I Project p I ~v~Mopendocs.cookcountyil.gov/procurement/contracts/1555...I ~v~M I I Cook County...
Transcript of I Project p I ~v~Mopendocs.cookcountyil.gov/procurement/contracts/1555...I ~v~M I I Cook County...
I ~v~M I ICook County
Department of Planning & Policy69 W Washington
Chicago, IL 60802
DCPP Project ID: No input p 2Jifrgg
Dale 02/26/2018
To: Cook County, Purchasing118N. Clark Rm. 1018Chicano, illinois 60602
From: Cook County Department of Capital Planning 8 Policy69 W Washington, Floor 30Chicano, IL 60602
Work Order Number: 051462.00
Location: DOC -Cook County Jail Complex2850 S. Calli'crniaChicego, IL 60602
Portrolira Public SafetyContract iR 1555-14475-MC-SSE16
Contractor: Autumn Construction Services, Inc.
Work Order Title: DOC Restroom Exhaust Fan Replacements
If Revtaech 0 Date:
Your Work Order Proposal has been accepted for the above Work as follows;
Work Order Amount $420,349,26
Licensing Faster The Gordian Group(5.00% of Construction) $21,017.46
Total Amount
0IIWBE Parbdpstfon:
Funding Bourns(s)
Liquidated Damages:
$441,366.72
$169,849.26
Mo input
Uquidatsd Damages wig not apply
A notlos to proceed will be issued which will establish ths Work Order Stsit date snd the completion date.
The CCOCPP JOC Coordinator
sheila Atkins, Project Dirdctor
Cook County Department of
7.a mr9da Analyst
f(ec(fr
Date
~ichor
Date
~/'8 i(8
Eric Davis, Deputy Director
Cook County Deparlmsnt ofPlanning and Policy
a/A.Ann P. Kalayil, Bureau Chief
(Signature required for Projects Over $1 million)
~raisDate
Ei I earl g, ciCook County Department ofCapital Planning & Policy
DateApproved By:
d/Ivni 2olPShannon E.Andrews, CPOOffice of Chief Procurement Officer
Date
Notice of Propoeai Acceptance Page 1 of 1
2/26/2018
,Cook County
E IMnr c E Dspartmetlt of P)soning'E Policy
I~ ~ o Bg W Washington
Chicago, IL 60602
"'yltjj! mill)E)2:gttm EE(NL
l'!lj II I! I5tll5m'!! jmjj!!!jj'll m~l!3'!! m'W
I olo
Job Order Number t 051462.00
Job order Name: Doc Restroom,Exhaust Fan Replacements
Jeb Order Leeagont
Approved Proposal:
DOC - Cook County Jell Complex;Chicago, IL BOB02
6420,8f0.26
Contractor: Auluinn Construction Serylcesr lnc.
construction Duragn)lt, 10Weeks
ffotlee ef Proposal Aceeptsnee (NOPA)
Cook'County Board Appreve Documentation lf Appgcable
county Justiscngton)Estimate (Provided by PM)
Contractor Evaluation - Pro)set Development
ContractoVs Job Order Proposal Package (soo solos)
Detailed scope of work luith Project Durason (slgnod br controoui)ElDrawings (lf appllcabls)
IZ Project P)stere(s) Documengng Existing Conditions
IZ Detsged Consirucilon ocheduie (if Appgesbff)
Approved Pries Proposal Summery 4 Detail gsgnod by conboctot)
M/wBE subcontradtor Estimate, Disclosure of Retained Patties (glghod br convocbx)
Utilixatlon Plan (Slgnod by contractor)
For Each ISIWID/SSE Subcontractor Letter of Intent (glgnod by sobcontrouoryCurient2!Kl
Certification LetterIdentltlcsgon of Submontraetor/gub.Consugsnt Form(IBF Fore)
P -UPESignstorypormEBackup
g Non Piro'PrtcsdlRslmbursable Back Up gfApplicable)
g special Insurance (If ApPIicabls)
g ls'project within Bond capacity. YIN
P i
Reviewed by Gmdlan AM/SAM( ~~i .K~Mr
Porchooo order Poctisgo choo)cia Pogo lo(12)gslggts
o on aaaa
I I I''tie~isÃ
~~o~IP
$I!ensue
IEIP'EPARTMENT,QP,CAPITALPLANNING a Poucv
SHEILA V.ATLIINS
PROJECT EBRECTQlt
69 W. WASHINGTQNF SUITE 3000 e CHICAGO, ILuNQIS 60602,o 43121603.0312
DATE: February 27, 2(18
, TONI IIREcKwINKLE
PRESIDENT
'CoohCoootirBoord
Of Comminlansrs
iecHARb Pi,iioYNN
1st histrlct
TO;
FROM:
Shannon E, Andrews, CPOOffice of the Chief Procurement Office
Sheila V. Atkins, Project DirectDepartment of Capital Plannin,4tl Policy
DENN5 raER
2od Didrict
JERRY'jit/TL'ER
3rd Dlstri'ct.
DOC Restroom Exhaust Fan ReplacementsJOC Budget Justification -:V/ork Order 051462.00Contract lsIO. 1555-14475-MCL-SBE16
STANLEY MOORE
4th District
'EIIORAHISIMis
5th Dlarict
EDWARD M. MOODY
6th Dittrict
JESUS G, GARQA
7th Distiltt
LLBS 'ARROYO,! R.
8th District
PELTER N. SILVESTIE
Elh olsrtitt
BRIDGET 6AINER
10til Dictrict
JOHN P, DALEY
'11th District
This memorandum serves as justification for the approval of, JOC construction services for
the above project in 'the amount of 6420,349.26
The cost approval has been reviewed by the'ordiari Group, Department of Capital
planning 8 Pollcyt and program Management Team BTV/denly, After..several revisions,
ws find the pricing to be fair and reasonabie. The DCPP Business case has been included
in the proposal package.
This construction project is in response to a 'request from the Department of Corrections
and Department of Facilities Management which receives complaints of condensation not
being exhausted when hundreds. of dstainees'hower ln Divisions 4, 6 8 6 daily,
We respectfuliy request the expeditious processing of this project.
if, you have any questions regarding this project, contact me at (312)603-0336.
JOHN A FRITCHEY
12th District
IARRY SUFFREDIN
13th District
'GREGG GOSUN
"14th District
IIMOTHY O. SCHNBDER'1 tth District
JEFFREY R, TOBOLSa
16th Distiict
SEAN M. MORRISON
11th District
$ Fiscal Responsibility'$ innovative I.eadership ill Transparency st accountability Qi Improved services
'Cook CountyI,Department. of Banning 5 Policy
~ „'..',68W WashingtonChicago, lL 60662
.Jpb Order Numbed 051482r00
dob Order Name: DOC Restroom ExhaustFan Replacements
Contractor: Autumn Construction Servlcesr Inc.
Construoaon Start Date: 07/QS/2018
Constrqctfon Amount: '5420,349.28 Cgnatruction Cgmplstton Date: 08/20/2018
Contractor Evaluation - Project Procttrementl.
~~=".::,'tr':-.,'PR'a'ts','th'=.oqnggoistj 317
2 Rate ths quality of the Detailed scope of work ~1,.8>."..'~VItII'f)b>r,de'fIIII>~ctorg4)l~ tfjijtI,I,,IcpIriosat'ocnItIQ) j!:::;.;;..:tIj),IIIt,'"
4 Rate the quality of the first Price Proposal ~f 2
v;,,==;.8.- Rbte.the„tfgalitj//jIritetln/W443Iajil'Snt-Pdoce Pl@oasittt,=-.;: .." .:+1,.„„":.~2;:.'r
0~3=-'E~3-'6+3='5 X
.X'/srItlIY I'I'l~„
.5 '[g
8 Enter the number of Price Proposals submitted for this Project 7 1 points
.8 Yes or No,did the contractor submit the Fill Package ongmeg YES = 8 points
10 Rats the quality of the'contractor',5 cornmunlcatidn and Rssponsh/aness ~1 ~2 ~,[g ~g x
„11'ate::th'e,'::::Cd'nt/astOr'j„:;;::O)a)ill',:fierfcrm'afiCa ':dueling. th'e ';, Prbjeotc ':.:, ':.p'roc'ur'evntjsflt p(oqssd:+'~j'-l";.":.",':,:::ll'r;,.',:-'"!'"-;;„;",;:;:-'":.
'. ":~'::.-,:,:::..-"'.:.:::.''==..=-',~', .' —'s
Poora1, Average-2 io 4, 5 = Exosgsnt. Yes = 5 Points, No = 1 Point
1-3proposals e 5 points4 proposals e.,4 points5 propos ala = 3 points6 proposals = 2 pointsa 7 proposals-"1point
Comments: 'M~ ~»so<~>/A~vs-~ M 74' 3 toxsr -vasss ~~+/ ~ ?Cn-., ~ 4 A -~~Fi'.e,~~~~'~~s o'
O ter n" j'~V
Contractor Evelueaon - Pro/ecr Procurement
/Gonf/an lo snsursr on/y quasi/ons 3, 5, 85)
Peae1ofi
Cook Counly
'llg ~i s I Departmeht'of Planning 5 Policy~ . 69 W Wsshmgton
Chlcffgo, II, 80602
Cook County Dspafbnsnt of Capital Planning 8 Policy
yl/ork Order fdumbsr: 051482,00
tfob Order. Contract
Con'tractor: Autumn ConstreNon Services, inc..
Datm 28 February 2018
work order Titkr: DOC Restroom Exhaust'Fan Replacements
—~NSIIISIISff sem ms m em Sksf
Pfbieotseotxrsfatus: G Ptetlmtnstv Cl Rivbfsd Q Final
(xl/fut/201 7
' ~
—:Is I Is
pcllowlnc'ls lhe scapsaf work far'lhe above pro)sat ftumber. All rmtulrements necesss/7 ta accomplish the warn tasks sst forth below chait beconsidered psn of mls swipe ol work.
Supbly and Install exhaust fans for like kind. All exhaust fans shall have backdraft dampers. Supply and install curbadapters. Supply and install service switches pef code. DFM will replace breakem aa fieceasary All daft(tost fans rousthave bird scrsiens installed. Ensure weathertight deals to prevent water leaks into equipment and building fncluding fhe useof sealtits ale%ical connecfions and fasteners with rleoprene washers. Label all atfhaust fans udlh 2 pktques per unit (oneoft'.the. llnit and anothef't the panel) and pftfvlds updefed es-built drasdrrgs showing exhapst fep IILvout and eqglpmsntSoltadulee. COntradtOr Will PrOVide final Clesn uP. 13reanheok Snd COOke ardrihfibbrefefled mahtifacturera. Dlfaot drfVq unite
srs preferred if the correct sMe Is svsilable, Contractor virlll test and bfffancs all newly instafisd exhaust fans at the registerlevel. Divisitm IV28 exhaust fans to be replaced Division IV (gym)-11 exhaust fans tobe replaced Division V38 exhaust fansto be rsplacedDivision vl-'40'exhaust fans to be ceplaced
Bdef Scope ofwork1'eplace
restroom exhaust fans for Division Iv, v snd vl
Specific Submlttals Required:
Sketches and Drawinfta;
Materisf Submittals:
Scliedullng Requirements:
Pride Proposal Due fkbte
Esfimated ConstructiorrStart:
08/I 4/2017
07/09/1 8
Esfimated Construcfion Completion: 09/20/18
Special Conditions:
Special Instructions:
Comments:
Liquidated Damages w'fil not apply
sd Pro)ect Durj)(on: 10 Weeks
6/8 02/2812028Zhelta Atkins, Pmiect Dlrastor bats: Autumri canstruasan services, tno
'a be vicnss bf caresclar if Final ecape aft/lark
Detailed Scape Of tnmrk Pass 1 of 1
2/23/2010
Oulntln jtembert
From;'Sent:
TolCc:Subject:
Sheila Atkins (Capital Planning) .<[email protected]>,Monday, February'26, 20181:26PM
CIuintin Rembert
Tse, Jo'ey O CHICAGO
Re: Draft. Business Case- Division IV Toilet Exhaust Fan Replacement
QuintinAttac'h the emails with t'his information
Sent from my iPad
On Feb 26,'2018, et 10:40AM, Ctuintin Rembert <Q.Rembertgebordian.corn> wrote:
'Thank youJoey,'roms
Tse, Joey ICHfCAGO Imailto Joev.Tse@cb'rercomlSent: Monday, February 26, 2018 10'.39AM
To:Qulntin Rembert CG.Rernbeyti@eor>dian.corn»; Sheila V, Atkins isheila.atkinssacookcountvilraovj<sheila:atk jnsseceokcoIJRtvjl Jtfjlr>
Subject: FW: Draft Business Case - Division IV Toilet Exhaust Fan Replacement
Sheila and Ctulntin, FYI. The two manufacturers, Greenheck and Cooks, were requested by DFM.
Joey Tee, P.E.,PMP l Sr Project Manager
«image001.jpg>na 224-268-7113itgefgheerv.corn,
From: Jim O'hea {Facilities Management) Imalltotilm.o'.sheajecookcountvll.aovl
Sent: Fyiday, February 23, 2018 9:04PM
To:Tse, Joey <JtseiBYhi.ery.corn>
Subjecb Re: Draft Business Case - Division IV Toilet Exhaust Fan Replacement
Yes, Greenheck Exhaust fan also will meets the specifications cif replacement exhaust fans
Sent from my iPhone
On Feb 23, 2018, at 4:23 PM, Tse, Joey <Jtseheerv.corn> wrote:
Jim, thanks for the coriflrmation but Greenheck is still an approved alternative,righty We always want to provide 2 or more options when specifying equipment to
avoid siegle sourcing a manufacturer
Joey Tee, P.E.,PMP j Sr Projecl Manager
<image003.jpg>nu 224-268-?113itse8heelv:,axn
From: Jim O'hea (Fadlities Management) imallto:Iim.o.'iheatrocookcountvll.novi
Sent: Friday, February 23,2018 3;54 PMTo'Tse, Joey'<Jtsa@heelv'oom>Cc: Ctuintin Rember'( (Q.Rembert@aordia'n.corn) «O;[email protected]>; ShellsAtklrlg (Capital Planning) «Sheila.atktnkiSCOOkCOuntullraOV>
subject: Re: Draft Business case - Division Iv Toilet Eihaust Fan Replacement
Cooks Exhaust fans. There should be no issues with the Cooks eshaust fans meeting the
specifications of the exhaust fans on the mechanical drawings for each division
Sent frpmmy iPhone
Oh Feb 23,'2018, at 12 54', Tse, Joey<Jts'eaaheervcoin>wrote
Jim, before'we send in the Final Package tO Procurement, can youplease confirm that DFM would like to specify e)ther cooko prGreehheck eihaust fans for the Division IV, V and Vl project per ourmeet)ng back ln April of last year? Thanks.
Joey Taa, P,E., PMP ( Sr Project Manager
«imagdOOZ,,)pg>
in: 224-288 7'l(3itsefbhaerv corn
Fram: Tse, JOOy
Sent: Thursday, May 11,2012 4:46 PM
Tot Ctulntln Rernbert (O.Re mba rtNraordian:corn)<[email protected]>; 'Jim 0'5hea (Fabllities
Managerrient)'llnfimrs)gaga'iScobkcbuntvil.aov>;!
Mich'ael.C'itberrvaacookcountvil;:aov'Michael;Cirberrvgscookcountvtl:aov>
cc:Bilqlg Jaobbs.EL (Bllois Jagobs'Elrarcookcnuntvfl:aov) «Bllols.Jacobs'::.Elgscookcdu'n«tvit,iov>; Sheila V. Jjtkins (sht4ia.atkins@'co'ok«crougtvil.eo«v)
«sheila;atklns@c'o'okcbuntvll.aov>; 'oatrlck.nolan@cookcountv(l;aov':«oatrtbJLnolancodkrcountvll.aov>
Tlmothv,TvrreTfgaceokcouTIRikiov'Tlmothv.TvrreIIaicookcountvil.aov>
Frederick.Falksrcookcoruntvl(afov'Fre'[email protected],
'JOSenII",IuiarkelrNCOOkoauntVILeOV'Josanh.hr(ar(telgkcookcountvl).eov>;
R(chird L. Milliken
(rmgltkegghearv.corn) <rmillljre'@heerv.corn>; Kelly, John T.<Jbhn;-XeilirBstvtn'c;coin>
SubjectI'RE: Draft Business case - Division'IY Toilet Exhaust FanReplacement
For your use. Please see the attached signed and approved businesscases.
Joey Tae, P.E„PMP j Sr Project Manager
«image003 jpg>m. 224 268-71 ([email protected]
From: Tse, JoeySant: Thursday, May 11,2017 994AMTo: Quintin Rembert-(5 Rembertfsaord fan.cofn)'<O:Rember'trsaordfan.earn>; 'Jim O'hea (Facilities
Management)'ffrii;a'.shea{ScaakEountvff.dav>
Michael~Ca'rb'errr'[email protected]'Mfcha!ef!6rhe
rrv{seaakcaifntvff.aov>
Cc:.Bflqfs I!acobs-EL {BilafsJacobs-klIScookcauntvil.aav) <Bjlals!Jaeobs:-:
Elfbc6akcauritvll.ah&; Sheila V. Atkins {sheila.atkiris5bco'okcounbdl.i.a'v')
<shaga;atkins!scodkaountvll;aov>;%gstr'[email protected]'aitrfek;nolanwcookcauntvfl.aav>;".T)mothv.
Tvrre)lggeookcountvifmav'Tfmathv;TVJ!tel
ltgcaakeountvil.iov>iprederfck;FalklScbbk)fauntvll.ebv'Frede'tfkk;)I
a) kr'dscookc'auntvl l.eov>; 'J oakoh'.Merkeliscba)(gal'untvil.aov'Joseah;Merkef'gacaakcauntvll.aav>;
Rirhard L Migfken(rmilfike'iS heel'v;eaml <'imlllffkewheerv.i 6'rh>; Kelp, John T.<John.Keflvtsstvfnc:eam>
sub)ect: REhDraft Business Case - Division, Iv Toilet Exhaust Fan
Replacement'yeryane,
please see the updated FINAL draft of the Division IV BusinessCase which was modified to now include the 10exhaust, fans over theDivisiori IV gym roof. The 10exhaust fans was Initially intended to bereplaced durlrig the gym roof replacement but Dcpp dec{deil to includeIt into this praJect instead tif the re-roof project.
Jim, if you haven't provided the roof mechanical drawings for the gymroOf to.S. Mechanical, 'can you please pull the drawings for them7
.Quintin, thanks for communicating to S. Mechanical already,
Thanks alf,
Jaey Tsa, P.b., PMP j Sr Project Man'ager
<image004,)pg>rn: 224-288-7( (5;ifsfkfgha'afv.corn
From: Tse, JoeySent: Wednesday, May 03, 20179;27AMTo: Quintin Rdmbert (Q,Rembert{Saord fan.corn)<Q.gembertfsaardfan,c'o'm>; 'Jim 0'hea (Facilities
Management)'firn.6!sheai@baak'couhtv)f.kbv>;
'Michael.Carberrvgbcoakcountvfi.aov'Michael;Carbe'rrv(Scookcountvil.adv>
CC'Bifqls Jacbbs-EL {BIlafs.Jacobs-gfcaokcbuntvil'aov) <Bllblsdacobs-Blihc'ookcoa'ntvfl.aav>; Sheila V. Atkins (she{la:atkfrisascook5'auntvfLaov)
<[email protected]>;'aatrick.nolansaaookcauhtv'If.aov'agtrfek.nafanfScaakcauntv'il.aa~othv
Tvriiff@cbakcaunt'v1f.ad+<T{mrathv.Tvrreflocookcountvff!aov>
1Frederfck.Fafkgacddk'couritvff.adv'Frede'rick.palkfscaokcauntvlf.aev>;
'Jasebh"Ma'r'kefascaaffs'auntvil.aov'Josenh.MerkelfScookcountvll.aav>;
Richai'd L, Milliken
(rmifffke!Sheerv.corn) <im'Ill)keisheerv.ca'm>; Kelly, JOhn.T.<John.Ke llviSstvinc.co'm>
Subject: Rgi Draft Business Case- Division'IVToilet Exhaust Fan
Replacem ant
Everyone, here al'cthe Business Cases for all 3,exhaust fan projectsincluding the other Division V Toilet Exhaust Fan Replacenlerit" and"Division Vl Replace 46 Toilet Exhaust Fans" projects,
Jim and Mike C., can you please help WIth the fogowing71. Need to verify the EF couritS Per Division.
2, Need to identify which ducts have'been weather damaged sowe can have the contractor price out the replacement or toIntefnal(y line dueta.
3. Need to provide cont'ractor with mechanical drawings andequipmentachedules for thein to use andupdate at the end afthe project.
Quintin, can you please schedule the Joirit Scope Meeting with thecontractor arid Invite me and the DFM team7 And please ensure thatthe attached are not shared with the contractor(s) since they areinter'nal use documents,
Thanks a II.
