HYBRID TESTFEST U.K
2ND Webinar
3RD September 2018
INTRODUCTION
Moderator:
Peter Schmitting ERTICO, Activity Leader InterCor TESTFEST
Speakers:
Cliff Lunnon Highways England TESTFEST Lead
Paul Warren WSP Technical Lead
Chris Cowen WSP Systems Architect
Kum Wah Choy Costain Technical Manager
Chris Chorlton WSP Evaluation Manager
Jack Mayes Highways England TESTFEST Event Manager
Jason Burrows WSP TESTFEST Project Manager
2
Notes about Webinar moderation
• All participants are muted during presentation
• Participants can “Ask questions”
• Use the control panel to write your question during the
presentation
• Ideally refer to a slide number in your question
• The moderator will review your question during the webinar
• Webinar will be recorded
• Recorded Webinar will be posted on the InterCor website
• FAQs from the webinar will be captured and posted on the InterCor
website
3
Contents Webinar
1. Introduction to InterCor (Peter Schmitting)
2. Participation Options (Cliff Lunnon)
3. Baseline Specification (Paul Warren)
4. Message Profiles (Chris Cowen)
5. Security (Kum Wah Choy)
6. Scenarios & Evaluation (Chris Chorlton)
7. Event Details (Jack Mayes)
8. Follow up (Jason Burrows)
9. Closing Remarks (Peter Schmitting)
4
INTERCOR INTRODUCTION
Peter Schmitting– ERTICO
5
InterCor Introduction (1)
•InterCor is a study of 1530 km of four member states under the TEN-T Core road network connecting from the North Sea – Mediterranean to the Arc Atlantique Corridor.
6
InterCor Introduction (2) 7
InterCor introduction
Streamline and pilot selected ‘Day 1 services’ in four member states and facilitate a first assessment of C-ITS services on freight and logistics by building on a common hybrid communication architecture
• Traffic management
• In Vehicle Signage
• Probe Data
• Road Work Warning
• GLOSA
• Freight and Logistics
• Multi-modal Cargo Transport Optimization (MCTO)
• Truck parking
• Tunnel Logistics
6
InterCor TESTFEST Schedule
TESTFESTS to date:
• ITS-G5, Netherlands, July 17 • Services RWW, IVS, PVD, July 3 – 6, 2017 - Dordrecht
• PKI, France, April 18 • Services RWW, IVS, PVD, GLOSA, April 23 – 26, 2018, Reims
• Pre- Hybrid, Netherlands, June 18 • Services GLOSA (ITS-G5 +Cellular), June 13 – 14, Helmond
Upcoming TESTFESTS:
• Hybrid, United Kingdom, October 2018 • Services RWW, IVS, PVD, GLOSA, October 8th – 12th , UK
• Final TESTFEST, Belgium, March 2019
3
9
OPTIONS FOR PARTICIPATION
Cliff Lunnon – Highways England
10
Options for Participation
Cellular Minimum • OBU / SP
• Country A & B
subscription
•GLOSA
•RWW
• IVS (speed advisory + free text)
Cellular Optional • Country A subscription
• Own country data simulated service
• IVS (speed advisory + free text)
ITS-G5 Minimum • OBU / HMI
• GLOSA
• RWW
• IVS (speed advisory)
• PVD
11
BASELINE SPECIFICATION
Paul Warren- WSP
12
Baseline Specification
Document Overview • Scope
• Facility Layer
• Network & Transport Layer
•Security Entity*
•Hybrid C-ITS Services
•Data Logging Format
•Appendices
13
Scope
• U.K Situation
• Assumptions
• Use Cases
14
Phase 0 Architecture
15
Hybrid C-ITS Services
•The IF2 interface being used is as follows ‘InterCor_2.1b_IF2_specs-v1.0 final’.
•The Unified Interchange Node (UID) InterCor Broker can be reached at:
Country FQDN IP TCP port
A a2m2-in-mq-
a.costain.technology
tbc 5602
B a2m2-in-mq-
b.costain.technology
tbc 5602
16
Hybrid C-ITS Services (2)
•The UIN InterCor IF2 AMQP broker is payload
agnostic.
•It is the responsibility of the C-ITS service to
publish the payloads in conformance to ETSI
message specifications.
17
•UIN InterCor IF2 AMQP connections over the public internet are only possible from white listed IP addresses.
•IP address whitelisting can be requested by submitting a request to: email: [email protected]
Hybrid C-ITS Services (3) 18
•Only TLS encrypted AMQP connections are supported.
•AMQP connections are authenticated by AMQP “plain” authentication. Can be requested by contacting email: [email protected].
Hybrid C-ITS Services (4) 19
•In order to protect the operational integrity of the UIN, the IF2 AMQP broker deployment will enforce a connection limit per virtual host.
