I100 - ftp.envisionky.comftp.envisionky.com/OwensboroSeniorLiving/Owensboro Senior...CERAMIC OR...

22
1. ALL EXPOSED SURFACES TO BE PREPARED TO RECEIVE NEW FINISHES. 2. DO NOT SCALE DRAWINGS. 3. ALL MATERIALS TO BE INSTALLED PER MANUFACTURER'S SPECIFICATIONS. 4. NO SUBSTITUTIONS WITHOUT ARCHITECT'S OR BUILDING OWNER'S APPROVAL. 5. ALL CARPETING TO BE INSTALLED BY DIRECT GLUE METHOD OR PER MANUF. RECOMMENDATIONS, UNLESS NOTED OTHERWISE. 6. INSPECT ALL SURFACES TO RECEIVE NEW FINISHES. REPORT TO ARCHITECT ANY AREAS WHICH ARE NOT SUITABLE TO RECEIVE NEW FINISH PRIOR TO BEGINNING WORK. CONTACT ARCHITECT WITH ANY DISCREPANCIES IN PRODUCT QUALITY SUCH AS DYELOT VARIANCES, PRODUCT SHADING, ETC. DO NOT CONTINUE TO INSTALL PRODUCTS WITH POSSIBLE DEFECTS. 7. ALL MATERIALS SPECIFIED ARE AVAILABLE AS OF ORIGINAL DATE ON PLAN. KAAS WILSON ARCHITECTS IS NOT RESPONSIBLE FOR ANY MATERIALS ORDERED AFTER THIS DATE THAT ARE DISCONTINUED OR UNAVAILABLE. ANY SUBSTITUTIONS MUST BE REVIEWED & APPROVED BY ARCHITECT. 8. 48"H FRP AT ALL MOP SINKS 9. ALL FRP SEAMS AND EXPOSED EDGES TO HAVE COORDINATING TRIM. 10. GROUT LINES AT TILE FLOORS NOT TO EXCEED 3/16" WIDTH GROUT SELECTIONS TO BE SUBMITTED AND APPROVED BY DESIGNER. 11. CERAMIC OR PORCELAIN PLANK FLOOR TILES INSTALLED IN A BRICK PATTERN SHOULD NOT BE OFFSET MORE THAN 33% OF THE LENGTH OF THE TILE. SEE MANUFACTURER'S SPECIFICATIONS FOR MAXIMUM OFFSET TO PREVENT LIPPAGE FROM BOWING IN THE TILE. 12. A SCHLUTER DILEX COVE TRIM IS TO BE USED IN ALL COMMON BATHS AND SHOWER/TUB ROOMS WHERE WALL TILE MEETS FLOOR TILE AND A COVE TILE IS NOT SPECIFIED. SCHLUTER RONDEC TRIM ALONG TOP EDGE OF EXPOSED TILE. ALL SCHLUTER TRIMS TO BE NICKEL FINISH. 13. A SCHLUTER TRANSITION STRIP SHOULD BE USED BETWEEN DIFFERENT FLOORING MATERIAL TRANSITIONS IN COMMON SPACES. PROFILES AND FINISHES TO BE SUBMITTED TO ARCHITECT FOR APPROVAL. 14. ALL MISC METAL ITEMS THROUGHOUT SPACE (METAL SUPPORT BRACKETS, FIRE EXTINGUISHER HOUSINGS, ETC) TO BE PAINTED. ARCHITECT TO SPECIFY COLOR. 15. ALL VCT TILE TO BE INSTALLED IN "SAME DIRECTION" PATTERN OR AS SPECIFIED ON THE FLOOR FINISH PLAN. PRODUCT TO BE WASHED & WAXED AFTER INSTALLATION PER MANUFACTURER'S GUIDELINES. 16. ALL SHEET VINYL PRODUCTS TO BE INSTALLED PER FINISH FLOOR PLAN OR ARCHITECT'S SPECIFICATIONS. PRODUCT TO BE WASHED & WAXED AFTER INSTALLATION PER MANUFACTURER'S GUIDELINES. NOTE: SHEET VINYL PRODUCTS MAY REQUIRE 3-5 COATINGS OF APPROPRIATE METAL CROSSLINK ACRYLIC POLISH VERIFY WITH MANUFACTURER'S REPRESENTATIVE PER PRODUCT FOR EXACT SPECS & RECOMMENDATIONS. 17. FLOOR TRANSITIONS TO OCCUR UNDER DOOR, TYP. 18. ACCENT PAINT AT UNIT ENTRIES IN CORRIDOR, UNLESS NOTED OTHERWISE. ACCENT PAINT INCLUDES WALL WITH ENTRY DOOR AND TWO RETURN WALLS AT SIDES. 19. ASSUME CEILING WHITE TYP. ON CEILINGS IN UNITS AND COMMON AREAS AND DIFFERENT COLOR ON WALLS UNLESS NOTED OTHERWISE. FLAT FINISH THROUGHOUT. 20. ALL EXPOSED ENDS OF CASEWORK TO BE FINISHED. 21. UNDERSIDE OF ALL SOFFITS TO BE SMOOTH. CARRY WALL COLOR ON FACE OF SOFFIT, UNDERSIDE OF SOFFIT TO BE WHITE. 22. ALL CEILINGS TO BE FINE KD, EXECPT IN BATHROOMS (COMMONS & UNITS) WHICH ARE TO BE SMOOTH. WALLS TO BE FINE TEXTURE EXCEPT AT AREAS NOTED FOR WALL COVERING 23. AT ALL LOCATIONS WHERE VINYL WALL COVERING IS APPLIED TO AN EXTERIOR WALL, THE SAME PRODUCT WITH MIRCO- PERF/MICRO-VENT MUST BE USED. BREATHABLE PRIMERS/ADHESIVES MUST ALSO BE USED WITH THE MICRO-VENTED WALL COVERING SO NOT TO REDUCE THE PERMEABILITY OF THE INSTALLATION. SEE MANUFACTURER'S RECOMMONDATIONS FOR PRIMERS. 24. ALL COUNTER TOPS IN KITCHEN/WET AREAS TO GET POST-FORM EDGE W/INTEGRAL BACKSPLASH ALL COUNTERTOPS IN NON-WET AREAS TO GET SQUARE EDGE. 25. ALL OUTLETS IN STAINED WOOD WAINSCOT TO HAVE DARK BROWN OUTLET AND COVER. 26. ALL STAINED TRIM PIECES/BASE/PANELING TO BE MAPLE. 27. ALL COMMON AREA WALLS TO HAVE EGGSHELL SHEEN. UNITS TO BE FLAT, EXCEPT AT KITCHENS AND BATHROOMS WHICH ARE TO BE EGGSHELL. 28. ALL COMMON AREA WINDOWS RECEIVE 1X4 TRIM & HDWD EXTENSION JAMBS - PAINT OR STAIN TO MATCH ROOM TRIM. SEE DETAIL ON SHEET I800. 29. SEE I800 MILLWORK FOR ALL CHAIR RAIL DETAILS (CR-1 - CR-7) 30. WIRE PULLS ON BACK OF HOUSE/STAFF WORK AREAS, BAR PULLS IN ALL COMMON AREAS ON ALL CABINETS. 31. CONTRACTOR TO SUBMIT QTY. (1) SAMPLES/CUT SHEETS FOR ALL FINISH MATERIALS LISTED IN FINISH SCHEDULE TO ARCHITECT FOR APPROVAL PRIOR TO ORDERING PRODUCT. IF SAMPLES ARE NOT SUBMITTED, CONTRACTOR ASSUMES RESPONSIBILITY. INTERIOR FINISHES GENERAL NOTES Date Project Number 1301 American Blvd E Suite 100 Bloomington, MN 55425 tel: (612) 879 - 6000 fax: (612) 879 - 6666 www.kaaswilson.com Copyright Kaas Wilson Architects Owner: Project: kaas wilson architects PERMIT SET 1" = 10'-0" 1/31/2017 5:40:27 PM C:\Revit Local\1667-Hearth Development-Owensboro Senior Living_sstanke.rvt Room Finish Schedule 01/31/2017 1667 Owensboro Senior Living Hearth Development I100 3138 Fairview Drive Owensboro, KY 42303 Kitchen: Strategic Equipment & Supply 1203 33rd Street South St. Cloud, MN 56301 (302) 257-8802 MEP: The Matrix Group 311 East Chicago Street, Suite 310 Milwaukee, WI 53202 (414) 329-2827 Civil: Bryant Engineering Inc. 1535 Frederica St. P.O. Box 21382 Owensboro, KY 42304 270-685-2811 Structural: Advanced Structural Technologies, Inc. 7210 Metro Blvd Edina, MN 55439 (952) 854-9302 6750 Stillwater Blvd. N., Suite 200 Stillwater, MN 55082 (651)-705-8811 Floor & Wall Finish Schedule Code Finish Type Manufacturer Description Size Location Contact Comments BASE VB-1 VINYL BASE JOHNSONITE TRADITIONAL VINYL BASE W/TOE - COLOR #80 FAWN 4"H UNIT LAUNDRY, BACK OF HOUSE/STAFF AREAS WB-1 WOOD BASE 2 3/4" PAINTED POPLAR BASE, PRINCETON STYLE, PT-3 2-3/4"H UNITS WB-2 WOOD BASE 5-1/2"H COMMONS BASE - STAINED 5-1/2"H STAIN TO MATCH WD-1 WB-3 WOOD BASE FERCHE F275, PAINT WHITE - PT-3 4 1/4"H COMMONS - CORRIDORS, OFFICES/BACK OF HOUSE WB-4 WOOD BASE 5-1/2"H, PAINT WHITE - PT-3 5-1/2"H COMMONS CARPET CPT-1 CARPET SHAW QUEEN CARPET "CHART TOPPER II" ; COLOR, ACORN 00706 BROADLOOM MC UNITS MARCO SANTORI, ( DIRECT GLUE. 12' W OR 15' W CPT-2 CARPET PATCRAFT SOCRATES II; 10069 ; LOCKE 00111 BROADLOOM AL UNITS MARCO SANTORI, ( CPT-3 CARPET DURKAN BRAMBLE ROAD (851), CLASSICAL IDEAL. COLOR: CUSTOM TBD PER DESIGNER 12' BROADLOOM LOBBY INSET ANDI TISOR; (515)-554-2013 CPT-4 CARPET TILE (WALK OFF) PHILADELPHIA COMMERCIAL SUCCESSION II TILE, 00702 WOOD SMOKE 24" X 24" VESTIBLE, ELEVATOR CABS AL HENRY, (612) 867-4185 CPT-5 CARPET DURKAN BRAMBLE ROAD (851), CLASSICAL IDEAL. COLOR: CUSTOM TBD PER DESIGNER 12' BROADLOOM ELEVATOR LOBBY INSET ANDI TISOR; (515)-554-2013 CPT-6 CARPET DURKAN BRAMBLE ROAD (851), CLASSICAL ORDER. COLOR: CUSTOM TBD PER DESIGNER 12' BROADLOOM CORRIDOR ANDI TISOR; (515)-554-2013 CPT-7 CARPET J+J INVISION GRAND SALON 6581, 1836 SURREY, UPGRADE TO TITANBAC PLUS 12' BROADLOOM DINING ROOM TONY HILL, (763) 614-8896 CPT-8 CARPET TILE MILLIKEN PLANK MODULAR, PLA93 MAROONED, COMFORT PLUS CUSHION BACK 50CM X 50CM CLUB ROOM LISA KIRKBRIDE, (952) 451-8646 INSTALL: MONOLITHIC CPT-9 CARPET TILE J+J INVISION GREAT HALL MODULAR 7580, SURREY 1836 24" X 24" OFFICES / OFFICE CORRIDOR / FITNESS TONY HILL, (763) 614-8896 INSTALL: ASHLAR CPT-10 CARPET TILE J+J INVISION RUSTED MODULAR 7901, STIMULATE 1404 24" X 24" PRIVATE DINING & CONFERENCE BORDER TONY HILL, (763) 614-8896 INSTALL: MONOLITHIC CPT-11 CARPET J+J INVISION GARDEN GATE 6583, SURREY 1836 12' BROADLOOM CONFERENCE ROOM / THEATER TONY HILL, (763) 614-8896 CPT-12 CARPET J+J INVISION CONSERVATORY 6582, 1836 SURREY, PREMIERBAC PLUS 12' BROADLOOM PRIVATE DINING TONY HILL, (763) 614-8896 CPT-13 CARPET TILE PATCRAFT PROSE I0396, HAZY MIST 00530 24" X 24" MC CORRIDOR MICHELE GEARS, (952) 270-2484 CPT-14 CARPET J+J INVISION MERGE 3520, MINGLE 1450 12' BROADLOOM BOH STAIR CARPET TONY HILL, (763) 614-8896 CPT-15 CARPET DURKAN BRAMBLE ROAD (851), GILDED NARRATIVE. COLOR: CUSTOM TBD PER DESIGNER 12' BROADLOOM LIBRARY / MEZZANINE / MAIL LOUNGE ANDI TISOR; (515)-554-2013 CPT-16 CARPET DURKAN BRAMBLE ROAD (851), IDYLLIC CHARM; COLOR: CUSTOM TBD PER DESIGNER 12' BROADLOOM COMMUNITY ROOM ANDI TISOR; (515)-554-2013 CPT-17 CARPET TILE PATCRAFT URBAN GARDEN I0395, HAZY MIST 00530 24" X 24" MC DAYROOM / DINING MICHELE GEARS, (952) 270-2484 PAINT PT-1 PAINT SHERWIN WILLIAMS SW 7036 / ACCESSIBLE BEIGE UNITS PT-2 PAINT SHERWIN WILLIAMS SW 9132 / ACACIA HAZE MC UNIT ACCENT, MC DINING ABOVE CHAIR RAIL, MC DAYROOM BELOW CHAIR RAIL PT-3 PAINT BENJAMIN MOORE WHITE DOVE OC-17 CEILINGS, TRIM PT-4 PAINT SHERWIN WILLIAMS SW 6207 / RETREAT LEVEL 1 UNIT ENTRY ACCENT PT-5 PAINT SHERWIN WILLIAMS SW 6130 / MANNERED GOLD LEVEL 2 UNIT ENTRY ACCENT PT-6 PAINT SHERWIN WILLIAMS SW 6020 / MAROONED LEVEL 3 UNIT ENTRY ACCENT PT-7 PAINT SHERWIN WILLIAMS SW 6229 / TEMPE STAR LEVEL 4 UNIT ENTRY ACCENT PT-8 PAINT BENJAMIN MOORE ELMIRA WHITE HC-84 CORRIDOR - ABOVE CHAIR RAIL AND RECESS AT UNIT DOOR, CRAFT, OFFICES, BACK OF HOUSE PT-9 PAINT SHERWIN WILLIAMS SW 7047 PORPOISE CORRIDOR - BELOW CHAIR RAIL PT-10 PAINT SHERWIN WILLIAMS SW 9168 / ELEPHANT EAR COMMON BATHROOMS & TUB ROOMS PT-11 PAINT SHERWIN WILLIAMS SW 6188 / SHADE GROWN CLUB ROOM PT-12 PAINT SHERWIN WILLIAMS SW 7046 / ANONYMOUS THEATER PT-13 PAINT SHERWIN WILLIAMS SW 7633 / TAUPE TONE MAIN DINING PT-14 PAINT SHERWIN WILLIAMS SW 9013 / OLDEN AMBER MC CORRIDOR ACCENT PT-15 PAINT SHERWIN WILLIAMS SW 6204 / SEA SALT MC DINING ALOVE ABOVE CHAIR RAIL, MC DAYROOM ABOVE CHAIR RAIL, SENSORY PT-16 PAINT SHERWIN WILLIAMS SW 6019 / POETRY PLUM SALON/SALON ALCOVE ACCENT TILE CT-1 TILE RUBBLE TILE CAMBRIDGE OAK; BLACK; 636AL6P 6" x 36" LOBBY & VESTIBLE FLOOR ERIN NEWTON, (612) 735-8201 CT-2 TILE DALTILE BRICKWORK, PATIO BW03 4" X 8" CLUB ROOM BACK SPLASH JENNIFER EDWARDS, (651) 208-1596 INSTALL: HORIZONTAL 50% OFFSET CT-3 TILE KATE-LO TILE SLATY MULTICOLOR, EDSM-12X12 12" X 12" COMMON BATHROOM FLOOR ALISSA OLSON, (763) 417-3808 INSTALL: STACK BOND CT-4 MOSAIC CERAMIC TILEWORKS CTWSPL5/8ASPE, SAPEN GLASS & STONE 5/8"X5/8" MOSAIC 12" X 12" SHEET COMMON BATHROOM WALL ACCENT NICOLE BANASZEWSKI, (763) 493-5238 CT-5 TILE KATE-LO TILE REGAL TAUPE NY.RG.TPE.0624.MT, MATTE FINISH 6" X 24" COMMON BATHROOM WALL TILE ALISSA OLSON, (763) 417-3808 INSTALL: 1/3 OFFSET CT-6 TILE RUBBLE TILE AVANTI WHITE DECO TILE LUSTRE WHITE PATTERNED #410LUS081DECO 4" X 10" MC DAYROOM KITCHEN BACKSPLASH ERIN NEWTON, (612) 735-8201 INSTALL: HORIZONTAL 50% OFFSET CT-7 TILE TILEXDESIGN CITI TILE - CITI TILE - 4x10 BEVEL GLOSSY COMMUNITY ROOM KITCHEN BACKSPLASH CT-8 TILE WALKER ZANGER SM ECRU GLOSS PETIT IMPERIAL #1SMOECRGPETIMP44 4" X 4" MAIL LOUNGE BACK SPLASH QT-1 QUARRY TILE DALTILE QUARRY TEXTURES, ASHEN GRAY 0T03 6" X 6" SERVICE PANTRY & KITCHEN FLOOR JENNIFER EDWARDS, (651) 208-1596 COORDINATING COVE BASE & EPOXY GROUT VINYL FLOORING LV-1 LUXURY VINYL PLANK MOHAWK PORTICO COLLECTION, PERMANENCE PLUS, 2MM LUXURY VINYL, TOASTED CHESTNUT P9003-I09, 12MIL WEAR LAYER 6" X 48" AL/IL UNIT KITCHENS BASE GRADE JON LARSON, (612) 270-9156 LV-2 LUXURY VINYL PLANK MOHAWK PORTICO COLLECTION, PERMANENCE PLUS, 2MM LUXURY VINYL, CHOCOLATE OAK P9003-I06, 12MIL WEAR LAYER 6" x 48" AL/IL UNIT KITCHENS UPGRADE JON LARSON, (612) 270-9156 LV-3 LUXURY VINYL PLANK MOHAWK HOT AND HEAVY, SECOYA 872 PICTON PARK, FLOATING LVP 9" X 59" THROUGHOUT COMMONS MARY BERGREN, (952) 237-1061 IN CORRIDORS GRAIN SHOULD RUN PARALLEL TO WALLS AT ALL TIME, MITRE CORNERS, LVP IS SAME HEIGHT AS CARPET - DOES NOT REQUIRE TRANSITION STRIP - INSTALL WITH MILL EDGE NEXT TO CARPET WHEN CUT LENGTH-WISE LV-4 LUXURY VINYL PLANK PATCRAFT LETTERPRESS ; UNDERSCORE 00450 24" X 24" CRAFT ROOM MICHELE GEARS, (952) 270-2484 SEE FLOOR FINISH PLAN - 70% OF INTERACTIVE PATTER LV-5 LUXURY VINYL PLANK PATCRAFT LETTERPRESS ; SCRIPT 00530 24" X 24" CRAFT ROOM MICHELE GEARS, (952) 270-2484 SEE FLOOR FINISH PLAN -70% INTERACTIVE PATTERN SV-1 SHEET VINYL MANNINGTON JUMPSTART, CAMBRIDGE, LIMESTONE 71291 12' SHEET UNIT BATHROOMS KELLY LEINES, (763) 331-4860 SV-2 SHEET VINYL SHAW COMPACT 12 / 113 SURREY 12' SHEET MC KITCHENS MARCO SANTORI, ( SV-3 SHEET VINYL MANNINGTON INSIGHT PLUS 6606, CROSSBAR GRATE 12' SHEET LAUNDRY, MECH., STORAGE, ELEC KELLY LEINES, (763) 331-4860 SV-4 SHEET VINYL MANNINGTON INSIGHT PLUS 6659, WILD OAK SESSILE 12' SHEET STAFF BREAKROOM KELLY LEINES, (763) 331-4860 WALL COVERING VWC-1 VINYL WALL COVERING D.L. COUCH VERSA, ESTANCIA A137-255 54" WIDTH LEVEL 1 ELEVATOR LOBBY MAGGIE COSGROVE, (612) 886-4688 VWC-2 VINYL WALL COVERING D.L. COUCH SYMPHONY, ROCK 'N' SCROLL, AZ52931RS, PURPLE PRELUDE 54" WIDTH LEVEL 2 ELEVATOR LOBBY MAGGIE COSGROVE, (612) 886-4688 VWC-3 VINYL WALL COVERING D.L. COUCH SYMPHONY, ROCK 'N' SCROLL, AZ52466, ERIC PLANTINUM 54" WIDTH LEVEL 3 ELEVATOR LOBBY MAGGIE COSGROVE, (612) 886-4688 VWC-4 VINYL WALL COVERING D.L. COUCH SYMPHONY, ROCK 'N' SCROLL, AZ52932RS, SILVERWAY TO HEAVEN 54" WIDTH LEVEL 4 ELEVATOR LOBBY MAGGIE COSGROVE, (612) 886-4688 Room Finish Schedule Number Name Wall Finish Wainscot Floor Finish Base Finish Ceiling Finish Comments Level 1 150 Corridor PT-8/9/4 CR-6/7 CPT-6/LV-3 SEE CR-6 ACT-1 152 MC Corridor PT-15/2/14 CR-6 CPT-13 SEE CR-6 ACT-1 PT-15 ABOVE CHAIR RAIL, PT-2 BELOW CHAIR RAIL, PT-14 FOR UNIT ENTRY ACCENT 160 Club Room PT-11 CR-3 CPT-8 SEE CR-3 PT-3 161 Pr. Dining PT-6 CR-2 CPT-12/CPT-10 SEE CR-2 PT-3 162 Dining PT-13 CR-1 CPT-7/LV-3 SEE CR-1 PT-3 163 Mail Lounge PT-8/PT-11 CR-1 CPT-15 SEE CR-1 PT-3 164 Fort PT-8 - CPT-9 WB-3 PT-3 165 Vest. PT-13 - CPT-4/CT-1 WB-3 PT-3 166 Lobby PT-8 CR-4 CPT-3/CT-1 SEE CR-4 PT-3 167 Reception VWC-3 - CPT-9 WB-4 PT-3 168 Office Corridor PT-8 - CPT-9 WB-3 ACT-1 169 Conf. PT-13 CR-1 CPT-11/CPT-10 SEE CR-1 PT-3 170 Office PT-8 - CPT-9 WB-3 ACT-1 171 Office PT-8 - CPT-9 WB-3 ACT-1 172 Nurse PT-8 - CPT-9 WB-3 ACT-1 173 Office PT-8 - CPT-9 WB-3 ACT-1 174 Office PT-8 - CPT-9 WB-3 ACT-1 175 Service Corridor PT-8/9 CR-7 CPT-6/LV-3 WB-3 PT-3 176 Trash FRP ALL WALLS TO CEILING - SEALED CONC. VB-1 PT-3 177 Mens PT-10 CT-4/5 CT-3 CT-5 PT-3 TILE UP TO 5'H, SCHLUTER COVE 178 Womens PT-10 CT-4/5 CT-3 CT-5 PT-3 TILE UP TO 5'H, SCHLUTER COVE 179 Elev Lobby VWC-1 CR-1 LV-3/CPT-5 SEE CR-1 PT-3 180 Kitchen FRP - QT-1 QT-1 ACT-2 EPOXY GROUT 180A Dry Storage FRP - QT-1 QT-1 ACT-2 EPOXY GROUT 180B Kitchen Office PT-8 - QT-1 QT-1 ACT-2 EPOXY GROUT 181 Elev. Equip. PT-8 - SEALED CONC. VB-1 PT-3 182 Mech PT-8 - SEALED CONC. VB-1 PT-3 183 Laundry PT-8 - SV-3 VB-1 PT-3 184 Elec. PT-8 - SEALED CONC. VB-1 PT-3 185 MC Dining PT-15/2 CR-1 LV-3/CPT-17 SEE CR-1 PT-3/ACT-1 PT-2 ABOVE CHAIR RAIL IN DINING 186 Tub Room PT-10 CT-4/5 CT-3 CT-5 PT-3 TILE UP TO 5'H, SCHLUTER COVE 186-B MC Garden - - - - - 187 Unisex PT-10 CT-4/5 CT-3 CT-5 PT-3 TILE UP TO 5'H, SCHLUTER COVE 188 Sensory PT-15 - CPT-17 WB-3 PT-3 189 MC Dayroom PT-15/2 CR-5 CPT-17 SEE CR-5 PT-3 PT-15 ABOVE CHAIR RAIL / PT-2 BELOW CHAIR RAIL 190 Stair A PT-8 - CPT-14 WB-3 PT-3 191 Stair B PT-8 - CPT-14 WB-3 PT-3 192 Stair C PT-8 - CPT-14 WB-3 PT-3 Level 2 250 Corridor PT-8/9/5 CR-6/7 CPT-6/LV-3 SEE CR-6 PT-3 251 Corridor PT-8/9/5 CR-6/7 CPT-6/LV-3 SEE CR-6 PT-3 260 Deck - - - - - 261 Screened Porch - LV-3 WB-3 PT-3 262 Community Room PT-12/PT-6 CR-1 CPT-16/LV-3 SEE CR-1 PT-3 PT-6 ON ISLAND 263 Library VWC-3/PT-8 CR-1 CPT-15 SEE CR-1 PT-3 264 Act. Dir. PT-8 - CPT-9 WB-3 PT-3 266 Mezzanine PT-8/9 CPT-15 WB-3 PT-3 267 Exam PT-8 - LV-3 WB-3 ACT-1 268 Toilet PT-10 CT-4/5 CT-3 CT-5 PT-3 TILE UP TO 5'H, SCHLUTER COVE 269 Fitness PT-8 - CPT-9 WB-3 ACT-1 269a Fitness Alcove PT-8 - LV-3 WB-3 PT-3 270 Trash PT-8 - SV-3 VB-1 PT-3 EPOXY PAINT ON WALLS 277 Toilet PT-10 CT-4/5 CT-3 CT-5 PT-3 TILE UP TO 5'H, SCHLUTER COVE 278 Salon PT-8/PT-16 - LV-3 WB-3 PT-3 278a Salon Alcove PT-8/PT-16 - LV-3 WB-4 PT-3 279 Elev Lobby VWC-2 CR-1 CPT-5/LV-3 SEE CR-1 PT-3 280 Janitor PT-8 - SV-3 VB-1 PT-3 281 Elec PT-8 - SV-3 VB-1 PT-3 282 Staff PT-8 - SV-4 VB-1 PT-3 282a Staff Corridor PT-8 - LV-3 WB-3 PT-3 283 Laundry PT-8 - SV-3 VB-1 PT-3 284 Charting PT-8 - CPT-9 WB-3 PT-3 285 Theater PT-12 CR-5 CPT-11 SEE CR-5 ACT-3 BLACK ACT 290 Stair A PT-8 - CPT-14 WB-3 PT-3 291 Stair B PT-8 - CPT-14 WB-3 PT-3 292 Stair C PT-8 - CPT-14 WB-3 PT-3 Level 3 350 Corridor PT-8/9/6 CR-6/7 CPT-6/LV-3 SEE CR-6 PT-3 370 Trash PT-8 - SV-3 VB-1 PT-3 EPOXY PAINT ON WALLS 379 Elev Lobby VWC-3 CR-1 CPT-5/LV-3 SEE CR-1 PT-3 380 Janitor PT-8 - SV-3 VB-1 PT-3 381 Elec PT-8 - SV-3 VB-1 PT-3 382 Storage PT-8 - SV-3 VB-1 PT-3 382a Storage Corridor PT-8/9 - LV-3 WB-3 PT-3 383 Laundry PT-8 - SV-3 VB-1 PT-3 384 Charting PT-8 - CPT-9 WB-3 PT-3 385 Crafts PT-8 - LV-4/LV-5 WB-3 PT-3 386 Storage PT-8 - SV-3 VB-1 PT-3 390 Stair A PT-8 - CPT-14 WB-3 PT-3 391 Stair B PT-8 - CPT-14 WB-3 PT-3 392 Stair C PT-8 - CPT-14 WB-3 PT-3 Level 4 450 Corridor PT-8/9/7 CR-6/7 CPT-6/LV-3 SEE CR-6 PT-3 470 Trash PT-8 - SV-3 VB-1 PT-3 EXPOXY PAINT ON WALLS 479 Elev Lobby VWC-4 CR-1 CPT-5/LV-3 SEE CR-1 PT-3 480 Janitor PT-8 - SV-3 VB-1 PT-3 481 Elec PT-8 - SV-3 VB-1 PT-3 482 Storage PT-8 - SV-3 VB-1 PT-3 482a Storage Corridor PT-8/9 - LV-3 WB-3 PT-3 483 Laundry PT-8 - SV-3 VB-1 PT-3 484 Charting PT-8 - CPT-9 WB-3 PT-3 485 Res Storage PT-8 - SV-3 VB-1 PT-3 486 Tub Room PT-10 CT-5/CT-4 CT-3 CT-5 PT-3 TILE UP TO 5'H, SCHLUTER COVE 490 Stair A PT-8 - CPT-14 WB-3 PT-3 491 Stair B PT-8 - CPT-14 WB-3 PT-3 492 Stair C PT-8 - CPT-14 WB-3 PT-3 Millwork Finish Schedule Code Finish Type Manufacturer Description Location Comments METAL MTL-1 MAILBOX FINISH AF FLORENCE DARK BRONZE PMS BLACK 7C - FLAT FINISH MAIL CAFE PLASTIC LAMINATE PL-1 PLASTIC LAMINATE FORMICA FLAX GAUZE 7708-58 UNIT BASE GRADE & MC KITCHEN CTOPS PL-2 PLASTIC LAMINATE FORMICA 180FX BLUE FLOWER GRANITE 9304-43 ARTISAN FINISH UNIT KITCHENS FOR UPGRADE PACKAGE PL-3 PLASTIC LAMINATE WILSONART CAFELLE 7933K-07 DINING NSF CABINETS PL-4 PLASTIC LAMINATE WILSONART GESSO TRACERY 4962-38, FINE VELVET FINISH BACK OF HOUSE - SEE ELEVATIONS STONE BR-1 THIN BRICK GENERAL SHALE OLD BRICK ORIGINALS, PEPPERMILL THIN BRICK LOBBY FIREPLACE CONTACT: DON HERWEYER, BROCK WHITE (651) 289-1262 CM-1 CULTURED MARBLE PRINCESS MARBLE OR EQUAL WHITE ON WHITE #99, MATTE FINISH UNIT & COMMNONS - BATHROOM VANITY GR-1 GRANITE AMSUM & ASH ARIES WHITE RECEPTION DESK, MAIL CAFE, COMMUNITY ROOM & CLUB ROOM SEE ELEVATIONS & FINISH PLANS FOR LOCATIONS GR-2 GRANITE AMSUM & ASH MONT BLEU MC DINING ROOM SEE ELEVATIONS & FINISH PLANS FOR LOCATIONS QZ-1 QUARTZ SILESTONE ARCTIC OCEAN DINING BREAKFAST COUNTER WOOD WD-1 WOOD SMART CABINETS MAPLE PECAN STAIN - BRIGHTON PROFILE FOR CABINETS UNITS BASE GRADE PACKAGE WD-2 WOOD CABINETS SMART CABINETS MAPLE ROOT BEER STAIN - PROFILE CAROLINA UNIT CABINET UPGRADE & COMMONS 20% OF UNITS TO RECEIVE UPGRADED FINISH PACKAGE WD-3 WOOD PANEL TABLEAUX WOOD VENEER, PANEL SCREEN DEENNA 900; LESS DENSE DESIGN - CONTRACTOR TO PAINT PT-14 MC DAYROOM TYPICAL UNIT FINISH SCHEDULE Name Wall Finish Paint Floor Finish Floor Base Ceiling Finish Comments Living Room FINE KD/PT-1 FLAT CPT-1/CPT-2 WB-1 KD/PT-3 CPT-1 FOR MC, CPT-2 FOR AL Kitchen FINE KD/PT-1 EGG SHELL LV-1/LV-2/SV-1 WB-1 KD/PT-3 SV-1 IN MC, LV-1 BASE GRADE UNITS, LV-2 UPGRADE UNITS Bedroom FINE KD/PT-1 FLAT CPT-1/CPT-2 WB-1 KD/PT-3 CPT-1 FOR MC, CPT-2 FOR AL Bathroom SMOOTH/PT-1, PT-2 ACCENT EGG SHELL SV-1 WB-1 KD/PT-3 PT-2 ACCENT AT VANITY WALL FOR MC UNITS Entry Closet FINE KD/PT-1 FLAT LV/CPT WB-1 KD/PT-3 CARRY ADJACENT FLOORING INTO CLOSET, SEE UNIT PLANS FOR FLOORING TRANSITIONS Walk-In Closet FINE KD/PT-1 FLAT CPT-1/CPT-2 WB-1 KD/PT-3 CPT-1 FOR MC, CPT-2 FOR AL Laundry Closet FINE KD/PT-1 FLAT SV-1 WB-1 KD/PT-3 R e v . N o . R e v i s i o n D a t e

Transcript of I100 - ftp.envisionky.comftp.envisionky.com/OwensboroSeniorLiving/Owensboro Senior...CERAMIC OR...

