HYDROSTATIC AND PRESURE TESTING - epawebapp.epa.ie
Transcript of HYDROSTATIC AND PRESURE TESTING - epawebapp.epa.ie
CLONMINAM INDUSTRIAL ESTATE PORTLAOISE CO.LAOISTel: 057 8678600 Fax:eMail: [email protected]
HYDROSTATIC AND PRESURE TESTING
Client: LUFTHANSA TECHNIK AIRMOTIVE IRL. BALDONNELL DUBLIN
Tel. 0872364168
Project number: 6
Project:
Start of project: 09/04/2014 09:49:39
Principale cont.:
Last change: 30/04/2014 18:58:43
Side 1© 1999-2013, Sklarz GmbH
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 31-07-2015:23:37:23
Order no.: 6 Test no.: 67
PORTLAOISE CO.LAOIS - CLONMINAM INDUSTRIAL ESTATE - Tel : 057 8678600
Client:LUFTHANSA TECHNIK AIRMOTIVE IRL. BALDONNELL DUBLINTel. 0872364168
Pressure test report Pipe - Air/EN 1610
0 1 2 3 4 5 6 7 8 9 10 11Time in min
Pressure
0.0 mbar
127.1 mbar
112.1 mbar
140.0 mbar
Pressure build-upPre-fill time
Test duration Pressure drop
Location :Location : DUBLIN Drawing No. :Street : BALDONNELL Section no.: :Tester : Ray o Connell from manhole : F 1ETest equipment : MASTERTEST® SN:130515 to manhole : F 22.1Order no. : 6 Length of test section : 97.5 mTest date : 30/04/2014 11:16:09 Pipe profile : CircleTest method : Air/EN 1610 Diameter : 225 mmTest category : Air LCTest section : Pipe Pipe no. :Material : PVC Internal protection : withoutRemark :
Sensor : PMC131 -300 - +300 mbar, SN: H4086001052 Sensor test : 16/05/2013Approval :
Test pressure : 127.1 mbar Pre-fill time : 5:02 minPermiss. pressure loss : 15.0 mbar Test duration : 3:01 minAct. pressure loss : -2.6 mbar Result : Passed
Testing contractor Client
Side 2© 1999-2013, Sklarz GmbH
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 31-07-2015:23:37:23
Order no.: 6 Test no.: 68
PORTLAOISE CO.LAOIS - CLONMINAM INDUSTRIAL ESTATE - Tel : 057 8678600Client:LUFTHANSA TECHNIK AIRMOTIVE IRL. BALDONNELL DUBLINTel. 0872364168
Pressure test report Pipe - Air/EN 1610
0 1 2 3 4 5 6 7 8Time in min
Pressure
0.0 mbar
148.7 mbar133.7 mbar
164.0 mbar
Pressure build-upPre-fill time
Test duration Pressure drop
Location :Location : Dublin Drawing No. :Street : Baldonnell Section no.: :Tester : Ray o Connell from manhole : ALK 1Test equipment : MASTERTEST® SN:130515 to manhole : ALK 1AOrder no. : 6 Length of test section : 15.5 mTest date : 30/04/2014 14:18:31 Pipe profile : CircleTest method : Air/EN 1610 Diameter : 100 mmTest category : Air LCTest section : Pipe Pipe no. :Material : PVC Internal protection : withoutRemark :
Sensor : PMC131 -300 - +300 mbar, SN: H4086001052 Sensor test : 16/05/2013Approval :
Test pressure : 148.7 mbar Pre-fill time : 5:00 minPermiss. pressure loss : 15.0 mbar Test duration : 3:03 minAct. pressure loss : -0.8 mbar Result : Passed
Testing contractor Client
Side 3© 1999-2013, Sklarz GmbH
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 31-07-2015:23:37:23
Order no.: 6 Test no.: 69
PORTLAOISE CO.LAOIS - CLONMINAM INDUSTRIAL ESTATE - Tel : 057 8678600Client:LUFTHANSA TECHNIK AIRMOTIVE IRL. BALDONNELL DUBLINTel. 0872364168
Pressure test report Pipe - Air/EN 1610
0 1 2 3 4 5 6 7 8Time in min
