I100 - ftp.envisionky.comftp.envisionky.com/OwensboroSeniorLiving/Owensboro Senior...CERAMIC OR...
Transcript of I100 - ftp.envisionky.comftp.envisionky.com/OwensboroSeniorLiving/Owensboro Senior...CERAMIC OR...
1. ALL EXPOSED SURFACES TO BE PREPARED TO RECEIVE NEW FINISHES.
2. DO NOT SCALE DRAWINGS.
3. ALL MATERIALS TO BE INSTALLED PER MANUFACTURER'S SPECIFICATIONS.
4. NO SUBSTITUTIONS WITHOUT ARCHITECT'S OR BUILDING OWNER'S APPROVAL.
5. ALL CARPETING TO BE INSTALLED BY DIRECT GLUE METHOD OR PER MANUF. RECOMMENDATIONS, UNLESS NOTED OTHERWISE.
6. INSPECT ALL SURFACES TO RECEIVE NEW FINISHES. REPORT TO ARCHITECT ANY AREAS WHICH ARE NOT SUITABLE TO RECEIVE NEW FINISH PRIOR TO BEGINNING WORK. CONTACT ARCHITECT WITH ANY DISCREPANCIES IN PRODUCT QUALITY SUCH AS DYELOT VARIANCES, PRODUCT SHADING, ETC. DO NOT CONTINUE TO INSTALL PRODUCTS WITH POSSIBLE DEFECTS.
7. ALL MATERIALS SPECIFIED ARE AVAILABLE AS OF ORIGINAL DATE ON PLAN. KAAS WILSON ARCHITECTS IS NOT RESPONSIBLE FOR ANY MATERIALS ORDERED AFTER THIS DATE THAT ARE DISCONTINUED OR UNAVAILABLE. ANY SUBSTITUTIONS MUST BE REVIEWED & APPROVED BY ARCHITECT.
8. 48"H FRP AT ALL MOP SINKS
9. ALL FRP SEAMS AND EXPOSED EDGES TO HAVE COORDINATING TRIM.
10. GROUT LINES AT TILE FLOORS NOT TO EXCEED 3/16" WIDTH GROUT SELECTIONS TO BE SUBMITTED AND APPROVED BY DESIGNER.
11. CERAMIC OR PORCELAIN PLANK FLOOR TILES INSTALLED IN A BRICK PATTERN SHOULD NOT BE OFFSET MORE THAN 33% OF THE LENGTH OF THE TILE. SEE MANUFACTURER'S SPECIFICATIONS FOR MAXIMUM OFFSET TO PREVENT LIPPAGE FROM BOWING IN THE TILE.
12. A SCHLUTER DILEX COVE TRIM IS TO BE USED IN ALL COMMON BATHS AND SHOWER/TUB ROOMS WHERE WALL TILE MEETS FLOOR TILE AND A COVE TILE IS NOT SPECIFIED. SCHLUTER RONDEC TRIM ALONG TOP EDGE OF EXPOSED TILE. ALL SCHLUTER TRIMS TO BE NICKEL FINISH.
13. A SCHLUTER TRANSITION STRIP SHOULD BE USED BETWEEN DIFFERENT FLOORING MATERIAL TRANSITIONS IN COMMON SPACES. PROFILES AND FINISHES TO BE SUBMITTED TO ARCHITECT FOR APPROVAL.
14. ALL MISC METAL ITEMS THROUGHOUT SPACE (METAL SUPPORT BRACKETS, FIRE EXTINGUISHER HOUSINGS, ETC) TO BE PAINTED. ARCHITECT TO SPECIFY COLOR.
15. ALL VCT TILE TO BE INSTALLED IN "SAME DIRECTION" PATTERN OR AS SPECIFIED ON THE FLOOR FINISH PLAN. PRODUCT TO BE WASHED & WAXED AFTER INSTALLATION PER MANUFACTURER'S GUIDELINES.
16. ALL SHEET VINYL PRODUCTS TO BE INSTALLED PER FINISH FLOOR PLAN OR ARCHITECT'S SPECIFICATIONS. PRODUCT TO BE WASHED & WAXED AFTER INSTALLATION PER MANUFACTURER'S GUIDELINES. NOTE: SHEET VINYL PRODUCTS MAY REQUIRE 3-5 COATINGS OF APPROPRIATE METAL CROSSLINK ACRYLIC POLISH VERIFY WITH MANUFACTURER'S REPRESENTATIVE PER PRODUCT FOR EXACT SPECS & RECOMMENDATIONS.
17. FLOOR TRANSITIONS TO OCCUR UNDER DOOR, TYP.
18. ACCENT PAINT AT UNIT ENTRIES IN CORRIDOR, UNLESS NOTED OTHERWISE. ACCENT PAINT INCLUDES WALL WITH ENTRY DOOR AND TWO RETURN WALLS AT SIDES.
19. ASSUME CEILING WHITE TYP. ON CEILINGS IN UNITS AND COMMON AREAS AND DIFFERENT COLOR ON WALLS UNLESS NOTED OTHERWISE. FLAT FINISH THROUGHOUT.
20. ALL EXPOSED ENDS OF CASEWORK TO BE FINISHED.
21. UNDERSIDE OF ALL SOFFITS TO BE SMOOTH. CARRY WALL COLOR ON FACE OF SOFFIT, UNDERSIDE OF SOFFIT TO BE WHITE.
22. ALL CEILINGS TO BE FINE KD, EXECPT IN BATHROOMS (COMMONS & UNITS) WHICH ARE TO BE SMOOTH. WALLS TO BE FINE TEXTURE EXCEPT AT AREAS NOTED FOR WALL COVERING
23. AT ALL LOCATIONS WHERE VINYL WALL COVERING IS APPLIED TO AN EXTERIOR WALL, THE SAME PRODUCT WITH MIRCO-PERF/MICRO-VENT MUST BE USED. BREATHABLE PRIMERS/ADHESIVES MUST ALSO BE USED WITH THE MICRO-VENTED WALL COVERING SO NOT TO REDUCE THE PERMEABILITY OF THE INSTALLATION. SEE MANUFACTURER'S RECOMMONDATIONS FOR PRIMERS.
24. ALL COUNTER TOPS IN KITCHEN/WET AREAS TO GET POST-FORM EDGE W/INTEGRAL BACKSPLASH ALL COUNTERTOPS IN NON-WET AREAS TO GET SQUARE EDGE.
25. ALL OUTLETS IN STAINED WOOD WAINSCOT TO HAVE DARK BROWN OUTLET AND COVER.
26. ALL STAINED TRIM PIECES/BASE/PANELING TO BE MAPLE.
27. ALL COMMON AREA WALLS TO HAVE EGGSHELL SHEEN. UNITS TO BE FLAT, EXCEPT AT KITCHENS AND BATHROOMS WHICH ARE TO BE EGGSHELL.
28. ALL COMMON AREA WINDOWS RECEIVE 1X4 TRIM & HDWD EXTENSION JAMBS - PAINT OR STAIN TO MATCH ROOM TRIM. SEE DETAIL ON SHEET I800.
29. SEE I800 MILLWORK FOR ALL CHAIR RAIL DETAILS (CR-1 - CR-7)
30. WIRE PULLS ON BACK OF HOUSE/STAFF WORK AREAS, BAR PULLS IN ALL COMMON AREAS ON ALL CABINETS.
31. CONTRACTOR TO SUBMIT QTY. (1) SAMPLES/CUT SHEETS FOR ALL FINISH MATERIALS LISTED IN FINISH SCHEDULE TO ARCHITECT FOR APPROVAL PRIOR TO ORDERING PRODUCT. IF SAMPLES ARE NOT SUBMITTED, CONTRACTOR ASSUMES RESPONSIBILITY.
INTERIOR FINISHES GENERAL NOTES
Date
Project Number
1301 American Blvd ESuite 100Bloomington, MN 55425tel: (612) 879-6000fax: (612) 879-6666www.kaaswilson.com
Copyr
ight K
aas
Wils
on A
rchite
cts
Ow
ner:
Pro
ject
:
kaas wilson
architects
PERMIT SET
1" = 10'-0"
1/3
1/2
01
7 5
:40:2
7 P
MC
:\R
evit L
ocal\1
667
-He
art
h D
evelo
pm
en
t-O
wen
sb
oro
Se
nio
r Liv
ing_ssta
nke.r
vt
Room FinishSchedule
01/31/2017
1667
Ow
ensb
oro
Senio
r Li
ving
Heart
h D
evelo
pm
ent
I100
3138 F
airvie
w D
rive
Ow
ensboro
, K
Y 4
2303
Kitchen:Strategic Equipment & Supply1203 33rd Street South St.Cloud, MN 56301(302) 257-8802
MEP:The Matrix Group311 East Chicago Street,Suite 310Milwaukee, WI 53202(414) 329-2827
Civil:Bryant Engineering Inc.1535 Frederica St.P.O. Box 21382Owensboro, KY 42304270-685-2811
Structural:Advanced StructuralTechnologies, Inc.7210 Metro BlvdEdina, MN 55439(952) 854-9302
67
50
Stillw
ate
r B
lvd. N
., S
uite 2
00
Stillw
ate
r, M
N 5
50
82
(65
1)-
705-8
811
Floor & Wall Finish Schedule
Code Finish Type Manufacturer Description Size Location Contact Comments
BASE
VB-1 VINYL BASE JOHNSONITE TRADITIONAL VINYL BASE W/TOE - COLOR #80 FAWN 4"H UNIT LAUNDRY, BACK OF HOUSE/STAFF AREAS
WB-1 WOOD BASE 2 3/4" PAINTED POPLAR BASE, PRINCETON STYLE,PT-3
2-3/4"H UNITS
WB-2 WOOD BASE 5-1/2"H COMMONS BASE - STAINED 5-1/2"H STAIN TO MATCH WD-1
WB-3 WOOD BASE FERCHE F275, PAINT WHITE - PT-3 4 1/4"H COMMONS - CORRIDORS, OFFICES/BACK OFHOUSE
WB-4 WOOD BASE 5-1/2"H, PAINT WHITE - PT-3 5-1/2"H COMMONS
CARPET
CPT-1 CARPET SHAW QUEEN CARPET "CHART TOPPER II" ; COLOR, ACORN00706
BROADLOOM MC UNITS MARCO SANTORI, ( DIRECT GLUE. 12' W OR 15' W
CPT-2 CARPET PATCRAFT SOCRATES II; 10069 ; LOCKE 00111 BROADLOOM AL UNITS MARCO SANTORI, (
CPT-3 CARPET DURKAN BRAMBLE ROAD (851), CLASSICAL IDEAL. COLOR:CUSTOM TBD PER DESIGNER
12' BROADLOOM LOBBY INSET ANDI TISOR;(515)-554-2013
CPT-4 CARPET TILE(WALK OFF)
PHILADELPHIACOMMERCIAL
SUCCESSION II TILE, 00702 WOOD SMOKE 24" X 24" VESTIBLE, ELEVATOR CABS AL HENRY, (612) 867-4185
CPT-5 CARPET DURKAN BRAMBLE ROAD (851), CLASSICAL IDEAL. COLOR:CUSTOM TBD PER DESIGNER
12' BROADLOOM ELEVATOR LOBBY INSET ANDI TISOR;(515)-554-2013
CPT-6 CARPET DURKAN BRAMBLE ROAD (851), CLASSICAL ORDER. COLOR:CUSTOM TBD PER DESIGNER
12' BROADLOOM CORRIDOR ANDI TISOR;(515)-554-2013
CPT-7 CARPET J+J INVISION GRAND SALON 6581, 1836 SURREY, UPGRADE TOTITANBAC PLUS
12' BROADLOOM DINING ROOM TONY HILL, (763) 614-8896
CPT-8 CARPET TILE MILLIKEN PLANK MODULAR, PLA93 MAROONED, COMFORTPLUS CUSHION BACK
50CM X 50CM CLUB ROOM LISA KIRKBRIDE, (952)451-8646
INSTALL: MONOLITHIC
CPT-9 CARPET TILE J+J INVISION GREAT HALL MODULAR 7580, SURREY 1836 24" X 24" OFFICES / OFFICE CORRIDOR / FITNESS TONY HILL, (763) 614-8896 INSTALL: ASHLAR
CPT-10 CARPET TILE J+J INVISION RUSTED MODULAR 7901, STIMULATE 1404 24" X 24" PRIVATE DINING & CONFERENCE BORDER TONY HILL, (763) 614-8896 INSTALL: MONOLITHIC
CPT-11 CARPET J+J INVISION GARDEN GATE 6583, SURREY 1836 12' BROADLOOM CONFERENCE ROOM / THEATER TONY HILL, (763) 614-8896
CPT-12 CARPET J+J INVISION CONSERVATORY 6582, 1836 SURREY, PREMIERBACPLUS
12' BROADLOOM PRIVATE DINING TONY HILL, (763) 614-8896
CPT-13 CARPET TILE PATCRAFT PROSE I0396, HAZY MIST 00530 24" X 24" MC CORRIDOR MICHELE GEARS, (952)270-2484
CPT-14 CARPET J+J INVISION MERGE 3520, MINGLE 1450 12' BROADLOOM BOH STAIR CARPET TONY HILL, (763) 614-8896
CPT-15 CARPET DURKAN BRAMBLE ROAD (851), GILDED NARRATIVE. COLOR:CUSTOM TBD PER DESIGNER
12' BROADLOOM LIBRARY / MEZZANINE / MAIL LOUNGE ANDI TISOR;(515)-554-2013
CPT-16 CARPET DURKAN BRAMBLE ROAD (851), IDYLLIC CHARM; COLOR:CUSTOM TBD PER DESIGNER
12' BROADLOOM COMMUNITY ROOM ANDI TISOR;(515)-554-2013
CPT-17 CARPET TILE PATCRAFT URBAN GARDEN I0395, HAZY MIST 00530 24" X 24" MC DAYROOM / DINING MICHELE GEARS, (952)270-2484
PAINT
PT-1 PAINT SHERWINWILLIAMS
SW 7036 / ACCESSIBLE BEIGE UNITS
PT-2 PAINT SHERWINWILLIAMS
SW 9132 / ACACIA HAZE MC UNIT ACCENT, MC DINING ABOVE CHAIRRAIL, MC DAYROOM BELOW CHAIR RAIL
PT-3 PAINT BENJAMIN MOORE WHITE DOVE OC-17 CEILINGS, TRIM
PT-4 PAINT SHERWINWILLIAMS
SW 6207 / RETREAT LEVEL 1 UNIT ENTRY ACCENT
PT-5 PAINT SHERWINWILLIAMS
SW 6130 / MANNERED GOLD LEVEL 2 UNIT ENTRY ACCENT
PT-6 PAINT SHERWINWILLIAMS
SW 6020 / MAROONED LEVEL 3 UNIT ENTRY ACCENT
PT-7 PAINT SHERWINWILLIAMS
SW 6229 / TEMPE STAR LEVEL 4 UNIT ENTRY ACCENT
PT-8 PAINT BENJAMIN MOORE ELMIRA WHITE HC-84 CORRIDOR - ABOVE CHAIR RAIL AND RECESSAT UNIT DOOR, CRAFT, OFFICES, BACK OFHOUSE
PT-9 PAINT SHERWINWILLIAMS
SW 7047 PORPOISE CORRIDOR - BELOW CHAIR RAIL
PT-10 PAINT SHERWINWILLIAMS
SW 9168 / ELEPHANT EAR COMMON BATHROOMS & TUB ROOMS
PT-11 PAINT SHERWINWILLIAMS
SW 6188 / SHADE GROWN CLUB ROOM
PT-12 PAINT SHERWINWILLIAMS
SW 7046 / ANONYMOUS THEATER
PT-13 PAINT SHERWINWILLIAMS
SW 7633 / TAUPE TONE MAIN DINING
PT-14 PAINT SHERWINWILLIAMS
SW 9013 / OLDEN AMBER MC CORRIDOR ACCENT
PT-15 PAINT SHERWINWILLIAMS
SW 6204 / SEA SALT MC DINING ALOVE ABOVE CHAIR RAIL, MCDAYROOM ABOVE CHAIR RAIL, SENSORY
PT-16 PAINT SHERWINWILLIAMS
SW 6019 / POETRY PLUM SALON/SALON ALCOVE ACCENT
TILE
CT-1 TILE RUBBLE TILE CAMBRIDGE OAK; BLACK; 636AL6P 6" x 36" LOBBY & VESTIBLE FLOOR ERIN NEWTON, (612)735-8201
CT-2 TILE DALTILE BRICKWORK, PATIO BW03 4" X 8" CLUB ROOM BACK SPLASH JENNIFER EDWARDS,(651) 208-1596
INSTALL: HORIZONTAL 50% OFFSET
CT-3 TILE KATE-LO TILE SLATY MULTICOLOR, EDSM-12X12 12" X 12" COMMON BATHROOM FLOOR ALISSA OLSON, (763)417-3808
INSTALL: STACK BOND
CT-4 MOSAIC CERAMICTILEWORKS
CTWSPL5/8ASPE, SAPEN GLASS & STONE 5/8"X5/8"MOSAIC
12" X 12" SHEET COMMON BATHROOM WALL ACCENT NICOLE BANASZEWSKI,(763) 493-5238
CT-5 TILE KATE-LO TILE REGAL TAUPE NY.RG.TPE.0624.MT, MATTE FINISH 6" X 24" COMMON BATHROOM WALL TILE ALISSA OLSON, (763)417-3808
INSTALL: 1/3 OFFSET
CT-6 TILE RUBBLE TILE AVANTI WHITE DECO TILE LUSTRE WHITEPATTERNED #410LUS081DECO
4" X 10" MC DAYROOM KITCHEN BACKSPLASH ERIN NEWTON, (612)735-8201
INSTALL: HORIZONTAL 50% OFFSET
CT-7 TILE TILEXDESIGN CITI TILE - CITI TILE - 4x10 BEVEL GLOSSY COMMUNITY ROOM KITCHEN BACKSPLASH
CT-8 TILE WALKER ZANGER SM ECRU GLOSS PETIT IMPERIAL#1SMOECRGPETIMP44
4" X 4" MAIL LOUNGE BACK SPLASH
QT-1 QUARRY TILE DALTILE QUARRY TEXTURES, ASHEN GRAY 0T03 6" X 6" SERVICE PANTRY & KITCHEN FLOOR JENNIFER EDWARDS,(651) 208-1596
COORDINATING COVE BASE & EPOXY GROUT
VINYL FLOORING
LV-1 LUXURY VINYLPLANK
MOHAWK PORTICO COLLECTION, PERMANENCE PLUS, 2MMLUXURY VINYL, TOASTED CHESTNUT P9003-I09, 12MILWEAR LAYER
6" X 48" AL/IL UNIT KITCHENS BASE GRADE JON LARSON, (612)270-9156
LV-2 LUXURY VINYLPLANK
MOHAWK PORTICO COLLECTION, PERMANENCE PLUS, 2MMLUXURY VINYL, CHOCOLATE OAK P9003-I06, 12MILWEAR LAYER
6" x 48" AL/IL UNIT KITCHENS UPGRADE JON LARSON, (612)270-9156
LV-3 LUXURY VINYLPLANK
MOHAWK HOT AND HEAVY, SECOYA 872 PICTON PARK,FLOATING LVP
9" X 59" THROUGHOUT COMMONS MARY BERGREN, (952)237-1061
IN CORRIDORS GRAIN SHOULD RUN PARALLEL TO WALLS AT ALL TIME,MITRE CORNERS, LVP IS SAME HEIGHT AS CARPET - DOES NOT REQUIRETRANSITION STRIP - INSTALL WITH MILL EDGE NEXT TO CARPET WHENCUT LENGTH-WISE
LV-4 LUXURY VINYLPLANK
PATCRAFT LETTERPRESS ; UNDERSCORE 00450 24" X 24" CRAFT ROOM MICHELE GEARS, (952)270-2484
SEE FLOOR FINISH PLAN - 70% OF INTERACTIVE PATTER
LV-5 LUXURY VINYLPLANK
PATCRAFT LETTERPRESS ; SCRIPT 00530 24" X 24" CRAFT ROOM MICHELE GEARS, (952)270-2484
SEE FLOOR FINISH PLAN -70% INTERACTIVE PATTERN
SV-1 SHEET VINYL MANNINGTON JUMPSTART, CAMBRIDGE, LIMESTONE 71291 12' SHEET UNIT BATHROOMS KELLY LEINES, (763)331-4860
SV-2 SHEET VINYL SHAW COMPACT 12 / 113 SURREY 12' SHEET MC KITCHENS MARCO SANTORI, (
SV-3 SHEET VINYL MANNINGTON INSIGHT PLUS 6606, CROSSBAR GRATE 12' SHEET LAUNDRY, MECH., STORAGE, ELEC KELLY LEINES, (763)331-4860
SV-4 SHEET VINYL MANNINGTON INSIGHT PLUS 6659, WILD OAK SESSILE 12' SHEET STAFF BREAKROOM KELLY LEINES, (763)331-4860
WALL COVERING
VWC-1 VINYL WALLCOVERING
D.L. COUCH VERSA, ESTANCIA A137-255 54" WIDTH LEVEL 1 ELEVATOR LOBBY MAGGIE COSGROVE,(612) 886-4688
VWC-2 VINYL WALLCOVERING
D.L. COUCH SYMPHONY, ROCK 'N' SCROLL, AZ52931RS, PURPLEPRELUDE
54" WIDTH LEVEL 2 ELEVATOR LOBBY MAGGIE COSGROVE,(612) 886-4688
VWC-3 VINYL WALLCOVERING
D.L. COUCH SYMPHONY, ROCK 'N' SCROLL, AZ52466, ERICPLANTINUM
54" WIDTH LEVEL 3 ELEVATOR LOBBY MAGGIE COSGROVE,(612) 886-4688
VWC-4 VINYL WALLCOVERING
D.L. COUCH SYMPHONY, ROCK 'N' SCROLL, AZ52932RS,SILVERWAY TO HEAVEN
54" WIDTH LEVEL 4 ELEVATOR LOBBY MAGGIE COSGROVE,(612) 886-4688
Room Finish Schedule
Number Name Wall Finish Wainscot Floor Finish Base Finish Ceiling Finish Comments
Level 1
150 Corridor PT-8/9/4 CR-6/7 CPT-6/LV-3 SEE CR-6 ACT-1
152 MC Corridor PT-15/2/14 CR-6 CPT-13 SEE CR-6 ACT-1 PT-15 ABOVE CHAIR RAIL, PT-2BELOW CHAIR RAIL, PT-14 FORUNIT ENTRY ACCENT
160 Club Room PT-11 CR-3 CPT-8 SEE CR-3 PT-3
161 Pr. Dining PT-6 CR-2 CPT-12/CPT-10 SEE CR-2 PT-3
162 Dining PT-13 CR-1 CPT-7/LV-3 SEE CR-1 PT-3
163 Mail Lounge PT-8/PT-11 CR-1 CPT-15 SEE CR-1 PT-3
164 Fort PT-8 - CPT-9 WB-3 PT-3
165 Vest. PT-13 - CPT-4/CT-1 WB-3 PT-3
166 Lobby PT-8 CR-4 CPT-3/CT-1 SEE CR-4 PT-3
167 Reception VWC-3 - CPT-9 WB-4 PT-3
168 Office Corridor PT-8 - CPT-9 WB-3 ACT-1
169 Conf. PT-13 CR-1 CPT-11/CPT-10 SEE CR-1 PT-3
170 Office PT-8 - CPT-9 WB-3 ACT-1
171 Office PT-8 - CPT-9 WB-3 ACT-1
172 Nurse PT-8 - CPT-9 WB-3 ACT-1
173 Office PT-8 - CPT-9 WB-3 ACT-1
174 Office PT-8 - CPT-9 WB-3 ACT-1
175 Service Corridor PT-8/9 CR-7 CPT-6/LV-3 WB-3 PT-3
176 Trash FRP ALLWALLS TOCEILING
- SEALED CONC. VB-1 PT-3
177 Mens PT-10 CT-4/5 CT-3 CT-5 PT-3 TILE UP TO 5'H, SCHLUTER COVE
178 Womens PT-10 CT-4/5 CT-3 CT-5 PT-3 TILE UP TO 5'H, SCHLUTER COVE
179 Elev Lobby VWC-1 CR-1 LV-3/CPT-5 SEE CR-1 PT-3
180 Kitchen FRP - QT-1 QT-1 ACT-2 EPOXY GROUT
180A Dry Storage FRP - QT-1 QT-1 ACT-2 EPOXY GROUT
180B Kitchen Office PT-8 - QT-1 QT-1 ACT-2 EPOXY GROUT
181 Elev. Equip. PT-8 - SEALED CONC. VB-1 PT-3
182 Mech PT-8 - SEALED CONC. VB-1 PT-3
183 Laundry PT-8 - SV-3 VB-1 PT-3
184 Elec. PT-8 - SEALED CONC. VB-1 PT-3
185 MC Dining PT-15/2 CR-1 LV-3/CPT-17 SEE CR-1 PT-3/ACT-1 PT-2 ABOVE CHAIR RAIL IN DINING
186 Tub Room PT-10 CT-4/5 CT-3 CT-5 PT-3 TILE UP TO 5'H, SCHLUTER COVE
186-B MC Garden - - - - -
187 Unisex PT-10 CT-4/5 CT-3 CT-5 PT-3 TILE UP TO 5'H, SCHLUTER COVE
188 Sensory PT-15 - CPT-17 WB-3 PT-3
189 MC Dayroom PT-15/2 CR-5 CPT-17 SEE CR-5 PT-3 PT-15 ABOVE CHAIR RAIL / PT-2BELOW CHAIR RAIL