Page 1: I100 - ftp.envisionky.comftp.envisionky.com/OwensboroSeniorLiving/Owensboro Senior...CERAMIC OR PORCELAIN PLANK FLOOR TILES INSTALLED IN A BRICK PATTERN SHOULD NOT BE OFFSET MORE THAN

1. ALL EXPOSED SURFACES TO BE PREPARED TO RECEIVE NEW FINISHES.

2. DO NOT SCALE DRAWINGS.

3. ALL MATERIALS TO BE INSTALLED PER MANUFACTURER'S SPECIFICATIONS.

4. NO SUBSTITUTIONS WITHOUT ARCHITECT'S OR BUILDING OWNER'S APPROVAL.

5. ALL CARPETING TO BE INSTALLED BY DIRECT GLUE METHOD OR PER MANUF. RECOMMENDATIONS, UNLESS NOTED OTHERWISE.

6. INSPECT ALL SURFACES TO RECEIVE NEW FINISHES. REPORT TO ARCHITECT ANY AREAS WHICH ARE NOT SUITABLE TO RECEIVE NEW FINISH PRIOR TO BEGINNING WORK. CONTACT ARCHITECT WITH ANY DISCREPANCIES IN PRODUCT QUALITY SUCH AS DYELOT VARIANCES, PRODUCT SHADING, ETC. DO NOT CONTINUE TO INSTALL PRODUCTS WITH POSSIBLE DEFECTS.

7. ALL MATERIALS SPECIFIED ARE AVAILABLE AS OF ORIGINAL DATE ON PLAN. KAAS WILSON ARCHITECTS IS NOT RESPONSIBLE FOR ANY MATERIALS ORDERED AFTER THIS DATE THAT ARE DISCONTINUED OR UNAVAILABLE. ANY SUBSTITUTIONS MUST BE REVIEWED & APPROVED BY ARCHITECT.

8. 48"H FRP AT ALL MOP SINKS

9. ALL FRP SEAMS AND EXPOSED EDGES TO HAVE COORDINATING TRIM.

10. GROUT LINES AT TILE FLOORS NOT TO EXCEED 3/16" WIDTH GROUT SELECTIONS TO BE SUBMITTED AND APPROVED BY DESIGNER.

11. CERAMIC OR PORCELAIN PLANK FLOOR TILES INSTALLED IN A BRICK PATTERN SHOULD NOT BE OFFSET MORE THAN 33% OF THE LENGTH OF THE TILE. SEE MANUFACTURER'S SPECIFICATIONS FOR MAXIMUM OFFSET TO PREVENT LIPPAGE FROM BOWING IN THE TILE.

12. A SCHLUTER DILEX COVE TRIM IS TO BE USED IN ALL COMMON BATHS AND SHOWER/TUB ROOMS WHERE WALL TILE MEETS FLOOR TILE AND A COVE TILE IS NOT SPECIFIED. SCHLUTER RONDEC TRIM ALONG TOP EDGE OF EXPOSED TILE. ALL SCHLUTER TRIMS TO BE NICKEL FINISH.

13. A SCHLUTER TRANSITION STRIP SHOULD BE USED BETWEEN DIFFERENT FLOORING MATERIAL TRANSITIONS IN COMMON SPACES. PROFILES AND FINISHES TO BE SUBMITTED TO ARCHITECT FOR APPROVAL.

14. ALL MISC METAL ITEMS THROUGHOUT SPACE (METAL SUPPORT BRACKETS, FIRE EXTINGUISHER HOUSINGS, ETC) TO BE PAINTED. ARCHITECT TO SPECIFY COLOR.

15. ALL VCT TILE TO BE INSTALLED IN "SAME DIRECTION" PATTERN OR AS SPECIFIED ON THE FLOOR FINISH PLAN. PRODUCT TO BE WASHED & WAXED AFTER INSTALLATION PER MANUFACTURER'S GUIDELINES.

16. ALL SHEET VINYL PRODUCTS TO BE INSTALLED PER FINISH FLOOR PLAN OR ARCHITECT'S SPECIFICATIONS. PRODUCT TO BE WASHED & WAXED AFTER INSTALLATION PER MANUFACTURER'S GUIDELINES. NOTE: SHEET VINYL PRODUCTS MAY REQUIRE 3-5 COATINGS OF APPROPRIATE METAL CROSSLINK ACRYLIC POLISH VERIFY WITH MANUFACTURER'S REPRESENTATIVE PER PRODUCT FOR EXACT SPECS & RECOMMENDATIONS.

17. FLOOR TRANSITIONS TO OCCUR UNDER DOOR, TYP.

18. ACCENT PAINT AT UNIT ENTRIES IN CORRIDOR, UNLESS NOTED OTHERWISE. ACCENT PAINT INCLUDES WALL WITH ENTRY DOOR AND TWO RETURN WALLS AT SIDES.

19. ASSUME CEILING WHITE TYP. ON CEILINGS IN UNITS AND COMMON AREAS AND DIFFERENT COLOR ON WALLS UNLESS NOTED OTHERWISE. FLAT FINISH THROUGHOUT.

20. ALL EXPOSED ENDS OF CASEWORK TO BE FINISHED.

21. UNDERSIDE OF ALL SOFFITS TO BE SMOOTH. CARRY WALL COLOR ON FACE OF SOFFIT, UNDERSIDE OF SOFFIT TO BE WHITE.

22. ALL CEILINGS TO BE FINE KD, EXECPT IN BATHROOMS (COMMONS & UNITS) WHICH ARE TO BE SMOOTH. WALLS TO BE FINE TEXTURE EXCEPT AT AREAS NOTED FOR WALL COVERING

23. AT ALL LOCATIONS WHERE VINYL WALL COVERING IS APPLIED TO AN EXTERIOR WALL, THE SAME PRODUCT WITH MIRCO-PERF/MICRO-VENT MUST BE USED. BREATHABLE PRIMERS/ADHESIVES MUST ALSO BE USED WITH THE MICRO-VENTED WALL COVERING SO NOT TO REDUCE THE PERMEABILITY OF THE INSTALLATION. SEE MANUFACTURER'S RECOMMONDATIONS FOR PRIMERS.

24. ALL COUNTER TOPS IN KITCHEN/WET AREAS TO GET POST-FORM EDGE W/INTEGRAL BACKSPLASH ALL COUNTERTOPS IN NON-WET AREAS TO GET SQUARE EDGE.

25. ALL OUTLETS IN STAINED WOOD WAINSCOT TO HAVE DARK BROWN OUTLET AND COVER.

26. ALL STAINED TRIM PIECES/BASE/PANELING TO BE MAPLE.

27. ALL COMMON AREA WALLS TO HAVE EGGSHELL SHEEN. UNITS TO BE FLAT, EXCEPT AT KITCHENS AND BATHROOMS WHICH ARE TO BE EGGSHELL.

28. ALL COMMON AREA WINDOWS RECEIVE 1X4 TRIM & HDWD EXTENSION JAMBS - PAINT OR STAIN TO MATCH ROOM TRIM. SEE DETAIL ON SHEET I800.

29. SEE I800 MILLWORK FOR ALL CHAIR RAIL DETAILS (CR-1 - CR-7)

30. WIRE PULLS ON BACK OF HOUSE/STAFF WORK AREAS, BAR PULLS IN ALL COMMON AREAS ON ALL CABINETS.

31. CONTRACTOR TO SUBMIT QTY. (1) SAMPLES/CUT SHEETS FOR ALL FINISH MATERIALS LISTED IN FINISH SCHEDULE TO ARCHITECT FOR APPROVAL PRIOR TO ORDERING PRODUCT. IF SAMPLES ARE NOT SUBMITTED, CONTRACTOR ASSUMES RESPONSIBILITY.

INTERIOR FINISHES GENERAL NOTES

Date

Project Number

1301 American Blvd ESuite 100Bloomington, MN 55425tel: (612) 879-6000fax: (612) 879-6666www.kaaswilson.com

Copyr

ight K

aas

Wils

on A

rchite

cts

Ow

ner:

Pro

ject

:

kaas wilson

architects

PERMIT SET

1" = 10'-0"

1/3

1/2

01

7 5

:40:2

7 P

MC

:\R

evit L

ocal\1

667

-He

art

h D

evelo

pm

en

t-O

wen

sb

oro

Se

nio

r Liv

ing_ssta

nke.r

vt

Room FinishSchedule

01/31/2017

1667

Ow

ensb

oro

Senio

r Li

ving

Heart

h D

evelo

pm

ent

I100

3138 F

airvie

w D

rive

Ow

ensboro

, K

Y 4

2303

Kitchen:Strategic Equipment & Supply1203 33rd Street South St.Cloud, MN 56301(302) 257-8802

MEP:The Matrix Group311 East Chicago Street,Suite 310Milwaukee, WI 53202(414) 329-2827

Civil:Bryant Engineering Inc.1535 Frederica St.P.O. Box 21382Owensboro, KY 42304270-685-2811

Structural:Advanced StructuralTechnologies, Inc.7210 Metro BlvdEdina, MN 55439(952) 854-9302

67

50

Stillw

ate

r B

lvd. N

., S

uite 2

00

Stillw

ate

r, M

N 5

50

82

(65

1)-

705-8

811

Floor & Wall Finish Schedule

Code Finish Type Manufacturer Description Size Location Contact Comments

BASE

VB-1 VINYL BASE JOHNSONITE TRADITIONAL VINYL BASE W/TOE - COLOR #80 FAWN 4"H UNIT LAUNDRY, BACK OF HOUSE/STAFF AREAS

WB-1 WOOD BASE 2 3/4" PAINTED POPLAR BASE, PRINCETON STYLE,PT-3

2-3/4"H UNITS

WB-2 WOOD BASE 5-1/2"H COMMONS BASE - STAINED 5-1/2"H STAIN TO MATCH WD-1

WB-3 WOOD BASE FERCHE F275, PAINT WHITE - PT-3 4 1/4"H COMMONS - CORRIDORS, OFFICES/BACK OFHOUSE

WB-4 WOOD BASE 5-1/2"H, PAINT WHITE - PT-3 5-1/2"H COMMONS

CARPET

CPT-1 CARPET SHAW QUEEN CARPET "CHART TOPPER II" ; COLOR, ACORN00706

BROADLOOM MC UNITS MARCO SANTORI, ( DIRECT GLUE. 12' W OR 15' W

CPT-2 CARPET PATCRAFT SOCRATES II; 10069 ; LOCKE 00111 BROADLOOM AL UNITS MARCO SANTORI, (

CPT-3 CARPET DURKAN BRAMBLE ROAD (851), CLASSICAL IDEAL. COLOR:CUSTOM TBD PER DESIGNER

12' BROADLOOM LOBBY INSET ANDI TISOR;(515)-554-2013

CPT-4 CARPET TILE(WALK OFF)

PHILADELPHIACOMMERCIAL

SUCCESSION II TILE, 00702 WOOD SMOKE 24" X 24" VESTIBLE, ELEVATOR CABS AL HENRY, (612) 867-4185

CPT-5 CARPET DURKAN BRAMBLE ROAD (851), CLASSICAL IDEAL. COLOR:CUSTOM TBD PER DESIGNER

12' BROADLOOM ELEVATOR LOBBY INSET ANDI TISOR;(515)-554-2013

CPT-6 CARPET DURKAN BRAMBLE ROAD (851), CLASSICAL ORDER. COLOR:CUSTOM TBD PER DESIGNER

12' BROADLOOM CORRIDOR ANDI TISOR;(515)-554-2013

CPT-7 CARPET J+J INVISION GRAND SALON 6581, 1836 SURREY, UPGRADE TOTITANBAC PLUS

12' BROADLOOM DINING ROOM TONY HILL, (763) 614-8896

CPT-8 CARPET TILE MILLIKEN PLANK MODULAR, PLA93 MAROONED, COMFORTPLUS CUSHION BACK

50CM X 50CM CLUB ROOM LISA KIRKBRIDE, (952)451-8646

INSTALL: MONOLITHIC

CPT-9 CARPET TILE J+J INVISION GREAT HALL MODULAR 7580, SURREY 1836 24" X 24" OFFICES / OFFICE CORRIDOR / FITNESS TONY HILL, (763) 614-8896 INSTALL: ASHLAR

CPT-10 CARPET TILE J+J INVISION RUSTED MODULAR 7901, STIMULATE 1404 24" X 24" PRIVATE DINING & CONFERENCE BORDER TONY HILL, (763) 614-8896 INSTALL: MONOLITHIC

CPT-11 CARPET J+J INVISION GARDEN GATE 6583, SURREY 1836 12' BROADLOOM CONFERENCE ROOM / THEATER TONY HILL, (763) 614-8896

CPT-12 CARPET J+J INVISION CONSERVATORY 6582, 1836 SURREY, PREMIERBACPLUS

12' BROADLOOM PRIVATE DINING TONY HILL, (763) 614-8896

CPT-13 CARPET TILE PATCRAFT PROSE I0396, HAZY MIST 00530 24" X 24" MC CORRIDOR MICHELE GEARS, (952)270-2484

CPT-14 CARPET J+J INVISION MERGE 3520, MINGLE 1450 12' BROADLOOM BOH STAIR CARPET TONY HILL, (763) 614-8896

CPT-15 CARPET DURKAN BRAMBLE ROAD (851), GILDED NARRATIVE. COLOR:CUSTOM TBD PER DESIGNER

12' BROADLOOM LIBRARY / MEZZANINE / MAIL LOUNGE ANDI TISOR;(515)-554-2013

CPT-16 CARPET DURKAN BRAMBLE ROAD (851), IDYLLIC CHARM; COLOR:CUSTOM TBD PER DESIGNER

12' BROADLOOM COMMUNITY ROOM ANDI TISOR;(515)-554-2013

CPT-17 CARPET TILE PATCRAFT URBAN GARDEN I0395, HAZY MIST 00530 24" X 24" MC DAYROOM / DINING MICHELE GEARS, (952)270-2484

PAINT

PT-1 PAINT SHERWINWILLIAMS

SW 7036 / ACCESSIBLE BEIGE UNITS

PT-2 PAINT SHERWINWILLIAMS

SW 9132 / ACACIA HAZE MC UNIT ACCENT, MC DINING ABOVE CHAIRRAIL, MC DAYROOM BELOW CHAIR RAIL

PT-3 PAINT BENJAMIN MOORE WHITE DOVE OC-17 CEILINGS, TRIM

PT-4 PAINT SHERWINWILLIAMS

SW 6207 / RETREAT LEVEL 1 UNIT ENTRY ACCENT

PT-5 PAINT SHERWINWILLIAMS

SW 6130 / MANNERED GOLD LEVEL 2 UNIT ENTRY ACCENT

PT-6 PAINT SHERWINWILLIAMS

SW 6020 / MAROONED LEVEL 3 UNIT ENTRY ACCENT

PT-7 PAINT SHERWINWILLIAMS

SW 6229 / TEMPE STAR LEVEL 4 UNIT ENTRY ACCENT

PT-8 PAINT BENJAMIN MOORE ELMIRA WHITE HC-84 CORRIDOR - ABOVE CHAIR RAIL AND RECESSAT UNIT DOOR, CRAFT, OFFICES, BACK OFHOUSE

PT-9 PAINT SHERWINWILLIAMS

SW 7047 PORPOISE CORRIDOR - BELOW CHAIR RAIL

PT-10 PAINT SHERWINWILLIAMS

SW 9168 / ELEPHANT EAR COMMON BATHROOMS & TUB ROOMS

PT-11 PAINT SHERWINWILLIAMS

SW 6188 / SHADE GROWN CLUB ROOM

PT-12 PAINT SHERWINWILLIAMS

SW 7046 / ANONYMOUS THEATER

PT-13 PAINT SHERWINWILLIAMS

SW 7633 / TAUPE TONE MAIN DINING

PT-14 PAINT SHERWINWILLIAMS

SW 9013 / OLDEN AMBER MC CORRIDOR ACCENT

PT-15 PAINT SHERWINWILLIAMS

SW 6204 / SEA SALT MC DINING ALOVE ABOVE CHAIR RAIL, MCDAYROOM ABOVE CHAIR RAIL, SENSORY

PT-16 PAINT SHERWINWILLIAMS

SW 6019 / POETRY PLUM SALON/SALON ALCOVE ACCENT

TILE

CT-1 TILE RUBBLE TILE CAMBRIDGE OAK; BLACK; 636AL6P 6" x 36" LOBBY & VESTIBLE FLOOR ERIN NEWTON, (612)735-8201

CT-2 TILE DALTILE BRICKWORK, PATIO BW03 4" X 8" CLUB ROOM BACK SPLASH JENNIFER EDWARDS,(651) 208-1596

INSTALL: HORIZONTAL 50% OFFSET

CT-3 TILE KATE-LO TILE SLATY MULTICOLOR, EDSM-12X12 12" X 12" COMMON BATHROOM FLOOR ALISSA OLSON, (763)417-3808

INSTALL: STACK BOND

CT-4 MOSAIC CERAMICTILEWORKS

CTWSPL5/8ASPE, SAPEN GLASS & STONE 5/8"X5/8"MOSAIC

12" X 12" SHEET COMMON BATHROOM WALL ACCENT NICOLE BANASZEWSKI,(763) 493-5238

CT-5 TILE KATE-LO TILE REGAL TAUPE NY.RG.TPE.0624.MT, MATTE FINISH 6" X 24" COMMON BATHROOM WALL TILE ALISSA OLSON, (763)417-3808

INSTALL: 1/3 OFFSET

CT-6 TILE RUBBLE TILE AVANTI WHITE DECO TILE LUSTRE WHITEPATTERNED #410LUS081DECO

4" X 10" MC DAYROOM KITCHEN BACKSPLASH ERIN NEWTON, (612)735-8201

INSTALL: HORIZONTAL 50% OFFSET

CT-7 TILE TILEXDESIGN CITI TILE - CITI TILE - 4x10 BEVEL GLOSSY COMMUNITY ROOM KITCHEN BACKSPLASH

CT-8 TILE WALKER ZANGER SM ECRU GLOSS PETIT IMPERIAL#1SMOECRGPETIMP44

4" X 4" MAIL LOUNGE BACK SPLASH

QT-1 QUARRY TILE DALTILE QUARRY TEXTURES, ASHEN GRAY 0T03 6" X 6" SERVICE PANTRY & KITCHEN FLOOR JENNIFER EDWARDS,(651) 208-1596

COORDINATING COVE BASE & EPOXY GROUT

VINYL FLOORING

LV-1 LUXURY VINYLPLANK

MOHAWK PORTICO COLLECTION, PERMANENCE PLUS, 2MMLUXURY VINYL, TOASTED CHESTNUT P9003-I09, 12MILWEAR LAYER

6" X 48" AL/IL UNIT KITCHENS BASE GRADE JON LARSON, (612)270-9156

LV-2 LUXURY VINYLPLANK

MOHAWK PORTICO COLLECTION, PERMANENCE PLUS, 2MMLUXURY VINYL, CHOCOLATE OAK P9003-I06, 12MILWEAR LAYER

6" x 48" AL/IL UNIT KITCHENS UPGRADE JON LARSON, (612)270-9156

LV-3 LUXURY VINYLPLANK

MOHAWK HOT AND HEAVY, SECOYA 872 PICTON PARK,FLOATING LVP

9" X 59" THROUGHOUT COMMONS MARY BERGREN, (952)237-1061

IN CORRIDORS GRAIN SHOULD RUN PARALLEL TO WALLS AT ALL TIME,MITRE CORNERS, LVP IS SAME HEIGHT AS CARPET - DOES NOT REQUIRETRANSITION STRIP - INSTALL WITH MILL EDGE NEXT TO CARPET WHENCUT LENGTH-WISE

LV-4 LUXURY VINYLPLANK

PATCRAFT LETTERPRESS ; UNDERSCORE 00450 24" X 24" CRAFT ROOM MICHELE GEARS, (952)270-2484

SEE FLOOR FINISH PLAN - 70% OF INTERACTIVE PATTER

LV-5 LUXURY VINYLPLANK

PATCRAFT LETTERPRESS ; SCRIPT 00530 24" X 24" CRAFT ROOM MICHELE GEARS, (952)270-2484

SEE FLOOR FINISH PLAN -70% INTERACTIVE PATTERN

SV-1 SHEET VINYL MANNINGTON JUMPSTART, CAMBRIDGE, LIMESTONE 71291 12' SHEET UNIT BATHROOMS KELLY LEINES, (763)331-4860

SV-2 SHEET VINYL SHAW COMPACT 12 / 113 SURREY 12' SHEET MC KITCHENS MARCO SANTORI, (

SV-3 SHEET VINYL MANNINGTON INSIGHT PLUS 6606, CROSSBAR GRATE 12' SHEET LAUNDRY, MECH., STORAGE, ELEC KELLY LEINES, (763)331-4860

SV-4 SHEET VINYL MANNINGTON INSIGHT PLUS 6659, WILD OAK SESSILE 12' SHEET STAFF BREAKROOM KELLY LEINES, (763)331-4860

WALL COVERING

VWC-1 VINYL WALLCOVERING

D.L. COUCH VERSA, ESTANCIA A137-255 54" WIDTH LEVEL 1 ELEVATOR LOBBY MAGGIE COSGROVE,(612) 886-4688

VWC-2 VINYL WALLCOVERING

D.L. COUCH SYMPHONY, ROCK 'N' SCROLL, AZ52931RS, PURPLEPRELUDE

54" WIDTH LEVEL 2 ELEVATOR LOBBY MAGGIE COSGROVE,(612) 886-4688

VWC-3 VINYL WALLCOVERING

D.L. COUCH SYMPHONY, ROCK 'N' SCROLL, AZ52466, ERICPLANTINUM

54" WIDTH LEVEL 3 ELEVATOR LOBBY MAGGIE COSGROVE,(612) 886-4688

VWC-4 VINYL WALLCOVERING

D.L. COUCH SYMPHONY, ROCK 'N' SCROLL, AZ52932RS,SILVERWAY TO HEAVEN

54" WIDTH LEVEL 4 ELEVATOR LOBBY MAGGIE COSGROVE,(612) 886-4688

Room Finish Schedule

Number Name Wall Finish Wainscot Floor Finish Base Finish Ceiling Finish Comments

Level 1

150 Corridor PT-8/9/4 CR-6/7 CPT-6/LV-3 SEE CR-6 ACT-1

152 MC Corridor PT-15/2/14 CR-6 CPT-13 SEE CR-6 ACT-1 PT-15 ABOVE CHAIR RAIL, PT-2BELOW CHAIR RAIL, PT-14 FORUNIT ENTRY ACCENT

160 Club Room PT-11 CR-3 CPT-8 SEE CR-3 PT-3

161 Pr. Dining PT-6 CR-2 CPT-12/CPT-10 SEE CR-2 PT-3

162 Dining PT-13 CR-1 CPT-7/LV-3 SEE CR-1 PT-3

163 Mail Lounge PT-8/PT-11 CR-1 CPT-15 SEE CR-1 PT-3

164 Fort PT-8 - CPT-9 WB-3 PT-3

165 Vest. PT-13 - CPT-4/CT-1 WB-3 PT-3

166 Lobby PT-8 CR-4 CPT-3/CT-1 SEE CR-4 PT-3

167 Reception VWC-3 - CPT-9 WB-4 PT-3

168 Office Corridor PT-8 - CPT-9 WB-3 ACT-1

169 Conf. PT-13 CR-1 CPT-11/CPT-10 SEE CR-1 PT-3

170 Office PT-8 - CPT-9 WB-3 ACT-1

171 Office PT-8 - CPT-9 WB-3 ACT-1

172 Nurse PT-8 - CPT-9 WB-3 ACT-1

173 Office PT-8 - CPT-9 WB-3 ACT-1

174 Office PT-8 - CPT-9 WB-3 ACT-1

175 Service Corridor PT-8/9 CR-7 CPT-6/LV-3 WB-3 PT-3

176 Trash FRP ALLWALLS TOCEILING

- SEALED CONC. VB-1 PT-3

177 Mens PT-10 CT-4/5 CT-3 CT-5 PT-3 TILE UP TO 5'H, SCHLUTER COVE

178 Womens PT-10 CT-4/5 CT-3 CT-5 PT-3 TILE UP TO 5'H, SCHLUTER COVE

179 Elev Lobby VWC-1 CR-1 LV-3/CPT-5 SEE CR-1 PT-3

180 Kitchen FRP - QT-1 QT-1 ACT-2 EPOXY GROUT

180A Dry Storage FRP - QT-1 QT-1 ACT-2 EPOXY GROUT

180B Kitchen Office PT-8 - QT-1 QT-1 ACT-2 EPOXY GROUT

181 Elev. Equip. PT-8 - SEALED CONC. VB-1 PT-3

182 Mech PT-8 - SEALED CONC. VB-1 PT-3

183 Laundry PT-8 - SV-3 VB-1 PT-3

184 Elec. PT-8 - SEALED CONC. VB-1 PT-3

185 MC Dining PT-15/2 CR-1 LV-3/CPT-17 SEE CR-1 PT-3/ACT-1 PT-2 ABOVE CHAIR RAIL IN DINING

186 Tub Room PT-10 CT-4/5 CT-3 CT-5 PT-3 TILE UP TO 5'H, SCHLUTER COVE

186-B MC Garden - - - - -

187 Unisex PT-10 CT-4/5 CT-3 CT-5 PT-3 TILE UP TO 5'H, SCHLUTER COVE

188 Sensory PT-15 - CPT-17 WB-3 PT-3

189 MC Dayroom PT-15/2 CR-5 CPT-17 SEE CR-5 PT-3 PT-15 ABOVE CHAIR RAIL / PT-2BELOW CHAIR RAIL

190 Stair A PT-8 - CPT-14 WB-3 PT-3

191 Stair B PT-8 - CPT-14 WB-3 PT-3

192 Stair C PT-8 - CPT-14 WB-3 PT-3

Level 2

250 Corridor PT-8/9/5 CR-6/7 CPT-6/LV-3 SEE CR-6 PT-3

251 Corridor PT-8/9/5 CR-6/7 CPT-6/LV-3 SEE CR-6 PT-3

260 Deck - - - - -

261 Screened Porch - LV-3 WB-3 PT-3

262 Community Room PT-12/PT-6 CR-1 CPT-16/LV-3 SEE CR-1 PT-3 PT-6 ON ISLAND

263 Library VWC-3/PT-8 CR-1 CPT-15 SEE CR-1 PT-3

264 Act. Dir. PT-8 - CPT-9 WB-3 PT-3

266 Mezzanine PT-8/9 CPT-15 WB-3 PT-3

267 Exam PT-8 - LV-3 WB-3 ACT-1

268 Toilet PT-10 CT-4/5 CT-3 CT-5 PT-3 TILE UP TO 5'H, SCHLUTER COVE

269 Fitness PT-8 - CPT-9 WB-3 ACT-1

269a Fitness Alcove PT-8 - LV-3 WB-3 PT-3

270 Trash PT-8 - SV-3 VB-1 PT-3 EPOXY PAINT ON WALLS

277 Toilet PT-10 CT-4/5 CT-3 CT-5 PT-3 TILE UP TO 5'H, SCHLUTER COVE

278 Salon PT-8/PT-16 - LV-3 WB-3 PT-3

278a Salon Alcove PT-8/PT-16 - LV-3 WB-4 PT-3

279 Elev Lobby VWC-2 CR-1 CPT-5/LV-3 SEE CR-1 PT-3

280 Janitor PT-8 - SV-3 VB-1 PT-3

281 Elec PT-8 - SV-3 VB-1 PT-3

282 Staff PT-8 - SV-4 VB-1 PT-3

282a Staff Corridor PT-8 - LV-3 WB-3 PT-3

283 Laundry PT-8 - SV-3 VB-1 PT-3

284 Charting PT-8 - CPT-9 WB-3 PT-3

285 Theater PT-12 CR-5 CPT-11 SEE CR-5 ACT-3 BLACK ACT

290 Stair A PT-8 - CPT-14 WB-3 PT-3

291 Stair B PT-8 - CPT-14 WB-3 PT-3

292 Stair C PT-8 - CPT-14 WB-3 PT-3

Level 3

350 Corridor PT-8/9/6 CR-6/7 CPT-6/LV-3 SEE CR-6 PT-3

370 Trash PT-8 - SV-3 VB-1 PT-3 EPOXY PAINT ON WALLS

379 Elev Lobby VWC-3 CR-1 CPT-5/LV-3 SEE CR-1 PT-3

380 Janitor PT-8 - SV-3 VB-1 PT-3

381 Elec PT-8 - SV-3 VB-1 PT-3

382 Storage PT-8 - SV-3 VB-1 PT-3

382a Storage Corridor PT-8/9 - LV-3 WB-3 PT-3

383 Laundry PT-8 - SV-3 VB-1 PT-3

384 Charting PT-8 - CPT-9 WB-3 PT-3

385 Crafts PT-8 - LV-4/LV-5 WB-3 PT-3

386 Storage PT-8 - SV-3 VB-1 PT-3

390 Stair A PT-8 - CPT-14 WB-3 PT-3

391 Stair B PT-8 - CPT-14 WB-3 PT-3

392 Stair C PT-8 - CPT-14 WB-3 PT-3

Level 4

450 Corridor PT-8/9/7 CR-6/7 CPT-6/LV-3 SEE CR-6 PT-3

470 Trash PT-8 - SV-3 VB-1 PT-3 EXPOXY PAINT ON WALLS

479 Elev Lobby VWC-4 CR-1 CPT-5/LV-3 SEE CR-1 PT-3

480 Janitor PT-8 - SV-3 VB-1 PT-3

481 Elec PT-8 - SV-3 VB-1 PT-3

482 Storage PT-8 - SV-3 VB-1 PT-3

482a Storage Corridor PT-8/9 - LV-3 WB-3 PT-3

483 Laundry PT-8 - SV-3 VB-1 PT-3

484 Charting PT-8 - CPT-9 WB-3 PT-3

485 Res Storage PT-8 - SV-3 VB-1 PT-3

486 Tub Room PT-10 CT-5/CT-4 CT-3 CT-5 PT-3 TILE UP TO 5'H, SCHLUTER COVE

490 Stair A PT-8 - CPT-14 WB-3 PT-3

491 Stair B PT-8 - CPT-14 WB-3 PT-3

492 Stair C PT-8 - CPT-14 WB-3 PT-3

Millwork Finish Schedule

Code Finish Type Manufacturer Description Location Comments

METAL

MTL-1 MAILBOX FINISH AF FLORENCE DARK BRONZE PMS BLACK 7C - FLAT FINISH MAIL CAFE

PLASTIC LAMINATE

PL-1 PLASTIC LAMINATE FORMICA FLAX GAUZE 7708-58 UNIT BASE GRADE & MC KITCHEN CTOPS

PL-2 PLASTIC LAMINATE FORMICA 180FX BLUE FLOWER GRANITE 9304-43 ARTISAN FINISH UNIT KITCHENS FOR UPGRADE PACKAGE

PL-3 PLASTIC LAMINATE WILSONART CAFELLE 7933K-07 DINING NSF CABINETS

PL-4 PLASTIC LAMINATE WILSONART GESSO TRACERY 4962-38, FINE VELVET FINISH BACK OF HOUSE - SEE ELEVATIONS

STONE

BR-1 THIN BRICK GENERAL SHALE OLD BRICK ORIGINALS, PEPPERMILL THIN BRICK LOBBY FIREPLACE CONTACT: DON HERWEYER, BROCK WHITE (651) 289-1262

