w w w . h m r . g o v . i n 1
Hyderabad Metro Rail - an Urban Redesign Opportunity
London,13.07.2015
NVS ReddyManaging Director,
Hyderabad Metro Rail Ltd.
Presentation at Smart Secure and Sustainable Cities India Summit
![Page 2: Hyderabad Metro Rail - an Urban Redesign Opportunity - Mr. NVS Reddy](https://reader036.fdocuments.in/reader036/viewer/2022081420/55cef2dcbb61ebca3d8b466a/html5/thumbnails/2.jpg)
w w w . h m r . g o v . i n 2
India
India
Hyderabad
Hyderabad city – geographical location
![Page 3: Hyderabad Metro Rail - an Urban Redesign Opportunity - Mr. NVS Reddy](https://reader036.fdocuments.in/reader036/viewer/2022081420/55cef2dcbb61ebca3d8b466a/html5/thumbnails/3.jpg)
w w w . h m r . g o v . i n 3
• India, a late entrant in urbanizn
• Now rapid urbanizn- scale & speed not happened anywhere other than in China
• Urban pop. from 30% (30 Cr.) to 40% (60 Cr.) by 2030 – will be doubled & twice the pop. of the US today
• Urbanizn – both a challenge & an opportunity to rebuild India & fast track economic growth
• At just 30% urbanizn – Indian cities already bursting at seams & infrastructure cracking
• McKinsey estimates $1.2 trillion (76 Lakh Cr.) investmt to meet infrastructure demand in urban India
• McKinsey estimates about 8,400 km of metro rail requirement in 35 top Tier I & Tier II Indian cities
India’s Urbanization
![Page 4: Hyderabad Metro Rail - an Urban Redesign Opportunity - Mr. NVS Reddy](https://reader036.fdocuments.in/reader036/viewer/2022081420/55cef2dcbb61ebca3d8b466a/html5/thumbnails/4.jpg)
w w w . h m r . g o v . i n 4
Hyderabad, a city of 10m pop
Capital of the Southern State of Telangana
Historical City – now hub of pharma industry, research institutes, IT/ITES Service Sector Economy
Severe traffic congestion & increasing pollution levels
Lack of efficient, reliable & comfortable PTS increase in personal vehicles: 3.0 million vehs + addition of 0.3 m p.a
Total motorized trips: 7 m per day – Bus + local rail: 44%; Two wheelers: 30%; Autos: 16%; cars: 10%
Traffic & Transportation Scenario in Hyderabad
![Page 5: Hyderabad Metro Rail - an Urban Redesign Opportunity - Mr. NVS Reddy](https://reader036.fdocuments.in/reader036/viewer/2022081420/55cef2dcbb61ebca3d8b466a/html5/thumbnails/5.jpg)
w w w . h m r . g o v . i n 5
A completely elevated MRT project in Hyderabad (Telangana, Southern India)
3 Corridors/Lines (72 km) in Phase I: 66 stns & 3 Depots
World’s largest Metro Rail project in PPP mode
Main project cost : USD 2.28 b (INR 14,132 Cr.) + Property Devpt. ph.I USD 0.36b (INR 2,243 Cr.) + Land & other costs USD 0.32 b (INR 1,980 Cr.) = USD 2.96 b (INR 18,355 Cr.)
Implementing Entity:
● Concessioning Authority: Hyderabad Metro Rail Limited (Govt. of Telangana)
● Concessionaire (Pvt. Sector): L&T Metro Rail (Hyderabad) Limited, an SPV of USD 14 b (INR 84,000 Cr. ) L&T
Hyderabad Metro Rail Project
![Page 6: Hyderabad Metro Rail - an Urban Redesign Opportunity - Mr. NVS Reddy](https://reader036.fdocuments.in/reader036/viewer/2022081420/55cef2dcbb61ebca3d8b466a/html5/thumbnails/6.jpg)