Pressure
0.0 mbar
139.1 mbar
124.1 mbar
153.0 mbar
Pressure build-upPre-fill time
Test duration Pressure drop
Location :Location : Dublin Drawing No. :Street : Baldonnell Section no.: :Tester : Ray o Connell from manhole : ACID 2Test equipment : MASTERTEST® SN:130515 to manhole : SUMPOrder no. : 6 Length of test section : 7.0 mTest date : 30/04/2014 14:28:59 Pipe profile : CircleTest method : Air/EN 1610 Diameter : 150 mmTest category : Air LCTest section : Pipe Pipe no. :Material : Relined clay Internal protection : withoutRemark :
Sensor : PMC131 -300 - +300 mbar, SN: H4086001052 Sensor test : 16/05/2013Approval :
Test pressure : 139.1 mbar Pre-fill time : 5:00 minPermiss. pressure loss : 15.0 mbar Test duration : 3:01 minAct. pressure loss : 0.0 mbar Result : Passed
Testing contractor Client
Side 4© 1999-2013, Sklarz GmbH
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 31-07-2015:23:37:23
Order no.: 6 Test no.: 70
PORTLAOISE CO.LAOIS - CLONMINAM INDUSTRIAL ESTATE - Tel : 057 8678600Client:LUFTHANSA TECHNIK AIRMOTIVE IRL. BALDONNELL DUBLINTel. 0872364168
Pressure test report Pipe - Air/EN 1610
0 1 2 3 4 5 6 7 8Time in min
Pressure
0.0 mbar
141.0 mbar126.0 mbar
156.0 mbar
Pressure build-upPre-fill time
Test duration Pressure drop
Location :Location : Dublin Drawing No. :Street : Baldonnell Section no.: :Tester : Ray o Connell from manhole : F26Test equipment : MASTERTEST® SN:130515 to manhole : F14AOrder no. : 6 Length of test section : 7.3 mTest date : 30/04/2014 15:57:54 Pipe profile : CircleTest method : Air/EN 1610 Diameter : 100 mmTest category : Air LCTest section : Pipe Pipe no. :Material : PVC Internal protection : withoutRemark :
Sensor : PMC131 -300 - +300 mbar, SN: H4086001052 Sensor test : 16/05/2013Approval :
Test pressure : 141.0 mbar Pre-fill time : 5:00 minPermiss. pressure loss : 15.0 mbar Test duration : 3:01 minAct. pressure loss : -10.1 mbar Result : Passed
Testing contractor Client
Side 5© 1999-2013, Sklarz GmbH
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 31-07-2015:23:37:23
Order no.: 6 Test no.: 71
PORTLAOISE CO.LAOIS - CLONMINAM INDUSTRIAL ESTATE - Tel : 057 8678600Client:LUFTHANSA TECHNIK AIRMOTIVE IRL. BALDONNELL DUBLINTel. 0872364168
Pressure test report Pipe - Air/EN 1610
0 1 2 3 4 5 6 7 8Time in min
Pressure
0.0 mbar
180.2 mbar165.2 mbar
199.0 mbar
Pressure build-upPre-fill time
Test duration Pressure drop
Location :Location : Dublin Drawing No. :Street : Baldonnell Section no.: :Tester : Ray o Connell from manhole : F27Test equipment : MASTERTEST® SN:130515 to manhole : F23Order no. : 6 Length of test section : 7.0 mTest date : 30/04/2014 16:10:18 Pipe profile : CircleTest method : Air/EN 1610 Diameter : 100 mmTest category : Air LCTest section : Pipe Pipe no. :Material : PVC Internal protection : withoutRemark :
Sensor : PMC131 -300 - +300 mbar, SN: H4086001052 Sensor test : 16/05/2013Approval :
Test pressure : 180.2 mbar Pre-fill time : 5:02 minPermiss. pressure loss : 15.0 mbar Test duration : 3:00 minAct. pressure loss : -0.1 mbar Result : Passed