Joey 7se, P.E„PMP ( Sr Pro}eel Manager
<imagg005.}pg>m:.224-268-7l13liseSheeiv.corn
From: Tse, JoeySent: Friday, April ZS, 2017 5:22 PM
To: Quintin Rembert (Et:Remb'eitssirordfan;crim)
<D.Rembertsseordian.carri>r; Jim 0'hea (Facilities Management}<iim.o'sbg'a'st'L'aakcduritvll.gsv>;
'Frederick.Fglk@carikeauwtvl(.eov'[email protected]>
Cc:qylichael.CarberrvgscaokcouhtviI>ov',
<M(C}iael.Carbs'rivgacbokcountvil.eryg>; Bllqis Jacobs-Ei. (Biliils Jacdbs'-'Elsg'caakcauritull.eav) <gllels jac'o'bs E1irscaa'kcauntvi(i'eav>„Sheila V.Atkins (shglla:atkins Jscedkbbuhtv'Il.eov)
<[email protected]>asfyick:nolanwcdakcaliritvII:eov'aatrick.nalari'Cdbn'akcauntvi(;eall>;
-'Tlnio'thv;Tvrrillaacoakc<aeritv1leav'TImathv.
[email protected]>;'Jasgah;Merkelltsco'okcountvil;eov'Jaseah.M'[email protected]>;
RIChard L, MIIIIIIen (rmllllkjrSS6er'erV.Cam) <rm(l}lkeriahaaiV.}IOm>; Kelly„John T, <John;Kellvstvlnc;corn>
Subject: Draft Busiriess Case - Division IV Toilet Exhaust Fan
Replacement
This is a first draft of the buslnpss case for the "Division Iv Toilet ExhaustFan Replacement" project which was walked with the users on4/25/2017. Please provide any comments, additions or modifications tome, Thanks for your assistance with the proofread.
l vlrill create the business cases for the Division Vend Division Vl exhaustfan projects after l receive comments on this.
Quintln, can'ou please select a contactor and set up a time for the jointscope meeting7
Thanks'alk
Joejf Tee, P.E., PMP j Sr Proje'cl Manager
«image006,jpg>nt,'24-288 7113jtsti8heeN:eem
,goTIcsiThls f'» il~nfonrmdifon fdrco'pylng, alterhl
prglgNedkl Xnplaastrnetlfy t y ycpiyie .S
h.nfas syihm and destroy anytrrthted copies. The idmaionicnlly ito'rgd dots In
dl am Jor fnfoimation purposes wily, No warranty eltler mprerhed'oilmpgad ls
htl rfbcuracy or.rallabglty of this'd'efa. He'ery makes every, efiorhtp ensure'our
c9plusty fom trdurthe enclose fgefr'nade roger iri 't
fk/jttifghssumasoc'r'espohslblllty fordaliihfftt causi dhy Ihstsllsfidq of this datetegtfyrySSHGCSdsktbtgy,)
fjluis) ark, vkils,:folsclatrner'yos
om jiiiall atlon and erly et thchments'f thit nfhstesuv} uiaincontsls coqgdeiitlalr th'u scile use of thai ptenrfiid reclplentli), sfIIyil'lhsugroilsad utgr aiscto'sufe, viewing,
lan„'alssdrhlnatlon ui distribution of, or rail anaca dhudg tn'esssijrrlpytrlctly'u have rec'chad this niessage ln error, or you are nolan auth orlted recipient,
he'senderfnuuedlatel b re I tothlsrnessa e,:delhtethlsinesmgaandail
«P67'Division iV Toilet Exhaust Fan Replacement - Approved Business
Case 05112017FINAi.pdf>
«p68 Division v Toilet Exhaust Fan Replacement -Approved BusinessCase 5-11-2017vpdf>
«P69 Division Vl Replace.46 Toilet Exhaust Fans -. Approved Business
Case 5-11-2017,pdb
'
fili'<$' HC0
WU*i f:".
C
kjDDTlc
D
O
i I1
OO
l.i— w m
jiiil ~pi
Il~
hI
~d,i(%II ~@',1'$V i
8
I'k
'jW,!~)
1.
Q '".g~Ãj
EOI
EO
I
O'
~ I
AVTil/HIMlacement
ttt he Hen
Nmbw Onh
r dtotfmftdi Mitbns~ Noted Itl Ptltmtk
4 Dte Inwmmlk tt Iahlhel tree Iht Ih fe Amer»
Invmwl/aew-Nbwmnsnettblnpp'/I we .AbwkFI c d NApt re
'Oi hetdhtP Itl b ftl~aqU/wl tlobdett ihwthwt.ttl vttF aIyepnuntF bwwnt»dtwd fe ludo
il IheCNltl tlonM eh/thos'i/Wrensii'eikeii'Ot I14 N Dltenoetl/Iet ewhhthsemtm Dhltd IMJHwr -4 elq fp e thd Itewf14 wtlwttlthenFJIAmmhwwvtedpo er/contfehTf Oat d WSh
ohm Uy/M I N24N IHd lett ~ Ha Ivw)m I».Dhwwnnntwwhtehttwm 04:Mfmrikk)HNFnw cmwfqtdleentetifeebedM 042 liiiidlffvff jonnwwdnlhwnid Peher/Dtntrett
m OheelblNIhmmwide Us/Mwwsm
spn/117 fm Mwbuvww/d seaaFir 4y ,*If II 211tH A tm 19 IronfoNq fls tlpelnttlNllewFknJNflawwedlvtoe/cteuett
opeawy dl I
SIIINfh NIIP/M I m 5addeiiisl fain)
M DSfomefnm/Rewetmoehe1i Dl Dmrerll4)heUFsw-cewtq Ipenfahllwf~ belw a New F nuhddt. Iwn w f themeN net»ewe h
Dhch NUp
w Ivht tldc4 plweP II 1st
w lbulmeinap/howbtlew m Ilcb melllnelei Ihel ceptptdfw
WD4 lt 5
0 dim.
04iri0IUY
M tlmID dnfl
19dmtl dmxad m
avw'4 of
:o4m
1tint
~ tfm
8 tetIdmwoflie v
I dm~ dtm
~ dtYI
IAt14 7
7dmIdm
3 dkn
I deYt
I IW
ld 1liam
IIdm4 Iey
2dm
Odm54 Y
I II 72
ll dm0 der
Mwa/i/14'eadtll'I
Men 7/1/NM oklabh \/Jd»hfwefifpttIne d34/N
-11 I/Io/IIkeel/m/14
. N I/14/IIlike 7/k/14.
tastier»bhn'fhffk
'oueTha/»"I/m/ia
'lh 7/19/Ut
Mthdtawyfedtslha II»/»d I/I/»ft»/I/NU Ifl/Hl
Uel/ttl/Ia.Ih tifmfmhm/Mfmnl I/I I/18
M Ilf»/N-thN W13/ISbh e/17/Ja
Mwa/17/HI
Tw I/!I/NTw ohm»eeocjla/lat»i/I/Jb
I/xlH W»fts.d S/JO/18
thmha/leU I/hfiam sjie/Ia
IAd la/N/»
itwt thbb fd Ne
Menafdl4 Mw»dhll,'tdm'4'/kfta .M Thiw
',ltttntjt/N kmefo/NMwv/JMN kmefff»mac/»/N Uwd»fxsd" Cjtkfui
Ie'/»Tie'ao
5/tafw Ih»5hlfelMon5/14l» INwfhl/litIN»7/P/HI M 4/M/IlIHH I/lllN hhet/ti/I ~Men thhb Me I/ddtOfd,efe/N IONI I/ehb
I qe I'/I'0/N MUYVWII
Meir/Jl/N awt/N/14Iblt7/dl/14 emdt/tl/IaTw7/MfN TJi thl/14Th I/2/ts ee'7llVNwml/xhl wbeo/JfteIeahtf» medsfmMwb/4/» mN/Ntfnbff/N ftllNIO
Ibul/14/14 mvs/MNW Ofllhl Tltu dil/Iahrijh/ie Twb/dhq
Tee/14/N telo/41/laMw8/NI'14 Ntgt/Nlkvafief» MwafwflaMht I/17/Nl It» t/N/»Twahll/N Mwl(le/l4
'wdlsj» MwbfefteTIU0/N/II IWI/ll/Ndaeva/I/It a»et»/IeIbul/I/14 Wdafddte
T 9/ill/» N II»14mvehO/N UUWihtWot sfHt/N Wax WiafxlU 4/N/ie
tavern/Is
U.shtha 'Mon twv»Menltt/I/Ht Mw»l/tn
Wtdxo/IWN Hee/NM4Uett»httfle WNIIO/lttfm
tb fwd
MM ddta4tn'jjf/tamfeop/Mptw'f/IdieMelt 4/lb/ M
ai 5~lidtwde/Jt/ItM I/4/»Mw Thtf!Itike tflfdi
;ff»l/l/24Itgb kfb/Nfw 'f/lkhS
ble Tf»f»tm th9f»milllhsIa sfl/Ntmah/Mh»/I'I/N'stint/5/24
kfefbffjikskua/tsf/is
IIII/lll»fO'I/»/N
lie If/N/N
,M nl/24/»7bu Sh3f»Mvltaht/N
Twe/Tll/UI
UHU/It/IsfffeejffefteMef'sji/isihu y/I/ItTve 9httf Jetbu
Ihl/14'uijto/il
tbv9/Jar ltt'rmn eO/ahl
wtd 14/ltd la
wmts/lwta,We/ktf»/»
M$ S4aythb»
I
555
f,tadm tdelv
»9lf IMF
Jipii»mid y
'Nti
1717»
NetlhvNil22M
N
IMIml I dey
IV3
%»N,IT.PSatm 29,th 17
I~S,w,i ah,l7U»b»,37
I»demeilritalmiN
IJI,T4,14
10313FF.3
MfF ~
lb 1l
'le
eadem»d rN17,»29,244427aa10
i12,1»1 td IIlNMNJCNWJI
24,2J
2934mdh44,NQI
tf,
Mfl tmx At
al,3IUIJS f i3lnl
amhwNateN Hxttdte Anvttlewehe
Imekftl
overal ptaiod Duration No» Madel condru dion/ ~ le Uae»Pmelmnl - Submit Dubfem nypwva b estimated el 2 w cela duetln
~ """""""ftncfpshinnd,s,e,stqymNFNopfntoment
I
Spfsffsat2
lmlhpfncvhslwnnci~Vw SI Inh
wswtm ppwwlnmfmmlhhlelF n,jsvswt~~m.'hmmla.~tshmi mdeoocmm4ilenmcnw/sppwm
wp~f ed owthwsmN 0 ewmw
'0lislet 0fv 0
Oiiwwnammm aha Shew odl welch I» -ctw leilpcocvlenhNnwt
eahcl linc f nsccwahmceemnt lnwlwi
W cctlplahwmmve
'p Ipamcamm
SfvNP llec'owen
te 0th
hdnacphtlslnm Fnc cj aa
hn s n F Awp,lh
Fenwdpchwn-Cltwlhfsm Iem ~
l Aefl Iewf
imp fr
ovems pw)em Dvlsson iltom flacl of constnlCjfoni ~ 16weelnpecmfmns- hcomtt Nwiew, Afpwvaheslfmsled st Pcmsfa dwsmn
tnwanwlc cfwcwc p
9neN mldpham
1
55li
R '$~~.——S %$—
1
hi% I heal Rtl8'I I%iN
5 I I 5 W'l5M I 5 I Is me+
,~Igloo~=,= ~45 .~ y~y~40
(iO
kJSIR~"—- „
g et 'ears~','~~W
lTI
5a'l
A0O
lb
=== ~Ji
Qo
0
IImmi lf
I
piM~, V' I K -"lWS %Sl-at h 8 5~89K
~gg
~O
I
S
l Rlhd-.%&5~.
a we
, ill
, hi.~
I
X,Ikt I:
Q"
si8."'Q~.
gll> iiL
/I I Wh
5
.M 17 CO
I I
0O
Ol
IK,
IV
I P
g I I
t ~
11
1K%ii'I Ill
Co
0'I I
tItt~ I,
I I . It
II P
~il
zr
IllOlOl
KlP
il I Q
Ii%f4:. ~PRIES 1%
Job Order ContractAPPROVED - Pr'lee Proposal Summsry - CSI
Oats.'ontractNumber.
sobOrderitumber.'ob
Order rider
Contracts'r:
Propoi'al Value:
Proposal Name:
Novemb'sr 29, 2017
[email protected] Restroom Exhaust Fan Replacements
Autuninconstruction Serv'ices, Inc.
$420;349.26ooc Rmrlraam Bihamt Fsn Replacements-ALL olvs weardisn Revs.fhsi-tr
01 ~ Gsfteftil Regulrbtasnts:
05 - Metals:
07 - Ther'orat And Moisture Protection:
23 ~ Heatjfitl, Ventilating, Aiid Air-conditioning'(HVAGJ;
28;alactttcat:
Proposal Total
This prapassi lalsl rsprsssnic the ccrtsct falsi far the prapmisl, Any discrspancfr bsbsssn line taisls,sab latals sad!he proposal tale! ls duels mucdinc af the sas tees la and sub icisls.
594,358,9155,372.04'$8,104,88
82S4,695.44
980; sor.ot
5420,348.28
The Percent of Npp on this Proposal: 0,00%
gcunty Project Dl'rector
~5@A ~Subhn Nelson,
!Is(frfoaIa
32/4/2037
Date
Price Proposal Summary - CSI Paus1af111/29/2c1 7
Job Order ContractAPPROVED- Price Proposal Detail - CSI
Date: November 29, 2017
Contract Number: 1555-14475-MC-SBE16
Job Order Number. 051462.00
Job order Title: DDO Restroom Exhaust Fan Replacements
Contractor: Autumn Cbnstruction Services, Inc.
ProPosal Value: $420,349.26
propossl Name: DOC Restroom Exhaust Fan Replacements- ALL DIVS w-Gordian Revs.8-31-17
Ad)ustment Factor(s) Used; 0.8589-Normal Working Hours
Rec» CSI Number
Iod - General Requirements
I 01 22 20 000010
Mod. UOM Description
Installation 8.50 x $8859 x D,8589
HR EledrlcisnFortasks not Induded in the Construction Task Catsloge snd ssdirected by owner only.
Quantity Unit Price Factor
Line Total
$810.28
Total
$610.26
Category1: Electr
2 01 22 20 00 0029
Category1; HVAC
User Note: Lost time. Dw4i 3 days x 1 electr x.5hrs/day = 1,5 hrs, Gyin: 2 days x 1 electr x.5 hrs/dsy = I hn D5 6days x I electr x Blvs/day= 3 hre, D6: 8 days x 1 electr x .5hr/day = 3 hrs (1 5+1+3+3= 8 5 hrs)
HR Sheet Metal Worker For tasks not Included In Ihs Construction Task Catalogsand as directed by owner only.
Quentin/ Unit Price Factor
Installation 36.00 $85 39 0.8589
$2,840.29
Total
$2,640.29
User Nots: Lost time: Div4i 8 days x 2 SM workers x.5 hrs/day = 6 hrs; Gym. 5 days x 2 SM wwkers x.5 hrs/dsy = 5hr; DB. 11 dsysx2SMworkersx.5hrs/day 11hrs; D6:12daysx2 SM worksrsx Bhr/day=12hrs(8+5+11+12 = 36 hrs)
3 01 22 20 000029 HR
Instststion
Sheet Metal Works rFor laslis not included in the Construction Task Catalogs
and as directed by owner only.
Quantity Unit Price Factor
1DB.DD $85.39 x 0.8589
$7,920.38
Total
$7,920.88
Category1/ HVAC
User Note: D4 Equipment Rigging: 3 sheet metalworks tor rigging sg new exhaustior picks to roof and removal of old
exhaust fans, ( 3 sheet metal workers x 8 hr/day x 4 5 days)
01 22 20 000029
Instelation 72.0D x $85.39 x 0.8589
HR Sheet Metal WorkerFor tasks nol included in the Construction Task CatalogS
and as directed by owner only
Quantity Unit Price Factor
$5,280.59
Total
$5,280.69
Category1: HVAC
5 01 22 20 000029
Category1/ HVAC
User Note. DB Rigging for fan Irha 3 sheet metalworks for rigging sg new exhaust for picks to roof and removal of old
exhaust fans (3 men x3 days x 8houm/day = 72hours)
I-IR Sheet Metal Worker For tasks not included in Ihe Construction Teak Catalogs
and ss directed by owrier onM
Quantity
$6,6D0.73
Unit Price Factor Total
$8539 x 0 8589 $6,600.73Installation 90.0D
User Note'D5 Rigging For 36 Fane: 3 sheet metal works for rigging as new exhaust lor picks lo roof and removal of old
exhaust fans. (3x 5 days x 8 hours = 90 hours)
Price Proposal Detail - CSI Page 1 of2211/29/2017
Price Proposal Detail -'06}Conlinueg..
Job Order Number: 051462.00Job Order Tide: t}00Restroom Exhaust Fsn Replacements
Linc Totalalod, 'UOtl DssoriptloiiRecs cal Number
]04 - General Requirements
0 01 22 20 000020
usey Nole
HR ghost tiistdl yycrkerporlasks n«it included In sw canstrucfion Task cahdagsi $2,640.29
and ss directed bv «wmer onhr,.
Quantity Unit Price Factor Total
Inotalellon 38.00 x elis«39 X 18539 $2,640.29
Gym Rig giny For 11 Fan; 3 sheet metal workers for rigging sg nsw sxbsudt fans to loof end removal sf oidexhaust fans, (emerl x 1.5days x 8 hmm = 36 hours}
Category1: HVAC
7 01 22 20 000031
Categorytf General
S Ot 22 20 000044
Calegory1; Geoeral
01 22 20 000044
Catsgory1: 'General
10 01 22 20 000044
usernon:
user note
User Hole
User Note
MR Steam/ Pipe Fitterpor tasks not included fn the Construction Taskuatstuge and
ss directed bv owner onlv.
ciuansty UhII piles Fmdor Total
Inatsgatlon l»50 x $84.'77 3 'O.S569 s $618.88
Lost Smn Div¹:3days x 1 PF x.5 hrsrday = 1 5 hrs; Gynx 2 'days 3 1 PF x,5 hrsrday = I hr; DS: 6 days X 1PF x,shrs/dsir= 8 hrs; D6: 6 days x 1 PFr x .5 hrrdsv = 3 brsqt 5+1+3+3= 8 5 hrs}
SSt8,80
Inveiog sting Engineer or spioiagy collsuganlFw specfpl Invessganrg $2.061 36
rsqulremonn or services outside rogriltrid amhitoctumt snd'oirglhewlng
envies a,Qurintity'nit Price Facter 7otsl
Installation 30.00 $80,00 o« 0.8559 $2,061.36
D4 Engtriser required fcr site invesligslmn for Ste purpose of preparing decuma un and drawings for pemtit
review. Indudei msetlrigs end drawing rerislons, 30 Hours
$2,811.06HR hwesligaong Engineer orspecialty ccnsuge'ntFor special invsstlgaany.
requirements or services outside required arlilech«mt and engineerinaerwca«»
Quantity unit Prus 7'actor Total
Instslatlhn «58.00 x 4lso.oo x ,'l»5559 $2,614,06
D5 Enyinsr requires for sos fnvestlgstion for ths purpose ofpreparing doourriants and «mwlngs for part«1 treview Includes meetings snd drawing revb}ons, 38 Moors
$2,01 CosHR Invessgasny Engtneer or spedaltyConsultanlFor specisllnv'estlgaong
re«porements cr services oulilde required archilschirsl snd onginesrfog
aeorlms.
