ICAO-Paris 17-19 June 2015 Meetings Seminars and Workshops/NAT... · ICAO-Paris 17-19 June 2015 Wim...

26
2 nd NAT/EUR PBCS Workshop ICAO-Paris 17-19 June 2015 Wim Brondsema EUROCONTROL/HQ

Transcript of ICAO-Paris 17-19 June 2015 Meetings Seminars and Workshops/NAT... · ICAO-Paris 17-19 June 2015 Wim...

Page 1: ICAO-Paris 17-19 June 2015 Meetings Seminars and Workshops/NAT... · ICAO-Paris 17-19 June 2015 Wim Brondsema EUROCONTROL/HQ. Overview 2 Future EUR PBCS Plan Baseline 2 Performance

2nd NAT/EUR PBCS Workshop

ICAO-Paris17-19 June 2015

Wim BrondsemaEUROCONTROL/HQ

Page 2: ICAO-Paris 17-19 June 2015 Meetings Seminars and Workshops/NAT... · ICAO-Paris 17-19 June 2015 Wim Brondsema EUROCONTROL/HQ. Overview 2 Future EUR PBCS Plan Baseline 2 Performance

Overview

2

Future EUR PBCS Plan

Baseline 2 Performance Specs

Towards Baseline 2

Baseline 1 Performance Specs

Page 3: ICAO-Paris 17-19 June 2015 Meetings Seminars and Workshops/NAT... · ICAO-Paris 17-19 June 2015 Wim Brondsema EUROCONTROL/HQ. Overview 2 Future EUR PBCS Plan Baseline 2 Performance

B1 DLS-IR, Standards and Specifications

3

EUROCAE/RTCA: ED120 (CONT SPR) and ED110B (ATN-B1 INT)ICAO: ATN-B1 SARPSARINC-631-6: VDLM2/MF specs

Certification Specs (Aircraft)EASA: CS-ACNS

Bind

ing

COTR- IR: No 30/2009

Non

-Bin

ding

o G/G transfer of Logon info to next ACC: LOF/NAN

DLS-IR 29/2009 + Amendment 310/2015o CPDLC: ATC Clearances (ACL); Comm Transfer (ACM); ATC Microphone Check (AMC)o En-route: FL 285 and aboveo Using ATN-B1 over VDLM2o Implementation: ANSPs - 5th Feb 2018; AO - 5th Feb 2020

Community Specs (ANSPs) ETSI EN 303 214 –V1.2.1 OLDI/ADEXP EUROCONTROL Spec (LOF/NAN)

Page 4: ICAO-Paris 17-19 June 2015 Meetings Seminars and Workshops/NAT... · ICAO-Paris 17-19 June 2015 Wim Brondsema EUROCONTROL/HQ. Overview 2 Future EUR PBCS Plan Baseline 2 Performance

Application of ED120 Performance and Safety Requirements

4

EASA Regulation requires:

• Air traffic services (ATS) provision and prescription - Safety oversight of ATS- EUR FIRs iaw Implementing Rule

• Operator authorization - Airworthiness certification- AO files in FPL, A/C communication capability

(CPDLC technical capability, flight crew qualifications and authorizationfrom the NSA)

• Post-implementation monitoring of actual performance- Continuing analysis against the performance requirements - Problem reporting and corrective actions

Page 5: ICAO-Paris 17-19 June 2015 Meetings Seminars and Workshops/NAT... · ICAO-Paris 17-19 June 2015 Wim Brondsema EUROCONTROL/HQ. Overview 2 Future EUR PBCS Plan Baseline 2 Performance

B1 - Safety oversight framework of DLS

ANSP

ATSU

CSP

ServiceAgreement

Aircraft Operator

Aircraft

Network Access Service

Agreement

VDLM2

Airworthiness, Operations and

Maintenance

Initial Approval& Oper

monitoring

NSA

ETSI Community Specs (ANSPs)EASA Certification Specs (Aircraft)

EASA:SO-IR + CR-IR / Nat Safety Rules

Page 6: ICAO-Paris 17-19 June 2015 Meetings Seminars and Workshops/NAT... · ICAO-Paris 17-19 June 2015 Wim Brondsema EUROCONTROL/HQ. Overview 2 Future EUR PBCS Plan Baseline 2 Performance

Eligibility to operate Baseline 1

Aircraft Operator (AO) Provision of CPDLC technical capability and operational readiness in FPL

o In Item 10A: J1 for CPDLC-ATN-B1 VDLM2o (J2 through J7 is reserved for FANS A/C, using different links)o In Item 18: CODE/24-bit Aircraft Address (6 hexadecimal chars)

(REG/Registration mark: for FANS aircraft) AO exempted from operating B1:

o In Item 10: “Z” o Item 18: DAT/CPDLCX

J descriptors denote Interoperability for A/C equipmentB1 Performance capability not denoted in FPL No RCP Spec

6

ANSP Announcement of CPDLC Interoperability and operational readiness in

Aeronautical Information Publication (AIP).

