Ia 6 Eisenmann - Home - DRI Desert Research Institute710 MW Gas710 MW Gas-Fired (NG and BFG)Fired...

22
Field Demonstration of a Cost Effective Field Demonstration of a Cost-Effective Advanced Monitoring Solution – Deployment of a Predictive Emissions Deployment of a Predictive Emissions Monitoring System (PEMS) as a Complete Compliance Solution for a Large Compliance Solution for a Large Cogeneration Facility in the U.S. Abstract 157 Th Ei CMC S l ti LLC Thomas Eisenmann CMC Solutions, L.L.C. Brian G. Swanson (Panel Session Chair) CMC Solutions, L.L.C. Slide 1 CMC Solutions

Transcript of Ia 6 Eisenmann - Home - DRI Desert Research Institute710 MW Gas710 MW Gas-Fired (NG and BFG)Fired...

Page 1: Ia 6 Eisenmann - Home - DRI Desert Research Institute710 MW Gas710 MW Gas-Fired (NG and BFG)Fired (NG and BFG) Natural gas and blast furnace gas fired turbines and boilers with existing

Field Demonstration of a Cost EffectiveField Demonstration of a Cost-Effective Advanced Monitoring Solution –

Deployment of a Predictive EmissionsDeployment of a Predictive Emissions Monitoring System (PEMS) as a Complete

Compliance Solution for a LargeCompliance Solution for a Large Cogeneration Facility in the U.S.

Abstract 157

Th Ei CMC S l ti L L CThomas Eisenmann CMC Solutions, L.L.C.Brian G. Swanson (Panel Session Chair) CMC Solutions, L.L.C.

Slide 1CMC Solutions

Page 2: Ia 6 Eisenmann - Home - DRI Desert Research Institute710 MW Gas710 MW Gas-Fired (NG and BFG)Fired (NG and BFG) Natural gas and blast furnace gas fired turbines and boilers with existing

Definition of PEMS

A PEMS is a software based data acquisition qsystem that is interfaced with the process control

system and inputs from the combustion or pollution y p pcontrol process.

It utilizes these inputs to determine the emission rates of the various pollutants that are regulated

A PEMS has no gas analyzers like a CEMS -

rates of the various pollutants that are regulated.

A PEMS has no gas analyzers like a CEMS -Continuous Emissions Monitoring System

Slide 2CMC Solutions

Page 3: Ia 6 Eisenmann - Home - DRI Desert Research Institute710 MW Gas710 MW Gas-Fired (NG and BFG)Fired (NG and BFG) Natural gas and blast furnace gas fired turbines and boilers with existing

Typical PEMS Schematicyp

PEMS Component

(PEMS Server)

Slide 3CMC Solutions

Page 4: Ia 6 Eisenmann - Home - DRI Desert Research Institute710 MW Gas710 MW Gas-Fired (NG and BFG)Fired (NG and BFG) Natural gas and blast furnace gas fired turbines and boilers with existing

PEMS for Compliance with

40 CFR Part 60

p

40 CFR Part 60NEW SOURCE PERFORMANCE STANDARD

(Performance Standard PS 16 for PEMS)(Performance Standard PS-16 for PEMS)

40 CFR Part 7540 CFR Part 75TITLE IV ACID RAIN (Subpart E requirements

f lt ti th d )for alternative methods)

Other regulations as alternate to CEMS

Slide 4CMC Solutions

Page 5: Ia 6 Eisenmann - Home - DRI Desert Research Institute710 MW Gas710 MW Gas-Fired (NG and BFG)Fired (NG and BFG) Natural gas and blast furnace gas fired turbines and boilers with existing

Regulatory Selection Criteriag yMonitoring Primary Pollutants (NOx, SOx, CO) and

O2, CO2, VOC, NH3, H2S etc.

PEMS may be used as an alternative to CEMS for all gas- or oil-fired boilers ethanol plants forfor all gas- or oil-fired boilers, ethanol plants, for

gas-fired heaters, sewage sludge incinerators and simple or combined cycle turbinesand simple or combined cycle turbines

PEMS are allowed as alternatives to CEMS

Slide 5CMC Solutions

Page 6: Ia 6 Eisenmann - Home - DRI Desert Research Institute710 MW Gas710 MW Gas-Fired (NG and BFG)Fired (NG and BFG) Natural gas and blast furnace gas fired turbines and boilers with existing

Parametric SystemsyUp to 3 inputs with correlation to emissions Simple formulaic approachAccuracy is very limited y yPerformance will not be the same as CEMSNormally over reports emissions for the sourceNormally over-reports emissions for the sourceAcceptable for peaking units with less than 10% operating time in a year and for flares where site testing is not feasibleContinuous Parametric Monitoring System -CPMS

Slide 6CMC Solutions

CPMS

Page 7: Ia 6 Eisenmann - Home - DRI Desert Research Institute710 MW Gas710 MW Gas-Fired (NG and BFG)Fired (NG and BFG) Natural gas and blast furnace gas fired turbines and boilers with existing

