Hyundae mipo chosun. 2008013448 Choi Su Min. Ship Process. Ship Process. 1.HULL WORK - the steel is cut, shaped and assembled into block in accordance with the design, Normally 150~200 blocks are required to assemble one ship. - PowerPoint PPT Presentation
Transcript of Hyundae mipo chosun
2008013448Choi Su Min
1.HULL WORK - the steel is cut, shaped and assembled into block in accordance with the design, Normally 150~200 blocks are required to assemble one ship.
2.TRANSPORTING - The equipment to transport block to the work place.
3.FITTING WORK - block undergoes fitting and painting work in shelter house.
4.DOCK WORK - Blocks are assembled in the dock. After assembling all block the dock is filled with the sea-water for launching the ship.
5.QUAY - The work -place for fitting works after launching, and Various on-board tests are carried out before sea-trial. HMD has 2.6Km long quay.