IBS Brochure v4 - REHDA | Instituterehdainstitute.com/wp-content/uploads/2019/01/IBS... ·...

5
EXECUTIVE MASTERCLASS: Strategic Event Partner: Platinum Partner: Disclaimer Attendance: Participants must complete all aspects of the modules to be eligible for the Certificate of Attendance MASTERCLASS CONFERENCE 11 & 12 March 2019 13 March 2019 : : For more information please contact: Mr. Pearljit Singh | 016 3260 598 | [email protected] Ms. Karen Leong | 016 615 3877 | [email protected] 03 7803 6006 / 7006 [email protected]

Transcript of IBS Brochure v4 - REHDA | Instituterehdainstitute.com/wp-content/uploads/2019/01/IBS... ·...

Page 1: IBS Brochure v4 - REHDA | Instituterehdainstitute.com/wp-content/uploads/2019/01/IBS... · 2019-02-14 · Contact REHDA INSTITUTE REGISTRATION Tel: 03-7803 6006 H/P: 016 - 3260598

EXECUTIVE MASTERCLASS:

Strategic Event Partner: Platinum Partner:

DisclaimerAttendance: Participants mustcomplete all aspects of the modulesto be eligible for the Certificate of Attendance

MASTERCLASS

CONFERENCE

11 & 12 March 2019

13 March 2019

:

:

For more information please contact: Mr. Pearljit Singh | 016 3260 598 | [email protected]. Karen Leong | 016 615 3877 | [email protected]

03 7803 6006 / 7006 [email protected]

Page 2: IBS Brochure v4 - REHDA | Instituterehdainstitute.com/wp-content/uploads/2019/01/IBS... · 2019-02-14 · Contact REHDA INSTITUTE REGISTRATION Tel: 03-7803 6006 H/P: 016 - 3260598

ITINERARY

�������������������11 March 2019 @ Wisma REHDA, Petaling Jaya

Disclaimer: REHDA Institute reserves the right to replace/change speakers or some aspects of the itinerary in the best interest of the conference.

���������������� ������� ������������� ���

Advancement in Construc�on Technology through Industrialised Building System (IBS)Growth, innova�on and advancement of construc�on technologyPrefabrica�on & Modulariza�on Construc�on, Precast Concrete , System frameworkFuture trends of IBS: Benefits & Advantages Past & Current ProjectsOverview of Building Informa�on Modelling (BIM)

Speaker:Mr. Ahmad Farrin Mokhtar (General Manager of IBS Division, CIDB)

������� ������������

Project Planning in Industrialised Building System (IBS)Ini�a�on, planning, implementa�on, and closureRate of Work Progress over Project Time: IBS Project vs Conven�onal Approach

Speaker: Proposed Speaker from Brunsfield Interna�onal Group

BIM and Pla�orm Strategy for Industrialised Building System (IBS)Customizing the project housing solu�on/ layoutPlanning work ac�vi�es and iden�fy logis�cs op�onsStreamlining the site exercises & implemen�ng project execu�on plan

Speaker: Ms. Miranda Lui (Founder & Director, MES Digital Ltd & Chairlady, Global BIM Centre of Excellence Hong Kong)

�����

����

Overcoming the design dynamics incorpora�ng IBS in capital projectsDesign Philosophy: Design for Manufacture and Assembly (DFMA) Design on system & components of IBSArchitectural Design: Compa�bility

Speaker:Invited Phillip Langley (Board Director, Crea�ve Technologies, Bryden Wood Australia) / Ar. Zarim Abu Bakar (AK Rekatelier & Council Member of PAM)

����������� ���Increasing produc�vity in construc�on industry by integra�ng Building Informa�on Modelling (BIM) in IBSThe integra�on of Project Management to the core components of BIMFactors driving future use of IBS for non-usersNon-users’ current reasons for not using IBS on projectsImplemen�ng & demonstra�ng robust levels of governance thought project cycles