190 Stair A PT-8 - CPT-14 WB-3 PT-3
191 Stair B PT-8 - CPT-14 WB-3 PT-3
192 Stair C PT-8 - CPT-14 WB-3 PT-3
Level 2
250 Corridor PT-8/9/5 CR-6/7 CPT-6/LV-3 SEE CR-6 PT-3
251 Corridor PT-8/9/5 CR-6/7 CPT-6/LV-3 SEE CR-6 PT-3
260 Deck - - - - -
261 Screened Porch - LV-3 WB-3 PT-3
262 Community Room PT-12/PT-6 CR-1 CPT-16/LV-3 SEE CR-1 PT-3 PT-6 ON ISLAND
263 Library VWC-3/PT-8 CR-1 CPT-15 SEE CR-1 PT-3
264 Act. Dir. PT-8 - CPT-9 WB-3 PT-3
266 Mezzanine PT-8/9 CPT-15 WB-3 PT-3
267 Exam PT-8 - LV-3 WB-3 ACT-1
268 Toilet PT-10 CT-4/5 CT-3 CT-5 PT-3 TILE UP TO 5'H, SCHLUTER COVE
269 Fitness PT-8 - CPT-9 WB-3 ACT-1
269a Fitness Alcove PT-8 - LV-3 WB-3 PT-3
270 Trash PT-8 - SV-3 VB-1 PT-3 EPOXY PAINT ON WALLS
277 Toilet PT-10 CT-4/5 CT-3 CT-5 PT-3 TILE UP TO 5'H, SCHLUTER COVE
278 Salon PT-8/PT-16 - LV-3 WB-3 PT-3
278a Salon Alcove PT-8/PT-16 - LV-3 WB-4 PT-3
279 Elev Lobby VWC-2 CR-1 CPT-5/LV-3 SEE CR-1 PT-3
280 Janitor PT-8 - SV-3 VB-1 PT-3
281 Elec PT-8 - SV-3 VB-1 PT-3
282 Staff PT-8 - SV-4 VB-1 PT-3
282a Staff Corridor PT-8 - LV-3 WB-3 PT-3
283 Laundry PT-8 - SV-3 VB-1 PT-3
284 Charting PT-8 - CPT-9 WB-3 PT-3
285 Theater PT-12 CR-5 CPT-11 SEE CR-5 ACT-3 BLACK ACT
290 Stair A PT-8 - CPT-14 WB-3 PT-3
291 Stair B PT-8 - CPT-14 WB-3 PT-3
292 Stair C PT-8 - CPT-14 WB-3 PT-3
Level 3
350 Corridor PT-8/9/6 CR-6/7 CPT-6/LV-3 SEE CR-6 PT-3
370 Trash PT-8 - SV-3 VB-1 PT-3 EPOXY PAINT ON WALLS
379 Elev Lobby VWC-3 CR-1 CPT-5/LV-3 SEE CR-1 PT-3
380 Janitor PT-8 - SV-3 VB-1 PT-3
381 Elec PT-8 - SV-3 VB-1 PT-3
382 Storage PT-8 - SV-3 VB-1 PT-3
382a Storage Corridor PT-8/9 - LV-3 WB-3 PT-3
383 Laundry PT-8 - SV-3 VB-1 PT-3
384 Charting PT-8 - CPT-9 WB-3 PT-3
385 Crafts PT-8 - LV-4/LV-5 WB-3 PT-3
386 Storage PT-8 - SV-3 VB-1 PT-3
390 Stair A PT-8 - CPT-14 WB-3 PT-3
391 Stair B PT-8 - CPT-14 WB-3 PT-3
392 Stair C PT-8 - CPT-14 WB-3 PT-3
Level 4
450 Corridor PT-8/9/7 CR-6/7 CPT-6/LV-3 SEE CR-6 PT-3
470 Trash PT-8 - SV-3 VB-1 PT-3 EXPOXY PAINT ON WALLS
479 Elev Lobby VWC-4 CR-1 CPT-5/LV-3 SEE CR-1 PT-3
480 Janitor PT-8 - SV-3 VB-1 PT-3
481 Elec PT-8 - SV-3 VB-1 PT-3
482 Storage PT-8 - SV-3 VB-1 PT-3
482a Storage Corridor PT-8/9 - LV-3 WB-3 PT-3
483 Laundry PT-8 - SV-3 VB-1 PT-3
484 Charting PT-8 - CPT-9 WB-3 PT-3
485 Res Storage PT-8 - SV-3 VB-1 PT-3
486 Tub Room PT-10 CT-5/CT-4 CT-3 CT-5 PT-3 TILE UP TO 5'H, SCHLUTER COVE
490 Stair A PT-8 - CPT-14 WB-3 PT-3
491 Stair B PT-8 - CPT-14 WB-3 PT-3
492 Stair C PT-8 - CPT-14 WB-3 PT-3
Millwork Finish Schedule
Code Finish Type Manufacturer Description Location Comments
METAL
MTL-1 MAILBOX FINISH AF FLORENCE DARK BRONZE PMS BLACK 7C - FLAT FINISH MAIL CAFE
PLASTIC LAMINATE
PL-1 PLASTIC LAMINATE FORMICA FLAX GAUZE 7708-58 UNIT BASE GRADE & MC KITCHEN CTOPS
PL-2 PLASTIC LAMINATE FORMICA 180FX BLUE FLOWER GRANITE 9304-43 ARTISAN FINISH UNIT KITCHENS FOR UPGRADE PACKAGE
PL-3 PLASTIC LAMINATE WILSONART CAFELLE 7933K-07 DINING NSF CABINETS
PL-4 PLASTIC LAMINATE WILSONART GESSO TRACERY 4962-38, FINE VELVET FINISH BACK OF HOUSE - SEE ELEVATIONS
STONE
BR-1 THIN BRICK GENERAL SHALE OLD BRICK ORIGINALS, PEPPERMILL THIN BRICK LOBBY FIREPLACE CONTACT: DON HERWEYER, BROCK WHITE (651) 289-1262
CM-1 CULTURED MARBLE PRINCESS MARBLE OREQUAL
WHITE ON WHITE #99, MATTE FINISH UNIT & COMMNONS - BATHROOM VANITY
GR-1 GRANITE AMSUM & ASH ARIES WHITE RECEPTION DESK, MAIL CAFE, COMMUNITY ROOM & CLUB ROOM SEE ELEVATIONS & FINISH PLANS FOR LOCATIONS
GR-2 GRANITE AMSUM & ASH MONT BLEU MC DINING ROOM SEE ELEVATIONS & FINISH PLANS FOR LOCATIONS
QZ-1 QUARTZ SILESTONE ARCTIC OCEAN DINING BREAKFAST COUNTER
WOOD
WD-1 WOOD SMART CABINETS MAPLE PECAN STAIN - BRIGHTON PROFILE FOR CABINETS UNITS BASE GRADE PACKAGE
WD-2 WOOD CABINETS SMART CABINETS MAPLE ROOT BEER STAIN - PROFILE CAROLINA UNIT CABINET UPGRADE & COMMONS 20% OF UNITS TO RECEIVE UPGRADED FINISH PACKAGE
WD-3 WOOD PANEL TABLEAUX WOOD VENEER, PANEL SCREEN DEENNA 900; LESS DENSE DESIGN- CONTRACTOR TO PAINT PT-14
MC DAYROOM
TYPICAL UNIT FINISH SCHEDULE
Name Wall Finish PaintFloorFinish Floor Base
CeilingFinish Comments
Living Room FINE KD/PT-1 FLAT CPT-1/CPT-2 WB-1 KD/PT-3 CPT-1 FOR MC, CPT-2 FOR AL
Kitchen FINE KD/PT-1 EGG SHELL LV-1/LV-2/SV-1 WB-1 KD/PT-3 SV-1 IN MC, LV-1 BASE GRADE UNITS, LV-2 UPGRADE UNITS
Bedroom FINE KD/PT-1 FLAT CPT-1/CPT-2 WB-1 KD/PT-3 CPT-1 FOR MC, CPT-2 FOR AL
Bathroom SMOOTH/PT-1,PT-2 ACCENT
EGG SHELL SV-1 WB-1 KD/PT-3 PT-2 ACCENT AT VANITY WALL FOR MC UNITS
Entry Closet FINE KD/PT-1 FLAT LV/CPT WB-1 KD/PT-3 CARRY ADJACENT FLOORING INTO CLOSET, SEE UNIT PLANSFOR FLOORING TRANSITIONS
Walk-In Closet FINE KD/PT-1 FLAT CPT-1/CPT-2 WB-1 KD/PT-3 CPT-1 FOR MC, CPT-2 FOR AL
Laundry Closet FINE KD/PT-1 FLAT SV-1 WB-1 KD/PT-3
Rev.
No.
Revi
sion
Date
W/D
W/D
W/D
REF.
DW
Seat
W/D
REF.
DW
Seat
W/D
DW
REF.
DW
REF.
DW
REF.
FDFD
DWREF.WW
DD
RE
F.
RE
F.
REF.
REF.
DW
REF.
FD
FD
FD
RE
F.
RE
F.
RE
F.
RE
F.
REF.
RE
F.
REF.
REF.
REF.
RE
F.
RE
F.
RE
F.
RE
F.
REF.
RE
F.
RE
F.
RE
F.
RE
F.
UP
MA
IL C
UB
BIE
S
1872
43" MIN. CLEAR
34DR
43" MIN. CLEAR
34DR
HDRL
HDRL
Unit C1
A4561
100
Unit C1
A4561
101
Unit A1
A4511
103
Unit A1
A4511
104
Club Room
160
Pr. Dining
161
Unit A4
A4531
102
Stair A
190
MATCH LINE
I400
2
I410
2
I900
2
FE
Unit MC A1 - ACC
A4601
134
Unit MC A1 - ACC
A4601
135
Unit MC S1
A4602
133
Unit MC S2
A4611
132
Unit MC S1
A4602
131
Unit MC S2
A4611
129
Unit MC S1
A4602
130
Unit MC S1
A4602
127
Unit MC S1
A4602
125
Unit MC S2
A4611
126
Unit MC S1
A4602
124
Unit MC S2
A4611
120
Unit MC S1
A4602
118
Unit MC S1
A4602
136
Unit MC S2
A4611
138
Unit MC S1
A4602
140
Unit MC A1 - ACC
A4601
142
Unit MC A1 - ACC
A4601
141
Unit MC S3
A4612
143
Unit MC S3
A4612
144
Unit MC S1
A4602
139
Unit MC S1
A4602
137
FEFE
FE
MC Dining
185
Sensory
188
Unisex
187
Tub Room
186
Reception
167
MC Dayroom
189
MC Garden
186-B
HDRL
STRUCT. STOOP
HDRL
6' H. DECORATIVE ALUM FENCE w/ REMOVABLE PANEL FOR MAINT. ACCESS
N
FE
Fort
164
HDRL
Unit MC S1
A4602
122
Unit MC S1
A4602
128
Dining
162
Mail Lounge
163
Lobby
166
Vest.
165
Conf.
169
Office
171
Office
173
Office
174
Office Corridor
168Nurse
172
Office
170
Mens
177
Womens
178
Elev Lobby
179
Elec.
184
Mech
182
Laundry
183Kitchen
180
Trash
176ServiceCorridor
175
Stair C
192
Stair B
191
Elev. Equip.
181
Corridor
150
MATCH LINE
Dry Storage
180A
Kitchen Office
180B
STRUCT. STOOP
I400
1
I410
1
I900
1
I411
1I401
1
I901
1
I403
2
I413
1
I903
2
I403
1
I413
2
I903
1
I411
2
I413
4
I801
4TYP.
I801
4TYP.
Date
Project Number
1301 American Blvd ESuite 100Bloomington, MN 55425tel: (612) 879-6000fax: (612) 879-6666www.kaaswilson.com
Copyr
ight K
aas
Wils
on A
rchite
cts
Ow
ner:
Pro
ject
:
kaas wilson
architects
PERMIT SET
3/32" = 1'-0"
1/3
1/2
01
7 5
:40:5
4 P
MC
:\R
evit L
ocal\1
667
-He
art
h D
evelo
pm
en
t-O
wen
sb
oro
Se
nio
r Liv
ing_ssta
nke.r
vt
Overall/CoodinationFloor Plan - Level 1
01/31/2017
1667
Ow
ensb
oro
Senio
r Li
ving
Heart
h D
evelo
pm
ent
I300
3138 F
airvie
w D
rive
Ow
ensboro
, K
Y 4
2303
Kitchen:Strategic Equipment & Supply1203 33rd Street South St.Cloud, MN 56301(302) 257-8802
MEP:The Matrix Group311 East Chicago Street,Suite 310Milwaukee, WI 53202(414) 329-2827
Civil:Bryant Engineering Inc.1535 Frederica St.P.O. Box 21382Owensboro, KY 42304270-685-2811
Structural:Advanced StructuralTechnologies, Inc.7210 Metro BlvdEdina, MN 55439(952) 854-9302
67
50
Stillw
ate
r B
lvd. N
., S
uite 2
00
Stillw
ate
r, M
N 5
50
82
(65
1)-
705-8
811
3/32" = 1'-0"1
Level 1 - West Interior Overall/Coordination
3/32" = 1'-0"2
Level 1 - East Interior Overall/Coordination
Rev.
No.
Revi
sion
Date
W/D
W/D
W/D
Seat
DW
REF.
REF.
DW
Seat
W/D
REF.
DW
Seat
W/D
W/D
DW
REF.
DW
REF.
DW
REF.
DW
REF.
WW
DD
W/D
Seat
W/D
W/D
W/D
W/D
Seat
W/D
W/D
REF.
DW
Seat
W/D
REF.
DW
Seat
W/D
DW
REF.
DW
REF.
DW
REF.
DW
REF.
RE
F.
REF.
RE
F.
DW
RE
F.
DW
RE
F.
W/D
W/D
DW
REF.
W/D
DW
REF.
W/D
DW
REF.
W/D
DW
RE
F.
REF. RE
F.
REF.
RE
F.
DW
RE
F.
DW
REF.
FD
FD
REF.
Unit C1
A4561
201
Unit C1
A4561
200
MATCH LINE
FE
HDRL
Unit A1
A4511
203
Unit A1
A4511
204
Unit A4
A4531
202
Unit C4
A4581
205
Stair A
290
Corridor
251
I404
3Typ.
Library
263
CommunityRoom
262
ScreenedPorch
261
Unit C1
A4561
230
Unit C1
A4561
229
Unit S2
A4574
228
Unit S1
A4567
218
Unit S1
A4567
236
MATCH LINE
Act. Dir.
264
HDRL
HDRL
Unit A1
A4511
222
Unit A1
A4511
226
Unit A1
A4511
223
Unit C2
A4571
238
Unit C2
A4571
237
Unit Guest
A4592
231
Stair C
292
Deck
260
Salon
278
Toilet
277
Elev Lobby
279
Elec
281
Janitor
280
Charting
284
Laundry
283
Staff
282
Theater
285
Exam
267
Toilet
268
Fitness
269
Mezzanine
266
Unit A5
A4532
216
N
Corridor
250
Unit B1
A4552
227
Stair B
291
Corridor
251
Trash
270
FE
FE
Unit C5
A4591
233
Unit S4
A4583
221
Unit A2
A4521
220
Unit A2
A4521
224
Unit A2
A4521
225
Unit A2
A4521
234
Salon Alcove
278a
Fitness Alcove
269a Staff Corridor
282a
HDRL
I402
1
I412
1I902
1
I403
3
I413
3
I903
3
I404
3Typ.
I404
3Typ.
I801
4TYP.
I801
4TYP.
I801
4TYP.
FE
FE
Date
Project Number
1301 American Blvd ESuite 100Bloomington, MN 55425tel: (612) 879-6000fax: (612) 879-6666www.kaaswilson.com
Copyr
ight K
aas
Wils
on A
rchite
cts
Ow
ner:
Pro
ject
:
kaas wilson
architects
PERMIT SET
3/32" = 1'-0"
1/3
1/2
01
7 5
:41:1
8 P
MC
:\R
evit L
ocal\1
667
-He
art
h D
evelo
pm
en
t-O
wen
sb
oro
Se
nio
r Liv
ing_ssta
nke.r
vt
Overall/CoordinationFloor Plan - Level 2
01/31/2017
1667
Ow
ensb
oro
Senio
r Li
ving
Heart
h D
evelo
pm
ent
I301
3138 F
airvie
w D
rive
Ow
ensboro
, K
Y 4
2303
Kitchen:Strategic Equipment & Supply1203 33rd Street South St.Cloud, MN 56301(302) 257-8802
MEP:The Matrix Group311 East Chicago Street,Suite 310Milwaukee, WI 53202(414) 329-2827
Civil:Bryant Engineering Inc.1535 Frederica St.P.O. Box 21382Owensboro, KY 42304270-685-2811
Structural:Advanced StructuralTechnologies, Inc.7210 Metro BlvdEdina, MN 55439(952) 854-9302
67
50
Stillw
ate
r B
lvd. N
., S
uite 2
00
Stillw
ate
r, M
N 5
50
82
(65
1)-
705-8
811
3/32" = 1'-0"1
Level 2 - West Interior Overall/Coordination
3/32" = 1'-0"2
Level 2 - East Interior Overall/Coordination
Rev.
No.
Revi
sion
Date
WW
DD
Typ
e C
ata
log
Typ
e C
ata
log
W/D
W/D
Seat
W/D
W/D
W/D
W/D
W/D
W/D
W/D
W/DW/D
Seat
W/D
W/D
REF.
DW
Seat
W/D
REF.
DW
Seat
W/D
DW
REF.
DW
REF.
DW
REF.
DW
REF.
DW
REF.
DW
REF.
DW
RE
F.
RE
F.
DW
REF.
RE
F.
DW
RE
F.
DW
DW
DW
REF.
WD
W/D
W/D
DW
REF.
W/D
DW
REF.
W/D
DW
REF.
W/D
DW
RE
F.
REF.REF.
REF.
RE
F.
REF.
RE
F.
DW
RE
F.
DW
REF.
DW
REF.
DW
REF.
RE
F.
W/D
W/D
W/D
Seat
DW
REF.
REF.
DW
Seat
W/D
REF.
DW
Seat
W/D
W/DDW
REF.
DW
REF.
DW
REF.
DW
REF.
Unit S2
A4574
328
FE
MATCH LINE
HDRL
HDRL
Unit B3
A4551
306
Unit A1
A4511
307
Unit A1
A4511
308
Unit A7
A4541
312
Unit A5
A4532
316
Unit S1
A4567
318
Unit S1
A4567
331
Unit C2
A4571
337
Unit C2
A4571
338
Unit S1
A4567
336
Unit A1a
A4512
332
Unit A1
A4511
323
Unit C1
A4561
329
Unit C1
A4561
330
Unit A1
A4511
326
Unit A1
A4511
322
Elev Lobby
379
Elec
381
Janitor
380
Charting
384
Laundry
383
Storage
382
Crafts
385
Stair C
392
N
Unit B1
A4552
309
Unit B1
A4552
327
Stair B
391
Unit A6 - ACC
A4542
311
Corridor
350
Unit A3
A4522
314
Storage
386
FE
Trash
370
Unit C5
A4591
333
Unit S4
A4583
321
Unit S5
A4593
310
Unit A2
A4521
320
Unit A2
A4521
324
Unit A2
A4521
325
Unit A2
A4521
334
StorageCorridor
382a
I904
1
I414
1
I404
2
I404
3Typ.
I404
3Typ.
I404
3Typ.
I801
4TYP.
I801
4TYP.
I801
4TYP.
FE
MATCH LINE
Unit C1
A4561
300
Unit C1
A4561
301
Unit A1
A4511
303
Unit A1
A4511
304
Unit C4
A4581
305
Unit A4
A4531
302
Stair A
390
HDRL
I404
3Typ.
FE
Date
Project Number
1301 American Blvd ESuite 100Bloomington, MN 55425tel: (612) 879-6000fax: (612) 879-6666www.kaaswilson.com
Copyr
ight K
aas
Wils
on A
rchite
cts
Ow
ner:
Pro
ject
:
kaas wilson
architects
PERMIT SET
3/32" = 1'-0"
1/3
1/2
01
7 5
:41:3
9 P
MC
:\R
evit L
ocal\1
667
-He
art
h D
evelo
pm
en
t-O
wen
sb
oro
Se
nio
r Liv
ing_ssta
nke.r
vt
Overall/CoordinationFloor Plan - Level 3
01/31/2017
1667
Ow
ensb
oro
Senio
r Li
ving
Heart
h D
evelo
pm
ent
I302
3138 F
airvie
w D
rive
Ow
ensboro
, K
Y 4
2303
Kitchen:Strategic Equipment & Supply1203 33rd Street South St.Cloud, MN 56301(302) 257-8802
MEP:The Matrix Group311 East Chicago Street,Suite 310Milwaukee, WI 53202(414) 329-2827
Civil:Bryant Engineering Inc.1535 Frederica St.P.O. Box 21382Owensboro, KY 42304270-685-2811
Structural:Advanced StructuralTechnologies, Inc.7210 Metro BlvdEdina, MN 55439(952) 854-9302
67
50
Stillw
ate
r B
lvd. N
., S
uite 2
00
Stillw
ate
r, M
N 5
50
82
(65
1)-
705-8
811
3/32" = 1'-0"1
Level 3 - East Interiors Overall/Coordination
3/32" = 1'-0"2
Level 3 - West Interiors Overall/Coordination
Rev.
No.
Revi
sion
Date
W/D
W/D
W/D
Seat
DW
REF.
REF.
DW
Seat
W/D
REF.
DW
Seat
W/D
W/DDW
REF.
DW
REF.
DW
REF.
DW
REF.
WW
DD
FD
W/D
W/D
Seat
W/D
W/D
W/D
W/D
W/D
W/D
W/D
W/DW/D
Seat
W/D
W/D
REF.
DW
Seat
W/D
REF.
DW
Seat
W/D
DW
REF.
DW
REF.
DW
REF.
DW
REF.
DW
REF.
DW
REF.
DW
RE
F.
RE
F.
DW
REF.
RE
F.
DW
RE
F.
DW
DW
DW
REF.
WD
W/D
W/D
DW
REF.
W/D
DW
REF.
W/D
DW
REF.
W/D
DW
RE
F.
REF.REF. R
EF
.
REF.
REF.
RE
F.
DW
RE
F.
DW
REF.
DW
REF.
DW
REF.
RE
F.
Unit C1
A4561
400
Unit C1
A4561
401
Unit A1
A4511
403
Unit A1
A4511
404
Unit A4
A4531
402
Unit C4
A4581
405
Stair A
490
HDRL
MATCH LINE
I404
3Typ.
FE
Stair C
492
Unit A1
A4511
407
Unit B3
A4551
406
Unit A1
A4511
408
Elev Lobby
479
Storage
482
Elec
481
Janitor
480
Charting
484
Laundry
483
Tub Room
486
Res Storage
485
Unit A7
A4541
412
Unit A5
A4532
416
Unit S1
A4567
418
Unit A1
A4511
422
Unit A1
A4511
426
Unit S2
A4574
428
Unit C1
A4561
430
Unit C1
A4561
429Unit A1
A4511
423
Unit S1
A4567
431
Unit C2
A4571
437
Unit C2
A4571
438
Unit S1
A4567
436
Unit A1a
A4512
432
N
Unit B1
A4552
409
Unit B1
A4552
427
Stair B
491
Unit A6 - ACC
A4542
411
Unit A3
A4522
414
HDRL
HDRL
FE
Trash
470
MATCH LINE
Unit C5
A4591
433
Unit S4
A4583
421
Unit A2
A4521
434
Unit A2
A4521
425
Unit A2
A4521
424
Unit A2
A4521
420
Unit S5
A4593
410
StorageCorridor
482aCorridor
450
Corridor
450
I404
1
I414
2
I904
2
I404
3Typ.
I404
3Typ.
I404
3Typ.
I801
4TYP.
I801
4TYP.
I801
4TYP.
FE
FE
Date
Project Number
1301 American Blvd ESuite 100Bloomington, MN 55425tel: (612) 879-6000fax: (612) 879-6666www.kaaswilson.com
Copyr
ight K
aas
Wils
on A
rchite
cts
Ow
ner:
Pro
ject
:
kaas wilson
architects
PERMIT SET
3/32" = 1'-0"
1/3
1/2
01
7 5
:42:0
0 P
MC
:\R
evit L
ocal\1
667
-He
art
h D
evelo
pm
en
t-O
wen
sb
oro
Se
nio
r Liv
ing_ssta
nke.r
vt
Overall/CoordinationFloor Plan - Level 4
01/31/2017
1667
Ow
ensb
oro
Senio
r Li
ving
Heart
h D
evelo
pm
ent
I303
3138 F
airvie
w D
rive
Ow
ensboro
, K
Y 4
2303
Kitchen:Strategic Equipment & Supply1203 33rd Street South St.Cloud, MN 56301(302) 257-8802
MEP:The Matrix Group311 East Chicago Street,Suite 310Milwaukee, WI 53202(414) 329-2827
Civil:Bryant Engineering Inc.1535 Frederica St.P.O. Box 21382Owensboro, KY 42304270-685-2811
Structural:Advanced StructuralTechnologies, Inc.7210 Metro BlvdEdina, MN 55439(952) 854-9302
67
50
Stillw
ate
r B
lvd. N
., S
uite 2
00
Stillw
ate
r, M
N 5
50
82
(65
1)-
705-8
811
3/32" = 1'-0"1
Level 4 - West Interiors Overall/Coordination
3/32" = 1'-0"2
Level 4 - East Interiors Overall/Coordination
Rev.