CM-1 CULTURED MARBLE PRINCESS MARBLE OREQUAL

WHITE ON WHITE #99, MATTE FINISH UNIT & COMMNONS - BATHROOM VANITY

GR-1 GRANITE AMSUM & ASH ARIES WHITE RECEPTION DESK, MAIL CAFE, COMMUNITY ROOM & CLUB ROOM SEE ELEVATIONS & FINISH PLANS FOR LOCATIONS

GR-2 GRANITE AMSUM & ASH MONT BLEU MC DINING ROOM SEE ELEVATIONS & FINISH PLANS FOR LOCATIONS

QZ-1 QUARTZ SILESTONE ARCTIC OCEAN DINING BREAKFAST COUNTER

WOOD

WD-1 WOOD SMART CABINETS MAPLE PECAN STAIN - BRIGHTON PROFILE FOR CABINETS UNITS BASE GRADE PACKAGE

WD-2 WOOD CABINETS SMART CABINETS MAPLE ROOT BEER STAIN - PROFILE CAROLINA UNIT CABINET UPGRADE & COMMONS 20% OF UNITS TO RECEIVE UPGRADED FINISH PACKAGE

WD-3 WOOD PANEL TABLEAUX WOOD VENEER, PANEL SCREEN DEENNA 900; LESS DENSE DESIGN- CONTRACTOR TO PAINT PT-14

MC DAYROOM

TYPICAL UNIT FINISH SCHEDULE

Name Wall Finish PaintFloorFinish Floor Base

CeilingFinish Comments

Living Room FINE KD/PT-1 FLAT CPT-1/CPT-2 WB-1 KD/PT-3 CPT-1 FOR MC, CPT-2 FOR AL

Kitchen FINE KD/PT-1 EGG SHELL LV-1/LV-2/SV-1 WB-1 KD/PT-3 SV-1 IN MC, LV-1 BASE GRADE UNITS, LV-2 UPGRADE UNITS

Bedroom FINE KD/PT-1 FLAT CPT-1/CPT-2 WB-1 KD/PT-3 CPT-1 FOR MC, CPT-2 FOR AL

Bathroom SMOOTH/PT-1,PT-2 ACCENT

EGG SHELL SV-1 WB-1 KD/PT-3 PT-2 ACCENT AT VANITY WALL FOR MC UNITS

Entry Closet FINE KD/PT-1 FLAT LV/CPT WB-1 KD/PT-3 CARRY ADJACENT FLOORING INTO CLOSET, SEE UNIT PLANSFOR FLOORING TRANSITIONS

Walk-In Closet FINE KD/PT-1 FLAT CPT-1/CPT-2 WB-1 KD/PT-3 CPT-1 FOR MC, CPT-2 FOR AL

Laundry Closet FINE KD/PT-1 FLAT SV-1 WB-1 KD/PT-3

Rev.

No.

Revi

sion

Date

Page 2: I100 - ftp.envisionky.comftp.envisionky.com/OwensboroSeniorLiving/Owensboro Senior...CERAMIC OR PORCELAIN PLANK FLOOR TILES INSTALLED IN A BRICK PATTERN SHOULD NOT BE OFFSET MORE THAN

W/D

W/D

W/D

REF.

DW

Seat

W/D

REF.

DW

Seat

W/D

DW

REF.

DW

REF.

DW

REF.

FDFD

DWREF.WW

DD

RE

F.

RE

F.

REF.

REF.

DW

REF.

FD

FD

FD

RE

F.

RE

F.

RE

F.

RE

F.

REF.

RE

F.

REF.

REF.

REF.

RE

F.

RE

F.

RE

F.

RE

F.

REF.

RE

F.

RE

F.

RE

F.

RE

F.

UP

MA

IL C

UB

BIE

S

1872

43" MIN. CLEAR

34DR

43" MIN. CLEAR

34DR

HDRL

HDRL

Unit C1

A4561

100

Unit C1

A4561

101

Unit A1

A4511

103

Unit A1

A4511

104

Club Room

160

Pr. Dining

161

Unit A4

A4531

102

Stair A

190

MATCH LINE

I400

2

I410

2

I900

2

FE

Unit MC A1 - ACC

A4601

134

Unit MC A1 - ACC

A4601

135

Unit MC S1

A4602

133

Unit MC S2

A4611

132

Unit MC S1

A4602

131

Unit MC S2

A4611

129

Unit MC S1

A4602

130

Unit MC S1

A4602

127

Unit MC S1

A4602

125

Unit MC S2

A4611

126

Unit MC S1

A4602

124

Unit MC S2

A4611

120

Unit MC S1

A4602

118

Unit MC S1

A4602

136

Unit MC S2

A4611

138

Unit MC S1

A4602

140

Unit MC A1 - ACC

A4601

142

Unit MC A1 - ACC

A4601

141

Unit MC S3

A4612

143

Unit MC S3

A4612

144

Unit MC S1

A4602

139

Unit MC S1

A4602

137

FEFE

FE

MC Dining

185

Sensory

188

Unisex

187

Tub Room

186

Reception

167

MC Dayroom

189

MC Garden

186-B

HDRL

STRUCT. STOOP

HDRL

6' H. DECORATIVE ALUM FENCE w/ REMOVABLE PANEL FOR MAINT. ACCESS

N

FE

Fort

164

HDRL

Unit MC S1

A4602

122

Unit MC S1

A4602

128

Dining

162

Mail Lounge

163

Lobby

166

Vest.

165

Conf.

169

Office

171

Office

173

Office

174

Office Corridor

168Nurse

172

Office

170

Mens

177

Womens

178

Elev Lobby

179

Elec.

184

Mech

182

Laundry

183Kitchen

180

Trash

176ServiceCorridor

175

Stair C

192

Stair B

191

Elev. Equip.

181

Corridor

150

MATCH LINE

Dry Storage

180A

Kitchen Office

180B

STRUCT. STOOP

I400

1

I410

1

I900

1

I411

1I401

1

I901

1

I403

2

I413

1

I903

2

I403

1

I413

2

I903

1

I411

2

I413

4

I801

4TYP.

I801

4TYP.

Date

Project Number

1301 American Blvd ESuite 100Bloomington, MN 55425tel: (612) 879-6000fax: (612) 879-6666www.kaaswilson.com

Copyr

ight K

aas

Wils

on A

rchite

cts

Ow

ner:

Pro

ject

:

kaas wilson

architects

PERMIT SET

3/32" = 1'-0"

1/3

1/2

01

7 5

:40:5

4 P

MC

:\R

evit L

ocal\1

667

-He

art

h D

evelo

pm

en

t-O

wen

sb

oro

Se

nio

r Liv

ing_ssta

nke.r

vt

Overall/CoodinationFloor Plan - Level 1

01/31/2017

1667

Ow

ensb

oro

Senio

r Li

ving

Heart

h D

evelo

pm

ent

I300

3138 F

airvie

w D

rive

Ow

ensboro

, K

Y 4

2303

Kitchen:Strategic Equipment & Supply1203 33rd Street South St.Cloud, MN 56301(302) 257-8802

MEP:The Matrix Group311 East Chicago Street,Suite 310Milwaukee, WI 53202(414) 329-2827

Civil:Bryant Engineering Inc.1535 Frederica St.P.O. Box 21382Owensboro, KY 42304270-685-2811

Structural:Advanced StructuralTechnologies, Inc.7210 Metro BlvdEdina, MN 55439(952) 854-9302

67

50

Stillw

ate

r B

lvd. N

., S

uite 2

00

Stillw

ate

r, M

N 5

50

82

(65

1)-

705-8

811

3/32" = 1'-0"1

Level 1 - West Interior Overall/Coordination

3/32" = 1'-0"2

Level 1 - East Interior Overall/Coordination

Rev.

No.

Revi

sion

Date

Page 3: I100 - ftp.envisionky.comftp.envisionky.com/OwensboroSeniorLiving/Owensboro Senior...CERAMIC OR PORCELAIN PLANK FLOOR TILES INSTALLED IN A BRICK PATTERN SHOULD NOT BE OFFSET MORE THAN

W/D

W/D

W/D

Seat

DW

REF.

REF.

DW

Seat

W/D

REF.

DW

Seat

W/D

W/D

DW

REF.

DW

REF.

DW

REF.

DW

REF.

WW

DD

W/D

Seat

W/D

W/D

W/D

W/D

Seat

W/D

W/D

REF.

DW

Seat

W/D

REF.

DW

Seat

W/D

DW

REF.

DW

REF.

DW

REF.

DW

REF.

RE

F.

REF.

RE

F.

DW

RE

F.

DW

RE

F.

W/D

W/D

DW

REF.

W/D

DW

REF.

W/D

DW

REF.

W/D

DW

RE

F.

REF. RE

F.

REF.

RE

F.

DW

RE

F.

DW

REF.

FD

FD

REF.

Unit C1

A4561

201

Unit C1

A4561

200

MATCH LINE

FE

HDRL

Unit A1

A4511

203

Unit A1

A4511

204

Unit A4

A4531

202

Unit C4

A4581

205

Stair A

290

Corridor

251

I404

3Typ.

Library

263

CommunityRoom

262

ScreenedPorch

261

Unit C1

A4561

230

Unit C1

A4561

229

Unit S2

A4574

228

Unit S1

A4567

218

Unit S1

A4567

236

MATCH LINE

Act. Dir.

264

HDRL

HDRL

Unit A1

A4511

222

Unit A1

A4511

226

Unit A1

A4511

223

Unit C2

A4571

238

Unit C2

A4571

237

Unit Guest

A4592

231

Stair C

292

Deck

260

Salon

278

Toilet

277

Elev Lobby

279

Elec

281

Janitor

280

Charting

284

Laundry

283

Staff

282

Theater

285

Exam

267

Toilet

268

Fitness

269

Mezzanine

266

Unit A5

A4532

216

N

Corridor

250

Unit B1

A4552

227

Stair B

291

Corridor

251

Trash

270

FE

FE

Unit C5

A4591

233

Unit S4

A4583

221

Unit A2

A4521

220

Unit A2

A4521

224

Unit A2

A4521

225

Unit A2

A4521

234

Salon Alcove

278a

Fitness Alcove

269a Staff Corridor

282a

HDRL

I402

1

I412

1I902

1

I403

3

I413

3

I903

3

I404

3Typ.

I404

3Typ.

I801

4TYP.

I801

4TYP.

I801

4TYP.

FE

FE

Date

Project Number

1301 American Blvd ESuite 100Bloomington, MN 55425tel: (612) 879-6000fax: (612) 879-6666www.kaaswilson.com

Copyr

ight K

aas

Wils

on A

rchite

cts

Ow

ner:

Pro

ject

:

kaas wilson

architects

PERMIT SET

3/32" = 1'-0"

1/3

1/2

01

7 5

:41:1

8 P

MC

:\R

evit L

ocal\1

667

-He

art

h D

evelo

pm

en

t-O

wen

sb

oro

Se

nio

r Liv

ing_ssta

nke.r

vt

Overall/CoordinationFloor Plan - Level 2

01/31/2017

1667

Ow

ensb

oro

Senio

r Li

ving

Heart

h D

evelo

pm

ent

I301

3138 F

airvie

w D

rive

Ow

ensboro

, K

Y 4

2303

Kitchen:Strategic Equipment & Supply1203 33rd Street South St.Cloud, MN 56301(302) 257-8802

MEP:The Matrix Group311 East Chicago Street,Suite 310Milwaukee, WI 53202(414) 329-2827

Civil:Bryant Engineering Inc.1535 Frederica St.P.O. Box 21382Owensboro, KY 42304270-685-2811

Structural:Advanced StructuralTechnologies, Inc.7210 Metro BlvdEdina, MN 55439(952) 854-9302

67

50

Stillw

ate

r B

lvd. N

., S

uite 2

00

Stillw

ate

r, M

N 5

50

82

(65

1)-

705-8

811

3/32" = 1'-0"1

Level 2 - West Interior Overall/Coordination

3/32" = 1'-0"2

Level 2 - East Interior Overall/Coordination

Rev.

No.

Revi

sion

Date

Page 4: I100 - ftp.envisionky.comftp.envisionky.com/OwensboroSeniorLiving/Owensboro Senior...CERAMIC OR PORCELAIN PLANK FLOOR TILES INSTALLED IN A BRICK PATTERN SHOULD NOT BE OFFSET MORE THAN

WW

DD

Typ

e C

ata

log

Typ

e C

ata

log

W/D

W/D

Seat

W/D

W/D

W/D

W/D

W/D

W/D

W/D

W/DW/D

Seat

W/D

W/D

REF.

DW

Seat

W/D

REF.

DW

Seat

W/D

DW

REF.

DW

REF.

DW

REF.

DW

REF.

DW

REF.

DW

REF.

DW

RE

F.

RE

F.

DW

REF.

RE

F.

DW

RE

F.

DW

DW

DW

REF.

WD

W/D

W/D

DW

REF.

W/D

DW

REF.

W/D

DW

REF.

W/D

DW

RE

F.

REF.REF.

REF.

RE

F.

REF.

RE

F.

DW

RE

F.

DW

REF.

DW

REF.

DW

REF.

RE

F.

W/D

W/D

W/D

Seat

DW

REF.

REF.

DW

Seat

W/D

REF.

DW

Seat

W/D

W/DDW

REF.

DW

REF.

DW

REF.

DW

REF.

Unit S2

A4574

328

FE

MATCH LINE

HDRL

HDRL

Unit B3

A4551

306

Unit A1

A4511

307

Unit A1

A4511

308

Unit A7

A4541

312

Unit A5

A4532

316

Unit S1

A4567

318

Unit S1

A4567

331

Unit C2

A4571

337

Unit C2

A4571

338

Unit S1

A4567

336

Unit A1a

A4512

332

Unit A1

A4511

323

Unit C1

A4561

329

Unit C1

A4561

330

Unit A1

A4511

326

Unit A1

A4511

322

Elev Lobby

379

Elec

381

Janitor

380

Charting

384

Laundry

383

Storage

382

Crafts

385

Stair C

392

N

Unit B1

A4552

309

Unit B1

A4552

327

Stair B

391

Unit A6 - ACC

A4542

311

Corridor

350

Unit A3

A4522

314

Storage

386

FE

Trash

370

Unit C5

A4591

333

Unit S4

A4583

321

Unit S5

A4593

310

Unit A2

A4521

320

Unit A2

A4521

324

Unit A2

A4521

325

Unit A2

A4521

334

StorageCorridor

382a

I904

1

I414

1

I404

2

I404

3Typ.

I404

3Typ.

I404

3Typ.

I801

4TYP.

I801

4TYP.

I801

4TYP.

FE

MATCH LINE

Unit C1

A4561

300

Unit C1

A4561

301

Unit A1

A4511

303

Unit A1

A4511

304

Unit C4

A4581

305

Unit A4

A4531

302

Stair A

390

HDRL

I404

3Typ.

FE

Date

Project Number

1301 American Blvd ESuite 100Bloomington, MN 55425tel: (612) 879-6000fax: (612) 879-6666www.kaaswilson.com

Copyr

ight K

aas

Wils

on A

rchite

cts

Ow

ner:

Pro

ject

:

kaas wilson

architects

PERMIT SET

3/32" = 1'-0"

1/3

1/2

01

7 5

:41:3

9 P

MC

:\R

evit L

ocal\1

667

-He

art

h D

evelo

pm

en

t-O

wen

sb

oro

Se

nio

r Liv

ing_ssta

nke.r

vt

Overall/CoordinationFloor Plan - Level 3

01/31/2017

1667

Ow

ensb

oro

Senio

r Li

ving

Heart

h D

evelo

pm

ent

I302

3138 F

airvie

w D

rive

Ow

ensboro

, K

Y 4

2303

Kitchen:Strategic Equipment & Supply1203 33rd Street South St.Cloud, MN 56301(302) 257-8802

MEP:The Matrix Group311 East Chicago Street,Suite 310Milwaukee, WI 53202(414) 329-2827

Civil:Bryant Engineering Inc.1535 Frederica St.P.O. Box 21382Owensboro, KY 42304270-685-2811

Structural:Advanced StructuralTechnologies, Inc.7210 Metro BlvdEdina, MN 55439(952) 854-9302

67

50

Stillw

ate

r B

lvd. N

., S

uite 2

00

Stillw

ate

r, M

N 5

50

82

(65

1)-

705-8

811

3/32" = 1'-0"1

Level 3 - East Interiors Overall/Coordination

3/32" = 1'-0"2

Level 3 - West Interiors Overall/Coordination

Rev.

No.

Revi

sion

Date

Page 5: I100 - ftp.envisionky.comftp.envisionky.com/OwensboroSeniorLiving/Owensboro Senior...CERAMIC OR PORCELAIN PLANK FLOOR TILES INSTALLED IN A BRICK PATTERN SHOULD NOT BE OFFSET MORE THAN

W/D

W/D

W/D

Seat

DW

REF.

REF.

DW

Seat

W/D

REF.

DW

Seat

W/D

W/DDW

REF.

DW

REF.

DW

REF.

DW

REF.

WW

DD

FD

W/D

W/D

Seat

W/D

W/D

W/D

W/D

W/D

W/D

W/D

W/DW/D

Seat

W/D

W/D

REF.

DW

Seat

W/D

REF.

DW

Seat

W/D

DW

REF.

DW

REF.

DW

REF.

DW

REF.

DW

REF.

DW

REF.

DW

RE

F.

RE

F.

DW

REF.

RE

F.

DW

RE

F.

DW

DW

DW

REF.

WD

W/D

W/D

DW

REF.

W/D

DW

REF.

W/D

DW

REF.

W/D

DW

RE

F.

REF.REF. R

EF

.

REF.

REF.

RE

F.

DW

RE

F.

DW

REF.

DW

REF.

DW

REF.

RE

F.

Unit C1

A4561

400

Unit C1

A4561

401

Unit A1

A4511

403

Unit A1

A4511

404

Unit A4

A4531

402

Unit C4

A4581

405

Stair A

490

HDRL

MATCH LINE

I404

3Typ.

FE

Stair C

492

Unit A1

A4511

407

Unit B3

A4551

406

Unit A1

A4511

408

Elev Lobby

479

Storage

482

Elec

481

Janitor

480

Charting

484

Laundry

483

Tub Room

486

Res Storage

485

Unit A7

A4541

412

Unit A5

A4532

416

Unit S1

A4567

418

Unit A1

A4511

422

Unit A1

A4511

426

Unit S2

A4574

428

Unit C1

A4561

430

Unit C1

A4561

429Unit A1

A4511

423

Unit S1

A4567

431

Unit C2

A4571

437

Unit C2

A4571

438

Unit S1

A4567

436

Unit A1a

A4512

432

N

Unit B1

A4552

409

Unit B1

A4552

427

Stair B

491

Unit A6 - ACC

A4542

411

Unit A3

A4522

414

HDRL

HDRL

FE

Trash

470

MATCH LINE

Unit C5

A4591

433

Unit S4

A4583

421

Unit A2

A4521

434

Unit A2

A4521

425

Unit A2

A4521

424

Unit A2

A4521

420

Unit S5

A4593

410

StorageCorridor

482aCorridor

450

Corridor

450

I404

1

I414

2

I904

2

I404

3Typ.

I404

3Typ.

I404

3Typ.

I801

4TYP.

I801

4TYP.

I801

4TYP.

FE

FE

Date

Project Number

1301 American Blvd ESuite 100Bloomington, MN 55425tel: (612) 879-6000fax: (612) 879-6666www.kaaswilson.com

Copyr

ight K

aas

Wils

on A

rchite

cts

Ow

ner:

Pro

ject

:

kaas wilson

architects

PERMIT SET

3/32" = 1'-0"

1/3

1/2

01

7 5

:42:0

0 P

MC

:\R

evit L

ocal\1

667

-He

art

h D

evelo

pm

en

t-O

wen

sb

oro

Se

nio

r Liv

ing_ssta

nke.r

vt

Overall/CoordinationFloor Plan - Level 4

01/31/2017

1667

Ow

ensb

oro

Senio

r Li

ving

Heart

h D

evelo

pm

ent

I303

3138 F

airvie

w D

rive

Ow

ensboro

, K

Y 4

2303

Kitchen:Strategic Equipment & Supply1203 33rd Street South St.Cloud, MN 56301(302) 257-8802

MEP:The Matrix Group311 East Chicago Street,Suite 310Milwaukee, WI 53202(414) 329-2827

Civil:Bryant Engineering Inc.1535 Frederica St.P.O. Box 21382Owensboro, KY 42304270-685-2811

Structural:Advanced StructuralTechnologies, Inc.7210 Metro BlvdEdina, MN 55439(952) 854-9302

67

50

Stillw

ate

r B

lvd. N

., S

uite 2

00

Stillw

ate

r, M

N 5

50

82

(65

1)-

705-8

811

3/32" = 1'-0"1

Level 4 - West Interiors Overall/Coordination

3/32" = 1'-0"2

Level 4 - East Interiors Overall/Coordination

Rev.

No.

Revi

sion

Date

Page 6: I100 - ftp.envisionky.comftp.envisionky.com/OwensboroSeniorLiving/Owensboro Senior...CERAMIC OR PORCELAIN PLANK FLOOR TILES INSTALLED IN A BRICK PATTERN SHOULD NOT BE OFFSET MORE THAN

MA

IL C

UB

BIE

S

REF.REF.

Mail Lounge

163

SEE CR-1

CPT-15

Lobby

166

SEE CR-4

CPT-3/CT-1

Reception

167

WB-4

CPT-9

Dining

162

SEE CR-1

CPT-7/LV-3

Corridor

150

SEE CR-6

CPT-6/LV-3

Vest.

165

WB-3

CPT-4/CT-1

CPT-3 CT-1

LV

-3C

PT

-7C

PT

-7L

V-3

LV

-3C

PT

-7

CPT-7 LV-3

CP

T-9

CT

-1

CPT-15 CT-1

LV

-3C

PT

-15

4'-6

"

CP

T-6

CP

T-1

0

LV

-3C

PT

-6

LV

-3C

PT

-6

11'-0"ALIGN

1'-6"

1'-6

"

1'-6"

1'-6

"

1'-6"

1'-6"1'-6"

LV-3 CPT-7CPT-7 LV-3

1'-0

"1'

-0"

1'-0"1'-0"

CP

T-4

CT

-1

CP

T-1

0C

T-1

CP

T-1

0C

T-1

CP

T-6

LV

-3

CP

T-6

LV

-3

CP

T-6

CP

T-1

09'

-0"

Club Room

160

SEE CR-3

CPT-8

Pr. Dining

161

SEE CR-2

CPT-12/CPT-10

Corridor

150

SEE CR-6

CPT-6/LV-3

CPT-10 LV-3

CPT-8 LV-3

LV

-3C

PT

-6

1'-0

"

1'-0"

1'-0

"

1'-0"

CPT-12 CPT-10

CP

T-8

LV

-3

DIRECTION OF LINEAR PATTERN - MITRE AT CORNERS

I404

3Typ.

1. ALL EXPOSED SURFACES TO BE PREPARED TO RECEIVE NEW FINISHES.

2. DO NOT SCALE DRAWINGS.

3. ALL MATERIALS TO BE INSTALLED PER MANUFACTURER'S SPECIFICATIONS.

4. NO SUBSTITUTIONS WITHOUT ARCHITECT'S OR BUILDING OWNER'S APPROVAL.

5. ALL CARPETING TO BE INSTALLED BY DIRECT GLUE METHOD OR PER MANUF. RECOMMENDATIONS, UNLESS NOTED OTHERWISE.

6. INSPECT ALL SURFACES TO RECEIVE NEW FINISHES. REPORT TO ARCHITECT ANY AREAS WHICH ARE NOT SUITABLE TO RECEIVE NEW FINISH PRIOR TO BEGINNING WORK. CONTACT ARCHITECT WITH ANY DISCREPANCIES IN PRODUCT QUALITY SUCH AS DYELOT VARIANCES, PRODUCT SHADING, ETC. DO NOT CONTINUE TO INSTALL PRODUCTS WITH POSSIBLE DEFECTS.

7. ALL MATERIALS SPECIFIED ARE AVAILABLE AS OF ORIGINAL DATE ON PLAN. KAAS WILSON ARCHITECTS IS NOT RESPONSIBLE FOR ANY MATERIALS ORDERED AFTER THIS DATE THAT ARE DISCONTINUED OR UNAVAILABLE. ANY SUBSTITUTIONS MUST BE REVIEWED & APPROVED BY ARCHITECT.

8. 48"H FRP AT ALL MOP SINKS

9. ALL FRP SEAMS AND EXPOSED EDGES TO HAVE COORDINATING TRIM.

10. GROUT LINES AT TILE FLOORS NOT TO EXCEED 3/16" WIDTH GROUT SELECTIONS TO BE SUBMITTED AND APPROVED BY DESIGNER.

11. CERAMIC OR PORCELAIN PLANK FLOOR TILES INSTALLED IN A BRICK PATTERN SHOULD NOT BE OFFSET MORE THAN 33% OF THE LENGTH OF THE TILE. SEE MANUFACTURER'S SPECIFICATIONS FOR MAXIMUM OFFSET TO PREVENT LIPPAGE FROM BOWING IN THE TILE.

12. A SCHLUTER DILEX COVE TRIM IS TO BE USED IN ALL COMMON BATHS AND SHOWER/TUB ROOMS WHERE WALL TILE MEETS FLOOR TILE AND A COVE TILE IS NOT SPECIFIED. SCHLUTER RONDEC TRIM ALONG TOP EDGE OF EXPOSED TILE. ALL SCHLUTER TRIMS TO BE NICKEL FINISH.

13. A SCHLUTER TRANSITION STRIP SHOULD BE USED BETWEEN DIFFERENT FLOORING MATERIAL TRANSITIONS IN COMMON SPACES. PROFILES AND FINISHES TO BE SUBMITTED TO ARCHITECT FOR APPROVAL.

14. ALL MISC METAL ITEMS THROUGHOUT SPACE (METAL SUPPORT BRACKETS, FIRE EXTINGUISHER HOUSINGS, ETC) TO BE PAINTED. ARCHITECT TO SPECIFY COLOR.