Empirical Systemsp yMany inputs with correlation to emissionsP f b th CEMS ith i ilPerformance can be the same as a CEMS with similar quality assurance Collect Historical Training DatasetCollect Historical Training Dataset

Collect process and emission data for a period of 7 to 30 days under normal operating conditions

Empirical neural network and statistical hybrid PEMS models have been certified by Clean Airto 30 days under normal operating conditions

through full load with varying ambient rangeEmission data comes from existing CEMS or RM

PEMS models have been certified by Clean Air Markets Division

Emission data comes from existing CEMS or RM testing

Certification and Performance TestingCertification and Performance TestingPeriodic (annual or quarterly) testing to validate the emission levels at each load point

Slide 7CMC Solutions

emission levels at each load point

5/27/2010 10:36 AM

Page 8: Ia 6 Eisenmann - Home - DRI Desert Research Institute710 MW Gas710 MW Gas-Fired (NG and BFG)Fired (NG and BFG) Natural gas and blast furnace gas fired turbines and boilers with existing

PEMS Model Envelopep

Slide 8CMC Solutions5/27/2010 10:36 AM

Page 9: Ia 6 Eisenmann - Home - DRI Desert Research Institute710 MW Gas710 MW Gas-Fired (NG and BFG)Fired (NG and BFG) Natural gas and blast furnace gas fired turbines and boilers with existing

Empirical System Results (NOx & O2)x 2

Oil-fired boiler

Slide 9CMC Solutions

Page 10: Ia 6 Eisenmann - Home - DRI Desert Research Institute710 MW Gas710 MW Gas-Fired (NG and BFG)Fired (NG and BFG) Natural gas and blast furnace gas fired turbines and boilers with existing

Empirical System Results (CO & CO2)2

Oil-fired boiler

Slide 10CMC Solutions

Page 11: Ia 6 Eisenmann - Home - DRI Desert Research Institute710 MW Gas710 MW Gas-Fired (NG and BFG)Fired (NG and BFG) Natural gas and blast furnace gas fired turbines and boilers with existing

PEMS Periodic Quality ControlyPEMS is an Analyzer!

Sensor Validation Every minuteZero & Span DailyZero & Span DailyRAA (versus SRM) Quarterly in the first yearRATA AnnuallyInput failure detection Before RATABias check After RATAStatistical analysis After re-training of modelStatistical analysis After re training of modelInput failure alarms After re-training or RATA

Slide 11CMC Solutions

Page 12: Ia 6 Eisenmann - Home - DRI Desert Research Institute710 MW Gas710 MW Gas-Fired (NG and BFG)Fired (NG and BFG) Natural gas and blast furnace gas fired turbines and boilers with existing

RATA (RAA) ( )

"Relative Accuracy Test Audit“ Primary method of determining the correlation of CEMS / PEMS data to simultaneously collected reference ymethod test data, using no fewer than nine reference method test runs, conducted as ,outlined in 40 CFR 60, Appendix A.“RAA - Relative Accuracy Audit“ Alternative testRAA - Relative Accuracy Audit Alternative test procedure outlined in 40 CFR 60, Appendix F. No fewer than three reference method test runsthan three reference method test runs.

Slide 12CMC Solutions

Page 13: Ia 6 Eisenmann - Home - DRI Desert Research Institute710 MW Gas710 MW Gas-Fired (NG and BFG)Fired (NG and BFG) Natural gas and blast furnace gas fired turbines and boilers with existing

PEMS Cogeneration Facilityg y

710 MW Gas-Fired (NG and BFG)710 MW Gas Fired (NG and BFG)Natural gas and blast furnace gas fired

turbines and boilers with existing CEMS. U.S. EPA Part 75 NOx Trading, and Part 60U.S. EPA Part 75 NOx Trading, and Part 60

CO and SO2

Slide 13CMC Solutions

Page 14: Ia 6 Eisenmann - Home - DRI Desert Research Institute710 MW Gas710 MW Gas-Fired (NG and BFG)Fired (NG and BFG) Natural gas and blast furnace gas fired turbines and boilers with existing

PEMS Initial RATA Test0.1

0.08

0.09

0 05

0.06

0.07

mm

btu

RM

0.03

0.04

0.05

NO

x lb

/m

PEMSBoiler Gas

0.01

0.02

01 2 3 4 5 6 7 8 9 10 11 12

Test Run

Slide 14CMC Solutions

Page 15: Ia 6 Eisenmann - Home - DRI Desert Research Institute710 MW Gas710 MW Gas-Fired (NG and BFG)Fired (NG and BFG) Natural gas and blast furnace gas fired turbines and boilers with existing

PEMS Initial RATA Test0.034

0 032

0.033

0.031

0.032

s/m

mbt

u

RM

0.029

0.030

NO

x lb

s PEMS

0.028

0.029

Combined Cycle Turbine

0.0271 2 3 4 5 6 7 8 9

Test Run

Slide 15CMC Solutions

Page 16: Ia 6 Eisenmann - Home - DRI Desert Research Institute710 MW Gas710 MW Gas-Fired (NG and BFG)Fired (NG and BFG) Natural gas and blast furnace gas fired turbines and boilers with existing