Page 7: ICAO-Paris 17-19 June 2015 Meetings Seminars and Workshops/NAT... · ICAO-Paris 17-19 June 2015 Wim Brondsema EUROCONTROL/HQ. Overview 2 Future EUR PBCS Plan Baseline 2 Performance

Baseline 1 – DLS Performance SpecificationsCPDLC used for Instructions/requests, comm transfer, mike check CPDLC performance predicated on ED120 Performance specs (No RCP spec)

Controller sends ATC instruction

Controller receives indication of response

and understands it

Performance Parameters• Monitored Transaction Time(Pseudo E-t-E transaction time)

• Continuity• Availability• Integrity

Interoperability & functional definition

Page 8: ICAO-Paris 17-19 June 2015 Meetings Seminars and Workshops/NAT... · ICAO-Paris 17-19 June 2015 Wim Brondsema EUROCONTROL/HQ. Overview 2 Future EUR PBCS Plan Baseline 2 Performance

Performance needs from controller perspective

8

Intervention capability Performance parameter

CPDLC to issue an ATC instruction, when necessary Availability

Receives timely response to an ATC instruction Monitored Transaction Time

Delayed responses to ATC instructions are not frequent Continuity

System and procedures that ensure flight crew understands and complies

with an ATC instructionIntegrity

Page 9: ICAO-Paris 17-19 June 2015 Meetings Seminars and Workshops/NAT... · ICAO-Paris 17-19 June 2015 Wim Brondsema EUROCONTROL/HQ. Overview 2 Future EUR PBCS Plan Baseline 2 Performance

Baseline 1: RCMP (TRN) Time and Continuity

Controller’s intervention capability in En-Route

9

RCP specification (RCP Transaction time): Not provided

Controller composes and sends message

Operational Monitored Performance

Controller receives indication

and confirms response

Monitored Transaction time (seconds)

99.9% not provided 120 not provided ET

95% not provided 60 not provided TT

RCTP (Ground to Air) PORT RCTP (Air to Ground)

99.9% Part of 20 100 Part of 20 99.9%

95% Part of 16 44 Part of 16 95%

ATSP (combined ATSU/CSP)

Aircraft system

Aircraft system

ATSP (combined ATSU/CSP)

99.9% Part of14 P of 6 P of 6 Part of 14 99.9%

95% Part of 12 P of 4 P of 4 Part of 12 95%

Page 10: ICAO-Paris 17-19 June 2015 Meetings Seminars and Workshops/NAT... · ICAO-Paris 17-19 June 2015 Wim Brondsema EUROCONTROL/HQ. Overview 2 Future EUR PBCS Plan Baseline 2 Performance

Baseline 1: Required Availability

10

Availability requirementsAvailability parameter Efficiency Compliance means

1.Availability of Service provision (APROV) Probability that communication with all aircraft in the area is in service, when needed. Loss of CPDLC mainly affects efficiency.(Shared between ATSU and CSP: impacts all A/C within a FIR)

0.999

Contract/service agreement terms

Unplanned outage duration limit (min) 6

Maximum accumulated unplanned outage time (min/yr). Assuming 24/7 operation over a 12 month period(Outage due to planned maintenance is excluded)

520

2. Availability of Use (AUSE): The probability that the communication path between a single aircraft and ATSU is in service, when needed. (Impacts a single A/C within a FIR)Determines number of redundant components in A/C; one component can meet 0.993 availability

0.993

Page 11: ICAO-Paris 17-19 June 2015 Meetings Seminars and Workshops/NAT... · ICAO-Paris 17-19 June 2015 Wim Brondsema EUROCONTROL/HQ. Overview 2 Future EUR PBCS Plan Baseline 2 Performance

Baseline 1: Required Integrity (1)

11

ED120 provides safety requirements for the components of the operational system Integrity is defined as the acceptable rate of transactions having

undetectable errors and so by definition cannot be regularly monitored in service.

Integrity is achieved through system design, architecture and supporting analysis (e.g. CRC and FPL correlation with logon information)

System integrity issues discovered during operations should be reported to the Regional/State monitoring agency for further action

Integrity Requirements

Integrity parameter Integrity value Compliance means

Integrity (I) Malfunction = 10-5 /FH)

Analysis, safety requirements, development assurance level commensurate with integrity level, (compliance shown prior to operational implementation).