Quanlily I!nil Prim Fuctw Total
InstaOation 68.00 $80.00 x o.esey $2,611.06
Ds Eriginser rsqulred fo rasp lnvssdgsson for the pptpass of prepadng doqulnenfs end drawings fpr psnplt
rsvlavv. Includes meetings end drawing revlsionn,38;Hours
Categoryt I General
11 01 22 20 000044
Category1: General——
User Note:
HR Invwligeting Engineer Qr speclaay consuganiFfs sporal irivsstlgaling
requirements or sewlws outside required smhlteclurel and eriylnssilng
soNbes.Qtlantlly Vhll Prfce Fb«ex
,Instagadon «.00 x $8GOS x 0,8588 =
Gym Engineer required for site invssf«Sation for the purpose of Flaps ring documonn and drawings for
permit review Indmles meetings end drawing revisions. 11 Homo
$755,83
Total
$765.83
Price Proposal natal - CSI Page 2 of 22«rfor2017
Pr(00 Prilposn( D)t(s)l'*GSI Cont(@ties
,Job Order lismberi D5(452,6)Job Order Title: DOC Restroom Enh aust Fsn Replacements
ROOS Csl Number
IOt - General Ri,ilnlrementi
Mod. /UOM Dsssrlptloit Cine Total
/2 01 22 -23 000ina
Usaf Note
$8,419,28DAY 4BTO 45 Ton Lift Hydniulc crane with Full-Time opefaiir
Qusntliy Un}tprioe Factof Total
InsmSation 4.00 $1„668.46 x 0.8569 $6.419.28Div OL ls Fans:. crane L'itis'one'si each corner'of ttuldlng snd (I) lri beriter of bfsdktg plus (1)'lnya for
,removal of ex/sling equlpnient and demo Inatsrlals 4 days
Catsgoiy1; 'Gederal
13 01 22 23 000618 DAY 40'fo45 Ton LiftHydraulfccrensvnth Full/pirl(e Ops'rater $9,826.92
Cstegory1: General
14 01 22 23 000618
goof Note
Quantity Unit Price Factm Total
Inontleson 6,00 x i$1;68846 x 0 $5SS $9,626,92
DIV 5 56 Fans: crena LNO (1)dey st each corner oi(1) days in center of buldlng+ (1)days for removal ofexliSng equipment and demo matsrisls. (4+1+1«8}
DAY SSTo 45 Ton Litt Hydraulic crabs ytnh Ful-Tlm'e Op'sratci
Category1: General
,$9,828.92
User Note
QusnSly Unit Price Famer Total
Ihptslollon 'S,QO x St,BSSAS x, (L3589 $9,628.92,
DIV 8 40 Fans: Crane Lifts one at sech bvilding comer and (1) in center of bulli) tng Fsts(1) to remove dimefsna and materials «8 deyk total,
15 01 22 23 000624 DAY 00 To 05 Ton Lift Hydmuliocrsne With Full TimaCporator SS,STS45
Catogoryt: General
Quantity iinl Price Factof Total
Instslstlon Sioo x $2,'261,0S x 0.8689 $5,671.45User Nolo; Gym,", R Fans crees Lifts 8 days plus one day Ibr remmel of exlaUng demo mstmlan end equipment. 4uger
crane required duo to tiighter access to gym roof
,fd,ol 22 23 000885
User. Note>
DAY 6-1/2 Ton capardty, 1srsed, 4 x 2 Flat Bell Tnfdcydth Ful-Time Tiuoftodiver
Queriiily Unit Price Faotm
Insmllalcn 8.00 6812.10 x 0.8589
Gyrh 'I I Exhaust sms stored/stepsd olfsits and brought to DQQ as requlmd for each doy'era rie }litpius
demo removal days «3 days total.
$2,092.69
Total
$2,092,59
Category1: Gsnerst
17 01 22 23 000386
Category1: Gsnorel
18 01 22 23 000868
Category1i General
Usernots
Ue'sr Note:
DAY .6-1/2 Tcn Dapaciiy, 18'ed, 4 x 2 Flat Bed Truck Nlh Full-Time Tmdf Driver $4,185.39
Quantsy Unl Price Factor Total
,)natal}alon s,oo x 8512,18 x S,SSSB = $4,156.3908 Eiihaust fans squlpmerit will be staged clfslto and brought to OOC is rbqulisd foi each day of 'crane sit
, plus domo remmial dsy e days total
DAY'-1i2 Ton Capacity„18', Bed, 4 x 2 Flat Bed Truck With FuS-Time Trudr Diver Sq,t 65.39
QuanUty I/nit Price Factm Tolol
Instalat}on 8.00 x $81B16 x 0;8589 = $4,185.39DB 38 Exhaust fane Stored/staged oifsse and brought to DDc as required for each day crane lift ptua demo
ramwat days 6 Iotal
Price Proposal Dstsl - CSI Page 3 /422'11/29/2017
arias (?()3POSSI DB>g - Dg) caggn 088
Job Order Number: 06(462.00dob Order 1)tier DGG Restroom bx)tsUSt Fsn Raplgagmant3
Reed CSI Number
10( - General Rag u(rainan'ta
'19 01 22 23 D00988
Mod, UDIS DeCCrlpttOh
DAY 81/2TcnCspxcity, 'IB'gml akg Flkt Sed Truakydlh Full Time TnickDdver
Llhe Total
I82,790.28
Quantity Unit Price Factor Total
i(isis)pilpn 4.00 x $1N2,18 x 0.8589 = $2,790.26
User Note: Dc Fall equipment wUI bs'faged od wle snd brought to DDC as required for sech dsy of crena lift, plus
demo removal days
Category1: General
20 01 31 83 000003 EA Minhriurn Labor Cost, 2 Prdcon Crew Size 82,285.55
Quantily Unit Price FColor'otal,In'slallatlog C,aa $859,52 x,a,858a = $2.266.86
Dew motet '04 3am)n x8 days x (0) 2 person crew 1s houla lotal. Ertuetec to(4) hdlf day (4 hour min) Isbaicharge
Category(r General
2f 01 31 33 000003 EA Mmimum Labor Cost, 2 Pemon Crew Size 32,285.85
Cstegory1: General
Qusnsiy urihprikm Fectlx Total
InctellsUcn '4.00 Seao.52 , 0,85da $2,266.86
'User Nohu DB'Sp lain's x 8 days x (2) 2 person crew = 18 houni total equafec to OI) 'hplf Say (4 hour) min c)iiirge.This lc for tool cheek-In and shack out, secular lect 8'nie wsgng Nr ecccrb.needed to unlock doors snd
aaow workers up m toot
22 01 31 33 000003 EA Minlmvm Labor'Cost, 2 Pemon Crew Size 32,285.85
Cstegorytr General
01 31 33 000903
Quh'ntlbr Unit Price Factor Total
InstaBaUOh 4,00 x 8858,52 x 68589 $2,266.86'ser
Note: D5 90 minutes x s days x (2)-2 person erma 18 hours toleL Equafea to (4) half day (4 hour min) charge.
This ic for tool check-in end check-out, decuiiiy lost time waidngfcrecccrts needed xr unlock doom and 1st
workers on reed.
EA Mlnimurri Labor coat 2 perimh crew sike $1,899.39
Qu'aaUly Unit Price Factor Total
InatsllaUon a.ao 8859.52 0,5568 $1.699.99User Natm Gym 30 Minutes x 9 days x {2)2 perwm crew = 12 hours irmd equates to (3) half days(4 hour min charge.
This ia for tool check In and checkvxrt ae'curiiy lost time warvam fcr esconc neerled lo urvock doors and
allow workers onto roof
Cslsgory1; General
24 017«3 oaaaay
Category1: Gansisl
26 0'I 71 13 CDDDP7
Cstegory1: General
0021 'E)r For >30 TO 80 NUlec Radius, Add
InstaUatlon
Quantity
1.00 x
Unh Price
813529 x 0.8589
,EA 40 To 50 Ton Lift Move On/ON Coal, Tnick Mounted Cranelnctudec delivmy and
pickutx
Quantity Unil Parce Factor
Inateoaiion 1.00 x. 8541,15 x. 0838a
Ussr Rute; D4 Crane will rmnaln on-Ciie in sebuiad area overnight
Total
$484.79
$(IB20
Total
$116:20
Price Proposal Dalai - CSI Page 4 of2211I29/2017
Prlgg Proppesl Detgl) ~ t)SI Cbnllnveg
Job Order Number; 051462))0Job order Tiger DOC ReitrOQm hxhsvst Fsn RBPlscsments
Reog CBI Number
lg1 - Genersg Regnlrements
25 01 71 13 000007
tiser Note
UOtll Descrlgtfon
EA 4QTo 50 Ton UR Move OnfOE Cost, TruckMmialed Cranelnclqdeaffebveiy and
plckllp.
Quantity Unit Prtoe Factor
lnatalls!ion 1.flo x 8841.15 x 9,5589
08 crane will remain on attain secured ares ovarnight
Lips'fatal
I$484.79
TWf
$464.79,
Categorytr General
27 01'7l 13 000007 0021'A For.>80 To'80 Miles Radius, Add :$118.20
Cgtagory1i General
InetsQrition
Quantily
IQQ x
Uriit Price
$185,29 x
Factor
0.8589 ~
Total
$116,20
'29 01 71 13 000007
User Note
EA 40 To 50 Ton Lift Move oniori cost, Truck Mounted crsnstncludss ifehvtuy and
pickup.
Qusngly Unit Price Farior
lnstellason I.OQ x $541.15 x 0,8589
Oyin Crena Crane will remain on site in secured arml ovemlght
,$484.79
Total
$464,79
Cst9goryl; General
20 01 71 13 000007
Installation
Quantity
I OO x
Ofr)1 EA For >30 To BQ Ivgles Radius.Add
Unit Priss
$135.29, 2 0,8589
$118.20
Total
$116.20Catsgoryt: 'General
30 01 71 13 000007
Ussr )lets
EA do To so Ton LIE Move OnfOtf cast, Truck blbunted Cranolhcludes dsgvery anti
pickup.
Qusntay Vnii Price Factor
Instatalion 1.00 x. $541.15 0.8589
Ds Crena will mmaln on-site in seemed area overnight
8484.7e
Total
$864,79
Category1f .General
Ql 71 13 000007 0021 'EA For >30 To 80 Miles Radius, Add $11.9:20
Citegory1: General
Installation
Qudtitlty
I OO x
Unit Price
$135,29
Factor
0.8589
Total
$116.20
32 01 74 18 000015
Categoryt: General
33 01 74'9 000015
Category1: General
User Note:
User Note
EA 20 cv Dumpster (3 Ton) "construction Debris'includes delivery of dumpster,
rental cost. ulck-co cost hauling, snd disposal fee. Nor>hszsnlous material.
Quengb, .Uhl Piles Fecbx
IhetaBagon 1.00 x $484.40 x 0,8588
04 1 Dumpster rarluired for Ihe removal of at packing niaterim
EA 20 cv Dumpster (3 Ton) "construction Debrisetncktdes delivery ofdmopsler,rental cost. pick-uo cost. hauling, snd disposal feo. Non-hazardous materiel,
Qgsntgy Unit 7'rice Factor
Instagatlon LOQ x '$45440 x 0.8589
Ds \ Dumpster pxtuhed for the removal rd a9 pacldng material
$398,87
Total
$398.87
$398.87
Tots)
$398.87
Price PropoeeIDelsl "CSI Page 5 of 2211/29/2017
P/I'oe Proposal tyetalf -'CS(,Gonktnues
dob Order Number: 051462.00dob Drdertw'er DOC Restroom EI(haust Fan Replaaements
Roofs Csi Nt/mlwr Mod. 'UOM Desaripeon'int/yowlIat - Generat,Requirements
, 01 74 19 000615 20 DY Dumpster (3 Tco340onstructlbn Debrki lndudes delivery of dumpsler,
remal cast, pick-up cos( hauling, snd disposal les. Non-hazardous mstedal,
Quantity tlnlt Puce Factor
Instadsdon 1.00 x. 8484,4o x S8589
'User Meter .D5 'I Dumpster rmwlrod frit the removal of Sd packing rrmierlsl.
3390.87
.Total
$398,87
Category1: General
35 Ot 74 19 000015
Category1: General
EA 20 DY Dumpster (3 TonTvconsuucdon Debris'htchwep delivery ofdwlwster,
rehlal cost, pick-up om( Iwuling, and dlslesel fse, Non-hmardous malwlal,
Qusnttty Und P/ice Footer
Inotsdadon .I.aa 846440 x,o.S569Ussr Note: Gym 1 Dumpster rsclulred for ths removal of ad packing materwl.
(otal
$398.6/
Subtotal foi 61 - General Retttttrements:
106 cggetats.
88 06 05 23 001184 EA 12-24 x 1-1/4", Hex washer Heed, Takes s self Drlldria Screw
Quantity Unit Price Facmr
Instsdaticn 57s.oo 82,82 'O.SBBS =veer Note; 05 35 Fans as screws per fan plus 8 swows per reef curb adhptsr 38x 16= 57sl
$91,369.91
Itl1,444.50
Total
$1c444.60
Cstegory1: HVAC
,87 06 05 23 001164
Category1: HVAC
98 95 05 23 001164
Category1: HVAC
User Nots:
EA 12-24 x 1-1/4",, Hex Washer Heed, '/ahse 5 Balf Drillng ghlow
Quantity Vrdt Price Fan(or
Instsdsdon 840,00 62.92 0,8589
06 46 fans x 6 swaws psr fsn plus 6 screws for reef curb sdsoters = 409 16 v 640
'EA 1224xx I//L",.HoxwashmueadtTskes58eltDrllliri9scl4w
Qdanlliy'r5t Price Factw
Inslsdatlon 396.00 .32 02 x 0,8589
Gym 11 Fans x24 sorsws per fan plus 12 screws per roof cob adapter (11x 38 =398}
$1,805 11
Total
$1,600.11
3993.18
7otal
$993.16
05 05 23 001166
Cstegory1: HVAC
40 05 05 23 001387
Category1: HVAC
41 05 05 '23 001387
Category1: HVAC
Prics ProposalDehd - CSI
EA 12-24 x 2", Hex washer Hrmd, Teksw 5.self Dr(Sing Screw
Qtisndg Unit Price ,Factor
Inst'adetlon one.aa 83.33 x 0.8558
Ussrnoto; D428fens'xBswewsperfenplusBeachfcrrcolcuradsptets 26x16=41S
EA 3/8" Inside Diameter, Zinc Plated Steel, Lov/Csrtmn Flat Washer
Quantity Unit Price Factor
Inptslldllon eda.ad $0,08 x 0,8589
User ltote: DS 40 fans x s wsshers psr fan plus 8 washers for roof curb adapters 40 x 18 840
EA s/8" Inside Diameter, Etna plated steeL Low Cwbon Flat Washer
Quantity Unit Price Fsclw
Instadatlon 398.00 x 80.08 0.8589
User Nots. Qym 11 Fans x 24 weshers per fan plus 12 washato per roof curb adapte/ (11 x 36 396)
Total
$43.96
Total
$27.21
327.21
Page 8 et 22.I I/29/2017
81.189,82
Tclal
$1,109.82
Pi}0'6'roposat Detail .cst contlnuss
Job 0!Eer,Nmnber; 051482.f}0Job Order'Tilts: DOC Restroom Exhaust Fan Replacements
Ress CSI Number
F05 - Metals
"42 Q5 05 ES 001387
Mod. 'UDM Description
EA SIB"inside Diameter, Bneplifed Steel, LowCmban Flat Washw
Llna Total
I039.58
Cstsgory1: HVAC
43 05 QS -23 001387
User Note
Quantig Unit Price Factor
Installation 578.OO, 803M x Q.SBM-0630 Fans x 0 washers psr fen plus 8 washem per roof curb adapter Bfl F10 578}
EA 3IB"Inside Diameler, zinc plated Bbiil, Low Carbon Flat washer
Total
.$39.ES
820.55
Caiegolyi: HYAc
Quanoiy vnfi Price Fee!or
InstaSalion 416.0Q x 80,09 X .0.85S9
User Non; 04 2S fans x 8 washers per fsn illus 0 each fcr mof curb adapters '20)i 10 418
Total
$28.58
Subtotal for 05 .Illletsls:
IDT - Thermal And IIBoisture Protection
44 07 92 13 00001S
Veer Note:
Catagoryl: HVAC
CI,F 1"x 1"Joint, SI9cona SealentAnd Caulking
Quantity Unit Price
Inafallatlon 1.60 x $1,107.55. xD420 fans x8 LF each = t58 LF
Fllclor
O.SSBB
$5,372.04
I01,403.99
Total
$1,483.99
46 07 92 13 000015
Cstegory1: HVAC
46 QT 92 13 800015
Quangty
Installation 0.88 xVsernotm Qym11fansxslfpsreach 88
Vnsprf
Btr107.55,x
CLF 1"x1"Joint, SI8cone Seslam And Caulklng
DLF 1"xl" Joint, sgiconesealantAnd caugdng
Factor .0.0589
'BS37,12
Total
$837,12
03,044.00
Qiiantsy
'lrnNBapon 8;20
UssrNotef D040fensxBLFParsach 020LF
Una Price
$},t07.55
Fscior
0,8880
Total
$3,044.08
Catsgoryt: HVAC
47 07 92 13 000015
cstoboiy1; HYAc
Quantify
InsteBaoon 2.08 xUssr Note: DS 30 ISns x 8 If per each'u EBS
Unit Price
81,107.55 x
,CLF 1"x 1"Joinl, Soicons Seannt And Csu)ung
Factor
Q.8589
02,739,67
Total
$2,739.87
48 2S 05 63 000040 EA 2" Diameter lrfentgicascn Tsg, arses
Cstegory1r 'HVAC
Quantity
Instsllaiion 52.00 x
Usertfote; 04Fan Tags26fansx2perfan=52
Vnlt Price Factor
08.19 fi 0.8589
Subtotal for 07 ~ Thermal And Moisture Protection:
l23 -Heatinm Ventgating, And Air-Ccnditioning }HVAC}
$8,104.88
I$3MTB
Total
$365.79
price proposslnetaS - csl Page 7 cf 221 02gi2017
piles proposal Cetbil .Cgi Continue'8
Job Qrder Humtwr: 051452.00dob Crdsr Tiger CCG Refitrooin Exhaust pnn Rgplnosments
RSCB Csl Number Mod, UDM
Dssorlpgaa'ategoryti
HVAC
Qusrifity
lqshltallpn 22.00 x
UserNote: Gymgperfsnxll fans ~ 22
Unit Price
8819 x
l23 - Heating, Vsntiiating, And Air.Conditioning 04VAC}
49 23 98 's3 00 0040 EA 2'iameter Identification Tsg, Brass
Factor
0.8589
l.lne Tidal
I$154.76
Total
$154.78
50 23 OS 53 00.0040 EA 2 Diameter Identificsfion Tsg, Bfasti $562.75
Cstegoryt; HVAC.
Quantity
Instafisfion 80.00 x
Ussr nots: DBFdn Taps 2 per Fan x40'fans 80
Unit PrlCO
$8.18 x
Factor
O.asss-Total
$582,75
51 23 05 53 000040 EA 2" Diameter Idenfirtcqyton Tsg, Brass $506.48
Guhntity
Instsfia5on 72.00 x
Usernolei 052perfanxsslans 72
Categoryl: Electrical
52 23 05 93 OOOD06 EA Balsndng Roof ExhaustFan
Unit Price
$8.18
Factor
0,8569
Total
$50S.48
85,798.57
Cetegory1: TAB
23 05 93 000006
Categoryl: TAB
64 23 D5 93 000906
Quantity Unit Price Fsctof
Instsfiation 26.00 S259.6S 0.8589
user Note: D4 1'est and Balance of28 fans to confirm the'cfm exhaust requirements
EA Bahnclng Root Bihaust Fan
Cu entity Unit Price Factor
hshllatlon 40.00 x $259ne 0.85S9
Ussr Mole: DS Test and'Sdancs of40 exhaust fans h confirm cfm exhaust as.par raquirsmsrih
'EA Balancing Root Exhaust Fan
Cuanfity Unit Prlc8 Factor
Instsfistlon 11,00 $259.88 0.8589
user Noh: Gym Test and bshncs at 11 fans to consrm ctrn exhaust requirements are mst
Total
$5i79S.57
$8;92O.SS
Total
$S,920.88
82,45S.24
Total
$2,453.24
Category1: 'TAB
55 23 05 83 00000tl
Category1; TAB
EA seisnclng poof, Exhaust ran
Cuantlg Unit Priss
Installation 38.OO x $259,86
User Note: D5 Test and balance of 36 fans to confirm cfm exhaust requhemsnts
Fsdor
0.8589
$8,028,"ts
Total
$8,028.79
68 23 OS 93 000018 $7,434.84
Categoryt: TAB
Balancing HYAp Duel systnn, ceilieg Haigm «12'upply, Return, Exhaust,
Reoisler Aild Dilfuser
Cuentgy Unit Prim Fachr Total
Instafiation SO.OO 81D8,2il x $7,434.84
User Note: D6 Test snd balance at ot register hvet ts) point locations on each exhaust system 2 x 40 = 80 to conrirm
.-CFM psr docllmalils
O.SSSS =
price proposal Detail - CSI Page 8 of 2211i29/2D17
Pr(ge Proposal Detail - CS) continued
Jab Onlsr Number: 052452.00Job Order TINs: DDG Restroom Exhaust Fan Rapiacerqents
Reog Csiaumhsr Mod. UOM DeeerlpSon Line 1'cital
l23 - Heggng, Ventilating, And Air-Conditioning (HVAC)
87 23 05 33 00 DOTS 'EA Balancing HYAc Duce System, ceifing Height>dy supply, Return, Extunnt,
Reghter And Diffueer
Qurint!ty i}hil Price, Fpptcr
Instelelion 62.00 x 8108,20 x,0.8539
User Note: D4 Test and balance at 2 locations on each exhaus't syctein to corifirm exhaus( CFM st register level ~
,2 = 52
Catsgcry1f TAB
84,832.62
'Tourt
84,83251,
58 23 05 93 000018
Category1f TAB
EA Betendng HVAC Duct System, Ceiling Hetghtnt2'Supply, Return, Exhaust,
Register And Ditfuser
QusnUty UriU Pries Factor
Installation 72.00 x .810820 x 0.85NI
llser Moist D5 Test and cannes st (2) locations on each ot (36}exhaust cyclem at at reglster hnnd
88;891.17
Total
36,691.17
59 23 05 93 000016
Cstegory1: TAB
Balsndng HVAC Duct Systnn ceillrrg Height 12'supply Return Exhsun 32,044.53
Reoister And Diffucer
Quantity Udlt Price Factor Total
InshglaUon 2300 x 810S,20 0.85SS ~ $2,044,53
Ucw Waar Gyni Test and ISdsnce ai'(2) Icmgons on each of (11)exhaust systems at reglshu terat to conffrm cfm (2 x11=22)
60 23 Oli 23 000092
Catsgory1: Electrical
61 j!3 09 23 000092
Category1f Electrical
82 23 09 23 000092
EA Insha And VVBe Exhaust Fen DDC Corilnristert cx slop and status,
Qgsnl(ty l)ritt Piles Factor
Instailagon 38,00 x 8435.31 x 0,8589
Demoligon 38.00 x 879.19 nx 0,8589
Ueernme DC Temp Cnnufpccnnnoucnc X "CB rene
EA lnclaU And IMre Exhaust Fari DDc ccnltol6twt or stop end:status.
