Hywind. Deep offshore wind operational experience. · 2014. 11. 17. · • Production 2012 is 7,4...

23
Hywind. Deep offshore wind operational experience. Finn Gunnar Nielsen, Statoil RDI

Transcript of Hywind. Deep offshore wind operational experience. · 2014. 11. 17. · • Production 2012 is 7,4...

  • Hywind. Deep offshore wind operational experience.Finn Gunnar Nielsen, Statoil RDI

  • The starting point -2001

    • Inspired by floating sailing marks.

    − “Seawind” matured during 2002

    Tong, K.C. OWEMES seminar , Atena, Rome,Feb. 1994

    2

  • Key features

    Combines known technologies

    Designed for harsh environment

    ”Standard” offshore turbine

    Water depth >100 m

    Assembled in sheltered waters, towed to field

    Relies upon experience from :Floating platforms

    Electrical power production

    Onshore wind turbines

    The Hywind concept

    3

  • From idea to commercial concept

    Demo

    Pilot park

    Model test

    Concept & theory

    Onshore connected parks

    2002

    2005

    2009

    Technical Focus

    Cost Focus

    Market Focus

    2013

    Idea

    2003

    4

    Onshore connected parks

  • What does it take?

    Demo

    Pilot park

    Model test

    Concept & theory

    Onshore connected parks

    2002

    2005

    2009

    Technical Focus

    Cost Focus

    Market Focus

    2013

    Idea

    2003

    5

    Onshore connected parks

    •Creativity•Competence & experience •Endurance •Business understanding •Professional project execution •Management commitment•Timing •Funding

  • MODEL SCALE EXPERIMENTS 2005• Demonstration of system behaviour • Validation of numerical tools• Model scale 1:47• Irregular waves, turbulent wind, and various control strategies

    6

  • Assembly and installation of Hywind Demo Summer 2009

    7

  • Operation in harsh environment

    • Max wind velocity: 40 m/sec

    • Max sign wave height: 10.5 m

    8

  • • A total of more than 200 sensors:

    − Waves wind and current (magnitude and direction)

    − Motion (6 DOF) and position of floater

    − Mooring line tension

    − Strain gauges at tower and hull (4 levels – bending moments and axial force)

    − Rotor speed, blade pitch and generator power

    − Flap- and edgeways rotor bending moments

    − Motion (tower pitch) / blade pitch controllers

    Full scale measurements

    9

  • Hywind Operation and monitoring

    10

  • Databases and data management

    •Integration of people process and technology

    •Use of data, collaborative technology and multidisciplinary work

    Integrated Operations – implementing O&G experience

    11

  • A base for testing vessels and access systems• Fob Trim, Stril Merkur (MSDC12), Buddy, Fob Swath1, Bayard 3 • Undertun prototype access system, MaXccess access system

    12

  • Hywind performance in 2012

    • 2 stops in Q1 due to external grid faults, total 57 days. Production loss of ~1,5 GWh

    • Production 2012 is 7,4 GWh (8,9 GWh without grid error)

    • 11% lower than normal wind speed

    • Capacity factor 2012: 37% (would be 44% without grid error)

    • September production 1,1 GWh, Capacity factor 54%.

    • Focus on improvements, lower O&M cost

    Grid faults

    13

  • Production during a storm condition• 24 hour period during

    storm “Dagmar”, Dec 2011

    • Avg. wind speed 16 m/sec

    • Max wind speed 24 m/sec

    • Max significant wave height 7.1m

    • Power production 96.7% of rated

    14

  • Metocean data. Measured versus design basis

    Nacelle wind distribution

    Wind statistics

    5%

    10%

    15%

    WEST EA ST

    SOUTH

    NORTH

    Wind distribution from turbine.Direction is interpreted as coming from

    Distribution from Design Basis

    15

  • Data interpretation and validation

    0 100 200 3000

    0.1

    0.2

    0.3

    0.4

    0.5

    0.6

    0.7

    0.8

    0.9

    1

    Amplitude [ton2-s-1]

    Freq

    uenc

    y [H

    z]

    Hull_MoorForceX_Pos1_Backup - Black curve is generator speed [RPM/1e4]

    Time

    Freq

    uenc

    y [H

    z]

    Oct/100

    0.1

    0.2

    0.3

    0.4

    0.5

    0.6

    0.7

    0.8

    0.9

    1Gen. below 800Gen. above 800

    3P

    Surge

    Pitch

    Poor/No data

    • Spectrogram of mooring line force

    • 1 month of data shown

    • Used for:

    − Error detection

    − Identification of natural frequencies.

    16

  • Full scale versus computations• Wind speed 17.5 m/sec, Significant wave height 4.0m, Current 0.4 m/sec

    • Estimated wave time history.

    • Computed motion response

    • Wind forces included from measured wind spectrum

    • Visualization

    Tower pitch motion

    17

  • Bending moment in tower.

    • Mean wind: 13.2 m/s Hs: 3.2 m Tp: 9.0 s

    • East – West and North – South axis

    0 0.1 0.2 0.3 0.4 0.5 0.60

    1

    2

    3

    4

    5

    6

    7x 10

    8 Bending moments about North-axis - Level 3

    frequency [Hz]

    bend

    ing

    mom

    ent [

    (kN

    m)2 s

    ]

    simulationmeasurement

    0 0.1 0.2 0.3 0.4 0.5 0.60

    1

    2

    3

    4

    5

    6

    7

    8x 10

    8 Bending moments about West-axis - Level 3

    frequency [Hz]

    bend

    ing

    mom

    ent [

    (kN

    m)2 s

    ]

    simulationmeasurement

    18

  • Importance of motion controller

    50 100 150 200 250 300 350 400 450 500 550-6

    -4

    -2

    0

    2

    4

    6

    time [s]

    tow

    er p

    itch

    angl

    e [d

    eg]

    Conventional controller

    Motion stabilizing controller

    Shut down

    19

  • Hywind evolution Use of experience - Improved design

    Hywind Demo Hywind II

    • Bigger turbine• Smaller hull• Lower costs• Site specific

    20

  • 21

    Floating wind will compete with conventional bottom fixed solutions in a mature market

  • The next step

    22

  • Presentation title

    Presenters namePresenters titleE-mail address ……@statoil.comTel: +4700000000

    www.statoil.com

    Thank You23