Speaker:Dr. Mohd Harris Ismail (CEO, Ascension Technology Sdn Bhd)

���������� �������

��������� ������� ��­

���������� ���

• •

••

•••

•••

••

•••

Page 3: IBS Brochure v4 - REHDA | Instituterehdainstitute.com/wp-content/uploads/2019/01/IBS... · 2019-02-14 · Contact REHDA INSTITUTE REGISTRATION Tel: 03-7803 6006 H/P: 016 - 3260598

Disclaimer: REHDA Institute reserves the right to replace/change speakers or some aspects of the itinerary in the best interest of the conference.

ITINERARY

�������������������12 March 2019 @ Wisma REHDA, Petaling Jaya���������������� ������� ������������� ���

Prefabricated Prefinished Volumetric Construc�on (PPVC)Produc�vity Rate of PPVCDesign Challenges of Using Steel PPVC in Residen�al Implementa�on and Challenges of Adop�ng Steel PPVC

Speaker:**Proposed Mr. Hugh Lim (CEO, Building and Construc�on Authority (BCA), Singapore)

������� ������������

Op�mising Efficiency and produc�vity in Digital IBSMass customiza�on and mass produc�on

Speaker: Invited Mr. Tan Ek Khai (General Manager, Gamuda IBS)

Transport & logis�cs concerns for assessing important aspects in having lis�ng of large structureImplementa�on of strategist and guidelinesChallenges in movement, li�ing and �me consumingInstalla�on

Speaker: Invited Speaker from Zhong Lian Transporta�on Sdn Bhd

���������� ���

��������� ������� ��­

����������� ���IBS content scoring system Recap on IBS component IBS Score for Structural System, Wall Systems, Other Simplified Construc�on Solu�ons & Project with Group of BuildingsSample calcula�onCalcula�on for construc�on area & wall lengths

Speaker:Ms. Suraya Johari (Technical & Design Manager, NS BlueScope Lysaght)

������������������

����

• ••

••

••

•••

Strengthening construc�on risk management & Safety Management Prac�ces Tools & strategist used for project planningRisk management during proposal stage, contract nego�a�ons, project execu�on and comple�onSafety Management Prac�ces

Speaker: Invited Mr. Chris Hillier (Group Execu�ve Director, Dscaff Group)

����

••

Page 4: IBS Brochure v4 - REHDA | Instituterehdainstitute.com/wp-content/uploads/2019/01/IBS... · 2019-02-14 · Contact REHDA INSTITUTE REGISTRATION Tel: 03-7803 6006 H/P: 016 - 3260598

�������������������12 March 2019 @ Wisma REHDA, Petaling Jaya

Disclaimer: REHDA Institute reserves the right to replace/change speakers or some aspects of the itinerary in the best interest of the conference.

ITINERARY

� ������������������­��������������������� ������� ������������������������ ��������­��� ��������������������������� ���� ���� ���� ������

��������� ���������

Invited YB Datuk Igna�us Darell Leiking (Minister of MITI) or YB Dr. Ong Kian Ming (Deputy Minister of MITI)

Op�mising Efficiency and Produc�vity in IBS

Func�onal & Sustainable Design for IBS Also Translates Into Cost Savings (Digital IBS)

����� ���

��������� ������� ��­

����� ���Affordable Housing Delivery Through Modern Construc�on Technologies

���������� �������

����� ���

••

••••

••

••

Presenta�on by MIDA / MITIPresenta�on by SME Bank

����� ���

Presenta�on by Datuk Ir. Elias Ismail (Senior General Manager of CIDB)Local Case Studies: Se�a PrecastLocal Case Studies: Gamuda IBSSummary with Panel Discussion Invited Moderator: Dato’ Soam Heng Choon (President, REHDA Malaysia)Guest Panellists:MBAM, CIDB, Gamadu IBS & Se�a Precast