Testing contractor Client
Side 6© 1999-2013, Sklarz GmbH
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 31-07-2015:23:37:23
Order no.: 6 Test no.: 72
PORTLAOISE CO.LAOIS - CLONMINAM INDUSTRIAL ESTATE - Tel : 057 8678600Client:LUFTHANSA TECHNIK AIRMOTIVE IRL. BALDONNELL DUBLINTel. 0872364168
Pressure test report Pipe - Air/EN 1610
0 1 2 3 4 5 6 7 8 9Time in min
Pressure
0.0 mbar
125.6 mbar
110.6 mbar
139.0 mbar
Pressure build-upPre-fill time
Test duration Pressure drop
Location :Location : Dublin Drawing No. :Street : Baldonnell Section no.: :Tester : Ray o Connell from manhole : F3Test equipment : MASTERTEST® SN:130515 to manhole : F3AOrder no. : 6 Length of test section : 13.0 mTest date : 30/04/2014 18:27:00 Pipe profile : CircleTest method : Air/EN 1610 Diameter : 150 mmTest category : Air LCTest section : Pipe Pipe no. :Material : Relined pvc Internal protection : withoutRemark :
Sensor : PMC131 -300 - +300 mbar, SN: H4086001052 Sensor test : 16/05/2013Approval :
Test pressure : 125.6 mbar Pre-fill time : 5:02 minPermiss. pressure loss : 15.0 mbar Test duration : 3:00 minAct. pressure loss : -0.7 mbar Result : Passed
Testing contractor Client
Side 7© 1999-2013, Sklarz GmbH
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 31-07-2015:23:37:23
Order no.: 6 Test no.: 73
PORTLAOISE CO.LAOIS - CLONMINAM INDUSTRIAL ESTATE - Tel : 057 8678600Client:LUFTHANSA TECHNIK AIRMOTIVE IRL. BALDONNELL DUBLINTel. 0872364168
Pressure test report Pipe - Air/EN 1610
0 1 2 3 4 5 6 7 8 9Time in min
Pressure
0.0 mbar
125.8 mbar
110.8 mbar
139.0 mbar
Pressure build-upPre-fill time
Test duration Pressure drop
Location :Location : Dublin Drawing No. :Street : Baldonnell Section no.: :Tester : Ray o Connell from manhole : F27.2Test equipment : MASTERTEST® SN:130515 to manhole : F27.3Order no. : 6 Length of test section : 25.0 mTest date : 30/04/2014 18:37:41 Pipe profile : CircleTest method : Air/EN 1610 Diameter : 100 mmTest category : Air LCTest section : Pipe Pipe no. :Material : PVC Internal protection : withoutRemark :
Sensor : PMC131 -300 - +300 mbar, SN: H4086001052 Sensor test : 16/05/2013Approval :
Test pressure : 125.8 mbar Pre-fill time : 5:02 minPermiss. pressure loss : 15.0 mbar Test duration : 3:01 minAct. pressure loss : -0.7 mbar Result : Passed
Testing contractor Client
Side 8© 1999-2013, Sklarz GmbH
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 31-07-2015:23:37:23
Order no.: 6 Test no.: 74
PORTLAOISE CO.LAOIS - CLONMINAM INDUSTRIAL ESTATE - Tel : 057 8678600Client:LUFTHANSA TECHNIK AIRMOTIVE IRL. BALDONNELL DUBLINTel. 0872364168
Pressure test report Pipe - Air/EN 1610
0 1 2 3 4 5 6 7 8Time in min
Pressure
0.0 mbar
128.6 mbar
113.6 mbar
142.0 mbar
Pressure build-upPre-fill time
Test duration Pressure drop
Location :Location : Dublin Drawing No. :Street : Baldonnell Section no.: :Tester : Ray o Connell from manhole : F11Test equipment : MASTERTEST® SN:130515 to manhole : F11AOrder no. : 6 Length of test section : 8.0 mTest date : 30/04/2014 18:48:05 Pipe profile : CircleTest method : Air/EN 1610 Diameter : 150 mmTest category : Air LCTest section : Pipe Pipe no. :Material : Relined clay Internal protection : withoutRemark :
