SEED EA-Pr2EA Prerequisite 2 - Minimum Energy Performance
(SEED Rater)
as defined by the criteria below:
Project shall meet all requirements below:A 10% improvement over ASHRAE/IESNA Std 90.1-2007 Sections 5.4, 6.4, 7.4, 8.4, 9.4, 10.4 (w/o amendments) Calculate a baseline with eQuest using Appendix G Calculate energy use of the design building using Appendix G
Must Also Include 1) A write-up describing how this project meets the requirements and intent of this credit 2) Baseline building parameters must satisfy ASHRAE 90.1-2007 3) Discussion on envelope baseline and proposed design parameters chosen 4) Discussion on mechanical HVAC equipment chosen with baseline and proposed design parameters 5) Discussion on lighting baseline and proposed design parameters chosen 6) Include eQuest charts with anotation clarifying 10% reduction over 90.1-2007
Be sure to identify what you cited from the literature and what is your writing.
Name:
Organization:
Role in Project:
Signature:
Date:
Other sourcesSee www.energycodes.gov for comCheck comliance sofware.
I, , declare this building site meets the minimum requirements for Prerequisite 2
![Page 2: Hw 4asdfg](https://reader036.fdocuments.in/reader036/viewer/2022071803/55cf9927550346d0339be55e/html5/thumbnails/2.jpg)
See www.ashrae.com to purchase compliance documentation.See www.eere.energy.gov/buildings/energyplus for EnergyPlus compliance software.
![Page 3: Hw 4asdfg](https://reader036.fdocuments.in/reader036/viewer/2022071803/55cf9927550346d0339be55e/html5/thumbnails/3.jpg)
EA-Pr2 - Minimum Energy PerformanceEA Prerequisite 2 - Minimum Energy Performance For compliance, determine method through simulation tools.
as defined by the criteria below:
Project shall meet all requirements below:A 10% improvement over ASHRAE/IESNA Std 90.1-2007 Sections 5.4, 6.4, 7.4, 8.4, 9.4, 10.4 (w/o amendments) Calculate a baseline with eQuest using Appendix G Calculate energy use of the design building using Appendix G
1) A write-up describing how this project meets the requirements and intent of this credit 2) Baseline building parameters must satisfy ASHRAE 90.1-2007 3) Discussion on envelope baseline and proposed design parameters chosen 4) Discussion on mechanical HVAC equipment chosen with baseline and proposed design parameters 5) Discussion on lighting baseline and proposed design parameters chosen 6) Include eQuest charts with anotation clarifying 10% reduction over 90.1-2007
Be sure to identify what you cited from the literature and what is your writing.
Joe JudgeSEED Rating ServiceSEED Rater
See www.energycodes.gov for comCheck comliance sofware.
, declare this building site meets the minimum requirements for Prerequisite 2
![Page 4: Hw 4asdfg](https://reader036.fdocuments.in/reader036/viewer/2022071803/55cf9927550346d0339be55e/html5/thumbnails/4.jpg)
See www.ashrae.com to purchase compliance documentation.See www.eere.energy.gov/buildings/energyplus for EnergyPlus compliance software.
![Page 5: Hw 4asdfg](https://reader036.fdocuments.in/reader036/viewer/2022071803/55cf9927550346d0339be55e/html5/thumbnails/5.jpg)
EA-Pr2 - Minimum Energy PerformanceFor compliance, determine method through simulation tools.