No.
Revi
sion
Date
MA
IL C
UB
BIE
S
REF.REF.
Mail Lounge
163
SEE CR-1
CPT-15
Lobby
166
SEE CR-4
CPT-3/CT-1
Reception
167
WB-4
CPT-9
Dining
162
SEE CR-1
CPT-7/LV-3
Corridor
150
SEE CR-6
CPT-6/LV-3
Vest.
165
WB-3
CPT-4/CT-1
CPT-3 CT-1
LV
-3C
PT
-7C
PT
-7L
V-3
LV
-3C
PT
-7
CPT-7 LV-3
CP
T-9
CT
-1
CPT-15 CT-1
LV
-3C
PT
-15
4'-6
"
CP
T-6
CP
T-1
0
LV
-3C
PT
-6
LV
-3C
PT
-6
11'-0"ALIGN
1'-6"
1'-6
"
1'-6"
1'-6
"
1'-6"
1'-6"1'-6"
LV-3 CPT-7CPT-7 LV-3
1'-0
"1'
-0"
1'-0"1'-0"
CP
T-4
CT
-1
CP
T-1
0C
T-1
CP
T-1
0C
T-1
CP
T-6
LV
-3
CP
T-6
LV
-3
CP
T-6
CP
T-1
09'
-0"
Club Room
160
SEE CR-3
CPT-8
Pr. Dining
161
SEE CR-2
CPT-12/CPT-10
Corridor
150
SEE CR-6
CPT-6/LV-3
CPT-10 LV-3
CPT-8 LV-3
LV
-3C
PT
-6
1'-0
"
1'-0"
1'-0
"
1'-0"
CPT-12 CPT-10
CP
T-8
LV
-3
DIRECTION OF LINEAR PATTERN - MITRE AT CORNERS
I404
3Typ.
1. ALL EXPOSED SURFACES TO BE PREPARED TO RECEIVE NEW FINISHES.
2. DO NOT SCALE DRAWINGS.
3. ALL MATERIALS TO BE INSTALLED PER MANUFACTURER'S SPECIFICATIONS.
4. NO SUBSTITUTIONS WITHOUT ARCHITECT'S OR BUILDING OWNER'S APPROVAL.
5. ALL CARPETING TO BE INSTALLED BY DIRECT GLUE METHOD OR PER MANUF. RECOMMENDATIONS, UNLESS NOTED OTHERWISE.
6. INSPECT ALL SURFACES TO RECEIVE NEW FINISHES. REPORT TO ARCHITECT ANY AREAS WHICH ARE NOT SUITABLE TO RECEIVE NEW FINISH PRIOR TO BEGINNING WORK. CONTACT ARCHITECT WITH ANY DISCREPANCIES IN PRODUCT QUALITY SUCH AS DYELOT VARIANCES, PRODUCT SHADING, ETC. DO NOT CONTINUE TO INSTALL PRODUCTS WITH POSSIBLE DEFECTS.
7. ALL MATERIALS SPECIFIED ARE AVAILABLE AS OF ORIGINAL DATE ON PLAN. KAAS WILSON ARCHITECTS IS NOT RESPONSIBLE FOR ANY MATERIALS ORDERED AFTER THIS DATE THAT ARE DISCONTINUED OR UNAVAILABLE. ANY SUBSTITUTIONS MUST BE REVIEWED & APPROVED BY ARCHITECT.
8. 48"H FRP AT ALL MOP SINKS
9. ALL FRP SEAMS AND EXPOSED EDGES TO HAVE COORDINATING TRIM.
10. GROUT LINES AT TILE FLOORS NOT TO EXCEED 3/16" WIDTH GROUT SELECTIONS TO BE SUBMITTED AND APPROVED BY DESIGNER.
11. CERAMIC OR PORCELAIN PLANK FLOOR TILES INSTALLED IN A BRICK PATTERN SHOULD NOT BE OFFSET MORE THAN 33% OF THE LENGTH OF THE TILE. SEE MANUFACTURER'S SPECIFICATIONS FOR MAXIMUM OFFSET TO PREVENT LIPPAGE FROM BOWING IN THE TILE.
12. A SCHLUTER DILEX COVE TRIM IS TO BE USED IN ALL COMMON BATHS AND SHOWER/TUB ROOMS WHERE WALL TILE MEETS FLOOR TILE AND A COVE TILE IS NOT SPECIFIED. SCHLUTER RONDEC TRIM ALONG TOP EDGE OF EXPOSED TILE. ALL SCHLUTER TRIMS TO BE NICKEL FINISH.
13. A SCHLUTER TRANSITION STRIP SHOULD BE USED BETWEEN DIFFERENT FLOORING MATERIAL TRANSITIONS IN COMMON SPACES. PROFILES AND FINISHES TO BE SUBMITTED TO ARCHITECT FOR APPROVAL.
14. ALL MISC METAL ITEMS THROUGHOUT SPACE (METAL SUPPORT BRACKETS, FIRE EXTINGUISHER HOUSINGS, ETC) TO BE PAINTED. ARCHITECT TO SPECIFY COLOR.
15. ALL VCT TILE TO BE INSTALLED IN "SAME DIRECTION" PATTERN OR AS SPECIFIED ON THE FLOOR FINISH PLAN. PRODUCT TO BE WASHED & WAXED AFTER INSTALLATION PER MANUFACTURER'S GUIDELINES.
16. ALL SHEET VINYL PRODUCTS TO BE INSTALLED PER FINISH FLOOR PLAN OR ARCHITECT'S SPECIFICATIONS. PRODUCT TO BE WASHED & WAXED AFTER INSTALLATION PER MANUFACTURER'S GUIDELINES. NOTE: SHEET VINYL PRODUCTS MAY REQUIRE 3-5 COATINGS OF APPROPRIATE METAL CROSSLINK ACRYLIC POLISH VERIFY WITH MANUFACTURER'S REPRESENTATIVE PER PRODUCT FOR EXACT SPECS & RECOMMENDATIONS.
17. FLOOR TRANSITIONS TO OCCUR UNDER DOOR, TYP.
18. ACCENT PAINT AT UNIT ENTRIES IN CORRIDOR, UNLESS NOTED OTHERWISE. ACCENT PAINT INCLUDES WALL WITH ENTRY DOOR AND TWO RETURN WALLS AT SIDES.
19. ASSUME CEILING WHITE TYP. ON CEILINGS IN UNITS AND COMMON AREAS AND DIFFERENT COLOR ON WALLS UNLESS NOTED OTHERWISE. FLAT FINISH THROUGHOUT.
20. ALL EXPOSED ENDS OF CASEWORK TO BE FINISHED.
21. UNDERSIDE OF ALL SOFFITS TO BE SMOOTH. CARRY WALL COLOR ON FACE OF SOFFIT, UNDERSIDE OF SOFFIT TO BE WHITE.
22. ALL CEILINGS TO BE FINE KD, EXECPT IN BATHROOMS (COMMONS & UNITS) WHICH ARE TO BE SMOOTH. WALLS TO BE FINE TEXTURE EXCEPT AT AREAS NOTED FOR WALL COVERING
23. AT ALL LOCATIONS WHERE VINYL WALL COVERING IS APPLIED TO AN EXTERIOR WALL, THE SAME PRODUCT WITH MIRCO-PERF/MICRO-VENT MUST BE USED. BREATHABLE PRIMERS/ADHESIVES MUST ALSO BE USED WITH THE MICRO-VENTED WALL COVERING SO NOT TO REDUCE THE PERMEABILITY OF THE INSTALLATION. SEE MANUFACTURER'S RECOMMONDATIONS FOR PRIMERS.
24. ALL COUNTER TOPS IN KITCHEN/WET AREAS TO GET POST-FORM EDGE W/INTEGRAL BACKSPLASH ALL COUNTERTOPS IN NON-WET AREAS TO GET SQUARE EDGE.
25. ALL OUTLETS IN STAINED WOOD WAINSCOT TO HAVE DARK BROWN OUTLET AND COVER.
26. ALL STAINED TRIM PIECES/BASE/PANELING TO BE MAPLE.
27. ALL COMMON AREA WALLS TO HAVE EGGSHELL SHEEN. UNITS TO BE FLAT, EXCEPT AT KITCHENS AND BATHROOMS WHICH ARE TO BE EGGSHELL.
28. ALL COMMON AREA WINDOWS RECEIVE 1X4 TRIM & HDWD EXTENSION JAMBS - PAINT OR STAIN TO MATCH ROOM TRIM. SEE DETAIL ON SHEET I800.
29. SEE I800 MILLWORK FOR ALL CHAIR RAIL DETAILS (CR-1 - CR-7)
30. WIRE PULLS ON BACK OF HOUSE/STAFF WORK AREAS, BAR PULLS IN ALL COMMON AREAS ON ALL CABINETS.
31. CONTRACTOR TO SUBMIT QTY. (1) SAMPLES/CUT SHEETS FOR ALL FINISH MATERIALS LISTED IN FINISH SCHEDULE TO ARCHITECT FOR APPROVAL PRIOR TO ORDERING PRODUCT. IF SAMPLES ARE NOT SUBMITTED, CONTRACTOR ASSUMES RESPONSIBILITY.
INTERIOR FINISHES GENERAL NOTES
INTERIOR FINISHES KEY
ROOM FLOOR FINISH TAG
PL-1
CPT-1
MILLWORK FINISH TAG
FLOOR & WALL FINISH TAG
Room name
101
Base
Floor
ROOM WALL FINISH TAG
Room name
101
Wall
Ceiling
Date
Project Number
1301 American Blvd ESuite 100Bloomington, MN 55425tel: (612) 879-6000fax: (612) 879-6666www.kaaswilson.com
Copyr
ight K
aas
Wils
on A
rchite
cts
Ow
ner:
Pro
ject
:
kaas wilson
architects
PERMIT SET
As indicated
1/3
1/2
01
7 5
:42:0
4 P
MC
:\R
evit L
ocal\1
667
-He
art
h D
evelo
pm
en
t-O
wen
sb
oro
Se
nio
r Liv
ing_ssta
nke.r
vt
Floor Finish Plans -Level 1 Commons
01/31/2017
1667
Ow
ensb
oro
Senio
r Li
ving
Heart
h D
evelo
pm
ent
I400
3138 F
airvie
w D
rive
Ow
ensboro
, K
Y 4
2303
Kitchen:Strategic Equipment & Supply1203 33rd Street South St.Cloud, MN 56301(302) 257-8802
MEP:The Matrix Group311 East Chicago Street,Suite 310Milwaukee, WI 53202(414) 329-2827
Civil:Bryant Engineering Inc.1535 Frederica St.P.O. Box 21382Owensboro, KY 42304270-685-2811
Structural:Advanced StructuralTechnologies, Inc.7210 Metro BlvdEdina, MN 55439(952) 854-9302
67
50
Stillw
ate
r B
lvd. N
., S
uite 2
00
Stillw
ate
r, M
N 5
50
82
(65
1)-
705-8
811
1/4" = 1'-0"1
Floor Finish Plan - Lobby / Dining 1/4" = 1'-0"
2Floor Finish Plan - Club Room / Pr. Dining
Rev.
No.
Revi
sion
Date
WW
DD
FD
FD
FD
1872
43" MIN. CLEAR
34DR
43" MIN. CLEAR
34DR
Elev Lobby
179
SEE CR-1
LV-3/CPT-5
Elev. Equip.
181
VB-1
SEALEDCONC.
Elec.
184
VB-1
SEALEDCONC.
Mech
182
VB-1
SEALEDCONC.
Laundry
183
VB-1
SV-3
Kitchen
180
QT-1
QT-1
Kitchen
180
QT-1
QT-1
Kitchen
180
QT-1
QT-1
Womens
178
CT-5
CT-3
Mens
177
CT-5
CT-3
Lobby
166
SEE CR-4
CPT-3/CT-1
Reception
167
WB-4
CPT-9
Office
170
WB-3
CPT-9
Nurse
172
WB-3
CPT-9
Office
171
WB-3
CPT-9
Office
173
WB-3
CPT-9
Office
174
WB-3
CPT-9
Conf.
169
SEE CR-1
CPT-11/CPT-10
ServiceCorridor
175
WB-3
CPT-6/LV-3
Trash
176
VB-1
SEALEDCONC.
Office Corridor
168
WB-3
CPT-9
Corridor
150
SEE CR-6
CPT-6/LV-3
Corridor
150
SEE CR-6
CPT-6/LV-3
Kitchen Office
180B
QT-1
QT-1
Dry Storage
180A
QT-1
QT-1
CP
T-6
CPT-6LV-3
LV-3CPT-6
CP
T-6
LV
-3
LV-3CPT-6
CPT-6LV-3
4'-6"
4'-6"
9" 5'-6" 9"
CT-3LV-3
LV-3CT-3
2'-0"
1'-0"
1'-0"
1'-0"
1'-0"
CT
-1C
PT-9
CP
T-1
0C
PT-9
CP
T-1
1C
PT
-10
CT-1CPT-10CPT-10
CPT-11
CT-1CPT-9
DIRECTION OF LINEAR PATTERN -MITRE AT CORNERS
2'-0"
CPT-6 CPT-13
QT-1 CPT-13
LV-3QT-1
LV-3QT-1
LV
-3
CP
T-6
QT
-1L
V-3 L
V-3
CP
T-6
LV
-3C
PT
-5
2'-0"
2'-0"
2'-0"
2'-0"
1. ALL EXPOSED SURFACES TO BE PREPARED TO RECEIVE NEW FINISHES.
2. DO NOT SCALE DRAWINGS.
3. ALL MATERIALS TO BE INSTALLED PER MANUFACTURER'S SPECIFICATIONS.
4. NO SUBSTITUTIONS WITHOUT ARCHITECT'S OR BUILDING OWNER'S APPROVAL.
5. ALL CARPETING TO BE INSTALLED BY DIRECT GLUE METHOD OR PER MANUF. RECOMMENDATIONS, UNLESS NOTED OTHERWISE.
6. INSPECT ALL SURFACES TO RECEIVE NEW FINISHES. REPORT TO ARCHITECT ANY AREAS WHICH ARE NOT SUITABLE TO RECEIVE NEW FINISH PRIOR TO BEGINNING WORK. CONTACT ARCHITECT WITH ANY DISCREPANCIES IN PRODUCT QUALITY SUCH AS DYELOT VARIANCES, PRODUCT SHADING, ETC. DO NOT CONTINUE TO INSTALL PRODUCTS WITH POSSIBLE DEFECTS.
7. ALL MATERIALS SPECIFIED ARE AVAILABLE AS OF ORIGINAL DATE ON PLAN. KAAS WILSON ARCHITECTS IS NOT RESPONSIBLE FOR ANY MATERIALS ORDERED AFTER THIS DATE THAT ARE DISCONTINUED OR UNAVAILABLE. ANY SUBSTITUTIONS MUST BE REVIEWED & APPROVED BY ARCHITECT.
8. 48"H FRP AT ALL MOP SINKS
9. ALL FRP SEAMS AND EXPOSED EDGES TO HAVE COORDINATING TRIM.
10. GROUT LINES AT TILE FLOORS NOT TO EXCEED 3/16" WIDTH GROUT SELECTIONS TO BE SUBMITTED AND APPROVED BY DESIGNER.
11. CERAMIC OR PORCELAIN PLANK FLOOR TILES INSTALLED IN A BRICK PATTERN SHOULD NOT BE OFFSET MORE THAN 33% OF THE LENGTH OF THE TILE. SEE MANUFACTURER'S SPECIFICATIONS FOR MAXIMUM OFFSET TO PREVENT LIPPAGE FROM BOWING IN THE TILE.
12. A SCHLUTER DILEX COVE TRIM IS TO BE USED IN ALL COMMON BATHS AND SHOWER/TUB ROOMS WHERE WALL TILE MEETS FLOOR TILE AND A COVE TILE IS NOT SPECIFIED. SCHLUTER RONDEC TRIM ALONG TOP EDGE OF EXPOSED TILE. ALL SCHLUTER TRIMS TO BE NICKEL FINISH.
13. A SCHLUTER TRANSITION STRIP SHOULD BE USED BETWEEN DIFFERENT FLOORING MATERIAL TRANSITIONS IN COMMON SPACES. PROFILES AND FINISHES TO BE SUBMITTED TO ARCHITECT FOR APPROVAL.
14. ALL MISC METAL ITEMS THROUGHOUT SPACE (METAL SUPPORT BRACKETS, FIRE EXTINGUISHER HOUSINGS, ETC) TO BE PAINTED. ARCHITECT TO SPECIFY COLOR.
15. ALL VCT TILE TO BE INSTALLED IN "SAME DIRECTION" PATTERN OR AS SPECIFIED ON THE FLOOR FINISH PLAN. PRODUCT TO BE WASHED & WAXED AFTER INSTALLATION PER MANUFACTURER'S GUIDELINES.
16. ALL SHEET VINYL PRODUCTS TO BE INSTALLED PER FINISH FLOOR PLAN OR ARCHITECT'S SPECIFICATIONS. PRODUCT TO BE WASHED & WAXED AFTER INSTALLATION PER MANUFACTURER'S GUIDELINES. NOTE: SHEET VINYL PRODUCTS MAY REQUIRE 3-5 COATINGS OF APPROPRIATE METAL CROSSLINK ACRYLIC POLISH VERIFY WITH MANUFACTURER'S REPRESENTATIVE PER PRODUCT FOR EXACT SPECS & RECOMMENDATIONS.
17. FLOOR TRANSITIONS TO OCCUR UNDER DOOR, TYP.
18. ACCENT PAINT AT UNIT ENTRIES IN CORRIDOR, UNLESS NOTED OTHERWISE. ACCENT PAINT INCLUDES WALL WITH ENTRY DOOR AND TWO RETURN WALLS AT SIDES.
19. ASSUME CEILING WHITE TYP. ON CEILINGS IN UNITS AND COMMON AREAS AND DIFFERENT COLOR ON WALLS UNLESS NOTED OTHERWISE. FLAT FINISH THROUGHOUT.
20. ALL EXPOSED ENDS OF CASEWORK TO BE FINISHED.
21. UNDERSIDE OF ALL SOFFITS TO BE SMOOTH. CARRY WALL COLOR ON FACE OF SOFFIT, UNDERSIDE OF SOFFIT TO BE WHITE.
22. ALL CEILINGS TO BE FINE KD, EXECPT IN BATHROOMS (COMMONS & UNITS) WHICH ARE TO BE SMOOTH. WALLS TO BE FINE TEXTURE EXCEPT AT AREAS NOTED FOR WALL COVERING
23. AT ALL LOCATIONS WHERE VINYL WALL COVERING IS APPLIED TO AN EXTERIOR WALL, THE SAME PRODUCT WITH MIRCO-PERF/MICRO-VENT MUST BE USED. BREATHABLE PRIMERS/ADHESIVES MUST ALSO BE USED WITH THE MICRO-VENTED WALL COVERING SO NOT TO REDUCE THE PERMEABILITY OF THE INSTALLATION. SEE MANUFACTURER'S RECOMMONDATIONS FOR PRIMERS.
24. ALL COUNTER TOPS IN KITCHEN/WET AREAS TO GET POST-FORM EDGE W/INTEGRAL BACKSPLASH ALL COUNTERTOPS IN NON-WET AREAS TO GET SQUARE EDGE.
25. ALL OUTLETS IN STAINED WOOD WAINSCOT TO HAVE DARK BROWN OUTLET AND COVER.
26. ALL STAINED TRIM PIECES/BASE/PANELING TO BE MAPLE.
27. ALL COMMON AREA WALLS TO HAVE EGGSHELL SHEEN. UNITS TO BE FLAT, EXCEPT AT KITCHENS AND BATHROOMS WHICH ARE TO BE EGGSHELL.
28. ALL COMMON AREA WINDOWS RECEIVE 1X4 TRIM & HDWD EXTENSION JAMBS - PAINT OR STAIN TO MATCH ROOM TRIM. SEE DETAIL ON SHEET I800.
29. SEE I800 MILLWORK FOR ALL CHAIR RAIL DETAILS (CR-1 - CR-7)
30. WIRE PULLS ON BACK OF HOUSE/STAFF WORK AREAS, BAR PULLS IN ALL COMMON AREAS ON ALL CABINETS.
31. CONTRACTOR TO SUBMIT QTY. (1) SAMPLES/CUT SHEETS FOR ALL FINISH MATERIALS LISTED IN FINISH SCHEDULE TO ARCHITECT FOR APPROVAL PRIOR TO ORDERING PRODUCT. IF SAMPLES ARE NOT SUBMITTED, CONTRACTOR ASSUMES RESPONSIBILITY.
INTERIOR FINISHES GENERAL NOTES
INTERIOR FINISHES KEY
ROOM FLOOR FINISH TAG
PL-1
CPT-1
MILLWORK FINISH TAG
FLOOR & WALL FINISH TAG
Room name
101
Base
Floor
ROOM WALL FINISH TAG
Room name
101
Wall
Ceiling
Date
Project Number
1301 American Blvd ESuite 100Bloomington, MN 55425tel: (612) 879-6000fax: (612) 879-6666www.kaaswilson.com
Copyr
ight K
aas
Wils
on A
rchite
cts
Ow
ner:
Pro
ject
:
kaas wilson
architects
PERMIT SET
As indicated
1/3
1/2
01
7 5
:42:0
7 P
MC
:\R
evit L
ocal\1
667
-He
art
h D
evelo
pm
en
t-O
wen
sb
oro
Se
nio
r Liv
ing_ssta
nke.r
vt
Floor Finish Plans -Level 1 Commons
01/31/2017
1667
Ow
ensb
oro
Senio
r Li
ving
Heart
h D
evelo
pm
ent
I401
3138 F
airvie
w D
rive
Ow
ensboro
, K
Y 4
2303
Kitchen:Strategic Equipment & Supply1203 33rd Street South St.Cloud, MN 56301(302) 257-8802
MEP:The Matrix Group311 East Chicago Street,Suite 310Milwaukee, WI 53202(414) 329-2827
Civil:Bryant Engineering Inc.1535 Frederica St.P.O. Box 21382Owensboro, KY 42304270-685-2811
Structural:Advanced StructuralTechnologies, Inc.7210 Metro BlvdEdina, MN 55439(952) 854-9302
67
50
Stillw
ate
r B
lvd. N
., S
uite 2
00
Stillw
ate
r, M
N 5
50
82
(65
1)-
705-8
811
1/4" = 1'-0"1
Floor Finish Plan - Office / Elevator. Lobby
Rev.
No.
Revi
sion
Date
DWREF.
W
W
D
D
W/D
RE
F.
REF.
RE
F.
FD
FD
Library
263
SEE CR-1
CPT-15
Act. Dir.
264
WB-3
CPT-9
Mezzanine
266
WB-3
CPT-15
Corridor
250
SEE CR-6
CPT-6/LV-3
Exam
267
WB-3
LV-3
Toilet
268
CT-5
CT-3
Vest.
165
WB-3
CPT-4/CT-1
Fitness Alcove
269a
WB-3
LV-3
Fitness
269
WB-3
CPT-9
Staff Corridor
282a
WB-3
LV-3
Janitor
280
VB-1
SV-3
Elec
281
VB-1
SV-3
Charting
284
WB-3
CPT-9
Laundry
283
VB-1
SV-3
Staff
282
VB-1
SV-4
Elev Lobby
279
SEE CR-1
CPT-5/LV-3
Salon
278
WB-3
LV-3
Salon Alcove
278a
WB-4
LV-3
Toilet
277
CT-5
CT-3
CommunityRoom
262
SEE CR-1
CPT-16/LV-3
Deck
260
-
-
ScreenedPorch
261
WB-3
LV-3
LV
-3C
PT
-6
LV
-3C
PT
-15
LV
-3C
PT
-15
CP
T-6
LV
-3
CP
T-6
LV
-3
LV
-3C
PT
-15
LV
-3C
PT
-6
CPT-6 LV-3 LV-3 CPT-6
CP
T-6
LV
-3
CP
T-1
6L
V-3
CP
T-1
6L
V-3
CP
T-5
LV
-3
LV
-3C
PT-6
CT-3 LV-3
LV
-3C
PT
-9
CT-3 LV-3
CP
T-9
CP
T-1
5
SV
-4LV
-3
LV-3SV-3
LV-3CPT-6
CPT-6LV-3
4'-6
"
9"4'
-6"
9"
INTERIOR FINISHES KEY
ROOM FLOOR FINISH TAG
PL-1
CPT-1
MILLWORK FINISH TAG
FLOOR & WALL FINISH TAG
Room name
101
Base
Floor
ROOM WALL FINISH TAG
Room name
101
Wall
Ceiling
Date
Project Number
1301 American Blvd ESuite 100Bloomington, MN 55425tel: (612) 879-6000fax: (612) 879-6666www.kaaswilson.com
Copyr
ight K
aas
Wils
on A
rchite
cts
Ow
ner:
Pro
ject
:
kaas wilson
architects
PERMIT SET
As indicated
1/3
1/2
01
7 5
:42:1
2 P
MC
:\R
evit L
ocal\1
667
-He
art
h D
evelo
pm
en
t-O
wen
sb
oro
Se
nio
r Liv
ing_ssta
nke.r
vt
Floor Finish Plans -Level 2 Commons
01/31/2017
1667
Ow
ensb
oro
Senio
r Li
ving
Heart
h D
evelo
pm
ent
I402
3138 F
airvie
w D
rive
Ow
ensboro
, K
Y 4
2303
Kitchen:Strategic Equipment & Supply1203 33rd Street South St.Cloud, MN 56301(302) 257-8802
MEP:The Matrix Group311 East Chicago Street,Suite 310Milwaukee, WI 53202(414) 329-2827
Civil:Bryant Engineering Inc.1535 Frederica St.P.O. Box 21382Owensboro, KY 42304270-685-2811
Structural:Advanced StructuralTechnologies, Inc.7210 Metro BlvdEdina, MN 55439(952) 854-9302
67
50
Stillw
ate
r B
lvd. N
., S
uite 2
00
Stillw
ate
r, M
N 5
50
82
(65
1)-
705-8
811
1/4" = 1'-0"1
Floor Finish Plan - Level 2 Commons
Rev.