15. ALL VCT TILE TO BE INSTALLED IN "SAME DIRECTION" PATTERN OR AS SPECIFIED ON THE FLOOR FINISH PLAN. PRODUCT TO BE WASHED & WAXED AFTER INSTALLATION PER MANUFACTURER'S GUIDELINES.

16. ALL SHEET VINYL PRODUCTS TO BE INSTALLED PER FINISH FLOOR PLAN OR ARCHITECT'S SPECIFICATIONS. PRODUCT TO BE WASHED & WAXED AFTER INSTALLATION PER MANUFACTURER'S GUIDELINES. NOTE: SHEET VINYL PRODUCTS MAY REQUIRE 3-5 COATINGS OF APPROPRIATE METAL CROSSLINK ACRYLIC POLISH VERIFY WITH MANUFACTURER'S REPRESENTATIVE PER PRODUCT FOR EXACT SPECS & RECOMMENDATIONS.

17. FLOOR TRANSITIONS TO OCCUR UNDER DOOR, TYP.

18. ACCENT PAINT AT UNIT ENTRIES IN CORRIDOR, UNLESS NOTED OTHERWISE. ACCENT PAINT INCLUDES WALL WITH ENTRY DOOR AND TWO RETURN WALLS AT SIDES.

19. ASSUME CEILING WHITE TYP. ON CEILINGS IN UNITS AND COMMON AREAS AND DIFFERENT COLOR ON WALLS UNLESS NOTED OTHERWISE. FLAT FINISH THROUGHOUT.

20. ALL EXPOSED ENDS OF CASEWORK TO BE FINISHED.

21. UNDERSIDE OF ALL SOFFITS TO BE SMOOTH. CARRY WALL COLOR ON FACE OF SOFFIT, UNDERSIDE OF SOFFIT TO BE WHITE.

22. ALL CEILINGS TO BE FINE KD, EXECPT IN BATHROOMS (COMMONS & UNITS) WHICH ARE TO BE SMOOTH. WALLS TO BE FINE TEXTURE EXCEPT AT AREAS NOTED FOR WALL COVERING

23. AT ALL LOCATIONS WHERE VINYL WALL COVERING IS APPLIED TO AN EXTERIOR WALL, THE SAME PRODUCT WITH MIRCO-PERF/MICRO-VENT MUST BE USED. BREATHABLE PRIMERS/ADHESIVES MUST ALSO BE USED WITH THE MICRO-VENTED WALL COVERING SO NOT TO REDUCE THE PERMEABILITY OF THE INSTALLATION. SEE MANUFACTURER'S RECOMMONDATIONS FOR PRIMERS.

24. ALL COUNTER TOPS IN KITCHEN/WET AREAS TO GET POST-FORM EDGE W/INTEGRAL BACKSPLASH ALL COUNTERTOPS IN NON-WET AREAS TO GET SQUARE EDGE.

25. ALL OUTLETS IN STAINED WOOD WAINSCOT TO HAVE DARK BROWN OUTLET AND COVER.

26. ALL STAINED TRIM PIECES/BASE/PANELING TO BE MAPLE.

27. ALL COMMON AREA WALLS TO HAVE EGGSHELL SHEEN. UNITS TO BE FLAT, EXCEPT AT KITCHENS AND BATHROOMS WHICH ARE TO BE EGGSHELL.

28. ALL COMMON AREA WINDOWS RECEIVE 1X4 TRIM & HDWD EXTENSION JAMBS - PAINT OR STAIN TO MATCH ROOM TRIM. SEE DETAIL ON SHEET I800.

29. SEE I800 MILLWORK FOR ALL CHAIR RAIL DETAILS (CR-1 - CR-7)

30. WIRE PULLS ON BACK OF HOUSE/STAFF WORK AREAS, BAR PULLS IN ALL COMMON AREAS ON ALL CABINETS.

31. CONTRACTOR TO SUBMIT QTY. (1) SAMPLES/CUT SHEETS FOR ALL FINISH MATERIALS LISTED IN FINISH SCHEDULE TO ARCHITECT FOR APPROVAL PRIOR TO ORDERING PRODUCT. IF SAMPLES ARE NOT SUBMITTED, CONTRACTOR ASSUMES RESPONSIBILITY.

INTERIOR FINISHES GENERAL NOTES

INTERIOR FINISHES KEY

ROOM FLOOR FINISH TAG

PL-1

CPT-1

MILLWORK FINISH TAG

FLOOR & WALL FINISH TAG

Room name

101

Base

Floor

ROOM WALL FINISH TAG

Room name

101

Wall

Ceiling

Date

Project Number

1301 American Blvd ESuite 100Bloomington, MN 55425tel: (612) 879-6000fax: (612) 879-6666www.kaaswilson.com

Copyr

ight K

aas

Wils

on A

rchite

cts

Ow

ner:

Pro

ject

:

kaas wilson

architects

PERMIT SET

As indicated

1/3

1/2

01

7 5

:42:0

4 P

MC

:\R

evit L

ocal\1

667

-He

art

h D

evelo

pm

en

t-O

wen

sb

oro

Se

nio

r Liv

ing_ssta

nke.r

vt

Floor Finish Plans -Level 1 Commons

01/31/2017

1667

Ow

ensb

oro

Senio

r Li

ving

Heart

h D

evelo

pm

ent

I400

3138 F

airvie

w D

rive

Ow

ensboro

, K

Y 4

2303

Kitchen:Strategic Equipment & Supply1203 33rd Street South St.Cloud, MN 56301(302) 257-8802

MEP:The Matrix Group311 East Chicago Street,Suite 310Milwaukee, WI 53202(414) 329-2827

Civil:Bryant Engineering Inc.1535 Frederica St.P.O. Box 21382Owensboro, KY 42304270-685-2811

Structural:Advanced StructuralTechnologies, Inc.7210 Metro BlvdEdina, MN 55439(952) 854-9302

67

50

Stillw

ate

r B

lvd. N

., S

uite 2

00

Stillw

ate

r, M

N 5

50

82

(65

1)-

705-8

811

1/4" = 1'-0"1

Floor Finish Plan - Lobby / Dining 1/4" = 1'-0"

2Floor Finish Plan - Club Room / Pr. Dining

Rev.

No.

Revi

sion

Date

Page 7: I100 - ftp.envisionky.comftp.envisionky.com/OwensboroSeniorLiving/Owensboro Senior...CERAMIC OR PORCELAIN PLANK FLOOR TILES INSTALLED IN A BRICK PATTERN SHOULD NOT BE OFFSET MORE THAN

WW

DD

FD

FD

FD

1872

43" MIN. CLEAR

34DR

43" MIN. CLEAR

34DR

Elev Lobby

179

SEE CR-1

LV-3/CPT-5

Elev. Equip.

181

VB-1

SEALEDCONC.

Elec.

184

VB-1

SEALEDCONC.

Mech

182

VB-1

SEALEDCONC.

Laundry

183

VB-1

SV-3

Kitchen

180

QT-1

QT-1

Kitchen

180

QT-1

QT-1

Kitchen

180

QT-1

QT-1

Womens

178

CT-5

CT-3

Mens

177

CT-5

CT-3

Lobby

166

SEE CR-4

CPT-3/CT-1

Reception

167

WB-4

CPT-9

Office

170

WB-3

CPT-9

Nurse

172

WB-3

CPT-9

Office

171

WB-3

CPT-9

Office

173

WB-3

CPT-9

Office

174

WB-3

CPT-9

Conf.

169

SEE CR-1

CPT-11/CPT-10

ServiceCorridor

175

WB-3

CPT-6/LV-3

Trash

176

VB-1

SEALEDCONC.

Office Corridor

168

WB-3

CPT-9

Corridor

150

SEE CR-6

CPT-6/LV-3

Corridor

150

SEE CR-6

CPT-6/LV-3

Kitchen Office

180B

QT-1

QT-1

Dry Storage

180A

QT-1

QT-1

CP

T-6

CPT-6LV-3

LV-3CPT-6

CP

T-6

LV

-3

LV-3CPT-6

CPT-6LV-3

4'-6"

4'-6"

9" 5'-6" 9"

CT-3LV-3

LV-3CT-3

2'-0"

1'-0"

1'-0"

1'-0"

1'-0"

CT

-1C

PT-9

CP

T-1

0C

PT-9

CP

T-1

1C

PT

-10

CT-1CPT-10CPT-10

CPT-11

CT-1CPT-9

DIRECTION OF LINEAR PATTERN -MITRE AT CORNERS

2'-0"

CPT-6 CPT-13

QT-1 CPT-13

LV-3QT-1

LV-3QT-1

LV

-3

CP

T-6

QT

-1L

V-3 L

V-3

CP

T-6

LV

-3C

PT

-5

2'-0"

2'-0"

2'-0"

2'-0"

1. ALL EXPOSED SURFACES TO BE PREPARED TO RECEIVE NEW FINISHES.

2. DO NOT SCALE DRAWINGS.

3. ALL MATERIALS TO BE INSTALLED PER MANUFACTURER'S SPECIFICATIONS.

4. NO SUBSTITUTIONS WITHOUT ARCHITECT'S OR BUILDING OWNER'S APPROVAL.

5. ALL CARPETING TO BE INSTALLED BY DIRECT GLUE METHOD OR PER MANUF. RECOMMENDATIONS, UNLESS NOTED OTHERWISE.

6. INSPECT ALL SURFACES TO RECEIVE NEW FINISHES. REPORT TO ARCHITECT ANY AREAS WHICH ARE NOT SUITABLE TO RECEIVE NEW FINISH PRIOR TO BEGINNING WORK. CONTACT ARCHITECT WITH ANY DISCREPANCIES IN PRODUCT QUALITY SUCH AS DYELOT VARIANCES, PRODUCT SHADING, ETC. DO NOT CONTINUE TO INSTALL PRODUCTS WITH POSSIBLE DEFECTS.

7. ALL MATERIALS SPECIFIED ARE AVAILABLE AS OF ORIGINAL DATE ON PLAN. KAAS WILSON ARCHITECTS IS NOT RESPONSIBLE FOR ANY MATERIALS ORDERED AFTER THIS DATE THAT ARE DISCONTINUED OR UNAVAILABLE. ANY SUBSTITUTIONS MUST BE REVIEWED & APPROVED BY ARCHITECT.

8. 48"H FRP AT ALL MOP SINKS

9. ALL FRP SEAMS AND EXPOSED EDGES TO HAVE COORDINATING TRIM.

10. GROUT LINES AT TILE FLOORS NOT TO EXCEED 3/16" WIDTH GROUT SELECTIONS TO BE SUBMITTED AND APPROVED BY DESIGNER.

11. CERAMIC OR PORCELAIN PLANK FLOOR TILES INSTALLED IN A BRICK PATTERN SHOULD NOT BE OFFSET MORE THAN 33% OF THE LENGTH OF THE TILE. SEE MANUFACTURER'S SPECIFICATIONS FOR MAXIMUM OFFSET TO PREVENT LIPPAGE FROM BOWING IN THE TILE.

12. A SCHLUTER DILEX COVE TRIM IS TO BE USED IN ALL COMMON BATHS AND SHOWER/TUB ROOMS WHERE WALL TILE MEETS FLOOR TILE AND A COVE TILE IS NOT SPECIFIED. SCHLUTER RONDEC TRIM ALONG TOP EDGE OF EXPOSED TILE. ALL SCHLUTER TRIMS TO BE NICKEL FINISH.

13. A SCHLUTER TRANSITION STRIP SHOULD BE USED BETWEEN DIFFERENT FLOORING MATERIAL TRANSITIONS IN COMMON SPACES. PROFILES AND FINISHES TO BE SUBMITTED TO ARCHITECT FOR APPROVAL.

14. ALL MISC METAL ITEMS THROUGHOUT SPACE (METAL SUPPORT BRACKETS, FIRE EXTINGUISHER HOUSINGS, ETC) TO BE PAINTED. ARCHITECT TO SPECIFY COLOR.

15. ALL VCT TILE TO BE INSTALLED IN "SAME DIRECTION" PATTERN OR AS SPECIFIED ON THE FLOOR FINISH PLAN. PRODUCT TO BE WASHED & WAXED AFTER INSTALLATION PER MANUFACTURER'S GUIDELINES.

16. ALL SHEET VINYL PRODUCTS TO BE INSTALLED PER FINISH FLOOR PLAN OR ARCHITECT'S SPECIFICATIONS. PRODUCT TO BE WASHED & WAXED AFTER INSTALLATION PER MANUFACTURER'S GUIDELINES. NOTE: SHEET VINYL PRODUCTS MAY REQUIRE 3-5 COATINGS OF APPROPRIATE METAL CROSSLINK ACRYLIC POLISH VERIFY WITH MANUFACTURER'S REPRESENTATIVE PER PRODUCT FOR EXACT SPECS & RECOMMENDATIONS.

17. FLOOR TRANSITIONS TO OCCUR UNDER DOOR, TYP.

18. ACCENT PAINT AT UNIT ENTRIES IN CORRIDOR, UNLESS NOTED OTHERWISE. ACCENT PAINT INCLUDES WALL WITH ENTRY DOOR AND TWO RETURN WALLS AT SIDES.

19. ASSUME CEILING WHITE TYP. ON CEILINGS IN UNITS AND COMMON AREAS AND DIFFERENT COLOR ON WALLS UNLESS NOTED OTHERWISE. FLAT FINISH THROUGHOUT.

20. ALL EXPOSED ENDS OF CASEWORK TO BE FINISHED.

21. UNDERSIDE OF ALL SOFFITS TO BE SMOOTH. CARRY WALL COLOR ON FACE OF SOFFIT, UNDERSIDE OF SOFFIT TO BE WHITE.

22. ALL CEILINGS TO BE FINE KD, EXECPT IN BATHROOMS (COMMONS & UNITS) WHICH ARE TO BE SMOOTH. WALLS TO BE FINE TEXTURE EXCEPT AT AREAS NOTED FOR WALL COVERING

23. AT ALL LOCATIONS WHERE VINYL WALL COVERING IS APPLIED TO AN EXTERIOR WALL, THE SAME PRODUCT WITH MIRCO-PERF/MICRO-VENT MUST BE USED. BREATHABLE PRIMERS/ADHESIVES MUST ALSO BE USED WITH THE MICRO-VENTED WALL COVERING SO NOT TO REDUCE THE PERMEABILITY OF THE INSTALLATION. SEE MANUFACTURER'S RECOMMONDATIONS FOR PRIMERS.

24. ALL COUNTER TOPS IN KITCHEN/WET AREAS TO GET POST-FORM EDGE W/INTEGRAL BACKSPLASH ALL COUNTERTOPS IN NON-WET AREAS TO GET SQUARE EDGE.

25. ALL OUTLETS IN STAINED WOOD WAINSCOT TO HAVE DARK BROWN OUTLET AND COVER.

26. ALL STAINED TRIM PIECES/BASE/PANELING TO BE MAPLE.

27. ALL COMMON AREA WALLS TO HAVE EGGSHELL SHEEN. UNITS TO BE FLAT, EXCEPT AT KITCHENS AND BATHROOMS WHICH ARE TO BE EGGSHELL.

28. ALL COMMON AREA WINDOWS RECEIVE 1X4 TRIM & HDWD EXTENSION JAMBS - PAINT OR STAIN TO MATCH ROOM TRIM. SEE DETAIL ON SHEET I800.

29. SEE I800 MILLWORK FOR ALL CHAIR RAIL DETAILS (CR-1 - CR-7)

30. WIRE PULLS ON BACK OF HOUSE/STAFF WORK AREAS, BAR PULLS IN ALL COMMON AREAS ON ALL CABINETS.

31. CONTRACTOR TO SUBMIT QTY. (1) SAMPLES/CUT SHEETS FOR ALL FINISH MATERIALS LISTED IN FINISH SCHEDULE TO ARCHITECT FOR APPROVAL PRIOR TO ORDERING PRODUCT. IF SAMPLES ARE NOT SUBMITTED, CONTRACTOR ASSUMES RESPONSIBILITY.

INTERIOR FINISHES GENERAL NOTES

INTERIOR FINISHES KEY

ROOM FLOOR FINISH TAG

PL-1

CPT-1

MILLWORK FINISH TAG

FLOOR & WALL FINISH TAG

Room name

101

Base

Floor

ROOM WALL FINISH TAG

Room name

101

Wall

Ceiling

Date

Project Number

1301 American Blvd ESuite 100Bloomington, MN 55425tel: (612) 879-6000fax: (612) 879-6666www.kaaswilson.com

Copyr

ight K

aas

Wils

on A

rchite

cts

Ow

ner:

Pro

ject

:

kaas wilson

architects

PERMIT SET

As indicated

1/3

1/2

01

7 5

:42:0

7 P

MC

:\R

evit L

ocal\1

667

-He

art

h D

evelo

pm

en

t-O

wen

sb

oro

Se

nio

r Liv

ing_ssta

nke.r

vt

Floor Finish Plans -Level 1 Commons

01/31/2017

1667

Ow

ensb

oro

Senio

r Li

ving

Heart

h D

evelo

pm

ent

I401

3138 F

airvie

w D

rive

Ow

ensboro

, K

Y 4

2303

Kitchen:Strategic Equipment & Supply1203 33rd Street South St.Cloud, MN 56301(302) 257-8802

MEP:The Matrix Group311 East Chicago Street,Suite 310Milwaukee, WI 53202(414) 329-2827

Civil:Bryant Engineering Inc.1535 Frederica St.P.O. Box 21382Owensboro, KY 42304270-685-2811

Structural:Advanced StructuralTechnologies, Inc.7210 Metro BlvdEdina, MN 55439(952) 854-9302

67

50

Stillw

ate

r B

lvd. N

., S

uite 2

00

Stillw

ate

r, M

N 5

50

82

(65

1)-

705-8

811

1/4" = 1'-0"1

Floor Finish Plan - Office / Elevator. Lobby

Rev.

No.

Revi

sion

Date

Page 8: I100 - ftp.envisionky.comftp.envisionky.com/OwensboroSeniorLiving/Owensboro Senior...CERAMIC OR PORCELAIN PLANK FLOOR TILES INSTALLED IN A BRICK PATTERN SHOULD NOT BE OFFSET MORE THAN

DWREF.

W

W

D

D

W/D

RE

F.

REF.

RE

F.

FD

FD

Library

263

SEE CR-1

CPT-15

Act. Dir.

264

WB-3

CPT-9

Mezzanine

266

WB-3

CPT-15

Corridor

250

SEE CR-6

CPT-6/LV-3

Exam

267

WB-3

LV-3

Toilet

268

CT-5

CT-3

Vest.

165

WB-3

CPT-4/CT-1

Fitness Alcove

269a

WB-3

LV-3

Fitness

269

WB-3

CPT-9

Staff Corridor

282a

WB-3

LV-3

Janitor

280

VB-1

SV-3

Elec

281

VB-1

SV-3

Charting

284

WB-3

CPT-9

Laundry

283

VB-1

SV-3

Staff

282

VB-1

SV-4

Elev Lobby

279

SEE CR-1

CPT-5/LV-3

Salon

278

WB-3

LV-3

Salon Alcove

278a

WB-4

LV-3

Toilet

277

CT-5

CT-3

CommunityRoom

262

SEE CR-1

CPT-16/LV-3

Deck

260

-

-

ScreenedPorch

261

WB-3

LV-3

LV

-3C

PT

-6

LV

-3C

PT

-15

LV

-3C

PT

-15

CP

T-6

LV

-3

CP

T-6

LV

-3

LV

-3C

PT

-15

LV

-3C

PT

-6

CPT-6 LV-3 LV-3 CPT-6

CP

T-6

LV

-3

CP

T-1

6L

V-3

CP

T-1

6L

V-3

CP

T-5

LV

-3

LV

-3C

PT-6

CT-3 LV-3

LV

-3C

PT

-9

CT-3 LV-3

CP

T-9

CP

T-1

5

SV

-4LV

-3

LV-3SV-3

LV-3CPT-6

CPT-6LV-3

4'-6

"

9"4'

-6"

9"

INTERIOR FINISHES KEY

ROOM FLOOR FINISH TAG

PL-1

CPT-1

MILLWORK FINISH TAG

FLOOR & WALL FINISH TAG

Room name

101

Base

Floor

ROOM WALL FINISH TAG

Room name

101

Wall

Ceiling

Date

Project Number

1301 American Blvd ESuite 100Bloomington, MN 55425tel: (612) 879-6000fax: (612) 879-6666www.kaaswilson.com

Copyr

ight K

aas

Wils

on A

rchite

cts

Ow

ner:

Pro

ject

:

kaas wilson

architects

PERMIT SET

As indicated

1/3

1/2

01

7 5

:42:1

2 P

MC

:\R

evit L

ocal\1

667

-He

art

h D

evelo

pm

en

t-O

wen

sb

oro

Se

nio

r Liv

ing_ssta

nke.r

vt

Floor Finish Plans -Level 2 Commons

01/31/2017

1667

Ow

ensb

oro

Senio

r Li

ving

Heart

h D

evelo

pm

ent

I402

3138 F

airvie

w D

rive

Ow

ensboro

, K

Y 4

2303

Kitchen:Strategic Equipment & Supply1203 33rd Street South St.Cloud, MN 56301(302) 257-8802

MEP:The Matrix Group311 East Chicago Street,Suite 310Milwaukee, WI 53202(414) 329-2827

Civil:Bryant Engineering Inc.1535 Frederica St.P.O. Box 21382Owensboro, KY 42304270-685-2811

Structural:Advanced StructuralTechnologies, Inc.7210 Metro BlvdEdina, MN 55439(952) 854-9302

67

50

Stillw

ate

r B

lvd. N

., S

uite 2

00

Stillw

ate

r, M

N 5

50

82

(65

1)-

705-8

811

1/4" = 1'-0"1

Floor Finish Plan - Level 2 Commons

Rev.

No.

Revi

sion

Date

Page 9: I100 - ftp.envisionky.comftp.envisionky.com/OwensboroSeniorLiving/Owensboro Senior...CERAMIC OR PORCELAIN PLANK FLOOR TILES INSTALLED IN A BRICK PATTERN SHOULD NOT BE OFFSET MORE THAN

FD

FD

DWREF.

REF.

MC Dayroom

189

SEE CR-5

CPT-17

CPT-18 CPT-17

CPT-18 CPT-17

MC Dining

185

SEE CR-1

LV-3/CPT-17

Sensory

188

WB-3

CPT-17

Unisex

187

CT-5

CT-3

Tub Room

186

CT-5

CT-3

MC Corridor

152

SEE CR-6

CPT-13

MC Corridor

152

SEE CR-6

CPT-13

CPT-13 LV-3

CPT-13 LV-3

LV-3 CPT-17

CT

-3C

PT

-13

CT

-3C

PT

-13

FEATHER TRANSITION FROM CPT-13 TO CPT-17

CPT-13

CPT-13

CPT-13

CPT-17

CPT-17

CPT-17

CPT-17

CPT-17

CPT-17

CPT-17

CPT-13

CPT-13

CPT-13

CPT-13

CPT-13 CPT-13

CPT-13

CPT-13

Theater

285

SEE CR-5

CPT-11

Corridor

250

SEE CR-6

CPT-6/LV-3

LV-3 CPT-6

CPT-6 LV-3

LV

-3C

PT

-6

CP

T-6

LV

-3

CP

T-1

1L

V-3

CP

T-1

1L

V-3

I404

3Typ.

I404

3Typ.

1. ALL EXPOSED SURFACES TO BE PREPARED TO RECEIVE NEW FINISHES.

2. DO NOT SCALE DRAWINGS.

3. ALL MATERIALS TO BE INSTALLED PER MANUFACTURER'S SPECIFICATIONS.

4. NO SUBSTITUTIONS WITHOUT ARCHITECT'S OR BUILDING OWNER'S APPROVAL.

5. ALL CARPETING TO BE INSTALLED BY DIRECT GLUE METHOD OR PER MANUF. RECOMMENDATIONS, UNLESS NOTED OTHERWISE.

6. INSPECT ALL SURFACES TO RECEIVE NEW FINISHES. REPORT TO ARCHITECT ANY AREAS WHICH ARE NOT SUITABLE TO RECEIVE NEW FINISH PRIOR TO BEGINNING WORK. CONTACT ARCHITECT WITH ANY DISCREPANCIES IN PRODUCT QUALITY SUCH AS DYELOT VARIANCES, PRODUCT SHADING, ETC. DO NOT CONTINUE TO INSTALL PRODUCTS WITH POSSIBLE DEFECTS.

7. ALL MATERIALS SPECIFIED ARE AVAILABLE AS OF ORIGINAL DATE ON PLAN. KAAS WILSON ARCHITECTS IS NOT RESPONSIBLE FOR ANY MATERIALS ORDERED AFTER THIS DATE THAT ARE DISCONTINUED OR UNAVAILABLE. ANY SUBSTITUTIONS MUST BE REVIEWED & APPROVED BY ARCHITECT.

8. 48"H FRP AT ALL MOP SINKS

9. ALL FRP SEAMS AND EXPOSED EDGES TO HAVE COORDINATING TRIM.

10. GROUT LINES AT TILE FLOORS NOT TO EXCEED 3/16" WIDTH GROUT SELECTIONS TO BE SUBMITTED AND APPROVED BY DESIGNER.

11. CERAMIC OR PORCELAIN PLANK FLOOR TILES INSTALLED IN A BRICK PATTERN SHOULD NOT BE OFFSET MORE THAN 33% OF THE LENGTH OF THE TILE. SEE MANUFACTURER'S SPECIFICATIONS FOR MAXIMUM OFFSET TO PREVENT LIPPAGE FROM BOWING IN THE TILE.

12. A SCHLUTER DILEX COVE TRIM IS TO BE USED IN ALL COMMON BATHS AND SHOWER/TUB ROOMS WHERE WALL TILE MEETS FLOOR TILE AND A COVE TILE IS NOT SPECIFIED. SCHLUTER RONDEC TRIM ALONG TOP EDGE OF EXPOSED TILE. ALL SCHLUTER TRIMS TO BE NICKEL FINISH.

13. A SCHLUTER TRANSITION STRIP SHOULD BE USED BETWEEN DIFFERENT FLOORING MATERIAL TRANSITIONS IN COMMON SPACES. PROFILES AND FINISHES TO BE SUBMITTED TO ARCHITECT FOR APPROVAL.

14. ALL MISC METAL ITEMS THROUGHOUT SPACE (METAL SUPPORT BRACKETS, FIRE EXTINGUISHER HOUSINGS, ETC) TO BE PAINTED. ARCHITECT TO SPECIFY COLOR.

15. ALL VCT TILE TO BE INSTALLED IN "SAME DIRECTION" PATTERN OR AS SPECIFIED ON THE FLOOR FINISH PLAN. PRODUCT TO BE WASHED & WAXED AFTER INSTALLATION PER MANUFACTURER'S GUIDELINES.

16. ALL SHEET VINYL PRODUCTS TO BE INSTALLED PER FINISH FLOOR PLAN OR ARCHITECT'S SPECIFICATIONS. PRODUCT TO BE WASHED & WAXED AFTER INSTALLATION PER MANUFACTURER'S GUIDELINES. NOTE: SHEET VINYL PRODUCTS MAY REQUIRE 3-5 COATINGS OF APPROPRIATE METAL CROSSLINK ACRYLIC POLISH VERIFY WITH MANUFACTURER'S REPRESENTATIVE PER PRODUCT FOR EXACT SPECS & RECOMMENDATIONS.

17. FLOOR TRANSITIONS TO OCCUR UNDER DOOR, TYP.

18. ACCENT PAINT AT UNIT ENTRIES IN CORRIDOR, UNLESS NOTED OTHERWISE. ACCENT PAINT INCLUDES WALL WITH ENTRY DOOR AND TWO RETURN WALLS AT SIDES.

19. ASSUME CEILING WHITE TYP. ON CEILINGS IN UNITS AND COMMON AREAS AND DIFFERENT COLOR ON WALLS UNLESS NOTED OTHERWISE. FLAT FINISH THROUGHOUT.

20. ALL EXPOSED ENDS OF CASEWORK TO BE FINISHED.

21. UNDERSIDE OF ALL SOFFITS TO BE SMOOTH. CARRY WALL COLOR ON FACE OF SOFFIT, UNDERSIDE OF SOFFIT TO BE WHITE.

22. ALL CEILINGS TO BE FINE KD, EXECPT IN BATHROOMS (COMMONS & UNITS) WHICH ARE TO BE SMOOTH. WALLS TO BE FINE TEXTURE EXCEPT AT AREAS NOTED FOR WALL COVERING

23. AT ALL LOCATIONS WHERE VINYL WALL COVERING IS APPLIED TO AN EXTERIOR WALL, THE SAME PRODUCT WITH MIRCO-PERF/MICRO-VENT MUST BE USED. BREATHABLE PRIMERS/ADHESIVES MUST ALSO BE USED WITH THE MICRO-VENTED WALL COVERING SO NOT TO REDUCE THE PERMEABILITY OF THE INSTALLATION. SEE MANUFACTURER'S RECOMMONDATIONS FOR PRIMERS.

24. ALL COUNTER TOPS IN KITCHEN/WET AREAS TO GET POST-FORM EDGE W/INTEGRAL BACKSPLASH ALL COUNTERTOPS IN NON-WET AREAS TO GET SQUARE EDGE.

25. ALL OUTLETS IN STAINED WOOD WAINSCOT TO HAVE DARK BROWN OUTLET AND COVER.

26. ALL STAINED TRIM PIECES/BASE/PANELING TO BE MAPLE.

27. ALL COMMON AREA WALLS TO HAVE EGGSHELL SHEEN. UNITS TO BE FLAT, EXCEPT AT KITCHENS AND BATHROOMS WHICH ARE TO BE EGGSHELL.

28. ALL COMMON AREA WINDOWS RECEIVE 1X4 TRIM & HDWD EXTENSION JAMBS - PAINT OR STAIN TO MATCH ROOM TRIM. SEE DETAIL ON SHEET I800.

29. SEE I800 MILLWORK FOR ALL CHAIR RAIL DETAILS (CR-1 - CR-7)

30. WIRE PULLS ON BACK OF HOUSE/STAFF WORK AREAS, BAR PULLS IN ALL COMMON AREAS ON ALL CABINETS.

31. CONTRACTOR TO SUBMIT QTY. (1) SAMPLES/CUT SHEETS FOR ALL FINISH MATERIALS LISTED IN FINISH SCHEDULE TO ARCHITECT FOR APPROVAL PRIOR TO ORDERING PRODUCT. IF SAMPLES ARE NOT SUBMITTED, CONTRACTOR ASSUMES RESPONSIBILITY.