PEMS Capital and O&M costp

CEMS vs. PEMS Quality AssuranceCEMS vs. PEMS Quality Assurance Costs about the same

PEMS vs. CEMS Initial Capital CostspAbout 50 % to 70 % of CEMS

PEMS vs. CEMS Operational CostsAbout 10 % to 30 % of CEMS

Slide 16CMC Solutions

Page 17: Ia 6 Eisenmann - Home - DRI Desert Research Institute710 MW Gas710 MW Gas-Fired (NG and BFG)Fired (NG and BFG) Natural gas and blast furnace gas fired turbines and boilers with existing

Cost PEMS vs. CEMS (Recent Example)

System Total 2 PEMS 2 CEMSyInitial System Costs:

I l di i t ll ti

$166K  $ 255K 

Including installation costs

Annual Costs: per year $30K $66KAnnual Costs: per year $30K $66KMaintenance Costs: per year $12K $54K

Annual System Cost $42K $120KAnnual System Cost Totals: 

$42K $120K

Grand Total:  $208K $375K

Slide 17CMC Solutions5/27/2010 10:36 AM

Page 18: Ia 6 Eisenmann - Home - DRI Desert Research Institute710 MW Gas710 MW Gas-Fired (NG and BFG)Fired (NG and BFG) Natural gas and blast furnace gas fired turbines and boilers with existing

PEMS Cogeneration Facilityg y

3 Turbines, 3 Boilers = 6 CEMS Retired• Initial certification in March 2004.

40 CFR P t 75 S b t E d t ti• 40 CFR Part 75 Subpart E demonstration completed Q3 2004. EPA Administrator approval received Q1, 2005

• This site turned off 6 CEMS in 6 shelters• This site turned off 6 CEMS in 6 shelters which eliminated over $300,000 per year in operational and maintenance costs!

Slide 18CMC Solutions

Page 19: Ia 6 Eisenmann - Home - DRI Desert Research Institute710 MW Gas710 MW Gas-Fired (NG and BFG)Fired (NG and BFG) Natural gas and blast furnace gas fired turbines and boilers with existing

PEMS BenefitsSignificantly lower capital expenditures A fraction the operational costs of a CEMSA fraction the operational costs of a CEMSMaintenance and repair costs virtually eliminatedIf a particular parameter is missing the model utilizes otherIf a particular parameter is missing, the model utilizes other available parameters for prediction – Hybrid aspect of the modelValid for normal operating conditions and during transitional states such as startup and shutdown.Accuracy equal to or better than a CEMSAccuracy equal to or better than a CEMSResilient to input failures Model can be setup by staff onsite or third party consultantsModel can be setup by staff onsite or third party consultantsPEMS can be used to determine the source of excess emissions; diagnostic tool to lower emissions

Slide 19CMC Solutions

; g

Page 20: Ia 6 Eisenmann - Home - DRI Desert Research Institute710 MW Gas710 MW Gas-Fired (NG and BFG)Fired (NG and BFG) Natural gas and blast furnace gas fired turbines and boilers with existing

PEMS Outside the USAsia: Countries with regulations following US EPA look for PEMS implementation Examples are Malaysia PhilippinesPEMS implementation. Examples are Malaysia Philippines, Korea, Singapore etc.

China will become a large market due to the extreme powerChina will become a large market due to the extreme power demand and the large number of suitable power and industrial plants. For China we are looking for partners.

Middle East: Strong activities in the United Arab Emirates and Saudi-Arabia. Many plants do not consider the use of CEMS

d l i l l PEMSand want to exclusively apply PEMS.

Europe: Some countries use PEMS in lieu of CEMS like the N th l d I l d Th l EU t i GNetherlands or Ireland. The large EU countries Germany, France, UK, Italy and Spain are starting now. PEMS already applied for small sources < 50 MW (GT).

Slide 20CMC Solutions

applied for small sources 50 MW (GT).

Page 21: Ia 6 Eisenmann - Home - DRI Desert Research Institute710 MW Gas710 MW Gas-Fired (NG and BFG)Fired (NG and BFG) Natural gas and blast furnace gas fired turbines and boilers with existing

Leapfroggingp gg gFor appropriate sources that need continuous

emissions monitoring under an enacted regulation, PEMS can be used in lieu of CEMS.

In case these sources do not have any monitoring, this could save the customer the initial

implementation of laborious and costly CEMS f Sbefore ultimately using PEMS.

Q lit f th it i lt llQuality of the monitoring results as well as availability could even be improved by PEMS.

Slide 21CMC Solutions

Page 22: Ia 6 Eisenmann - Home - DRI Desert Research Institute710 MW Gas710 MW Gas-Fired (NG and BFG)Fired (NG and BFG) Natural gas and blast furnace gas fired turbines and boilers with existing

Questions?

Thomas EisenmannThomas EisenmannVice President International Marketing

CMC Solutionsteisenmann@cmcsolutions [email protected]

Poeseldorfer Weg 320148 Hamburg

Phone +49 152 0153 7104Phone +49 152 0153 7104

Slide 22CMC Solutions5/27/2010 10:36 AM