No.
Revi
sion
Date
FD
FD
DWREF.
REF.
MC Dayroom
189
SEE CR-5
CPT-17
CPT-18 CPT-17
CPT-18 CPT-17
MC Dining
185
SEE CR-1
LV-3/CPT-17
Sensory
188
WB-3
CPT-17
Unisex
187
CT-5
CT-3
Tub Room
186
CT-5
CT-3
MC Corridor
152
SEE CR-6
CPT-13
MC Corridor
152
SEE CR-6
CPT-13
CPT-13 LV-3
CPT-13 LV-3
LV-3 CPT-17
CT
-3C
PT
-13
CT
-3C
PT
-13
FEATHER TRANSITION FROM CPT-13 TO CPT-17
CPT-13
CPT-13
CPT-13
CPT-17
CPT-17
CPT-17
CPT-17
CPT-17
CPT-17
CPT-17
CPT-13
CPT-13
CPT-13
CPT-13
CPT-13 CPT-13
CPT-13
CPT-13
Theater
285
SEE CR-5
CPT-11
Corridor
250
SEE CR-6
CPT-6/LV-3
LV-3 CPT-6
CPT-6 LV-3
LV
-3C
PT
-6
CP
T-6
LV
-3
CP
T-1
1L
V-3
CP
T-1
1L
V-3
I404
3Typ.
I404
3Typ.
1. ALL EXPOSED SURFACES TO BE PREPARED TO RECEIVE NEW FINISHES.
2. DO NOT SCALE DRAWINGS.
3. ALL MATERIALS TO BE INSTALLED PER MANUFACTURER'S SPECIFICATIONS.
4. NO SUBSTITUTIONS WITHOUT ARCHITECT'S OR BUILDING OWNER'S APPROVAL.
5. ALL CARPETING TO BE INSTALLED BY DIRECT GLUE METHOD OR PER MANUF. RECOMMENDATIONS, UNLESS NOTED OTHERWISE.
6. INSPECT ALL SURFACES TO RECEIVE NEW FINISHES. REPORT TO ARCHITECT ANY AREAS WHICH ARE NOT SUITABLE TO RECEIVE NEW FINISH PRIOR TO BEGINNING WORK. CONTACT ARCHITECT WITH ANY DISCREPANCIES IN PRODUCT QUALITY SUCH AS DYELOT VARIANCES, PRODUCT SHADING, ETC. DO NOT CONTINUE TO INSTALL PRODUCTS WITH POSSIBLE DEFECTS.
7. ALL MATERIALS SPECIFIED ARE AVAILABLE AS OF ORIGINAL DATE ON PLAN. KAAS WILSON ARCHITECTS IS NOT RESPONSIBLE FOR ANY MATERIALS ORDERED AFTER THIS DATE THAT ARE DISCONTINUED OR UNAVAILABLE. ANY SUBSTITUTIONS MUST BE REVIEWED & APPROVED BY ARCHITECT.
8. 48"H FRP AT ALL MOP SINKS
9. ALL FRP SEAMS AND EXPOSED EDGES TO HAVE COORDINATING TRIM.
10. GROUT LINES AT TILE FLOORS NOT TO EXCEED 3/16" WIDTH GROUT SELECTIONS TO BE SUBMITTED AND APPROVED BY DESIGNER.
11. CERAMIC OR PORCELAIN PLANK FLOOR TILES INSTALLED IN A BRICK PATTERN SHOULD NOT BE OFFSET MORE THAN 33% OF THE LENGTH OF THE TILE. SEE MANUFACTURER'S SPECIFICATIONS FOR MAXIMUM OFFSET TO PREVENT LIPPAGE FROM BOWING IN THE TILE.
12. A SCHLUTER DILEX COVE TRIM IS TO BE USED IN ALL COMMON BATHS AND SHOWER/TUB ROOMS WHERE WALL TILE MEETS FLOOR TILE AND A COVE TILE IS NOT SPECIFIED. SCHLUTER RONDEC TRIM ALONG TOP EDGE OF EXPOSED TILE. ALL SCHLUTER TRIMS TO BE NICKEL FINISH.
13. A SCHLUTER TRANSITION STRIP SHOULD BE USED BETWEEN DIFFERENT FLOORING MATERIAL TRANSITIONS IN COMMON SPACES. PROFILES AND FINISHES TO BE SUBMITTED TO ARCHITECT FOR APPROVAL.
14. ALL MISC METAL ITEMS THROUGHOUT SPACE (METAL SUPPORT BRACKETS, FIRE EXTINGUISHER HOUSINGS, ETC) TO BE PAINTED. ARCHITECT TO SPECIFY COLOR.
15. ALL VCT TILE TO BE INSTALLED IN "SAME DIRECTION" PATTERN OR AS SPECIFIED ON THE FLOOR FINISH PLAN. PRODUCT TO BE WASHED & WAXED AFTER INSTALLATION PER MANUFACTURER'S GUIDELINES.
16. ALL SHEET VINYL PRODUCTS TO BE INSTALLED PER FINISH FLOOR PLAN OR ARCHITECT'S SPECIFICATIONS. PRODUCT TO BE WASHED & WAXED AFTER INSTALLATION PER MANUFACTURER'S GUIDELINES. NOTE: SHEET VINYL PRODUCTS MAY REQUIRE 3-5 COATINGS OF APPROPRIATE METAL CROSSLINK ACRYLIC POLISH VERIFY WITH MANUFACTURER'S REPRESENTATIVE PER PRODUCT FOR EXACT SPECS & RECOMMENDATIONS.
17. FLOOR TRANSITIONS TO OCCUR UNDER DOOR, TYP.
18. ACCENT PAINT AT UNIT ENTRIES IN CORRIDOR, UNLESS NOTED OTHERWISE. ACCENT PAINT INCLUDES WALL WITH ENTRY DOOR AND TWO RETURN WALLS AT SIDES.
19. ASSUME CEILING WHITE TYP. ON CEILINGS IN UNITS AND COMMON AREAS AND DIFFERENT COLOR ON WALLS UNLESS NOTED OTHERWISE. FLAT FINISH THROUGHOUT.
20. ALL EXPOSED ENDS OF CASEWORK TO BE FINISHED.
21. UNDERSIDE OF ALL SOFFITS TO BE SMOOTH. CARRY WALL COLOR ON FACE OF SOFFIT, UNDERSIDE OF SOFFIT TO BE WHITE.
22. ALL CEILINGS TO BE FINE KD, EXECPT IN BATHROOMS (COMMONS & UNITS) WHICH ARE TO BE SMOOTH. WALLS TO BE FINE TEXTURE EXCEPT AT AREAS NOTED FOR WALL COVERING
23. AT ALL LOCATIONS WHERE VINYL WALL COVERING IS APPLIED TO AN EXTERIOR WALL, THE SAME PRODUCT WITH MIRCO-PERF/MICRO-VENT MUST BE USED. BREATHABLE PRIMERS/ADHESIVES MUST ALSO BE USED WITH THE MICRO-VENTED WALL COVERING SO NOT TO REDUCE THE PERMEABILITY OF THE INSTALLATION. SEE MANUFACTURER'S RECOMMONDATIONS FOR PRIMERS.
24. ALL COUNTER TOPS IN KITCHEN/WET AREAS TO GET POST-FORM EDGE W/INTEGRAL BACKSPLASH ALL COUNTERTOPS IN NON-WET AREAS TO GET SQUARE EDGE.
25. ALL OUTLETS IN STAINED WOOD WAINSCOT TO HAVE DARK BROWN OUTLET AND COVER.
26. ALL STAINED TRIM PIECES/BASE/PANELING TO BE MAPLE.
27. ALL COMMON AREA WALLS TO HAVE EGGSHELL SHEEN. UNITS TO BE FLAT, EXCEPT AT KITCHENS AND BATHROOMS WHICH ARE TO BE EGGSHELL.
28. ALL COMMON AREA WINDOWS RECEIVE 1X4 TRIM & HDWD EXTENSION JAMBS - PAINT OR STAIN TO MATCH ROOM TRIM. SEE DETAIL ON SHEET I800.
29. SEE I800 MILLWORK FOR ALL CHAIR RAIL DETAILS (CR-1 - CR-7)
30. WIRE PULLS ON BACK OF HOUSE/STAFF WORK AREAS, BAR PULLS IN ALL COMMON AREAS ON ALL CABINETS.
31. CONTRACTOR TO SUBMIT QTY. (1) SAMPLES/CUT SHEETS FOR ALL FINISH MATERIALS LISTED IN FINISH SCHEDULE TO ARCHITECT FOR APPROVAL PRIOR TO ORDERING PRODUCT. IF SAMPLES ARE NOT SUBMITTED, CONTRACTOR ASSUMES RESPONSIBILITY.
INTERIOR FINISHES GENERAL NOTES
INTERIOR FINISHES KEY
ROOM FLOOR FINISH TAG
PL-1
CPT-1
MILLWORK FINISH TAG
FLOOR & WALL FINISH TAG
Room name
101
Base
Floor
ROOM WALL FINISH TAG
Room name
101
Wall
Ceiling
Date
Project Number
1301 American Blvd ESuite 100Bloomington, MN 55425tel: (612) 879-6000fax: (612) 879-6666www.kaaswilson.com
Copyr
ight K
aas
Wils
on A
rchite
cts
Ow
ner:
Pro
ject
:
kaas wilson
architects
PERMIT SET
As indicated
1/3
1/2
01
7 5
:42:1
5 P
MC
:\R
evit L
ocal\1
667
-He
art
h D
evelo
pm
en
t-O
wen
sb
oro
Se
nio
r Liv
ing_ssta
nke.r
vt
Floor Finish Plans -MC & Theater
01/31/2017
1667
Ow
ensb
oro
Senio
r Li
ving
Heart
h D
evelo
pm
ent
I403
3138 F
airvie
w D
rive
Ow
ensboro
, K
Y 4
2303
Kitchen:Strategic Equipment & Supply1203 33rd Street South St.Cloud, MN 56301(302) 257-8802
MEP:The Matrix Group311 East Chicago Street,Suite 310Milwaukee, WI 53202(414) 329-2827
Civil:Bryant Engineering Inc.1535 Frederica St.P.O. Box 21382Owensboro, KY 42304270-685-2811
Structural:Advanced StructuralTechnologies, Inc.7210 Metro BlvdEdina, MN 55439(952) 854-9302
67
50
Stillw
ate
r B
lvd. N
., S
uite 2
00
Stillw
ate
r, M
N 5
50
82
(65
1)-
705-8
811
1/4" = 1'-0"1
Floor Finish Plan - MC Dayroom 1/4" = 1'-0"
2Floor FInish Plan - MC Dining
1/4" = 1'-0"3
Floor Finish Plan - Theater
Rev.
No.
Revi
sion
Date
WW
DD
FD
REF.
REF.
WW
DD
Corridor
450
SEE CR-6
CPT-6/LV-3
Tub Room
486
CT-5
CT-3
Res Storage
485
VB-1
SV-3
Laundry
483
VB-1
SV-3
Charting
484
WB-3
CPT-9
Elec
481
VB-1
SV-3
Janitor
480
VB-1
SV-3
StorageCorridor
482a
WB-3
LV-3
Storage
482
VB-1
SV-3
Elev Lobby
479
SEE CR-1
CPT-5/LV-3
Corridor
450
SEE CR-6
CPT-6/LV-3
CPT-6LV-3
LV-3CPT-6
CP
T-6
LV
-3
LV-3CPT-6
CPT-6LV-3
LV-3 SV-3
CPT-6 LV-3
I404
3Typ.
LV-3 CT-3
I404
3Typ.
I404
3Typ.
LV
-3C
PT
-9
CP
T-6
LV
-3
LV
-3S
V-3
LV
-3S
V-3
LV
-3C
PT
-5
1'-6"
1'-6"
1'-6"
1'-6"
LV-3 SV-3
SV-3 LV-3
Elev Lobby
379
SEE CR-1
CPT-5/LV-3
Janitor
380
VB-1
SV-3
Elec
381
VB-1
SV-3
Charting
384
WB-3
CPT-9
Laundry
383
VB-1
SV-3Storage
382
VB-1
SV-3
StorageCorridor
382a
WB-3
LV-3
Crafts
385
WB-3
LV-4/LV-5
Corridor
350
SEE CR-6
CPT-6/LV-3
Storage
386
VB-1
SV-3
Corridor
350
SEE CR-6
CPT-6/LV-3
LV
-3C
PT
-5
I404
3
CPT-6LV-3
CP
T-6
LV
-3
CPT-6LV-3
CP
T-6
LV
-3
LV-3 CPT-6
CPT-6 LV-3
LV-3 CPT-6
LV
-3C
PT
-6
CP
T-6
LV
-3
1'-6"
1'-6"
1'-6"
LV-3CPT-6
LV-3CPT-6
9"
TYP
.
4'-6"
9"
2'-0"
2'-0"
LV-3 SV-3
LV
-3S
V-3
LV
-3S
V-3
LV
-3C
PT
-9
LV
-3L
V-3
SV-3 LV-3
LV-3 SV-3
I404
3Typ.
I404
3Typ.
LV-4
LV-4
LV-4 LV-4 LV-4
LV-4
LV-4
LV-4
LV-4
LV-4
LV-4
LV-4
LV-4
LV-4
LV-4 LV-4
LV-4
LV-4
LV-4
LV-4
LV-4
LV-4LV-4
LV-4
LV-4
LV-4 LV-4LV-4
1'-0" 1'-0"
9"4'
-6"
9"
CPT-6 LV-3
LV-3 CPT-6
CP
T-6
LV
-3L
V-3
CP
T-6
*NOTE: NO LVP IN CORRIDORS IN MEMORY CARE
1. ALL EXPOSED SURFACES TO BE PREPARED TO RECEIVE NEW FINISHES.
2. DO NOT SCALE DRAWINGS.
3. ALL MATERIALS TO BE INSTALLED PER MANUFACTURER'S SPECIFICATIONS.
4. NO SUBSTITUTIONS WITHOUT ARCHITECT'S OR BUILDING OWNER'S APPROVAL.
5. ALL CARPETING TO BE INSTALLED BY DIRECT GLUE METHOD OR PER MANUF. RECOMMENDATIONS, UNLESS NOTED OTHERWISE.
6. INSPECT ALL SURFACES TO RECEIVE NEW FINISHES. REPORT TO ARCHITECT ANY AREAS WHICH ARE NOT SUITABLE TO RECEIVE NEW FINISH PRIOR TO BEGINNING WORK. CONTACT ARCHITECT WITH ANY DISCREPANCIES IN PRODUCT QUALITY SUCH AS DYELOT VARIANCES, PRODUCT SHADING, ETC. DO NOT CONTINUE TO INSTALL PRODUCTS WITH POSSIBLE DEFECTS.
7. ALL MATERIALS SPECIFIED ARE AVAILABLE AS OF ORIGINAL DATE ON PLAN. KAAS WILSON ARCHITECTS IS NOT RESPONSIBLE FOR ANY MATERIALS ORDERED AFTER THIS DATE THAT ARE DISCONTINUED OR UNAVAILABLE. ANY SUBSTITUTIONS MUST BE REVIEWED & APPROVED BY ARCHITECT.
8. 48"H FRP AT ALL MOP SINKS
9. ALL FRP SEAMS AND EXPOSED EDGES TO HAVE COORDINATING TRIM.
10. GROUT LINES AT TILE FLOORS NOT TO EXCEED 3/16" WIDTH GROUT SELECTIONS TO BE SUBMITTED AND APPROVED BY DESIGNER.
11. CERAMIC OR PORCELAIN PLANK FLOOR TILES INSTALLED IN A BRICK PATTERN SHOULD NOT BE OFFSET MORE THAN 33% OF THE LENGTH OF THE TILE. SEE MANUFACTURER'S SPECIFICATIONS FOR MAXIMUM OFFSET TO PREVENT LIPPAGE FROM BOWING IN THE TILE.
12. A SCHLUTER DILEX COVE TRIM IS TO BE USED IN ALL COMMON BATHS AND SHOWER/TUB ROOMS WHERE WALL TILE MEETS FLOOR TILE AND A COVE TILE IS NOT SPECIFIED. SCHLUTER RONDEC TRIM ALONG TOP EDGE OF EXPOSED TILE. ALL SCHLUTER TRIMS TO BE NICKEL FINISH.
13. A SCHLUTER TRANSITION STRIP SHOULD BE USED BETWEEN DIFFERENT FLOORING MATERIAL TRANSITIONS IN COMMON SPACES. PROFILES AND FINISHES TO BE SUBMITTED TO ARCHITECT FOR APPROVAL.
14. ALL MISC METAL ITEMS THROUGHOUT SPACE (METAL SUPPORT BRACKETS, FIRE EXTINGUISHER HOUSINGS, ETC) TO BE PAINTED. ARCHITECT TO SPECIFY COLOR.
15. ALL VCT TILE TO BE INSTALLED IN "SAME DIRECTION" PATTERN OR AS SPECIFIED ON THE FLOOR FINISH PLAN. PRODUCT TO BE WASHED & WAXED AFTER INSTALLATION PER MANUFACTURER'S GUIDELINES.
16. ALL SHEET VINYL PRODUCTS TO BE INSTALLED PER FINISH FLOOR PLAN OR ARCHITECT'S SPECIFICATIONS. PRODUCT TO BE WASHED & WAXED AFTER INSTALLATION PER MANUFACTURER'S GUIDELINES. NOTE: SHEET VINYL PRODUCTS MAY REQUIRE 3-5 COATINGS OF APPROPRIATE METAL CROSSLINK ACRYLIC POLISH VERIFY WITH MANUFACTURER'S REPRESENTATIVE PER PRODUCT FOR EXACT SPECS & RECOMMENDATIONS.
17. FLOOR TRANSITIONS TO OCCUR UNDER DOOR, TYP.
18. ACCENT PAINT AT UNIT ENTRIES IN CORRIDOR, UNLESS NOTED OTHERWISE. ACCENT PAINT INCLUDES WALL WITH ENTRY DOOR AND TWO RETURN WALLS AT SIDES.
19. ASSUME CEILING WHITE TYP. ON CEILINGS IN UNITS AND COMMON AREAS AND DIFFERENT COLOR ON WALLS UNLESS NOTED OTHERWISE. FLAT FINISH THROUGHOUT.
20. ALL EXPOSED ENDS OF CASEWORK TO BE FINISHED.
21. UNDERSIDE OF ALL SOFFITS TO BE SMOOTH. CARRY WALL COLOR ON FACE OF SOFFIT, UNDERSIDE OF SOFFIT TO BE WHITE.
22. ALL CEILINGS TO BE FINE KD, EXECPT IN BATHROOMS (COMMONS & UNITS) WHICH ARE TO BE SMOOTH. WALLS TO BE FINE TEXTURE EXCEPT AT AREAS NOTED FOR WALL COVERING
23. AT ALL LOCATIONS WHERE VINYL WALL COVERING IS APPLIED TO AN EXTERIOR WALL, THE SAME PRODUCT WITH MIRCO-PERF/MICRO-VENT MUST BE USED. BREATHABLE PRIMERS/ADHESIVES MUST ALSO BE USED WITH THE MICRO-VENTED WALL COVERING SO NOT TO REDUCE THE PERMEABILITY OF THE INSTALLATION. SEE MANUFACTURER'S RECOMMONDATIONS FOR PRIMERS.
24. ALL COUNTER TOPS IN KITCHEN/WET AREAS TO GET POST-FORM EDGE W/INTEGRAL BACKSPLASH ALL COUNTERTOPS IN NON-WET AREAS TO GET SQUARE EDGE.
25. ALL OUTLETS IN STAINED WOOD WAINSCOT TO HAVE DARK BROWN OUTLET AND COVER.
26. ALL STAINED TRIM PIECES/BASE/PANELING TO BE MAPLE.
27. ALL COMMON AREA WALLS TO HAVE EGGSHELL SHEEN. UNITS TO BE FLAT, EXCEPT AT KITCHENS AND BATHROOMS WHICH ARE TO BE EGGSHELL.
28. ALL COMMON AREA WINDOWS RECEIVE 1X4 TRIM & HDWD EXTENSION JAMBS - PAINT OR STAIN TO MATCH ROOM TRIM. SEE DETAIL ON SHEET I800.
29. SEE I800 MILLWORK FOR ALL CHAIR RAIL DETAILS (CR-1 - CR-7)
30. WIRE PULLS ON BACK OF HOUSE/STAFF WORK AREAS, BAR PULLS IN ALL COMMON AREAS ON ALL CABINETS.
31. CONTRACTOR TO SUBMIT QTY. (1) SAMPLES/CUT SHEETS FOR ALL FINISH MATERIALS LISTED IN FINISH SCHEDULE TO ARCHITECT FOR APPROVAL PRIOR TO ORDERING PRODUCT. IF SAMPLES ARE NOT SUBMITTED, CONTRACTOR ASSUMES RESPONSIBILITY.
INTERIOR FINISHES GENERAL NOTES
INTERIOR FINISHES KEY
ROOM FLOOR FINISH TAG
PL-1
CPT-1
MILLWORK FINISH TAG
FLOOR & WALL FINISH TAG
Room name
101
Base
Floor
ROOM WALL FINISH TAG
Room name
101
Wall
Ceiling
Date
Project Number
1301 American Blvd ESuite 100Bloomington, MN 55425tel: (612) 879-6000fax: (612) 879-6666www.kaaswilson.com
Copyr
ight K
aas
Wils
on A
rchite
cts
Ow
ner:
Pro
ject
:
kaas wilson
architects
PERMIT SET
As indicated
1/3
1/2
01
7 5
:42:1
8 P
MC
:\R
evit L
ocal\1
667
-He
art
h D
evelo
pm
en
t-O
wen
sb
oro
Se
nio
r Liv
ing_ssta
nke.r
vt
Floor Finish Plans -Level 3 & 4
01/31/2017
1667
Ow
ensb
oro
Senio
r Li
ving
Heart
h D
evelo
pm
ent
I404
3138 F
airvie
w D
rive
Ow
ensboro
, K
Y 4
2303
Kitchen:Strategic Equipment & Supply1203 33rd Street South St.Cloud, MN 56301(302) 257-8802
MEP:The Matrix Group311 East Chicago Street,Suite 310Milwaukee, WI 53202(414) 329-2827
Civil:Bryant Engineering Inc.1535 Frederica St.P.O. Box 21382Owensboro, KY 42304270-685-2811
Structural:Advanced StructuralTechnologies, Inc.7210 Metro BlvdEdina, MN 55439(952) 854-9302
67
50
Stillw
ate
r B
lvd. N
., S
uite 2
00
Stillw
ate
r, M
N 5
50
82
(65
1)-
705-8
811
1/4" = 1'-0"1
Floor Finish Plan - Level 4 Commons
1/4" = 1'-0"2
Floor Finish Plans - Level 3 Commons 1/2" = 1'-0"
3
Floor Finish Plan - Typical Flooring atCorridor Arches
Rev.
No.
Revi
sion
Date
MA
IL C
UB
BIE
S
I500
23
I501
1a
I500
3
I500
6
I500
9
1
24
5
7
810
21
2224
I500
26
25
Dining
162
PT-13
PT-3
Lobby
166
PT-8
PT-3
Mail Lounge
163
PT-8/PT-11
PT-3
Corridor
150
PT-8/9/4
ACT-1
Reception
167
VWC-3
PT-3
Vest.
165
PT-13
PT-3
VWC-3
VW
C-3
PT-11P
T-1
1
PT
-11
I50014
I500
17
18
19
20
11
12
13
Club Room
160
PT-11
PT-3
Pr. Dining
161
PT-6
PT-3
Corridor
150
PT-8/9/4
ACT-1
I500 1516
1. ALL EXPOSED SURFACES TO BE PREPARED TO RECEIVE NEW FINISHES.
2. DO NOT SCALE DRAWINGS.
3. ALL MATERIALS TO BE INSTALLED PER MANUFACTURER'S SPECIFICATIONS.
4. NO SUBSTITUTIONS WITHOUT ARCHITECT'S OR BUILDING OWNER'S APPROVAL.
5. ALL CARPETING TO BE INSTALLED BY DIRECT GLUE METHOD OR PER MANUF. RECOMMENDATIONS, UNLESS NOTED OTHERWISE.
6. INSPECT ALL SURFACES TO RECEIVE NEW FINISHES. REPORT TO ARCHITECT ANY AREAS WHICH ARE NOT SUITABLE TO RECEIVE NEW FINISH PRIOR TO BEGINNING WORK. CONTACT ARCHITECT WITH ANY DISCREPANCIES IN PRODUCT QUALITY SUCH AS DYELOT VARIANCES, PRODUCT SHADING, ETC. DO NOT CONTINUE TO INSTALL PRODUCTS WITH POSSIBLE DEFECTS.