w w w . h m r . g o v . i n 6
Miyapur
Ameerpet
M.G.Bus Station
Jubilee Bus Station
Parade Grounds
Falaknuma
L.B.Nagar
Nagole
Shilparamam
JNTU
KPHB Colony
Kukatpally
Balanagar
Moosapet
Bharat Nagar
Erragadda
ESI
S.R.Nagar
Panjagutta
Irrum Manzil
Khairatabad
Lakdi-ka-pul
Assembly
Nampally
Gandhi Bhavan
OMC MalakpetNew Market
Musarambagh
Dilsukhnagar
Chaitanyapuri
Victoria Memorial
Secunderabad R.S
Gandhi Hospital
Musheerabad
RTC X Road
Chikkadpally
Narayanaguda
Sultan Bazaar
Salarjung Museum
Charminar
Shalibanda
Shamsheergunj
Jangammet
Uppal
NGRI
Habsiguda
Tarnaka
Mettuguda
Secunderabad
Paradise
Rasoolpura
Prakash Nagar
Begumpet
Madhura NagarYusufguda
Jubilee Hills Road No.5
Jubilee Hills Check Post
Peddamma Temple
Madhapur PS
Durgam Cheruvu
Hitec City
Hyderabad Metro Rail Corridors
3 Traffic corridors (72 km) in phase I. Cost INR 14,132 Cr.
1. Miyapur – L.B.Nagar : 29 km; 27 stns
2. Jubilee Bus Station – Falaknuma : 15 km; 16 stns
3. Nagole – Shilparamam : 28 km; 23 stns
Metro Rail Interchange
MMTS Integration
Integration with Rail Terminals
Integration with Bus Stations
1
2
3
2
1
3
Survey of India
![Page 7: Hyderabad Metro Rail - an Urban Redesign Opportunity - Mr. NVS Reddy](https://reader036.fdocuments.in/reader036/viewer/2022081420/55cef2dcbb61ebca3d8b466a/html5/thumbnails/7.jpg)
w w w . h m r . g o v . i n 7
Phase I: 3 corridors; 72 km; 66 stations & 3 Depots
Integration/Interchange with Main rail terminals & Bus Depots
‘Transit +’ concept: Last mile connectivity with Feeder Buses, NMT, Pedestrian Facilities & Street Furniture
Not a simple Metro, but an urban redesign & rejuvenation effort to transform Hyderabad into a people friendly green city
Eco-friendly stations with natural ventilation, skywalks, bicycle stations & tracks and other commuter friendly facilities
Expected to generate about INR 50,000 Cr. (USD 8.06 b) investments in Hyderabad & it’s surroundings
Hyderabad Metro Rail as “ Transit + ”
![Page 8: Hyderabad Metro Rail - an Urban Redesign Opportunity - Mr. NVS Reddy](https://reader036.fdocuments.in/reader036/viewer/2022081420/55cef2dcbb61ebca3d8b466a/html5/thumbnails/8.jpg)
w w w . h m r . g o v . i n 8
Project cost : USD 2.73 b (INR 16,375 Cr.)(MRT : 2.36 b (INR 14,132 Cr.) + Property Devpt : 0.37 b (INR 2,243 Cr.))
Senior Debt : USD 1.91 b (INR 11,478 Cr.) Subordinate Debt : USD 0.17 b (INR 1,000 Cr. ) Equity : USD 0.41 b (INR 2,439 Cr.) Other Sources (VGF) : USD 0.24 b (INR 1,458 Cr.)
Total : USD 2.73 b (INR 16,375 Cr.)
Financial Closure achieved in March 2011
Revenue Model: 50% from Fare box; 45% from Property devpt; 5% Misc (Ads + Parking fee)
IRR
Project IRR : 13.89%
Equity IRR : 17.50%
Funding Pattern & Financial model
![Page 9: Hyderabad Metro Rail - an Urban Redesign Opportunity - Mr. NVS Reddy](https://reader036.fdocuments.in/reader036/viewer/2022081420/55cef2dcbb61ebca3d8b466a/html5/thumbnails/9.jpg)
w w w . h m r . g o v . i n 9
Lenders’ Engineer
Consultants for Carbon Credits
• Independent Engineer : Louis Berger, USA • Safety Consultant : Eptisa, Spain
Programme Manager
Concessionaire’s Engineer(CE)
Independent Safety and RAM Assessor
Lenders Insurance Consultant-Marsh India Pvt. Ltd.