Quantity
Inctsgetlon 11,00 x
Derllcgflmt 11.00 x
User Note: Gym Temp oxdrcl ccnnectione x11fane
Unit Price Feeler
3435,31 x 0.8589
37989 x 0.8689
EA Inslsl And trilte Exhaust Fan DDC Cpptlotatsrt orcpp and atelus.
Qua hgty Unl('Price Feast
Instsge5on 26.00 8435.31 x 0.8588
Demolitinn 26.00 x 370.ie x O.S588
Ueernote: D4 Temp ConlrclCcnnection per fan x 2e fans
Sisg06,s5
Total
913,459.9682,440,59
911,4eUrsi
Total
88,721.0881,768A2
84,580,94
Total
84r112.778748.18
Category1: Electrical
88 23 03 23 000092
category 1l Electrical
EA Instsl And irigre Exhaust Fsn DDC,'Cent'rdlStarl
Quantity Unff Price
Inslaffsltcn 40.00 x. 3435.31
Defrlolition 40,00 x 37s.is
User No(er DB Temp control corinecUon per fan x 40 lsnii
or stop and status.
Factor
0.85S9Q.SBSS
81 8870.16
Total
814;955.5132,720,65
Price Proposal Delnl - Csl Page.g cf 2211>29/2017
Prlt 5 Rr'0«oaal DstB)l -cgl cgtignns'8
Job Order Npmabe: 051462,00Job order Tfge: D()c RGStfqom Exhaust Fan RSP(scemant8
Recg cSI Number Mod. 'IIOIB Dsscrlpgoii
123 ~ Heat(nit, Ventilating, Arid Atr-Conditioning'(HVAC)
64 23 34 18 GQ 0224
Category1: HVAC
User Note
Factor
SF Hb/gad Mesh Screen FoyWsVPropeller Fans isx1" Frame(SF Ofpan
Opening)
Qu!nbty Unit Price
Instsllavon 2200 x N74.23 x 0.8589 =
Gyro 11fans x 2 sf each for'Bird migs/smesn tor fans
Lihe$ obd
I$t,402.84
Total
$1,402.54'5
'23 34 38 000224
Cstegoryt: HVAC
66 23 S4 18 000224
Cstsgory1: HVAC
87 23 34 18 000224
Category1/ HVAC
66 23 34 '23 000004
U!er Note
User Not«
User Note
User Nots:
SF Hinged lrlesh Screen ForMNV PropeVer Fansh'x I"Frame(SF Ofpdin
Opening)
Quantity .Unit Prfcs pact»
Instsllatlon i52.90 x ,874.23 x Q.8589
DIV 4 26 Fans x 2 ages for Bird cage/semen for Isn's
Hinged Mesh Screen For WOV Propeher Fans,4" x1"Frame (SF Of Fsn
Opening)
Quantity Unit Price Factor
InstallsUon «o,gg $74.23 v, 0.6589
Div s 40 fans x 2 sf per fans for Bird cagenlwssh for tshs
SF Hinged Mesh Semen For Wall Props ger Fiins, Vx 1"Frame (SF OfpanOpening)
Quengly Unit Prie Factor
Instetelion 72.00 x $74.2S x 0.8689
Dlv 5: 36 fer» x 2 sf/sa for Bird cage/screen for fane
EA iN HP, 863 CFbl At t/4 Siaiio Pressure, 1M »1TP Base, Direct Driye,
Afumlnum, centnfugal Roof ExhsusterThree simml motor.
Quenthy Unit PriceFsptor'ns(pilot(on
$84'4,84 x 0.8589
Demoligon 4,50 x $129.17 x 9,8589 =
D4 Renuirsd fora» toilets end showers: (E-8)
$3,315.32
Total
$3,315.32
35,100NS
Tolsl
$5,100,40,
84,690.44
Total
'$4,590.44
$2,314.94
Tofsl
$1,571;17$44$,'/8
Category1; HVAC
69 23 34 23 000004
Category 1: HVAC
70 23 34 23 000004
M06 EA For12" RoofCurb,Add
QOSOVty
lrlstallsgon 4.00
User Note: Curb adapter needed for new fan.
0512 EA Fer Bsckdrsh Damper, Adif
Unit Prbe
$132.24 x
Factor
0,8S89
Total
$454.32
$454.S2
$238.71
Cetegory1i HVAC
Inslelle Von
Qu!nVly
500 x
Unit Price
$88.90 x
Factor
0.8589
Total
$235.71,
71 23 34 23 000004 8520 EA FarDsmper Motor,Add $400.32
Categoryt; HVAC
Installation'uantity4.00 x
Unit Price
$118.52 x
Factor
'0.856tf"W"
Total
$40().32
Prics Proposal Deist - CSI Page'IG rtf22t'I/2S/2017
, Price Proposal Detail * Cgt Ozontlnit8e ..
Jobtbrder Number: 051462.00dob'Order Title: DOC Restroom Ekhauat pan Replacements
Recg Cii Number Mod. UCBI Desarlptlon kine Tote'I
l23 r Heating, Ventilating, And Air-Conditioning (HVAC)
72 23 34 '23 000004 EA 1/6 HP, 863 CFlu At 1/4 Static Pressure, 17"XZP Buss, Direct Dnve.
Aluminum, Centrifugal Roof Exhsustsr Three speed niotor.
Quantify unit price Factor
Inatslla8on 13rOO X 'gil44.64 x o,eeae
bemo8tion 13.00 x $128,17 x 0,8589
user Nots: D5 13 exhaust fans that require 800 cfpx $-2, E6)
$7,523,56
Total
$6,06$ .26.$1.44227
Category1f 14VAC
73 23 34 23 000004 8508
Ussr Note:
Catsgoryt; HVAC
74 23 34 23 000004 '0512
EA Far t2" Raof Curb, Add
Quantity
Instails5on 1300 x
curb adsptor rsquksd
EA For Backdrsfi Damper, Add
rung Price
8132.24 x
Faatfu
0.8589 ~
$1,476.55
Toaft
$1,476.55
$763.32
Categery1: HVAC
tnpt8ltaUon
Quantify
'13 00. x
unit Price
,$68'leo x
Facile
0;6689
75 '23 34 23 000004 di520i EA FarDamper Motor,Add
Instalstion
Qusntily
13.00 x
Uflll PflCO
$11L52
Fsclar
0.8589 =
$1,30uoh
Total
$1,304.03
Oetegory1: HVAC
ye 23 34 23 oo0004
Category1: HVAC
EA 1/8 HP,883, CFM At u4" staffc P/assure, 17"x17"Sass, Dlrect Drlye,
Aluminuin,'entrifugal Raof ExhaustsrThree speedmatar.
Qusntiiy Unit Price Factor
Installation 4,00 x $544.84 x 0,8589
Demolition 4.00 .x $129.17 x 0,6569 u
l3ym 4 exhaust fans that requlm qp to eoo cfm. JE 1, 6.3, E.5,6-9)
82,814.94
Ta'tal
$4 e71.17$443.78
77 23 34 B3 000004
Categoty1; HVAC
78 23 34 23 000004
0808 EA For 12" Roof Curb, Add
Quantity
Installation 4.00 3ussr Hater Cu/b.adaPIOI required
.0512 EA For Bsckdraft Damper. Add
Unit Price
$132.24 x
.$454.32
Total
$454.32
Insteie5on
Qusnaty
4.00
Unit Price Fsclof
O.S559 =.
Total
236.71
Category1; HVAC
76 23 84 23 000004
Cetegory1: HVAC
0620 EA For Damper Motar, Add
Quantify
Instsllatlan 4.00 x
Unit Price
$116.52 x
Factof
0,658e =
8400.32
Total
$400.32
Price Pfopossl Delsll - CBI Page 11 af221029/2017
Price tdybpr'vast Oe'te11 '2tltl Contlnuee..
Job Order Number: 051462.00dob Order Title: DOC Restroom ExhsuetFanReplacements
Reel 08I Number Mod. I/CM Desarlpboii
l23 - Heating, Ventilating, And Air Conditioning.{HVAC}
Line Yetai
80 23 34 23 000004
Cstegorytr 3IVAC
User Note
'EA 1/s HP, 853 DFM At I/4 Bsufc Pressure, 17"xTP Bsaa, Diract Drhnc
Abrminum, centrifuga Roof ExhsusterThree speml motor,
Quaritlty Unit Price Fastar
'lnaN(ladon 17.90 x '$544,84 x O.SS89
Demclllicn 17.00 x $129.17 x'.5569 sD617 sxbaustfans EF-1, 2, 3, 4, 5, 8,19,20, 21, 22 23„24,30,31, 32, 3337
$9,838.50
Total
$7,952,¹5SIANI8.08
8/ 23 34 23 000004
Cdte go ry1: HVAC
82 23 34 23 OOOD04
05Oe EA For 12'oof Curb. Add
Quenbs/
16SNII95bn 1BOO
User Note: curb ada ptor required
EA Fm'Backdrah Damp'srrAikl
I/nit Price
$132.24
Facto/
X 0.8589
$1,830.SS
Tetal
'$1,930.55
$1,006.03
Category1: HVAC
lpaleflaSon
Quantity
17700 x
Unit Price
Se8.'so X '0.8589
Total
91,005.03
83 23 34 23. 000004 EA For Damper Motor, Add $1,?01,34
Instataifcn
Quantity
17.DO x
Unit Price F/Icier
$116.52 x 0.8589 =Total
Bt,701.34
Cstegory1: tlVAC
84 23 34 23 00 0008
User Nolo
EA I/4 HP, 1,37» CFM At I/4" Stotlo Pressure, 19Akrmlnum, centrifugal Roof Exhaustsr
Quantity Unit Price
Insntstion 14.OO $818.11
Demolition 14.00 x $169.84
D4 5/thiiust fane required for the cells. (E-.3, Euf)
x 1$," Base, Direst Drive,
Fooler
o.65es0.6589,
$11,578,70
Total
99,537.45
$2,042:28
Cetegory1; HVAC
85 23 34 .23 000006
Category1; HVAC
88 23 34 23 000008
Calegory'1: HVAC
23 34 23 000008
Category1: HVAC
0518 EA For Backdraft DsnIPer. Add
Insta5sticn
,Quanaly
14.00
0520 EA For Damper Motor, Add
lnstallaacn
Qusnbhr
1400 x
9507 EA For 12" Roof Curb, Add
Qusniily
InstaOstion 14OO x
User Nore: roof curb adapter
Unit Price
$135.39
Unit P'rice
$74.89
Unit Prtce
$116.52 x
Factor'.8589
Factor
0.8589
Fsctm
D.85S9
$1,628.0t
Total
31,828.01
8900,52
Tatal
9900.52
$1,40'l.11
Tclel
91,401.11
Price Proposal deist - CSI Page 12 of 2211/29/2017
IPr($e Proposai Detaif. Cg( Cont(nues„
Job Order Number'659462.09Job Order Title: DOC Restroom Exhaust Fan Repiacernents
Rat((f CSl Number alod. UCM Descrlpf ion
l23 ~ Heating, Ventilbti'ng, And Air-Conditioning (HVAC)
Lthe Tpbtl
'58 23 34 23 000007 EA 1/sHF, 1905 DFMAt 1agslsScprsssure 22 x22" Bass, Direct Drive $5,200.Miuumtnum, centrifugal Roof Exhsustsr
Quantity Unit Price Faclof 7otal
InstasaSon S,oo x $1,023,64 x D.BSS9 $4,395.59DemOStion S;DO 6187.38 ir 0.8689 $804.70
Ussr lsots: DB 5 exhaust fans that rsqutrs sbors1,300 chn to 1,900'cfm. EF 7, 12, 13, 18, 25, Using Damper Motor 8lor Root Curb mbptsr missiiig an thls ilemln book
Category1: HVAC
89 23'34 23 DD0D07
Category1: HVAC
InslaSstlon
!Qushsty
5:Do x
"0520 EA Fcr Damper Motor, Add
fina Piles
3'f18.52 x
Fact'or
0.8589
$590.40
1'otal
$MDAD
90 23 34 23 000007
Cstegory1: HVAC
EA 1/3 HP, 'I 905 CFM At 1/495tatic Pressure, 22"x 22" Base, Dirsm Drhfe,
Aluminum, Centrifugelnoof Exhausmr
Quantity Unit Price Factor
Instssatlon 6.09 x $1,029.64 X 0.8589
Demolition 5,00 ',6'I87.38 O.SSSS
UserNotu Gym 5 exhaustmns'that require upto1800cfm (Eg Em, E 7!E4I,E14)
$5,2Q0.30
Total
$4.395.59SS04,70
91 23 34 23 000007
Category1; HVAC
Installation
Quantity
'5,00 x
'0520, EA For Damper Motor, Add
Unit Price
$115,52 x
Far'ssr
0,8569
$50040
Total
$50949'2
23 94 23 000008
Catego/yt: HVAC
EA 1/2HP 4072CFMAt1/4" SisscPressure,22'322'Ba e D!r J'Dd(Aluminum, cenlrifuifal Roof Exhauslsr
Quantity Unit Price Fsclcf
InstsSIMcn 11,00 x 6'l,l 3'7.90 x D.SSSB
Demolitlon 11!f)9 x 9(99.34 x O.SSSS-
Ussr Note; D5 For the scheduled sxhaustfans between 2000 and 3 Doorsm, (E 5, E 7, E s, E 9, E 10, E
11)'Otal310,760.77
$1,863.34
93 23 34, 23 0000DS
Categoryt: HVAC
tnetpllaDon
Usw Nohlt curb adptof liood
Quantity
11.00 x
9598 EA For 12" Roof Curb, Add
Unit Price
$140,IWI x
Factor
0,6539 ~
$1,328.75
Total
$1,828.78
94 23 34 23 000008 0514 EA 'For Bsckrlrsil Damper, Add Ssof,e4
Catsgory1.'VACInstallation
Quantity
11.00 x
Unit Price
$84.86 x 0 8589
Total
$801.94
95 23 S4 23 0000DB
Category1: HVAC
0520 EA For Damper Motor, Add
Quantity
Installation . "—. —-'11.00 x
Unit Price
$1 'I 6.52—'2
Factor..—.—0.8589 =
61,100,87
Total
$1!I00,87
Puce 1'mpossl Delail - CBI Page 13of 2211/29/2017
Fr)Oe.Pro(F'988) petal( -",Cgi Continues..
Job Drder Number: 051462 00Job order Tltlet ()QG Restroom Ekhsust Fen Rep(808tnents
RO48 CSI Number Mod, IIDM Deesriptlon
]23 ~ 'Heating„Ventilating, Anl)A(r-Coytd)t(ontng (HVAC)
96 23 34 gS 000008 EA U2 HP, 3,072 CFMAt U4" Static Pressure, 22'-x22" Base, Direct nmre,
Atuminurh, Cehtrlfuasl Roof Exhsuster
Quantity Unit Price Factor
lnelslls9on 9$00 x IMCIST.SO BI 9689
Dsmolillon 42M x $189.34 9 0,8689 ~
User Note: DS 4 exhausl fansEP28, 27, 28, 29
Line Tatal
$4,594.22
Total
93,909.379S84.86
Catagory1: HVAC
'li7 23 S4 23 000008 t(508, FA Far 12" Roof Curb, Add
User Nota
'Cstegorylr HVAC
98 23 34 23 000008 0514
Instssktien
FM Backdrafl Damper, Add
Quantsy Unit Prius
400 x '984.88 x
Quen0ly Vnll P(the
Inenll89on i4,00 x 8140.94
curb adaPlor.maulrerl for this'item (4) + (5) 23 S4 23 000007
Feolof
8,8588
Factor
0 6569
$4abls
Total
$483.18
$291.61
Total
$291.81
CategoryII HVAC
99 23 34 23 000008 0529
Inste0ahon
For Damper Motor, Add
Qusnfdy
4.00 x
Urllt Price
$1 'I 5.52 x
Pecan
0.8589
$400,32
Total
8400.32
Category'Il HVAC
100. 23 34 23
000010'nsta0ason
DemoliSon
Veer Note D4 (E-7)
Belt Drive,
Factor
0.95890.858S =
1/4HP, I 858CFMAIII4" StatloPressure, ls"x 19"BessAluminum, Centrifuoat Roof Exhauster
Quantity'nit Price
2.00 x sl,ol e.ts2,00 x $199.ee x
$2,042NI
Total
$1M750,66
9291.75
Cst8gotyt: HVAC
fof 23 34 23 000010
Cstegory1; HVAC
102 23 $4 23 000010
0507 EA
Insta6aaon
User Nom Curb adapter
051$ EA
Instasatlon
For 12" Roaf Curb, Add
Quaritity
2,00 xneeded
For Beckdraft Damper, Add
Quantity
MOO x
Unit Price
61352M x
Unit Price
$74.8S
Factor'.85SO
o
Factor"
0.8689
$232.57
Total
8232.57
$128.65
Total
gt 28,65
Catsgory1: HVAC
foy 23 34 -23 000010
Categoryl: HVAC
.OS26
Inslalatiori
For Damper Motor, Add
Qukhtlly
'2.00
Udlt Price
$118.52
Factor
0.8689
620Q'll 6
Tetsl
$200.16
Price Propoeat Drmd - Csl Pass 14 ot 22III29I2017
Rr'tee'Prepeteat. ttetdll -'Cgi Centihubs
Job Order Number: 051462.00Job ortler Tillet DOC Restroom Exhauat Fan Replacements
Re'ON CSI Number leod, UDM Deaerlptloir
l23 ~ Heagn'g. Ventiiiting, And Air-Conditioning (HVAC)
Ltab Tolai
104 23 84 23 000010
user note
EA 1/dHp, 1,556 QFMAt I/4 static pressure, tfpxra'Base/dunsnum, Centrlfuoel Roof Exhaueter
Quanaly UhN Price
InhldNSNon 11.00, $>hotg13,DrirhcNlloh 11.00 6159.84
D611 sxhauetfane EF-8, 0,10,"lf,14,15,16,17,34,35,38
Belt Drive
0,8563
o.essa e
$11,233.27
Tctal
89,828.84St 004.83
Categoryt: HVAC
105 23 34 23 000010
Categoryt; HVAC
105 23 34 23 000010
tt557 EA For 12"Roof Curb, Add
guanab
Inelatatlon 'f1,00 x
Ueernate: Curbedapternaeded
EA For Backdraft Dampei, Add
Unt Price
813S.39 0,8589 ~
$1,279.15
Total
$1.279,18
Catego/yt: HVAC
InelaNailun
Quhritib
'it 00
Unit Price
574 89 x
Fador
0.8589
Total
8707,55'D7
23 34 '23 000010
InetaNation
Quantity
11.00 x
EA For Damper Motor, Add
Unit Price
$116.62 x
Feeler
0.8589
$1,100.87
Total
81,100.87Categoryt: HVAC
108 23 84 23 000011
CatNpory1: HVAC
100 23 34 23 0000tl
User Note
EA I/3 HP, I 888 CFM At I/456taNc Preeeure, 22'522" Nisse
Aluminum, Cenlrifuael Root Exhaueter
Quantity Unit Pdice
Installation 12.00 x 31,111.46jr'emolition"l2 00 x $216.09 x
DS For exhaust fane (E-I, 8 a, EM)
EA For 12" Roof Cutb, Add
Belt Drive,
Factor
0.8588o.esaa
81'3,582,'la
Tctal
$11;455,60$2;227.20
$2,S57.51
User Note:
Quantity
Installation 22.00 xCurb adirptar ntmdod
Unit Price
$140.84 x
Factor
o.65sa
Total
82,857,51
Categcry1: HVAC
110 '23 34 23 00001'I 0514 EA For BaokdraR Damper, Add 31,503.8il
Categoryt: HVAC.