Page 12: ICAO-Paris 17-19 June 2015 Meetings Seminars and Workshops/NAT... · ICAO-Paris 17-19 June 2015 Wim Brondsema EUROCONTROL/HQ. Overview 2 Future EUR PBCS Plan Baseline 2 Performance

Baseline 1: Required Integrity (2)

12

Two End-system design SRs against corrupted/mis-delivered CPDLC messages 1. 32-bit E-to-E Application Message Integrity Check (AMIC): Part of each CPDLC

message • ‘Built-in’ Mitigation in CPDLC application in Aircraft and Ground systems• AMIC Contents: Data, FID, 24-bit AA, ICAO designator of CDA

2. 2nd Identifier for FPL/Aircraft association (DLIC/Logon or OLDI/LOF) and in CRC of each CPDLC message

• 1st Identifier = FID + ADEP + ADES • 2nd Identifier = 24-bit Aircraft Address

- Mandated by ICAO/Doc 7030 (EUR) and Doc 4444 (PANS-ATM)

Page 13: ICAO-Paris 17-19 June 2015 Meetings Seminars and Workshops/NAT... · ICAO-Paris 17-19 June 2015 Wim Brondsema EUROCONTROL/HQ. Overview 2 Future EUR PBCS Plan Baseline 2 Performance

Overview

13

Towards Baseline 2

Baseline 1 Performance Specs

Page 14: ICAO-Paris 17-19 June 2015 Meetings Seminars and Workshops/NAT... · ICAO-Paris 17-19 June 2015 Wim Brondsema EUROCONTROL/HQ. Overview 2 Future EUR PBCS Plan Baseline 2 Performance

Roadmap towards Baseline2

14

Today/Short-term Mid-term

2018

Initial 4DTrajectories &Airport Services

Initial Data LinkEn-route services

FANS & ATN-B1 FANS & Converged ATN-B2

Transition Co-existence

VDL M2

Transition Co-existence

SBB Inmarsat

SatCom compliant with AMS(R)S SARPs (Annex10 – volume III – Nov.2007)

Iridium systemClassicAero (Inmarsat; MTSAT)

around2025?

Iridium Next

Page 15: ICAO-Paris 17-19 June 2015 Meetings Seminars and Workshops/NAT... · ICAO-Paris 17-19 June 2015 Wim Brondsema EUROCONTROL/HQ. Overview 2 Future EUR PBCS Plan Baseline 2 Performance

Baseline 2 (Initial release) DL Services

15

FANS 1/AED122-SPR;ED100A-INT

AFN:DLIC (Logon,Contact)CPDLC: CRD; IER; AMC

ACM, PR, IERADS-C: PR; IER

ATN B2ED228-SPR; ED229-INT

ATN B1ED120-SPR; ED110B-INT; ED154(A)-INT

CM: DLIC(Logon, Contact)CPDLC: IER; CRD;AMC; ACM; DTAXI;

DCL; ITP; IM; OCLADS-C: PR; IER i4DTRAD: Use of CPDLC and ADS-CNote: PR, OCL, ITP, FIM are not used in continental EUR airspace

CM: DLIC(Logon, Contact)CPDLC: ACL; ACM; AMC

ARINC 623-2

ED85A ED106

DCL OCL

Mid-term

Today/Short-term Today/Short-term

Page 16: ICAO-Paris 17-19 June 2015 Meetings Seminars and Workshops/NAT... · ICAO-Paris 17-19 June 2015 Wim Brondsema EUROCONTROL/HQ. Overview 2 Future EUR PBCS Plan Baseline 2 Performance

Baseline 2: Towards Performance based Communications and Surveillance (PBCS)

16

SESAR(TBO)

NextGen(TBO, A-IM, DRNP)

ATN-B2ATN-B2

NAT ConOps(RLongSM and RLatSM)

FANS 1/A

RCP130RSP160

RCP240RSP180 RCP130

RSP160

SBB SatCom + Classical SatcomVDLM2/MF

+ SBB Satcom?VDL2/MFSBB SatCom

Mid-term

Air traffic management operations are becoming more dependent on communication and surveillance capabilities and performances

TBO: Trajectory Based OperationsRLongSM: Reduced Longitudinal Separation Minima; RLatSM: Reduced Latitude Separation MinimaSBB: Swift Broadband