7. ALL MATERIALS SPECIFIED ARE AVAILABLE AS OF ORIGINAL DATE ON PLAN. KAAS WILSON ARCHITECTS IS NOT RESPONSIBLE FOR ANY MATERIALS ORDERED AFTER THIS DATE THAT ARE DISCONTINUED OR UNAVAILABLE. ANY SUBSTITUTIONS MUST BE REVIEWED & APPROVED BY ARCHITECT.
8. 48"H FRP AT ALL MOP SINKS
9. ALL FRP SEAMS AND EXPOSED EDGES TO HAVE COORDINATING TRIM.
10. GROUT LINES AT TILE FLOORS NOT TO EXCEED 3/16" WIDTH GROUT SELECTIONS TO BE SUBMITTED AND APPROVED BY DESIGNER.
11. CERAMIC OR PORCELAIN PLANK FLOOR TILES INSTALLED IN A BRICK PATTERN SHOULD NOT BE OFFSET MORE THAN 33% OF THE LENGTH OF THE TILE. SEE MANUFACTURER'S SPECIFICATIONS FOR MAXIMUM OFFSET TO PREVENT LIPPAGE FROM BOWING IN THE TILE.
12. A SCHLUTER DILEX COVE TRIM IS TO BE USED IN ALL COMMON BATHS AND SHOWER/TUB ROOMS WHERE WALL TILE MEETS FLOOR TILE AND A COVE TILE IS NOT SPECIFIED. SCHLUTER RONDEC TRIM ALONG TOP EDGE OF EXPOSED TILE. ALL SCHLUTER TRIMS TO BE NICKEL FINISH.
13. A SCHLUTER TRANSITION STRIP SHOULD BE USED BETWEEN DIFFERENT FLOORING MATERIAL TRANSITIONS IN COMMON SPACES. PROFILES AND FINISHES TO BE SUBMITTED TO ARCHITECT FOR APPROVAL.
14. ALL MISC METAL ITEMS THROUGHOUT SPACE (METAL SUPPORT BRACKETS, FIRE EXTINGUISHER HOUSINGS, ETC) TO BE PAINTED. ARCHITECT TO SPECIFY COLOR.
15. ALL VCT TILE TO BE INSTALLED IN "SAME DIRECTION" PATTERN OR AS SPECIFIED ON THE FLOOR FINISH PLAN. PRODUCT TO BE WASHED & WAXED AFTER INSTALLATION PER MANUFACTURER'S GUIDELINES.
16. ALL SHEET VINYL PRODUCTS TO BE INSTALLED PER FINISH FLOOR PLAN OR ARCHITECT'S SPECIFICATIONS. PRODUCT TO BE WASHED & WAXED AFTER INSTALLATION PER MANUFACTURER'S GUIDELINES. NOTE: SHEET VINYL PRODUCTS MAY REQUIRE 3-5 COATINGS OF APPROPRIATE METAL CROSSLINK ACRYLIC POLISH VERIFY WITH MANUFACTURER'S REPRESENTATIVE PER PRODUCT FOR EXACT SPECS & RECOMMENDATIONS.
17. FLOOR TRANSITIONS TO OCCUR UNDER DOOR, TYP.
18. ACCENT PAINT AT UNIT ENTRIES IN CORRIDOR, UNLESS NOTED OTHERWISE. ACCENT PAINT INCLUDES WALL WITH ENTRY DOOR AND TWO RETURN WALLS AT SIDES.
19. ASSUME CEILING WHITE TYP. ON CEILINGS IN UNITS AND COMMON AREAS AND DIFFERENT COLOR ON WALLS UNLESS NOTED OTHERWISE. FLAT FINISH THROUGHOUT.
20. ALL EXPOSED ENDS OF CASEWORK TO BE FINISHED.
21. UNDERSIDE OF ALL SOFFITS TO BE SMOOTH. CARRY WALL COLOR ON FACE OF SOFFIT, UNDERSIDE OF SOFFIT TO BE WHITE.
22. ALL CEILINGS TO BE FINE KD, EXECPT IN BATHROOMS (COMMONS & UNITS) WHICH ARE TO BE SMOOTH. WALLS TO BE FINE TEXTURE EXCEPT AT AREAS NOTED FOR WALL COVERING
23. AT ALL LOCATIONS WHERE VINYL WALL COVERING IS APPLIED TO AN EXTERIOR WALL, THE SAME PRODUCT WITH MIRCO-PERF/MICRO-VENT MUST BE USED. BREATHABLE PRIMERS/ADHESIVES MUST ALSO BE USED WITH THE MICRO-VENTED WALL COVERING SO NOT TO REDUCE THE PERMEABILITY OF THE INSTALLATION. SEE MANUFACTURER'S RECOMMONDATIONS FOR PRIMERS.
24. ALL COUNTER TOPS IN KITCHEN/WET AREAS TO GET POST-FORM EDGE W/INTEGRAL BACKSPLASH ALL COUNTERTOPS IN NON-WET AREAS TO GET SQUARE EDGE.
25. ALL OUTLETS IN STAINED WOOD WAINSCOT TO HAVE DARK BROWN OUTLET AND COVER.
26. ALL STAINED TRIM PIECES/BASE/PANELING TO BE MAPLE.
27. ALL COMMON AREA WALLS TO HAVE EGGSHELL SHEEN. UNITS TO BE FLAT, EXCEPT AT KITCHENS AND BATHROOMS WHICH ARE TO BE EGGSHELL.
28. ALL COMMON AREA WINDOWS RECEIVE 1X4 TRIM & HDWD EXTENSION JAMBS - PAINT OR STAIN TO MATCH ROOM TRIM. SEE DETAIL ON SHEET I800.
29. SEE I800 MILLWORK FOR ALL CHAIR RAIL DETAILS (CR-1 - CR-7)
30. WIRE PULLS ON BACK OF HOUSE/STAFF WORK AREAS, BAR PULLS IN ALL COMMON AREAS ON ALL CABINETS.
31. CONTRACTOR TO SUBMIT QTY. (1) SAMPLES/CUT SHEETS FOR ALL FINISH MATERIALS LISTED IN FINISH SCHEDULE TO ARCHITECT FOR APPROVAL PRIOR TO ORDERING PRODUCT. IF SAMPLES ARE NOT SUBMITTED, CONTRACTOR ASSUMES RESPONSIBILITY.
INTERIOR FINISHES GENERAL NOTES
INTERIOR FINISHES KEY
ROOM FLOOR FINISH TAG
PL-1
CPT-1
MILLWORK FINISH TAG
FLOOR & WALL FINISH TAG
Room name
101
Base
Floor
ROOM WALL FINISH TAG
Room name
101
Wall
Ceiling
Date
Project Number
1301 American Blvd ESuite 100Bloomington, MN 55425tel: (612) 879-6000fax: (612) 879-6666www.kaaswilson.com
Copyr
ight K
aas
Wils
on A
rchite
cts
Ow
ner:
Pro
ject
:
kaas wilson
architects
PERMIT SET
As indicated
1/3
1/2
01
7 5
:42:2
1 P
MC
:\R
evit L
ocal\1
667
-He
art
h D
evelo
pm
en
t-O
wen
sb
oro
Se
nio
r Liv
ing_ssta
nke.r
vt
Wall Finish Plans -Level 1 Commons
01/31/2017
1667
Ow
ensb
oro
Senio
r Li
ving
Heart
h D
evelo
pm
ent
I410
3138 F
airvie
w D
rive
Ow
ensboro
, K
Y 4
2303
Kitchen:Strategic Equipment & Supply1203 33rd Street South St.Cloud, MN 56301(302) 257-8802
MEP:The Matrix Group311 East Chicago Street,Suite 310Milwaukee, WI 53202(414) 329-2827
Civil:Bryant Engineering Inc.1535 Frederica St.P.O. Box 21382Owensboro, KY 42304270-685-2811
Structural:Advanced StructuralTechnologies, Inc.7210 Metro BlvdEdina, MN 55439(952) 854-9302
67
50
Stillw
ate
r B
lvd. N
., S
uite 2
00
Stillw
ate
r, M
N 5
50
82
(65
1)-
705-8
811
1/4" = 1'-0"1
Wall Finish Plan - Lobby / Dining 1/4" = 1'-0"
2Wall Finish Plan - Club Room / Pr. Dining
Rev.
No.
Revi
sion
Date
WW
DD
FD
FD
FD
CO
1872
43" MIN. CLEAR
34DR
43" MIN. CLEAR
34DR
FD
FD
I501
1a
I501
4
I5017
I501
10
2
3
5
6
8 I501 9
I501 15
Vest.
165
PT-13
PT-3
Lobby
166
PT-8
PT-3
Office
170
PT-8
ACT-1
Reception
167
VWC-3
PT-3
Office
171
PT-8
ACT-1
Office
173
PT-8
ACT-1
Office
174
PT-8
ACT-1
Office Corridor
168
PT-8
ACT-1
Nurse
172
PT-8
ACT-1
ServiceCorridor
175
PT-8/9
PT-3
Trash
176FRP ALLWALLS
TOCEILINGPT-3
Elec.
184
PT-8
PT-3
Elev. Equip.
181
PT-8
PT-3
Elev Lobby
179
VWC-1
PT-3
Dry Storage
180A
FRP
ACT-2Kitchen Office
180B
PT-8
ACT-2
Mech
182
PT-8
PT-3
Laundry
183
PT-8
PT-3
Kitchen
180
FRP
ACT-2
Kitchen
180
FRP
ACT-2
Kitchen
180
FRP
ACT-2Corridor
150
PT-8/9/4
ACT-1
Corridor
150
PT-8/9/4
ACT-1
Conf.
169
PT-13
PT-3
Mens
177
PT-10
PT-3
Womens
178
PT-10
PT-3
I50140
SIM
.
I411
2
FRP TO 4'H
I501 13
12
14
11
Mens
177
PT-10
PT-3
Womens
178
PT-10
PT-3
I501 13
SIM
.
12
SIM.
11
SIM
.
14
SIM.
INTERIOR FINISHES KEY
ROOM FLOOR FINISH TAG
PL-1
CPT-1
MILLWORK FINISH TAG
FLOOR & WALL FINISH TAG
Room name
101
Base
Floor
ROOM WALL FINISH TAG
Room name
101
Wall
Ceiling
Date
Project Number
1301 American Blvd ESuite 100Bloomington, MN 55425tel: (612) 879-6000fax: (612) 879-6666www.kaaswilson.com
Copyr
ight K
aas
Wils
on A
rchite
cts
Ow
ner:
Pro
ject
:
kaas wilson
architects
PERMIT SET
As indicated
1/3
1/2
01
7 5
:42:2
5 P
MC
:\R
evit L
ocal\1
667
-He
art
h D
evelo
pm
en
t-O
wen
sb
oro
Se
nio
r Liv
ing_ssta
nke.r
vt
Wall Finish Plans -Level 1 Commons
01/31/2017
1667
Ow
ensb
oro
Senio
r Li
ving
Heart
h D
evelo
pm
ent
I411
3138 F
airvie
w D
rive
Ow
ensboro
, K
Y 4
2303
Kitchen:Strategic Equipment & Supply1203 33rd Street South St.Cloud, MN 56301(302) 257-8802
MEP:The Matrix Group311 East Chicago Street,Suite 310Milwaukee, WI 53202(414) 329-2827
Civil:Bryant Engineering Inc.1535 Frederica St.P.O. Box 21382Owensboro, KY 42304270-685-2811
Structural:Advanced StructuralTechnologies, Inc.7210 Metro BlvdEdina, MN 55439(952) 854-9302
67
50
Stillw
ate
r B
lvd. N
., S
uite 2
00
Stillw
ate
r, M
N 5
50
82
(65
1)-
705-8
811
1/4" = 1'-0"1
Wall Finish Plan - Office / Elevator Lobby 1/2" = 1'-0"
2Wall Finish Plan - Common Area Restrooms
Rev.
No.
Revi
sion
Date
DWREF.
W
W
D
D
W/D
RE
F.
REF.
RE
F.
FD
FD
COCO
I502
1
I502
8
I502
3
I502
6
I50210
I50220
19
9
7
4
5
2
11
I50222
I50218
I502
12
13
14
15
I50216
CommunityRoom
262
PT-12/PT-6
PT-3
Salon
278
PT-8/PT-16
PT-3
Salon Alcove
278a
PT-8/PT-16
PT-3
Toilet
277
PT-10
PT-3
Mezzanine
266
PT-8/9
PT-3Exam
267
PT-8
ACT-1
Toilet
268
PT-10
PT-3
Fitness Alcove
269a
PT-8
PT-3
Fitness
269
PT-8
ACT-1
Vest.
165
PT-13
PT-3
Library
263
VWC-3/PT-8
PT-3
Act. Dir.
264
PT-8
PT-3
Deck
260
-
-
Elev Lobby
279
VWC-2
PT-3
Corridor
250
PT-8/9/5
PT-3
Corridor
250
PT-8/9/5
PT-3
Elec
281
PT-8
PT-3
Janitor
280
PT-8
PT-3
Staff Corridor
282a
PT-8
PT-3
Charting
284
PT-8
PT-3
Laundry
283
PT-8
PT-3
Staff
282
PT-8
PT-3
OPEN TO LOBBY BELOW
I50223
17
PT
-16
PT
-16
PT-16
I50221
I502
12
SIM.
15
SIM
.
14
SIM.
13
SIM
.
I501 40
VW
C-3
PT-6
INTERIOR FINISHES KEY
ROOM FLOOR FINISH TAG
PL-1
CPT-1
MILLWORK FINISH TAG
FLOOR & WALL FINISH TAG
Room name
101
Base
Floor
ROOM WALL FINISH TAG
Room name
101
Wall
Ceiling
Date
Project Number
1301 American Blvd ESuite 100Bloomington, MN 55425tel: (612) 879-6000fax: (612) 879-6666www.kaaswilson.com
Copyr
ight K
aas
Wils
on A
rchite
cts
Ow
ner:
Pro
ject
:
kaas wilson
architects
PERMIT SET
As indicated
1/3
1/2
01
7 5
:42:3
0 P
MC
:\R
evit L
ocal\1
667
-He
art
h D
evelo
pm
en
t-O
wen
sb
oro
Se
nio
r Liv
ing_ssta
nke.r
vt
Wall Finish Plans -Level 2 Commons
01/31/2017
1667
Ow
ensb
oro
Senio
r Li
ving
Heart
h D
evelo
pm
ent
I412
3138 F
airvie
w D
rive
Ow
ensboro
, K
Y 4
2303
Kitchen:Strategic Equipment & Supply1203 33rd Street South St.Cloud, MN 56301(302) 257-8802
MEP:The Matrix Group311 East Chicago Street,Suite 310Milwaukee, WI 53202(414) 329-2827
Civil:Bryant Engineering Inc.1535 Frederica St.P.O. Box 21382Owensboro, KY 42304270-685-2811
Structural:Advanced StructuralTechnologies, Inc.7210 Metro BlvdEdina, MN 55439(952) 854-9302
67
50
Stillw
ate
r B
lvd. N
., S
uite 2
00
Stillw
ate
r, M
N 5
50
82
(65
1)-
705-8
811
1/4" = 1'-0"1
Wall Finish Plans - Level 2 Commons
Rev.
No.
Revi
sion
Date
FD
FD
DWREF.
FD
FD
I501
18
I501
21
I501 2316
1719
20
22
24
25
MC Corridor
152
PT-15/2/14
ACT-1
MC Dining
185
PT-15/2
PT-3/ACT-1
Tub Room
186
PT-10
PT-3
Unisex
187
PT-10
PT-3
Sensory
188
PT-15
PT-3
PT-15
PT
-15
PT-14
PT-2
ABOVE CHAIR RAIL
ABOVE CHAIR RAIL
ABOVE CHAIR RAIL
AB
OV
E C
HA
IR R
AIL
I800
22Typ
I501
38
I501 3634
35
3739
MC Dayroom
189
PT-15/2
PT-3
PT-2
PT-15 ABOVE CHAIR RAIL
BELOW CHAIR RAIL
I502 25
24
27
26
Theater
285
PT-12
ACT-3
I501
26
27
28
29
I501
30
31
32
33
Tub Room
186
PT-10
PT-3
Unisex
187
PT-10
PT-3
1. ALL EXPOSED SURFACES TO BE PREPARED TO RECEIVE NEW FINISHES.
2. DO NOT SCALE DRAWINGS.
3. ALL MATERIALS TO BE INSTALLED PER MANUFACTURER'S SPECIFICATIONS.
4. NO SUBSTITUTIONS WITHOUT ARCHITECT'S OR BUILDING OWNER'S APPROVAL.
5. ALL CARPETING TO BE INSTALLED BY DIRECT GLUE METHOD OR PER MANUF. RECOMMENDATIONS, UNLESS NOTED OTHERWISE.
6. INSPECT ALL SURFACES TO RECEIVE NEW FINISHES. REPORT TO ARCHITECT ANY AREAS WHICH ARE NOT SUITABLE TO RECEIVE NEW FINISH PRIOR TO BEGINNING WORK. CONTACT ARCHITECT WITH ANY DISCREPANCIES IN PRODUCT QUALITY SUCH AS DYELOT VARIANCES, PRODUCT SHADING, ETC. DO NOT CONTINUE TO INSTALL PRODUCTS WITH POSSIBLE DEFECTS.
7. ALL MATERIALS SPECIFIED ARE AVAILABLE AS OF ORIGINAL DATE ON PLAN. KAAS WILSON ARCHITECTS IS NOT RESPONSIBLE FOR ANY MATERIALS ORDERED AFTER THIS DATE THAT ARE DISCONTINUED OR UNAVAILABLE. ANY SUBSTITUTIONS MUST BE REVIEWED & APPROVED BY ARCHITECT.
8. 48"H FRP AT ALL MOP SINKS
9. ALL FRP SEAMS AND EXPOSED EDGES TO HAVE COORDINATING TRIM.
10. GROUT LINES AT TILE FLOORS NOT TO EXCEED 3/16" WIDTH GROUT SELECTIONS TO BE SUBMITTED AND APPROVED BY DESIGNER.
11. CERAMIC OR PORCELAIN PLANK FLOOR TILES INSTALLED IN A BRICK PATTERN SHOULD NOT BE OFFSET MORE THAN 33% OF THE LENGTH OF THE TILE. SEE MANUFACTURER'S SPECIFICATIONS FOR MAXIMUM OFFSET TO PREVENT LIPPAGE FROM BOWING IN THE TILE.
12. A SCHLUTER DILEX COVE TRIM IS TO BE USED IN ALL COMMON BATHS AND SHOWER/TUB ROOMS WHERE WALL TILE MEETS FLOOR TILE AND A COVE TILE IS NOT SPECIFIED. SCHLUTER RONDEC TRIM ALONG TOP EDGE OF EXPOSED TILE. ALL SCHLUTER TRIMS TO BE NICKEL FINISH.
13. A SCHLUTER TRANSITION STRIP SHOULD BE USED BETWEEN DIFFERENT FLOORING MATERIAL TRANSITIONS IN COMMON SPACES. PROFILES AND FINISHES TO BE SUBMITTED TO ARCHITECT FOR APPROVAL.
14. ALL MISC METAL ITEMS THROUGHOUT SPACE (METAL SUPPORT BRACKETS, FIRE EXTINGUISHER HOUSINGS, ETC) TO BE PAINTED. ARCHITECT TO SPECIFY COLOR.
15. ALL VCT TILE TO BE INSTALLED IN "SAME DIRECTION" PATTERN OR AS SPECIFIED ON THE FLOOR FINISH PLAN. PRODUCT TO BE WASHED & WAXED AFTER INSTALLATION PER MANUFACTURER'S GUIDELINES.
16. ALL SHEET VINYL PRODUCTS TO BE INSTALLED PER FINISH FLOOR PLAN OR ARCHITECT'S SPECIFICATIONS. PRODUCT TO BE WASHED & WAXED AFTER INSTALLATION PER MANUFACTURER'S GUIDELINES. NOTE: SHEET VINYL PRODUCTS MAY REQUIRE 3-5 COATINGS OF APPROPRIATE METAL CROSSLINK ACRYLIC POLISH VERIFY WITH MANUFACTURER'S REPRESENTATIVE PER PRODUCT FOR EXACT SPECS & RECOMMENDATIONS.
17. FLOOR TRANSITIONS TO OCCUR UNDER DOOR, TYP.
18. ACCENT PAINT AT UNIT ENTRIES IN CORRIDOR, UNLESS NOTED OTHERWISE. ACCENT PAINT INCLUDES WALL WITH ENTRY DOOR AND TWO RETURN WALLS AT SIDES.
19. ASSUME CEILING WHITE TYP. ON CEILINGS IN UNITS AND COMMON AREAS AND DIFFERENT COLOR ON WALLS UNLESS NOTED OTHERWISE. FLAT FINISH THROUGHOUT.
20. ALL EXPOSED ENDS OF CASEWORK TO BE FINISHED.
21. UNDERSIDE OF ALL SOFFITS TO BE SMOOTH. CARRY WALL COLOR ON FACE OF SOFFIT, UNDERSIDE OF SOFFIT TO BE WHITE.
22. ALL CEILINGS TO BE FINE KD, EXECPT IN BATHROOMS (COMMONS & UNITS) WHICH ARE TO BE SMOOTH. WALLS TO BE FINE TEXTURE EXCEPT AT AREAS NOTED FOR WALL COVERING
23. AT ALL LOCATIONS WHERE VINYL WALL COVERING IS APPLIED TO AN EXTERIOR WALL, THE SAME PRODUCT WITH MIRCO-PERF/MICRO-VENT MUST BE USED. BREATHABLE PRIMERS/ADHESIVES MUST ALSO BE USED WITH THE MICRO-VENTED WALL COVERING SO NOT TO REDUCE THE PERMEABILITY OF THE INSTALLATION. SEE MANUFACTURER'S RECOMMONDATIONS FOR PRIMERS.
24. ALL COUNTER TOPS IN KITCHEN/WET AREAS TO GET POST-FORM EDGE W/INTEGRAL BACKSPLASH ALL COUNTERTOPS IN NON-WET AREAS TO GET SQUARE EDGE.
25. ALL OUTLETS IN STAINED WOOD WAINSCOT TO HAVE DARK BROWN OUTLET AND COVER.
26. ALL STAINED TRIM PIECES/BASE/PANELING TO BE MAPLE.
27. ALL COMMON AREA WALLS TO HAVE EGGSHELL SHEEN. UNITS TO BE FLAT, EXCEPT AT KITCHENS AND BATHROOMS WHICH ARE TO BE EGGSHELL.
28. ALL COMMON AREA WINDOWS RECEIVE 1X4 TRIM & HDWD EXTENSION JAMBS - PAINT OR STAIN TO MATCH ROOM TRIM. SEE DETAIL ON SHEET I800.
29. SEE I800 MILLWORK FOR ALL CHAIR RAIL DETAILS (CR-1 - CR-7)
30. WIRE PULLS ON BACK OF HOUSE/STAFF WORK AREAS, BAR PULLS IN ALL COMMON AREAS ON ALL CABINETS.
31. CONTRACTOR TO SUBMIT QTY. (1) SAMPLES/CUT SHEETS FOR ALL FINISH MATERIALS LISTED IN FINISH SCHEDULE TO ARCHITECT FOR APPROVAL PRIOR TO ORDERING PRODUCT. IF SAMPLES ARE NOT SUBMITTED, CONTRACTOR ASSUMES RESPONSIBILITY.
INTERIOR FINISHES GENERAL NOTES
INTERIOR FINISHES KEY
ROOM FLOOR FINISH TAG
PL-1
CPT-1
MILLWORK FINISH TAG
FLOOR & WALL FINISH TAG
Room name
101
Base
Floor
ROOM WALL FINISH TAG
Room name
101
Wall
Ceiling
Date
Project Number
1301 American Blvd ESuite 100Bloomington, MN 55425tel: (612) 879-6000fax: (612) 879-6666www.kaaswilson.com
Copyr
ight K
aas
Wils
on A
rchite
cts
Ow
ner:
Pro
ject
:
kaas wilson
architects
PERMIT SET
As indicated
1/3
1/2
01
7 5
:42:3
2 P
MC
:\R
evit L
ocal\1
667
-He
art
h D
evelo
pm
en
t-O
wen
sb
oro
Se
nio
r Liv
ing_ssta
nke.r
vt
Wall Finish Plans -MC & Theater
01/31/2017
1667
Ow
ensb
oro
Senio
r Li
ving
Heart
h D
evelo
pm
ent
I413
3138 F
airvie
w D
rive
Ow
ensboro
, K
Y 4
2303
Kitchen:Strategic Equipment & Supply1203 33rd Street South St.Cloud, MN 56301(302) 257-8802
MEP:The Matrix Group311 East Chicago Street,Suite 310Milwaukee, WI 53202(414) 329-2827
Civil:Bryant Engineering Inc.1535 Frederica St.P.O. Box 21382Owensboro, KY 42304270-685-2811
Structural:Advanced StructuralTechnologies, Inc.7210 Metro BlvdEdina, MN 55439(952) 854-9302
67
50
Stillw
ate
r B
lvd. N
., S
uite 2
00
Stillw
ate
r, M
N 5
50
82
(65
1)-
705-8
811
1/4" = 1'-0"1
Wall Finish Plan - MC Dining 1/4" = 1'-0"
2Wall Finish Plan - MC Dayroom
1/4" = 1'-0"3
Wall Finish Plan - Theater 1/2" = 1'-0"
4Wall Finish Plan - MC Tubroom / Restroom
Rev.
No.
Revi
sion
Date
WW
DD
REF.
