An array (Matrix) of small turbines instead of conventional sized turbines
Best suited for low head sites with existing dam and weir structures
Most economical in larger numbers -> not a typical small hydroapplication
HYDROMATRIX
An innovative way to hydropower generation
Conventional HYDROMATRIX
-
7/30/2019 Hydromatrix-Andritz
3/32
www.andritz.com3 ANDRITZ HYDRO 2011
Use of existing weir structures
No major civil construction > less cost
Little excavation & no coffer dams > less geological risk
No additional land usage -> environmentally friendly
Existing river flow pattern can be maintained
HYDROMATRIX Modules removeable at flood conditions
Standardized modular concept
Compressed project schedule
High availability & easy maintenance
HYDROMATRIX
Advantages
-
7/30/2019 Hydromatrix-Andritz
4/32www.andritz.com4 ANDRITZ HYDRO 2011
HYDROMATRIX
Application Range
Plant Flow > 60 m/sPlant Flow > 60 m/s
Head
2 - 20 mHead
2 - 20 m
Submergence
> 1.5 m
Submergence
> 1.5 mHWL
TWL
Sill levelUnit flow 5-12 m3/sUnit Output
100 kW
up to 1500 kW
-
7/30/2019 Hydromatrix-Andritz
5/32www.andritz.com5 ANDRITZ HYDRO 2011
Lower St. Anthony Falls
Chievo
HYDROMATRIX Projects
Locations
Ashta I&II
Agonitz
Nussdorf
Freudenau
Jebel Aulia
Colebrook
-
7/30/2019 Hydromatrix-Andritz
6/32www.andritz.com6 ANDRITZ HYDRO 2011
Unregulated propeller turbine (CuAlNiFe or CrNi 13.4)
Directly driven synchronous (Permanent Magnet
Technology) or asynchronous generator
Welded hydraulic steel structure
Mechanical face seal
Roller type bearings, oil sump lubrication
Light weight (9 13 t) -> truckable
Minimum maintenance
-> annual oil change
Flexible concept - Modular switchgear
HYDROMATRIX
Design Features
-
7/30/2019 Hydromatrix-Andritz
7/32www.andritz.com7 ANDRITZ HYDRO 2011
HYDROMATRIX
Turbine
Generator
Turbine
Generator
HYDROMATRIX
Innovation: From HYDROMATRIXto StrafloMatrixTM
StrafloMatrixTM
-
7/30/2019 Hydromatrix-Andritz
8/32
www.andritz.com8 ANDRITZ HYDRO 2011
HYDROMATRIX StrafloMatrix
Generator outside of flow (straight flow)
Synchronous Operation
Permanent Magnet Technology
Shorter, Less Weight
No PF Compensation required
Simple Bulb Design
Synchronous or Asynchronous Operation
Perm. Magnets or Conventional Rotor Winding
Longer, Heavier than StrafloMatrix
PF Compensation (for asynchronous version only)
HYDROMATRIX
Differences HYDROMATRIXvs StrafloMatrixTM
-
7/30/2019 Hydromatrix-Andritz
9/32
www.andritz.com9 ANDRITZ HYDRO 2011
Maintenance intervals
TG-Units: Annual Oil Inspection / Change
BOP Equipment:
According to maintenance schedule
UW - Cables: Change every 10-12 years
Accessibility
Easy access to all maintenance-relevant components without disturbance of overall plant
operation
Expected life time
Identical to conventional hydropower concepts
HYDROMATRIX
Operation Aspects
-
7/30/2019 Hydromatrix-Andritz
10/32
www.andritz.com10 ANDRITZ HYDRO 2011
Navigation Dams
Irrigation Dams
Canals and
Abandoned Shiplocks
Intake Towers
HYDROMATRIX
Potential Applications
-
7/30/2019 Hydromatrix-Andritz
11/32
Application: Irrigation Dams
HYDROMATRIX
-
7/30/2019 Hydromatrix-Andritz
12/32
www.andritz.com12 ANDRITZ HYDRO 2011
Client: National Electricity Corp.
