Hindustan Zinc Limited
Hindustan Zinc - A Sustainable Enterprise
2
A Journey towards Excellence - 15 million T Ore Production Capacity; & 1.2 million T MIC production capacity from Underground Mines
1st Rampura Agucha Largest zinc mine globally
2nd Largest zinc-lead miner
globally with: 9 million+ MT of ore production capacity
4th Largest zinc-lead smelter
globally: 1 million+ MT of
production capacity
(Rankings calculated from Wood Mackenzie, March 2015
Long Term Outlook)
Hindustan Zinc Limited
Safety & Sustainability
3
Safety
Zero harm to people, host communities and environment
� Safety cultural transformation journey from reactive to interdependent; engagement with “Dupont”
� Integrated safety organisation structure
� Promoting behaviour based safety
� Focus on hazard identification & near misses
Sustainability Initiatives
� Zero water discharge
� Adiabatic cooling towers
� Sewage treatment plant as sustainable water source
� Green energy of 309MW
� Bio-diversity conservation
Safety Pledge during mine safety week
2.292.15
1.95
1.01 0.880.64
FY10 FY11 FY12 FY13 FY14 FY15
LTIFR (per million man-hours worked)
72%
Hindustan Zinc Limited
Portfolio of Tier - 1 Assets
4
Zawar Mining Complex
Reserve : 9.6mt Resource : 74.2mtReserve Grade : Zn 3.4%, Pb 1.8%Current Ore Capacity : 1.2 mtpaCPP : 80MW
Wind Power Generation Capacity of 274 MW
Sindesar Khurd Mine
Reserve : 32.2mtResource : 73.9mtReserve Grade : Zn 4.5%, Pb 3.1%Current Ore Capacity : 2.0 mtpa
Rajpura Dariba Mine
Reserve : 9.6mt : Resource : 47.0mtReserve Grade : Zn 6.4%, Pb 1.6%Current Ore Capacity : 0.90 mtpa
Rampura Agucha Mine
Reserve : 49.5mt Resource : 53.5mtReserve Grade : Zn 14.0%, Pb 1.9%Current Ore Capacity : 6.15 mtpa
Kayad Mine
Reserve : 7.3mt Resource : 0.8mtReserve Grade : Zn 9.6%, Pb 1.4%Current Ore Capacity : 0.35 mtpa
Chanderiya Smelting Complex
Pyrometallurgical Lead Zinc Smelter:
105,000 tpa Zinc and 85,000 tpa Lead
Hydrometallurgical Zinc Smelter: 420,000 tpa Zinc
Captive Power Plant: 234MW
Zinc Smelter Debari
Hydrometallurgical Zinc Smelter: 88,000 tpa Zinc
Dariba Smelting Complex
Hydrometallurgical Zinc Smelter: 210,000 tpa Zinc
Lead Smelter: 100,000 tpa Lead
Captive Power Plant: 160MW
Pantnagar & Haridwar
Processing & Refining of Zinc, Lead & Silver
Hindustan Zinc Limited
Nyrstar
Hindustan Zinc
Glencore
Votorantim
Boliden
Tech
Industrias Penoles
NorandaHuludao ZincDongling
MMG
Minera Volan
Korea Zinc
VZI
Vedanta Group
0
200
400
600
800
1000
1200
1400
0 200 400 600 800 1000 1200
Min
e P
rod
uct
ion
(kt
Zn
)
Smelter Production (kt Zn)
4th Quartile
3rd Quartile
2nd Quartile
1st Quartile
5
Defining the Benchmark
Source: Wood Mackenzie Long Term Outlook Report, March 2015
Hindustan Zinc Limited
Strong Track Record of Growth
6
Reserve & Resource (mt) – 2.5X Growth
Ore Production(mt) – 3X Growth Silver Metal – Integrated Saleable (MT) – 5.5X Growth
Mined metal (kt) – 3X Growth
54 67 69 77 80 89 102 97 109 110 104 108
9298 109
133 152183
197 216223 239 261 267
146165
178
210232
272299
313332
348365 375
FY04 FY05 FY06 FY07 FY08 FY09 FY10 FY11 FY12 FY13 FY14 FY15
Reserve Resource Net R&R
262 317 355472 505 551
651 683752 739 765 770 774
3647
54
6067
78
8486
88 92106 110 113
298364
409
532572
629
735769
840 830870 880 887
FY03 FY04 FY05 FY06 FY07 FY08 FY09 FY10 FY11 FY12 FY13 FY14 FY15
MIC - Zinc MIC - Lead Total Mined Metal
4735
1124
51
80
105
139148
202
288301
266
FY03 FY04 FY05 FY06 FY07 FY08 FY09 FY10 FY11 FY12 FY13 FY14 FY15
1.8 2.2 2.53.5 3.7 4.1
5 5.16.1 5.9 6.1
5.5 5.01.31.4
1.5
1.3 1.41.7
1.7 2
1.4 2.12.5 3.8
3.9
3.13.6
3.9
4.85.1
5.8
6.77.1
7.58.0
8.6
9.38.9
FY03 FY04 FY05 FY06 FY07 FY08 FY09 FY10 FY11 FY12 FY13 FY14 FY15
Ore (OC) Ore (UG) Total Ore Production
Hindustan Zinc Limited
Rs bn
*Before Project Capex
-
10
20
30
40
50
60
70
80
FY02
FY03
FY04
FY05
FY06
FY07
FY08
FY09
FY10
FY11
FY12
FY13
FY14
FY15
EBITDA
-
10
20
30
40
50
60
70
80
90
FY02
FY03
FY04
FY05
FY06
FY07
FY08
FY09
FY10
FY11
FY12
FY13
FY14
FY15
PAT
-
50
100
150
200
250
300
350
FY02
FY03
FY04
FY05
FY06
FY07
FY08
FY09
FY10
FY11
FY12
FY13
FY14
FY15
Cash & Cash Equivalents*
-
5
10
15
20
25
FY02
FY03
FY04
FY05
FY06
FY07
FY08
FY09