Installation
Quantity
22.00 .x
Unit Price
$34.aa x
Factor
0.8589
Total
81,803.88
111 23 34 23 000011
Category1: HVAC
Installation
Quantity
12.00 x
0520 EA For Damper Motor, Add
Unit Prtce
$1'I8,52 x
Factor
0.35sa
$1,20l}I95
Total'1,200.95
Price Proposal Dstat - CSI Paae 16 of 2211/29/2017
)tr)ce'fropoeai 00'tal) ~ 'C'6) Car)gauss
dob Order Number: 051462.00Job Drder Title: DOC Res)room Exhaust Fan Rspiacamsnts
Reog 081 Nomic Mmt. UDMDescript)on'23
- Heating, Ventilating, And Air-Cohditioning (HVAC)
Ltdd Total
ff2 23 34 '23 000012
Instsf lotion
Dbmuiltion
usernote: D4<E-5)
'1f2 HP, 2043 CFM At tf4 Static Pressure, BBx22Altimitium, Centrifugal Roof Exhsuster
Quhntfty Unit Prior
4.,00 x $1,80LIS x4;00 x '$25T,SS
Base, Belt Driue,
Faotci'
8589
0.8589 ~
$6,055.08
Total
$5,171,82$084.04
Cstegory1t 'HVAC
ff3 23 34 23 000012
Category1: HVAC
23 34 2S 0000'l2
User Nate
EA For 12" Roof Curb, Adit
qua ndty
lristaestfon 4.00 xCurd adaptor needed
EA For Backdrafl Danipei, Add
Unit Price
x
Peeler
"0.05S9 ~
$483,18
'Total
$483.'l8
$201.01
lnslalletlon
Qusntiiy
4.00
Unit Price
i$84,88,Factor
0,0500
Total
$201,61
Category1: HVAC
ff5 23 84 23 000012 EA Fra Damper Motor, Add 3400,32
Installation
Qusntily
4.00
Unri Pnce
$118.52 x
Factor
0.85&0
Total
$400.32
Cslagoryt: HVAC
11423 S4 23 000012
User Note
EA 1/2 HP, 2045 GFM At 1/4" SlelliIPwssure, 22" x 22
Aluminum, Csnligugel Roof Exhausler
Quantily Unit Pdcc
Installation 2.00 x 11,505.13 xDemolition 2,00 x $257.55 x
Gym 2 exhaust fans that require up to 2000 oim, (Eut, 5-13)
Baca, Belt Drive,
Factar
O.8580 =
0.8589 =
SS,02'7:03
Total
$2,585.51$44242
Category1; HVAC
117 23 34 23 000012 0508 EA
Instaffalion
For 12"Rccf Curb, Add
Quantity
2.00
Unit Price
et 40.64
Factor
0.85flg
$241.59
Total
.3241.50
Categoryt: HVAC
118 '28 34 23 000012 0514
Installahcn
For Backdrafl Damper, Add
QuanSty
2.00 x
Unk Price
$64.5e «
Factor
0,0580
$145,81
Tobn
3)45.8'I
Cstegory1; HVAC
ffP 23 34 23 000012
Category1: HVAC
0520'nstallation
For Damper Motor, Add
Qg emily
0.00 x
Unit Price
ili115.62 x
Factor
,o.cess =
$200.16
Total
$200.)6
Price Proposalne@l - CSI Page 10 of 2211I29l201r
Priss Progosal Detail .Cgi Cghtinues
Job Order Number: O61462.%Job Order Tiger DDC Restroom Exhaust Fan Replacements
IteBS CSI Number Mod, UCM Descdptlon
123 - Heating, Ventilating, And AimConditionlng (HVAC}
120 23 34 23 00'0014 EA 1 HP8 157CFM At1/4 alstio Pressure, 34"x64" BassCentrifuoal Roof Exhausler
Quantity Unit Prios
Instsfslloh 200 x '$2,532.08 x
DemoUtlon Boo $398,88
Ussr Nota: D4 Requited for the North/South Equipment room. IE-1, 5-2}
Belt Drive, Aluminum,
Fsctm
0.3589
0,8589
Line Total
$5,035,46
Tourt
$4,350.60$884.85
Category1: HVAC
121 23. 84 23 000014
Category1: HVAC
'l22 23 34 23 000014
Catsgory1: HVAC.
123 23 34 23 000014
ttB(8 EA For Backdratt Damper, A'dd
lnstnUaUon
Quantity
2.00 x
0520, EA For Damper Motor, Add
0510 EA For 12"Roof Curb, Add
Quantity
Installstlcn 2.00 x
Ussrnnts: Cu*adaptornssded
Unit Price
$177.39 x
Uns Price
$4 12.86
Factor
,0.8589
Feclw
0,8589
$304.72
'Toll/I
$304.72
$193.87
Total
5'l93.87
$200.to
Installation
Quantity
2.00 x
Unit Price
$116.52 x
Fllclof
0.8589
Total
$200.16
'Categotyt: HVAC
23 84 23 000014 EA 1 HP,.8,167 CFM Al 1/4" StaticCsnlrlfuOsl Roof Exhaustsr
Quantity
instafation 3.00x'emolition3.00
Ussr Nots. Des penthouse Fan s EFMI, 42, 43
Unit Price
32,632.68sse8,88
partor
0,8589
0,8539 u
Ptsssum, 34"x 34"sass/Beit,briye, Atumlnurit'I 'IP,663'i18
Total
[email protected]$1,027,28
Calegory1i 'VAC'125 23 34 2S OO O014 0510 EA
InstaBatibn
Ussr Hots/ curb adapter
For 12"Roof Cur'b, Add
Qusnuty
3.00 x
Unit Price
$177.39 x
Factor
0,8589
$467.03
Tctal
$457,08
Cstegory1: HVAC
128 23 34 23 000014
Catsgory1: HVAC
127 25 34 23 000014
Category1/ HVAC
0518 EA
InstaUstion
0620 EA
lnstiUation
For Backdrsll bsmpw, Add
Quantity
3.'00 x
For Damper''Motor, Add
Quantity
3.00 x
Unit r rice
$112.88
Unit Price
$118.52
9'actor
0,8589
$290,81
Total
$290.81
$300,24
Total
$300.24
gubtotal for 23-Heating, Ventilating, Arid At+Conditioning (HVAC}:
I28 -. Electrical
$264jg95 v(4
Price Proposal getmi - Csl Pabs17 of221 1/29/20 17
Prise Proposal (3Stall - CEI Contlnuae..
Job Drdar Number: 651462.00Job order Title: DO(: Restroom Exhaust Fan Raplaoomenfs
Reca ASI Number
126- Eteotricat
128 28 01 20 000002
Mod. LIAIS Descrlptte/i
EA Lma out/Tsg out Local.Dncorinsci
Line Total
$199.45
fnetsgsson
UserNote: CymFor11Fsns
Categotyt: Elsctrleal
Quantity
1'I„OO x
Unit Price
bkf.ft
Factor
o,esse ~
Total
$199/45
129 25 01 20 000002
Category 1: Etectrjoal
130 25 01 .20 000002
User Note
EA Lack Cut/Tsg out Locaf Disconnect
Quantity Unit Price
Inststsson 36,00 x $2t.t 1 xDB Ops per fan
EA Lsdt Out/I'sg Out Locrg Di'sconnect
Faclor
0.8589
$652.73
Total
$652.73
$725.26
Quantity
Instetstion 40.00 x
User Note; DB Ona per fen 40
Unit Price
$21 11 .x 0,5589 =Total
$725,26
csteporyf: Electrical
1st 28 01 20 000002 EA Lock Out/Teg Out Local Disconnect $471.42
Inslslegon
I/eer Nofe; D4 One per am
Qusnoty
26.OO
Unit Price
$2f.tt'Factor
0,8589 v'-
Total
71.42
'Cetegofy1: Efectrlcal
132 25 05 19 18 0284 tfLF «10AWG cable- Type THHN-THwN. Boo volt capper, slngfe sogd, placed In
Crmduit
QuanUIT Unit Price Famer
Installation 1.20 x $689.01 x 0.8589 sDsmolitlon 1.20 x ,$2es.72 o.sess
Ds Replace Copper wire from eervice swish fo fttfi (3 wlmax'IOLF/each $40 fans 1200 LFIUser Noter
Category1; Elaetrleal
133 28 05 19 160284 MLF ¹taAWG Cable- Type THHN-THWN, 500 Vog CopPer, Single Sogd, Paced In
CoodUII
Qusnuh Unit Price Famer
Instatetion 0,78 x $869 01 x 0,8569 u
Deinogson 0.78 x $295.'/2 0.8589
D4 Replace mpper wiring from service switch In fan (5 w fres x 10 LF/each ti 28 fans = 780 LF)User Note.
Categoryt: Electrical
5'98I',11
Total
$710.15$27696
$641.82
Total
$461.60$1BODI3
134 28 05 19 160264
Categoiy1r ElectricalUser Note:
MLF «10AWG Cable- Type THHN-THWN, 600 Volt Copper, Single Scsd,Placed In
Conduit
Quantity Unit'Pres Factor
Irietslleiion 1;08 x ssse.ot „o.esseDemdlltlon 1.08 x $258 72 x '0.8589
D5Replececopperwirefrom servlcesvachtofsn(3wiresx10LF/eechx36-"1080LF
$888,40
Total
$539.13$249,27
Price PmpoeelDetas - CSI Page1eof22I I/29/201 7
Prloe Pi6goeal Cetag - CEI Coggituee..
dob Order Number. '05'(462,00Job order Title: DOC Restrbom Exhaust Fan Rep)aoqments
Rect CBI Number
l26 - Electrlcat
135 26 05 19 180264
Categoryt: Eleotrlcal
Iuod. VOM Desorlptlori
User Note
Efo AwG cable - Type THHH THwN, 600 volt copper, Single aosd; Pursed In
Conduit
Quantity Unit Price factor
lnstogallon ,033 x BSBS.O1 x O,BSSB-Demogtlon 'II.33 x $268.?2 x 0,8569
Gym Replace wsing Irom service magen to fan (3 wires x 10LFAmch x 11 fans "-330LF
Ltno total
I8271M8
Totaf
$195,29378,17
136 28 05 '33 130720
Cstegory1/ Electrical
Usm'Nolo
EA 1/2" Eleotricsl Metasb Tubing {EMT) To Flexlma conduii Compriieslon Adapter
Quantity Urill Pried Faotei
Insm$ a0dn S,OD x I310,17 x,)L8589 ~
Demolition 6.00 $2.77 tt D.ssss
D4 (2 adapters per each fsn) x 3 = 6
Total
$52,41$14,27
137 26 05 33 130720
InstegaSon
Demoliilon
1/2 .Electrical Metallic Tubing (EMT) To Pie/dms Conduit Compression Adapter
Quantity L'Inlt Price Foehn
22,00 x ,6'"loni 7 x 0.'85S9
22.0D $2.77 0.85S9 =
$244.51
Tot/it
$192.17$52.34
User Note; D52 per fan x11 =22
Cstegoryl; Elecirlcsl
138 26 DS 83 13 0720
Categbry1/ Electrical
139 28 05 33 130720
Category1: Electrical
f40 28 05 33 132489
User Noio
User Mole
UsmNote;
EA 1/2 Electrical Motsgic Tubing (EMT) To Fledbls Conduit Cqmpresslon Adapter
Qiianlily .Unil piles Factor
Instaflelfon 2100 x 610,17 x 0,8589
Demollilon 25.00 $2.77 x o.sess =
D62 sdtlpieis pe/all 1 = 14 ' 28
EA '3/8" Flexible Btsel To Bemricsi Mslsglo Tubing (EMT) Coupling
Unit Prico pastor
$IKSB x '0.858it
$2.70 0,8589
Quantity
Instsgstion 52.0D xDemoliiion 52.DD
D6 2 qoupllngs per fan = 26 x 2 = 52
EA I/2" ElecMcal Metallic Tubing (EMT) To Flexible Conduit Compression Adapter
.Qubntlfy UnJt Ptlae ifactor
Instalation 22.00 x $10.17 x D.8589
Demolition 22.00 $2.7/ D,8659
Gym 2 per fan x 11= 22
$311.20
Todil,
$244.55
824461
Total
$192;17$52,34
$428,36
Total
$306.39$120.59
Cstegory1: Electrical
141 26 05 33 13 2489
Catogory1: Electrical
Instsgstion
Domolison
UserNote: D52perfanx25=50
BOOD xBDOD x
EA 8/8" Flumible gteol To Bscfriqsl
Quantity
Molslllc, Tubing (EMT).Coupling
Unit Price Factor
$8.86 0.5589
$2.70' 0,8569
.3410.55
Total
$294.60$115.95
Price ProposslDetsl - CBI Page 19sf 2211/29/2017
Price PrOposal De(all ~ CSI Cgstlnues,r
gob Order Number: 051462,00gob Order TINe: DOC Restroom E)(haust Fsn Rsplabsmsnt6
Race Cel Number iNCM Desarlptlon
l26 - Electiical
'142 28 DS 63 132489 EA 3$"Flexlhl s'Steel To Efadmcsl Metallic Tublne(EM 7) Coupling
Qusntlly Unit Price Fociw
Insteeation ila,.bc x Ssee x D,8559
Dii.molson 48 00 52.70 x .i0:8689
User Note 04 (2 couptngs per each fnn) x 23 48
Line Tobl
I3377,71
Total
8271.038106.88
Category1; Electrical
143,28 05 83 000167
Cstegory1: Electrical
144 28 05 83 000167
Cstegory1: Electrical
145 26 05 83 000187
category1; Electrical
f45 28 05 83 000187
Catdgory1l Electrical
147 26 05 83 DD.Dier
Category1r Electrical
EA 1 HPA'C Motor Thms Phase, 46D Volt MotoriEqolpment,'Connemion. Temgnstion
And Rctation Testing
QudnUly Unit Price Factor
Insteeaeon 1(.OU x 370,22 x 0.8589DemOUUon 11.00 x 83E81 x .D.aces .
umrsoim D5 Fen electr@el disconnection and reconneclion for 11 fans motors (3 Phase)
EA I HPAC Motor ThresPhass,sebyoltMotorisqulbm'ent, Connectio'n, TmminsUon
And Rotation Testing
Dluahgly'Ui)II Frbe Factor
Instsgatlon 2 DD 870.22 0.8589Demolition 2.00 33i.ei 0.6889
user Note: Gym Fan disconnscuon and re.connemion for 2 fan moiore (8 Phase)
EA 1 Hp AC Mopl'hree phase, 480 Veil MotoriEqulpment, conneotion, Termination
And Rolalforl Tastlna
Qushtgy Unit Price Fscltr
Instsgation 14.00 x 870.22 D.eeea-Demolilion 14.oe x 331.81 0,8589 =
usor Nato, 08 Fan disconneceon and rmconneceon for 14 motors 8 phase
EA 1 Hp Ac Motdr Three phase, 480 vail Motorlgqulpment,'Cbhnoctton, Termlnatlob
And Ratsuon Testing
.Quantity Unit Pace Factor
Instaltation 3.00 x 570.22 x 0,8589
Demolition 300 x 531,61 D.eeea =
User Note; .D4 Fsn electrical disconneotlon end re-cmnscgon for 3 motors (3 Phoae),
ifg Hp AC And Less single phase, 120 vali MoloriEqulpment, connecrion,Termination And Rotaaon Testing
Qusntiiy Unit Prics Factor
Instseatlon 26.60 348.82 x 0.8589
Denlogtlon 28,00 x 831.08 x o.csee
User Note: De Fan disconnecfion stltl nuccnnsceon for 28 niotors 1 phase
596208,
Total
5663;438298,86
3174.92
Tmbt
$120,62854,30
81,224.47
Total
.8344,37seeb.tb
IM82,39
Tctsl
F80.9488145
8\,556.50
Total
$1,065,763470.75
Price Propossluelall - CSI Pago 20 of 221 li29i2017
Pr(co Proposal DBC)II ~ csi continuas
Job Order Numben 051482,00Jo» Order Title: ()OG Rgslroom Exhaust Fan Replacements
Ress CSI Number
l28 - Elactncal
14S 28 05 85 000187
Category1r Electrical
149 28 05 83 000167
Categoiy1: Electrical
160 26 05 SS 000187
Cstegon/1; Electrical
181 28 28 18 000005
Mod.,'I/CM DescrlpSOn
EA 1/2 HPAC And Less Single Phase, 120 Volt Igotor/Eqdipmenl, ConnecUim,
Terrdhation And Rotalion Testing
Quentin Unit Price'actorInslirllatlon 2600 x $46,82 x O,8889
Demolition Qs.llg $21,08 x 0.8589
tlssr Non; D5 Fsn elechical disconnection nnd re connection far25 farfs niolors (I Phase)
EA 4/2 HP AC And Less Binole Fhase, 120 Voa Miitm/Equipment C nnection.
Tenhlriatlon And Rolalion Testing
Quantity Un$ Price Factor
Instafletlon 28.00 $48.82 '0:8589
Demolition 23.00 x 521.08 0.55SB
user Notm Ds Fan electrical disconnecgon'and re ixunsction for 23 molors (1 Phase)
FA I/2 Hp Ac Andi.ass single pham, 120 volt Motor/Equipmeni, collation,Termination And Roiason Testing
QusnSly Unh Price Factor
Instasstion 9.00 $48.62
Demolillon 9.00 x $21.08 x 0,8569. =
User Role; Gym Fan disccrinedlon snd renconnelslon foi' fan rnoiore(1 Phase)
0.6588
30 Amp, Fused Disconnect Switch, NEBIA 1, Heavy Duly, Whh Fuses, 240 Volt,
I Phase. 2 Pale
Queerly Unit Price Factor
lnstetatiorr 2 Qfi 5290.'IS 0,8689
Demolition 2.00 $64.30 0 8589
user Note: Dym Seivice switch/disconnect required for each fsn (3 pliase)
L'Ina'1'otsf
3'1,496.SB
Total
$1,043,99$452,84
$1,376.90
I'Otal
$980,4$
$418.43
$638.79
Total
$375.84$362.95
6843,30
Total
4498,49$144.81
Categoryt: Electrlcsl
1il2 26 28 16 OQQOQB EA
InstaUalion
Demolition
User Note:, 04 Service
30Amp, Fused Disconnect swhch, NEMA 1,Heavy Duly, with Fuswl, 240 volt,.1.Phase,QPols
Qusntiiy Umit Prir» Factor
22,00 $280.19 x 0.8589
22.00 x $84.80 x 0.8589
snnctvifisconnsct Required fcr Eacli pan (I phase)
$7,078.28
Total
$5;483.37$1,592.92
Category1i Electrical
153 28 28 16 000005
Category1: Electrical
EA
Instalation
Demo)IUon
User Note: DS Service
30 Amp, Fused Disconnect switch, NEMA I, Heavy Duiy, with Fusmu240 volt,1'Phase, 2 Pole
Quantity .Unit Pride Factor
26.00 x $290,19 x o,85se =
2600 x $84,30 x 0,6589
SwilcNdieconnect required for each fnn (1 phase)
$8,382.89
Total
$8,480.35$1,882,54
price proposal Detail - est Page 21 of'221 I/29/2017
Prfclf Proposal Detal( ~ CS( ContiEuenni
dob Order Ntunbe'r: 051462,00'ob
Prde)Titter ()OC Restroom Erthaus(Fan Rsp)600(nants
Nsolf Qln Number
l26 -'Elect'rlcal
154 26 26 ns 000005
Category1i Electrical
155 28 28 16 000030
Categoryt: Electrical
156 28 28 16 000030
.Category1: Electrical
167 26 23 16 000030
Catagory1c Elestrlsal
f((6 as ss ts oooosp
Mod,,(IDM Dsectlpgon
EA BBAmp, Fund Disconn xa Swsch, NEMA(, Heavy Duly, ihilth Fuss's 240 Volt,
1 Pince, 2 Pole
Quiintlty Unit Price Factor
Inshfotlon 25,00 x saec.la x O.SBSS
Demofson 25.00 884,30 x 0,8589 .=User Note: Ds Service mvitchldiscohnscl required for each fsn (I phase)
EA 30 iunp, Fused Dtsconnmd Switch, REMA 1, Heavy Duly, With Fuses, 600 Volt,
3 Phase
QUsnqty 'Mist Price Fselis
InUhglaUon 4.00 x $538.'l2 x,0.85NIDemolition 4.00 $148.24 x 0.6589
tiser Nots. D4 Service Sestchfdtsconnect Requimd for Each Fsn (3 Phmm)
30 Amp, Fined Disconnsclnvdlch, NEMA 1, Heavy Duty Wsh Fuses 800 Volt3 Phase
Quanlgy i)nit Pries Factor
Instasslion 9.00 x $538,12 x 0.6569
Demolition 9 00 x $148.24 x'.6568 =User Nailer Oym Service sirilclydisccnnect requireirfor ehch fsn (1 phase)
EA 30 Amp, Fhseil Qisconnsct 6wllch, NEMA 1, Heavy Duly, Wtlh Fuses, 890 Volt,
3 PhaseQua nUly Unit Price Factor
Instsllatiorl 11,00 x $538.12 0.6589
Demoiitioii 11.00 X. $14fL24 0.sess =
User Nchi D5 Service'switch/disconnect required for each fan (3 phase)
0.8569
EA 30Amp, Fused Disconnect Swltcli, NEMA 1,Hemy Duly, With Fuses, 600 Voa,3 Ph'sse
Quantity Unit Price Factor
InstslaUon 14.00 x $636.12 xDemolition 1400 x $146.24 0.8589
User Note: DB Selylce Swachfdlsoonnem required for each fan (3 phase)
bins 'rotsl
$8,041.24
Total
86,231.10$1,810A6
Toto)
$1,841,89$502.42
85,274.71
Tots(
34,144.2681.130.45
$6,446,87
Total
85,065.21$1@It,ss
fi8,205.17
Total
86446.63st,TSa.43
Category1: Eleetrlcal
Subtotal for 26- Electrical:
Proposal Total
860,907.01
.8420,349.26
This proposal total reprsseriQ the owrem total for lha proposal. Any diswepsncy between line hvlals,.sub.totals snd the proposal total is due to rounding of tits line totals and sub-totals.