D = 1,120 mm
n = 375 rpm
H = 5.5 m
Ptu = 380 kW
80 units in 40 modules
Ptotal = 30.4 MW
Existing barrage on the White Nile
Contractaward: 2000
HYDROMATRIX Experience
Irrigation Dams J EBEL AULIA /Sudan
-
7/30/2019 Hydromatrix-Andritz
13/32
www.andritz.com13 ANDRITZ HYDRO 2011
Status November 2003
HYDROMATRIX Experience
Irrigation Dams J EBEL AULIA /Sudan
-
7/30/2019 Hydromatrix-Andritz
14/32
www.andritz.com14 ANDRITZ HYDRO 2011
Client: Energie AG
D = 1,120 mm
n = 428.6 rpm
H = 8.5 m
Ptu = 700 kW
1 unit, further developmentof
HYDROMATRIX
Contractaward: 2002
Commissioning: 2003
StrafloMatrixTM Experience
Agonitz / Austria
-
7/30/2019 Hydromatrix-Andritz
15/32
www.andritz.com15 ANDRITZ HYDRO 2011
Installation of the firstpermanent StrafloMatrix unit in March 2004
StrafloMatrixTM Experience
Agonitz / Austria
-
7/30/2019 Hydromatrix-Andritz
16/32
www.andritz.com16 ANDRITZ HYDRO 2011
Client: AHP / EVN / Wienstrom
D = 1,320 mm
n = 336.7 rpm
H = 5.86 m
Ptu = 545 kW
12 single units
Ptotal = 4.5 MW
Contractaward: 2004
Commissioning: 2005
HYDROMATRIX Experience
NUSSDORF / Austria
-
7/30/2019 Hydromatrix-Andritz
17/32
www.andritz.com17 ANDRITZ HYDRO 2011
Construction Phase
HYDROMATRIX Experience
NUSSDORF / Austria
HYDROMATRIX E i
-
7/30/2019 Hydromatrix-Andritz
18/32
www.andritz.com18 ANDRITZ HYDRO 2011
Client: AHP / EVN / Wienstrom
After commissioning in J une 2005
HYDROMATRIX Experience
NUSSDORF / Austria
CHIEVO DAM It l
-
7/30/2019 Hydromatrix-Andritz
19/32
www.andritz.com19 ANDRITZ HYDRO 2011
CHIEVO DAM - Italy
Project Location
CHIEVO DAM It l
-
7/30/2019 Hydromatrix-Andritz
20/32
www.andritz.com20 ANDRITZ HYDRO 2011
Use minimumriver discharge for
hydropower generation at existing
lock & dam
Maintain flood discharge capability
through lock
Use existing lock structure withoutmajor modifications
Preserve architectural appearance
of historic environment
Establish possibilities for fish
migration
CHIEVO DAM - Italy
Design Challenges
CHIEVO DAM Italy
-
7/30/2019 Hydromatrix-Andritz
21/32
www.andritz.com21 ANDRITZ HYDRO 2011
CHIEVO DAM - Italy
Plant Layout
StrafloMatrixTM Experience
-
7/30/2019 Hydromatrix-Andritz
22/32
www.andritz.com22 ANDRITZ HYDRO 2011
Client: Consorzio Canale Ind. le
G.Camuzzoni
D = 1,320 mm
n = 250 rpm
H = 3.8 m
Ptu
= 270 kW
5 units in 1 module
Ptotal = 1.35 MW
Annual Energy: 12 GWh
Project Start: 2007
Commissioning: 2009
Prior to StrafloMatrixplant construction
DuringStrafloMatrixplant construction
StrafloMatrixTM Experience
CHIEVO DAM / Italy
CHIEVO DAM
-
7/30/2019 Hydromatrix-Andritz
23/32
www.andritz.com23 ANDRITZ HYDRO 2011
Client: Consorzio Canale Ind. le
G.Camuzzoni
Consultant: Studio Frosio
H = 3.8 m
Ptu = 270 kW
5 StrafloMatrix units in
1 module
Ptotal = 1.35 MW
Annual Energy: 12 GWh
Project Start: 2007
Commissioning: 2009
CHIEVO DAM
Project Data
StrafloMatrixTM Experience
-
7/30/2019 Hydromatrix-Andritz
24/32
www.andritz.com24 ANDRITZ HYDRO 2011
StrafloMatrixTM Experience
CHIEVO DAM / Italy
The Winner of Austrian State Award
for Environmental and Energy
Technology 2010
LOWER ST ANTHONY FALLS - USA
-
7/30/2019 Hydromatrix-Andritz
25/32
www.andritz.com25 ANDRITZ HYDRO 2011
(3)
LOWER ST ANTHONY FALLS - USA
Project Location
LOWER ST ANTHONY FALLS - USA
-
7/30/2019 Hydromatrix-Andritz
26/32
www.andritz.com26 ANDRITZ HYDRO 2011
Use existing lock structure withoutmajor
modifications (no excavation)
Maintain flooddischarge capability
through lock
Model test at TU VIE
Fulfill grid interconnection requirements
No adverse effects on barge and rec.