AMQP virtual host Maximum number of concurrent AMQP
connections per account
Production 2
Test 5
Hybrid C-ITS Services (5) 20
UIN IF2 message broker exchanges
Name Description
IVI Exchange on which IVI payloads will be
published
DENM Exchange on which DENM payloads will be
published
CAM* CAM Exchange on which CAM payloads will
be published*
SPAT Exchange on which SPAT payloads will be
published
MAP Exchange on which MAP payloads will be
published
Hybrid C-ITS Services (6) 21
Tile coordinates and Quad Keys from Bing Maps
https://msdn.microsoft.com/en-us/library/bb259689.aspx
Sample implementation: https://github.com/passchieri/Hybrid-
IF2
• Events published at Zoom level 18 (100m x 100m square), as per IF2 specification.
• Quad keys added to AMQP Header based on event location.
• UUID added to AMQP header to aid tracing (should be logged but not processed by
clients)
• OBUs to subscribe at higher zoom levels (expected 13 to 15) to filter relevant data.
IF2 Message Distribution Scheme
22
Data Logging
• InterCor partners are expected to provide logging in one of the agreed data formats after every session.
•In (Netten, 2018) the formats are defined for communication, application and HMI logging that can be processed automatically and shared through a repository to provide quantitative input for the debriefings and to share results with all participants.
23
Data Logging (2)
•Other partners are encouraged to also provide and share data logging in the debriefings and the repository.
•The logging files recorded during the UK TestFest will be shared post TestFest via an online document repository
24
MESSAGE PROFILES
Chris Cowen - WSP
25
Message Profiles
• UK profiles provided for IVI, DENM and CAM messages.
• GLOSA SPAT and MAP messages are identical to those used by the Dutch at the pre-testfest in June 2018
• In the profiles the following key has been used: • Items in bold are mandatory in the standard
• Items underlined are choices to be made in the standard
• Items in italics are optional in the standard
• Items highlighted in dark pink are used
• Items highlighted in light pink are not used
Message Profiles
Message Profiles
• IVI Key Points:
• Messages modelled on a per carriageway per gantry basis
• Messages will only use the ‘New’ and ‘Update’ iviStatus
• Messages will time out when validTo time is reached
• IVI messages can contain multiple roadsign codes as well as extraText in a single message
• ExtraText is where the message sign text will be included.
• When only extraText is shown on a gantry/virtual gantry then reserved rsCodes will be used as rsCodes are mandatory values
Message Profiles
•DENM Key Points:
• eventPositionHistory will be used to describe the DENM event linear location
• traces will be used to define relevance distance
• the ‘alacarte container’ will contain the lanePosition, Roadworks>closedLanes and Roadworks>trafficFlowRule information
• Speed limit information in roadworks will be provided by IVI messages
Message Profiles
•CAM Key Points:
• Only collecting on RSU
• Includes: • the basicContainer Latitude and Longitude elements
• the highFrequencyContainer Heading and Speed mandatory elements
• Other non UK OBUs transmitting CAM messages will be received and logged via ITS-G5 units on the roadside only.
SECURITY
Kum Wah Choy - Costain
31
ITS-G5 Security
Certificate formats to comply with ETSI 103097 v1.2.1
A standalone UK Hybrid TestFest trust domain will be established, dedicated for the duration of the testfest
Manual distribution; participants expected to load certificates onto their devices via Costain Service Desk
No ITSG5 CRL or CTL - Certificate validity expires at the end of the TestFest
OBU only have permission to send CAM messages
RSU have permission to send DENM, IVI, RLT (MAP), TLM (SPAT), and CAM messages
32
PKI/UIN Service Request
InterCor UK TestFest Security Credentials (inc. Certificate) Distribution Process (Simplified)
Costain HelpDesk (1st Line)Participant Authority (HE)
Res
pons
eA
uth
ori
sati
on
Contact Costain
TestFest Participant Details
Receive Call and Collect Data; inform participant that details will be stored in accordance with GDPR
Call
Authorize Participant?
Email Details
NoEnd Inform Participant
Yes
Download archive
Email with
download link
Email / Call Receive email / call
Call-back on initially provided number and
confirm identity
Not confirmed
Confirmed
Release passphrase
Check and confirm access
Access achieved Record delivery
End
Prepare Passphrase protected Zip Archive (inc Interchange Node access
username/password
Configure Interchange Node Access
Record the following: Participant Approver Date/time Certificates identities
issues Interchange node
credentials issued.
