HYDROELECTRIC POWER PLANTS - M A Industrie · Power plant shut down for a number of years,...

4

Transcript of HYDROELECTRIC POWER PLANTS - M A Industrie · Power plant shut down for a number of years,...

Page 1: HYDROELECTRIC POWER PLANTS - M A Industrie · Power plant shut down for a number of years, renovation to obtain the H07 contract or repairs following an incident; M.A.INDUSTRIE can
Page 2: HYDROELECTRIC POWER PLANTS - M A Industrie · Power plant shut down for a number of years, renovation to obtain the H07 contract or repairs following an incident; M.A.INDUSTRIE can

Preliminary design:M.A.INDUSTRIE studies thedimensional, environmentaland technical constraints onyour site to design and costthe trash rack cleaning

solution best suited to your needs. We can devisecostings for your project from your plans or our ownsite survey.

Study:M.A.INDUSTRIE itself designsall the mechanical andautomation systems for itsown trash rack cleaners.With our volume modellingsoftware we can easily simulate the kinematics andcalculate the forces involved; you can then forwardthe findings to your civil engineering contractors.Our automation engineers have a wealth ofexperience in the industry and can program mostindustrial PLCs.

Manufacture:With 2000 m² of workshopsavailable, M.A.INDUSTRIEcan handle all phasesof production. Dedicatedmachine welding, painting,

machining, wiring and assembly workshops. Testingand adjustment is carried out as far as possible inour workshop, with final adjustments made on site.M.A.INDUSTRIE also has 1000 m² storage spaceavailable.

Installation on site:M.A.INDUSTRIE’s installa-tion teams are availablethroughout France toremove your old equipmentand install your new trashrack cleaning machine. Our site managers all shareour guiding values of quality, safety and on-timedelivery.Our installation technicians undergo regular trainingto ensure their qualifications are kept up to date.

Remote management:M.A.INDUSTRIE’s trash rackcleaners are fully automatic,but we also offer a remotemanagement option which,when l inked to v ideo

monitoring, allows you to operate the trash rackcleaner manually from any computer with an Internetconnection. This option is also available on tabletsand smartphones.

Maintenance:All M.A.INDUSTRIE equip-ment is shipped with adetailed instruction andmaintenance manual. Ourinstallation engineers canbe deployed rapidly on site to assist with anyservicing or maintenance requirements for any typeof trash rack cleaner.

Fixedtrash rack cleanerwith channeldischarge(fish friendly)

Travellingtrash rack cleanerwith channeldischarge

Travellingtrash rack cleaner

with ditchdischarge

Travellingtrash rack cleaner

with skipdischarge

Page 3: HYDROELECTRIC POWER PLANTS - M A Industrie · Power plant shut down for a number of years, renovation to obtain the H07 contract or repairs following an incident; M.A.INDUSTRIE can

Preliminary design:Power plant shut down for anumber of years, renovationto obtain the H07 contractor repairs following anincident; M.A.INDUSTRIE

can cost your restoration project based on its 20years’ experience in hydroelectric power generation.We service power plants up to 5 MW.

Installation on site:M.A.INDUSTRIE’s installa-tion teams can travel allover France to dismantleand refit your hydraulicturbine. We work on allkinds of turbine: Kaplan, Francis, Pelton, Banki,…and we are familiar with the majority of older andmore recent manufacturers.

Analysis:M.A.INDUSTRIE’s engineerswill assess the equipmentremoved so as to achievethe best possible cost/returnratio.

A fully justified and costed report is provided at theend of the removal process before the renovationwork begins.We design and provide drawings for parts requiringrepair and provide a complete job file at the end ofthe work.

Repairs:M.A.INDUSTRIE will over-see any specific repairwork to your hydraulicturbine: bearing adjust-ment, impeller fabrication,shaft repairs, along with a full range of commonservice options: impeller reconditioning, flangereinforcement, seal and guide reconstruction,machining of small and medium sized parts.

Testing and adjustment:Preadjustment of the machi-nery is carried out byM.A.INDUSTRIE’s installerswhen re-fitting the turbine. Adocument describing test

procedures is prepared and discussed with theoperator before the water supply is restored to yourplant, to ensure the safety of people and equipment.The test manager will check any final adjustmentsbefore the plant is brought back into service.

Maintenance:M.A.INDUSTRIE’s installa-t ion teams are a lsoavailable for all yourpreventive and correctivemaintenance needs.

Before After Before After

Francis 410 kW Kaplan 2000 kW Pelton 1800 kW Francis 240 kW

Page 4: HYDROELECTRIC POWER PLANTS - M A Industrie · Power plant shut down for a number of years, renovation to obtain the H07 contract or repairs following an incident; M.A.INDUSTRIE can