Ths Percent of NPP on this Prnposat: 0.00%
Price Propossl Delsl - CSI Page 22 of 2211/29/2017
Work Order'Numbsn 051462.00
Work Order Title: DOG Restroom EEhaust Fsn Replacements
Job Order 'Contract
Cpntractor: Cook County'- Autum'n
ConstfucSln Ss'rvices,.inc,
Oats: Dscstnbsr 02, 201T
Following is the proposed list of miriority owned, womsrl owned snd non'-minority subcontractors and material suppliers proposed forths Ebovs work order. This 'estimate is submilted with oui final walk order prqpdsst in the amount sf $420,349,28,
Contractor
Action Msohsnicsl Furnish sfrd iiietss venlllstlon
mete rlele linrl labor for exhaustfe'n mpiscsments
Trade Totsl 6 ldIWISSS 6 %df Pioieet
5200,000.00
lutiumn Construcson Smvicex, Inc Macho nisei work sssocisted
with rsplscemsnkof exhaust
fons.
w 5100040.20 2100,040Ja 40.41%
Shsssn Electric apmpenr Electron l work for Exhaust Fen
Replacements
Trades sr 8'ubcontrectcn hh Materiel supplierIWWSPs - M: Mlnmlir; W.'omsnl N: Non MIWSE
N 550,500.00
$420,64fhss
50.00 0.00%
'6'tssJt4046 48.4'4%
Total MBE Subcontractor Participation ScheduledTotal MBE Supplier PerttoiPation Scheduled
Total WEE Subcontractoi'articipation ScheduledTotal WBE Supplier Paiticipation Scheduled
Total 8BE Subcont actor Participation Scheduled
Total SBE Supplier Participation Scheduled
sa.aa
$0.00
$169,849.26
$0.00
$0.00$0.00
0.00%
p ppcrt
~$0.00~0aport
40.4l% ~$189r849.26p,ppr4 ~ 40.41%
0.00% ~ $0.000 00'/ 0 00'/c
MBE Total
WBE Total
SBE Total
Total M1W/SBE Participation Scheduled
W5&vl HEAhw(contractor) project Msns9er
$166,840.26 40.41%
Eubcontrsctor end MWSSE Eslimsie Pace 1 of 1
12I2I2017
Cook County
I (}ffice o(P(annlng (L Poffcy6g W Washington
Chicage„(L 60602
!
(Sut)i(75'dhr Total: 4420,549.26
A. Dehnfunns and Died osure Renulremenls
Pe(e Qecemher 02/2017
I, Aa usodltcmfn, Ihe latm reonlractop means a pecos or enplywho has any mnlnfclleesavnth the capnlypl coofr.
Pure seto Ermmthe 0Ne gy-1 evwy shy contract'nrt firaae mud mmcom per(hi by e dsewswo slaiwneiu Provtena cwleln Informslfonond epwmch toewlsta,nccounfams, eonsvllants, subconlrsdore dud olhei parsons
The onhaeot It not required lo'disease employees tvho are palamlsly Urrough Ihe conlmddys regutsr psyros.
vl obbybcmewu any penon (a}who far csmpensatbq or on belied el any psrscrt ether than emssd umledaiss lo Inh ence any legislative or ad«Weltdlon action, or (b)arw pert er whcee dupes as sn em paces el another Indudes iwdwbAI w lo Inhuence any leghlsgre or sdmfnlstr'al'we eclhm.
e.~'Contrsclor hwotp corllgss ss to)own
This cbdmvrof eleles lo the ddowlnll Irsnsac ann
2 pretsdnaner 0514egco oocnosammphhaust pen Rephuemsnls
Nemo of cmtrdciw cola county. Adumn cmstmw tort so«foes, Ino.
EACH ANO EVERY adopt ay, hbbybt sccdbttanl cons tfnsnl, lneccnlreclor, or elhwperson Ialeliled'or mrgclpeled lobe roiabad by the Contractor whh respecl loor ln wnamaonwhh Ihe centred sr lame 0 titled tmfow
(suecbtv}chad Iwges if neceswuy).
Name
BUSINESS
ADDRESS
MSE
tee E
op Non
NonShilitbn Etecido Company ,0101 S.Sa(Umcld
cheetah IL, 80817Adinn Mechanics) 8042 t(tdhfmn courl
Dyer, 5, 40311 Non
Autumn Conslruqttm Services, Inc 440 Eisenhower Lone South tn/EE
,Lombare )L, 'Bci40
CNSCK HERB IF No SUCR PERSCNS HAVE BEEN RETAINED'CR ARE ANTICIPATUS'Io OE RBTAINEO N
Rslaaonehip
(attorney,lobbyist,subaOAtraplor,ete.)
subccdlrach)
INbconfractor
Subcontractor
FSE(lmacafo
whether paid
or estimated)
850,500,(O EeL
5200,0IEL(m Esl,
4. The ccnhador I/rtdsrslsnds anti egrww Ihd Ihtr cay msy rely enate Informnaon provided Ewe)tsnd lhsl providing onyfrdre Inomtplele ot~trtformnaonshel «msmtm dafatth under Ihscoelrsd ao4 may recuh In lemhwtlon of Ihe conlracl or tasse
5 Tits cohbachr undwslsndo sndoeeeslhat tr sny cese inwhae the cenlrador Isu'ncwail'ntvhslhero dfshlosure b reqiwedundsrthe Evr/cue««mr ths canlradwmust wswr ed Ihd dly whslhe/dlsdelure is mquirsd or maRe Ihe dfsclosuro
Under Ihs ponafllea of pwiury, 1 cirftify Ihsl I wn mnllofltp4 Io a«tents alla Dlschwure anbehap of Ihe Conlrsclw lttd alo Irltarmeaon chcletlfld herein fs true sndc«n plots, and thai no relevant
frlhmfh finn hnr been wRhheld,
XLAh/Y 12/04/2017
Signature
Susan Nelson
Meme (Type or Pdnl)
President
Tilts
Subscribed and sworn to before me
4th
arnot
Daccmbarao D
Np)IT/y pgb}ic Stpnslure
Died enure Slalemenl Poco I of I
I2/22201T
NIBBNIIBE UTILIZAEIGhi:PLIIII ~ PORIN 8
,BIBIIENIP%PIIBEBH5EFJW StyfIEBuhat u!I NIBEJIINENrtns iududedllrNdu Plsn ere certified BSEefWBEs 'by si leak sse ekthrr schlterr ysted 8 tbs eeuerafr!cuditiatta-Eschtn tB
Ir, 'ffihllkftfpiihlpftlrkff NIBEINSIE+ILTIJth gechfhfruhyoprlshr Itnef
QX Blddsrffricyrsrs h s cedlfted MBEor yyBBdttir. lif's'a, uhscb anny nf curreiy Lrsfnraf tr'Prtfflt hyttu'I
UBfddsdpacummla 8 Jairit hhnturs und aria ar inarit Juhrt tfsnfuip 'fedbsiu erur certified'Il7lufh or NBEs {fpaur aNch ~J of Letter(e)'cy@rhftcstiojr «crfff uf Jatnt'enhtte,ftftiaeruent creasy daccnbtnh fbh rute Nf thu SIBE'I%BE5rtdo sitd iS dmerdttlp itdsieB tu:the Jdic't,
vsnfnro sn4'Naunpfehrrf Jstit ventnrscaffrdsrltfMwilsbte uuttns ultttfns~tp'ikacrycucriiurfacrtitsaucri)
Blddedpfayaaet 8 uut'n nefftfled ht85er'Wlk Ituuc nttfat Jtynl tfdufltfhufLNI 4IB~Nttiffttrm. Nuyrrflf uftlimf MNE Sod WEE fbuu Slttmr
dimity a'r~ Laths Pufhnuotctrtdt1W fhfttfciet, 5fi'ah tyintyltdd ~lttdlutsrtiftdutfi~ dfluient-Fdrm'd f-
it', [gg Biredt PdttlrdpsBnri af hIBPJyyhESuidrh + tlndireat Pe~flit:oyhl88llfIBEPtihut
IINITE! Nyhtuh @tlfp buuhytftf hhffhf Nqhifrtlhff fitfotrkfr dlruhft flhrtfdlppftfdh~ gidttdflPfiffhtsfit'hufl fhcfui& ilttaurrrsfthtlfbnnttkhpfirhoffhdo huohhlsufrNfredt Ptrftt Itou st Ihe Itnru oy WdfPrrrpsssf,sobinlsdlon. (mdiridt"Psrkufpstton sttk,ttnhfhe uarrdfdtfitfd ttffrry4ILNIJ%fdt@teet Ptu44fpl@iN fiinrs liNN %fffhtidltyk. 0IIQ kehp Nrttthth tfhttfyfhhttfdftdn ftf Qohd Ptdtb Nerlh lo yhmdaN wilt Indlruet'.psrftufpsHonhs norfstryhrdrd.
NIBbAIBEu thdturfltyiffunn rfsdubcunfrrrdprslsuypttutor~rite Incht@ NPENllhtfd<g
INBNftrfkhpurh AIJtIJNlft CWBtyfftntlEIA 8oftfft &I,, lhC.
„@„„IJL4e BBNhyfha-er Lane 8oeh, l,tBNftbihr4, N. 49ie8
E „p,i., BIIBEIyt,yIBtiwi'@EO|IJmffelfyMCtiofI.Bim
Eenfactp,,d88LIBEIFI N~ii p„~800~4886IyalthyJtfuaunt psruuif'rulrpru $ 169,849.26
Pafientkmanntarf Pdittctptrtfdii'I 4+~
'Laker af I~NJJN Vea .":Curfrrrd Lsherakfbchdcekcn tr~hINWW55:Piner
Alhwrh
5wdf
curutfcritcutsurc
IM'SiJIrauunt Aatfdt'frrdburh
perunu0utrtuttftsyirurtlcipptfuui
aLeuunaf. Infetu utuiuhedy Tda Nn
fhlautlf~hbttteby"Caitiflpaftunahenherff pdd Sm
Agadff addiliieAhueleN deadek
FLstfer(sj ol'ohirithtrkhuhhnf Lulkrhuf Ceftif!ca&it ~iHU 'efstfbtrr'dhfdut thfryirrro nf IN,
art/thtBE:tttftiuhtiurt plerr - Fnrtrr y Revtnqtb'ttycgpJEtit.e
MBE/WBE LETTER OF INTENT ~ FORM 9
hf/WBE Flrnc Autumn construction services, inc.
Dentist pemon, Susan Nelson..
Address.'49 Eisenhower Ln South
Cergfylng Agency City of Chlca8o
Csrtgloagon Expl/allen Dates
Ethnlci[yl caucastsn
City/Statal 'Lombard IL Zffx 60148 Btd/Propcsat/Ccntnvgfq 1555-14475-hqC-SBE
'Pbuim 630-588r9585 Fmq '630-58S-9586 FEfN9; 36-4035882
Eqiall,'ussnineisonmautum'n'construction.corn
Pmlblpallom +XDlrect +indirect
ylgil Ihe M/W8E f/rmbs subconlracllng anfroylhe goods or aervtces of Ibis contract lo another ffrmV
+No Qx Yes-please allach sxplansgon, Proposerf Bubconlraolor(s: shaitan Eiectrlc'comPany, Action hqach»teal HvAG
The undemtgned hgwBE fs prepared to provide Ihe foliowlhg commodlges/Bsmtces for Ihe above named ProJecg coniract. (//
monepsmis»ssdsdls/s/t dawr/ss/du/SE Rash propossdsccpsofuu/ised/cr psymwgschqtb/e, sgsch arfdil/mrds/us/s)
lvlechanicsl worh associated with exhaust fan replacements
httgeats Ihe Dollar Amount, Psrcentane. em( lhe Terms of Pavment for ihs abovevfsacdhed Commcdlgea/Sewlcesi
, $169,849.26
THE UNDERsIGNED PARTIEB AGREE Ihat Ihb Lstlar of Intent will become a bfndfng Subcontract Agreemenl fcr Ihs abovevdiik, conditioned upon (I) Ihe Bidder/Proposer's receipt of a ntgsed ixintract fren Em County of Cordq (2) UndersignedSutomtractcr remaining compllhmt with alt mlevsnt credengals,''iiodes, ordinances snd statutes requlrud btf (hmlrectcr, GoqhCounty, and lhe State to pargclpats es a MBE/WBE ftrm (or lhvi above work, The Undersigned Parties do abo certify that theydid not aMx their signatures lo Ih fs document until elf erase under Dsuvfptfon of Service/ supply and Fee/Goat were completed,
)M6~Mgnatsra (hytygE) Signature (Prime Biddiowmposer)
Stisan Nelson Susan Nelson
Pdnt Name Print Name
Autumn Construction Services, Inc.
Firm Name
12/4/20t7
Date
Autumn'Construction Services, Inc.
Firm Name
12/4/2017
Date
Subwlbed and sworn before ma
(hb 4th day of December
Notmy Pubgc
I gg
Subscribed snd sworn before me
Ihls4th dayM December
Nohxy Pubgo
SEAL
m2 d: 1/29/14
DEPARTMENT QF PRCOUREMEÃv SRRYIGEs
ciTY OF c81(iauQ
Susan NelsonAuhimn Collstructlon Services, Inc,449 Eisenhower Lane SouthLombard,. IL 60146
Dear Susan Netsori':
We are pleased to Infbrm you that Autumn Conatl'uctlon Qfirvlces, lnc, has beenrecertified as.a Women.Owned iguslrtess Enterprise ("WBF') 'by the City of Chicago("Gftyv). This WBE certification is Valid until 11/1/2022; however your firm'8 certificationmust be revalidated annually. in.the past the city has provkfed you with an annual letter
confirming your certification; such letters will no longer be issued. As a consequence,we require you to be even mors diligent in filing your a'nnusl No-Change Affidavit 80days before your annual anniversa'ry bete.
It is now your responsibility to check the City's certification directory and verify yourceiOfication status, As a condibon of continued cerilficatton during the fare year periOd
atated above, you must file an anriual No-Change Affidavit. Your firm'8 annual No-
Change Afl'idavit is due by 11/1/2058, 11/1/2018, 11/1/2020, arid 11/1/2021, Pleaseremember, you have ah,.affirmative di/ty to file your N04hange Affidavit 80 days prior
to th'e date of expiration. Failure to file your annual No&hsnge Affidavit may result in
the suspension-or rescission of your certification,
Your firm's five year certification will expire on 11/1/2022, You have an affirmative duty
to file for recertificaticn 80 days prior to the dets of the five year anniversary date,Therefore, you must file for recertiflcaticin by 8/1/2022.
Itis important to note that you also have an ongoing affirmative duty to notify the City,of
any changes in ownership or control of your firm, or any other fact affecting your firm's
eligibility for certification within 10 days of such change. These changes 'may incl'ude
but are not limited to a change of address, chanOa of business structure, change in
ownership or ownership structure, change of busineiis operatioris, gross receiPte and or
personal net worth that exo'aed the program threshold. Failure to provide the City with
timely notice of such changes may result Jn the suspension or rescission of yourcertification, In addition, you may be liable for civil penalties under Chapter 1-22, "FalseClaims", of the Municipal Code of Chicago,
181'NORTH LASALLE STREET, ROOM 808, OHICAOO ILLINOIS 60608
Autumn Construction Services, Inc. f(0y- SNl) Page 2 of 2S>291
Please note —you shill be deemed to have had your certification lapse arid will beineligible to participate as a lfifBE if you fail to;
~ Pile your annual No-Change Affidavit within the required time period;Provide financial or other records requested pursuant to an audit within therequired time period;
~ Notify the City of any changes affecting your firm's certification within 10days of:such change; or.
~ Pile your recertlfication iMithin the required time period,
Please be reminded of your contractual obligation 'to:cooperate w'ith the City withrespect to any reviews, audits or investigation of its contracts and affir'mative actionprograms. WS strdngly encourage you to assist us in maintaining the integr(ty of ourprograms by reporting "instances or suspicions of frau'd or abuse to the City'i inspectorOeneral at chlcagolns'pectorgeneral.org, or 866-IQ-TIPLINE (866M84764}.
Be advised that à you or your%rm is found to be involved in certification„bidding and/orcontractual fraud or abuse, the City will pursue decertification and debarment. Inaddition, to any other penalty imposed by law,, any person who knowingly obtains, orknowingly assists anothsr in obtalnlhg a contract with the city'by falsely representingthe individual or entity, or the indiVidual or entity assisted is guilty o'f a misdemeanor,punishable'by incarceration in the county jail for a period not to exceed six months, or afine of not less than 55,000 and not more than $10,000 orboth,
Your firm's name will be listed in the City's Directory of Minority and Women-OwnedBusiness Enterprises in the specialty area(s) of:
Nk'BB Code(s)t236220 Construction Management, Commeroial and institutional Building238220 Mechanical Contractors541330 Engines/Ing Design Serv'lees541520 Environmental Consulting Services
Your firm's participation on City contracts will be credited only toward Women-OwnedBusiness Enterprise goals in your area(s) specialty. While your participation on Citycontracts is not limited to your area of specialty, credit toward goals will be given onlyfor work that ls self-performed and providing a comm6rcially useful I'unction that is donein the app/o'ved specialty category,
Thank you for your interest -in the City's Minority and Women~ned BusinessEnterprise (MBE/WBE) Program.
Sincerely,
RB/agt Officer
Contract ¹:1555-14475-MC-SBE16
Job Order ¹:051462.00
>sriit eabreamp eta anrtesssu rend subset err Idantibbab@s>fo'sbeeeb 84I RsCtuasbtbi proposstnaisf ttebtre5t tanTbpbts sscb'-'stibsenfrs@et,:-8qpptiesna4ebppttsrti@ef prbi hbtw 4Nbltypharrtteein Ibe ttbttaetton bf 80b~rs,e sn nbttststt I%pa
8sbtpr ttabtbrr8uppliw@ubbbbsuiteblpenb pspjbubilidglcn., The bbrittaetOIPIuatiPOblbtete'tubeIshee bepisrf err tbtr tterttrbbb, fn tbtrbMtht tbptth8aPPIIar+Pf Itrl@betlbttltbrttttr bbt iCtbntet¹brl'btt¹8
bbP4t ttsrLSsCttotc ttebttttt I . I ilfIs' rtlesses
fftttteebf'ttteNttref PitbettittttttttOtfteW Lsf b~e.'B~~]ftelhtt|teslttbst: of stibeett1@eterfttggtIItNN4@itttbtStstttb Pbftrl.
htlartttdrtar/plopossrrrlespetlgeIIT t. thb gttifrsbtnt I . I
BbpRRrtltpg IIio, 1555-14475-MCNBE16
Contbtbt TSet@ratlyern Etrttetwt Pbtt ttagbtahbSNbtt¹I %'bbPbbottttnntbbfbubpllb¹
Etonbaatet'gurnn Qorstttuytton ttbnr less, Irss pbttcwetrttentbi'tst pbttltbn cbtletttstttbtt ~,tfftstlesttei'uisbtabr,
iJrrrltbnr]aetttbarbLe for
b,r4on~ro . susan trtatsbn, ttubnnrtbasta~rart geselr 5bason:..bnbconsbitarb
atleehrbalacn@eubrlnnannabIIOgabearn ttbub~nta.ettarbatlaan.naI~NIICbnatrlNklitetrntE~]A¹ttraae,... 2
...'' 'Ega'iIAdeISWS
4tr Etbebhbslsrf siss4Istdb '@~a~Jt¹tbpJbanhesrer t4lrsp~yttb.gientrsdott,
, (tfupb'bti. b~btprp
~'TC~p~a~tp f.ebibant, 'lL 60446 4'6 Tb~cb1~p bbmbarg tt„(@feb
Cbbbtatas<,. —: " - Gibrtbbsbserst 4p
be~tea~~Ã ffM4864tbebiekb~eebbb 'lBUeb~tmbrh tmtt4wtbbbar ibbb-btb bbbtt
Ibemptstten:stat'ea Tbtt 458btettceit bbttae 'FbttCan'frantic', ..:Sabbnntrpotuk...
stbttr IJBo'n reTaast, asap¹nt'ett Irriteersrubsrinbaclhr attreanterbp Inttet ba lberrtdtg wtbb tIIUpQ„
Tatai ~pstrss nfttssstNttbn rrt'tbssstbaa,as Ihiaallsa ItnbsrsrtbaabesIr
Mssrsss u.larbabsa,
btsgbrstbat vrnrk as~ sitlb asbatrst Ibnreplaeenteittb Iptbb@49,bt
The rarbonn'tract rtrssansnts saili Incorporate sll Iprluisarneats rrt'tr'Iego5tNA wwN4 ts the cetibbntsr ae sppiicsttia,lbe aabanntrast wilt in nn wyg'Iltrst@ttss8uti&ntrablbti8uppttertttslebrrrtsbltebt tlbtb Itrelrttebttntt,ttsl erotic'sSsin pnv,
ether nonttsstalrt srhinh it ts btItteb e ttobnentre&irtttlrppl'ier/subP¹tteil~ ot ptteeIptf perttipetott 'tIjtb'~uas lil,hebtp aIItb the iprberalanrtlrtt that «Ie 4antnilbkr tb Irst urtder antr tttdibhbethbie Iettssed et. AINie. endObtftatbatiab one Ib IeSPOnatbie fa'I'the mbantbati'en, Partbrrnanatrs a'Oif ebb fly at'-fibttt 7htb fettrl jtbea ttbbaPPnabsIIt 5mpnetrbp eTIsngeai nnltstons osnsuttttsstions softer ao'atra'trpnstrbp ttbeFptfsg Wlkbtlon. ptsrta 4brpbbgNfi5rt tg tbe .~eps %IPPAksist tbMIINBEIttbllaebon Plan 'nIIPIT ba.'sirbtntttsa foal tier tbtbse tl tbstttbtbspt Qamptbsreis
W@mn CPnetritcstnn 8¹httettbr ine,
QabtrastorSuaen trt'diabn.
btms
$4kt g~kprime Crsttreebff 8~ Data
Vsrslsn t4
Contract ¹:1555-14475-MC-SBE16
Job Order ¹:051462.00
/ arsprr DMLY-:
ithoob Oyffflttr H djleeuellltrsrircjj
Of¹boNINI4hfdf'i'fddtffNiftbttf O@SSftdanttfbts8trfj tjpstjNjej¹ttfsshblfSttptfttsrt8tittotffbitttttlltbPsNrli
Tba Njfddbr>Pioh~fronNejtt fxlttN@33tfddfhg@lll Ndhfidjuiojate snd airecufe snd subn¹an; ldenbdcahonjef'trahtpf@dfNNINNBubcojthditaiNFafdjI IBP 3 utfb ssrjh.bid Rsqu~ Prupoeei,. arjjN ttebusei fordrisk i'lte sdjhb'ssI¹r i'nprskiw'iiipiete the Isp for esdb kberbdrsubjrdtripfrffs'r sp4ubcdijsdttsdf erNrfch
sbsffbsi'epff ptr4brssbnWiiiti- tntfdidirbjtt thbt tfdjrfj Srtr iiny efsrNINde tuftjhrjrNINNttlbli of Sufjebntraotprh,i8utfPlleis 4'tttibtjhhertttdljts„tbstfItithdbtcr IdljtjttNtisb shdfjtedfNIP.