���

���������� •

Presenta�on by PAMForeign Case Studies: Daiwa House Industry Co.Foreign Case Studies: Australia Summary with Panel DiscussionInvited Moderator:Dato’ Wan Hashimi Albakri (Chairman of Construc�on, Technology and Labour (CTL) Commi�e, REHDA Malaysia)Guest Panellist:PAM, Daiwa House

����

��������

����

Funding, Loans & Incen�ves for IBS��������

������ �����������

Presenta�on by CREAM, CIDBPresenta�on by Sime Darby PropertyPresenta�on by Architecture of Surbana JurongSummary with Panel DiscussionInvited Moderator: Tan Sri Datuk Eddy Chen (Chairman, Perbadanan PR1MA Malaysia & REHDA Ins�tute Trustee)

����•����

��������

Page 5: IBS Brochure v4 - REHDA | Instituterehdainstitute.com/wp-content/uploads/2019/01/IBS... · 2019-02-14 · Contact REHDA INSTITUTE REGISTRATION Tel: 03-7803 6006 H/P: 016 - 3260598

Contact REHDA INSTITUTEREGISTRATION

Tel: 03-7803 6006H/P: 016 - 3260598Mr. Pearljit Singh

Fax: 03-7880 3823E-mail:�[email protected]

REGISTRATION FORM

IBS Masterclass 2019

Bank drafts or cheque should be crossed and made payable to ‘REHDA Institute’. The cheque can be deposited to REHDA Institute’s Public Bank account no and fax the bank-in slip to 03-7880 3823.

Bank: Public Bank Name: REHDA Institute Account No: 31 3479 1907

Wisma REHDA, No. 2C, Jalan SS5D/6, Kelana Jaya 47301 Petaling Jaya, Selangor, Malaysia

www.rehdainstitute.com

Please read the terms and conditions below that will be binding on all participants and participating companies (REF:01012017)

REHDA Institute reserves the right to replace/change speakers or some aspects of the itinerary in the best interest of the conference.

Confirmation of Registration Participants/Participating company will need to send us back the registration form with their official company stamp as confirmation of their agreement with the organiser’s terms and conditions.

No cancellation Once we have received the registration form with the company’s stamp and seal, the organisers will allocate food, seating arrangements etc. for the delegates. Hence you will still be charged whether or not your participants turn up on the day.

Payments For registrants intending to take advantage of the discounted early bird price, please make full payment before the end of the early bird period. If payment are made AFTER the early bird period, the price invoiced will be changed to the full price. Kindly ensure that payments are made early to take advantage of the discounts.

All full payments must be made to the organisers before the actual event day. For those paying through bank transfers, please make sure you send us a copy of your bank in slip and details, else the payment may no be acknowledged by us.

The confirmation e-mail will be issued 7 days before the commencement of the event. In the vent you do not receive the confirmation letter, please contact us immediately.

Address

Company Name

Contact Number (Compulsory)

COMPANY DETAILS

ATTENDEE DETAILS

1

2

3

4

5

Company to invoice:

Job Title

EmailMobile (Compulsory)

Name

Company to invoice:

Job Title

EmailMobile (Compulsory)

Name

Company to invoice:

Job Title

EmailMobile (Compulsory)

Name

Company to invoice:

Job Title

EmailMobile (Compulsory)

Name

Company to invoice:

Job Title

EmailMobile (Compulsory)

Name

Tel

Company Stamp For Approval�

(Compulsory)

COMPANY KEY CONTACT PERSON

PAYMENT/ACCOUNT CONTACT PERSON IN CHARGE

Job Title

Job Title

Email

Email

Tel

Name

Name

* Please tick the relevant box above as appropriate.

Executive Masterclass+ IBS Conference

IBS Conference

Early Bird (before 19 February 2019)

REGISTRATION FEES (Course fee per participant)

RM 1099.00

RM 1899.00

RM 1399.00

RM 2199.00

Normal Price (after 19 February 2019)