Page 17: ICAO-Paris 17-19 June 2015 Meetings Seminars and Workshops/NAT... · ICAO-Paris 17-19 June 2015 Wim Brondsema EUROCONTROL/HQ. Overview 2 Future EUR PBCS Plan Baseline 2 Performance

Overview

17

Baseline 2 Performance Specs

Towards Baseline 2

Baseline 1 Performance Specs

Page 18: ICAO-Paris 17-19 June 2015 Meetings Seminars and Workshops/NAT... · ICAO-Paris 17-19 June 2015 Wim Brondsema EUROCONTROL/HQ. Overview 2 Future EUR PBCS Plan Baseline 2 Performance

Baseline 2 – DLS Performance SpecificationsCPDLC used for simple/complex clearances (i4D, DCL, DTAXI) and ATC CommCPDLC performance predicated on RCP130/RCP400-A2 specifications

Controller composes and sends ATC instruction

Controller receives indication of response

and understands it

Performance Parameters• Comm Transaction Time • Continuity• Availability• Integrity

Interoperability & functional definition

Page 19: ICAO-Paris 17-19 June 2015 Meetings Seminars and Workshops/NAT... · ICAO-Paris 17-19 June 2015 Wim Brondsema EUROCONTROL/HQ. Overview 2 Future EUR PBCS Plan Baseline 2 Performance

RSP160 Specification

Event

Interval

Interoperability & functional definition

ATSU/controller receives the surveillance data

RSP Parameters• Data delivery time• RSP continuity• RSP availability• RSP integrity

ADS-C performance predicated on RSP 160 specification Applies to EPP Reporting (Periodic/Event) for Conformance Monitoring

Page 20: ICAO-Paris 17-19 June 2015 Meetings Seminars and Workshops/NAT... · ICAO-Paris 17-19 June 2015 Wim Brondsema EUROCONTROL/HQ. Overview 2 Future EUR PBCS Plan Baseline 2 Performance

Baseline 2 – RCP130/RSP160 Specifications (Continental airspace)

ED228/DO350 (ATN-B2)RCP Specification RCP130 RCP400/A2

Parameter ET TT95% ET TT95%

Transaction Time (Sec) 130 67 400 350

Continuity (C) 0.999 0.95 0.999 0.95Availability (A) 0.989 0.989 Integrity (I) 1E-5/FH 1E-5/FH

Defined Allocations RCP 130 RCP 400/A2

Parameter ET TT95% 23 TT95%

Transaction Time (Sec)Initiator 30 13 30 13RCMP (TRN) 120 60 0.999 174Responder 100 44 371 161RCTP 32 20 32 20RCTPATSP (Combined ATSU & CSP/SSP) 23 14 23 14RCTPAircraft 23 10 23 10Continuity (C)

CATSU, CCSP/SSP, and CAircraft 0.999 0.95 0.95Availability (A)APROV 0.999 0.999AAircraft 0.99 0.99IntegrityIATSU 1E-5/FH 1E-5/FHICSP/SSP not specified not specifiedIAircraft 1E-5/FH 1E-5/FH

ED228/DO350 (ATN-B2)RSP Specification RSP 160

Parameter OT DT95%

Data Delivery Time (sec) 160 90

Continuity (C) 0.999 0.95Availability (A) 0.989

Integrity (I) 1E-5/FH

Defined Allocations RSP 160

Parameter OT DT95%

Data Delivery Time (sec)RSP = RSTP 160 90RSTPATSP(combined ATSU& CSP/SSP) 14 7RSTPCSP/SSP 12 5RSTPAircraft 159 86Continuity (C)

CATSU, CSP, and Aircraft 0.999 0.95Availability (A)APROV 0.999AAircraft 0.99

Integrity (I)IATSU 1E-5/FHICSP/SSP not specified IAircraft 1E-5/FH

20

Page 21: ICAO-Paris 17-19 June 2015 Meetings Seminars and Workshops/NAT... · ICAO-Paris 17-19 June 2015 Wim Brondsema EUROCONTROL/HQ. Overview 2 Future EUR PBCS Plan Baseline 2 Performance

Eligibility to operate Baseline 2 in EUR

ANSP Announcement of CPDLC and ADS-C Interoperability and operational

readiness in Aeronautical Information Publication (AIP).