Operation & Maintenance Contractor
The Team (Authority, Concessionaire, Consultants etc.,)
Concessionaire : L&TMRHL
Authority : Hyderabad Metro Rail Limited (GoT)
8
![Page 10: Hyderabad Metro Rail - an Urban Redesign Opportunity - Mr. NVS Reddy](https://reader036.fdocuments.in/reader036/viewer/2022081420/55cef2dcbb61ebca3d8b466a/html5/thumbnails/10.jpg)
w w w . h m r . g o v . i n 10
Viaduct Stations Depots
Rolling StockAutomatic fare
collection
OETS, PSS, Electrical & Tracks
Signalling & Train control Communication
Lifts & Escalators
Transit Oriented Development
Engineering, Procurement & Construction contractors
![Page 11: Hyderabad Metro Rail - an Urban Redesign Opportunity - Mr. NVS Reddy](https://reader036.fdocuments.in/reader036/viewer/2022081420/55cef2dcbb61ebca3d8b466a/html5/thumbnails/11.jpg)
w w w . h m r . g o v . i n 11
We are redesigning the city
It’s a people’s project
Engineers’ Paradise vis-a-vis People’s Project
![Page 12: Hyderabad Metro Rail - an Urban Redesign Opportunity - Mr. NVS Reddy](https://reader036.fdocuments.in/reader036/viewer/2022081420/55cef2dcbb61ebca3d8b466a/html5/thumbnails/12.jpg)
w w w . h m r . g o v . i n 12
City for children, women, senior
citizens & differently abled
Gender equality & women’s
empowerment
Urban Redesign
![Page 13: Hyderabad Metro Rail - an Urban Redesign Opportunity - Mr. NVS Reddy](https://reader036.fdocuments.in/reader036/viewer/2022081420/55cef2dcbb61ebca3d8b466a/html5/thumbnails/13.jpg)
w w w . h m r . g o v . i n 13
Happy City
Quality Public space
Public space & poorer sections
Affordable transportation with
comfort
![Page 14: Hyderabad Metro Rail - an Urban Redesign Opportunity - Mr. NVS Reddy](https://reader036.fdocuments.in/reader036/viewer/2022081420/55cef2dcbb61ebca3d8b466a/html5/thumbnails/14.jpg)
w w w . h m r . g o v . i n 14
Happy City
Promoting family values
BAQ & improving livability
![Page 15: Hyderabad Metro Rail - an Urban Redesign Opportunity - Mr. NVS Reddy](https://reader036.fdocuments.in/reader036/viewer/2022081420/55cef2dcbb61ebca3d8b466a/html5/thumbnails/15.jpg)
w w w . h m r . g o v . i n 15
Not a simple ‘Transit’ project
but ‘Transit +’
Efficient city with low carbon
footprint
‘Transit’ to ‘Transit +’
![Page 16: Hyderabad Metro Rail - an Urban Redesign Opportunity - Mr. NVS Reddy](https://reader036.fdocuments.in/reader036/viewer/2022081420/55cef2dcbb61ebca3d8b466a/html5/thumbnails/16.jpg)
w w w . h m r . g o v . i n 16
Improving productivity &
enabling quality time
Multimodal integration + NMT
Pedestrian facilities; Skywalks;
Sidewalks; Bike stns, etc.
‘Transit’ to ‘Transit +’
![Page 17: Hyderabad Metro Rail - an Urban Redesign Opportunity - Mr. NVS Reddy](https://reader036.fdocuments.in/reader036/viewer/2022081420/55cef2dcbb61ebca3d8b466a/html5/thumbnails/17.jpg)
w w w . h m r . g o v . i n 17
Skywalks for Connectivity & Road crossing
![Page 18: Hyderabad Metro Rail - an Urban Redesign Opportunity - Mr. NVS Reddy](https://reader036.fdocuments.in/reader036/viewer/2022081420/55cef2dcbb61ebca3d8b466a/html5/thumbnails/18.jpg)
w w w . h m r . g o v . i n 18
Integration with existing Rail
terminals, MMTS stns & Bus
depots
“Merry go round” feeder buses
between Metro stns & catchment
areas “seamless travel” – on
same ticket
Hyderabad Metro Rail & Last Mile connectivity
![Page 19: Hyderabad Metro Rail - an Urban Redesign Opportunity - Mr. NVS Reddy](https://reader036.fdocuments.in/reader036/viewer/2022081420/55cef2dcbb61ebca3d8b466a/html5/thumbnails/19.jpg)
w w w . h m r . g o v . i n 19
Greenery, Street Furniture, Bicycle Tracks, Pedestrianisation, etc.