FY10
FY11
FY12
FY13
FY14
FY15
EPS
-
100
200
300
400
500
600
700
800
FY02
FY03
FY04
FY05
FY06
FY07
FY08
FY09
FY10
FY11
FY12
FY13
FY14
FY15
Market Cap
-
500
1,000
1,500
2,000
2,500
3,000
3,500
4,000
FY02
FY03
FY04
FY05
FY06
FY07
FY08
FY09
FY10
FY11
FY12
FY13
FY14
FY15
LME Price
Zinc LME
Lead LME
EBITDA CAGR 29% despite Zinc LME growth of only 7%
Rs $/MT
Rs bn Rs bn
Rs bn
Robust Financial Performance
7
Hindustan Zinc Limited
2013-14 2020-21
RA OC RA UG Kayad SKM RDM ZWM BKM
Way Forward
8
� Resource driven growth
� Six major projects to increase mined metal capacity by 20% to 1.2 mtpa, including replacement from RAM OC
� Total capex of $1.5 billion, out of which ~$0.5 bn is spent
� Expansion of mines in sync with increasing R&R
� Extension of RAM OC mine life to FY20 to smoothen transition to UG
Future mine production profileTransition to underground mining (% share in MIC)
0%
20%
40%
60%
80%
100%
FY13 FY14 FY15 FY16 FY17 FY18 FY19 FY20 FY21
Open-Cast Underground
Journey ahead - Projects
RAM UG RajpuraDariba
SindesarKhurd
Kayad Zawar BamniaKalan
3.75 1.75 3.8
1.2 0.5
0.3 2 0.65
0.350.9
Current Capacity, (mtpa)
Capacity Addition, (mtpa)
0%
20%
40%
60%
80%
100%
2014-15 2020-21
Ore Production
0%
20%
40%
60%
80%
100%
2014-15 2020-21
MIC Production
Hindustan Zinc Limited
Rampura Agucha Mine
9
Added: Added legend for clarity of current Open pit depth and pit extension
Shaft Access
South
Ventilation
Shaft
North
Ventilation
Shaft
Main
Hoisting
Shaft
Main
Decline Open Pit
Extension shell
Underground resource:
As Built
development
Open Pit
To Feb 2015
Open Pit
Ultimate Pit Depth: 420 meters from surface
Mine Life: FY 2019-20
UG Mine
Production Capacity: 3.75 mtpa
Mine Life: +20 years
R&R: 35.2 mn MT & 55.1 mn MT
Mining Method: LHS with paste fill
Major Activities:
� Decline and ancillary development
� Production shaft & crusher system
� Raise boring
� Paste fill plant
� Surface infrastructures
Shaft
� Hoisting Capacity: 3.75 mtpa
� Shaft Dimension: 7.5 m Dia., 950m deep
High Lead Content Deposit
RA UG14 OB
Hindustan Zinc Limited
Vent. Raise
Vent. RaiseDeclines
Production Shaft
Underground Crusher
& Loading Stations
Ore & Waste Passes
Sindesar Khurd Mine
10
Salient Features
� Access to mine: Through two ramps
� Method of working: Blast hole open stopingLHS with back filling
� Ore hauling: Ramps & shaft
� Mine ventilation: Two ventilation shafts (Peripheral)
� Production capacity : 3.75mtpa
Particulars Main Ore Body Main Ore Body + Auxiliary Lenses
R&R* 37 mn tonnes 106 mn tonnes
Capacity 2 mtpa 3.75 mtpa
Main Ore Body
SK6
SK2
*as on March 31, 2015
Hindustan Zinc Limited
40%
50%
60%
70%
80%
90%
100%
20102011201220132014201520162017201820192020
Emerging Markets Developmed Economies
Global Refined Zinc Market Overview
11
Source: Wood Mackenzie Long Term Outlook Report, March 2015
‘000 MT
EM share in global
demand to increase 10% in 10 years
‘000 MT
World - Steady demand growth at 4-5%China - CAGR (2013-2020) 6.2%India - CAGR (2013-2020) 5.7%
Emerging Markets Driving DemandRefined Market Balance
India Steel Production and Zinc Demand
Mn MT
Source: Feedback Consulting & HZL
Source: Wood Mackenzie Long Term Outlook Report, March 2015 6469
7275
7884
502
533
577
629 617
648
60
65
70
75
80
85
90
95
400
450
500
550
600
650
700
FY 2011 FY 2012 FY 2013 FY 2014 FY 2015 FY 2016 E
Steel Production (RH) Zinc Demand (LH)
10,000
11,000
12,000
13,000
14,000
15,000
16,000
17,000
18,000
2015 2016 2017 2018 2019 2020
Consumption Supply
Hindustan Zinc Limited
Among the lowest cost producers of zinc
Source: Wood Mackenzie Research
Leading the way with fully integrated operations
Hindustan Zinc
Teck
Glencore Xstrata
MMG Limited
Boliden Nyrstar
0 10 20 30 40 50 60 70 80 90 100
0
250
500
750
1000
1250
1500
1750
2000
2250
2500
C1 Cash Cost ($/t Zn)
Cumulative Production (Percentile)
Captive mines with Reserve & Resource base of 375.1 million MT ensuring mine life of 25 years
Integrated metal production supported by captive power plants
Low cost of operations driven by quality assets and multi-metal recovery
Market leadership in India with strong presence in emerging economies of Asia
Summary
Core Strengths
12