WW
DD
FD
REF.
REF.
I503
1
2
Elev Lobby
379
VWC-3
PT-3
StorageCorridor
382a
PT-8/9
PT-3
Janitor
380
PT-8
PT-3
Elec
381
PT-8
PT-3
Storage
382
PT-8
PT-3
Laundry
383
PT-8
PT-3
Charting
384
PT-8
PT-3
Corridor
350
PT-8/9/6
PT-3
Storage
386
PT-8
PT-3
Crafts
385
PT-8
PT-3
I50218
SIM
.
I502 16
SIM
.
17
SIM
.
I503
3
5
46
Storage
482
PT-8
PT-3
Elec
481
PT-8
PT-3
Charting
484
PT-8
PT-3
Janitor
480
PT-8
PT-3
StorageCorridor
482a
PT-8/9
PT-3
Elev Lobby
479
VWC-4
PT-3
Laundry
483
PT-8
PT-3
Res Storage
485
PT-8
PT-3
Corridor
450
PT-8/9/7
PT-3
Tub Room
486
PT-10
PT-3
I50218
SIM
.
I502 16
SIM
.
17
SIM
.
I503 78
1. ALL EXPOSED SURFACES TO BE PREPARED TO RECEIVE NEW FINISHES.
2. DO NOT SCALE DRAWINGS.
3. ALL MATERIALS TO BE INSTALLED PER MANUFACTURER'S SPECIFICATIONS.
4. NO SUBSTITUTIONS WITHOUT ARCHITECT'S OR BUILDING OWNER'S APPROVAL.
5. ALL CARPETING TO BE INSTALLED BY DIRECT GLUE METHOD OR PER MANUF. RECOMMENDATIONS, UNLESS NOTED OTHERWISE.
6. INSPECT ALL SURFACES TO RECEIVE NEW FINISHES. REPORT TO ARCHITECT ANY AREAS WHICH ARE NOT SUITABLE TO RECEIVE NEW FINISH PRIOR TO BEGINNING WORK. CONTACT ARCHITECT WITH ANY DISCREPANCIES IN PRODUCT QUALITY SUCH AS DYELOT VARIANCES, PRODUCT SHADING, ETC. DO NOT CONTINUE TO INSTALL PRODUCTS WITH POSSIBLE DEFECTS.
7. ALL MATERIALS SPECIFIED ARE AVAILABLE AS OF ORIGINAL DATE ON PLAN. KAAS WILSON ARCHITECTS IS NOT RESPONSIBLE FOR ANY MATERIALS ORDERED AFTER THIS DATE THAT ARE DISCONTINUED OR UNAVAILABLE. ANY SUBSTITUTIONS MUST BE REVIEWED & APPROVED BY ARCHITECT.
8. 48"H FRP AT ALL MOP SINKS
9. ALL FRP SEAMS AND EXPOSED EDGES TO HAVE COORDINATING TRIM.
10. GROUT LINES AT TILE FLOORS NOT TO EXCEED 3/16" WIDTH GROUT SELECTIONS TO BE SUBMITTED AND APPROVED BY DESIGNER.
11. CERAMIC OR PORCELAIN PLANK FLOOR TILES INSTALLED IN A BRICK PATTERN SHOULD NOT BE OFFSET MORE THAN 33% OF THE LENGTH OF THE TILE. SEE MANUFACTURER'S SPECIFICATIONS FOR MAXIMUM OFFSET TO PREVENT LIPPAGE FROM BOWING IN THE TILE.
12. A SCHLUTER DILEX COVE TRIM IS TO BE USED IN ALL COMMON BATHS AND SHOWER/TUB ROOMS WHERE WALL TILE MEETS FLOOR TILE AND A COVE TILE IS NOT SPECIFIED. SCHLUTER RONDEC TRIM ALONG TOP EDGE OF EXPOSED TILE. ALL SCHLUTER TRIMS TO BE NICKEL FINISH.
13. A SCHLUTER TRANSITION STRIP SHOULD BE USED BETWEEN DIFFERENT FLOORING MATERIAL TRANSITIONS IN COMMON SPACES. PROFILES AND FINISHES TO BE SUBMITTED TO ARCHITECT FOR APPROVAL.
14. ALL MISC METAL ITEMS THROUGHOUT SPACE (METAL SUPPORT BRACKETS, FIRE EXTINGUISHER HOUSINGS, ETC) TO BE PAINTED. ARCHITECT TO SPECIFY COLOR.
15. ALL VCT TILE TO BE INSTALLED IN "SAME DIRECTION" PATTERN OR AS SPECIFIED ON THE FLOOR FINISH PLAN. PRODUCT TO BE WASHED & WAXED AFTER INSTALLATION PER MANUFACTURER'S GUIDELINES.
16. ALL SHEET VINYL PRODUCTS TO BE INSTALLED PER FINISH FLOOR PLAN OR ARCHITECT'S SPECIFICATIONS. PRODUCT TO BE WASHED & WAXED AFTER INSTALLATION PER MANUFACTURER'S GUIDELINES. NOTE: SHEET VINYL PRODUCTS MAY REQUIRE 3-5 COATINGS OF APPROPRIATE METAL CROSSLINK ACRYLIC POLISH VERIFY WITH MANUFACTURER'S REPRESENTATIVE PER PRODUCT FOR EXACT SPECS & RECOMMENDATIONS.
17. FLOOR TRANSITIONS TO OCCUR UNDER DOOR, TYP.
18. ACCENT PAINT AT UNIT ENTRIES IN CORRIDOR, UNLESS NOTED OTHERWISE. ACCENT PAINT INCLUDES WALL WITH ENTRY DOOR AND TWO RETURN WALLS AT SIDES.
19. ASSUME CEILING WHITE TYP. ON CEILINGS IN UNITS AND COMMON AREAS AND DIFFERENT COLOR ON WALLS UNLESS NOTED OTHERWISE. FLAT FINISH THROUGHOUT.
20. ALL EXPOSED ENDS OF CASEWORK TO BE FINISHED.
21. UNDERSIDE OF ALL SOFFITS TO BE SMOOTH. CARRY WALL COLOR ON FACE OF SOFFIT, UNDERSIDE OF SOFFIT TO BE WHITE.
22. ALL CEILINGS TO BE FINE KD, EXECPT IN BATHROOMS (COMMONS & UNITS) WHICH ARE TO BE SMOOTH. WALLS TO BE FINE TEXTURE EXCEPT AT AREAS NOTED FOR WALL COVERING
23. AT ALL LOCATIONS WHERE VINYL WALL COVERING IS APPLIED TO AN EXTERIOR WALL, THE SAME PRODUCT WITH MIRCO-PERF/MICRO-VENT MUST BE USED. BREATHABLE PRIMERS/ADHESIVES MUST ALSO BE USED WITH THE MICRO-VENTED WALL COVERING SO NOT TO REDUCE THE PERMEABILITY OF THE INSTALLATION. SEE MANUFACTURER'S RECOMMONDATIONS FOR PRIMERS.
24. ALL COUNTER TOPS IN KITCHEN/WET AREAS TO GET POST-FORM EDGE W/INTEGRAL BACKSPLASH ALL COUNTERTOPS IN NON-WET AREAS TO GET SQUARE EDGE.
25. ALL OUTLETS IN STAINED WOOD WAINSCOT TO HAVE DARK BROWN OUTLET AND COVER.
26. ALL STAINED TRIM PIECES/BASE/PANELING TO BE MAPLE.
27. ALL COMMON AREA WALLS TO HAVE EGGSHELL SHEEN. UNITS TO BE FLAT, EXCEPT AT KITCHENS AND BATHROOMS WHICH ARE TO BE EGGSHELL.
28. ALL COMMON AREA WINDOWS RECEIVE 1X4 TRIM & HDWD EXTENSION JAMBS - PAINT OR STAIN TO MATCH ROOM TRIM. SEE DETAIL ON SHEET I800.
29. SEE I800 MILLWORK FOR ALL CHAIR RAIL DETAILS (CR-1 - CR-7)
30. WIRE PULLS ON BACK OF HOUSE/STAFF WORK AREAS, BAR PULLS IN ALL COMMON AREAS ON ALL CABINETS.
31. CONTRACTOR TO SUBMIT QTY. (1) SAMPLES/CUT SHEETS FOR ALL FINISH MATERIALS LISTED IN FINISH SCHEDULE TO ARCHITECT FOR APPROVAL PRIOR TO ORDERING PRODUCT. IF SAMPLES ARE NOT SUBMITTED, CONTRACTOR ASSUMES RESPONSIBILITY.
INTERIOR FINISHES GENERAL NOTES
INTERIOR FINISHES KEY
ROOM FLOOR FINISH TAG
PL-1
CPT-1
MILLWORK FINISH TAG
FLOOR & WALL FINISH TAG
Room name
101
Base
Floor
ROOM WALL FINISH TAG
Room name
101
Wall
Ceiling
Date
Project Number
1301 American Blvd ESuite 100Bloomington, MN 55425tel: (612) 879-6000fax: (612) 879-6666www.kaaswilson.com
Copyr
ight K
aas
Wils
on A
rchite
cts
Ow
ner:
Pro
ject
:
kaas wilson
architects
PERMIT SET
As indicated
1/3
1/2
01
7 5
:42:4
1 P
MC
:\R
evit L
ocal\1
667
-He
art
h D
evelo
pm
en
t-O
wen
sb
oro
Se
nio
r Liv
ing_ssta
nke.r
vt
Wall Finish Plans -Level 3 & 4
01/31/2017
1667
Ow
ensb
oro
Senio
r Li
ving
Heart
h D
evelo
pm
ent
I414
3138 F
airvie
w D
rive
Ow
ensboro
, K
Y 4
2303
Kitchen:Strategic Equipment & Supply1203 33rd Street South St.Cloud, MN 56301(302) 257-8802
MEP:The Matrix Group311 East Chicago Street,Suite 310Milwaukee, WI 53202(414) 329-2827
Civil:Bryant Engineering Inc.1535 Frederica St.P.O. Box 21382Owensboro, KY 42304270-685-2811
Structural:Advanced StructuralTechnologies, Inc.7210 Metro BlvdEdina, MN 55439(952) 854-9302
67
50
Stillw
ate
r B
lvd. N
., S
uite 2
00
Stillw
ate
r, M
N 5
50
82
(65
1)-
705-8
811
1/4" = 1'-0"1
Wall Finish Plan - Level 3 Commons
1/4" = 1'-0"2
Wall Finish Plan - Level 4 Commons
Rev.
No.
Revi
sion
Date
165b
7'-5
"
8
I800
11
I800
Typ
16'-1
7/8
"3'
-0"
169a 168a
OPEN TO RECEPTION
CURVED DESK
2'-1
0"
RECEPTION TOP
GR-1
7
I801
8
I800
OPEN TO 1st LEVEL
CORRIDOR
OPEN TO 1st LEVEL
CORRIDOR
5'-6
"
167
BRICK - SEE FINISH SCHEDULE
DOUBLE SIDED - GAS FIREPLACE
I800
14
OPEN TO MEZZANINE BEYOND
OPEN TO MEZZANINE BEYOND
OPEN TO RECEPTION
GR-1
25
I800
OPEN TO MAIL/BISTRO
OPEN TO FORT
164
OPEN TO LIBRARY BEYOND
OPEN TO LIBRARY BEYOND
OPEN TO LIBRARY BEYOND
5'-4
"1'
-0"
DOUBLE SIDED GAS FIREPLACE INSERT
OPENOPEN
BR-1
BR-1
13
I800
OPEN TO 1ST LEVEL CORRIDOR
OPEN TO 1ST LEVEL CORRIDOR
OPEN TO 1ST LEVEL CORRIDOR
I800
20Typ.
2
I800
21
I800163
3'-0
"
4
I800
3
I801
OPEN TO 1ST LEVEL CORRIDOR
1
I801
2
I801
I800
20Typ.
2'-6"2'-6"2'-6"2'-6"
4
I802
24" D C-TOP
MOSAIC ACCENT TILE
1
I801 CT-8
GR-1
B36FH B36FH B36FH
2'-6"
OPEN TO PUB ROOM
17
I801
GRANITE CTOP GR-1
PANELING DETAIL & TRIM TO WRAP BOTH ENDS OF ISLAND
WALL SCONCESEE ELEC.
12
I800
1
I800
161
12
I800
6'-6
"
1
I800
11
I800
Typ
12
I800
1
I800
162b162a
4
I800
WALL SCONCESEE ELEC.
1
I800
162c 162d
3'-0
"
4
I800
WALL SCONCESEE ELEC.
2
I800
1
I800
OPEN TO DINING ROOM BEYOND
OPEN TO DINING ROOM BEYOND
OPEN TO DINING ROOM BEYOND
OPEN TO DINING ROOM BEYOND
OPEN TO DINING ROOM BEYOND
2
I800
WALL SCONCE - SEE ELEC. I800
20Typ.1
I800
161 160a
3'-0
"
I800
20Typ.
1
I800
4
I80011
I800
Typ
OPEN TO DINING ROOM BEYOND
OPEN TO DINING ROOM BEYOND
OPEN TO DINING ROOM BEYOND
OPEN TO DINING ROOM BEYOND
OPEN TO DINING ROOM BEYOND
I800
20Typ.1
I800
3'-0
"
NSF34x34.5 NSF34x34.5 NSF34x34.5 NSF34x34.5 NSF34x34.5 NSF34x34.5
24"D C-TOP NSF PLAM CABS W/6" STAINLESS STEEL LEGS W/ REMOVABLE PLAM TOEKICK
QZ-1PL-3
QZ-124"D CTOP
OPEN TO DINING ROOM BEYOND
OPEN TO DINING ROOM BEYOND OPEN TO DINING
ROOM BEYOND
OPEN TO DINING ROOM BEYOND OPEN TO DINING
ROOM BEYOND
2
I800
WALL SCONCESEE ELEC.
I800
20Typ.
1
I800
160 160b
3
I800
3'-0
"
160a
3'-0
"
3
I800
ARTWORK LOCATION.
3
I80011
I800
Typ
OPEN TO BELOW
OPEN TO PUB ROOM BEYOND
3'-0
"
GRAITNE CTOP GR-1
17
I801
2'-1
0"
B36X32.5"HB36X32.5"H
24"D C-TOP
5
I802
B18X32.5"H RBS36X32.5"H B18X32.5"H
TILE BACKSPLASH
STAINLESS STEEL UNDERMOUNT SINK
TV NIC - GC PROVIDE POWER AND BACKING
3'-0
"
GR-1
CT-2
3
I800
General Notes - Interior Elevations
1. All counters @ common areas to be granite unless noted otherwise.
2. Crown molding @ all common area casework.
3. Coordinate/verify soffit depth requirements with mechanical and millwork. Do not cut into crown molding for mechanical grilles.
4. Paint all louvers, access panels, etc. to match adjacent wall/ceiling surface.
5. Do not place any sprinkler heads, fire alarm pulls or horn/strobes, nurse call pulls, or other such devices in any area noted for artwork or TV locations. If any such devices are required to be in proximity to these locations, consult architect regarding placement prior to installation.
6. See I800-I801 for millwork details.
7. See A870 for door schedule, door elevations, and door details.
8. See I300's (floor plans) for corridor arch & millwork arch locations
INTERIOR FINISHES KEY
ROOM FLOOR FINISH TAG
PL-1
CPT-1
MILLWORK FINISH TAG
FLOOR & WALL FINISH TAG
Room name
101
Base
Floor
ROOM WALL FINISH TAG
Room name
101
Wall
Ceiling
Date
Project Number
1301 American Blvd ESuite 100Bloomington, MN 55425tel: (612) 879-6000fax: (612) 879-6666www.kaaswilson.com
Copyr
ight K
aas
Wils
on A
rchite
cts
Ow
ner:
Pro
ject
:
kaas wilson
architects
PERMIT SET
As indicated
1/3
1/2
01
7 5
:43:0
2 P
MC
:\R
evit L
ocal\1
667
-He
art
h D
evelo
pm
en
t-O
wen
sb
oro
Se
nio
r Liv
ing_ssta
nke.r
vt
Interior Elevations -Level 1 Commons
01/31/2017
1667
Ow
ensb
oro
Senio
r Li
ving
Heart
h D
evelo
pm
ent
I500
3138 F
airvie
w D
rive
Ow
ensboro
, K
Y 4
2303
Kitchen:Strategic Equipment & Supply1203 33rd Street South St.Cloud, MN 56301(302) 257-8802
MEP:The Matrix Group311 East Chicago Street,Suite 310Milwaukee, WI 53202(414) 329-2827
Civil:Bryant Engineering Inc.1535 Frederica St.P.O. Box 21382Owensboro, KY 42304270-685-2811
Structural:Advanced StructuralTechnologies, Inc.7210 Metro BlvdEdina, MN 55439(952) 854-9302
67
50
Stillw
ate
r B
lvd. N
., S
uite 2
00
Stillw
ate
r, M
N 5
50
82
(65
1)-
705-8
811
1/4" = 1'-0"1
Lobby - Elevation 1 1/4" = 1'-0"
2Lobby - Elevation 2
1/4" = 1'-0"3
Lobby - Elevation 3 1/4" = 1'-0"
4Lobby - Elevation 4
1/4" = 1'-0"5
Lobby - Elevation 5 1/4" = 1'-0"
6Lobby - Elevation 6
1/4" = 1'-0"7
Mail Lounge - Elevation 1 1/4" = 1'-0"
8Mail Lounge - Elevation 2
1/4" = 1'-0"9
Mail Lounge - Elevation 3
1/4" = 1'-0"10
Mail Lounge - Elevation 4
1/4" = 1'-0"14
Club Room - Elevation 4 1/4" = 1'-0"
17Private Dining - Elevation 1
1/4" = 1'-0"18
Private Dining - Elevation 2
1/4" = 1'-0"19
Private Dining - Elevation 3 1/4" = 1'-0"
20Private Dining - Elevation 4
1/4" = 1'-0"21
Dining - Elevation 1 1/4" = 1'-0"
22Dining - Elevation 2
1/4" = 1'-0"23
Dining - Elevation 3 1/4" = 1'-0"24
Dining - Elevation 4
1/4" = 1'-0"25
Dining - Elevation 5 1/4" = 1'-0"
26Dining - Elevation 6
1/4" = 1'-0"11
Club Room - Elevation 1 1/4" = 1'-0"
12Club Room - Elevation 2
1/4" = 1'-0"13
Club Room - Elevation 3
1/4" = 1'-0"15
Club Room - Elevation 5 1/4" = 1'-0"
16Club Room - Elevation 6
Rev.
No.
Revi
sion
Date
3'-0
"
OPEN TO MC CORRIDOR
BEYOND
21
I800
4
I800
I800
20Typ.
WALL SCONCESEE ELEC.
OPEN TO MC CORRIDOR
BEYOND
OPEN TO MC CORRIDOR
BEYOND
3'-0
"
I800
20Typ.
21
I800 2
I800
11
I800
Typ OPEN TO MC DINING BEYOND
9
I801
ISLAND CTOPGR-2
OPEN TO MC CORRIDOR
BEYOND
OPEN TO MC CORRIDOR
BEYOND
OPEN TO MC CORRIDOR
BEYOND
I800
20Typ.
2
I800
21
I800OPEN TO MC
DINING BEYOND9
I801
OPEN BELOW
ISLAND CTOP
GR-2
2'-6
"
BMC27
W2730 W2730
W3618
W3330
W3018
W1530
W3615
LC1884
B15HCP
WHB36
3" VALANCE W/ LIGHT - SEE ELEC.
HOOD - SEE MECH.
24"D C-TOP
NSF REFRIG - VFY WIDTH PRIOR TO INSTALLING CASEWORK
DROP-IN RANGE
PIPE PROTECTION PANEL. DOUBLE BASIN UNDERMOUNT STAINLESS STEEL SINK
MICRO
BACKSPLASH TILE. 1/3 OFF SET.
VFY LOCKED CAB LOCATION W/ OWNER
3'-0
"
2'-1
0"1'
-6"
2'-6
"
3" SUPPORT END PANEL
ADA HT. DISHWASHER
4
I800
10
A004
Sim
CT-6
GR-2
WHB30
OPEN TO MC CORRIDOR
BEYOND
188
3'-0
"
4
I800
I800
20Typ.
3'-0
"
4
I800
185
4
I80011
I800
TypOPEN TO
MC DINING BEYOND
I800
20Typ.
21
I800
6'-8 1/4"
4'-1
1 1/
4"
TABLEAUX WOOD VENEER GRILLE
SYSTEM - FIELD VFY.
2
I800 186
5'-0
"
8" ACCENT MOSAIC STRIP
6"x24" FIELD TILE. INSTALL 1/3 OFFSET
CT-4
CT-5
5'-0
"
CT-5THERAPY TUB
LC1884
10
A004
Sim
VANITY FIXTURE-SEE ELEC.
3'-6" x 3'-0" WD FRAME MIRROR
-NO TILE BEHIND
PIPE PROTECTION
PANEL
5'-0
"
THERAPY TUB
5'-0
"
8" WIDE ACCENT MOSAIC
6"X24" FIELD TILE. INSTALL 1/3 OFFSET.
CT-5
CT-4
THERAPY TUB- SEE SPEC
5'-0
"
187
CT-5
5'-0
"
10
A004
Sim
VANITY FIXTURE-SEE ELEC.
3'-6" x 3'-0" WD FRAME MIRROR
-NO TILE BEHIND
PIPE PROTECTION
PANEL
2'-1
0"
CT-5
5'-0
"
8" WIDE ACCENT MOSAIC
6"X24" FIELD TILE. INSTALL 1/3 OFFSET.
CT-5
CT-4
5'-0
"
8" WIDE ACCENT MOSAIC
6"X24" FIELD TILE. INSTALL 1/3 OFFSET.
CT-5
CT-4
183
24"D PLAM C-TOP
PL-4 W2730W2730 W2730
3'-0
"1'
-6"
2'-6
"
OPEN BASE CABS WITH FULL DEPTH
ADJ. SHELFBMC27 BMC27 BMC27
?
CORRIDOR BEYOND
3'-0
"
6
I800
CUSTOM FISH TANK BY FISH
TANK SUPPLIER
4
I800
U01
3'-0
"
26
I800
3'-0
"
I800
22Typ
26
I800
11
I800
TypFISH TANK NIC BEYOND
OPEN TO MC DAYROOM BEYOND
TABLEAUX WOOD VENEER GRILLE
SYSTEM - FIELD VFY.
6'-6"
4'-1
1 1/
4"
I800
20Typ.
2
I800OPEN TO MC
DAYROOM BEYOND
OPEN TO MC DAYROOM BEYOND
26
I800
CUSTOM FISH TANK NIC - BY
FISH TANK SUPPLIER
4
I800
3'-0
"
2'-6
"
24" D COUNTERTOP
OPEN BELOW
BOX/FILE/FILE
27
I800GR-1
4
I800
11
I800
Typ
4
I800
3'-0
"
169b
3'-0
"
4
I800 169a
4
I800
3'-0
"
2'-6
"1'
-6"
3'-0
"
B30 B33 B30
W3030W3330W3030
24" D. CTOP
18
I801
Sim.
PL-4
B30 DC3-18
COPIER N.I.C.
3'-0
"
172
2'-6
"1'
-6"
3'-0
"
11
I801
B30 RBS30
W3030
W3015
18
I801
Sim.
172a
BOX/FILE/FILE BOX/FILE/FILE
24"D PLAM C-TOP
MOVABLE FILE CABINETS.CO-ORDINATE BRACKET LOCATION.
2'-6
"2'
-0"
2'-6
"
W3330 W3330
PL-4
2'-6
"2'
-0"
2'-6
"
172b
24" D. CTOP
BOX/FILE/FILE BOX/FILE/FILE
12
I801
MOVABLE FILE CABINETS. CO-ORDINATE BRACKET LOCATION.
PL-4W3630 W3630
5'-0
"
8" MOSAIC TILE STRIP
WALL TILE -INSTALL 1/3
OFFSET
CT-5
CT-4
177
2'-1
0"
5'-0
"
2'-2
"2'
-10"
VANITY FIXTURE-SEE ELEC.