INTERIOR FINISHES GENERAL NOTES

INTERIOR FINISHES KEY

ROOM FLOOR FINISH TAG

PL-1

CPT-1

MILLWORK FINISH TAG

FLOOR & WALL FINISH TAG

Room name

101

Base

Floor

ROOM WALL FINISH TAG

Room name

101

Wall

Ceiling

Date

Project Number

1301 American Blvd ESuite 100Bloomington, MN 55425tel: (612) 879-6000fax: (612) 879-6666www.kaaswilson.com

Copyr

ight K

aas

Wils

on A

rchite

cts

Ow

ner:

Pro

ject

:

kaas wilson

architects

PERMIT SET

As indicated

1/3

1/2

01

7 5

:42:1

5 P

MC

:\R

evit L

ocal\1

667

-He

art

h D

evelo

pm

en

t-O

wen

sb

oro

Se

nio

r Liv

ing_ssta

nke.r

vt

Floor Finish Plans -MC & Theater

01/31/2017

1667

Ow

ensb

oro

Senio

r Li

ving

Heart

h D

evelo

pm

ent

I403

3138 F

airvie

w D

rive

Ow

ensboro

, K

Y 4

2303

Kitchen:Strategic Equipment & Supply1203 33rd Street South St.Cloud, MN 56301(302) 257-8802

MEP:The Matrix Group311 East Chicago Street,Suite 310Milwaukee, WI 53202(414) 329-2827

Civil:Bryant Engineering Inc.1535 Frederica St.P.O. Box 21382Owensboro, KY 42304270-685-2811

Structural:Advanced StructuralTechnologies, Inc.7210 Metro BlvdEdina, MN 55439(952) 854-9302

67

50

Stillw

ate

r B

lvd. N

., S

uite 2

00

Stillw

ate

r, M

N 5

50

82

(65

1)-

705-8

811

1/4" = 1'-0"1

Floor Finish Plan - MC Dayroom 1/4" = 1'-0"

2Floor FInish Plan - MC Dining

1/4" = 1'-0"3

Floor Finish Plan - Theater

Rev.

No.

Revi

sion

Date

Page 10: I100 - ftp.envisionky.comftp.envisionky.com/OwensboroSeniorLiving/Owensboro Senior...CERAMIC OR PORCELAIN PLANK FLOOR TILES INSTALLED IN A BRICK PATTERN SHOULD NOT BE OFFSET MORE THAN

WW

DD

FD

REF.

REF.

WW

DD

Corridor

450

SEE CR-6

CPT-6/LV-3

Tub Room

486

CT-5

CT-3

Res Storage

485

VB-1

SV-3

Laundry

483

VB-1

SV-3

Charting

484

WB-3

CPT-9

Elec

481

VB-1

SV-3

Janitor

480

VB-1

SV-3

StorageCorridor

482a

WB-3

LV-3

Storage

482

VB-1

SV-3

Elev Lobby

479

SEE CR-1

CPT-5/LV-3

Corridor

450

SEE CR-6

CPT-6/LV-3

CPT-6LV-3

LV-3CPT-6

CP

T-6

LV

-3

LV-3CPT-6

CPT-6LV-3

LV-3 SV-3

CPT-6 LV-3

I404

3Typ.

LV-3 CT-3

I404

3Typ.

I404

3Typ.

LV

-3C

PT

-9

CP

T-6

LV

-3

LV

-3S

V-3

LV

-3S

V-3

LV

-3C

PT

-5

1'-6"

1'-6"

1'-6"

1'-6"

LV-3 SV-3

SV-3 LV-3

Elev Lobby

379

SEE CR-1

CPT-5/LV-3

Janitor

380

VB-1

SV-3

Elec

381

VB-1

SV-3

Charting

384

WB-3

CPT-9

Laundry

383

VB-1

SV-3Storage

382

VB-1

SV-3

StorageCorridor

382a

WB-3

LV-3

Crafts

385

WB-3

LV-4/LV-5

Corridor

350

SEE CR-6

CPT-6/LV-3

Storage

386

VB-1

SV-3

Corridor

350

SEE CR-6

CPT-6/LV-3

LV

-3C

PT

-5

I404

3

CPT-6LV-3

CP

T-6

LV

-3

CPT-6LV-3

CP

T-6

LV

-3

LV-3 CPT-6

CPT-6 LV-3

LV-3 CPT-6

LV

-3C

PT

-6

CP

T-6

LV

-3

1'-6"

1'-6"

1'-6"

LV-3CPT-6

LV-3CPT-6

9"

TYP

.

4'-6"

9"

2'-0"

2'-0"

LV-3 SV-3

LV

-3S

V-3

LV

-3S

V-3

LV

-3C

PT

-9

LV

-3L

V-3

SV-3 LV-3

LV-3 SV-3

I404

3Typ.

I404

3Typ.

LV-4

LV-4

LV-4 LV-4 LV-4

LV-4

LV-4

LV-4

LV-4

LV-4

LV-4

LV-4

LV-4

LV-4

LV-4 LV-4

LV-4

LV-4

LV-4

LV-4

LV-4

LV-4LV-4

LV-4

LV-4

LV-4 LV-4LV-4

1'-0" 1'-0"

9"4'

-6"

9"

CPT-6 LV-3

LV-3 CPT-6

CP

T-6

LV

-3L

V-3

CP

T-6

*NOTE: NO LVP IN CORRIDORS IN MEMORY CARE

1. ALL EXPOSED SURFACES TO BE PREPARED TO RECEIVE NEW FINISHES.

2. DO NOT SCALE DRAWINGS.

3. ALL MATERIALS TO BE INSTALLED PER MANUFACTURER'S SPECIFICATIONS.

4. NO SUBSTITUTIONS WITHOUT ARCHITECT'S OR BUILDING OWNER'S APPROVAL.

5. ALL CARPETING TO BE INSTALLED BY DIRECT GLUE METHOD OR PER MANUF. RECOMMENDATIONS, UNLESS NOTED OTHERWISE.

6. INSPECT ALL SURFACES TO RECEIVE NEW FINISHES. REPORT TO ARCHITECT ANY AREAS WHICH ARE NOT SUITABLE TO RECEIVE NEW FINISH PRIOR TO BEGINNING WORK. CONTACT ARCHITECT WITH ANY DISCREPANCIES IN PRODUCT QUALITY SUCH AS DYELOT VARIANCES, PRODUCT SHADING, ETC. DO NOT CONTINUE TO INSTALL PRODUCTS WITH POSSIBLE DEFECTS.

7. ALL MATERIALS SPECIFIED ARE AVAILABLE AS OF ORIGINAL DATE ON PLAN. KAAS WILSON ARCHITECTS IS NOT RESPONSIBLE FOR ANY MATERIALS ORDERED AFTER THIS DATE THAT ARE DISCONTINUED OR UNAVAILABLE. ANY SUBSTITUTIONS MUST BE REVIEWED & APPROVED BY ARCHITECT.

8. 48"H FRP AT ALL MOP SINKS

9. ALL FRP SEAMS AND EXPOSED EDGES TO HAVE COORDINATING TRIM.

10. GROUT LINES AT TILE FLOORS NOT TO EXCEED 3/16" WIDTH GROUT SELECTIONS TO BE SUBMITTED AND APPROVED BY DESIGNER.

11. CERAMIC OR PORCELAIN PLANK FLOOR TILES INSTALLED IN A BRICK PATTERN SHOULD NOT BE OFFSET MORE THAN 33% OF THE LENGTH OF THE TILE. SEE MANUFACTURER'S SPECIFICATIONS FOR MAXIMUM OFFSET TO PREVENT LIPPAGE FROM BOWING IN THE TILE.

12. A SCHLUTER DILEX COVE TRIM IS TO BE USED IN ALL COMMON BATHS AND SHOWER/TUB ROOMS WHERE WALL TILE MEETS FLOOR TILE AND A COVE TILE IS NOT SPECIFIED. SCHLUTER RONDEC TRIM ALONG TOP EDGE OF EXPOSED TILE. ALL SCHLUTER TRIMS TO BE NICKEL FINISH.

13. A SCHLUTER TRANSITION STRIP SHOULD BE USED BETWEEN DIFFERENT FLOORING MATERIAL TRANSITIONS IN COMMON SPACES. PROFILES AND FINISHES TO BE SUBMITTED TO ARCHITECT FOR APPROVAL.

14. ALL MISC METAL ITEMS THROUGHOUT SPACE (METAL SUPPORT BRACKETS, FIRE EXTINGUISHER HOUSINGS, ETC) TO BE PAINTED. ARCHITECT TO SPECIFY COLOR.

15. ALL VCT TILE TO BE INSTALLED IN "SAME DIRECTION" PATTERN OR AS SPECIFIED ON THE FLOOR FINISH PLAN. PRODUCT TO BE WASHED & WAXED AFTER INSTALLATION PER MANUFACTURER'S GUIDELINES.

16. ALL SHEET VINYL PRODUCTS TO BE INSTALLED PER FINISH FLOOR PLAN OR ARCHITECT'S SPECIFICATIONS. PRODUCT TO BE WASHED & WAXED AFTER INSTALLATION PER MANUFACTURER'S GUIDELINES. NOTE: SHEET VINYL PRODUCTS MAY REQUIRE 3-5 COATINGS OF APPROPRIATE METAL CROSSLINK ACRYLIC POLISH VERIFY WITH MANUFACTURER'S REPRESENTATIVE PER PRODUCT FOR EXACT SPECS & RECOMMENDATIONS.

17. FLOOR TRANSITIONS TO OCCUR UNDER DOOR, TYP.

18. ACCENT PAINT AT UNIT ENTRIES IN CORRIDOR, UNLESS NOTED OTHERWISE. ACCENT PAINT INCLUDES WALL WITH ENTRY DOOR AND TWO RETURN WALLS AT SIDES.

19. ASSUME CEILING WHITE TYP. ON CEILINGS IN UNITS AND COMMON AREAS AND DIFFERENT COLOR ON WALLS UNLESS NOTED OTHERWISE. FLAT FINISH THROUGHOUT.

20. ALL EXPOSED ENDS OF CASEWORK TO BE FINISHED.

21. UNDERSIDE OF ALL SOFFITS TO BE SMOOTH. CARRY WALL COLOR ON FACE OF SOFFIT, UNDERSIDE OF SOFFIT TO BE WHITE.

22. ALL CEILINGS TO BE FINE KD, EXECPT IN BATHROOMS (COMMONS & UNITS) WHICH ARE TO BE SMOOTH. WALLS TO BE FINE TEXTURE EXCEPT AT AREAS NOTED FOR WALL COVERING

23. AT ALL LOCATIONS WHERE VINYL WALL COVERING IS APPLIED TO AN EXTERIOR WALL, THE SAME PRODUCT WITH MIRCO-PERF/MICRO-VENT MUST BE USED. BREATHABLE PRIMERS/ADHESIVES MUST ALSO BE USED WITH THE MICRO-VENTED WALL COVERING SO NOT TO REDUCE THE PERMEABILITY OF THE INSTALLATION. SEE MANUFACTURER'S RECOMMONDATIONS FOR PRIMERS.

24. ALL COUNTER TOPS IN KITCHEN/WET AREAS TO GET POST-FORM EDGE W/INTEGRAL BACKSPLASH ALL COUNTERTOPS IN NON-WET AREAS TO GET SQUARE EDGE.

25. ALL OUTLETS IN STAINED WOOD WAINSCOT TO HAVE DARK BROWN OUTLET AND COVER.

26. ALL STAINED TRIM PIECES/BASE/PANELING TO BE MAPLE.

27. ALL COMMON AREA WALLS TO HAVE EGGSHELL SHEEN. UNITS TO BE FLAT, EXCEPT AT KITCHENS AND BATHROOMS WHICH ARE TO BE EGGSHELL.

28. ALL COMMON AREA WINDOWS RECEIVE 1X4 TRIM & HDWD EXTENSION JAMBS - PAINT OR STAIN TO MATCH ROOM TRIM. SEE DETAIL ON SHEET I800.

29. SEE I800 MILLWORK FOR ALL CHAIR RAIL DETAILS (CR-1 - CR-7)

30. WIRE PULLS ON BACK OF HOUSE/STAFF WORK AREAS, BAR PULLS IN ALL COMMON AREAS ON ALL CABINETS.

31. CONTRACTOR TO SUBMIT QTY. (1) SAMPLES/CUT SHEETS FOR ALL FINISH MATERIALS LISTED IN FINISH SCHEDULE TO ARCHITECT FOR APPROVAL PRIOR TO ORDERING PRODUCT. IF SAMPLES ARE NOT SUBMITTED, CONTRACTOR ASSUMES RESPONSIBILITY.

INTERIOR FINISHES GENERAL NOTES

INTERIOR FINISHES KEY

ROOM FLOOR FINISH TAG

PL-1

CPT-1

MILLWORK FINISH TAG

FLOOR & WALL FINISH TAG

Room name

101

Base

Floor

ROOM WALL FINISH TAG

Room name

101

Wall

Ceiling

Date

Project Number

1301 American Blvd ESuite 100Bloomington, MN 55425tel: (612) 879-6000fax: (612) 879-6666www.kaaswilson.com

Copyr

ight K

aas

Wils

on A

rchite

cts

Ow

ner:

Pro

ject

:

kaas wilson

architects

PERMIT SET

As indicated

1/3

1/2

01

7 5

:42:1

8 P

MC

:\R

evit L

ocal\1

667

-He

art

h D

evelo

pm

en

t-O

wen

sb

oro

Se

nio

r Liv

ing_ssta

nke.r

vt

Floor Finish Plans -Level 3 & 4

01/31/2017

1667

Ow

ensb

oro

Senio

r Li

ving

Heart

h D

evelo

pm

ent

I404

3138 F

airvie

w D

rive

Ow

ensboro

, K

Y 4

2303

Kitchen:Strategic Equipment & Supply1203 33rd Street South St.Cloud, MN 56301(302) 257-8802

MEP:The Matrix Group311 East Chicago Street,Suite 310Milwaukee, WI 53202(414) 329-2827

Civil:Bryant Engineering Inc.1535 Frederica St.P.O. Box 21382Owensboro, KY 42304270-685-2811

Structural:Advanced StructuralTechnologies, Inc.7210 Metro BlvdEdina, MN 55439(952) 854-9302

67

50

Stillw

ate

r B

lvd. N

., S

uite 2

00

Stillw

ate

r, M

N 5

50

82

(65

1)-

705-8

811

1/4" = 1'-0"1

Floor Finish Plan - Level 4 Commons

1/4" = 1'-0"2

Floor Finish Plans - Level 3 Commons 1/2" = 1'-0"

3

Floor Finish Plan - Typical Flooring atCorridor Arches

Rev.

No.

Revi

sion

Date

Page 11: I100 - ftp.envisionky.comftp.envisionky.com/OwensboroSeniorLiving/Owensboro Senior...CERAMIC OR PORCELAIN PLANK FLOOR TILES INSTALLED IN A BRICK PATTERN SHOULD NOT BE OFFSET MORE THAN

MA

IL C

UB

BIE

S

I500

23

I501

1a

I500

3

I500

6

I500

9

1

24

5

7

810

21

2224

I500

26

25

Dining

162

PT-13

PT-3

Lobby

166

PT-8

PT-3

Mail Lounge

163

PT-8/PT-11

PT-3

Corridor

150

PT-8/9/4

ACT-1

Reception

167

VWC-3

PT-3

Vest.

165

PT-13

PT-3

VWC-3

VW

C-3

PT-11P

T-1

1

PT

-11

I50014

I500

17

18

19

20

11

12

13

Club Room

160

PT-11

PT-3

Pr. Dining

161

PT-6

PT-3

Corridor

150

PT-8/9/4

ACT-1

I500 1516

1. ALL EXPOSED SURFACES TO BE PREPARED TO RECEIVE NEW FINISHES.

2. DO NOT SCALE DRAWINGS.

3. ALL MATERIALS TO BE INSTALLED PER MANUFACTURER'S SPECIFICATIONS.

4. NO SUBSTITUTIONS WITHOUT ARCHITECT'S OR BUILDING OWNER'S APPROVAL.

5. ALL CARPETING TO BE INSTALLED BY DIRECT GLUE METHOD OR PER MANUF. RECOMMENDATIONS, UNLESS NOTED OTHERWISE.

6. INSPECT ALL SURFACES TO RECEIVE NEW FINISHES. REPORT TO ARCHITECT ANY AREAS WHICH ARE NOT SUITABLE TO RECEIVE NEW FINISH PRIOR TO BEGINNING WORK. CONTACT ARCHITECT WITH ANY DISCREPANCIES IN PRODUCT QUALITY SUCH AS DYELOT VARIANCES, PRODUCT SHADING, ETC. DO NOT CONTINUE TO INSTALL PRODUCTS WITH POSSIBLE DEFECTS.

7. ALL MATERIALS SPECIFIED ARE AVAILABLE AS OF ORIGINAL DATE ON PLAN. KAAS WILSON ARCHITECTS IS NOT RESPONSIBLE FOR ANY MATERIALS ORDERED AFTER THIS DATE THAT ARE DISCONTINUED OR UNAVAILABLE. ANY SUBSTITUTIONS MUST BE REVIEWED & APPROVED BY ARCHITECT.

8. 48"H FRP AT ALL MOP SINKS

9. ALL FRP SEAMS AND EXPOSED EDGES TO HAVE COORDINATING TRIM.

10. GROUT LINES AT TILE FLOORS NOT TO EXCEED 3/16" WIDTH GROUT SELECTIONS TO BE SUBMITTED AND APPROVED BY DESIGNER.

11. CERAMIC OR PORCELAIN PLANK FLOOR TILES INSTALLED IN A BRICK PATTERN SHOULD NOT BE OFFSET MORE THAN 33% OF THE LENGTH OF THE TILE. SEE MANUFACTURER'S SPECIFICATIONS FOR MAXIMUM OFFSET TO PREVENT LIPPAGE FROM BOWING IN THE TILE.

12. A SCHLUTER DILEX COVE TRIM IS TO BE USED IN ALL COMMON BATHS AND SHOWER/TUB ROOMS WHERE WALL TILE MEETS FLOOR TILE AND A COVE TILE IS NOT SPECIFIED. SCHLUTER RONDEC TRIM ALONG TOP EDGE OF EXPOSED TILE. ALL SCHLUTER TRIMS TO BE NICKEL FINISH.

13. A SCHLUTER TRANSITION STRIP SHOULD BE USED BETWEEN DIFFERENT FLOORING MATERIAL TRANSITIONS IN COMMON SPACES. PROFILES AND FINISHES TO BE SUBMITTED TO ARCHITECT FOR APPROVAL.

14. ALL MISC METAL ITEMS THROUGHOUT SPACE (METAL SUPPORT BRACKETS, FIRE EXTINGUISHER HOUSINGS, ETC) TO BE PAINTED. ARCHITECT TO SPECIFY COLOR.

15. ALL VCT TILE TO BE INSTALLED IN "SAME DIRECTION" PATTERN OR AS SPECIFIED ON THE FLOOR FINISH PLAN. PRODUCT TO BE WASHED & WAXED AFTER INSTALLATION PER MANUFACTURER'S GUIDELINES.

16. ALL SHEET VINYL PRODUCTS TO BE INSTALLED PER FINISH FLOOR PLAN OR ARCHITECT'S SPECIFICATIONS. PRODUCT TO BE WASHED & WAXED AFTER INSTALLATION PER MANUFACTURER'S GUIDELINES. NOTE: SHEET VINYL PRODUCTS MAY REQUIRE 3-5 COATINGS OF APPROPRIATE METAL CROSSLINK ACRYLIC POLISH VERIFY WITH MANUFACTURER'S REPRESENTATIVE PER PRODUCT FOR EXACT SPECS & RECOMMENDATIONS.

17. FLOOR TRANSITIONS TO OCCUR UNDER DOOR, TYP.

18. ACCENT PAINT AT UNIT ENTRIES IN CORRIDOR, UNLESS NOTED OTHERWISE. ACCENT PAINT INCLUDES WALL WITH ENTRY DOOR AND TWO RETURN WALLS AT SIDES.

19. ASSUME CEILING WHITE TYP. ON CEILINGS IN UNITS AND COMMON AREAS AND DIFFERENT COLOR ON WALLS UNLESS NOTED OTHERWISE. FLAT FINISH THROUGHOUT.

20. ALL EXPOSED ENDS OF CASEWORK TO BE FINISHED.

21. UNDERSIDE OF ALL SOFFITS TO BE SMOOTH. CARRY WALL COLOR ON FACE OF SOFFIT, UNDERSIDE OF SOFFIT TO BE WHITE.

22. ALL CEILINGS TO BE FINE KD, EXECPT IN BATHROOMS (COMMONS & UNITS) WHICH ARE TO BE SMOOTH. WALLS TO BE FINE TEXTURE EXCEPT AT AREAS NOTED FOR WALL COVERING

23. AT ALL LOCATIONS WHERE VINYL WALL COVERING IS APPLIED TO AN EXTERIOR WALL, THE SAME PRODUCT WITH MIRCO-PERF/MICRO-VENT MUST BE USED. BREATHABLE PRIMERS/ADHESIVES MUST ALSO BE USED WITH THE MICRO-VENTED WALL COVERING SO NOT TO REDUCE THE PERMEABILITY OF THE INSTALLATION. SEE MANUFACTURER'S RECOMMONDATIONS FOR PRIMERS.

24. ALL COUNTER TOPS IN KITCHEN/WET AREAS TO GET POST-FORM EDGE W/INTEGRAL BACKSPLASH ALL COUNTERTOPS IN NON-WET AREAS TO GET SQUARE EDGE.

25. ALL OUTLETS IN STAINED WOOD WAINSCOT TO HAVE DARK BROWN OUTLET AND COVER.

26. ALL STAINED TRIM PIECES/BASE/PANELING TO BE MAPLE.

27. ALL COMMON AREA WALLS TO HAVE EGGSHELL SHEEN. UNITS TO BE FLAT, EXCEPT AT KITCHENS AND BATHROOMS WHICH ARE TO BE EGGSHELL.

28. ALL COMMON AREA WINDOWS RECEIVE 1X4 TRIM & HDWD EXTENSION JAMBS - PAINT OR STAIN TO MATCH ROOM TRIM. SEE DETAIL ON SHEET I800.

29. SEE I800 MILLWORK FOR ALL CHAIR RAIL DETAILS (CR-1 - CR-7)

30. WIRE PULLS ON BACK OF HOUSE/STAFF WORK AREAS, BAR PULLS IN ALL COMMON AREAS ON ALL CABINETS.

31. CONTRACTOR TO SUBMIT QTY. (1) SAMPLES/CUT SHEETS FOR ALL FINISH MATERIALS LISTED IN FINISH SCHEDULE TO ARCHITECT FOR APPROVAL PRIOR TO ORDERING PRODUCT. IF SAMPLES ARE NOT SUBMITTED, CONTRACTOR ASSUMES RESPONSIBILITY.

INTERIOR FINISHES GENERAL NOTES

INTERIOR FINISHES KEY

ROOM FLOOR FINISH TAG

PL-1

CPT-1

MILLWORK FINISH TAG

FLOOR & WALL FINISH TAG

Room name

101

Base

Floor

ROOM WALL FINISH TAG

Room name

101

Wall

Ceiling

Date

Project Number

1301 American Blvd ESuite 100Bloomington, MN 55425tel: (612) 879-6000fax: (612) 879-6666www.kaaswilson.com

Copyr

ight K

aas

Wils

on A

rchite

cts

Ow

ner:

Pro

ject

:

kaas wilson

architects

PERMIT SET

As indicated

1/3

1/2

01

7 5

:42:2

1 P

MC

:\R

evit L

ocal\1

667

-He

art

h D

evelo

pm

en

t-O

wen

sb

oro

Se

nio

r Liv

ing_ssta

nke.r

vt

Wall Finish Plans -Level 1 Commons

01/31/2017

1667

Ow

ensb

oro

Senio

r Li

ving

Heart

h D

evelo

pm

ent

I410

3138 F

airvie

w D

rive

Ow

ensboro

, K

Y 4

2303

Kitchen:Strategic Equipment & Supply1203 33rd Street South St.Cloud, MN 56301(302) 257-8802

MEP:The Matrix Group311 East Chicago Street,Suite 310Milwaukee, WI 53202(414) 329-2827

Civil:Bryant Engineering Inc.1535 Frederica St.P.O. Box 21382Owensboro, KY 42304270-685-2811

Structural:Advanced StructuralTechnologies, Inc.7210 Metro BlvdEdina, MN 55439(952) 854-9302

67

50

Stillw

ate

r B

lvd. N

., S

uite 2

00

Stillw

ate

r, M

N 5

50

82

(65

1)-

705-8

811

1/4" = 1'-0"1

Wall Finish Plan - Lobby / Dining 1/4" = 1'-0"

2Wall Finish Plan - Club Room / Pr. Dining

Rev.

No.

Revi

sion

Date

Page 12: I100 - ftp.envisionky.comftp.envisionky.com/OwensboroSeniorLiving/Owensboro Senior...CERAMIC OR PORCELAIN PLANK FLOOR TILES INSTALLED IN A BRICK PATTERN SHOULD NOT BE OFFSET MORE THAN

WW

DD

FD

FD

FD

CO

1872

43" MIN. CLEAR

34DR

43" MIN. CLEAR

34DR

FD

FD

I501

1a

I501

4

I5017

I501

10

2

3

5

6

8 I501 9

I501 15

Vest.

165

PT-13

PT-3

Lobby

166

PT-8

PT-3

Office

170

PT-8

ACT-1

Reception

167

VWC-3

PT-3

Office

171

PT-8

ACT-1

Office

173

PT-8

ACT-1

Office

174

PT-8

ACT-1

Office Corridor

168

PT-8

ACT-1

Nurse

172

PT-8

ACT-1

ServiceCorridor

175

PT-8/9

PT-3

Trash

176FRP ALLWALLS

TOCEILINGPT-3

Elec.

184

PT-8

PT-3

Elev. Equip.

181

PT-8

PT-3

Elev Lobby

179

VWC-1

PT-3

Dry Storage

180A

FRP

ACT-2Kitchen Office

180B

PT-8

ACT-2

Mech

182

PT-8

PT-3

Laundry

183

PT-8

PT-3

Kitchen

180

FRP

ACT-2

Kitchen

180

FRP

ACT-2

Kitchen

180

FRP

ACT-2Corridor

150

PT-8/9/4

ACT-1

Corridor

150

PT-8/9/4

ACT-1

Conf.

169

PT-13

PT-3

Mens

177

PT-10

PT-3

Womens

178

PT-10

PT-3

I50140

SIM

.

I411

2

FRP TO 4'H

I501 13

12

14

11

Mens

177

PT-10

PT-3

Womens

178

PT-10

PT-3

I501 13

SIM

.

12

SIM.

11

SIM

.

14

SIM.

INTERIOR FINISHES KEY

ROOM FLOOR FINISH TAG

PL-1

CPT-1

MILLWORK FINISH TAG

FLOOR & WALL FINISH TAG

Room name

101

Base

Floor

ROOM WALL FINISH TAG

Room name

101

Wall

Ceiling

Date

Project Number

1301 American Blvd ESuite 100Bloomington, MN 55425tel: (612) 879-6000fax: (612) 879-6666www.kaaswilson.com

Copyr

ight K

aas

Wils

on A

rchite

cts

Ow

ner:

Pro

ject

:

kaas wilson

architects

PERMIT SET

As indicated

1/3

1/2

01

7 5

:42:2

5 P

MC

:\R

evit L

ocal\1

667

-He

art

h D

evelo

pm

en

t-O

wen

sb

oro

Se

nio

r Liv

ing_ssta

nke.r

vt

Wall Finish Plans -Level 1 Commons

01/31/2017

1667

Ow

ensb

oro

Senio

r Li

ving

Heart

h D

evelo

pm

ent

I411

3138 F

airvie

w D

rive

Ow

ensboro

, K

Y 4

2303

Kitchen:Strategic Equipment & Supply1203 33rd Street South St.Cloud, MN 56301(302) 257-8802

MEP:The Matrix Group311 East Chicago Street,Suite 310Milwaukee, WI 53202(414) 329-2827

Civil:Bryant Engineering Inc.1535 Frederica St.P.O. Box 21382Owensboro, KY 42304270-685-2811

Structural:Advanced StructuralTechnologies, Inc.7210 Metro BlvdEdina, MN 55439(952) 854-9302

67

50

Stillw

ate

r B

lvd. N

., S

uite 2

00

Stillw

ate

r, M

N 5

50

82

(65

1)-

705-8

811

1/4" = 1'-0"1

Wall Finish Plan - Office / Elevator Lobby 1/2" = 1'-0"

2Wall Finish Plan - Common Area Restrooms

Rev.

No.

Revi

sion

Date

Page 13: I100 - ftp.envisionky.comftp.envisionky.com/OwensboroSeniorLiving/Owensboro Senior...CERAMIC OR PORCELAIN PLANK FLOOR TILES INSTALLED IN A BRICK PATTERN SHOULD NOT BE OFFSET MORE THAN

DWREF.

W

W

D

D

W/D

RE

F.

REF.

RE

F.

FD

FD

COCO

I502

1

I502

8

I502

3

I502

6

I50210

I50220

19

9

7

4

5

2

11

I50222

I50218

I502

12

13

14

15

I50216

CommunityRoom

262

PT-12/PT-6

PT-3

Salon

278

PT-8/PT-16

PT-3

Salon Alcove

278a

PT-8/PT-16

PT-3

Toilet

277

PT-10

PT-3

Mezzanine

266

PT-8/9

PT-3Exam

267

PT-8

ACT-1

Toilet

268

PT-10

PT-3

Fitness Alcove

269a

PT-8

PT-3

Fitness

269

PT-8

ACT-1

Vest.

165

PT-13

PT-3

Library

263

VWC-3/PT-8

PT-3

Act. Dir.

264

PT-8

PT-3

Deck

260

-

-

Elev Lobby

279

VWC-2

PT-3

Corridor

250

PT-8/9/5

PT-3

Corridor

250

PT-8/9/5

PT-3

Elec

281

PT-8

PT-3

Janitor

280

PT-8

PT-3

Staff Corridor

282a

PT-8

PT-3

Charting

284

PT-8

PT-3

Laundry

283

PT-8

PT-3

Staff

282

PT-8

PT-3

OPEN TO LOBBY BELOW

I50223

17

PT

-16

PT

-16

PT-16

I50221

I502

12

SIM.