boat traffic
Preserve architectural appearance of
existing lock
LOWER ST ANTHONY FALLS - USA
Design Challenges
LOWER ST ANTHONY FALLS - USA
-
7/30/2019 Hydromatrix-Andritz
27/32
www.andritz.com27 ANDRITZ HYDRO 2011
Technical Data:
16 TG-units (2 rows of 8)
H GR max = 7.6 m
P Gen = 625 kW
Max. Plant Capacity: 10 MW
Annual Energy: 62 GWh
Project Start: 2007
Commissioning: 2011
LOWER ST ANTHONY FALLS USA
StrafloMatrixTM Plant in Auxiliary Shiplock
HYDROMATRIX Experience
-
7/30/2019 Hydromatrix-Andritz
28/32
www.andritz.com28 ANDRITZ HYDRO 2011
Client: Energji Ashta
2 HYDROMATRIXplants
45 Modules (1 row) per plant
1 TG-Unit per Module
Ptotal = 24 + 45 MW
Annual Energy: 242 GWh
Project Start: Dec. 2008
Commissioning: 2012
HYDROMATRIX Experience
ASHTA 1 & 2 / Albania
HYDROMATRIX Experience
-
7/30/2019 Hydromatrix-Andritz
29/32
www.andritz.com29 ANDRITZ HYDRO 2011
Plant Layout
2 Plants, 45 TG-Units each
6 km newly constructed discharge canal between Ashta 1 & 2
Turn-key supply of E & M Equipment
HYDROMATRIX Experience
ASHTA 1 & 2 / Albania
HYDROMATRIX Experience
-
7/30/2019 Hydromatrix-Andritz
30/32
www.andritz.com30 ANDRITZ HYDRO 2011
TECHNICAL DATA: Ashta 1
OUTPUT: 45 x 534 kW = 24.03 MW / 24.64 MVA
HEAD: 4.98 m
SPEED: 300.0 rpm
RUNNER DIAMETER: 1,320 mm
RATED VOLTAGE: 3,300 V
TECHNICAL DATA: Ashta 2NUMBER OF TG-UNITS: 45
OUTPUT: 45 x 1,003 kW = 45.14 MW / 46.29 MVA
HEAD: 7.53 m
SPEED: 375.0 rpm
RUNNER DIAMETER: 1,320 mm
RATED VOLTAGE: 3,300 V
Sectional View Ashta 1
O pe e ce
ASHTA 1 & 2 / Albania
HYDROMATRIX
-
7/30/2019 Hydromatrix-Andritz
31/32
www.andritz.com31 ANDRITZ HYDRO 2011
ASHTA 1 & 2 / Albania
HYDROMATRIX
-
7/30/2019 Hydromatrix-Andritz
32/32
www.andritz.com32 ANDRITZ HYDRO 2011
For more information about HYDROMATRIX please contact:
Alexander BIHLMAYER
HYDROMATRIX Product Management
ANDRITZ HYDRO GmbHA - 4031 Linz, Austria
Lunzerstrasse 78
Phone: +43 (732) 6986 74261Fax: +43 (732) 6980 2554
E-mail: [email protected]
Web: http://www.andritz.com
Contact Worldwide