![Page 1: HydroEurope Presentation Team9 – Web-Collaborative Work Contact:: team9@hydroeurope.org February 22nd 2010 Presentation on Web Collaborative Work Team.](https://reader035.fdocuments.in/reader035/viewer/2022062323/56649e5c5503460f94b54b69/html5/thumbnails/1.jpg)
HydroEurope PresentationTeam9 – Web-Collaborative WorkContact:: [email protected]
February 22nd 2010
Presentation on Web Collaborative Work Team 9
Date: February 22nd 2010
![Page 2: HydroEurope Presentation Team9 – Web-Collaborative Work Contact:: team9@hydroeurope.org February 22nd 2010 Presentation on Web Collaborative Work Team.](https://reader035.fdocuments.in/reader035/viewer/2022062323/56649e5c5503460f94b54b69/html5/thumbnails/2.jpg)
HydroEurope PresentationTeam9 – Web-Collaborative WorkContact:: [email protected]
February 22nd 2010
Team 9 : who’s who?
Amine Bouarab
Morgan AbilyPoh Hoon Ang
Roland Baatz
Gonzalo Pena C. Evert De Proost
Vu Dinh ThaiJose Luis Aragon
Albert Guido Moshi
![Page 3: HydroEurope Presentation Team9 – Web-Collaborative Work Contact:: team9@hydroeurope.org February 22nd 2010 Presentation on Web Collaborative Work Team.](https://reader035.fdocuments.in/reader035/viewer/2022062323/56649e5c5503460f94b54b69/html5/thumbnails/3.jpg)
HydroEurope PresentationTeam9 – Web-Collaborative WorkContact:: [email protected]
February 22nd 2010
Team 9 : and special guest...
Masato OKABE
![Page 4: HydroEurope Presentation Team9 – Web-Collaborative Work Contact:: team9@hydroeurope.org February 22nd 2010 Presentation on Web Collaborative Work Team.](https://reader035.fdocuments.in/reader035/viewer/2022062323/56649e5c5503460f94b54b69/html5/thumbnails/4.jpg)
HydroEurope PresentationTeam9 – Web-Collaborative WorkContact:: [email protected]
February 22nd 2010
Web collaboration : objectives
• Get in touch with teammates• GIS Modeling• Hydrological analysis:
Rainfall interpolation
Frequency analysis
Rough model
Conceptual model• Prepare Mike11 and MikeSHE
![Page 5: HydroEurope Presentation Team9 – Web-Collaborative Work Contact:: team9@hydroeurope.org February 22nd 2010 Presentation on Web Collaborative Work Team.](https://reader035.fdocuments.in/reader035/viewer/2022062323/56649e5c5503460f94b54b69/html5/thumbnails/5.jpg)
HydroEurope PresentationTeam9 – Web-Collaborative WorkContact:: [email protected]
February 22nd 2010
Goals face-to-face meeting
• Physically based hydrological modeling (Mike SHE)• Mike 11 and ISIS modeling• Strategy for flood wave approach
• Have a great time in Nice
Work hard, play hard
![Page 6: HydroEurope Presentation Team9 – Web-Collaborative Work Contact:: team9@hydroeurope.org February 22nd 2010 Presentation on Web Collaborative Work Team.](https://reader035.fdocuments.in/reader035/viewer/2022062323/56649e5c5503460f94b54b69/html5/thumbnails/6.jpg)
HydroEurope PresentationTeam9 – Web-Collaborative WorkContact:: [email protected]
February 22nd 2010
The Web-SiteGeneral layout
![Page 7: HydroEurope Presentation Team9 – Web-Collaborative Work Contact:: team9@hydroeurope.org February 22nd 2010 Presentation on Web Collaborative Work Team.](https://reader035.fdocuments.in/reader035/viewer/2022062323/56649e5c5503460f94b54b69/html5/thumbnails/7.jpg)
HydroEurope PresentationTeam9 – Web-Collaborative WorkContact:: [email protected]
February 22nd 2010
The Web-SiteTeam Memberspresentation
![Page 8: HydroEurope Presentation Team9 – Web-Collaborative Work Contact:: team9@hydroeurope.org February 22nd 2010 Presentation on Web Collaborative Work Team.](https://reader035.fdocuments.in/reader035/viewer/2022062323/56649e5c5503460f94b54b69/html5/thumbnails/8.jpg)
HydroEurope PresentationTeam9 – Web-Collaborative WorkContact:: [email protected]
February 22nd 2010
Problem description
Reflection and work guideline
Improvement of the phenomena description and
Problem resolution
Morphological and physical
Watersheds characteristics
DEM elaboration