15

SIM

.

14

SIM.

13

SIM

.

I501 40

VW

C-3

PT-6

INTERIOR FINISHES KEY

ROOM FLOOR FINISH TAG

PL-1

CPT-1

MILLWORK FINISH TAG

FLOOR & WALL FINISH TAG

Room name

101

Base

Floor

ROOM WALL FINISH TAG

Room name

101

Wall

Ceiling

Date

Project Number

1301 American Blvd ESuite 100Bloomington, MN 55425tel: (612) 879-6000fax: (612) 879-6666www.kaaswilson.com

Copyr

ight K

aas

Wils

on A

rchite

cts

Ow

ner:

Pro

ject

:

kaas wilson

architects

PERMIT SET

As indicated

1/3

1/2

01

7 5

:42:3

0 P

MC

:\R

evit L

ocal\1

667

-He

art

h D

evelo

pm

en

t-O

wen

sb

oro

Se

nio

r Liv

ing_ssta

nke.r

vt

Wall Finish Plans -Level 2 Commons

01/31/2017

1667

Ow

ensb

oro

Senio

r Li

ving

Heart

h D

evelo

pm

ent

I412

3138 F

airvie

w D

rive

Ow

ensboro

, K

Y 4

2303

Kitchen:Strategic Equipment & Supply1203 33rd Street South St.Cloud, MN 56301(302) 257-8802

MEP:The Matrix Group311 East Chicago Street,Suite 310Milwaukee, WI 53202(414) 329-2827

Civil:Bryant Engineering Inc.1535 Frederica St.P.O. Box 21382Owensboro, KY 42304270-685-2811

Structural:Advanced StructuralTechnologies, Inc.7210 Metro BlvdEdina, MN 55439(952) 854-9302

67

50

Stillw

ate

r B

lvd. N

., S

uite 2

00

Stillw

ate

r, M

N 5

50

82

(65

1)-

705-8

811

1/4" = 1'-0"1

Wall Finish Plans - Level 2 Commons

Rev.

No.

Revi

sion

Date

Page 14: I100 - ftp.envisionky.comftp.envisionky.com/OwensboroSeniorLiving/Owensboro Senior...CERAMIC OR PORCELAIN PLANK FLOOR TILES INSTALLED IN A BRICK PATTERN SHOULD NOT BE OFFSET MORE THAN

FD

FD

DWREF.

FD

FD

I501

18

I501

21

I501 2316

1719

20

22

24

25

MC Corridor

152

PT-15/2/14

ACT-1

MC Dining

185

PT-15/2

PT-3/ACT-1

Tub Room

186

PT-10

PT-3

Unisex

187

PT-10

PT-3

Sensory

188

PT-15

PT-3

PT-15

PT

-15

PT-14

PT-2

ABOVE CHAIR RAIL

ABOVE CHAIR RAIL

ABOVE CHAIR RAIL

AB

OV

E C

HA

IR R

AIL

I800

22Typ

I501

38

I501 3634

35

3739

MC Dayroom

189

PT-15/2

PT-3

PT-2

PT-15 ABOVE CHAIR RAIL

BELOW CHAIR RAIL

I502 25

24

27

26

Theater

285

PT-12

ACT-3

I501

26

27

28

29

I501

30

31

32

33

Tub Room

186

PT-10

PT-3

Unisex

187

PT-10

PT-3

1. ALL EXPOSED SURFACES TO BE PREPARED TO RECEIVE NEW FINISHES.

2. DO NOT SCALE DRAWINGS.

3. ALL MATERIALS TO BE INSTALLED PER MANUFACTURER'S SPECIFICATIONS.

4. NO SUBSTITUTIONS WITHOUT ARCHITECT'S OR BUILDING OWNER'S APPROVAL.

5. ALL CARPETING TO BE INSTALLED BY DIRECT GLUE METHOD OR PER MANUF. RECOMMENDATIONS, UNLESS NOTED OTHERWISE.

6. INSPECT ALL SURFACES TO RECEIVE NEW FINISHES. REPORT TO ARCHITECT ANY AREAS WHICH ARE NOT SUITABLE TO RECEIVE NEW FINISH PRIOR TO BEGINNING WORK. CONTACT ARCHITECT WITH ANY DISCREPANCIES IN PRODUCT QUALITY SUCH AS DYELOT VARIANCES, PRODUCT SHADING, ETC. DO NOT CONTINUE TO INSTALL PRODUCTS WITH POSSIBLE DEFECTS.

7. ALL MATERIALS SPECIFIED ARE AVAILABLE AS OF ORIGINAL DATE ON PLAN. KAAS WILSON ARCHITECTS IS NOT RESPONSIBLE FOR ANY MATERIALS ORDERED AFTER THIS DATE THAT ARE DISCONTINUED OR UNAVAILABLE. ANY SUBSTITUTIONS MUST BE REVIEWED & APPROVED BY ARCHITECT.

8. 48"H FRP AT ALL MOP SINKS

9. ALL FRP SEAMS AND EXPOSED EDGES TO HAVE COORDINATING TRIM.

10. GROUT LINES AT TILE FLOORS NOT TO EXCEED 3/16" WIDTH GROUT SELECTIONS TO BE SUBMITTED AND APPROVED BY DESIGNER.

11. CERAMIC OR PORCELAIN PLANK FLOOR TILES INSTALLED IN A BRICK PATTERN SHOULD NOT BE OFFSET MORE THAN 33% OF THE LENGTH OF THE TILE. SEE MANUFACTURER'S SPECIFICATIONS FOR MAXIMUM OFFSET TO PREVENT LIPPAGE FROM BOWING IN THE TILE.

12. A SCHLUTER DILEX COVE TRIM IS TO BE USED IN ALL COMMON BATHS AND SHOWER/TUB ROOMS WHERE WALL TILE MEETS FLOOR TILE AND A COVE TILE IS NOT SPECIFIED. SCHLUTER RONDEC TRIM ALONG TOP EDGE OF EXPOSED TILE. ALL SCHLUTER TRIMS TO BE NICKEL FINISH.

13. A SCHLUTER TRANSITION STRIP SHOULD BE USED BETWEEN DIFFERENT FLOORING MATERIAL TRANSITIONS IN COMMON SPACES. PROFILES AND FINISHES TO BE SUBMITTED TO ARCHITECT FOR APPROVAL.

14. ALL MISC METAL ITEMS THROUGHOUT SPACE (METAL SUPPORT BRACKETS, FIRE EXTINGUISHER HOUSINGS, ETC) TO BE PAINTED. ARCHITECT TO SPECIFY COLOR.

15. ALL VCT TILE TO BE INSTALLED IN "SAME DIRECTION" PATTERN OR AS SPECIFIED ON THE FLOOR FINISH PLAN. PRODUCT TO BE WASHED & WAXED AFTER INSTALLATION PER MANUFACTURER'S GUIDELINES.

16. ALL SHEET VINYL PRODUCTS TO BE INSTALLED PER FINISH FLOOR PLAN OR ARCHITECT'S SPECIFICATIONS. PRODUCT TO BE WASHED & WAXED AFTER INSTALLATION PER MANUFACTURER'S GUIDELINES. NOTE: SHEET VINYL PRODUCTS MAY REQUIRE 3-5 COATINGS OF APPROPRIATE METAL CROSSLINK ACRYLIC POLISH VERIFY WITH MANUFACTURER'S REPRESENTATIVE PER PRODUCT FOR EXACT SPECS & RECOMMENDATIONS.

17. FLOOR TRANSITIONS TO OCCUR UNDER DOOR, TYP.

18. ACCENT PAINT AT UNIT ENTRIES IN CORRIDOR, UNLESS NOTED OTHERWISE. ACCENT PAINT INCLUDES WALL WITH ENTRY DOOR AND TWO RETURN WALLS AT SIDES.

19. ASSUME CEILING WHITE TYP. ON CEILINGS IN UNITS AND COMMON AREAS AND DIFFERENT COLOR ON WALLS UNLESS NOTED OTHERWISE. FLAT FINISH THROUGHOUT.

20. ALL EXPOSED ENDS OF CASEWORK TO BE FINISHED.

21. UNDERSIDE OF ALL SOFFITS TO BE SMOOTH. CARRY WALL COLOR ON FACE OF SOFFIT, UNDERSIDE OF SOFFIT TO BE WHITE.

22. ALL CEILINGS TO BE FINE KD, EXECPT IN BATHROOMS (COMMONS & UNITS) WHICH ARE TO BE SMOOTH. WALLS TO BE FINE TEXTURE EXCEPT AT AREAS NOTED FOR WALL COVERING

23. AT ALL LOCATIONS WHERE VINYL WALL COVERING IS APPLIED TO AN EXTERIOR WALL, THE SAME PRODUCT WITH MIRCO-PERF/MICRO-VENT MUST BE USED. BREATHABLE PRIMERS/ADHESIVES MUST ALSO BE USED WITH THE MICRO-VENTED WALL COVERING SO NOT TO REDUCE THE PERMEABILITY OF THE INSTALLATION. SEE MANUFACTURER'S RECOMMONDATIONS FOR PRIMERS.

24. ALL COUNTER TOPS IN KITCHEN/WET AREAS TO GET POST-FORM EDGE W/INTEGRAL BACKSPLASH ALL COUNTERTOPS IN NON-WET AREAS TO GET SQUARE EDGE.

25. ALL OUTLETS IN STAINED WOOD WAINSCOT TO HAVE DARK BROWN OUTLET AND COVER.

26. ALL STAINED TRIM PIECES/BASE/PANELING TO BE MAPLE.

27. ALL COMMON AREA WALLS TO HAVE EGGSHELL SHEEN. UNITS TO BE FLAT, EXCEPT AT KITCHENS AND BATHROOMS WHICH ARE TO BE EGGSHELL.

28. ALL COMMON AREA WINDOWS RECEIVE 1X4 TRIM & HDWD EXTENSION JAMBS - PAINT OR STAIN TO MATCH ROOM TRIM. SEE DETAIL ON SHEET I800.

29. SEE I800 MILLWORK FOR ALL CHAIR RAIL DETAILS (CR-1 - CR-7)

30. WIRE PULLS ON BACK OF HOUSE/STAFF WORK AREAS, BAR PULLS IN ALL COMMON AREAS ON ALL CABINETS.

31. CONTRACTOR TO SUBMIT QTY. (1) SAMPLES/CUT SHEETS FOR ALL FINISH MATERIALS LISTED IN FINISH SCHEDULE TO ARCHITECT FOR APPROVAL PRIOR TO ORDERING PRODUCT. IF SAMPLES ARE NOT SUBMITTED, CONTRACTOR ASSUMES RESPONSIBILITY.

INTERIOR FINISHES GENERAL NOTES

INTERIOR FINISHES KEY

ROOM FLOOR FINISH TAG

PL-1

CPT-1

MILLWORK FINISH TAG

FLOOR & WALL FINISH TAG

Room name

101

Base

Floor

ROOM WALL FINISH TAG

Room name

101

Wall

Ceiling

Date

Project Number

1301 American Blvd ESuite 100Bloomington, MN 55425tel: (612) 879-6000fax: (612) 879-6666www.kaaswilson.com

Copyr

ight K

aas

Wils

on A

rchite

cts

Ow

ner:

Pro

ject

:

kaas wilson

architects

PERMIT SET

As indicated

1/3

1/2

01

7 5

:42:3

2 P

MC

:\R

evit L

ocal\1

667

-He

art

h D

evelo

pm

en

t-O

wen

sb

oro

Se

nio

r Liv

ing_ssta

nke.r

vt

Wall Finish Plans -MC & Theater

01/31/2017

1667

Ow

ensb

oro

Senio

r Li

ving

Heart

h D

evelo

pm

ent

I413

3138 F

airvie

w D

rive

Ow

ensboro

, K

Y 4

2303

Kitchen:Strategic Equipment & Supply1203 33rd Street South St.Cloud, MN 56301(302) 257-8802

MEP:The Matrix Group311 East Chicago Street,Suite 310Milwaukee, WI 53202(414) 329-2827

Civil:Bryant Engineering Inc.1535 Frederica St.P.O. Box 21382Owensboro, KY 42304270-685-2811

Structural:Advanced StructuralTechnologies, Inc.7210 Metro BlvdEdina, MN 55439(952) 854-9302

67

50

Stillw

ate

r B

lvd. N

., S

uite 2

00

Stillw

ate

r, M

N 5

50

82

(65

1)-

705-8

811

1/4" = 1'-0"1

Wall Finish Plan - MC Dining 1/4" = 1'-0"

2Wall Finish Plan - MC Dayroom

1/4" = 1'-0"3

Wall Finish Plan - Theater 1/2" = 1'-0"

4Wall Finish Plan - MC Tubroom / Restroom

Rev.

No.

Revi

sion

Date

Page 15: I100 - ftp.envisionky.comftp.envisionky.com/OwensboroSeniorLiving/Owensboro Senior...CERAMIC OR PORCELAIN PLANK FLOOR TILES INSTALLED IN A BRICK PATTERN SHOULD NOT BE OFFSET MORE THAN

WW

DD

REF.

WW

DD

FD

REF.

REF.

I503

1

2

Elev Lobby

379

VWC-3

PT-3

StorageCorridor

382a

PT-8/9

PT-3

Janitor

380

PT-8

PT-3

Elec

381

PT-8

PT-3

Storage

382

PT-8

PT-3

Laundry

383

PT-8

PT-3

Charting

384

PT-8

PT-3

Corridor

350

PT-8/9/6

PT-3

Storage

386

PT-8

PT-3

Crafts

385

PT-8

PT-3

I50218

SIM

.

I502 16

SIM

.

17

SIM

.

I503

3

5

46

Storage

482

PT-8

PT-3

Elec

481

PT-8

PT-3

Charting

484

PT-8

PT-3

Janitor

480

PT-8

PT-3

StorageCorridor

482a

PT-8/9

PT-3

Elev Lobby

479

VWC-4

PT-3

Laundry

483

PT-8

PT-3

Res Storage

485

PT-8

PT-3

Corridor

450

PT-8/9/7

PT-3

Tub Room

486

PT-10

PT-3

I50218

SIM

.

I502 16

SIM

.

17

SIM

.

I503 78

1. ALL EXPOSED SURFACES TO BE PREPARED TO RECEIVE NEW FINISHES.

2. DO NOT SCALE DRAWINGS.

3. ALL MATERIALS TO BE INSTALLED PER MANUFACTURER'S SPECIFICATIONS.

4. NO SUBSTITUTIONS WITHOUT ARCHITECT'S OR BUILDING OWNER'S APPROVAL.

5. ALL CARPETING TO BE INSTALLED BY DIRECT GLUE METHOD OR PER MANUF. RECOMMENDATIONS, UNLESS NOTED OTHERWISE.

6. INSPECT ALL SURFACES TO RECEIVE NEW FINISHES. REPORT TO ARCHITECT ANY AREAS WHICH ARE NOT SUITABLE TO RECEIVE NEW FINISH PRIOR TO BEGINNING WORK. CONTACT ARCHITECT WITH ANY DISCREPANCIES IN PRODUCT QUALITY SUCH AS DYELOT VARIANCES, PRODUCT SHADING, ETC. DO NOT CONTINUE TO INSTALL PRODUCTS WITH POSSIBLE DEFECTS.

7. ALL MATERIALS SPECIFIED ARE AVAILABLE AS OF ORIGINAL DATE ON PLAN. KAAS WILSON ARCHITECTS IS NOT RESPONSIBLE FOR ANY MATERIALS ORDERED AFTER THIS DATE THAT ARE DISCONTINUED OR UNAVAILABLE. ANY SUBSTITUTIONS MUST BE REVIEWED & APPROVED BY ARCHITECT.

8. 48"H FRP AT ALL MOP SINKS

9. ALL FRP SEAMS AND EXPOSED EDGES TO HAVE COORDINATING TRIM.

10. GROUT LINES AT TILE FLOORS NOT TO EXCEED 3/16" WIDTH GROUT SELECTIONS TO BE SUBMITTED AND APPROVED BY DESIGNER.

11. CERAMIC OR PORCELAIN PLANK FLOOR TILES INSTALLED IN A BRICK PATTERN SHOULD NOT BE OFFSET MORE THAN 33% OF THE LENGTH OF THE TILE. SEE MANUFACTURER'S SPECIFICATIONS FOR MAXIMUM OFFSET TO PREVENT LIPPAGE FROM BOWING IN THE TILE.

12. A SCHLUTER DILEX COVE TRIM IS TO BE USED IN ALL COMMON BATHS AND SHOWER/TUB ROOMS WHERE WALL TILE MEETS FLOOR TILE AND A COVE TILE IS NOT SPECIFIED. SCHLUTER RONDEC TRIM ALONG TOP EDGE OF EXPOSED TILE. ALL SCHLUTER TRIMS TO BE NICKEL FINISH.

13. A SCHLUTER TRANSITION STRIP SHOULD BE USED BETWEEN DIFFERENT FLOORING MATERIAL TRANSITIONS IN COMMON SPACES. PROFILES AND FINISHES TO BE SUBMITTED TO ARCHITECT FOR APPROVAL.

14. ALL MISC METAL ITEMS THROUGHOUT SPACE (METAL SUPPORT BRACKETS, FIRE EXTINGUISHER HOUSINGS, ETC) TO BE PAINTED. ARCHITECT TO SPECIFY COLOR.

15. ALL VCT TILE TO BE INSTALLED IN "SAME DIRECTION" PATTERN OR AS SPECIFIED ON THE FLOOR FINISH PLAN. PRODUCT TO BE WASHED & WAXED AFTER INSTALLATION PER MANUFACTURER'S GUIDELINES.

16. ALL SHEET VINYL PRODUCTS TO BE INSTALLED PER FINISH FLOOR PLAN OR ARCHITECT'S SPECIFICATIONS. PRODUCT TO BE WASHED & WAXED AFTER INSTALLATION PER MANUFACTURER'S GUIDELINES. NOTE: SHEET VINYL PRODUCTS MAY REQUIRE 3-5 COATINGS OF APPROPRIATE METAL CROSSLINK ACRYLIC POLISH VERIFY WITH MANUFACTURER'S REPRESENTATIVE PER PRODUCT FOR EXACT SPECS & RECOMMENDATIONS.

17. FLOOR TRANSITIONS TO OCCUR UNDER DOOR, TYP.

18. ACCENT PAINT AT UNIT ENTRIES IN CORRIDOR, UNLESS NOTED OTHERWISE. ACCENT PAINT INCLUDES WALL WITH ENTRY DOOR AND TWO RETURN WALLS AT SIDES.

19. ASSUME CEILING WHITE TYP. ON CEILINGS IN UNITS AND COMMON AREAS AND DIFFERENT COLOR ON WALLS UNLESS NOTED OTHERWISE. FLAT FINISH THROUGHOUT.

20. ALL EXPOSED ENDS OF CASEWORK TO BE FINISHED.

21. UNDERSIDE OF ALL SOFFITS TO BE SMOOTH. CARRY WALL COLOR ON FACE OF SOFFIT, UNDERSIDE OF SOFFIT TO BE WHITE.

22. ALL CEILINGS TO BE FINE KD, EXECPT IN BATHROOMS (COMMONS & UNITS) WHICH ARE TO BE SMOOTH. WALLS TO BE FINE TEXTURE EXCEPT AT AREAS NOTED FOR WALL COVERING

23. AT ALL LOCATIONS WHERE VINYL WALL COVERING IS APPLIED TO AN EXTERIOR WALL, THE SAME PRODUCT WITH MIRCO-PERF/MICRO-VENT MUST BE USED. BREATHABLE PRIMERS/ADHESIVES MUST ALSO BE USED WITH THE MICRO-VENTED WALL COVERING SO NOT TO REDUCE THE PERMEABILITY OF THE INSTALLATION. SEE MANUFACTURER'S RECOMMONDATIONS FOR PRIMERS.

24. ALL COUNTER TOPS IN KITCHEN/WET AREAS TO GET POST-FORM EDGE W/INTEGRAL BACKSPLASH ALL COUNTERTOPS IN NON-WET AREAS TO GET SQUARE EDGE.

25. ALL OUTLETS IN STAINED WOOD WAINSCOT TO HAVE DARK BROWN OUTLET AND COVER.

26. ALL STAINED TRIM PIECES/BASE/PANELING TO BE MAPLE.

27. ALL COMMON AREA WALLS TO HAVE EGGSHELL SHEEN. UNITS TO BE FLAT, EXCEPT AT KITCHENS AND BATHROOMS WHICH ARE TO BE EGGSHELL.

28. ALL COMMON AREA WINDOWS RECEIVE 1X4 TRIM & HDWD EXTENSION JAMBS - PAINT OR STAIN TO MATCH ROOM TRIM. SEE DETAIL ON SHEET I800.

29. SEE I800 MILLWORK FOR ALL CHAIR RAIL DETAILS (CR-1 - CR-7)

30. WIRE PULLS ON BACK OF HOUSE/STAFF WORK AREAS, BAR PULLS IN ALL COMMON AREAS ON ALL CABINETS.

31. CONTRACTOR TO SUBMIT QTY. (1) SAMPLES/CUT SHEETS FOR ALL FINISH MATERIALS LISTED IN FINISH SCHEDULE TO ARCHITECT FOR APPROVAL PRIOR TO ORDERING PRODUCT. IF SAMPLES ARE NOT SUBMITTED, CONTRACTOR ASSUMES RESPONSIBILITY.

INTERIOR FINISHES GENERAL NOTES

INTERIOR FINISHES KEY

ROOM FLOOR FINISH TAG

PL-1

CPT-1

MILLWORK FINISH TAG

FLOOR & WALL FINISH TAG

Room name

101

Base

Floor

ROOM WALL FINISH TAG

Room name

101

Wall

Ceiling

Date

Project Number

1301 American Blvd ESuite 100Bloomington, MN 55425tel: (612) 879-6000fax: (612) 879-6666www.kaaswilson.com

Copyr

ight K

aas

Wils

on A

rchite

cts

Ow

ner:

Pro

ject

:

kaas wilson

architects

PERMIT SET

As indicated

1/3

1/2

01

7 5

:42:4

1 P

MC

:\R

evit L

ocal\1

667

-He

art

h D

evelo

pm

en

t-O

wen

sb

oro

Se

nio

r Liv

ing_ssta

nke.r

vt

Wall Finish Plans -Level 3 & 4

01/31/2017

1667

Ow

ensb

oro

Senio

r Li

ving

Heart

h D

evelo

pm

ent

I414

3138 F

airvie

w D

rive

Ow

ensboro

, K

Y 4

2303

Kitchen:Strategic Equipment & Supply1203 33rd Street South St.Cloud, MN 56301(302) 257-8802

MEP:The Matrix Group311 East Chicago Street,Suite 310Milwaukee, WI 53202(414) 329-2827

Civil:Bryant Engineering Inc.1535 Frederica St.P.O. Box 21382Owensboro, KY 42304270-685-2811

Structural:Advanced StructuralTechnologies, Inc.7210 Metro BlvdEdina, MN 55439(952) 854-9302

67

50

Stillw

ate

r B

lvd. N

., S

uite 2

00

Stillw

ate

r, M

N 5

50

82

(65

1)-

705-8

811

1/4" = 1'-0"1

Wall Finish Plan - Level 3 Commons

1/4" = 1'-0"2

Wall Finish Plan - Level 4 Commons

Rev.

No.

Revi

sion

Date

Page 16: I100 - ftp.envisionky.comftp.envisionky.com/OwensboroSeniorLiving/Owensboro Senior...CERAMIC OR PORCELAIN PLANK FLOOR TILES INSTALLED IN A BRICK PATTERN SHOULD NOT BE OFFSET MORE THAN

165b

7'-5

"

8

I800

11

I800

Typ

16'-1

7/8

"3'

-0"

169a 168a

OPEN TO RECEPTION

CURVED DESK

2'-1

0"

RECEPTION TOP

GR-1

7

I801

8

I800

OPEN TO 1st LEVEL

CORRIDOR

OPEN TO 1st LEVEL

CORRIDOR

5'-6

"

167

BRICK - SEE FINISH SCHEDULE

DOUBLE SIDED - GAS FIREPLACE

I800

14

OPEN TO MEZZANINE BEYOND

OPEN TO MEZZANINE BEYOND

OPEN TO RECEPTION

GR-1

25

I800

OPEN TO MAIL/BISTRO

OPEN TO FORT

164

OPEN TO LIBRARY BEYOND

OPEN TO LIBRARY BEYOND

OPEN TO LIBRARY BEYOND

5'-4

"1'

-0"

DOUBLE SIDED GAS FIREPLACE INSERT

OPENOPEN

BR-1

BR-1

13

I800

OPEN TO 1ST LEVEL CORRIDOR

OPEN TO 1ST LEVEL CORRIDOR

OPEN TO 1ST LEVEL CORRIDOR

I800

20Typ.

2

I800

21

I800163

3'-0

"

4

I800

3

I801

OPEN TO 1ST LEVEL CORRIDOR

1

I801

2

I801

I800

20Typ.

2'-6"2'-6"2'-6"2'-6"

4

I802

24" D C-TOP

MOSAIC ACCENT TILE

1

I801 CT-8

GR-1

B36FH B36FH B36FH

2'-6"

OPEN TO PUB ROOM

17

I801

GRANITE CTOP GR-1

PANELING DETAIL & TRIM TO WRAP BOTH ENDS OF ISLAND

WALL SCONCESEE ELEC.

12

I800

1

I800

161

12

I800

6'-6

"

1

I800

11

I800

Typ

12

I800

1

I800

162b162a

4

I800

WALL SCONCESEE ELEC.

1

I800

162c 162d

3'-0

"

4

I800

WALL SCONCESEE ELEC.

2

I800

1

I800

OPEN TO DINING ROOM BEYOND

OPEN TO DINING ROOM BEYOND

OPEN TO DINING ROOM BEYOND

OPEN TO DINING ROOM BEYOND

OPEN TO DINING ROOM BEYOND

2

I800

WALL SCONCE - SEE ELEC. I800

20Typ.1

I800

161 160a

3'-0

"

I800

20Typ.

1

I800

4

I80011

I800

Typ

OPEN TO DINING ROOM BEYOND

OPEN TO DINING ROOM BEYOND

OPEN TO DINING ROOM BEYOND

OPEN TO DINING ROOM BEYOND

OPEN TO DINING ROOM BEYOND

I800

20Typ.1

I800

3'-0

"

NSF34x34.5 NSF34x34.5 NSF34x34.5 NSF34x34.5 NSF34x34.5 NSF34x34.5

24"D C-TOP NSF PLAM CABS W/6" STAINLESS STEEL LEGS W/ REMOVABLE PLAM TOEKICK

QZ-1PL-3

QZ-124"D CTOP

OPEN TO DINING ROOM BEYOND

OPEN TO DINING ROOM BEYOND OPEN TO DINING

ROOM BEYOND

OPEN TO DINING ROOM BEYOND OPEN TO DINING

ROOM BEYOND

2

I800

WALL SCONCESEE ELEC.

I800

20Typ.

1

I800

160 160b

3

I800

3'-0

"

160a

3'-0

"

3

I800

ARTWORK LOCATION.

3

I80011

I800

Typ

OPEN TO BELOW

OPEN TO PUB ROOM BEYOND

3'-0

"

GRAITNE CTOP GR-1

17

I801

2'-1

0"

B36X32.5"HB36X32.5"H

24"D C-TOP

5

I802

B18X32.5"H RBS36X32.5"H B18X32.5"H

TILE BACKSPLASH

STAINLESS STEEL UNDERMOUNT SINK

TV NIC - GC PROVIDE POWER AND BACKING

3'-0

"

GR-1

CT-2

3

I800

General Notes - Interior Elevations

1. All counters @ common areas to be granite unless noted otherwise.

2. Crown molding @ all common area casework.

3. Coordinate/verify soffit depth requirements with mechanical and millwork. Do not cut into crown molding for mechanical grilles.

4. Paint all louvers, access panels, etc. to match adjacent wall/ceiling surface.

5. Do not place any sprinkler heads, fire alarm pulls or horn/strobes, nurse call pulls, or other such devices in any area noted for artwork or TV locations. If any such devices are required to be in proximity to these locations, consult architect regarding placement prior to installation.

6. See I800-I801 for millwork details.

7. See A870 for door schedule, door elevations, and door details.

8. See I300's (floor plans) for corridor arch & millwork arch locations

INTERIOR FINISHES KEY

ROOM FLOOR FINISH TAG

PL-1

CPT-1

MILLWORK FINISH TAG

FLOOR & WALL FINISH TAG

Room name

101

Base

Floor

ROOM WALL FINISH TAG

Room name

101

Wall

Ceiling

Date

Project Number

1301 American Blvd ESuite 100Bloomington, MN 55425tel: (612) 879-6000fax: (612) 879-6666www.kaaswilson.com

Copyr

ight K

aas

Wils

on A

rchite

cts

Ow

ner:

Pro

ject

:

kaas wilson

architects

PERMIT SET

As indicated

1/3

1/2

01

7 5

:43:0

2 P

MC

:\R

evit L

ocal\1

667

-He

art

h D

evelo

pm

en

t-O

wen

sb

oro

Se

nio

r Liv

ing_ssta

nke.r

vt

Interior Elevations -Level 1 Commons

01/31/2017

1667

Ow

ensb

oro

Senio

r Li

ving

Heart

h D

evelo

pm

ent

I500

3138 F

airvie

w D

rive

Ow

ensboro

, K

Y 4

2303

Kitchen:Strategic Equipment & Supply1203 33rd Street South St.Cloud, MN 56301(302) 257-8802

MEP:The Matrix Group311 East Chicago Street,Suite 310Milwaukee, WI 53202(414) 329-2827

Civil:Bryant Engineering Inc.1535 Frederica St.P.O. Box 21382Owensboro, KY 42304270-685-2811

Structural:Advanced StructuralTechnologies, Inc.7210 Metro BlvdEdina, MN 55439(952) 854-9302

67

50

Stillw

ate

r B

lvd. N

., S

uite 2

00

Stillw

ate

r, M

N 5

50

82

(65

1)-

705-8

811

1/4" = 1'-0"1

Lobby - Elevation 1 1/4" = 1'-0"

2Lobby - Elevation 2

1/4" = 1'-0"3

Lobby - Elevation 3 1/4" = 1'-0"

4Lobby - Elevation 4

1/4" = 1'-0"5

Lobby - Elevation 5 1/4" = 1'-0"

6Lobby - Elevation 6

1/4" = 1'-0"7

Mail Lounge - Elevation 1 1/4" = 1'-0"

8Mail Lounge - Elevation 2

1/4" = 1'-0"9

Mail Lounge - Elevation 3

1/4" = 1'-0"10

Mail Lounge - Elevation 4

1/4" = 1'-0"14

Club Room - Elevation 4 1/4" = 1'-0"

17Private Dining - Elevation 1

1/4" = 1'-0"18

Private Dining - Elevation 2

1/4" = 1'-0"19

Private Dining - Elevation 3 1/4" = 1'-0"

20Private Dining - Elevation 4

1/4" = 1'-0"21

Dining - Elevation 1 1/4" = 1'-0"

22Dining - Elevation 2

1/4" = 1'-0"23

Dining - Elevation 3 1/4" = 1'-0"24

Dining - Elevation 4

1/4" = 1'-0"25

Dining - Elevation 5 1/4" = 1'-0"

26Dining - Elevation 6

1/4" = 1'-0"11

Club Room - Elevation 1 1/4" = 1'-0"

12Club Room - Elevation 2

1/4" = 1'-0"13

Club Room - Elevation 3

1/4" = 1'-0"15

Club Room - Elevation 5 1/4" = 1'-0"

16Club Room - Elevation 6

Rev.