Bggppftfpg. hh, 1555-14475-MC-SBE16 Oats' thdd NStk
bunt, $4N0rhrglNS @NjtbtetTi13bi'ExtjaejNPan fteplscsmeijttNfdtN200
subddljtrssterjtfbpppsljr'toahsetesdstsmnGonstrjlrtflsnlSsnribseiIN. Ifsbsprsjslbsd&ka ktdldnlhacbadfstd.,ifjL
added,sredhdlfshL',
ABedzsd'.Nbenteot Autb jrrtnrd C5ptaet ferSdhhrl Neiedn Sub conlnrowi@ufihjisrl INon Crabbed
Subd Iriauitarjh
d„'ueertrrefaonc¹utunrnrjdhsftucdondrarrEttfdf ftddidae .... Eirldll ftddfddS
44N Zthsnfujsrsr IJtnsdfbdl, ~~~~ 'WrNN H ifffhdfj Chbtb
. 1>
Nbtfb ntrshbiftj ~ 'L NS146 mburjntraaee ufsr 'S itt"
gÃh@ats snd ... - " '."Qitp, Stdtserjhf
TttTgbdtrfj arjd '> +> N~N Tblephows frief FSI(<fNN~ >:Patt estltjtieterb . " — - - ' - . f8ubsdntrdeisrti .%sprnitjisN ~d NhjNittfjtbtfpftfftefjdOrrspisfhju ttstsb "isfr tfpnhtletk h Prided veittfontradtddj: .....NBubebnhehtufb
tthjui raquaat; decoy Ofbhl ajdfbaj Subecidiaofcr jbpthjriterjte f Ijiht bh Nrbjrided tc the gQtrQ.
ttesejjtsfle» af'sdfetdes nr snsaffsw
fi jfftc arerir aesuefstsrt'ieldr exhaust fati fbpldcblrjhnts
The sebusnhajk dorxansnfe eil( Irisurtjtinrbl pll fifNGjlhfdtf fife dt'tbbt 'gjNSNINN drrsrdtwl'trr Nba 8antrector asspplicrdilb.Tbs setxajrI|itrht iaf f Irt ns freed ttlfjdhpcitur ffubsdnttsytdrfsupyNtffimjiffdsssulbird fisjir mstnjshjing Its |sidbrtsh trn snNalber ealffnfdthtrr stiddh'it bl tjltINfr d8ubcsitfitjetsrfsuPPNerfttusybtthtjthtbf qr'IfthNIINI sojlloudor. '4ilr dlestbsoie'srrbafe Wttb ttId tjljrtajidanditNt ttrlf tlat:Brjnfraijbjr ia'td~frdrffd¹
ther fdrdhritafjateee. reibnred Xjf Ibr dbiNNaa hindNNdidlsr, djjd IN itrspbfjsthie Njr tijrr srNanihatfeu, ~se, abd rfbtNNN bfwrib "fijhi Nsi'iN darer trot aNtsfojra''NjfOPrjeed a~r radiaiune sr reudfdedtierna fatter:rrardnjeti ~hd NINNPJNIINS tttNIaaddn Pbeu Arijr',fo tier tsrshwata approsjsf NNBEfjrIIBEItl8fiae¹n Ptsp ~ bN autshithrd Ns tbs %pea tff Ors
Cjtrdrset ttonipdarrus.
ktrtuajh fNShstftrNNsn Sssdsss, Ibrh
Colt~rsusari bfeiadfl
ffjrrrib
)QiW't 'INIBjfftNPIPJ
Pdrnjs 05ntrhhhff giffftbtlitb tfate
Contract ¹;1555-14475-MC-SBE16
Job Order ¹:054162 00
tttbrr'StttILY
fPdPtf Etj8t'iftttr
Ofri~t8I8fttt8tbisf Prottttfbittsr <8ttrwsf'41~"'"'~"'ftbjftftffff@lb>
Of&tbftftttrltttbSNtttty'lttt¹/ItttttbflItttittttSftt Portrf'be
Nldarlprepoasdttsapljvdent gths fbjntre~ jjcrll8nlltrnomplals and sjjeeuis sncfsubrn8 arj tctarjfifinsffcar cd8utsjnntiaotor¹tjplbsrErjflconsulteritFcjrm ("IBF")with senti Bicf.Itsjtuestftjr pihtlosdl,.and Rcsfndst rojQusltnojtt'ion. 'fere'fbrntrantof stat'nntsplete the tsp fs¹saoAubssijlfrsdtor„sljjpptissdpsubetipeiltsttfwhidbStfdil be tfdatt jtb tcbd@intbbdt. III the Sjijtot that there'Sra Sntr Orjdij8ee tn 8je uhlfpeflnn atSubdnrjttddtnjnjNupplisls ttt Ijtjtboonautbjntd, tbtj ftfjfjflnoter lntist fits anupjtsfbj8 lftP.
ttjdgpprtfpft go —-1555=14475-Mc-sBE16
I Elle,,os prtrdrrss¹jineunt,""8480>ssbs8' s "sahtfitib~nr Ejlhsudb&0 If¹PIBNrntsnt twjnftf2 ds
'Subeentlrtetrr¹Srjppfjefl'CdntrttsfSMutjildn
Cdn¹trdpfjbn SerVieeb tfjpj 'Subtjnnnunant ta bn 4lWribn Etjtrsiltj ~i,,
Atitnprlsad.frbrttaf8Autncriisnd cijinfjtef fer'
Stj88ij Nelabjj Aubdnntrcr~pljekjjjjjijrajn fbtttenketjfjontjuifent
tones rjdfdress ....En'isll fjjjtpr'SSSSgeeruntti¹cn@euturnnnenatiunf inn.jjjnn' 'urbtientntdnti),4%fdfNISIjnttnnresln
~8448 Rbjsjjittnwsr Lans 8Irrdtb ~,~ ft'f'4 tt, fjtsfdfjfprs
tfdjnfrbotorg @ubabiltraolasb
cits, Stdte dhciZln tCOntracieri;~88- ":"ld fsubrocnt
g Err Stbftj end Iftp,,
0 'brit SKQ4888jbjttrd tOQ 888 tht88 fbujndnn~, SVIb%1-StfjfiPVe8»'rÃ-@bb
Esgrnetditgtalbsnd %fltlNftt¹tl Stdtt csjd 78>b8on':tnsfjsj. Wlhbidtjdn nfatet,ffto Njotenr . Ibdbocrr'lditirdttb
Slitter: Uptjnrddrjssb¹j odyy of all trrf8Ptt tjfjbtjbntjilufq'r'spserflenty inuanhs pFqyttbd tq'inn jftgP().
ftaaertatlon.nt tterstlaesor Suaetfactfjntel ipjtosef
ttdhsenirsatso¹Serefsdd sjr Siiosllas
Efse8tssl Urddl slilprss'ftjttijjjitb bidjsnsntep Isplagerndjjfs 85fl„nttftta
fhe srltjosntI sst rfonpmSrntjj tftil tiicl) II lnlf5 elj wujrtddetlsr nf ftts ggntnjrsfdurardbd fs tija fferitrsotof sa'apptiostlle.'fhe sutinhntrdjtt jjjtttrin ns trtjtI Ijtljffenrtf'isttjtijibd'bt8tittotfsttbbllsfijfbssjnsu8ndt flora rnairjtaintlrjt 8¹pjnntjsas en
intr'ft
jet odrifrjtat Sir slititjtt It fa 41ttsrr s sutjotrritesisrrbrrpptlsrjLbsfjnsb4nt st piftfdfttsi NNNlotbrj "Ifffs dbsioaurs tsms4s yi8h tljs nnkegtsndftrg 8~at~ bsntlaq@r Is, ~4t Uhgli srjy dlt4M5wbln„s rioted nf™Itssb8Nes NndObfjltdtloner Snd tp IINPSnalbfa 'fer ttjd drganfd5ficrn„PSjfeim anno Sttjt huiilltp OPffdfit Yfitbftjmt CIOBB SOSSPprejre
yrnpsned Obanttee, reofatejjja an rnddifinetinne far Stre rc'pdr'rbjspb Spyfiitnrtd Sjltb@llltE tttphrnttnrn Pbnjn distrshanties jar ths'dstrtasuplc epprewstt tjtEtESI8tt~fjn f'Isll ntfnrb be bsttrrsttsp to ttjs QTffos tts fhsCcjntrjtnt ftctinpttssss;
enUtuinn,jjjtfitbtfttntton nfjftctt¹j, lh¹r
Confsrctof'iibbb
f4elsoejj
Pthsigdnt,
'II'~> <2lli¹rerIV
Pj)ilia jedhfj'Sdhtf ignsfvre tbde
Vent¹n fS
Intial Reviewer: Final Reviewer: RFP / CONTRACT REVIEW LOG
Contract ¹I 1555-14475-MC SBE16 Project Description: 2016 JOC PROGRAM
Requisition ¹: 10000042457
Vendor Name: AUTUMN CONSTRUCTION SERVICESINC.
Department: ]CAPITAL PLANNING AND POLICY [Department Contact: ISEAMEAH LLOYD
Contract Phone:I Contract Email:
ISEAMEALLLLOYDtaCOOKCOVIEIYIL.GOV
Date Req. Rec'd: ~03/13/18Date to Buyer:
~
03/13/18Date to User for Review:Date Singed-off Rec'd:Advertisement Date:
Bid Opening:Pre-Bid Meeting:Recommendation Letter Rec'd:Compliance Letter Rec'd:
Board Approval: YesBoard Meeting:Item Number:Fact Sheet for CPO:
No
Contract Term:Contract Amount: $
~Renewal Options: Yes No ¹ Years
Date Intials Notes
03/13/18
s /i~'/~
CI ASSIGNED AND GAVE TO LILLIAN
Date Intials Notes
Carolynn Jones (Procurement)
From:Sent:To:CC:
Subject:
James Fitzpatrick (Procurement)
Monday, March 12, 2018 4:52 PM
Carolynn Jones (Procurement); Jacqueline Taylor (Procurement)Alesia Hawkins (Procurement); Cho Ng (Procurement); Danuta Rusin (Procurement);
Lillian Lee (Procurement); Barbie Flock (Procurement)
Req assignments for 3/13
Carolynn./ Jacqueline,Please complete the following req assignments:
1. 10000038619to Donna as a new contract using 1855-172092. 10000041076 to Donna as a new contract using 1855-172753. 10000042765 to Donna as a JOC W/0 under 1555-14475-GC14. 10000042457 to Lillian as a JOC W/0 under 1555-14475-MC SBE165. 10000042458 to Lillian as a JOC W/0 under 1555-14475-MC56. 10000042241 to Barbie as a new contract using 1884-17305
Thanks! .James Fitzpatrick
Operations Analyst0'ffice of the Chief Procurement Officer
118 N. Clark St- Room 1018312.603.1490
gc~$ fo r o~e
I II II l
~ I ÃI t
~ ~ I
4' l l SSK
~5K I
al llaasl~-~I~
FitIS Pl
g
L1$ LI ~ = —-.-- . '' ' .3~~55&5~Ws r-"I~=:
)X@IRW~~:=-"- 'M~A%8~iLiihiMsL
lELwlSi h g
OI
lOKO
lTI
Vh~ Ct
Ct
~immy
Fl"I
— ---" oU~ea~ iL48
! i yo"0OI
If@ I i !'-!—, „--
.~ IS~==1111
!!!~RI
I I I
i! ,*
.::==iiilII+ TIKI~~~
I'~~
>,
IR
C
-0
~ IJ X
Vt 5%e"'hiJ I I""—~ 4
m ~11I
~SR
k L I IBR~Jl
Wi' ~ @~ ~$%@Lil ~g
8
*
Ilk&
~Wit~'ll Ill!ill'Il NIII
I
L"
CO
CL
C
0
.'IIII!!'I!
NJI I
40
0y5
5
~ \
4 %P4
d Ii @51~
I g''
I
IIm
Whale Id Ii..!'=,ii
idiR
ll NI I IBV I
co 'J<e.
C
>4 4 1! Ill & ~
III
'J I
'!I Ul I g. ~~-
=SR
i~ 8
IVW4)
." h I'
% @a ~
]I ll 'I-:i ~'iiii iL64ii~-.
Ili!'RSSF /II' 1 qll I I SS
M44H '4ssiw"iP-'~,.''aNI4I/
i.
i
~ '
.~ -- ~~V!m,~]$~g'gK 1 ~~~
ccs (91.) Printed Requisitions R port Report Date: 12-NAR-2018 13:32
Ccd I PL)
Report Parameters
Requisition Nmshsrs Prom: 10000042457To I 10000042457
Printed Asquieitlons Report Report Date: 12-NAA-2018 13:32P484; 2 Of 2
Reqeiaitxon4 10000042457Aequisitlen type: Purchase Requisition
creation Date: 07-NAR-leDescription. Pro)ect ZDr 23402 DOC Elhaust Fsn Repl
Nota lc Appr'over:Notesl
Preparer; IJOZO, SSANAW N
Approver I NANNZNS EARLCurrency; USD
Line Line Type ztmi Rev Cstegoty Description Cnit guanttty/Amount Snit price Zine Amount
Reque terNeed Ry SourceDate Urgent Type Sou ce
1 Woods 72120000 JOC Work Order DOZJ 0.01LLOZD, SSANSAR N Supplier 6051462.00 Aaount
PH1,366.7210000042457-
0,01
DlstslhutlonsI ..01 All ted To Recount: 11549.1031.17825.560106.00000.00000
Justification:Note To
Approver'otes;Attachmmlt 14 not a Text format
lot&1I 0,01
Pr4vloos Approvalsk
Sequence Date Approver
1 07-M6(-18 ILOYD, BARMEN( N2 12-Wel-18 WINNINS, EARL
approval Action (circle one)I
Approve Toruaed Re)eoe
ro sard To:
WoteI
Action
6uhmitAppro e
Note
Joc Package
Signature:
http: //ccgprod.ccounty.corn/OA CGI/FNDWRR,exe'1tcmp id=1354023783 3/12/2018
Eric Davis (Capital Pjanntng)
:Promt
SentToSubject:Attachments:
Eric Davis'(Capital Planning)
Monday, .Ma'rch 05,.2018gt39 PM
Seamaah Lloyd (Capital Planning)
Reallocation request -23402 D'DC Exhaust Fan Replacement
Transfer Request -'23402 DrOC Exhaust Fan RePlaeementwlsx
Seameah,
Please''equest a i'eallocatioh of 436,671.72as rioted on the attache'd spreadsheet, or a minor variation thereof as
heeded, to supplement the 5404,695 currently shown in D'racle for this project, I have attached a copy of thespreadsheet and this email to the package.
Eric Davis, AIADeputy Director, Department of Capital Planning and Pdlicy
Bureau of Asset Management69 W. WaShington Street, Suite 3000Chicago, IL 60602Phone: 312.603.0355Cell: 312.599,2877erletfaVlaiScookcoontvlkaov
Q
F g
E
;:l ~l
k "I
R
Judaffs -.. ) IIF
BUREAU OF HUMAN RESOURCES
VELISHA L HADDOXBUREAU CHIEF
118 North Clark Street, Room 840 ~ Chicago, Illinois 60602 ~ (312)603-3300
TONI PRECKWINKLE
TO: COUPE member unions (See attached list)
VIA EMAIL
PRESIDENT
Cook County Board
of Commisslonsm
RICHARD R. BOYKIN
1st Distnct
DENNIS DEER
2nd District
JERRY BUTLER
3rd Distnct
STANLEY MOORE
4th District
FROM: BHR —Labor Relations
RE: Notification Pursuant to Extension Agreement
DATE: March 15, 204 8
DOC Restroom Exhaust Fan Replacements
Pursuant to the Extension Agreement between the Coalition of Unionized Public Employees(COUPE) and the County of Cook, you are hereby notified that the County intends to undertakethe following construction work:
DEBORAH SIMS
Sth District
EDWARD M. MOODY
6th District
This work will be performed under the Job Order Contracting Agreement referenced above withAutumn Construction Services, Inc. The General Contractor intends to use a subcontractor(s) three (3)subcontractors for this project. The name and address of the contractor and subcontractor(s) are asfollow:
JESUS G. GARCIA
7th District
LUIS ARROYO JR
6th Distnct
GENERALCONTRACTOR
Autumn Construction Services, Inc.449 Eisenhower Lane SouthLombard, IL 60146
PETER N. SILYESTRI
9th District
BRIDGET GAINER
10th Distnct
Sub-Contractors:
Autumn Construction Services, Inc.449 Eisenhower Lane South
Lombard, IL 60146
JOHN P. DALEY
11th District
JOHN A. FRITCHEY
12th District
lARRY SUFFREDIN
13th District
GREGG GOSUN
14th District
TIMOTHY O. SCHNEIDER
13th Distdict
Action Mechanical, Inc.
3042 Hoffman Court
Dyer, IN 46311
Sharlen Electric Company
91015.Baltimore
Chicago, IL 60617
Please contact Phyllis Woods, Labor Liaison Officer at 312-603-5290 if you have any questions or
concerns. Procurement Awarded Contracts can be found at the following link:
www.cookcountvildzov/Drocurement.
JEFFREY R. TOBOLSKI
16th District
SEAN M. MORRISON
17th District
Cc: Shannon Andrews, CPO
Margaret Angelucci
Michael Leyden
$ Fiscal Responsibility fInrtovative Lea'dershlp. Transparency 81 Accountability @Ir'nproved setvice's
COUPE MEMBER UNIONS
First Name
John
Don
Harrison
Thomas
Joe
Joe
John
John
John
Mark
Michael
Mike
Paul
Last Name
Valone
Finn
Mailey
Ryan, Jr.