Contact name (certificates will be issued to named individuals only) Address Company Email address Phone Company/organisation Interest in test fest (short text description) No of certificate sets needed (0 or more) IP range for interchange node access
whitelisting
Costain Service Desk Telephone Number: +44 1934 839039
Starting: 10th Sept 2018, Closes: 26th Sept 2018
33
PKI/UIN Service Response
InterCor UK TestFest Security Credentials (inc. Certificate) Distribution Process (Simplified)
Costain HelpDesk (1st Line)Participant Authority (HE)
Resp
onse
Auth
orisa
tion
Contact Costain
TestFest Participant Details
Receive Call and Collect Data; inform participant that details will be stored in accordance with GDPR
Call
Authorize Participant?
Email Details
NoEnd Inform Participant
Yes
Download archive
Email with
download link
Email / Call Receive email / call
Call-back on initially provided number and
confirm identity
Not confirmed
Confirmed
Release passphrase
Check and confirm access
Access achieved Record delivery
End
Prepare Passphrase protected Zip Archive (inc Interchange Node access
username/password
Configure Interchange Node Access
Record the following: Participant Approver Date/time Certificates identities
issues Interchange node
credentials issued.
Contact name (certificates will be issued to named individuals only) Address Company Email address Phone Company/organisation Interest in test fest (short text description) No of certificate sets needed (0 or more) IP range for interchange node access
whitelisting
34
SCENARIOS & EVALUATION
Chris Chorlton - WSP
35
• Speed limit
• Variable Speed Limit
• Road Works Warning
• Supporting IVS
• Lane 1 RWW closure 300m
M2
A229
A2045
J2
2
M2
Main Test Centre
Taddington Roundabout
Lord Lees Roundabout
8515A
8507A
8479A
8479B
8487B
8498B
8510B Road Works 300m
8487A
J3
Junction 2
Junction 3
Motorway Sub Test Site 1 36
Motorway Sub Test Site 2
• Prove the concept of intercountry
interoperability
• 2 different C-ITS services (TCC)
• 2 IF2 – Country A, B
• Handover area where both services can
send messages.
• Service provider will need to subscribe
to both IF2’s
• OBU will connect to relevant service
based on GPS
North South
A2045
A229
A2045
M2
A278 Hoath Way
M2 (South)
M2
A229
J4
J3
Border
Main Test CentreKey
Gantry 8563A Welcome to Country
B
Gantry 8576B
MS3 8563B "Welcome to Country
A
Lord Lees Roundabout
National Speed Limit Gantry 8579A
Gantry 8571A
Taddington Roundabout
Junction 3
Junction 4
National Speed Limit Gantry 8550B
37
• GLOSA Time to Green Time to Red
and Speed Advice
Rural Test Site 38
Urban Test Site (Cellular only A2 & A102)
• RWW (Roadworks Warning) o RWW - Alert planned closure of a road
or a carriageway
• IVS o IVS - Dynamic Speed Limit Information
o IVS - Embedded VMS
• GLOSA o GLOSA – Time to Red
o GLOSA – Time to Green
Urban Test Centre
39
GPX files of routes
<?xml version="1.0"?>
<gpx version="1.1"
creator=“UK Testfest"
xmlns="http://www.topografix.
com/GPX/1/1"
xmlns:xsi="http://www.w3.org
/2001/XMLSchema-instance"
xsi:schemaLocation="http://w
ww.topografix.com/GPX/1/1
http://www.topografix.com/G
PX/1/1/gpx.xsd">
<wpt lat="51.452640"
lon="0.100763">
<name>Welcome to
London VMS</name>
40
Evaluation Plan
•Research Questions – Interoperability Performance
Physical
Datalink
Network
Transport
Session
Presentation
Application
Infrastructure
Network
Telecommunica
tions
Application
Telecommunications Performance Signal Strength
Signal / Noise Network Performance Packet Delivery Ratio
Round Trip Network Delay Application Performance Message Delivery Ratio
Infrastructure Performance Network Coverage
41
Collection of Data
1. Post commissioning tests
2. Logs collected at Testfest
Your logs from your OBU’s on memory sticks.
Logs meet the standard logging format
Collect a memory stick for each vehicle for each session at the beginning of the day.
Drop it in the box end of day.
42
Where will data go
•Costain created a data lake in Azure.
•Existing and new tools
•Performance of message delivery.
•We cant evaluate interoperability without your data.
43
What - When
Daily Briefing – 9.30am & 2pm
Safety Briefing
The Test Area in use
• GLOSA Cellular & GLOSA ITS-G5
• RWW ITS - G5 and Cellular
• IVS speed limits - G5 and Cellular
• IVS variable speed limits - G5 and Cellular
• Text Message - Cellular
• PVD – ITS-G5
The Messages / Use Cases
Return Logs – 5pm
De-Brief – 5pm
44
Evaluation Plan
•First Draft Published
•24 tests identified for evaluation
Method of calculating Area of Interest,
Method and frequency of subscription/re-subscription,
Granularity of location mapping,
Method if any of dead reckoning future location,
Interpretation of the ETSI message.