No.

Revi

sion

Date

Page 17: I100 - ftp.envisionky.comftp.envisionky.com/OwensboroSeniorLiving/Owensboro Senior...CERAMIC OR PORCELAIN PLANK FLOOR TILES INSTALLED IN A BRICK PATTERN SHOULD NOT BE OFFSET MORE THAN

3'-0

"

OPEN TO MC CORRIDOR

BEYOND

21

I800

4

I800

I800

20Typ.

WALL SCONCESEE ELEC.

OPEN TO MC CORRIDOR

BEYOND

OPEN TO MC CORRIDOR

BEYOND

3'-0

"

I800

20Typ.

21

I800 2

I800

11

I800

Typ OPEN TO MC DINING BEYOND

9

I801

ISLAND CTOPGR-2

OPEN TO MC CORRIDOR

BEYOND

OPEN TO MC CORRIDOR

BEYOND

OPEN TO MC CORRIDOR

BEYOND

I800

20Typ.

2

I800

21

I800OPEN TO MC

DINING BEYOND9

I801

OPEN BELOW

ISLAND CTOP

GR-2

2'-6

"

BMC27

W2730 W2730

W3618

W3330

W3018

W1530

W3615

LC1884

B15HCP

WHB36

3" VALANCE W/ LIGHT - SEE ELEC.

HOOD - SEE MECH.

24"D C-TOP

NSF REFRIG - VFY WIDTH PRIOR TO INSTALLING CASEWORK

DROP-IN RANGE

PIPE PROTECTION PANEL. DOUBLE BASIN UNDERMOUNT STAINLESS STEEL SINK

MICRO

BACKSPLASH TILE. 1/3 OFF SET.

VFY LOCKED CAB LOCATION W/ OWNER

3'-0

"

2'-1

0"1'

-6"

2'-6

"

3" SUPPORT END PANEL

ADA HT. DISHWASHER

4

I800

10

A004

Sim

CT-6

GR-2

WHB30

OPEN TO MC CORRIDOR

BEYOND

188

3'-0

"

4

I800

I800

20Typ.

3'-0

"

4

I800

185

4

I80011

I800

TypOPEN TO

MC DINING BEYOND

I800

20Typ.

21

I800

6'-8 1/4"

4'-1

1 1/

4"

TABLEAUX WOOD VENEER GRILLE

SYSTEM - FIELD VFY.

2

I800 186

5'-0

"

8" ACCENT MOSAIC STRIP

6"x24" FIELD TILE. INSTALL 1/3 OFFSET

CT-4

CT-5

5'-0

"

CT-5THERAPY TUB

LC1884

10

A004

Sim

VANITY FIXTURE-SEE ELEC.

3'-6" x 3'-0" WD FRAME MIRROR

-NO TILE BEHIND

PIPE PROTECTION

PANEL

5'-0

"

THERAPY TUB

5'-0

"

8" WIDE ACCENT MOSAIC

6"X24" FIELD TILE. INSTALL 1/3 OFFSET.

CT-5

CT-4

THERAPY TUB- SEE SPEC

5'-0

"

187

CT-5

5'-0

"

10

A004

Sim

VANITY FIXTURE-SEE ELEC.

3'-6" x 3'-0" WD FRAME MIRROR

-NO TILE BEHIND

PIPE PROTECTION

PANEL

2'-1

0"

CT-5

5'-0

"

8" WIDE ACCENT MOSAIC

6"X24" FIELD TILE. INSTALL 1/3 OFFSET.

CT-5

CT-4

5'-0

"

8" WIDE ACCENT MOSAIC

6"X24" FIELD TILE. INSTALL 1/3 OFFSET.

CT-5

CT-4

183

24"D PLAM C-TOP

PL-4 W2730W2730 W2730

3'-0

"1'

-6"

2'-6

"

OPEN BASE CABS WITH FULL DEPTH

ADJ. SHELFBMC27 BMC27 BMC27

?

CORRIDOR BEYOND

3'-0

"

6

I800

CUSTOM FISH TANK BY FISH

TANK SUPPLIER

4

I800

U01

3'-0

"

26

I800

3'-0

"

I800

22Typ

26

I800

11

I800

TypFISH TANK NIC BEYOND

OPEN TO MC DAYROOM BEYOND

TABLEAUX WOOD VENEER GRILLE

SYSTEM - FIELD VFY.

6'-6"

4'-1

1 1/

4"

I800

20Typ.

2

I800OPEN TO MC

DAYROOM BEYOND

OPEN TO MC DAYROOM BEYOND

26

I800

CUSTOM FISH TANK NIC - BY

FISH TANK SUPPLIER

4

I800

3'-0

"

2'-6

"

24" D COUNTERTOP

OPEN BELOW

BOX/FILE/FILE

27

I800GR-1

4

I800

11

I800

Typ

4

I800

3'-0

"

169b

3'-0

"

4

I800 169a

4

I800

3'-0

"

2'-6

"1'

-6"

3'-0

"

B30 B33 B30

W3030W3330W3030

24" D. CTOP

18

I801

Sim.

PL-4

B30 DC3-18

COPIER N.I.C.

3'-0

"

172

2'-6

"1'

-6"

3'-0

"

11

I801

B30 RBS30

W3030

W3015

18

I801

Sim.

172a

BOX/FILE/FILE BOX/FILE/FILE

24"D PLAM C-TOP

MOVABLE FILE CABINETS.CO-ORDINATE BRACKET LOCATION.

2'-6

"2'

-0"

2'-6

"

W3330 W3330

PL-4

2'-6

"2'

-0"

2'-6

"

172b

24" D. CTOP

BOX/FILE/FILE BOX/FILE/FILE

12

I801

MOVABLE FILE CABINETS. CO-ORDINATE BRACKET LOCATION.

PL-4W3630 W3630

5'-0

"

8" MOSAIC TILE STRIP

WALL TILE -INSTALL 1/3

OFFSET

CT-5

CT-4

177

2'-1

0"

5'-0

"

2'-2

"2'

-10"

VANITY FIXTURE-SEE ELEC.

3'-6" x 3'-0" WD FRAME MIRROR

-NO TILE BEHIND

PIPE PROTECTION

PANEL

10

A004

Sim

CT-5

5'-0

"

8" WIDE ACCENT MOSAIC

WALL TILE - INSTALL AT 1/3 OFFSET

CT-4

CT-5

4

I800

CHAIR RAIL ALL WALLS OF ELEV. LOBBY

VINYL WALL COVERING

Date

Project Number

1301 American Blvd ESuite 100Bloomington, MN 55425tel: (612) 879-6000fax: (612) 879-6666www.kaaswilson.com

Copyr

ight K

aas

Wils

on A

rchite

cts

Ow

ner:

Pro

ject

:

kaas wilson

architects

PERMIT SET

1/4" = 1'-0"

1/3

1/2

01

7 5

:43:0

7 P

MC

:\R

evit L

ocal\1

667

-He

art

h D

evelo

pm

en

t-O

wen

sb

oro

Se

nio

r Liv

ing_ssta

nke.r

vt

Interior Elevations -Level 1 Commons

& MC

01/31/2017

1667

Ow

ensb

oro

Senio

r Li

ving

Heart

h D

evelo

pm

ent

I501

3138 F

airvie

w D

rive

Ow

ensboro

, K

Y 4

2303

Kitchen:Strategic Equipment & Supply1203 33rd Street South St.Cloud, MN 56301(302) 257-8802

MEP:The Matrix Group311 East Chicago Street,Suite 310Milwaukee, WI 53202(414) 329-2827

Civil:Bryant Engineering Inc.1535 Frederica St.P.O. Box 21382Owensboro, KY 42304270-685-2811

Structural:Advanced StructuralTechnologies, Inc.7210 Metro BlvdEdina, MN 55439(952) 854-9302

67

50

Stillw

ate

r B

lvd. N

., S

uite 2

00

Stillw

ate

r, M

N 5

50

82

(65

1)-

705-8

811

1/4" = 1'-0"16

MC Dining - Elevation 1

1/4" = 1'-0"17

MC Dining - Elevation 2

1/4" = 1'-0"18

MC Dining - Elevation 3 1/4" = 1'-0"

19MC Dining - Elevation 4

1/4" = 1'-0"20

MC Dining - Elevation 5

1/4" = 1'-0"21

MC Dining - Elevation 6

1/4" = 1'-0"22

MC Dining - Elevation 7 1/4" = 1'-0"

23MC Dining - Elevation 8

1/4" = 1'-0"24

MC Dining - Elevation 9 1/4" = 1'-0"

25MC Dining - Elevation 10

1/4" = 1'-0"26

MC Tub Room - Elevation 1 1/4" = 1'-0"

27MC Tub Room - Elevation 2

1/4" = 1'-0"28

MC Tub Room - Elevation 3

1/4" = 1'-0"29

MC Tub Room - Elevation 4 1/4" = 1'-0"

30MC Restroom - Elevation 1

1/4" = 1'-0"31

MC Restroom - Elevation 2 1/4" = 1'-0"

32MC Restroom - Elevation 3

1/4" = 1'-0"33

MC Restroom - Elevation 4

1/4" = 1'-0"15

Laundry Level 1 - Elevation 1

1/4" = 1'-0"34

MC Dayroom - Elevation 1

1/4" = 1'-0"36

MC Dayroom - Elevation 2

1/4" = 1'-0"35

MC Dayroom - Elevation 3

1/4" = 1'-0"37

MC Dayroom - Elevation 4 1/4" = 1'-0"

38MC Dayroom - Elevation 5

1/4" = 1'-0"39

MC Dayroom - Elevation 6

1/4" = 1'-0"1a

Reception - Elevation 1 1/4" = 1'-0"

2Conf. - Elevation 1

1/4" = 1'-0"3

Conf. - Elevation 2 1/4" = 1'-0"

4Conf. - Elevation 3

1/4" = 1'-0"5

Conf. - Elevation 4 1/4" = 1'-0"

6Work Room - Elevation 1

1/4" = 1'-0"7

Work Room - Elevation 2 1/4" = 1'-0"

8Nurse - Elevation 1

1/4" = 1'-0"10

Nurse - Elevation 2 1/4" = 1'-0"

9Nurse - Elevation 3

1/4" = 1'-0"11

Mens/Womens Restroom - Elevation 1 1/4" = 1'-0"

12Mens/Womens Restroom - Elevation 2

1/4" = 1'-0"13

Mens/Womens Restroom - Elevation 3 1/4" = 1'-0"

14Mens/Womens Restroom - Elevation 4

1/4" = 1'-0"40

Elev. Lobby Typ - Elevation 1

Rev.

No.

Revi

sion

Date

Page 18: I100 - ftp.envisionky.comftp.envisionky.com/OwensboroSeniorLiving/Owensboro Senior...CERAMIC OR PORCELAIN PLANK FLOOR TILES INSTALLED IN A BRICK PATTERN SHOULD NOT BE OFFSET MORE THAN

264

OPEN TO 2ND CORRIDOR BEYOND

4

I800

3'-0

"

1

I802

B18X28.5"H

24" D PLAM C-TOP

ART - PROVIDE BACKING

ADJ. BOOKSHELVES

OPEN

VWC

20

I801263a

VWC-3

2'-6

"

PL-2

W2730

W3618

W3330

W3018

W1830

W3612

B18X32.5"H

W1530

B15HCP

PIPE PROTECTION PANEL.DOUBLE BASIN SINK.

3" VALANCE W/ LIGHT-SEE ELEC.

HOOD - SEE MECH.

VFY LOCKED CAB LOCATION W/ OWNER

BACKSPLASH TILE

24" D GRANITE C-TOP

NSF REFRIG - VFY WIDTH PRIOR TO CAB INSTALLATION

DROP-IN RANGE

ADA HT DISHWASHER

3" SUPPORT END PANEL

2

I802

GR-1

2'-1

0"1'

-6"

2'-6

" CT-7

WHB30WHB36

OPEN 3'-0

"

GRANITE C-TOP

OPEN TO COMMUNITY

ROOM BEYOND GR-1

4

I800

3'-0

"

262a 262b 262c

2'-6

"

3

I802

3'-0

"

PT-6 GYP & TRIM ON FRONT & SIDES OF ISLAND

4

I800262e

11

I800

Typ

262d

4

I800

3'-0

"

OPEN TO LOBBY BEYOND & BELOW

OPEN TO LOBBY BEYOND & BELOW

I800

15

OPEN TO 2nd LEVEL

CORRIDOR

OPEN TO 2nd LEVEL

CORRIDOR

OPEN TO 2nd LEVEL

CORRIDOR

4

I8002

I800

21

I800

I800

20Typ.

5'-0

"

8" WIDE MOSAIC ACCENT TILE

6x24 PORCELAIN FIELD TILE. INSTALL 1/3 OFFSET

CT-5

5'-0

"

2'-1

0"

CT-4

CT-5

10

A004

Sim

2'-1

0"

3'-4

" 5'-0

"

VANITY LIGHT FIXTURE -SEE LIGHTING SCHEDULE

3'6" x 3'0" WD FRAMED MIRROR

8" WIDE ACCENT MOSAIC TILE

6x24 PORCELAIN FIELD TILE.INSTALL 1/3 OFFSET.

PIPE PROTECTION PANEL

CT-5

CT-4

5'-0

"

CT-5

LC1884

DC3-18 B15 B15

BK3048

DC3-18

LC1884

GC TO PROVIDE BACKING.

MIRROR PROVIDED IN FF&E

WALL SCONCE TYP. SEE ELEC

21

I801

TYP.

278

B33B33B33

W3330W3330W3330

3'-0

"1'

-6"

2'-6

"

24"D PLAM C-TOP

FILLER PIECE TO MATCH

18

I801

Sim.

PL-4

269b269a

1'-0

"7'

-0"

8'-0

" MIRRORS - LEAVE FREE OF ALL DEVICES

4'-0"4'-0"4'-0"4'-0"4'-0"

APPROX. TV LOCOATION - GC TO PROVIDE BACKING

TO

CE

NT

ER

OF

TV

6'-6

"

23

I800

282a

DC3-15 B27X32.5"H B30X32.5"H

10

A004

Sim 24" D PLAM C-TOP

2'-1

0"1'

-6"

2'-6

"

PIPE PROTECTION PANEL.

W3030

W3615

W2730W1530

WD VALANCE W/ LIGHT

PL-1

COUNTERTOP MICRO

WHB36

285b 285c 285d285a

3'-0

"

26

I800

B30B30B30B30

3'-0

"

24" D PLAM C-TOP

26

I800

3'-0

"

PL-2

26

I800

3'-0

"

3'-0

"

26

I800

3'-0

"

UNDER COUNTER BRACKET SUPPORT.

24" D PLAM C-TOP

283

19

I801

PL-4W3630W3630W3630

10

I801

24" D C-TOP

COORDINATE BRACKET LOCATION W/ OWNER

2'-6

"2'

-0"

2'-6

"

BOX/FILE/FILE BOX/FILE/FILEOPEN

BELOW

PL-4

ALL CABS LOCKABLE

METAL LOCKERS -SEE SPEC

5'-0

"

FRP BEHIND SINK

MIN.

4'-0"

SINGLE BASIN SINK

PIPE PROTECTION PANEL

24" D PLAM C-TOP & BACKSPLASH

2'-1

0"

LC1884 LC1884

2

I802PL-4

Date

Project Number

1301 American Blvd ESuite 100Bloomington, MN 55425tel: (612) 879-6000fax: (612) 879-6666www.kaaswilson.com

Copyr

ight K

aas

Wils

on A

rchite

cts

Ow

ner:

Pro

ject

:

kaas wilson

architects

PERMIT SET

1/4" = 1'-0"

1/3

1/2

01

7 5

:43:1

1 P

MC

:\R

evit L

ocal\1

667

-He

art

h D

evelo

pm

en

t-O

wen

sb

oro

Se

nio

r Liv

ing_ssta

nke.r

vt

Interior Elevations -Level 2 Commons

01/31/2017

1667

Ow

ensb

oro

Senio

r Li

ving

Heart

h D

evelo

pm

ent

I502

3138 F

airvie

w D

rive

Ow

ensboro

, K

Y 4

2303

Kitchen:Strategic Equipment & Supply1203 33rd Street South St.Cloud, MN 56301(302) 257-8802

MEP:The Matrix Group311 East Chicago Street,Suite 310Milwaukee, WI 53202(414) 329-2827

Civil:Bryant Engineering Inc.1535 Frederica St.P.O. Box 21382Owensboro, KY 42304270-685-2811

Structural:Advanced StructuralTechnologies, Inc.7210 Metro BlvdEdina, MN 55439(952) 854-9302

67

50

Stillw

ate

r B

lvd. N

., S

uite 2

00

Stillw

ate

r, M

N 5

50

82

(65

1)-

705-8

811

1/4" = 1'-0"1

Library - Elevation 3 1/4" = 1'-0"

2Library - Elevation 4

1/4" = 1'-0"3

Community Room - Elevation 1

1/4" = 1'-0"5

Community Room - Elevation 2

1/4" = 1'-0"4

Community Room - Elevation 3

1/4" = 1'-0"6

Community Room - Elevation 5 1/4" = 1'-0"

7Community Room - Elevation 6

1/4" = 1'-0"8

Mezz. - Elevation 1 1/4" = 1'-0"

9Mezz. - Elevation 2

1/4" = 1'-0"12

Restroom 277 - Elevation 1 1/4" = 1'-0"

13Restroom 277 - Elevation 2

1/4" = 1'-0"14

Restroom 277 - Elevation 3 1/4" = 1'-0"

15Restroom 277 - Elevation 4

1/4" = 1'-0"10

Salon - Elevation 1 1/4" = 1'-0"

11Salon - Elevation 2

1/4" = 1'-0"19

Fitness - Elevation 1 1/4" = 1'-0"

20Fitness - Elevation 2

1/4" = 1'-0"22

Staff - Elevation 1

1/4" = 1'-0"24

Theater - Elevation 1 1/4" = 1'-0"

25Theater - Elevation 2

1/4" = 1'-0"26

Theater - Elevation 3 1/4" = 1'-0"

27Theater - Elevation 4

1/4" = 1'-0"16

Laundry Levels 2, 3 & 4 - Elevation 1 1/4" = 1'-0"

18Charting - Elevation 1

1/4" = 1'-0"23

Staff - Elevation 2

1/4" = 1'-0"17

Laundry Levels 2,3 & 4 - Elevation 2

1/4" = 1'-0"21

Exam - Elevation 1

Rev.

No.

Revi

sion

Date

Page 19: I100 - ftp.envisionky.comftp.envisionky.com/OwensboroSeniorLiving/Owensboro Senior...CERAMIC OR PORCELAIN PLANK FLOOR TILES INSTALLED IN A BRICK PATTERN SHOULD NOT BE OFFSET MORE THAN

B30X32.5"H B30X32.5"HB27X32.5"H

PIPE PROTECTION PANEL.

24" D PLAM C-TOP

W2730

W3618

W3030 W3030

WD VALANCE W/ LIGHT

2'-1

0"1'

-6"

2'-6

"

PL-4

WHB36

385b

LC1884

10

A004

Sim

5'-0

"

8"WIDE ACCENT MOSAIC

FIELD TILE. INSTALL AT 1/3 OFFSET.

VANITY LIGHT FIXTURE -SEE LIGHTING SCHEDULE

3'6" x 3'0" WD FRAMED MIRROR

PIPE PROTECTION PANEL

CT-5

CT-4

5'-0

"

9'-1

1/8

"

OPEN TO BEYOND

CT-5

5'-0

"

8"WIDE ACCENT MOSAIC

FIELD TILE. INSTALL AT 1/3 OFFSET.

CT-5

CT-4

486

5'-0

"

8"WIDE ACCENT MOSAIC

FIELD TILE. INSTALL AT 1/3 OFFSET.

CT-4

CT-5

OPEN

CT-5

8"WIDE ACCENT MOSAIC

FIELD TILE. INSTALL AT 1/3 OFFSET.

CT-5

CT-4

General Notes - Interior Elevations

1. All counters @ common areas to be granite unless noted otherwise.

2. Crown molding @ all common area casework.

3. Coordinate/verify soffit depth requirements with mechanical and millwork. Do not cut into crown molding for mechanical grilles.

4. Paint all louvers, access panels, etc. to match adjacent wall/ceiling surface.

5. Do not place any sprinkler heads, fire alarm pulls or horn/strobes, nurse call pulls, or other such devices in any area noted for artwork or TV locations. If any such devices are required to be in proximity to these locations, consult architect regarding placement prior to installation.

6. See I800-I801 for millwork details.

7. See A870 for door schedule, door elevations, and door details.

8. See I300's (floor plans) for corridor arch & millwork arch locations

Date

Project Number

1301 American Blvd ESuite 100Bloomington, MN 55425tel: (612) 879-6000fax: (612) 879-6666www.kaaswilson.com

Copyr

ight K

aas

Wils

on A

rchite

cts

Ow

ner:

Pro

ject

:

kaas wilson

architects

PERMIT SET

As indicated

1/3

1/2

01

7 5

:43:1

8 P

MC

:\R

evit L

ocal\1

667

-He

art

h D

evelo

pm

en

t-O

wen

sb

oro

Se

nio

r Liv

ing_ssta

nke.r

vt

Interior Elevations -Level 3 & 4Commons

01/31/2017

1667

Ow

ensb

oro

Senio

r Li

ving

Heart

h D

evelo

pm

ent

I503

3138 F

airvie

w D

rive

Ow

ensboro

, K

Y 4

2303

Kitchen:Strategic Equipment & Supply1203 33rd Street South St.Cloud, MN 56301(302) 257-8802

MEP:The Matrix Group311 East Chicago Street,Suite 310Milwaukee, WI 53202(414) 329-2827

Civil:Bryant Engineering Inc.1535 Frederica St.P.O. Box 21382Owensboro, KY 42304270-685-2811

Structural:Advanced StructuralTechnologies, Inc.7210 Metro BlvdEdina, MN 55439(952) 854-9302

67

50

Stillw

ate

r B

lvd. N

., S

uite 2

00

Stillw

ate

r, M

N 5

50

82

(65

1)-

705-8

811

1/4" = 1'-0"1

Crafts - Elevation 1 1/4" = 1'-0"

2Crafts - Elevation 2

1/4" = 1'-0"3

Tub Room - Elevation 1 1/4" = 1'-0"

4Tub Room - Elevation 2

1/4" = 1'-0"5

Tub Room - Elevation 3 1/4" = 1'-0"

6Tub Room - Elevation 4

1/4" = 1'-0"8

Tub Room 468 - Elevation 6 1/4" = 1'-0"

7Tub Room 486 - Elevation 5

Rev.

No.

Revi

sion

Date

Page 20: I100 - ftp.envisionky.comftp.envisionky.com/OwensboroSeniorLiving/Owensboro Senior...CERAMIC OR PORCELAIN PLANK FLOOR TILES INSTALLED IN A BRICK PATTERN SHOULD NOT BE OFFSET MORE THAN

GYP. BD

F600 F600

GYP. BD

1X4 HDWD

*SEE CHAIR RAIL DETAILS FOR WHERE TRIM IS STAINED OR PAINTED

1'-2"

2'-8

1/2

"1

1/2"

2'-1

0"

MOUNT ELEC BOXES, V.D./ CABLING TIGHT

TO UNDERSIDE OF COUNTER ALL WIRING

WITHIN STUD CAVITY

UNDER COUNTER CAB BEYOND

TYPICAL WALL PANEL DETAILING - SEE 6/A870

I3b

2'-0"

CASED OPENING BEYOND

PLAM CTOP ON 3/4" PART. BD.

SCRIBE PLAM BACK & SIDE SPLASH TO WALLS, TYP.

ELEC. WIRE MOLD - PAINTHOLD TIGHT TO BACKSPLASH

SEE ELEC. -TYP.

1 1/

2"

3 1/

4"

1x CLEAT @ ALL ADJ. WALLS

PROVIDE 3"x3"x1/8" ANGLE BRACKET @ 4'-0" MAX SPACING

2'-6

"

F600, STAIN F600, STAIN

1X4 HDWD, STAIN

GYP.

1/4" HDWD VENEER PANELS, STAIN

HOLD1/2"

HDWD SILL

1x4 HDWD TRIM

1" x 4" MAPLE TRIM SKIRT

1" THICK MAPLE SHELF- 12" RADIUS FROM CORNER

32

" A

.F.F

.

1" x 4" MAPLE TRIM SKIRT

SECTION

PLAN

1'-0"

1' -

0"

R

1" THICK MAPLE SHELF- 12" RADIUS FROM CORNER

PROVIDE BACKING AND USE FINISH SCREWS TO SECURE

WOOD BASE SHOE- FERCHE F200, STAIN

GYP. BD.

1/4" HDWD VENEER PANEL, STAIN

1x6 HDWD BASE, STAIN

WOOD TRIM- FERCHE 600, STAIN

2'-3

"4'

-3"

1x3 HDWD TRIM, STAIN

FERCHE TRIM F605, STAIN

1x4 HDWD TRIM, STAIN

FERCHE COVE F600, STAIN

1x4 HDWD TRIM, STAIN

FERCHE COVE F600, STAIN

1/4" HDWD VENEER PANEL, STAIN

10

I800

1X4" HDWD STILE BEYOND

FERCHE COVE F600, STAIN

1X4" HDWD STILE BEYOND

1x4 HDWD CHAIR RAIL, PAINT

1x2 HDWD TRIMEASE TOP EDGE (1x8 WALL CAP @ HALF WALL), PAINT

WOOD TRIM - FERCHE 600, PAINT

GYP. BD.

GYP. BD. - PAINT PT-3See

Ele

va

tion

1x6 HDWD BASE, PAINT

WOOD TRIM- FERCHE 600, PAINT

1x4 HDWD STILE BEYOND, PAINT 9

I800

WOOD BASE- FERCHE F225, PAINT

1x6 HDWD CHAIR RAIL, STAIN

WOOD TRIM- FERCHE F600, PAINT

WOOD TRIM- FERCHE F600, PAINT

0' - 1 1/2"GYP BD.

GYP. BD.

2x6 BLOCKING

2' -

5"

BREADLOAF HAND RAILRETURN ALL ENDS - STAIN

0' -

5 1

/2"

2' -

5"

WOOD BASE- FERCHE F275, PAINT

GYP. BD.

GYP. BD

1x6 HDWD CHAIR RAIL, PAINT

WOOD TRIM- FERCHE F600, PAINT

WOOD TRIM - FERCHE F600, PAINT

Double Sided Fireplace

I800

16

VERIFY CLEAR DIM OF FIREPLACE W/ VENDOR

CAST STONE HEARTH

2x10 BASE FRAME

BRICK BASE

1'-0" VFY W/MANUF. 1'-0"

1'-8

"1'

-0"

VF

Y W

/ F.P

. VE

ND

OR

3'-3

1/8

"2"

10"

I4a

GYP BD ART RECESS, BRICK SURROUND

HDWD TRIM

1x2 HDWD TRIM

F600 COVE1X4 HDWD TRIM

F600 COVE

1/4" HDWD VENEER PANEL

1x6 HDWD TRIM

1x3HDWD TRIM

1x2 HDWD TRIM

HDWD. VENEER PLYWD.

1x3 HDWD TRIM

F614

HDWD TRIM

F600 COVE1X4 HDWD TRIM

F600 COVE

1/4" HDWD VENEER PANEL

F600

HDWD. VENEER PLYWD.

1x3 HDWD TRIM

F614

F600

FIREPLACEVFY. DEPTH AND SIZE W/ MFGR.

REQUIREMENTS

NOTE: VERIFY CLEARANCE REQUIREMENTS TO COMBUSTABLE MATERIALS.

1x10 HDWD TRIM

F614 HDWD TRIM

1x HDWD TRIM

9 1/4"

1x4 HDWD TRIM

1x3 HDWD TRIM

F600

13

I800

PANELING TO WRAP ON ALL SIDES.

I800

16

5

I800

11 3

/4"

3'-8

15/

16"

1'-0

"7

1/4"

10'-1

1 3/

4"6

1/16

"2'

-0"

3 1/

4"

BRICK INSTALL AT 1/3 OFFSET

ALL WOOD PANELING & TRIM PT-3

BRICK INSTALL AS SHOWN. HERRINGBONE PATTERN. LINEAR BORDER.

KEYSTONE TO MATCH BRICK

1X HDWD CORNICE

FERCHE F614 CROWN

1X1 WOOD TRIM

R 1

3'-3

"

I800

16

1'-0" 1'-0" 5'-6 3/4" 1'-0" 1'-0"

1'-8

1/4

"8'

-11

9/16

"1'

-7 1

1/16

"

WRAP CORNER W/12" WOOD TRIM (FRONT & SIDE)

GAS FIREPLACE

INSERT

DECORATIVE RAIL

BR-1

1x Trim 1X8" HARDWOODTRIM

1X4" HARDWOODTRIM

METAL BALUSTER

NEWEL POST BEYOND

1x4 HDWD CHAIR RAIL, STAIN

1x2 HDWD TRIMEASE TOP EDGE (1x8 WALL CAP @ HALF WALL), STAIN

WOOD TRIM - FERCHE 600, STAIN

GYP. BD.