3'-6" x 3'-0" WD FRAME MIRROR
-NO TILE BEHIND
PIPE PROTECTION
PANEL
10
A004
Sim
CT-5
5'-0
"
8" WIDE ACCENT MOSAIC
WALL TILE - INSTALL AT 1/3 OFFSET
CT-4
CT-5
4
I800
CHAIR RAIL ALL WALLS OF ELEV. LOBBY
VINYL WALL COVERING
Date
Project Number
1301 American Blvd ESuite 100Bloomington, MN 55425tel: (612) 879-6000fax: (612) 879-6666www.kaaswilson.com
Copyr
ight K
aas
Wils
on A
rchite
cts
Ow
ner:
Pro
ject
:
kaas wilson
architects
PERMIT SET
1/4" = 1'-0"
1/3
1/2
01
7 5
:43:0
7 P
MC
:\R
evit L
ocal\1
667
-He
art
h D
evelo
pm
en
t-O
wen
sb
oro
Se
nio
r Liv
ing_ssta
nke.r
vt
Interior Elevations -Level 1 Commons
& MC
01/31/2017
1667
Ow
ensb
oro
Senio
r Li
ving
Heart
h D
evelo
pm
ent
I501
3138 F
airvie
w D
rive
Ow
ensboro
, K
Y 4
2303
Kitchen:Strategic Equipment & Supply1203 33rd Street South St.Cloud, MN 56301(302) 257-8802
MEP:The Matrix Group311 East Chicago Street,Suite 310Milwaukee, WI 53202(414) 329-2827
Civil:Bryant Engineering Inc.1535 Frederica St.P.O. Box 21382Owensboro, KY 42304270-685-2811
Structural:Advanced StructuralTechnologies, Inc.7210 Metro BlvdEdina, MN 55439(952) 854-9302
67
50
Stillw
ate
r B
lvd. N
., S
uite 2
00
Stillw
ate
r, M
N 5
50
82
(65
1)-
705-8
811
1/4" = 1'-0"16
MC Dining - Elevation 1
1/4" = 1'-0"17
MC Dining - Elevation 2
1/4" = 1'-0"18
MC Dining - Elevation 3 1/4" = 1'-0"
19MC Dining - Elevation 4
1/4" = 1'-0"20
MC Dining - Elevation 5
1/4" = 1'-0"21
MC Dining - Elevation 6
1/4" = 1'-0"22
MC Dining - Elevation 7 1/4" = 1'-0"
23MC Dining - Elevation 8
1/4" = 1'-0"24
MC Dining - Elevation 9 1/4" = 1'-0"
25MC Dining - Elevation 10
1/4" = 1'-0"26
MC Tub Room - Elevation 1 1/4" = 1'-0"
27MC Tub Room - Elevation 2
1/4" = 1'-0"28
MC Tub Room - Elevation 3
1/4" = 1'-0"29
MC Tub Room - Elevation 4 1/4" = 1'-0"
30MC Restroom - Elevation 1
1/4" = 1'-0"31
MC Restroom - Elevation 2 1/4" = 1'-0"
32MC Restroom - Elevation 3
1/4" = 1'-0"33
MC Restroom - Elevation 4
1/4" = 1'-0"15
Laundry Level 1 - Elevation 1
1/4" = 1'-0"34
MC Dayroom - Elevation 1
1/4" = 1'-0"36
MC Dayroom - Elevation 2
1/4" = 1'-0"35
MC Dayroom - Elevation 3
1/4" = 1'-0"37
MC Dayroom - Elevation 4 1/4" = 1'-0"
38MC Dayroom - Elevation 5
1/4" = 1'-0"39
MC Dayroom - Elevation 6
1/4" = 1'-0"1a
Reception - Elevation 1 1/4" = 1'-0"
2Conf. - Elevation 1
1/4" = 1'-0"3
Conf. - Elevation 2 1/4" = 1'-0"
4Conf. - Elevation 3
1/4" = 1'-0"5
Conf. - Elevation 4 1/4" = 1'-0"
6Work Room - Elevation 1
1/4" = 1'-0"7
Work Room - Elevation 2 1/4" = 1'-0"
8Nurse - Elevation 1
1/4" = 1'-0"10
Nurse - Elevation 2 1/4" = 1'-0"
9Nurse - Elevation 3
1/4" = 1'-0"11
Mens/Womens Restroom - Elevation 1 1/4" = 1'-0"
12Mens/Womens Restroom - Elevation 2
1/4" = 1'-0"13
Mens/Womens Restroom - Elevation 3 1/4" = 1'-0"
14Mens/Womens Restroom - Elevation 4
1/4" = 1'-0"40
Elev. Lobby Typ - Elevation 1
Rev.
No.
Revi
sion
Date
264
OPEN TO 2ND CORRIDOR BEYOND
4
I800
3'-0
"
1
I802
B18X28.5"H
24" D PLAM C-TOP
ART - PROVIDE BACKING
ADJ. BOOKSHELVES
OPEN
VWC
20
I801263a
VWC-3
2'-6
"
PL-2
W2730
W3618
W3330
W3018
W1830
W3612
B18X32.5"H
W1530
B15HCP
PIPE PROTECTION PANEL.DOUBLE BASIN SINK.
3" VALANCE W/ LIGHT-SEE ELEC.
HOOD - SEE MECH.
VFY LOCKED CAB LOCATION W/ OWNER
BACKSPLASH TILE
24" D GRANITE C-TOP
NSF REFRIG - VFY WIDTH PRIOR TO CAB INSTALLATION
DROP-IN RANGE
ADA HT DISHWASHER
3" SUPPORT END PANEL
2
I802
GR-1
2'-1
0"1'
-6"
2'-6
" CT-7
WHB30WHB36
OPEN 3'-0
"
GRANITE C-TOP
OPEN TO COMMUNITY
ROOM BEYOND GR-1
4
I800
3'-0
"
262a 262b 262c
2'-6
"
3
I802
3'-0
"
PT-6 GYP & TRIM ON FRONT & SIDES OF ISLAND
4
I800262e
11
I800
Typ
262d
4
I800
3'-0
"
OPEN TO LOBBY BEYOND & BELOW
OPEN TO LOBBY BEYOND & BELOW
I800
15
OPEN TO 2nd LEVEL
CORRIDOR
OPEN TO 2nd LEVEL
CORRIDOR
OPEN TO 2nd LEVEL
CORRIDOR
4
I8002
I800
21
I800
I800
20Typ.
5'-0
"
8" WIDE MOSAIC ACCENT TILE
6x24 PORCELAIN FIELD TILE. INSTALL 1/3 OFFSET
CT-5
5'-0
"
2'-1
0"
CT-4
CT-5
10
A004
Sim
2'-1
0"
3'-4
" 5'-0
"
VANITY LIGHT FIXTURE -SEE LIGHTING SCHEDULE
3'6" x 3'0" WD FRAMED MIRROR
8" WIDE ACCENT MOSAIC TILE
6x24 PORCELAIN FIELD TILE.INSTALL 1/3 OFFSET.
PIPE PROTECTION PANEL
CT-5
CT-4
5'-0
"
CT-5
LC1884
DC3-18 B15 B15
BK3048
DC3-18
LC1884
GC TO PROVIDE BACKING.
MIRROR PROVIDED IN FF&E
WALL SCONCE TYP. SEE ELEC
21
I801
TYP.
278
B33B33B33
W3330W3330W3330
3'-0
"1'
-6"
2'-6
"
24"D PLAM C-TOP
FILLER PIECE TO MATCH
18
I801
Sim.
PL-4
269b269a
1'-0
"7'
-0"
8'-0
" MIRRORS - LEAVE FREE OF ALL DEVICES
4'-0"4'-0"4'-0"4'-0"4'-0"
APPROX. TV LOCOATION - GC TO PROVIDE BACKING
TO
CE
NT
ER
OF
TV
6'-6
"
23
I800
282a
DC3-15 B27X32.5"H B30X32.5"H
10
A004
Sim 24" D PLAM C-TOP
2'-1
0"1'
-6"
2'-6
"
PIPE PROTECTION PANEL.
W3030
W3615
W2730W1530
WD VALANCE W/ LIGHT
PL-1
COUNTERTOP MICRO
WHB36
285b 285c 285d285a
3'-0
"
26
I800
B30B30B30B30
3'-0
"
24" D PLAM C-TOP
26
I800
3'-0
"
PL-2
26
I800
3'-0
"
3'-0
"
26
I800
3'-0
"
UNDER COUNTER BRACKET SUPPORT.
24" D PLAM C-TOP
283
19
I801
PL-4W3630W3630W3630
10
I801
24" D C-TOP
COORDINATE BRACKET LOCATION W/ OWNER
2'-6
"2'
-0"
2'-6
"
BOX/FILE/FILE BOX/FILE/FILEOPEN
BELOW
PL-4
ALL CABS LOCKABLE
METAL LOCKERS -SEE SPEC
5'-0
"
FRP BEHIND SINK
MIN.
4'-0"
SINGLE BASIN SINK
PIPE PROTECTION PANEL
24" D PLAM C-TOP & BACKSPLASH
2'-1
0"
LC1884 LC1884
2
I802PL-4
Date
Project Number
1301 American Blvd ESuite 100Bloomington, MN 55425tel: (612) 879-6000fax: (612) 879-6666www.kaaswilson.com
Copyr
ight K
aas
Wils
on A
rchite
cts
Ow
ner:
Pro
ject
:
kaas wilson
architects
PERMIT SET
1/4" = 1'-0"
1/3
1/2
01
7 5
:43:1
1 P
MC
:\R
evit L
ocal\1
667
-He
art
h D
evelo
pm
en
t-O
wen
sb
oro
Se
nio
r Liv
ing_ssta
nke.r
vt
Interior Elevations -Level 2 Commons
01/31/2017
1667
Ow
ensb
oro
Senio
r Li
ving
Heart
h D
evelo
pm
ent
I502
3138 F
airvie
w D
rive
Ow
ensboro
, K
Y 4
2303
Kitchen:Strategic Equipment & Supply1203 33rd Street South St.Cloud, MN 56301(302) 257-8802
MEP:The Matrix Group311 East Chicago Street,Suite 310Milwaukee, WI 53202(414) 329-2827
Civil:Bryant Engineering Inc.1535 Frederica St.P.O. Box 21382Owensboro, KY 42304270-685-2811
Structural:Advanced StructuralTechnologies, Inc.7210 Metro BlvdEdina, MN 55439(952) 854-9302
67
50
Stillw
ate
r B
lvd. N
., S
uite 2
00
Stillw
ate
r, M
N 5
50
82
(65
1)-
705-8
811
1/4" = 1'-0"1
Library - Elevation 3 1/4" = 1'-0"
2Library - Elevation 4
1/4" = 1'-0"3
Community Room - Elevation 1
1/4" = 1'-0"5
Community Room - Elevation 2
1/4" = 1'-0"4
Community Room - Elevation 3
1/4" = 1'-0"6
Community Room - Elevation 5 1/4" = 1'-0"
7Community Room - Elevation 6
1/4" = 1'-0"8
Mezz. - Elevation 1 1/4" = 1'-0"
9Mezz. - Elevation 2
1/4" = 1'-0"12
Restroom 277 - Elevation 1 1/4" = 1'-0"
13Restroom 277 - Elevation 2
1/4" = 1'-0"14
Restroom 277 - Elevation 3 1/4" = 1'-0"
15Restroom 277 - Elevation 4
1/4" = 1'-0"10
Salon - Elevation 1 1/4" = 1'-0"
11Salon - Elevation 2
1/4" = 1'-0"19
Fitness - Elevation 1 1/4" = 1'-0"
20Fitness - Elevation 2
1/4" = 1'-0"22
Staff - Elevation 1
1/4" = 1'-0"24
Theater - Elevation 1 1/4" = 1'-0"
25Theater - Elevation 2
1/4" = 1'-0"26
Theater - Elevation 3 1/4" = 1'-0"
27Theater - Elevation 4
1/4" = 1'-0"16
Laundry Levels 2, 3 & 4 - Elevation 1 1/4" = 1'-0"
18Charting - Elevation 1
1/4" = 1'-0"23
Staff - Elevation 2
1/4" = 1'-0"17
Laundry Levels 2,3 & 4 - Elevation 2
1/4" = 1'-0"21
Exam - Elevation 1
Rev.
No.
Revi
sion
Date
B30X32.5"H B30X32.5"HB27X32.5"H
PIPE PROTECTION PANEL.
24" D PLAM C-TOP
W2730
W3618
W3030 W3030
WD VALANCE W/ LIGHT
2'-1
0"1'
-6"
2'-6
"
PL-4
WHB36
385b
LC1884
10
A004
Sim
5'-0
"
8"WIDE ACCENT MOSAIC
FIELD TILE. INSTALL AT 1/3 OFFSET.
VANITY LIGHT FIXTURE -SEE LIGHTING SCHEDULE
3'6" x 3'0" WD FRAMED MIRROR
PIPE PROTECTION PANEL
CT-5
CT-4
5'-0
"
9'-1
1/8
"
OPEN TO BEYOND
CT-5
5'-0
"
8"WIDE ACCENT MOSAIC
FIELD TILE. INSTALL AT 1/3 OFFSET.
CT-5
CT-4
486
5'-0
"
8"WIDE ACCENT MOSAIC
FIELD TILE. INSTALL AT 1/3 OFFSET.
CT-4
CT-5
OPEN
CT-5
8"WIDE ACCENT MOSAIC
FIELD TILE. INSTALL AT 1/3 OFFSET.
CT-5
CT-4
General Notes - Interior Elevations
1. All counters @ common areas to be granite unless noted otherwise.
2. Crown molding @ all common area casework.
3. Coordinate/verify soffit depth requirements with mechanical and millwork. Do not cut into crown molding for mechanical grilles.
4. Paint all louvers, access panels, etc. to match adjacent wall/ceiling surface.
5. Do not place any sprinkler heads, fire alarm pulls or horn/strobes, nurse call pulls, or other such devices in any area noted for artwork or TV locations. If any such devices are required to be in proximity to these locations, consult architect regarding placement prior to installation.
6. See I800-I801 for millwork details.
7. See A870 for door schedule, door elevations, and door details.
8. See I300's (floor plans) for corridor arch & millwork arch locations
Date
Project Number
1301 American Blvd ESuite 100Bloomington, MN 55425tel: (612) 879-6000fax: (612) 879-6666www.kaaswilson.com
Copyr
ight K
aas
Wils
on A
rchite
cts
Ow
ner:
Pro
ject
:
kaas wilson
architects
PERMIT SET
As indicated
1/3
1/2
01
7 5
:43:1
8 P
MC
:\R
evit L
ocal\1
667
-He
art
h D
evelo
pm
en
t-O
wen
sb
oro
Se
nio
r Liv
ing_ssta
nke.r
vt
Interior Elevations -Level 3 & 4Commons
01/31/2017
1667
Ow
ensb
oro
Senio
r Li
ving
Heart
h D
evelo
pm
ent
I503
3138 F
airvie
w D
rive
Ow
ensboro
, K
Y 4
2303
Kitchen:Strategic Equipment & Supply1203 33rd Street South St.Cloud, MN 56301(302) 257-8802
MEP:The Matrix Group311 East Chicago Street,Suite 310Milwaukee, WI 53202(414) 329-2827
Civil:Bryant Engineering Inc.1535 Frederica St.P.O. Box 21382Owensboro, KY 42304270-685-2811
Structural:Advanced StructuralTechnologies, Inc.7210 Metro BlvdEdina, MN 55439(952) 854-9302
67
50
Stillw
ate
r B
lvd. N
., S
uite 2
00
Stillw
ate
r, M
N 5
50
82
(65
1)-
705-8
811
1/4" = 1'-0"1
Crafts - Elevation 1 1/4" = 1'-0"
2Crafts - Elevation 2
1/4" = 1'-0"3
Tub Room - Elevation 1 1/4" = 1'-0"
4Tub Room - Elevation 2
1/4" = 1'-0"5
Tub Room - Elevation 3 1/4" = 1'-0"
6Tub Room - Elevation 4
1/4" = 1'-0"8
Tub Room 468 - Elevation 6 1/4" = 1'-0"
7Tub Room 486 - Elevation 5
Rev.
No.
Revi
sion
Date
GYP. BD
F600 F600
GYP. BD
1X4 HDWD
*SEE CHAIR RAIL DETAILS FOR WHERE TRIM IS STAINED OR PAINTED
1'-2"
2'-8
1/2
"1
1/2"
2'-1
0"
MOUNT ELEC BOXES, V.D./ CABLING TIGHT
TO UNDERSIDE OF COUNTER ALL WIRING
WITHIN STUD CAVITY
UNDER COUNTER CAB BEYOND
TYPICAL WALL PANEL DETAILING - SEE 6/A870
I3b
2'-0"
CASED OPENING BEYOND
PLAM CTOP ON 3/4" PART. BD.
SCRIBE PLAM BACK & SIDE SPLASH TO WALLS, TYP.
ELEC. WIRE MOLD - PAINTHOLD TIGHT TO BACKSPLASH
SEE ELEC. -TYP.
1 1/
2"
3 1/
4"
1x CLEAT @ ALL ADJ. WALLS
PROVIDE 3"x3"x1/8" ANGLE BRACKET @ 4'-0" MAX SPACING
2'-6
"
F600, STAIN F600, STAIN
1X4 HDWD, STAIN
GYP.
1/4" HDWD VENEER PANELS, STAIN
HOLD1/2"
HDWD SILL
1x4 HDWD TRIM
1" x 4" MAPLE TRIM SKIRT
1" THICK MAPLE SHELF- 12" RADIUS FROM CORNER
32
" A
.F.F
.
1" x 4" MAPLE TRIM SKIRT
SECTION
PLAN
1'-0"
1' -
0"
R
1" THICK MAPLE SHELF- 12" RADIUS FROM CORNER
PROVIDE BACKING AND USE FINISH SCREWS TO SECURE
WOOD BASE SHOE- FERCHE F200, STAIN
GYP. BD.
1/4" HDWD VENEER PANEL, STAIN
1x6 HDWD BASE, STAIN
WOOD TRIM- FERCHE 600, STAIN
2'-3
"4'
-3"
1x3 HDWD TRIM, STAIN
FERCHE TRIM F605, STAIN
1x4 HDWD TRIM, STAIN
FERCHE COVE F600, STAIN
1x4 HDWD TRIM, STAIN
FERCHE COVE F600, STAIN
1/4" HDWD VENEER PANEL, STAIN
10
I800
1X4" HDWD STILE BEYOND
FERCHE COVE F600, STAIN
1X4" HDWD STILE BEYOND
1x4 HDWD CHAIR RAIL, PAINT
1x2 HDWD TRIMEASE TOP EDGE (1x8 WALL CAP @ HALF WALL), PAINT
WOOD TRIM - FERCHE 600, PAINT
GYP. BD.
GYP. BD. - PAINT PT-3See
Ele
va
tion
1x6 HDWD BASE, PAINT
WOOD TRIM- FERCHE 600, PAINT
1x4 HDWD STILE BEYOND, PAINT 9
I800
WOOD BASE- FERCHE F225, PAINT
1x6 HDWD CHAIR RAIL, STAIN
WOOD TRIM- FERCHE F600, PAINT
WOOD TRIM- FERCHE F600, PAINT
0' - 1 1/2"GYP BD.
GYP. BD.
2x6 BLOCKING
2' -
5"
BREADLOAF HAND RAILRETURN ALL ENDS - STAIN
0' -
5 1
/2"
2' -
5"
WOOD BASE- FERCHE F275, PAINT
GYP. BD.
GYP. BD
1x6 HDWD CHAIR RAIL, PAINT
WOOD TRIM- FERCHE F600, PAINT
WOOD TRIM - FERCHE F600, PAINT
Double Sided Fireplace
I800
16
VERIFY CLEAR DIM OF FIREPLACE W/ VENDOR
CAST STONE HEARTH
2x10 BASE FRAME
BRICK BASE
1'-0" VFY W/MANUF. 1'-0"
1'-8
"1'
-0"
VF
Y W
/ F.P
. VE
ND
OR
3'-3
1/8
"2"
10"
I4a
GYP BD ART RECESS, BRICK SURROUND
HDWD TRIM
1x2 HDWD TRIM
F600 COVE1X4 HDWD TRIM
F600 COVE
1/4" HDWD VENEER PANEL
1x6 HDWD TRIM
1x3HDWD TRIM
1x2 HDWD TRIM
HDWD. VENEER PLYWD.
1x3 HDWD TRIM
F614
HDWD TRIM
F600 COVE1X4 HDWD TRIM
F600 COVE
1/4" HDWD VENEER PANEL
F600
HDWD. VENEER PLYWD.
1x3 HDWD TRIM
F614
F600
FIREPLACEVFY. DEPTH AND SIZE W/ MFGR.
REQUIREMENTS
NOTE: VERIFY CLEARANCE REQUIREMENTS TO COMBUSTABLE MATERIALS.
1x10 HDWD TRIM
F614 HDWD TRIM
1x HDWD TRIM
9 1/4"
1x4 HDWD TRIM
1x3 HDWD TRIM
F600
13
I800
PANELING TO WRAP ON ALL SIDES.
I800
16
5
I800
11 3
/4"
3'-8
15/
16"
1'-0
"7
1/4"
10'-1
1 3/
4"6
1/16
"2'
-0"
3 1/
4"
BRICK INSTALL AT 1/3 OFFSET
ALL WOOD PANELING & TRIM PT-3
BRICK INSTALL AS SHOWN. HERRINGBONE PATTERN. LINEAR BORDER.
KEYSTONE TO MATCH BRICK
1X HDWD CORNICE
FERCHE F614 CROWN
1X1 WOOD TRIM
R 1
3'-3
"
I800
16
1'-0" 1'-0" 5'-6 3/4" 1'-0" 1'-0"
1'-8
1/4
"8'
-11
9/16
"1'
-7 1
1/16
"
WRAP CORNER W/12" WOOD TRIM (FRONT & SIDE)
GAS FIREPLACE
INSERT
DECORATIVE RAIL
BR-1
1x Trim 1X8" HARDWOODTRIM
1X4" HARDWOODTRIM
METAL BALUSTER
NEWEL POST BEYOND
1x4 HDWD CHAIR RAIL, STAIN
1x2 HDWD TRIMEASE TOP EDGE (1x8 WALL CAP @ HALF WALL), STAIN
WOOD TRIM - FERCHE 600, STAIN
GYP. BD.
1/4" HDWD VENEER, STAINSee
Ele
va
tion
1x6 HDWD BASE, STAIN
WOOD TRIM- FERCHE 600, STAIN
1x4 HDWD STILE BEYOND, STAIN
10
I800
5 1/
2"2'
-1 1
/2"
3 1/
2"
1 1/
2"
1x6 HDWD BASE, STAIN
1/2" COVE -FERCHE F600, TYP., STAIN
1x4 HDWD STILE BEYOND, STAIN
1x HDWD TRIM, STAIN
1x2 HDWD TRIM, STAIN
5/8" GYP. BD. - PAINT
I4a
9 1/2"
1x HDWD CAP, STAIN
SOFFIT FRAMING
CROWN MOULDINGFERCHE F614, STAIN
CEILING -SEE RCP
COVE LIGHTING - SEE ELEC.
3 1/2" 11" 3 1/2"3/4"
2 1/
2"11
1/2
"2
1/2"
3/4"
1'-6
"
1'-6"
11 3/4"11 3
/4"
1x4 HDWD TRIM, TYP
1x3 HDWD TRIM, TYP
1/2" COVE - ALL SIDES
5/8" GYP BD
1x6 HDWD BASE
2x4 FRAMING
3'-0
"
VA
RIE
S -
SE
E R
CP
GYP BD
1'-6"
1x4 HDWD TRIM
1/2" COVE - FERCHE F600, TYP
1x4 HDWD TRIM
GYP BD
1x4 HDWD TRIM
1x6 HDWD BASE
1/2" COVE - FERCHE F600, TYP
21
I800
ALL TRIM & GYP PAINTED PT-3
6 1/
4"1'
-7 5
/16"
2 1/
4"
2'-3
13/
16"
2 1/4" 5 3/4" 2 1/4"
10 1/4"
UNIT NUMBER PLAQUE
1/8" TEMPERED GLASS WINDOW
STAINED HDWD. (ALL EXPOSED SURFACES) TYP. - U.N.O.
CAMLOCK
CLR.
4"
1/2"
1/2"
1/2" 1/2"
1/2"
6 1/
4"1'
-7 5
/16"
2 1/
4"1/
2"
CLE
AR
2'-1
"
CAMLOCK
1/4" ADJ. GLASS SHELF (2-THUS), CENTER IN GLAZED WINDOW
5/8" TYPE 'X' GYP. BD. EA. SIDE WD STUDS
5/8" TYPE 'X' GYP. BD. ALL SIDES OF RECESS
Elevation Detail Section Detail
SEE PLANS
VARIES
STAINED HDWD VENEER (ALL EXPOSED SURFACES) TYP. - U.N.O.
2' -
10
"
BASE
IVES BRACKET - BRONZE
MAPLE LOAF WOOD HAND RAIL
RETURN TO WALL 45 DEGREESAT ALL TERMINATIONS
24
I800
1 1/2" HANDRAIL
1x6 HDWD TRIM
RETURN @ ALLENDS 45 DEGREES
IVES BRACKET48" O.C.
BLOCKING AS NEEDED
WOOD BASE- FERCHE F225
GYP. BD.
1x2 HDWD TRIMEASE TOP EDGE (1x8 WALL CAP @ HALF WALL)
GYP. BD.
SE
E E
LE
VA
TIO
N
STAIN TRIM & BASE AT THEATER, PAINTED TRIM & BASE AT MC DAYROOM (PT-3)
MOUNT ELEC BOXES, V.D./ CABLING TIGHT
TO UNDERSIDE OF COUNTER ALL WIRING
WITHIN STUD CAVITY
UNDER COUNTER CAB BEYOND
TYPICAL WALL PANEL DETAILING - SEE 6/A870
I3b
2'-0"
PLAM CTOP ON 3/4" PART. BD.
SCRIBE PLAM BACK & SIDE SPLASH TO WALLS, TYP.
ELEC. WIRE MOLD - PAINTHOLD TIGHT TO BACKSPLASH
SEE ELEC. -TYP.