Healy
Rinehart
Manley
Riel
5piros
McNiff
O'Donne ll
Tierney
Lowery
Wende
E-mail Address
ivaloneCaiuec2.corn
dfinn134Pamail.corn
hm a [email protected]
trvanirfacaroentersunion.ore
ioe h@loca 11092.ore
ba147laaol,corn
Larry.McNifflniwlocal63.corn
paul.wende&iwlocal63.corn
Comoanv
Elevator Constructors, Local 2
Local 134, IBEW
Pipefitters, Local597
Carpenters
Local 1092
Painters
Plasterers
Boilermakers
830,27, Ik 14
Ironworkers
830
Plumbers
Bricklayers
Ironworkers
Ramon Williams ramonwiateamsterslocal700.corn Teamsters 700
Ray
Terry
Terry
Thomas
Bill
Tom
Ryan
Suggs
O'rien
Shannon
Gavin
Mangin
Ryan
Kelly
ravsu nasl'ol.corn
taavinPualocal130.ore
local17billlnamail.corn
ubclocal13Paol.corn
Sheet Metal Workers
Operating Engineers
Bricklayers
Plumbers
Insulators
Carpenters
IAM, 8
BACKGIRCL/FIB CHECKLIST
5U 8-t"EXFttTTIAt'' Pi CGSRPLIAISCE I/EftIFICATIGI r
COOK COUNTY OFFICE OF THE CHIEF PROCUREMENT OFFICER
Q Sole Source Lf Quotes tJ'eference Contract 4k Contract Ld RFP IvJ ItFQfto.
1 SystsmforAwanifdysgeqnt fSAht): httos://www.sam.sov/oortal/ovblic/SAM/
Datesearched: ~ l.~ (~ Resultspriht&utauached\
2. City of Chicago osbarredlggh
htto://www citvofchlhaheessrddav/hu/Itfaats/sfes/ruswdrsdsofho/sacs/dehereeg .ffnns hst.html
Iiatesesrshtdff.*. 5l l9 O'.;:.'-"'tes~+qt~
Suju~tssg 94sutes 9~hagg 't'lNSgt; .fsgsrn//sfairw.samisav/oortaf/oirbllc/sgsgg
' '
I.IZ.'ity'~trebarred tish
littuty/havWsatuefchlcaso.ore/chv/en/dents/des/nrovdrs/camo/svds/deblarrad fhttu Ilk.html r
'orihptc/Stat/System for Award ivhtnigepeht~ hrtofc/Assewnam:eevlasstal
Date searched; ) )%)~ Resultsfrffnhtrutatthsllsd
2. City of Chicago Debarred List
htto://www.citvofchicaeo.ore/city/en/dents/dos/orovdts/comd/aves/debarred firms list.html
Oats searched: 3t L ~hI
Results print-out attached
Contract ¹;1555-14475-MC-SBE16
Job Order ¹:051462.00
jjdjy pettbsreeb Sid, jeerjueattbr PrOPOSalr end jtaltueai fer'jsF fet rzach@ubcdittjactorisupjl~lfaf Ã4pttcc'nlsultaid jehieh, tjls dcijr, ahj/.phanqae jn'the utijlzatjori bf S~rs„s 6/iugdated!I,Spi
:Bikaoritrhetor/~6ulbconddjihg:Fetib t"iBF;-"):1'jlaaflcsbdn, 'The sentrdoter'lnjistdonlpjsts 'theShalt bi ueelj dri the Bentrdbfj, in gie evdiit t/Ijrt th,Scedlisnj ef Sijjjssbsditttdjjrr jhjf t@bnjrdctof njjig"Ijt
Atrezi dul zr.jfeafc Ceuntjr I, I '0auijelersrtre~r
t pftjdjtfdjfffrjS differ t 1 Enm ~erbtttehkfftdsitjrrn ef sttbderitraotcrrfsijjjjjNsfllfiTItjt}jtsNtttfts psffrr.
Tjrarslddet/Irreptsesefjdepsridgnj $'jhdT7ohjrebtor"pyiijj corn iste anAxecule.and zubrlNit en jdsntjhcaeolrsjf
fjjgpRs/Rpjf pio, 1555-14475MB BBE16 ChjeiTEES44ISE
jr . gag 6 IPEQS49,SB Contract Titjdt ge5trcc/n E/tjjrtu8t Rljt jtePIhedr/jag @7iN 6E,P(l
su peon jradejffsujjpljsr/fjoajlaetadrrtufurnn conatrjrejlon serv(csa, los bdjjebbscujtant'to'be fttifjiinp cpjtbtjljtjtltjtj %@vices, lhs
addetfii/r'substihits'rs/jhorlÃed'Crrnta,Aldborizsd CM4aifor
fdfCantiettcr,. Incan Naiad' SdbucntraotndSuPPliri/, Susan dj bSubconatrltaoh
Erjdtii /jddresS,......,; .'
Email JlddreasIEd„"q~ebd. 'rjeshltidisenjSsutu//drppnatru@icn,corn, /Sub~tmESS, suszcnejscogsrdumncenstruE'iugdbtjj
'm n /tdd@~449SlaehbbwartaneSeujh,l @m S
/td~addjjsarijrevrerijdrerjjjfljjjj: (Ccnfjecbg :;I jdub<i,ti'Coif,
&iCoritratdhrb' '...Edu'brcodtrsctcA....Lcafbard fL S064L "@br)'@.~~+pLlrnbyrd,.ii 8tH4fr
7~8@'bfe end'S¹5686566/6306664pprje. 'Telephodesndi'mi89588BSS;gfjM488 6588Fjerfdbjjtrjtotuji:' - . - /Sutjermbedfedl
Esjlmrjerj Sjert end IS jrtlittjftf, Shirt andCenrpJstfdn;Pates Tjf0 .Eomplsjr'od pates TdfttWjifrectorj: <Sujjorntrdctorb .
hjob@i'ppn rertusst,. e cope ofall wrjttsueubsunjrer<cr afjrsamentp %i/et ss hlo@ddd to tjdj%%l%;
Tdtel~pzjoerrf'jaadrtetfsnefSrfrdjeea Sr Suddllse jbtbeshtrsatf6»
ssrrrtbss..si'.BujjjfiiiN,'5fectsrnjbal
werh saaosbdsd v8th srthausf Sar repjarrjrrtenja ST68,'6492I
The subco/Itract documents will incorprzate dll qrrjuirsrneafs t'i/the tjeejfdej sjf¹Nldd lo the cdhtdtojcr as appli'cajjja,Ths subcontract a/ill in nc trsji hjndsrths suffjtractor/8uppj/eifjji/sceheultent jfe/6 Inajnjainihjj jta pnbjres» on enjfother contract,:sn which It. Is ~jejj/er e sobrzartjdsjdr/suppfrer/subcdriaelttint of siihtji)dj eoittNr4?s Tbie jijssjdsdrs. Isrhade sIItb Ebs enderstandjrijj that. the Esntrscjcr !'i: ntd ender eny pjtcjhn'sfithjiitl rejig ejPhe pbcijjjjfar. andObjljjdjijlnS, end 'le ltSSrcndjbje fcr lhe erytnlZatjon:„yerfennanoat arid qaei
rOfn¹ojjt TSITr ebjbr deep 'ekdjSeeVS
Shjj jj'rljrPdehd:dhartSear ne/lb jere SZ nredhtaabens tn fbe Ccntrast Strerttued Sj(EnAEtC tjdjlaatfetr Piirh Jtnfehdfstbs tq tbe reed/note epprrnrss jsSEnhjtfE/Ifstfzatfol/ jr/an'asst bd. Svsfttisfrs jfj: ths ooftish as "ths@Sntipnt Cornptjenes.
Autumn 1/elietiecticn ssrujesd, Iny,
fjentrectcri'Boson jjaIadn
Nants
&54@.~~ fPJ04/Edjjf
p'nme acontrsdjbf Sigridtutd flats
version:frh
Contract ¹:1555-14475-MC-BBE16
Job Order¹: 051462 00
onPQ GNLV!
Cooft Gpurfftr D Cinerualdnuirin
Nftcsof'fttg4Nfrf'-Prgggygfgtgttafffggr L'"'d'snflftgsttorsof sufteontraotosfsuppilfgsftgu'h'dohsftffght Psrttt
The'sfdderfprepossrstesporident ('tgs@igtisgto'r'I 'uitltbstr bttrqp! efe snd eznsdfe and aubrigt err ldentificagdnnfsuttdontraqtgrfggppTjirsubcoyngt ttsrrt Eptnt ( IBF3usfi each,BId, ttsqueafsz proposal, arid ttequedt For@uafSCStign. Tee Ci5jttigotyr muat eoiiiPlete fhg]SP fer aadh SubcdntntutetnSu'Pttltezdr SuboeitaultarSWhibhslisil be Sasg blfettet Cgntrs@,,ln gtb trvbttt thgt:tbgrfr ais ardr changes In ttai tlttllqhtlan qf. Subsnntracfors,Suppliers ht'fttfbdchdultgitte tbs'ftorgrsotor must ftttrah vpdatsd fgts,
MSFP7RFQN, 1555-14475-Mc-SBE16 ftafa:12-64-Nels
I B.d I pi ~i~aunt. 6¹[email protected] GPLngadt TifIK ggtafrgolq'EXbauaf San Reglaoeraentggd t@-;gg
SubonhtrbqtuightPPIIIrf'fentrsdfrta rrrufumn Conafruoftonigsrvicesr Iris, 'obsgnsultant to be AbttgnNesltanfStlnfna
added er sobsttfuts:
Jtuthbhzed Contact. 'tuthortzsd CoMet tbtbtseor fasctorr
. Sutrqonfitrctpf@ughlrhry Ron gnabtnmgubdbrrautfattj
, SrnsflAddrase ....'. Email AdgnSihsuserznsgton@yutumnaonstruot!on;nnnr fsub+ss igrnncggaogorirrssdhsrilcathat,:
compeerAddrszs446'lssnfznsaf Lans 'shdth
ctffg gfS As2'ggdg Hbfffhgq Csgtli
fthtdfrsator): fsuboontfsnfdgc
~.Stets and Ofy; Qtsteang Stfrg~ t'conf @ rg
Ldtnbaid, 'lL 60148tgbbaontractcit
Teihphdrib arid ', 'Talsphtins sng Fatf "Fate (Cbmir'Scm„tr %6'5Ã ggggf 66fi ggg-gggg fgg a~it '2fg4IBT 8856 7
'Estlmstsdlsfsttastd Esgtggg'I'ttgftrft arid'
'omplstton.ftatss'Kgb 'Cgrdgigtjdfi f7atea TBCtCnntrantolt: fgubdontrscfbit;.
tttsw Upon'request; 6 aepy trait arriftsn subcontractor agrsernengs ir'lgat gg giovided fo fha Qcpg;
Ttttal Wlha dfssaatrfstlon et '8shrines nr. Buaogsis, SuttabttHaatgor
Telasa si Stathfiss,
Ittft@ srork assucStsrt with exhaust fag tehladeiYlehts 6200 860.89
Ttra subcontraoT documents uriel Incorponate pll ~utrhgtsgfg of ths t ddtNi@gwardad'to the sordrsdtar araapgllcabfe.The euboonirsof IMII in oo brett htndsrttsz Sugssntigqtqr@ugpllgrfgugdohsultant free rastntsining its Iprggrssa drr anyother confiast dn which s la elf lair a 8ubcnnfrsbl'Irfgupptisrlguttgbgggfgtrg o¹glingigtf('ptttttictor. Thing kaelosure Ismade equi tfis nndsitfbmdtqg that grs conflslcfor le ndt trngsr gtfy srhurdstanssa ielieusd n$ Ibr. sbilSss snddttflgaNqns, snrl ih nlpnnsibis for the organization, psifrsmands,, erfd ql@tgg gf work; Tbts gotln dor Lr notagprove86'gr'proposed shsngas; revisions os raodfgcatidna toSra hontreot ~d,llllttgttgggs tltilizaggn Plan„- Anydftsegrre,to the nnsfiact's apprasad tgsgnitrsgf0%aigqni pfarr tttttbb bs suhmtssd bo the Sfflaa ss thefbttgrsot: Compliance,
,Autumn Csnsfftrdghn Ssnttgstt, IWCodfradorSusan Nsisdn
Prastdsril','12I04i3tt T
Pdms'ontlsbtfti S!gqgtgfg Dans
Version t, 0
Contract ¹:1555-14475-MC-BBE16
Job Order ¹:054162.00
:Contr SHAY
Ctftitt Cetthtt/ ', Qkeiulsisiilarr
'ONOkjf ttte t'btef PrbnetISyrttent Qffi'Sd¹ .'I"eaten~~"
IdenNffdftttpjt Of 8tlbtfpttftsetpt/StfPIPNttifSSbdpfthlkltbbt Podn
Thar Bidder/Proposer/fteapondent $'the Stunt/actor"), iill 'fully comfr fats and tssrnuts and:.submit sn 'tdsdfifics'Aori'tsrrtsamtraotor/8upp88/subco/Ieultant Fbiln {."ISE'Tsrfhreach Bid, Request Sir Plupbe@ snd Ttitquest nfrttsehffoattcn. TSS'tabittrantcr mulct Crtinpfete tbe ISP feneaoh 81/bbendralotcre SuPP//ertts 8ubeotrnauftanterhfdbShelf Na ti aha Cin hbe 8dntraet; In the scant that 81ereara Sqy Phan9ea Ifr fhe uetfffxatfnn OrSuboentreetcre,supp/fere tS Ihubpb/Isultsntfv the I4phtwclcr Irtdat 'filh en updated ISP,
tfid/ttFP/Nett 'fisc .--1656-14475-Mc-SBE16
YeNtB/drat FI'ososal.Amourrbp e
'Qpnpsdfofrdt~n ctln¹trppflan Ssrvtssh;, leer
, I'Ibad tfettte/8 .odtrhgdn Susan Nelhon
88rtail 'Addrspe~s~ t.. [email protected]
@si~p~@>98449Kfssdborssr Lans Sn/fth
CN''ffsdtdrb
'tste: 19-0488
CnntrsctTitfe';lttrstrcem Sxhdudgkn ftdpfacarnsnf tf88$8980Subccntrnctor/Supplier/suboenstfftent ts be Sibdrlen sleet/IN Qkg@ny
. added orsubetitute:Authonze'd Gshfsbt rorSubccnt@'~pplfsi'/I/yflliamWlenSubebnaufteeitShisfl:/ldll/retd
. 89JIbeentmfdsrt;W>N'"s""":~
Stpmpssv /btdlsas 8"8"8'@"~-le
Shfmdf', i< @819'City,:Sfatf e18 Zip
"''/lS'T91-8988 fTSS 881-9988thubeentrsctur'I
Sht/III+8 Sttbt snd T88Cembhfpcn Dates
t. tdtyrbhr4y I I, 68168'Sdj Jhtate end
ONqt888885/SXN88e9888
Ssfmahftt J996iternd@pldpfa+tlrrn1ihfftee
rQOA1raotbrt: /Sub corrdrsdfdry
'idols t/psn reOGiist; 8'ccf Iy'f'elf within 9itbpont/tfcthr dfffsements musf be pm1rtded to rhe Qcpt7.
Bsesrtotfon ot Serslsaa or Suooll'sa
shichtchl wor9 Bssoofdthtt with bxheuetthnrspfade'ments
Total terfas4rtSutissntrssteoa
dtfrrvfesd or Sueollss
Tbe subcen'tract doctftnsnys 9/li'I I'npo/tioratb all rP9ufrbrnetfts dr the, contrsct swerdsd to the Sorftraotcrsa applicatile.The sqtlortntrstd ptt9 in ne 6vejhinder>s 8/ttrsphtfbstot/SdspllejvSdbsqnsuNaiit toro',msintafriih8 Ite,proftrsss.on
soy'OtherSanft89LSrl Which it Ia Slthsr 8 Subacnttst/htr/fhipeplferfsuhgigidefthnt Oi prl'rldlphri COdtfdctcr. Tpitta dfaolceure f~a
made edith tha ulldereflmdtrl9 that lhe Scntradfhr IS. nbt frltder 8/Iye Ofrhufiidtannea relbreed et+Its Shfihfe¹ Sndnbtget/ona, snd ls responsible 'ior the organ'fzahon, Psttormanpsx end Sualib of'world Tldtyptetn dbss riot ssb rovdsrnjptofrossd e~ revtsfons si mcdihbations der Srs ernertrhphassfbved ISBsnllNK Utiliratrsn pleat-.'knysbsnssa Se: ths'esntrrrcps spproesd «tBNhf/BS/tt8lea8trs Ptilt tlNsh be Subdrf8s8 to the Otffcs 4ff 'the8arrttldct SemptlaSrss
Autumn Arttt/Solfdn Serrtf¹9%; Ide
Sehtnrcba
SIISSBhlstadd
MensPrs'ardent
3QN~Pttnfe Qd/SAlfrtdftSSnrdure bate
Vernon I;,.0
SAM Search ResultsList of records matching your search for:
Search Term: autumn* construction* services*Record Status: Active
"YIIM ikMlAutumn Construction Services, Inc. Status:Active
DUNS: 001191506 +4: CAGE Code: 5PH34 DoDAAC:
Expiration Date: Feb 21, 2019 Has Active Exclusions: No Debt Subject to Offset?: No
Address: 449 EISENHOWER LN SCity: LOMBARD
ZIP Code: 60146-5706State/Province: ILLINOIS
Country: UNITED STATES
March 14.2018 4:07 PM https;//www.aam.gov/ Page 1 of 1
SAM Search ResultsList of records matching your search for:
Search Term: action* mechanical*Record Status: Active
;.WRIACTION MECHANICAL, INC.
DUNS: 608902177 +4;
Status:Active
CAGE Code: ONXV3 DoDAAC:
Expiration Date: Jan 10, 2019 Has Active Exclusion': No Debt Subject to Offset7: No
Address: 1856 LOMBARDY DR
City: RAPID CITY
ZIP Code: 57703-4130State/Province: SOUTH DAKOTA
Country: UNITED STATES
March 14, 2018 4:08 PM https:ltwww.sam.gov/ Page 1 of 1
SAM Search ResultsList of records matching your search for:
Search Term: sharlen* electric*Record Status: Active
No Search Results
March 14, 2018 4:08 PM https:IIWww.sam.govl Page 1 of 1
City ofChicago:: List of Debarred Firms and Individuals Page 1 of 3
(/content/city/en.html)
PROCUREMENT SERVICES
We are the contracting authority for the procurement of goods and services for the City ofChicago
List of Debarred Firms and Individuals
Debarred Firms and Individuals
AUTUMN CONSTRUCTION SERVICES
ENTITY/INDIVIDUAL STREET ADDRESS CITY
[MENU J
iSTATE
l Totals:
l':=-.EJN~M
Entities, individuals or both are subject to debarment. The following list provides info regardingentities or individuals, date of debarment, length of debarment and cause. Lifetime debarmentpertains to individuals, permanent pertains to entities. In addition, this list also identifiesindividuals and entities that are ineligible to do business with the City pursuant to Section 1-23-020 of the Municipal Code. Data is updated as needed.
(/content/dam/city/depts/dps/DebarredFirms/DebarredList0711.2.pdf)
View current PDF list of debarred firms and individuals
https://www.cityofchicago.org/city/en/depts/dps/provdrs/comp/svcs/debarred firms list. html 3/14/2018
City of Chicago:: List ofDebarred Firms and Individuals Page 1 of 3
(/content/city/en.html)
PROCUREMENT SERVICES
We are the contracting authority for the procurement of goods and services for the City ofChicago
i List of Debarred Firms and Individuals
MENU
Debarred Firms and individuals
ACTION MECHANICAL
ENTITY/INDIVIDUAL STREET ADDRESS 'ITY ;STATE
Totals:
Entities, individuals or both are subject to debarment. The following list provides info regardingentities or individuals, date of debarment, length of debarment and cause. Lifetime debarment
pertains to individuals, permanent pertains to entities. In addition, this list also identifies
individuals and entities that are ineligible to do business with the City pursuant to Section 1-23-
020 of the Municipal Code. Data is updated as needed.
(/content/dam/city/depts/dps/DebarredFirms/DebarredList0711.2.pdf)
View current PDF list of debarred firms and individuals
https://www.cityofchicago.org/city/en/depts/dps/provdrs/comp/svcs/debarred firms list. html 3/14/2018
City of Chicago:: List of Debarred Firms and Individuals Page 1 of 3
(/content/city/en.html)
PROCUREMENT SERVICES
We are the contracting authority for the procurement of goods and services for the City ofChicago
List of Debarred Firms and Individuals
MENU
Debarred Firms and Individuals
SFIARLEN ELECTRIC CO
ENTITY/INDIVIDUAL STREET ADDRESS ': CITY I'STATE
,Totals:
eaaliti!iIlfffffae "'..'
mmttttrf fflitltlt'tt t::: .'..'mair!tt/gffftar:u t)
Entities, individuals or both are subject to debarment. The following list provides info regardingentities or individuals, date of debarment, length of debarment and cause. Lifetime debarmentpertains to individuals, permanent pertains to entities. In addition, this list also identifiesindividuals and entities that are ineligible to do business with the City pursuant to Section 1-23-
020 of the Municipal Code. Data is updated as needed.
(/content/dam/city/depts/dps/DebarredFirms/DebarredList0711.2.pdf)
View current PDF list of debarred firms and individuals
https://www.cityofchicago.org/city/en/depts/dps/provdrs/comp/aves/debarred firms list. html 3/14/2018