Topics for the future Ian Bird WLCG Workshop, Barcelona, 9 th July 2014 9 July 2014 Ian Bird; Barcelona 1

description

3 LS1 Status Frédérick Bordry 28 th April 2014 Run 2Run 3 Run 4 LS 2 LS 3 LS 4LS 5Run 5 LS2 starting in 2018 (July)=> 18 months + 3 months BC LS3LHC: starting in 2023 =>30 months + 3 months BC Injectors: in 2024=>13 months + 3 months BC LHC roadmap: schedule beyond LS1 Beam commissioning Technical stop Shutdown Physics Run 2Run 3 Run 4 LS 2 LS 3 LS 4LS 5Run 5 (Extended) Year End Technical Stop: (E)YETS EYETS YETS 300 fb -1 3’000 fb fb -1 PHASE 1 PHASE 2

Transcript of Ian Bird WLCG Workshop, Barcelona, 9 th July 2014 9 July 2014 Ian Bird; Barcelona1.

Page 1: Ian Bird WLCG Workshop, Barcelona, 9 th July 2014 9 July 2014 Ian Bird; Barcelona1.

Topics for the future

Ian BirdWLCG Workshop, Barcelona, 9th July 2014

9 July 2014 Ian Bird; Barcelona 1

Page 2: Ian Bird WLCG Workshop, Barcelona, 9 th July 2014 9 July 2014 Ian Bird; Barcelona1.

Introduction• Successfully negotiated Run 1 – with great success

- Computing has become a recognised key tool• Significant experience and lessons gathered• Many ideas for evolution for Run 2

- Documented in the Computing Model Update document• Roles of Tiers, use of networks, federated data, clouds, opportunistic

resources, etc• Huge efforts in the experiments to improve efficiency – huge gains in

performance and memory use • Consolidation of operations/support activities

• Still much effort needed to live within likely resources (hardware and personnel)

• Now also time to look further forward

9 July 2014 Ian Bird; Barcelona 2

Page 3: Ian Bird WLCG Workshop, Barcelona, 9 th July 2014 9 July 2014 Ian Bird; Barcelona1.

3LS1 Status Frédérick Bordry 28th April 2014

Run 2 Run 3

Run 4

LS 2

LS 3

LS 4 LS 5Run 5

LS2 starting in 2018 (July) => 18 months + 3 months BC LS3 LHC: starting in 2023 => 30 months + 3 months BC

Injectors: in 2024 => 13 months + 3 months BC

LHC roadmap: schedule beyond LS1

Beam commissioning

Technical stop

ShutdownPhysics

LHCb b b b b b b b b b b b b o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o b b b b b b b b b b b b o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o

Injectorso o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o b b b b b b b b b b b b o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o

t

LHCo o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o b b b b b b b b b b b b o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o

Injectorso o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o b b b b b b b b b b b b o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o

LHCb b b b b b b b b b b b o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o b b b b b b b b b b b b o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o

Injectorsb b b b b b b b b b b b o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o b b b b b b b b b b b b o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o

2015 2016 2017 2018 2019Q4 Q1 Q2

2020 2021Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q3 Q4

2022 2023 2024 2025 2026 2027 2028

Q1 Q2 Q3 Q4 Q1 Q2Q3 Q4 Q1 Q2 Q3 Q4Q1 Q2 Q3

Q1 Q2 Q3 Q4Q1 Q2 Q3 Q4 Q1 Q2 Q1 Q2 Q3 Q4

2029 2030 2031 2032 2033 2034

Q3 Q4 Q1 Q2 Q3 Q4Q1 Q2 Q3 Q4 Q1 Q2Q3 Q4

Q2 Q3 Q4 Q1 Q2 Q32035

Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q4Q2 Q3 Q4 Q1 Q2 Q3Q4 Q1 Q2 Q3 Q4 Q1

Run 2 Run 3

Run 4

LS 2

LS 3

LS 4 LS 5Run 5

(Extended) Year End Technical Stop: (E)YETS

EYETSYETS YETS YETS

YETS

YETS

300 fb-1

3’000 fb-1

30 fb-1

PHASE 1

PHASE 2

Page 4: Ian Bird WLCG Workshop, Barcelona, 9 th July 2014 9 July 2014 Ian Bird; Barcelona1.

