vof/k]/kujkf”k ,oa Hkqxrku dh frfFk bR;kfn dks j[kus dh ftEesnkjh Bsdsnkj dh gksxh vkSj ftUgsa lEcfU/kr iz{ks= ds izHkkjh ls lR;kfir djkuk gksxk vkSj tc dHkh Hkh bu fjdkMksZa dks ns[kus ds fy, ekaxk tk;sxk rks miyC/k djkuk gksxkA

50- Ñf’k Jfedksa ls lEcfU/kr lHkh nkf;Ro Bsdsnkj ds gksaxsA 51- yscj ,DV ds vuqlkj Bsdsnkj@fufonknkrk dks lafonk Je vf/kfu;e ¼fofu;eu ,oa mUewyu½ 1970] deZdkj

izfriwfrZ vf/kfu;e] bZ-,l-vkbZ- (if applicable), bZ-ih-,Q- ,oa ,e-ih- vf/kfu;e vkfn dk iw.kZ :i ls ikyu djuk gksxkA ikyu u djus dh n”kk esa lkjh tokcnsgh Bsdsnkj@fufonknkrk dh gksxh rFkk mldh HkjikbZ Hkh Bsdsnkj@fufonknkrk dks djuh gksxhA

52- Bsdsnkj Je foHkkx ¼dsUnzh;@jktdh;½ ds fu;e ,oa “krksZa dks ekuus ds fy, ck/; gksxkA 53- Jfed laca/kh fdlh Hkh dkuwuh izko/kkukas ds laca/k esa Bsdsnkj Lo;a vdsys gh ftEesnkj gksxkA 54- dk;Z dk fu’iknu djus ds fy;s Bsdsnkj }kjk rSukr Jfedkas@lqijokbZtjkas ds lHkh dkuwuh nkf;Roksa tSls&osru

,oa lsok lEcU/kh “krksaZ dk fuoZgu fd;k tk;sxk rFkk le;&le; ij mu ij ykxw gksus okys fu;e o funsZ”kkas ,oa dkuwuh izko/kkuksa dk Hkh vuqikyu fd;k tk;sxkA ;fn fufonkdrkZ fofHkUu dkuwuh nkf;Roksa dk ikyu djus esa vlQy gksrk gS rks ,slh fLFkfr eas {kfriwfrZ ds fy;s og Lo;a ftEesnkj gksxk rFkk Hkkjrh; Ñf’k vuqla/kku ifj’kn@Hkkjrh; e`nk ,oa ty laj{k.k laLFkku] vuqla/kku dsUnz] dksVk dks fdlh Hkh nkok] uqdlku ,oa {kfr ls iw.kZr% vyx j[ksxkA fdlh Hkh fookn dh fLFkfr esa funs”kd egksn; laLFkku ,oa dsUnzk/;{k Hkkjrh; e`nk ,o aty laj{k.k laLFkku] vuqla/kku dsUnz] dksVk dk fu.kZ; vfUre gksxk vkSj Bsdsnkj ds fy;s og ekU; gksxkA

55- vuqcU/k ,oa fu;e o “krksZa ds fdlh Hkh igyw ij fookn dh fLFkfr esa funs”kd egksn; laLFkku ,oa

dsUnzk/;{k]Hkkjrh; e`nk ,oa ty laj{k.k laLFkku] vuqla/kku dsUnz dksVk dk fu.kZ; vfUre gksxkA ftls ekuus ds fy, nksukas i{k ck/; gksaxs vkSj mls fdlh Hkh e/;LFkr ds fy;s ugha Hkstk tk;sxkA

56- iwoZ esa fdlh Hkh ljdkjh dk;kZy; esa Bsdk ysus okys Bsdsnkj gh bl dszUnz ij cksyh yxk ldsxsa A

57- fufonk [kksyus ds iwoZ dsUnz ds lHkkxkj esa fnaukd 20-07-2019 dks 3-00 cts izh fcM fefVax j[kh xbZ gS A

lEcfU/kr fufonknkrk dks ;fn fufonk ls lEcfU/kr dksbZ tkudkjh pkfg;s rks os izh fcM fefVax esa fnaukd 20-07-2019 dks “kkfey gks ldrs gS A 58- bl fufonk dh dk;Zkof/k 1 vxLr 2019 ls 31 tqykbZ 2020 rd ekU; gksxh A dsUnzk/;{k dsUnzk/;{k dsUnzk/;{k dsUnzk/;{k

Page 14: ICAR: INDIAN INSTITUTE SOIL & WATER CONSERVATION, …€¦ · Tender schedule: Tender No. F.No. AGAW/02/2019-20/Stores/ Date of release of Tender through 6th July, 2019 Pre Bid meeting

14

Page 15: ICAR: INDIAN INSTITUTE SOIL & WATER CONSERVATION, …€¦ · Tender schedule: Tender No. F.No. AGAW/02/2019-20/Stores/ Date of release of Tender through 6th July, 2019 Pre Bid meeting

15

Page 16: ICAR: INDIAN INSTITUTE SOIL & WATER CONSERVATION, …€¦ · Tender schedule: Tender No. F.No. AGAW/02/2019-20/Stores/ Date of release of Tender through 6th July, 2019 Pre Bid meeting