Sensor : PMC131 -300 - +300 mbar, SN: H4086001052 Sensor test : 16/05/2013Approval :
Test pressure : 128.6 mbar Pre-fill time : 5:00 minPermiss. pressure loss : 15.0 mbar Test duration : 3:02 minAct. pressure loss : -0.7 mbar Result : Passed
Testing contractor Client
Side 9© 1999-2013, Sklarz GmbH
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 31-07-2015:23:37:23
Order no.: 6 Test no.: 75
PORTLAOISE CO.LAOIS - CLONMINAM INDUSTRIAL ESTATE - Tel : 057 8678600Client:LUFTHANSA TECHNIK AIRMOTIVE IRL. BALDONNELL DUBLINTel. 0872364168
Pressure test report Pipe - Air/EN 1610
0 1 2 3 4 5 6 7 8 9Time in min
Pressure
0.0 mbar
120.2 mbar
105.2 mbar
133.0 mbar
Pressure build-upPre-fill time
Test duration Pressure drop
Location :Location : Dublin Drawing No. :Street : Baldonnell Section no.: :Tester : Ray o Connell from manhole : F11ATest equipment : MASTERTEST® SN:130515 to manhole : F20Order no. : 6 Length of test section : 32.2 mTest date : 30/04/2014 18:58:43 Pipe profile : CircleTest method : Air/EN 1610 Diameter : 150 mmTest category : Air LCTest section : Pipe Pipe no. :Material : Relined clay Internal protection : withoutRemark :
Sensor : PMC131 -300 - +300 mbar, SN: H4086001052 Sensor test : 16/05/2013Approval :
Test pressure : 120.2 mbar Pre-fill time : 5:01 minPermiss. pressure loss : 15.0 mbar Test duration : 3:02 minAct. pressure loss : -0.5 mbar Result : Passed
Testing contractor Client
Side 10© 1999-2013, Sklarz GmbH
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 31-07-2015:23:37:23
Order no.: 6 Test no.: 75Pipe Air/VacuumDiameter Manhole Test
Test no. Section no. from Location Standard Test pressure in mbarTest date No. to Street Procedure Length in m Result
Pressure loss
10068 ALK 1 Dublin EN 1610 100 -0.7530/04/2014 14:18:31 ALK 1A Baldonnell Air LC 15.5 Passed
70 F26 Dublin EN 1610 100 -10.0930/04/2014 15:57:54 F14A Baldonnell Air LC 7.3 Passed
71 F27 Dublin EN 1610 100 -0.1130/04/2014 16:10:18 F23 Baldonnell Air LC 7.0 Passed
73 F27.2 Dublin EN 1610 100 -0.6830/04/2014 18:37:41 F27.3 Baldonnell Air LC 25.0 Passed
Quantity 4 PassedTotal length in m: 54.80
15069 ACID 2 Dublin EN 1610 100 0.0030/04/2014 14:28:59 SUMP Baldonnell Air LC 7.0 Passed
72 F3 Dublin EN 1610 100 -0.6830/04/2014 18:27:00 F3A Baldonnell Air LC 13.0 Passed
74 F11 Dublin EN 1610 100 -0.7130/04/2014 18:48:05 F11A Baldonnell Air LC 8.0 Passed
75 F11A Dublin EN 1610 100 -0.4930/04/2014 18:58:43 F20 Baldonnell Air LC 32.2 Passed
Side 11© 1999-2013, Sklarz GmbH
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 31-07-2015:23:37:23
Order no.: 6 Test no.: 75
Quantity 4 PassedTotal length in m: 60.20
22567 F 1E DUBLIN EN 1610 100 -2.6330/04/2014 11:16:09 F 22.1 BALDONNELL Air LC 97.5 Passed
Quantity 1 PassedTotal length in m: 97.50
Side 12© 1999-2013, Sklarz GmbH
For
insp
ectio
n pur
pose
s only
.
Conse
nt of
copy
right
owne
r req
uired
for a
ny ot
her u
se.
EPA Export 31-07-2015:23:37:23