Scale of challenge …

26 February 2014 Ian Bird; Cloud Expo 2014 4

Data: ~25 PB/yr 400 PB/yr

Compute: Growth > x50

10 Year Horizon

What we think is affordable unless we do something differently

2010 2015 2018 2023

Page 5: Ian Bird WLCG Workshop, Barcelona, 9 th July 2014 9 July 2014 Ian Bird; Barcelona1.

What do we need to do?In the face of a huge increase in resource needs: Reduce costs

Flat budgets very optimistic Must optimise the use of what we (will) have

And easily make use of opportunistic and other resources Reduce cost of operation

Needs to be self sustaining, minimal staffing Effort is limited and do not have large EC etc projects

Move with evolving technology Clouds, IPV6/networks, processor architectures

Long term planning for HL-LHC timescale Probably needs significant changes in models

9 July 2014 Ian Bird; Barcelona 5

Page 6: Ian Bird WLCG Workshop, Barcelona, 9 th July 2014 9 July 2014 Ian Bird; Barcelona1.

Optimisation• Software improvements – to make better use of new CPU• But needs to be optimised vs memory, storage, I/O

performance, network etc- We need a global optimisation- Needs some quantitative results for further planning

• Some work started- Dirk Duellmann – TEG, and subsequent efforts- Some useful investigations CERN-Wigner- Probably need to strengthen this work and start to look at some key

metrics• Must be able to justify in concrete terms how we improve overall

performance / €- What are the metrics – useful and meaningful for us and

understandable to FA’s etc

9 July 2014 Ian Bird; Barcelona 6

Page 7: Ian Bird WLCG Workshop, Barcelona, 9 th July 2014 9 July 2014 Ian Bird; Barcelona1.

HEP Software Collaboration Foundation

Summary of the workshop held at CERN on April 3-4 2014

Page 8: Ian Bird WLCG Workshop, Barcelona, 9 th July 2014 9 July 2014 Ian Bird; Barcelona1.

Ian Bird; Barcelona 8

HEP SW: Goals• Goals of the initiative are to:

- better meet the rapidly growing needs for simulation, reconstruction and analysis of current and future HEP experiments,

- further promote the maintenance and development of common software projects and components for use in current and future HEP experiments,

- enable the emergence of new projects that aim to adapt to new technologies, improve the performance, provide innovative capabilities or reduce the maintenance effort

- enable potential new collaborators to become involved- identify priorities and roadmaps- promote collaboration with other scientific and software domains.

9 July 2014

Page 9: Ian Bird WLCG Workshop, Barcelona, 9 th July 2014 9 July 2014 Ian Bird; Barcelona1.

Status today• 12 White papers received (inc. original)

- http://hep-software-foundation.web.cern.ch/documents/white-papers-contributed-discussion-hep-software-foundation

- A lot of commonality – broad agreement on goals, the need, and lightweight structure

• Authors of these have been contacted to meet to try and reach a consensus on goals, structure, and how to set up a foundation- 1st meeting next week; - aim for 2nd workshop with a solid proposal later this

year9 July 2014 Ian Bird; Barcelona 9

Page 10: Ian Bird WLCG Workshop, Barcelona, 9 th July 2014 9 July 2014 Ian Bird; Barcelona1.

Clouds … ???

9 July 2014 Ian Bird; Barcelona 10

Page 11: Ian Bird WLCG Workshop, Barcelona, 9 th July 2014 9 July 2014 Ian Bird; Barcelona1.

Clouds all the way?• Many sites are deploying cloud stacks• Experiments have used many cloud instances

- WLCG sites; HLT farms; Helix Nebula; opportunistic uses; Amazon, Google, etc.

• What is our long term strategy here?• Some observations:

- Use of commercial and other resources is likely to be via some sort of cloud-like software

- Same for opportunistic use of academic or public e-infrastructures- Grid software requires support from our community

• no one else will do it• Not obvious we have the effort available now• Many cloud stacks have significant support/development/user

communities behind them

9 July 2014 Ian Bird; Barcelona 11

Page 12: Ian Bird WLCG Workshop, Barcelona, 9 th July 2014 9 July 2014 Ian Bird; Barcelona1.

Options• Do nothing in particular

- Continue to run grid services on top of these cloud installations

• Move to fully embrace cloud sw as the primary means to submit jobs to our sites

• Focus on pilot factories as the site entry and not worry (as a community) about how the site is managed

9 July 2014 Ian Bird; Barcelona 12

Page 13: Ian Bird WLCG Workshop, Barcelona, 9 th July 2014 9 July 2014 Ian Bird; Barcelona1.