45
EVENT DETAILS
Jack Mayes - Highways England
46
Time Monday 8th Oct SET UP
Tuesdays 9th Oct LOCAL MOTORWAY TESTS
Wednesday 10th Oct REMOTE URBAN TESTS
Thursday 11th Oct LOCAL RURAL & MOTORWAY TESTS
08:00 Project Team Set up Project Team Set up Project Team Set up Project Team Set up
08:30
09:00 Participant Arrival & Set up at Main Test Centre
Participant Arrival & Set up at Main Test Centre Participant Arrival & Set up at Main Test Centre
09:30 Test Centre Daily Briefing
10:00 Participant Arrival & Set up Motorway Hybrid
tests:
Hybrid served IVS &
RWW (ITS-G5 & Cellular)
Test Team
technical support
Travel to Urban site Test Team
technical support
Rural ITS-G5 GLOSA Test Team
technical support 10:30 Opening remarks and
Briefing
11:00 Bench test:
Local test (event centre) to establish communications
Welcome and Health & Safety Briefing
Cellular Served GLOSA (TfL)
Cellular served urban IVS & RWW (TfL)
11:30
12:00
12:30
13:00 LUNCH
13:30
14:00 Main Test Centre Daily Briefing Urban Test Centre Briefing Main Test Centre Daily Briefing
14:10 Baseline test:
Basic ITS-G5 and cellular operation on live roads.
Motorway
Interoperability tests:
Cellular served cross border
Test Team
technical support
Cellular served GLOSA (TfL)
& Cellular served urban IVS & RWW (TfL
Test Team
technical support
Hybrid tests:
Hybrid served IVS & RWW (ITS-G5 & Cellular)
Test Team
technical support
14:30
15:00
15:30
16:00
16:30
17:00 Debriefing Main Test Centre
Debriefing Main Test Centre Debriefing Urban Test Centre Debriefing Main Test Centre
17:30 Closing Test Centres
18:00
18:30
19:00 Networking - UK Partners available on request
Networking - UK Partners available on request InterCor Function
19:30
20:00
20:30
Schedule 47
Test Centre Locations 48
Main Test Centre
The main test centre is located: Buckmore Park Kart Circuit,
Maidstone Road Chatham,
Kent ME5 9QG.
Test Centre for conducting
testing on the motorway and
rural test sites
Day AM Brief AM Testing PM Brief PM Testing
Monday Yes Yes (Set Up) Yes Yes (Set Up)
Tuesday Yes Yes Yes Yes
Wednesday Yes No No No
Thursday Yes Yes Yes Yes
49
Urban Test Centre
The urban test centre is located: Kier Depot, London, SE10 0PA
Test Centre for conducting
testing on the urban test sites
Day AM Brief AM Testing PM Brief PM Testing
Monday No No No No
Tuesday No No No No
Wednesday No Yes Yes Yes
Thursday No No No No
50
Urban Test Centre
Urban Test
Centre:
Kier Depot
Tunnel Avenue
London SE10 0PA
Main Test
Centre
(Buckmore
Park) via:
A229, M2, A2
Drive time from Main Test Centre to Urban Test Centre : 45 mins (approx.)
Full briefing & directions will be given at Wednesday AM briefing at Main Test Centre
51
Urban Test Centre: Itinerary
Start End Action Location
09:00 09:30 Participant arrival Main Test Centre
09:30 10:00 Daily Briefing Main Test Centre
10:00 11:00 Travel to Urban Test Centre
11:00 11:30 Welcome and Health and Safety briefing Urban Site
11:30 13:00 Testing On-street
13:00 14:00 Lunch Urban Site
14:00 14:10 Daily Briefing Urban Site
14:10 17:00 Testing On-street
17:00 17:30 Debrief Urban Site
17:30 18:00 Depart
52
FOLLOW UP
Jason Burrows – WSP
53
Follow up – Documentation
Draft documentation now available online, small amendments may be made later this week:
• Action Plan
• Baseline Specification
• Scenario Plan
• Evaluation Plan
•UK Messaging Profiles
54
Follow up – Key Dates
• Requests for security certification available from 10th September
• Site Acceptance and General Testing 1st - 3rd October
• Remote Testing capability available from 3rd October
• Arrive from 10 am on 8th October for set up
8th – 11th TESTFEST!
55
Follow Up – General
• Registration, via InterCor Website, extended till 21st September
• Tickets for the event will be issued w/c 24/09
• FAQs • Event Emma Lunnon
• Communications Mia Jeannot
• Technical Cliff Lunnon
• General Jason Burrows
• Security, Kum Wah Choy/ Emyr Thomas
56
CLOSING REMARKS
Peter Schmitting – ERTICO
Thankyou – we look forward to welcoming you to the UK.