![Page 20: Hyderabad Metro Rail - an Urban Redesign Opportunity - Mr. NVS Reddy](https://reader036.fdocuments.in/reader036/viewer/2022081420/55cef2dcbb61ebca3d8b466a/html5/thumbnails/20.jpg)
w w w . h m r . g o v . i n 20
Hyderabad Metro Rail – Green Initiatives (3,00,000 saplings planted)
![Page 21: Hyderabad Metro Rail - an Urban Redesign Opportunity - Mr. NVS Reddy](https://reader036.fdocuments.in/reader036/viewer/2022081420/55cef2dcbb61ebca3d8b466a/html5/thumbnails/21.jpg)
w w w . h m r . g o v . i n 21
Happy City
Improving competitiveness
Brand Equity of Hyderabad
![Page 22: Hyderabad Metro Rail - an Urban Redesign Opportunity - Mr. NVS Reddy](https://reader036.fdocuments.in/reader036/viewer/2022081420/55cef2dcbb61ebca3d8b466a/html5/thumbnails/22.jpg)
w w w . h m r . g o v . i n 22
Metro Rail for a Global City
(Works in Progress)
![Page 23: Hyderabad Metro Rail - an Urban Redesign Opportunity - Mr. NVS Reddy](https://reader036.fdocuments.in/reader036/viewer/2022081420/55cef2dcbb61ebca3d8b466a/html5/thumbnails/23.jpg)
w w w . h m r . g o v . i n 23
Depot
During
Before
After
![Page 24: Hyderabad Metro Rail - an Urban Redesign Opportunity - Mr. NVS Reddy](https://reader036.fdocuments.in/reader036/viewer/2022081420/55cef2dcbb61ebca3d8b466a/html5/thumbnails/24.jpg)
w w w . h m r . g o v . i n 24
Depot ProgressAdmin/OCC Building Annexe Building
Work ShopTest Tracks
![Page 25: Hyderabad Metro Rail - an Urban Redesign Opportunity - Mr. NVS Reddy](https://reader036.fdocuments.in/reader036/viewer/2022081420/55cef2dcbb61ebca3d8b466a/html5/thumbnails/25.jpg)
w w w . h m r . g o v . i n 25
Row of well shaped piers (pillars)
Aesthetic construction of elevated viaduct
![Page 26: Hyderabad Metro Rail - an Urban Redesign Opportunity - Mr. NVS Reddy](https://reader036.fdocuments.in/reader036/viewer/2022081420/55cef2dcbb61ebca3d8b466a/html5/thumbnails/26.jpg)
w w w . h m r . g o v . i n 26
Cantilever type Metro station resting on the central pillars Concourse level of Metro Station
Platform level of Metro Station Ticket Vending Machine
Automatic Fare Collection Gates
![Page 27: Hyderabad Metro Rail - an Urban Redesign Opportunity - Mr. NVS Reddy](https://reader036.fdocuments.in/reader036/viewer/2022081420/55cef2dcbb61ebca3d8b466a/html5/thumbnails/27.jpg)
w w w . h m r . g o v . i n 27
Hyderabad Metro Train
![Page 28: Hyderabad Metro Rail - an Urban Redesign Opportunity - Mr. NVS Reddy](https://reader036.fdocuments.in/reader036/viewer/2022081420/55cef2dcbb61ebca3d8b466a/html5/thumbnails/28.jpg)
w w w . h m r . g o v . i n 28
Transforming station surroundings and street scape
![Page 29: Hyderabad Metro Rail - an Urban Redesign Opportunity - Mr. NVS Reddy](https://reader036.fdocuments.in/reader036/viewer/2022081420/55cef2dcbb61ebca3d8b466a/html5/thumbnails/29.jpg)
w w w . h m r . g o v . i n 29
Street level planning at Metro station
![Page 30: Hyderabad Metro Rail - an Urban Redesign Opportunity - Mr. NVS Reddy](https://reader036.fdocuments.in/reader036/viewer/2022081420/55cef2dcbb61ebca3d8b466a/html5/thumbnails/30.jpg)
w w w . h m r . g o v . i n 30
Street level planning at Metro station
![Page 31: Hyderabad Metro Rail - an Urban Redesign Opportunity - Mr. NVS Reddy](https://reader036.fdocuments.in/reader036/viewer/2022081420/55cef2dcbb61ebca3d8b466a/html5/thumbnails/31.jpg)
w w w . h m r . g o v . i n 31
Street level planning at Metro station
![Page 32: Hyderabad Metro Rail - an Urban Redesign Opportunity - Mr. NVS Reddy](https://reader036.fdocuments.in/reader036/viewer/2022081420/55cef2dcbb61ebca3d8b466a/html5/thumbnails/32.jpg)