But:• Can’t avoid some level of fairly complex

scheduling- We are not elastic – we are always resource-

constrained• Should clarify our strategy wrt

- Cloud interfaces, pilot factories, CE’s

9 July 2014 Ian Bird; Barcelona 13

Page 14: Ian Bird WLCG Workshop, Barcelona, 9 th July 2014 9 July 2014 Ian Bird; Barcelona1.

Reducing operational costs

9 July 2014 Ian Bird; Barcelona 14

Page 15: Ian Bird WLCG Workshop, Barcelona, 9 th July 2014 9 July 2014 Ian Bird; Barcelona1.

Possible actions• Reduce amount of middleware that we need to

support ourselves- Moving to clouds may help – but in short term maybe

more issues to address- BUT: there is middleware we require, that has missing

support• Continue to simplify site management and services

that are needed- See Wahid’s comment about storage- ATLAS comment about small sites- Use of BOINC-like service to better use sites and

opportunistic resources

9 July 2014 Ian Bird; Barcelona 15

Page 16: Ian Bird WLCG Workshop, Barcelona, 9 th July 2014 9 July 2014 Ian Bird; Barcelona1.

Can the EC help?• CERN has been discussing with the EC, in the context of its Helix Nebula

activities, about support for the procurement of IT products and services by the public sector.

• It is our understanding that the EC intends to publish details of a funding call, ICT-8, in November 2014 with a deadline for submission of April 2015.

• It is our belief that the ICT-8 call could offer an opportunity for EU-T0 to gain support from the EC for the procurement of state-of-the-art hardware.

• The proposal should focus on preparing and executing a cross-national procurement process linked to the foreseen upgrades of the EU-T0 sites across Europe.

• It would imply the sites agreeing to a common procurement technical specification and committing to procure for a stated amount. - The EC would then provide an additional 20% to supplement the procurement

engagement. • An important innovation that EU-T0 could bring would be to consider

specifications that are compatible with the open compute project (http://www.opencompute.org/) and show how this cross-national procurement model could be a model for ESFRI research infrastructure in different disciplines.

9 July 2014 Ian Bird; Barcelona 16

Page 17: Ian Bird WLCG Workshop, Barcelona, 9 th July 2014 9 July 2014 Ian Bird; Barcelona1.

9 July 2014 Ian Bird; Barcelona 17

Page 18: Ian Bird WLCG Workshop, Barcelona, 9 th July 2014 9 July 2014 Ian Bird; Barcelona1.

9 July 2014 Ian Bird; Barcelona 18

Page 19: Ian Bird WLCG Workshop, Barcelona, 9 th July 2014 9 July 2014 Ian Bird; Barcelona1.

External funding• In order to benefit it is clear that HEP-only proposals

will be unlikely to succeed- In Europe and USA

• We need to engage with initiatives like EU-T0, OSG, EGI and via WLCG members with other sciences- We need to show that our experience can be useful to

others- We need to ensure that our developments have an eye to

being broadly useful outside of LHC• But: we need to be careful that our effort is used in

directions that help us- Cannot afford a scatter-gun approach

9 July 2014 Ian Bird; Barcelona 19

Page 20: Ian Bird WLCG Workshop, Barcelona, 9 th July 2014 9 July 2014 Ian Bird; Barcelona1.

WLCG scope• Several discussions on how “WLCG” could

support other HEP and similar experiments- e.g. requests from Belle2, ILC, others

• WLCG organisation is scoped for LHC- But the infrastructure should be common

• Has been no clear answer to this • Perhaps EU-T0 is a mechanism for this in

Europe- But that omits the global reach of WLCG and HEP- ???

9 July 2014 Ian Bird; Barcelona 20

Page 21: Ian Bird WLCG Workshop, Barcelona, 9 th July 2014 9 July 2014 Ian Bird; Barcelona1.

Summary• Lots of preparation for Run 2

- Run 2 is largely an evolution of Run 1• Need to start thinking about the longer term

- Set up/reinvigorate working groups on specific areas - Brainstorming about the 10-year future

• Resources will be highly constrained in the next years- Cannot afford duplicate efforts - Have to collaborate on common tools as much as possible- We have the structure to collaborate – must take advantage

of it- Will also need to strongly prioritise where we should spend

the available effort

9 July 2014 Ian Bird; Barcelona 21