16

Page 17: ICAR: INDIAN INSTITUTE SOIL & WATER CONSERVATION, …€¦ · Tender schedule: Tender No. F.No. AGAW/02/2019-20/Stores/ Date of release of Tender through 6th July, 2019 Pre Bid meeting

17

Page 18: ICAR: INDIAN INSTITUTE SOIL & WATER CONSERVATION, …€¦ · Tender schedule: Tender No. F.No. AGAW/02/2019-20/Stores/ Date of release of Tender through 6th July, 2019 Pre Bid meeting

18

Page 19: ICAR: INDIAN INSTITUTE SOIL & WATER CONSERVATION, …€¦ · Tender schedule: Tender No. F.No. AGAW/02/2019-20/Stores/ Date of release of Tender through 6th July, 2019 Pre Bid meeting

19

Page 20: ICAR: INDIAN INSTITUTE SOIL & WATER CONSERVATION, …€¦ · Tender schedule: Tender No. F.No. AGAW/02/2019-20/Stores/ Date of release of Tender through 6th July, 2019 Pre Bid meeting

20

Page 21: ICAR: INDIAN INSTITUTE SOIL & WATER CONSERVATION, …€¦ · Tender schedule: Tender No. F.No. AGAW/02/2019-20/Stores/ Date of release of Tender through 6th July, 2019 Pre Bid meeting

21

Page 22: ICAR: INDIAN INSTITUTE SOIL & WATER CONSERVATION, …€¦ · Tender schedule: Tender No. F.No. AGAW/02/2019-20/Stores/ Date of release of Tender through 6th July, 2019 Pre Bid meeting

22

Page 23: ICAR: INDIAN INSTITUTE SOIL & WATER CONSERVATION, …€¦ · Tender schedule: Tender No. F.No. AGAW/02/2019-20/Stores/ Date of release of Tender through 6th July, 2019 Pre Bid meeting

23

Page 24: ICAR: INDIAN INSTITUTE SOIL & WATER CONSERVATION, …€¦ · Tender schedule: Tender No. F.No. AGAW/02/2019-20/Stores/ Date of release of Tender through 6th July, 2019 Pre Bid meeting

24

Page 25: ICAR: INDIAN INSTITUTE SOIL & WATER CONSERVATION, …€¦ · Tender schedule: Tender No. F.No. AGAW/02/2019-20/Stores/ Date of release of Tender through 6th July, 2019 Pre Bid meeting

25

Page 26: ICAR: INDIAN INSTITUTE SOIL & WATER CONSERVATION, …€¦ · Tender schedule: Tender No. F.No. AGAW/02/2019-20/Stores/ Date of release of Tender through 6th July, 2019 Pre Bid meeting

26

Page 27: ICAR: INDIAN INSTITUTE SOIL & WATER CONSERVATION, …€¦ · Tender schedule: Tender No. F.No. AGAW/02/2019-20/Stores/ Date of release of Tender through 6th July, 2019 Pre Bid meeting

27

Page 28: ICAR: INDIAN INSTITUTE SOIL & WATER CONSERVATION, …€¦ · Tender schedule: Tender No. F.No. AGAW/02/2019-20/Stores/ Date of release of Tender through 6th July, 2019 Pre Bid meeting

28

Page 29: ICAR: INDIAN INSTITUTE SOIL & WATER CONSERVATION, …€¦ · Tender schedule: Tender No. F.No. AGAW/02/2019-20/Stores/ Date of release of Tender through 6th July, 2019 Pre Bid meeting

29

Page 30: ICAR: INDIAN INSTITUTE SOIL & WATER CONSERVATION, …€¦ · Tender schedule: Tender No. F.No. AGAW/02/2019-20/Stores/ Date of release of Tender through 6th July, 2019 Pre Bid meeting

30

Page 31: ICAR: INDIAN INSTITUTE SOIL & WATER CONSERVATION, …€¦ · Tender schedule: Tender No. F.No. AGAW/02/2019-20/Stores/ Date of release of Tender through 6th July, 2019 Pre Bid meeting

31

Page 32: ICAR: INDIAN INSTITUTE SOIL & WATER CONSERVATION, …€¦ · Tender schedule: Tender No. F.No. AGAW/02/2019-20/Stores/ Date of release of Tender through 6th July, 2019 Pre Bid meeting

32

Page 33: ICAR: INDIAN INSTITUTE SOIL & WATER CONSERVATION, …€¦ · Tender schedule: Tender No. F.No. AGAW/02/2019-20/Stores/ Date of release of Tender through 6th July, 2019 Pre Bid meeting

33

Page 34: ICAR: INDIAN INSTITUTE SOIL & WATER CONSERVATION, …€¦ · Tender schedule: Tender No. F.No. AGAW/02/2019-20/Stores/ Date of release of Tender through 6th July, 2019 Pre Bid meeting

34

Page 35: ICAR: INDIAN INSTITUTE SOIL & WATER CONSERVATION, …€¦ · Tender schedule: Tender No. F.No. AGAW/02/2019-20/Stores/ Date of release of Tender through 6th July, 2019 Pre Bid meeting

35