1 1/
2"
3 1/
4"
1x CLEAT @ ALL ADJ. WALLS
PROVIDE 3"x3"x1/8" ANGLE BRACKET @ 4'-0" MAX SPACING
2'-6
"
MEMORY CARE BOX @ MEMORY CARE UNITS (1st FLOOR ONLY) -PURSE SHELF AT AL/IL UNITS (STAIN)
HDWD. HANDRAIL, STAIN
60" MAX. HT. TO BRAILLE ON SIGNAGE
ACCENT PAINT- VARIES BY LEVEL
F608 - MITER & RETURN ON ENDS, PAINT
1X6 HDWD TRIM, PAINT
1X4 VERT. HDWD
TRIM, PAINT
1X6 HDWD TRIM, PAINT
1'-3"
EQ
EQ
4'-0
" T
O V
IEW
ER
@ A
CC
. UN
ITS
VIE
WE
R T
O B
E C
EN
TE
RE
D A
S S
HO
WN
1'-3"
T.O
. SH
ELF
2'-8
"
T.O
. FIN
ISH
ED
ME
MO
RY
BO
X
4'-1
1"
C.L
. SC
ON
CE
5'-1
0"
CONTROL JOINTS
I800
18
I800
19
PT-4
PT-5
PT-6
PT-7
LEVEL 1
LEVEL 2
LEVEL3
LEVEL 4
PT-8
PT-8
PT-9
ABOVE HAND RAIL
BELOW HAND RAIL
ACCENT PAINT WRAPS INSIDE RETURN
PT-14 MEMORY CARE
WOOD BASE SHOE- FERCHE F200, PT-3
GYP. BD. PT-3
1X1-1/2 WOOD TRIM BEYOND. PT-3
1x6 HDWD BASE, PT-3
WOOD TRIM- FERCHE 600. PT-3
4'-5
"3'
-0"
FERCHE COVE F600, PT-3
1X4 WOOD TRIM. PT-3
10
I800
7'-5
"
1x1-1/2 WOOD TRIM. PT-3
1X1-1/2 WOOD TRIM BEYOND. PT-3
WOOD TRIM- FERCHE 600. PT-3
WOOD TRIM- FERCHE 600. PT-3
1X1-1/2 WOOD TRIM BEYOND. PT-3
1x1-1/2 WOOD TRIM. PT-3
1x1-1/2 WOOD TRIM. PT-3
1X4 WOOD TRIM. PT-3
1X2 WOOD TRIM. PT-3
FIREPLACEVFY. DEPTH AND SIZE W/ MFGR.
REQUIREMENTS
BRICK BEYOND
MILLWORK FIREPLACE MANTLE SURROUND
(BEYOND)
NOTE: VERIFY CLEARANCE REQUIREMENTS TO COMBUSTABLE MATERIALS.
HDWD. VENEER PLYWD.
1x3 HDWD TRIM
F614
HDWD TRIM
F600
BRICK BEYOND
3'-0
"
MIN
IMU
M
1'-0
"1'
-8"
Date
Project Number
1301 American Blvd ESuite 100Bloomington, MN 55425tel: (612) 879-6000fax: (612) 879-6666www.kaaswilson.com
Copyr
ight K
aas
Wils
on A
rchite
cts
Ow
ner:
Pro
ject
:
kaas wilson
architects
PERMIT SET
As indicated
1/3
1/2
01
7 5
:43:2
7 P
MC
:\R
evit L
ocal\1
667
-He
art
h D
evelo
pm
en
t-O
wen
sb
oro
Se
nio
r Liv
ing_ssta
nke.r
vt
MillworkDetails/Unit Entries
01/31/2017
1667
Ow
ensb
oro
Senio
r Li
ving
Heart
h D
evelo
pm
ent
I800
3138 F
airvie
w D
rive
Ow
ensboro
, K
Y 4
2303
Kitchen:Strategic Equipment & Supply1203 33rd Street South St.Cloud, MN 56301(302) 257-8802
MEP:The Matrix Group311 East Chicago Street,Suite 310Milwaukee, WI 53202(414) 329-2827
Civil:Bryant Engineering Inc.1535 Frederica St.P.O. Box 21382Owensboro, KY 42304270-685-2811
Structural:Advanced StructuralTechnologies, Inc.7210 Metro BlvdEdina, MN 55439(952) 854-9302
67
50
Stillw
ate
r B
lvd. N
., S
uite 2
00
Stillw
ate
r, M
N 5
50
82
(65
1)-
705-8
811
1 1/2" = 1'-0"9
Millwork - Panel Stile w/Gyp.
1" = 1'-0"25
Millwork - Reception Desk Section
1 1/2" = 1'-0"10
Millwork - Panel Stile w/Wood 1 1/2" = 1'-0"
11Millwork - Window Sill Detail
1 1/2" = 1'-0"19
Millwork - Unit Entry Shelf
1" = 1'-0"12
Millwork - Private Dining Wood Paneling(CR-2)
1" = 1'-0"4
Millwork - Standard Paneling w/Gyp (CR-1) 1" = 1'-0"
6Millwork - Corridor Handrail (CR-6)
1" = 1'-0"7
Millwork - Corridor Chair Rail (CR-7)
1" = 1'-0"13
Millwork - Lobby Fireplace Section
1 1/2" = 1'-0"16
Millwork - Lobby Fireplace Molding Profile
1/2" = 1'-0"14
Millwork - Lobby Fireplace Elev 1st FloorFront
1/2" = 1'-0"15
Millwork - Lobby Fireplace
1" = 1'-0"17
Millwork - Lobby Balcony Edge Detail
1" = 1'-0"3
Millwork - Paneling Club Room (CR-3) 1" = 1'-0"
2Millwork - Half Wall Detail
1 1/2" = 1'-0"1
Millwork - Crown Molding 1" = 1'-0"
21Millwork - Column Wrap
1/2" = 1'-0"20
Millwork - Column Elevation
1 1/2" = 1'-0"18
Memory Box Details
3/4" = 1'-0"23
Interior Commons-Handrail Elevation 1 1/2" = 1'-0"
24Interior Commons -Hand Rail Detail
1" = 1'-0"26
Millwork - Basic Chair Rail (CR-5)
1" = 1'-0"27
Millwork - Reception Desk 1/2" = 1'-0"
22Millwork - Typical Unit Entry
1" = 1'-0"8
Millwork - Lobby Paneling (CR-4) 1" = 1'-0"
5Millwork - Section 2 at Lobby Fireplace
Rev.
No.
Revi
sion
Date
10"VFY. W/ MFGR.
1' - 5"
HDWD. SUPPORT BRACKET, STAIN
FRONT LOADING
MAILBOXES
2'-3
"
VF
Y. W
/ MF
GR
.
2'-4
1/2
"
1x6 HDWD BASE, STAIN
1/4" PLYWOOD PANEL, STAIN
PLAM.
1x4 HDWD. TRIM, STAIN
1x4 HDWD TRIM, BEYOND
6"
9"
3 1/4"
3 1
/4"
1x3 HDWD, STAIN
1X HDWD BRACE, STAIN
BOLT BRACKET TO BLOCKING
IN WALLCOUNTERSINK HOLES & PLUG
10"
CLR
10"
HDWD. SUPPORT BRACKET, STAIN
WD VENEER ALL EXPOSED
SURFACES ON 3/4" PLYWD
2'-3
"2'
-4 1
/2"
1x6 HDWD BASE, STAIN
1/4" PLYWOOD PANEL, STAIN
PLAM CTOP
1x4 HDWD. TRIM, STAIN
1x4 HDWD TRIM, BEYOND
1/4" VENEERED PLYWD
DIVIDERSI801
2
2'-1
0"
VARIES - SEE PLAN
4'-0
"4'
-6"
1'-6" 8'-0" 1'-6"
1x3 HDWD TRIM
1X6 BACKERBOARD
HANDRAIL. VARIES
NOTE: 8' X 4'-6" CORRIDOR ARCH. CENTER ON WALL. KEEP WALL SURFACE FREE OF DEVICES. SEE I300-I303 FOR TRIM LOCATIONS.
SE
E P
LAN
S
VA
RIE
S
1x4 HDWD. TRIM, STAINED
HDWD. BACKBAND, STAINED
JAMB
1x HDWD. TRIM, STAINED
SEE PLANS
VARIES
1x4 HDWD. TRIM, STAINED
1x HDWD. TRIM, STAINED
1/4"
HDWD. BACKBAND, STAINED
HEAD
1x TRIM, STAIN
BREADLOAF HANDRAIL,STAIN
METAL BALUSTER, 0'-6" O.C. MAX
NOTE: OPEN SPACE BETWEEN BALUSTERS NOT TO EXCEED 4" AT ANY POINT
1X8" HARDWOODTRIM, STAIN
1X4" HARDWOODTRIM, STAIN
FLOOR TRUSSES-SEE STRUCT.
1X4" HARDWOOD TRIM, STAIN
1X3" HARDWOOD TRIM, STAIN
SE
E R
CP
BEAM SEE STRUCT.
NEWEL POST, STAIN, 8'-0" O.C. MAX
See Ref. Clg Plan
3'-6
"
CROWN MOULDING, STAIN
2'-0
"
1X3 HDWD
2X2 HDWD
1X3 HDWD
9 1/4"
9 1
/4"
45°
1'-0"
1'-4
"
BOLT THROUGH TO STUD WALL
2'-6
"
I3a
1" 1'-11"
GRANITE TOP -SEE INTERIORS
I801
8
GYP BD WALL BEYOND
3'-6 3/4"
1'-2"
VF
Y -
VA
RIE
S P
ER
LO
CA
TIO
NV
FY
- V
ER
IES
PE
R L
OC
AT
ION
VF
Y-
VA
RIE
S P
ER
LO
CA
TIO
N
7'-8
"
3'-4
1/2
"
PLAM ON 1 1/4" PART. BD. TOP
PLAM BASE
PLAM (ALL EXPOSED SURFACES) ON 3/4" PART. BD.
PLAM (ALL EXPOSED SURFACES) ON 3/4" PART. BD
3/4" WHITE MELAMINE ADJ. SHELVES
PULL
INT. FINISH TO BE WHITE MELAMINE
3/4" WHITE MELAMINE ADJ. SHELF
1'-9"
2'-1"
CLEAR
1'-0 3/4"
2'-0"
4"1
1/4"
1/4"
6"
1/8"
2'-4
7/8
"
1/4"
1'-3"
4"
1'-8"
PULL
SCRIBE PLAM BACK & SIDE SPLASH TO WALLS, TYP.
4"
ELEC. WIRE MOLD - PAINTHOLD TIGHT TO BACKSPLASHSEE ELEC. -TYP.
PROVIDE IN-WALL BLKG. AS REQD. - TYP.
7'-8
"
7'-8
"
PLAM BASE
PLAM (ALL EXPOSED SURFACES) ON 3/4" PART. BD.
INT. FINISH TO BE WHITE MELAMINE
3/4" WHITE MELAMINE ADJ. SHELF
1'-9"
2'-0"
4"
PULL
PROVIDE IN-WALL BLKG. AS REQD. - TYP.
4'-2
"3/
8"3'
-5 3
/8"
3/4" WHITE MELAMINE ADJ. SHELF
3/4" WHITE MELAMINE ADJ. SHELF
3/4" WHITE MELAMINE ADJ. SHELF
SOFFIT FRAMING
CEILINGS & BOTT. OF SOFFITS TEXTURED - TYP.
WALL
CEILING
VE
RIF
Y w
/ RC
P
VERIFY w/ RCP
T.O
. BLK
G
7"
LED ROPE LIGHT
CROWN FERCHE F614, STAIN
2x WD BLKG
2 11/16"
3 1/
4"
PLAMCOUNTER TOP
OPEN
PAINT BRACESTO MATCH ADJACENTWALL
BRACKET SEE 7/A456
WELDEDSTL. PLATE
SLOPE & FILL
BOTTOM LEGS
2' -
10
"
0' -
2 1
/4"
1' - 6"
1" STL. TUBE
2 LAG BOLTS TOWALL & SCREW TO
COUNTERTOP
6"X6" TRIANGULAR1/8" WELDED STL. PLATE
SLOPE & FILL BOTTOM LEGS
PAINT BRACES TO MATCH ADJACENT WALL
NOTE:PROVIDE 16"X16" BRACE
@ H.C. BATH LAV. TOPSAND 10"X10" BRACE @
BREAKFAST COUNTERS
0' - 6"
2'-6
"1'
-8"
2'-8
"
6'-1
0"
PLAM CTOP ON 3/4" PART. BD.
PLAM (ALL EXPOSED SURFACES) ON 3/4" PART. BD
3/4" WHITE MELAMINE ADJ. SHELVES
PULLCLEAR
1'-0 3/4"
1/4"
1'-3"
SCRIBE PLAM BACK & SIDE SPLASH TO WALLS, TYP.
ELEC. WIRE MOLD - PAINTHOLD TIGHT TO BACKSPLASHSEE ELEC. -TYP.
PROVIDE IN-WALL BLKG. AS REQD. - TYP.
1 1/
2"
4"
2'-1"
1x CLEAT @ ALL ADJ. WALLS
PROVIDE 3"x3"x1/8" ANGLE BRACKET @ 4'-0" MAX SPACING
3"
3'-0
"2'
-4"
1'-1
0"
7'-2
"
PLAM ON 1 1/4" PART. BD. TOP
PLAM BASE
PLAM (ALL EXPOSED SURFACES) ON 3/4" PART. BD.
PLAM (ALL EXPOSED SURFACES) ON 3/4" PART. BD
3/4" WHITE MELAMINE ADJ. SHELVES
PULL
INT. FINISH TO BE WHITE MELAMINE
1'-9"
2'-1"
CLEAR
1'-0 3/4"
2'-0"
4"
1/4"
6"
1/8"
2'-0
3/8
"
1/4"
1'-3"
PULL
SCRIBE PLAM BACK & SIDE SPLASH TO WALLS, TYP.
PROVIDE IN-WALL BLKG. AS REQD. - TYP.
3"
MIN
2'-3
"
WRAP ALL HOT WATER AND DRAINPIPES, BY MECH.
UNDER-CAB LIGHT
VA
RIE
S -
SE
E E
LEV
.1'
-6"
VA
RIE
S -
SE
E E
LEV
.
7'-2
"
3'-0
"
PLAM ON 1 1/4" PART. BD. TOP
PLAM BASE
PLAM (ALL EXPOSED SURFACES) ON 3/4" PART. BD.
PLAM (ALL EXPOSED SURFACES) ON 3/4" PART. BD
3/4" WHITE MELAMINE ADJ. SHELVES
PULL
INT. FINISH TO BE WHITE MELAMINE
3/4" WHITE MELAMINE ADJ. SHELF
1'-9"
2'-1"
CLEAR
1'-0 3/4"
2'-0"
4"1
1/4"
1/4"
6"
1/8"
2'-0
3/8
"
1/4"
1'-3"
4"
1'-8"
PULL
SCRIBE PLAM BACK & SIDE SPLASH TO WALLS, TYP.
4"
ELEC. WIRE MOLD - PAINTHOLD TIGHT TO BACKSPLASHSEE ELEC. -TYP.
PROVIDE IN-WALL BLKG. AS REQD. - TYP.
PLAM CTOP ON 3/4" PART. BD.
SCRIBE PLAM BACK & SIDE SPLASH TO WALLS, TYP.
1 1/
2"
4"
1x CLEAT @ ALL ADJ. WALLS
PROVIDE 3"x3"x1/8" ANGLE BRACKET @ 4'-0" MAX SPACING
VF
Y -
VA
RIE
S P
ER
LO
CA
TIO
N
2'-6
"
PLAM CTOP ON 3/4" PART. BD.
SCRIBE PLAM BACK & SIDE SPLASH TO WALLS, TYP.
ELEC. WIRE MOLD - PAINTHOLD TIGHT TO BACKSPLASHSEE ELEC. -TYP.
1 1/
2"
4"
2'-1"
1x CLEAT @ ALL ADJ. WALLS
PROVIDE 3"x3"x1/8" ANGLE BRACKET @ 4'-0" MAX SPACING
3'-0
"4"
11"
3/4" HDWD VENEER PLYWD., STAINED TO MATCH CABINETRY. EDGEBAND OR WRAP VENEER ON EXPOSED SIDES.
PLAM 3 COUNTER, CONTINUOUS
SCRIBE PLAM. BACKSPLASH & SIDE SPLASH TO WALLS, TYP.
SALON SINK W/ HAND-HELD SPRAYER, ANCHOR TO 2x6 WD. FRAMING BEYOND
BLOW DRYER & CURLING IRON DROP-IN GROMMET AND HOLDERS (TWO PER STATION)2'-1"
ALIGN TO DOOR FACE OF ADJ. CABS
2'-1"
MATCH TOE KICK FINISH AND DEPTH TO ADJ. CABS
INSULATE SUPPLY AND DRAIN PIPES
PROVIDE POWER FOR DRYERS AND CURLING IRONS AT EACH STATION
CAULK ALL EDGES
NECK REST PORTION OF SINK TO BE MOUNTED AT 31" AFF
GRANITE C-TOP -SEE INTERIORS
BASE - SEE INTERIORS
HALF WALL - SEE PLAN
10 3/4"
BASE CAB.
3'-0
"
1x4 HDWD, STAIN
1x4 HDWD STILE BEYOND, STAIN
1x6 HDWD, STAIN
FERCHE F600 COVE TRIM, STAIN
FERCHE F600 COVE TRIM, STAIN
1/4" MAPLE VENEER, STAIN
3'-6"
Date
Project Number
1301 American Blvd ESuite 100Bloomington, MN 55425tel: (612) 879-6000fax: (612) 879-6666www.kaaswilson.com
Copyr
ight K
aas
Wils
on A
rchite
cts
Ow
ner:
Pro
ject
:
kaas wilson
architects
PERMIT SET
As indicated
1/3
1/2
01
7 5
:43:3
4 P
MC
:\R
evit L
ocal\1
667
-He
art
h D
evelo
pm
en
t-O
wen
sb
oro
Se
nio
r Liv
ing_ssta
nke.r
vt
Millwork Details
01/31/2017
1667
Ow
ensb
oro
Senio
r Li
ving
Heart
h D
evelo
pm
ent
I801
3138 F
airvie
w D
rive
Ow
ensboro
, K
Y 4
2303
Kitchen:Strategic Equipment & Supply1203 33rd Street South St.Cloud, MN 56301(302) 257-8802
MEP:The Matrix Group311 East Chicago Street,Suite 310Milwaukee, WI 53202(414) 329-2827
Civil:Bryant Engineering Inc.1535 Frederica St.P.O. Box 21382Owensboro, KY 42304270-685-2811
Structural:Advanced StructuralTechnologies, Inc.7210 Metro BlvdEdina, MN 55439(952) 854-9302
67
50
Stillw
ate
r B
lvd. N
., S
uite 2
00
Stillw
ate
r, M
N 5
50
82
(65
1)-
705-8
811
3/4" = 1'-0"1
Mailbox section 1 1/2" = 1'-0"
2Mailbox Counter Bracket
3/4" = 1'-0"3
Mail Cubby Section 1/4" = 1'-0"
4Corridor Custom Millwork Frames
1 1/2" = 1'-0"5
Cased Opening Jamb 1 1/2" = 1'-0"
6Cased Opening Head
1" = 1'-0"7
Balcony Section
1 1/2" = 1'-0"8
Island Counter bracket 1" = 1'-0"
9MC Dayroom Island Section
1" = 1'-0"12
Millwork - PLAM Cabinet @ Work Station 1" = 1'-0"
13Millwork - PLAM Tall Cabinet Detail
1 1/2" = 1'-0"14
Cove Ceiling Detail
1" = 1'-0"15
Bar Counter 1 1/2" = 1'-0"
16Counter Bracket
1" = 1'-0"10
Millwork - PLAM Desk Detail 1" = 1'-0"
11Millwork - PLAM Cabinet @ Nurse Sink
1" = 1'-0"18
Millwork - PLAM Cabinet Typ.
1" = 1'-0"19
Millwork - PLAM Wall Hung Countertop 1" = 1'-0"
20Millwork - PLAM Library Desk
1" = 1'-0"21
Millwork - Salon Sink 3/4" = 1'-0"
17Millwork - Club Room Island
Rev.
No.
Revi
sion
Date
2 X 6 FRAMING
HDWD VENEER ON 3/4" PART. BD., TYP.
CLEAR
11 3/4"
1'-2 1/8"
3/4"
1X6 HDWD BASE
8'-0
"5
1/2"
1X HDWD CORNICE
ADJ. 3/4" HDWD VENEER PLYWD SHELVING w/ BRACKETS & STANDARDS
HDWD VENEER (ALL EXPOSED SURFACES) ON 3/4" PART. BD.
1x VERTICAL HDWD TRIM
FERCHE F614 CROWN
3'-4
" M
AX
.
2'-5
" M
IN T
O B
OT
. O
F T
RIM
2'-1
0"
8" MIN
1/4"
2'-3
" M
IN K
NE
E
VARIES - SEE PLANS
1" TUBULAR STEEL BRACEW/ 45 DEGREE FINISHED END
PROVIDE 2X BLOCKING@ BRACES
WOOD BLOCKING FOR TRIM
3" H BACKSPLASH/SIDESPLASH
FIN
. F
LOO
R T
O B
OT
MIR
RO
R.
KNEE CLEAR
FIN
. F
LOO
R T
O T
O R
IM
CLE
AR
AN
CE
3" HDWD SKIRTS ALL SIDES, STAIN
C-TOP - SEE FINISH SCHEDULE SHEET A700
POST-FORMED EDGE
COUNTERTOP BRACKET, SEE 15/A865
2'-5
" M
IN T
O B
OT
. O
F T
RIM
2'-1
0"
2'-0"
SHIELD INSULATEDWASTE & SUPPLY PIPES
1" TUBULAR STEEL BRACEW/ 45 DEGREE FINISHED END
PROVIDE 2X BLOCKING@ BRACES
WOOD BLOCKING FOR TRIM
3" H BACKSPLASH/SIDESPLASH
MIN KNEE & TOE CLEARANCE
FIN
. F
LOO
R T
O T
O R
IM
HDWD SKIRT
C-TOP - SEE FINISH SCHEDULE SHEET A700
HDWD APRON
8" 3" 6"
1'-6
"9"
SINK WITH HARDWOOD APRON AND PROTECTION PANEL
SHIELD INSULATEDWASTE & SUPPLY PIPES
COUNTERTOP BRACKET, SEE 15/A865
GRANITE C-TOP -SEE INTERIORS
SIT
-UP
CO
UN
TE
R
2'-6
"
2'-6 3/4"
SEE PLANS
CURVED
BASE - SEE INTERIORS
HALF WALL - SEE PLAN
1x HDWD BRACKETSEE 15/A450
10"
10"
BASE CAB.
3'-0
"
HDWD
VA
RIE
S -
SE
E E
LEV
.
3'-0
"
GRANITE. STANDARD EASED & POLISHED EDGE.
PLAM BASE
PLAM (ALL EXPOSED SURFACES) ON 3/4" PART. BD.
INT. FINISH TO BE WHITE MELAMINE
3/4" WHITE MELAMINE ADJ. SHELF
1'-9"
2'-1"
2'-0"
4"1
1/4"
2'-6
3/4
"
PULL
CLEAR
11 3/4"
1X HDWD CORNICE
ADJ. 3/4" HDWD VENEER PLYWD SHELVING w/ BRACKETS & STANDARDS
HDWD VENEER (ALL EXPOSED SURFACES) ON 3/4" PART. BD.
FERCHE F614 CROWN
VA
RIE
S -
SE
E E
LEV
.
3'-0
"
GRANITE. STANDARD EASED & POLISHED EDGE. SEE FINISH SCHEDULE.
PLAM BASE
PLAM (ALL EXPOSED SURFACES) ON 3/4" PART. BD. SEE FINISH SCHEDULE.
INT. FINISH TO BE WHITE MELAMINE
3/4" WHITE MELAMINE ADJ. SHELF
1'-9"
2'-1"
2'-0"
4"1
1/4"
2'-6
3/4
"
PULL
11 3/4"
1X HDWD CORNICE
ADJ. 3/4" HDWD VENEER PLYWD SHELVING w/ BRACKETS & STANDARDS
HDWD VENEER (ALL EXPOSED SURFACES) ON 3/4" PART. BD.
PORCELAIN TILE. INSTALLED 1/3 OFFSET. SEE FINISH SCHEDULE.
Date
Project Number
1301 American Blvd ESuite 100Bloomington, MN 55425tel: (612) 879-6000fax: (612) 879-6666www.kaaswilson.com
Copyr
ight K
aas
Wils
on A
rchite
cts
Ow
ner:
Pro
ject
:
kaas wilson
architects
PERMIT SET
As indicated
1/3
1/2
01
7 5
:43:3
9 P
MC
:\R
evit L
ocal\1
667
-He
art
h D
evelo
pm
en
t-O
wen
sb
oro
Se
nio
r Liv
ing_ssta
nke.r
vt
Millwork Details
01/31/2017
1667
Ow
ensb
oro
Senio
r Li
ving
Heart
h D
evelo
pm
ent
I802
3138 F
airvie
w D
rive
Ow
ensboro
, K
Y 4
2303
Kitchen:Strategic Equipment & Supply1203 33rd Street South St.Cloud, MN 56301(302) 257-8802
MEP:The Matrix Group311 East Chicago Street,Suite 310Milwaukee, WI 53202(414) 329-2827
Civil:Bryant Engineering Inc.1535 Frederica St.P.O. Box 21382Owensboro, KY 42304270-685-2811
Structural:Advanced StructuralTechnologies, Inc.7210 Metro BlvdEdina, MN 55439(952) 854-9302
67
50
Stillw
ate
r B
lvd. N
., S
uite 2
00
Stillw
ate
r, M
N 5
50
82
(65
1)-
705-8
811
1" = 1'-0"1
Millwork - Library Bookshelves 1" = 1'-0"
2Millwork - Interior Commons Sink
3/4" = 1'-0"3
Millwork - Community Room Island 1" = 1'-0"
4Millwork - Mail Cafe Built-In
1" = 1'-0"5
Millwork - Club Room Built-In
Rev.
No.
Revi
sion
Date