Grids creation and analysis
GIS analysis
Hydrological Analysis
Modeling Tool
Data analysisO
bjectives of the GIS
-Work
+ Tools: ESRI ARCGIS 9.3 and it’s extensions
+ DEM Input for our upcoming models+ Morphological and physical watersheds characteristics Input for hydrological analysis
The Web-SitePlace and Objectives of The GIS-Work Inside Our Project
![Page 9: HydroEurope Presentation Team9 – Web-Collaborative Work Contact:: team9@hydroeurope.org February 22nd 2010 Presentation on Web Collaborative Work Team.](https://reader035.fdocuments.in/reader035/viewer/2022062323/56649e5c5503460f94b54b69/html5/thumbnails/9.jpg)
HydroEurope PresentationTeam9 – Web-Collaborative WorkContact:: [email protected]
February 22nd 2010
Esteron
Var
Tinée Vésubie
Var low valley
0%
20%
40%
60%
80%
100%
Var Lowvalley
Var highvalley
Vesubie Esteron Tinée
Water bodies
Wetlands
Forest and semi natural areas
Agricultural areas
Artificial surfaces
View of the 75m grid DEM using ARC Scene
• 300m and 75m grid DEM:• Watershed subdivision and
characteristic for each sub catchment:
Area
Longest path flow
Slope
Land use
Output of the ARCGIS Work
![Page 10: HydroEurope Presentation Team9 – Web-Collaborative Work Contact:: team9@hydroeurope.org February 22nd 2010 Presentation on Web Collaborative Work Team.](https://reader035.fdocuments.in/reader035/viewer/2022062323/56649e5c5503460f94b54b69/html5/thumbnails/10.jpg)
HydroEurope PresentationTeam9 – Web-Collaborative WorkContact:: [email protected]
February 22nd 2010
Hydrological Analysis• To perform a frequency analysis • To obtain an average rainfall using different methods • To determine the rainfall losses • To establish a unit hydrograph • To obtain surface runoff • To perform the flow propagation
![Page 11: HydroEurope Presentation Team9 – Web-Collaborative Work Contact:: team9@hydroeurope.org February 22nd 2010 Presentation on Web Collaborative Work Team.](https://reader035.fdocuments.in/reader035/viewer/2022062323/56649e5c5503460f94b54b69/html5/thumbnails/11.jpg)
HydroEurope PresentationTeam9 – Web-Collaborative WorkContact:: [email protected]
February 22nd 2010
Average Rainfall
![Page 12: HydroEurope Presentation Team9 – Web-Collaborative Work Contact:: team9@hydroeurope.org February 22nd 2010 Presentation on Web Collaborative Work Team.](https://reader035.fdocuments.in/reader035/viewer/2022062323/56649e5c5503460f94b54b69/html5/thumbnails/12.jpg)
HydroEurope PresentationTeam9 – Web-Collaborative WorkContact:: [email protected]
February 22nd 2010
Effective Rainfall
![Page 13: HydroEurope Presentation Team9 – Web-Collaborative Work Contact:: team9@hydroeurope.org February 22nd 2010 Presentation on Web Collaborative Work Team.](https://reader035.fdocuments.in/reader035/viewer/2022062323/56649e5c5503460f94b54b69/html5/thumbnails/13.jpg)
HydroEurope PresentationTeam9 – Web-Collaborative WorkContact:: [email protected]
February 22nd 2010
Hydrograph
![Page 14: HydroEurope Presentation Team9 – Web-Collaborative Work Contact:: team9@hydroeurope.org February 22nd 2010 Presentation on Web Collaborative Work Team.](https://reader035.fdocuments.in/reader035/viewer/2022062323/56649e5c5503460f94b54b69/html5/thumbnails/14.jpg)
HydroEurope PresentationTeam9 – Web-Collaborative WorkContact:: [email protected]
February 22nd 2010
Conclusion – Mission Accomplished?
• Get in touch with team mates?• GIS analysis?• Hydrological analysis with
- rainfall interpolation- frequency analysis - rough model- conceptual model
• Prepare Mike11 and MikeSHE
![Page 15: HydroEurope Presentation Team9 – Web-Collaborative Work Contact:: team9@hydroeurope.org February 22nd 2010 Presentation on Web Collaborative Work Team.](https://reader035.fdocuments.in/reader035/viewer/2022062323/56649e5c5503460f94b54b69/html5/thumbnails/15.jpg)
HydroEurope PresentationTeam9 – Web-Collaborative WorkContact:: [email protected]
February 22nd 2010
Thank you for your attention!