1/4" HDWD VENEER, STAINSee

Ele

va

tion

1x6 HDWD BASE, STAIN

WOOD TRIM- FERCHE 600, STAIN

1x4 HDWD STILE BEYOND, STAIN

10

I800

5 1/

2"2'

-1 1

/2"

3 1/

2"

1 1/

2"

1x6 HDWD BASE, STAIN

1/2" COVE -FERCHE F600, TYP., STAIN

1x4 HDWD STILE BEYOND, STAIN

1x HDWD TRIM, STAIN

1x2 HDWD TRIM, STAIN

5/8" GYP. BD. - PAINT

I4a

9 1/2"

1x HDWD CAP, STAIN

SOFFIT FRAMING

CROWN MOULDINGFERCHE F614, STAIN

CEILING -SEE RCP

COVE LIGHTING - SEE ELEC.

3 1/2" 11" 3 1/2"3/4"

2 1/

2"11

1/2

"2

1/2"

3/4"

1'-6

"

1'-6"

11 3/4"11 3

/4"

1x4 HDWD TRIM, TYP

1x3 HDWD TRIM, TYP

1/2" COVE - ALL SIDES

5/8" GYP BD

1x6 HDWD BASE

2x4 FRAMING

3'-0

"

VA

RIE

S -

SE

E R

CP

GYP BD

1'-6"

1x4 HDWD TRIM

1/2" COVE - FERCHE F600, TYP

1x4 HDWD TRIM

GYP BD

1x4 HDWD TRIM

1x6 HDWD BASE

1/2" COVE - FERCHE F600, TYP

21

I800

ALL TRIM & GYP PAINTED PT-3

6 1/

4"1'

-7 5

/16"

2 1/

4"

2'-3

13/

16"

2 1/4" 5 3/4" 2 1/4"

10 1/4"

UNIT NUMBER PLAQUE

1/8" TEMPERED GLASS WINDOW

STAINED HDWD. (ALL EXPOSED SURFACES) TYP. - U.N.O.

CAMLOCK

CLR.

4"

1/2"

1/2"

1/2" 1/2"

1/2"

6 1/

4"1'

-7 5

/16"

2 1/

4"1/

2"

CLE

AR

2'-1

"

CAMLOCK

1/4" ADJ. GLASS SHELF (2-THUS), CENTER IN GLAZED WINDOW

5/8" TYPE 'X' GYP. BD. EA. SIDE WD STUDS

5/8" TYPE 'X' GYP. BD. ALL SIDES OF RECESS

Elevation Detail Section Detail

SEE PLANS

VARIES

STAINED HDWD VENEER (ALL EXPOSED SURFACES) TYP. - U.N.O.

2' -

10

"

BASE

IVES BRACKET - BRONZE

MAPLE LOAF WOOD HAND RAIL

RETURN TO WALL 45 DEGREESAT ALL TERMINATIONS

24

I800

1 1/2" HANDRAIL

1x6 HDWD TRIM

RETURN @ ALLENDS 45 DEGREES

IVES BRACKET48" O.C.

BLOCKING AS NEEDED

WOOD BASE- FERCHE F225

GYP. BD.

1x2 HDWD TRIMEASE TOP EDGE (1x8 WALL CAP @ HALF WALL)

GYP. BD.

SE

E E

LE

VA

TIO

N

STAIN TRIM & BASE AT THEATER, PAINTED TRIM & BASE AT MC DAYROOM (PT-3)

MOUNT ELEC BOXES, V.D./ CABLING TIGHT

TO UNDERSIDE OF COUNTER ALL WIRING

WITHIN STUD CAVITY

UNDER COUNTER CAB BEYOND

TYPICAL WALL PANEL DETAILING - SEE 6/A870

I3b

2'-0"

PLAM CTOP ON 3/4" PART. BD.

SCRIBE PLAM BACK & SIDE SPLASH TO WALLS, TYP.

ELEC. WIRE MOLD - PAINTHOLD TIGHT TO BACKSPLASH

SEE ELEC. -TYP.

1 1/

2"

3 1/

4"

1x CLEAT @ ALL ADJ. WALLS

PROVIDE 3"x3"x1/8" ANGLE BRACKET @ 4'-0" MAX SPACING

2'-6

"

MEMORY CARE BOX @ MEMORY CARE UNITS (1st FLOOR ONLY) -PURSE SHELF AT AL/IL UNITS (STAIN)

HDWD. HANDRAIL, STAIN

60" MAX. HT. TO BRAILLE ON SIGNAGE

ACCENT PAINT- VARIES BY LEVEL

F608 - MITER & RETURN ON ENDS, PAINT

1X6 HDWD TRIM, PAINT

1X4 VERT. HDWD

TRIM, PAINT

1X6 HDWD TRIM, PAINT

1'-3"

EQ

EQ

4'-0

" T

O V

IEW

ER

@ A

CC

. UN

ITS

VIE

WE

R T

O B

E C

EN

TE

RE

D A

S S

HO

WN

1'-3"

T.O

. SH

ELF

2'-8

"

T.O

. FIN

ISH

ED

ME

MO

RY

BO

X

4'-1

1"

C.L

. SC

ON

CE

5'-1

0"

CONTROL JOINTS

I800

18

I800

19

PT-4

PT-5

PT-6

PT-7

LEVEL 1

LEVEL 2

LEVEL3

LEVEL 4

PT-8

PT-8

PT-9

ABOVE HAND RAIL

BELOW HAND RAIL

ACCENT PAINT WRAPS INSIDE RETURN

PT-14 MEMORY CARE

WOOD BASE SHOE- FERCHE F200, PT-3

GYP. BD. PT-3

1X1-1/2 WOOD TRIM BEYOND. PT-3

1x6 HDWD BASE, PT-3

WOOD TRIM- FERCHE 600. PT-3

4'-5

"3'

-0"

FERCHE COVE F600, PT-3

1X4 WOOD TRIM. PT-3

10

I800

7'-5

"

1x1-1/2 WOOD TRIM. PT-3

1X1-1/2 WOOD TRIM BEYOND. PT-3

WOOD TRIM- FERCHE 600. PT-3

WOOD TRIM- FERCHE 600. PT-3

1X1-1/2 WOOD TRIM BEYOND. PT-3

1x1-1/2 WOOD TRIM. PT-3

1x1-1/2 WOOD TRIM. PT-3

1X4 WOOD TRIM. PT-3

1X2 WOOD TRIM. PT-3

FIREPLACEVFY. DEPTH AND SIZE W/ MFGR.

REQUIREMENTS

BRICK BEYOND

MILLWORK FIREPLACE MANTLE SURROUND

(BEYOND)

NOTE: VERIFY CLEARANCE REQUIREMENTS TO COMBUSTABLE MATERIALS.

HDWD. VENEER PLYWD.

1x3 HDWD TRIM

F614

HDWD TRIM

F600

BRICK BEYOND

3'-0

"

MIN

IMU

M

1'-0

"1'

-8"

Date

Project Number

1301 American Blvd ESuite 100Bloomington, MN 55425tel: (612) 879-6000fax: (612) 879-6666www.kaaswilson.com

Copyr

ight K

aas

Wils

on A

rchite

cts

Ow

ner:

Pro

ject

:

kaas wilson

architects

PERMIT SET

As indicated

1/3

1/2

01

7 5

:43:2

7 P

MC

:\R

evit L

ocal\1

667

-He

art

h D

evelo

pm

en

t-O

wen

sb

oro

Se

nio

r Liv

ing_ssta

nke.r

vt

MillworkDetails/Unit Entries

01/31/2017

1667

Ow

ensb

oro

Senio

r Li

ving

Heart

h D

evelo

pm

ent

I800

3138 F

airvie

w D

rive

Ow

ensboro

, K

Y 4

2303

Kitchen:Strategic Equipment & Supply1203 33rd Street South St.Cloud, MN 56301(302) 257-8802

MEP:The Matrix Group311 East Chicago Street,Suite 310Milwaukee, WI 53202(414) 329-2827

Civil:Bryant Engineering Inc.1535 Frederica St.P.O. Box 21382Owensboro, KY 42304270-685-2811

Structural:Advanced StructuralTechnologies, Inc.7210 Metro BlvdEdina, MN 55439(952) 854-9302

67

50

Stillw

ate

r B

lvd. N

., S

uite 2

00

Stillw

ate

r, M

N 5

50

82

(65

1)-

705-8

811

1 1/2" = 1'-0"9

Millwork - Panel Stile w/Gyp.

1" = 1'-0"25

Millwork - Reception Desk Section

1 1/2" = 1'-0"10

Millwork - Panel Stile w/Wood 1 1/2" = 1'-0"

11Millwork - Window Sill Detail

1 1/2" = 1'-0"19

Millwork - Unit Entry Shelf

1" = 1'-0"12

Millwork - Private Dining Wood Paneling(CR-2)

1" = 1'-0"4

Millwork - Standard Paneling w/Gyp (CR-1) 1" = 1'-0"

6Millwork - Corridor Handrail (CR-6)

1" = 1'-0"7

Millwork - Corridor Chair Rail (CR-7)

1" = 1'-0"13

Millwork - Lobby Fireplace Section

1 1/2" = 1'-0"16

Millwork - Lobby Fireplace Molding Profile

1/2" = 1'-0"14

Millwork - Lobby Fireplace Elev 1st FloorFront

1/2" = 1'-0"15

Millwork - Lobby Fireplace

1" = 1'-0"17

Millwork - Lobby Balcony Edge Detail

1" = 1'-0"3

Millwork - Paneling Club Room (CR-3) 1" = 1'-0"

2Millwork - Half Wall Detail

1 1/2" = 1'-0"1

Millwork - Crown Molding 1" = 1'-0"

21Millwork - Column Wrap

1/2" = 1'-0"20

Millwork - Column Elevation

1 1/2" = 1'-0"18

Memory Box Details

3/4" = 1'-0"23

Interior Commons-Handrail Elevation 1 1/2" = 1'-0"

24Interior Commons -Hand Rail Detail

1" = 1'-0"26

Millwork - Basic Chair Rail (CR-5)

1" = 1'-0"27

Millwork - Reception Desk 1/2" = 1'-0"

22Millwork - Typical Unit Entry

1" = 1'-0"8

Millwork - Lobby Paneling (CR-4) 1" = 1'-0"

5Millwork - Section 2 at Lobby Fireplace

Rev.

No.

Revi

sion

Date

Page 21: I100 - ftp.envisionky.comftp.envisionky.com/OwensboroSeniorLiving/Owensboro Senior...CERAMIC OR PORCELAIN PLANK FLOOR TILES INSTALLED IN A BRICK PATTERN SHOULD NOT BE OFFSET MORE THAN

10"VFY. W/ MFGR.

1' - 5"

HDWD. SUPPORT BRACKET, STAIN

FRONT LOADING

MAILBOXES

2'-3

"

VF

Y. W

/ MF

GR

.

2'-4

1/2

"

1x6 HDWD BASE, STAIN

1/4" PLYWOOD PANEL, STAIN

PLAM.

1x4 HDWD. TRIM, STAIN

1x4 HDWD TRIM, BEYOND

6"

9"

3 1/4"

3 1

/4"

1x3 HDWD, STAIN

1X HDWD BRACE, STAIN

BOLT BRACKET TO BLOCKING

IN WALLCOUNTERSINK HOLES & PLUG

10"

CLR

10"

HDWD. SUPPORT BRACKET, STAIN

WD VENEER ALL EXPOSED

SURFACES ON 3/4" PLYWD

2'-3

"2'

-4 1

/2"

1x6 HDWD BASE, STAIN

1/4" PLYWOOD PANEL, STAIN

PLAM CTOP

1x4 HDWD. TRIM, STAIN

1x4 HDWD TRIM, BEYOND

1/4" VENEERED PLYWD

DIVIDERSI801

2

2'-1

0"

VARIES - SEE PLAN

4'-0

"4'

-6"

1'-6" 8'-0" 1'-6"

1x3 HDWD TRIM

1X6 BACKERBOARD

HANDRAIL. VARIES

NOTE: 8' X 4'-6" CORRIDOR ARCH. CENTER ON WALL. KEEP WALL SURFACE FREE OF DEVICES. SEE I300-I303 FOR TRIM LOCATIONS.

SE

E P

LAN

S

VA

RIE

S

1x4 HDWD. TRIM, STAINED

HDWD. BACKBAND, STAINED

JAMB

1x HDWD. TRIM, STAINED

SEE PLANS

VARIES

1x4 HDWD. TRIM, STAINED

1x HDWD. TRIM, STAINED

1/4"

HDWD. BACKBAND, STAINED

HEAD

1x TRIM, STAIN

BREADLOAF HANDRAIL,STAIN

METAL BALUSTER, 0'-6" O.C. MAX

NOTE: OPEN SPACE BETWEEN BALUSTERS NOT TO EXCEED 4" AT ANY POINT

1X8" HARDWOODTRIM, STAIN

1X4" HARDWOODTRIM, STAIN

FLOOR TRUSSES-SEE STRUCT.

1X4" HARDWOOD TRIM, STAIN

1X3" HARDWOOD TRIM, STAIN

SE

E R

CP

BEAM SEE STRUCT.

NEWEL POST, STAIN, 8'-0" O.C. MAX

See Ref. Clg Plan

3'-6

"

CROWN MOULDING, STAIN

2'-0

"

1X3 HDWD

2X2 HDWD

1X3 HDWD

9 1/4"

9 1

/4"

45°

1'-0"

1'-4

"

BOLT THROUGH TO STUD WALL

2'-6

"

I3a

1" 1'-11"

GRANITE TOP -SEE INTERIORS

I801

8

GYP BD WALL BEYOND

3'-6 3/4"

1'-2"

VF

Y -

VA

RIE

S P

ER

LO

CA

TIO

NV

FY

- V

ER

IES

PE

R L

OC

AT

ION

VF

Y-

VA

RIE

S P

ER

LO

CA

TIO

N

7'-8

"

3'-4

1/2

"

PLAM ON 1 1/4" PART. BD. TOP

PLAM BASE

PLAM (ALL EXPOSED SURFACES) ON 3/4" PART. BD.

PLAM (ALL EXPOSED SURFACES) ON 3/4" PART. BD

3/4" WHITE MELAMINE ADJ. SHELVES

PULL

INT. FINISH TO BE WHITE MELAMINE

3/4" WHITE MELAMINE ADJ. SHELF

1'-9"

2'-1"

CLEAR

1'-0 3/4"

2'-0"

4"1

1/4"

1/4"

6"

1/8"

2'-4

7/8

"

1/4"

1'-3"

4"

1'-8"

PULL

SCRIBE PLAM BACK & SIDE SPLASH TO WALLS, TYP.

4"

ELEC. WIRE MOLD - PAINTHOLD TIGHT TO BACKSPLASHSEE ELEC. -TYP.

PROVIDE IN-WALL BLKG. AS REQD. - TYP.

7'-8

"

7'-8

"

PLAM BASE

PLAM (ALL EXPOSED SURFACES) ON 3/4" PART. BD.

INT. FINISH TO BE WHITE MELAMINE

3/4" WHITE MELAMINE ADJ. SHELF

1'-9"

2'-0"

4"

PULL

PROVIDE IN-WALL BLKG. AS REQD. - TYP.

4'-2

"3/

8"3'

-5 3

/8"

3/4" WHITE MELAMINE ADJ. SHELF

3/4" WHITE MELAMINE ADJ. SHELF

3/4" WHITE MELAMINE ADJ. SHELF

SOFFIT FRAMING

CEILINGS & BOTT. OF SOFFITS TEXTURED - TYP.

WALL

CEILING

VE

RIF

Y w

/ RC

P

VERIFY w/ RCP

T.O

. BLK

G

7"

LED ROPE LIGHT

CROWN FERCHE F614, STAIN

2x WD BLKG

2 11/16"

3 1/

4"

PLAMCOUNTER TOP

OPEN

PAINT BRACESTO MATCH ADJACENTWALL

BRACKET SEE 7/A456

WELDEDSTL. PLATE

SLOPE & FILL

BOTTOM LEGS

2' -

10

"

0' -

2 1

/4"

1' - 6"

1" STL. TUBE

2 LAG BOLTS TOWALL & SCREW TO

COUNTERTOP

6"X6" TRIANGULAR1/8" WELDED STL. PLATE

SLOPE & FILL BOTTOM LEGS

PAINT BRACES TO MATCH ADJACENT WALL

NOTE:PROVIDE 16"X16" BRACE

@ H.C. BATH LAV. TOPSAND 10"X10" BRACE @

BREAKFAST COUNTERS

0' - 6"

2'-6

"1'

-8"

2'-8

"

6'-1

0"

PLAM CTOP ON 3/4" PART. BD.

PLAM (ALL EXPOSED SURFACES) ON 3/4" PART. BD

3/4" WHITE MELAMINE ADJ. SHELVES

PULLCLEAR

1'-0 3/4"

1/4"

1'-3"

SCRIBE PLAM BACK & SIDE SPLASH TO WALLS, TYP.

ELEC. WIRE MOLD - PAINTHOLD TIGHT TO BACKSPLASHSEE ELEC. -TYP.

PROVIDE IN-WALL BLKG. AS REQD. - TYP.

1 1/

2"

4"

2'-1"

1x CLEAT @ ALL ADJ. WALLS

PROVIDE 3"x3"x1/8" ANGLE BRACKET @ 4'-0" MAX SPACING

3"

3'-0

"2'

-4"

1'-1

0"

7'-2

"

PLAM ON 1 1/4" PART. BD. TOP

PLAM BASE

PLAM (ALL EXPOSED SURFACES) ON 3/4" PART. BD.

PLAM (ALL EXPOSED SURFACES) ON 3/4" PART. BD

3/4" WHITE MELAMINE ADJ. SHELVES

PULL

INT. FINISH TO BE WHITE MELAMINE

1'-9"

2'-1"

CLEAR

1'-0 3/4"

2'-0"

4"

1/4"

6"

1/8"

2'-0

3/8

"

1/4"

1'-3"

PULL

SCRIBE PLAM BACK & SIDE SPLASH TO WALLS, TYP.

PROVIDE IN-WALL BLKG. AS REQD. - TYP.

3"

MIN

2'-3

"

WRAP ALL HOT WATER AND DRAINPIPES, BY MECH.

UNDER-CAB LIGHT

VA

RIE

S -

SE

E E

LEV

.1'

-6"

VA

RIE

S -

SE

E E

LEV

.

7'-2

"

3'-0

"

PLAM ON 1 1/4" PART. BD. TOP

PLAM BASE

PLAM (ALL EXPOSED SURFACES) ON 3/4" PART. BD.

PLAM (ALL EXPOSED SURFACES) ON 3/4" PART. BD

3/4" WHITE MELAMINE ADJ. SHELVES

PULL

INT. FINISH TO BE WHITE MELAMINE

3/4" WHITE MELAMINE ADJ. SHELF

1'-9"

2'-1"

CLEAR

1'-0 3/4"

2'-0"

4"1

1/4"

1/4"

6"

1/8"

2'-0

3/8

"

1/4"

1'-3"

4"

1'-8"

PULL

SCRIBE PLAM BACK & SIDE SPLASH TO WALLS, TYP.

4"

ELEC. WIRE MOLD - PAINTHOLD TIGHT TO BACKSPLASHSEE ELEC. -TYP.

PROVIDE IN-WALL BLKG. AS REQD. - TYP.

PLAM CTOP ON 3/4" PART. BD.

SCRIBE PLAM BACK & SIDE SPLASH TO WALLS, TYP.

1 1/

2"

4"

1x CLEAT @ ALL ADJ. WALLS

PROVIDE 3"x3"x1/8" ANGLE BRACKET @ 4'-0" MAX SPACING

VF

Y -

VA

RIE

S P

ER

LO

CA

TIO

N

2'-6

"

PLAM CTOP ON 3/4" PART. BD.

SCRIBE PLAM BACK & SIDE SPLASH TO WALLS, TYP.

ELEC. WIRE MOLD - PAINTHOLD TIGHT TO BACKSPLASHSEE ELEC. -TYP.

1 1/

2"

4"

2'-1"

1x CLEAT @ ALL ADJ. WALLS

PROVIDE 3"x3"x1/8" ANGLE BRACKET @ 4'-0" MAX SPACING

3'-0

"4"

11"

3/4" HDWD VENEER PLYWD., STAINED TO MATCH CABINETRY. EDGEBAND OR WRAP VENEER ON EXPOSED SIDES.

PLAM 3 COUNTER, CONTINUOUS

SCRIBE PLAM. BACKSPLASH & SIDE SPLASH TO WALLS, TYP.

SALON SINK W/ HAND-HELD SPRAYER, ANCHOR TO 2x6 WD. FRAMING BEYOND

BLOW DRYER & CURLING IRON DROP-IN GROMMET AND HOLDERS (TWO PER STATION)2'-1"

ALIGN TO DOOR FACE OF ADJ. CABS

2'-1"

MATCH TOE KICK FINISH AND DEPTH TO ADJ. CABS

INSULATE SUPPLY AND DRAIN PIPES

PROVIDE POWER FOR DRYERS AND CURLING IRONS AT EACH STATION

CAULK ALL EDGES

NECK REST PORTION OF SINK TO BE MOUNTED AT 31" AFF

GRANITE C-TOP -SEE INTERIORS

BASE - SEE INTERIORS

HALF WALL - SEE PLAN

10 3/4"

BASE CAB.

3'-0

"

1x4 HDWD, STAIN

1x4 HDWD STILE BEYOND, STAIN

1x6 HDWD, STAIN

FERCHE F600 COVE TRIM, STAIN

FERCHE F600 COVE TRIM, STAIN

1/4" MAPLE VENEER, STAIN

3'-6"

Date

Project Number

1301 American Blvd ESuite 100Bloomington, MN 55425tel: (612) 879-6000fax: (612) 879-6666www.kaaswilson.com

Copyr

ight K

aas

Wils

on A

rchite

cts

Ow

ner:

Pro

ject

:

kaas wilson

architects

PERMIT SET

As indicated

1/3

1/2

01

7 5

:43:3

4 P

MC

:\R

evit L

ocal\1

667

-He

art

h D

evelo

pm

en

t-O

wen

sb

oro

Se

nio

r Liv

ing_ssta

nke.r

vt

Millwork Details

01/31/2017

1667

Ow

ensb

oro

Senio

r Li

ving

Heart

h D

evelo

pm

ent

I801

3138 F

airvie

w D

rive

Ow

ensboro

, K

Y 4

2303

Kitchen:Strategic Equipment & Supply1203 33rd Street South St.Cloud, MN 56301(302) 257-8802

MEP:The Matrix Group311 East Chicago Street,Suite 310Milwaukee, WI 53202(414) 329-2827

Civil:Bryant Engineering Inc.1535 Frederica St.P.O. Box 21382Owensboro, KY 42304270-685-2811

Structural:Advanced StructuralTechnologies, Inc.7210 Metro BlvdEdina, MN 55439(952) 854-9302

67

50

Stillw

ate

r B

lvd. N

., S

uite 2

00

Stillw

ate

r, M

N 5

50

82

(65

1)-

705-8

811

3/4" = 1'-0"1

Mailbox section 1 1/2" = 1'-0"

2Mailbox Counter Bracket

3/4" = 1'-0"3

Mail Cubby Section 1/4" = 1'-0"

4Corridor Custom Millwork Frames

1 1/2" = 1'-0"5

Cased Opening Jamb 1 1/2" = 1'-0"

6Cased Opening Head

1" = 1'-0"7

Balcony Section

1 1/2" = 1'-0"8

Island Counter bracket 1" = 1'-0"

9MC Dayroom Island Section

1" = 1'-0"12

Millwork - PLAM Cabinet @ Work Station 1" = 1'-0"

13Millwork - PLAM Tall Cabinet Detail

1 1/2" = 1'-0"14

Cove Ceiling Detail

1" = 1'-0"15

Bar Counter 1 1/2" = 1'-0"

16Counter Bracket

1" = 1'-0"10

Millwork - PLAM Desk Detail 1" = 1'-0"

11Millwork - PLAM Cabinet @ Nurse Sink

1" = 1'-0"18

Millwork - PLAM Cabinet Typ.

1" = 1'-0"19

Millwork - PLAM Wall Hung Countertop 1" = 1'-0"

20Millwork - PLAM Library Desk

1" = 1'-0"21

Millwork - Salon Sink 3/4" = 1'-0"

17Millwork - Club Room Island

Rev.

No.

Revi

sion

Date

Page 22: I100 - ftp.envisionky.comftp.envisionky.com/OwensboroSeniorLiving/Owensboro Senior...CERAMIC OR PORCELAIN PLANK FLOOR TILES INSTALLED IN A BRICK PATTERN SHOULD NOT BE OFFSET MORE THAN

2 X 6 FRAMING

HDWD VENEER ON 3/4" PART. BD., TYP.

CLEAR

11 3/4"

1'-2 1/8"

3/4"

1X6 HDWD BASE

8'-0

"5

1/2"

1X HDWD CORNICE

ADJ. 3/4" HDWD VENEER PLYWD SHELVING w/ BRACKETS & STANDARDS

HDWD VENEER (ALL EXPOSED SURFACES) ON 3/4" PART. BD.

1x VERTICAL HDWD TRIM

FERCHE F614 CROWN

3'-4

" M

AX

.

2'-5

" M

IN T

O B

OT

. O

F T

RIM

2'-1

0"

8" MIN

1/4"

2'-3

" M

IN K

NE

E

VARIES - SEE PLANS

1" TUBULAR STEEL BRACEW/ 45 DEGREE FINISHED END

PROVIDE 2X BLOCKING@ BRACES

WOOD BLOCKING FOR TRIM

3" H BACKSPLASH/SIDESPLASH

FIN

. F

LOO

R T

O B

OT

MIR

RO

R.

KNEE CLEAR

FIN

. F

LOO

R T

O T

O R

IM

CLE

AR

AN

CE

3" HDWD SKIRTS ALL SIDES, STAIN

C-TOP - SEE FINISH SCHEDULE SHEET A700

POST-FORMED EDGE

COUNTERTOP BRACKET, SEE 15/A865

2'-5

" M

IN T

O B

OT

. O

F T

RIM

2'-1

0"

2'-0"

SHIELD INSULATEDWASTE & SUPPLY PIPES

1" TUBULAR STEEL BRACEW/ 45 DEGREE FINISHED END

PROVIDE 2X BLOCKING@ BRACES

WOOD BLOCKING FOR TRIM

3" H BACKSPLASH/SIDESPLASH

MIN KNEE & TOE CLEARANCE

FIN

. F

LOO

R T

O T

O R

IM

HDWD SKIRT

C-TOP - SEE FINISH SCHEDULE SHEET A700

HDWD APRON

8" 3" 6"

1'-6

"9"

SINK WITH HARDWOOD APRON AND PROTECTION PANEL

SHIELD INSULATEDWASTE & SUPPLY PIPES

COUNTERTOP BRACKET, SEE 15/A865

GRANITE C-TOP -SEE INTERIORS

SIT

-UP

CO

UN

TE

R

2'-6

"

2'-6 3/4"

SEE PLANS

CURVED

BASE - SEE INTERIORS

HALF WALL - SEE PLAN

1x HDWD BRACKETSEE 15/A450

10"

10"

BASE CAB.

3'-0

"

HDWD

VA

RIE

S -

SE

E E

LEV

.

3'-0

"

GRANITE. STANDARD EASED & POLISHED EDGE.

PLAM BASE

PLAM (ALL EXPOSED SURFACES) ON 3/4" PART. BD.

INT. FINISH TO BE WHITE MELAMINE

3/4" WHITE MELAMINE ADJ. SHELF

1'-9"

2'-1"

2'-0"

4"1

1/4"

2'-6

3/4

"

PULL

CLEAR

11 3/4"

1X HDWD CORNICE

ADJ. 3/4" HDWD VENEER PLYWD SHELVING w/ BRACKETS & STANDARDS

HDWD VENEER (ALL EXPOSED SURFACES) ON 3/4" PART. BD.

FERCHE F614 CROWN

VA

RIE

S -

SE

E E

LEV

.

3'-0

"

GRANITE. STANDARD EASED & POLISHED EDGE. SEE FINISH SCHEDULE.

PLAM BASE

PLAM (ALL EXPOSED SURFACES) ON 3/4" PART. BD. SEE FINISH SCHEDULE.

INT. FINISH TO BE WHITE MELAMINE

3/4" WHITE MELAMINE ADJ. SHELF

1'-9"

2'-1"

2'-0"

4"1

1/4"

2'-6

3/4

"

PULL

11 3/4"

1X HDWD CORNICE

ADJ. 3/4" HDWD VENEER PLYWD SHELVING w/ BRACKETS & STANDARDS

HDWD VENEER (ALL EXPOSED SURFACES) ON 3/4" PART. BD.

PORCELAIN TILE. INSTALLED 1/3 OFFSET. SEE FINISH SCHEDULE.

Date

Project Number

1301 American Blvd ESuite 100Bloomington, MN 55425tel: (612) 879-6000fax: (612) 879-6666www.kaaswilson.com

Copyr

ight K

aas

Wils

on A

rchite

cts

Ow

ner:

Pro

ject

:

kaas wilson

architects

PERMIT SET

As indicated

1/3

1/2

01

7 5

:43:3

9 P

MC

:\R

evit L

ocal\1

667

-He

art

h D

evelo

pm

en

t-O

wen

sb

oro

Se

nio

r Liv

ing_ssta

nke.r

vt

Millwork Details

01/31/2017

1667

Ow

ensb

oro

Senio

r Li

ving

Heart

h D

evelo

pm

ent

I802

3138 F

airvie

w D

rive

Ow

ensboro

, K

Y 4

2303

Kitchen:Strategic Equipment & Supply1203 33rd Street South St.Cloud, MN 56301(302) 257-8802

MEP:The Matrix Group311 East Chicago Street,Suite 310Milwaukee, WI 53202(414) 329-2827

Civil:Bryant Engineering Inc.1535 Frederica St.P.O. Box 21382Owensboro, KY 42304270-685-2811

Structural:Advanced StructuralTechnologies, Inc.7210 Metro BlvdEdina, MN 55439(952) 854-9302

67

50

Stillw

ate

r B

lvd. N

., S

uite 2

00

Stillw

ate

r, M

N 5

50

82

(65

1)-

705-8

811

1" = 1'-0"1

Millwork - Library Bookshelves 1" = 1'-0"

2Millwork - Interior Commons Sink

3/4" = 1'-0"3

Millwork - Community Room Island 1" = 1'-0"

4Millwork - Mail Cafe Built-In

1" = 1'-0"5

Millwork - Club Room Built-In

Rev.

No.

Revi

sion

Date