Aircraft Operator (AO) Provision of CPDLC and ADS-C technical capability and operational

readiness in FPLo In Item 10A: Jx for CPDLC ATN-B2

: Px for RCP130 (In consultation with ICAO) : Px for RCP400/A2

o In Item 10A: D1 for ADS-C ATN-B2o In Item 18: SUR/RSP160 o In Item 18: CODE/24-bit Aircraft Address (6 hexadecimal chars)

Jx and D1 descriptors denote Interoperability for A/C equipmentRCP/RSP capability denotes Performance

21

Page 22: ICAO-Paris 17-19 June 2015 Meetings Seminars and Workshops/NAT... · ICAO-Paris 17-19 June 2015 Wim Brondsema EUROCONTROL/HQ. Overview 2 Future EUR PBCS Plan Baseline 2 Performance

Overview

22

Future EUR PBCS Plan

Baseline 2 Performance Specs

Towards Baseline 2

Baseline 1 Performance Specs

Page 23: ICAO-Paris 17-19 June 2015 Meetings Seminars and Workshops/NAT... · ICAO-Paris 17-19 June 2015 Wim Brondsema EUROCONTROL/HQ. Overview 2 Future EUR PBCS Plan Baseline 2 Performance

Basis for Future EUR PBCS Plan

ICAO Standards to be updated (OPDWG) o Annex 11 (RCP/RSP prescription)o Annex 6 (Operational authorization)o Doc 4444 (CPDLC Message set, Flight plan requirements)

ICAO Guidances Updates are in progress (OPDWG) o PBCS (Doc 9869) - Technical Guidance for Baseline 2 RCP/RSP specso GOLD (Doc xxxx) - Operational Guidance for Baseline 2 operations

Regional Doc 7030 to be updated

EUROCAE/RTCAo ED228/DO350 ‘B2 SPR) is published. Rev A is in progress o EDxxx/DO343A for SBB-Inmarsat and Iridium Next requirements is in progress

Community Specificationso New ETSI specs to be developed for B2o New EASA CS-ACNS to be developed for B2

23

Page 24: ICAO-Paris 17-19 June 2015 Meetings Seminars and Workshops/NAT... · ICAO-Paris 17-19 June 2015 Wim Brondsema EUROCONTROL/HQ. Overview 2 Future EUR PBCS Plan Baseline 2 Performance

Similar CPDLC Specs for B1 and B2

24

ED228 (ATN-B2) ED120 (ATN-B1) RCP Specification RCP130 RCP400/A2 N/A

Parameter ET TT95% ET TT95% ET TT95% Transaction Time (Sec) 130 67 400 350 N/A N/A Continuity (C) 0.999 0.95 0.999 0.95 0.999 0.95 Availability (A) 0.989 0.989 0.999 Integrity (I) 1E-5/FH 1E-5/FH 1E-5/FH

Defined Allocations RCP 130 RCP 400/A2 N/AParameter ET TT95% ET TT95% ET TT95% Transaction Time (Sec)Initiator 30 13 30 13 N/A N/A RCMP (TRN) 120 60 380 174 120 60 Responder 100 44 371 161 100 44 RCTP 32 20 32 20 20 16 RCTPATSP(Combined ATSU & CSP/SSP) 23 14 23 14 14 12 RCTPAircraft 23 10 23 10 6 4 Continuity (C)

CATSU, CCSP/SSP, and CAircraft 0.999 0.95 0.999 0.95 0.999 0.95 Availability (A) APROV 0.999 0.999 0.999 AAircraft 0.99 0.99 0.993 Integrity (I) IATSU 1E-5/FH 1E-5/FH 1E-5/FH ICSP/SSP not specified not specified not specified IAircraft 1E-5/FH 1E-5/FH 1E-5/FH

RCP: Required Communication Performance

Page 25: ICAO-Paris 17-19 June 2015 Meetings Seminars and Workshops/NAT... · ICAO-Paris 17-19 June 2015 Wim Brondsema EUROCONTROL/HQ. Overview 2 Future EUR PBCS Plan Baseline 2 Performance

B1 integration into Future EUR PBCS Plan?

Baseline 1/CPDLC supports ATC Comm function, which is also supported by Baseline 2. Same Performance Requirements Same Safety Requirements Same Safety Assessment approach (ED78A/DO264)

Compliance to RCP130 spec for B1 operations, rather than ED120 Reqs? Same spec in other CONT regions and EUR for En-route CPDLC

operations Allows performance capability indication in FPL More chance on compliance assurance Ensures integration with ICAO/PBCS concept, used in the rest of the

world EASA to streamline this when new B1 Regulation comes into force?

25

Page 26: ICAO-Paris 17-19 June 2015 Meetings Seminars and Workshops/NAT... · ICAO-Paris 17-19 June 2015 Wim Brondsema EUROCONTROL/HQ. Overview 2 Future EUR PBCS Plan Baseline 2 Performance

Questions?

26