![Page 6: Hw 4asdfg](https://reader036.fdocuments.in/reader036/viewer/2022071803/55cf9927550346d0339be55e/html5/thumbnails/6.jpg)
SEED EA-Pr3EA Prerequisite 3 - Fundamental Refrigerant Management
(SEED Rater)
as defined by the criteria below:
Do not use CFC refrigerants in new buildings
OR
Develop and implement a phase out plan for CFC in reuse buildings Only allowed when reusing HVAC equiipment in a major addition or a building shell reuse
Must Also Include 1) A write-up describing how this project meets the requirements and intent of this credit 2) Identify refrigerant to be used (if any) If using any refrigerant, specify the chiller being used If the refrigerant is hazzardous, describe how this will be handled and how local codes a and how local codes are satisfied. 3) Attach the Material Safety Data Sheet (MSDS) for the refrigerant. 4) Show a cut sheet for the selected chiller 5) Show phase out plan with dates and planned cost
Name:
Organization:
Role in Project:
Signature:
Date:
I, , declare this building site meets the minimum requirements for Prerequisite 3
![Page 7: Hw 4asdfg](https://reader036.fdocuments.in/reader036/viewer/2022071803/55cf9927550346d0339be55e/html5/thumbnails/7.jpg)
EA Prerequisite 3 - Fundamental Refrigerant Management
as defined by the criteria below:
Do not use CFC refrigerants in new buildings
Develop and implement a phase out plan for CFC in reuse buildings Only allowed when reusing HVAC equiipment in a major addition or a building shell reuse
1) A write-up describing how this project meets the requirements and intent of this credit 2) Identify refrigerant to be used (if any) If using any refrigerant, specify the chiller being used If the refrigerant is hazzardous, describe how this will be handled and how local codes a and how local codes are satisfied. 3) Attach the Material Safety Data Sheet (MSDS) for the refrigerant. 4) Show a cut sheet for the selected chiller 5) Show phase out plan with dates and planned cost
Luke CoolhandCool AireHVAC Installation
, declare this building site meets the minimum requirements for Prerequisite 3
![Page 8: Hw 4asdfg](https://reader036.fdocuments.in/reader036/viewer/2022071803/55cf9927550346d0339be55e/html5/thumbnails/8.jpg)
SEED EA-Cr6EA Credit 6 - Green Power (2 Points)
(SEED Rater)
as defined by the criteria below:
Provide 35% of the facilities electricity from renewable resources and
have a minimum 2 year contract for purchase Determine annual electrical use from EA-Cr1 or using DOE's Commercial Buildings Energy Consumption Survey (CBECS) database
Must Also Include 1) A write-up describing how this project meets the requirements and intent of this credit 2) Copy of contract to purchase 2 year supply 3) Calculation with explanations on achieving 35% of total electric load 4) eQuest electricity graph with explanation of the building simulated
Name:
Organization:
Role in Project:
Signature:
Date:
I, , declare this building site meets the minimum requirements for Credit 6
![Page 9: Hw 4asdfg](https://reader036.fdocuments.in/reader036/viewer/2022071803/55cf9927550346d0339be55e/html5/thumbnails/9.jpg)
EA Credit 6 - Green Power (2 Points)
as defined by the criteria below:
Provide 35% of the facilities electricity from renewable resources and
have a minimum 2 year contract for purchase Determine annual electrical use from EA-Cr1 or using DOE's Commercial Buildings Energy Consumption Survey (CBECS) database
1) A write-up describing how this project meets the requirements and intent of this credit 2) Copy of contract to purchase 2 year supply 3) Calculation with explanations on achieving 35% of total electric load 4) eQuest electricity graph with explanation of the building simulated
Ima WatchingWeRepYouBOD-Reviewing-Hiring
, declare this building site meets the minimum requirements for Credit 6
![Page 10: Hw 4asdfg](https://reader036.fdocuments.in/reader036/viewer/2022071803/55cf9927550346d0339be55e/html5/thumbnails/10.jpg)
SEED EA-Cr6Green Power Calculations Green Power
A contract needs to have the following T&CsWhat is being purchasedWhat price (may need detail)What delivery periodPayment requirementsPenalties for non-compliance of specific items
Determine the total purchase needed by Enter total yearly electrical load from eQuest (kWh)Find 35% of the yearly electrical loadEnter this into a 2 year contract
![Page 11: Hw 4asdfg](https://reader036.fdocuments.in/reader036/viewer/2022071803/55cf9927550346d0339be55e/html5/thumbnails/11.jpg)
A contract needs to have the following T&CsWhat is being purchasedWhat price (may need detail)What delivery periodPayment requirementsPenalties for non-compliance of specific items
Determine the total purchase needed by Enter total yearly electrical load from eQuest (kWh)Find 35% of the yearly electrical loadEnter this into a 2 year contract