w w w . h m r . g o v . i n 32
Street level planning at Metro station
![Page 33: Hyderabad Metro Rail - an Urban Redesign Opportunity - Mr. NVS Reddy](https://reader036.fdocuments.in/reader036/viewer/2022081420/55cef2dcbb61ebca3d8b466a/html5/thumbnails/33.jpg)
w w w . h m r . g o v . i n 33
Street level planning & plantation at station
![Page 34: Hyderabad Metro Rail - an Urban Redesign Opportunity - Mr. NVS Reddy](https://reader036.fdocuments.in/reader036/viewer/2022081420/55cef2dcbb61ebca3d8b466a/html5/thumbnails/34.jpg)
w w w . h m r . g o v . i n 34
Street level planning & plantation at station
![Page 35: Hyderabad Metro Rail - an Urban Redesign Opportunity - Mr. NVS Reddy](https://reader036.fdocuments.in/reader036/viewer/2022081420/55cef2dcbb61ebca3d8b466a/html5/thumbnails/35.jpg)
w w w . h m r . g o v . i n 35
Street level planning & plantation at station
![Page 36: Hyderabad Metro Rail - an Urban Redesign Opportunity - Mr. NVS Reddy](https://reader036.fdocuments.in/reader036/viewer/2022081420/55cef2dcbb61ebca3d8b466a/html5/thumbnails/36.jpg)
w w w . h m r . g o v . i n 36
Hyderabad Metro Rail – Green Initiatives below viaduct
![Page 37: Hyderabad Metro Rail - an Urban Redesign Opportunity - Mr. NVS Reddy](https://reader036.fdocuments.in/reader036/viewer/2022081420/55cef2dcbb61ebca3d8b466a/html5/thumbnails/37.jpg)
w w w . h m r . g o v . i n 37
Hyderabad Metro Rail – Green Initiatives below viaduct
![Page 38: Hyderabad Metro Rail - an Urban Redesign Opportunity - Mr. NVS Reddy](https://reader036.fdocuments.in/reader036/viewer/2022081420/55cef2dcbb61ebca3d8b466a/html5/thumbnails/38.jpg)
w w w . h m r . g o v . i n 38
Hyderabad Metro Rail – Green Initiatives
![Page 39: Hyderabad Metro Rail - an Urban Redesign Opportunity - Mr. NVS Reddy](https://reader036.fdocuments.in/reader036/viewer/2022081420/55cef2dcbb61ebca3d8b466a/html5/thumbnails/39.jpg)
w w w . h m r . g o v . i n 39
Improvement of Metro Station Area (Rd level)
![Page 40: Hyderabad Metro Rail - an Urban Redesign Opportunity - Mr. NVS Reddy](https://reader036.fdocuments.in/reader036/viewer/2022081420/55cef2dcbb61ebca3d8b466a/html5/thumbnails/40.jpg)
w w w . h m r . g o v . i n 40
![Page 41: Hyderabad Metro Rail - an Urban Redesign Opportunity - Mr. NVS Reddy](https://reader036.fdocuments.in/reader036/viewer/2022081420/55cef2dcbb61ebca3d8b466a/html5/thumbnails/41.jpg)
w w w . h m r . g o v . i n 41
“Global Engineering Project of the Year 2013” Award by Global Infrastructure Forum in New York
RoSPA (Royal Society for Prevention of Accidents) ‘Gold’ Award for Construction Safety and Occupational Health for the year 2013 at Glasgow (UK)
“Metro Rail Project of the Year 2013” by the Construction Week India, Mumbai
“American Concrete Institute (ACI) Award” for the year 2013 at Mumbai
Awards GaloreSeveral Global & National Awards in the nascent constn stage itself ( for a project once written off !)
![Page 42: Hyderabad Metro Rail - an Urban Redesign Opportunity - Mr. NVS Reddy](https://reader036.fdocuments.in/reader036/viewer/2022081420/55cef2dcbb61ebca3d8b466a/html5/thumbnails/42.jpg)
w w w . h m r . g o v . i n 42
![Page 43: Hyderabad Metro Rail - an Urban Redesign Opportunity - Mr. NVS Reddy](https://reader036.fdocuments.in/reader036/viewer/2022081420/55cef2dcbb61ebca3d8b466a/html5/thumbnails/43.jpg)
w w w . h m r . g o v . i n 43
NVS Reddy
Company : Hyderabad Metro Rail Limited (A Government of Telangana State Enterprise)
Designation : Managing Director
Phone : +91 40 2338 8580 / 81 (Fax 82)
Email : [email protected]
Website : www.hmr.gov. in