Hurricane Rita

16
Hurricane Rita

description

Hurricane Rita. ERCOT Preparation. ERCOT started alerts to QSEs and TOs on 9/21 Did a site failover of EMMS system Austin Taylor Procured satellite voice communications between ERCOT and TOs in impact area Cancelled planned transmission outages as of Friday, 9/23 - PowerPoint PPT Presentation

Transcript of Hurricane Rita

Page 1: Hurricane Rita

Hurricane Rita

Page 2: Hurricane Rita

2

ERCOT Preparation• ERCOT started alerts to QSEs and TOs on 9/21• Did a site failover of EMMS system Austin Taylor• Procured satellite voice communications between

ERCOT and TOs in impact area• Cancelled planned transmission outages as of

Friday, 9/23• Delayed scheduled implementation of Release 4

on 9/28• Requested QSEs to:

– Staff all plants unless safety dictated otherwise– Notify ERCOT of all evacuated plants– Keep Resource Plans, Schedules, Bids up to date– Bid in all available capacity into BES market, particularly DBES– Be prepared to take plants off line quickly if requested by ERCOT

Page 3: Hurricane Rita

3

ERCOT Preparation (cont.)• Distributed frequency control guidelines to all

QSEs and Generators in case of loss of communication ERCOT QSE Generator

• Created link for hurricane updates on ercot.com• Scheduled MP conference calls for September 23,

24, 25• Set up separate 24-hour phone hot lines for

media and market participants for issues not concerning real time operations beginning 9/23

• Arranged for extra ERCOT System Operators and Supervisors to come in if needed

• Stated intent to keep market operating as long as possible

Page 4: Hurricane Rita

4

Rita Track

120 MPH

50 MPH

Page 5: Hurricane Rita

5

ERCOT Customer Outages• Customer outages started 17:00 on 9/23 in

Galveston/Houston (CenterPoint)– hit a peak of 715,000 at 07:00 9/24

• Customer outages started 06:00 on 9/24 in Lufkin/Nacogdoches/Tyler (TXUED) – up to 70,000 customers ultimately affected

• Vast majority of customer outages due to distribution system damage

• Service to almost all customers in ERCOT restored by 9/30

Page 6: Hurricane Rita

6

ERCOT Transmission and Generation Outages

• Transmission16 - 138KV lines1 – 138/69KV autotransformer9 – 69 KV lines1 – 69 KV substationAll back in service by 06:00 9/28No 345 KV outages

• GenerationOne plant (76 MW) forced out by stormTwelve of 30 plants in Houston area were shut

down before the storm

Page 7: Hurricane Rita

7

ERCOT Summary

• The ERCOT system remained stable throughout the storm

• No significant communications problems with Market Participants

• ERCOT market systems functioned normally• Experienced record September peak

temperatures and demands in the four days following the storm without operational problems

However …………

Page 8: Hurricane Rita

8

Entergy Hit Very Hard • Transmission Outages – 82% of system

4 – 500 KV lines 28 – 230 KV lines 87 – 138 KV lines 161 – 69 KV lines 293 substations

• Affected 300,000 Entergy Texas customers

• East Texas was isolated from rest of Entergy system

• Generation deficient in East Texas

Page 9: Hurricane Rita

9

Block Load Transfers (BLTs)• On 9/25 discussions started about possibility of

BLTs from Entergy to ERCOT• Decision to close normally open 138 KV tie

between CenterPoint and Entergy at Crosby• Critical Houston water supply pumps on Trinity river• Line energized the evening of 9/26• Entergy started putting load on line on 9/27• Limit ~ 175 MW

• 138 KV tie established between TXUED and Deep East Texas Electric Coop at Huntington• Energized on 10/1• Limit ~ 40 MW

Page 10: Hurricane Rita

10

State and Federal Action

• On 9/26 the State Emergency Operations Center created a Tiger Team to determine how service can be restored in East Texas ASAP

• Actions:– Governor issued order suspending eminent domain

requirements for temporary facilities– On 9/27 PUCT issued order suspending CCN requirements

and allowing ERCOT TDSPs to extend service in area– DOE agreed to issue order maintaining ERCOT’s FERC

exemption for these emergency connections

Page 11: Hurricane Rita

11

Commercial Impact of Hurricane Rita

Page 12: Hurricane Rita

12

BLT Settlements

• Section 5.7 of Protocols define requirements for BLT events

• Two BLT points were implemented• Each BLT is:

– Initiated with a specific Dispatch Instruction– A wholesale delivery point(s) defined by an ESIID– Metered with an interval data recorder installed– Associated with a Load Serving Entity (LSE)– Represented by a Qualified Scheduling Entity (QSE)

Page 13: Hurricane Rita

13

BLT Settlements

• Estimated aggregate load is 100 to 150 MW

• For Settlement purposes, the BLTs are:– Treated as non-competitive wholesale load

• Transmission losses are applied• No UFE is applied

– Settled as load in the Congestion Zone in which their ESIID is located

• BLTs are excluded from 4CP calculations

Page 14: Hurricane Rita

14

Other Commercial Impacts due to Rita

• Initial settlement has only about 40% of meter reads available– Profiled ESIIDs use most recent usage for profile scaling factor– IDR ESIIDs may be estimated with prior period

• Final & True-Up settlement have over 99% of meter reads available– Profiled ESIIDs will use meter reads covering period.

However, application of usage to profile will result in load being assigned during outages

– IDR ESIIDs will use actual data available covering the period and will reflect what actually occurred for the ESIID

Page 15: Hurricane Rita

15

Other Commercial Impacts due to Rita

• Mass evacuation impacted UFE even before hurricane struck• UFE = Generation – (Load + Losses)

– Negative UFE means load is overestimated– Positive UFE means load is underestimated

• UFE may be created in a region but is allocated ERCOT-wide according to Protocols

Pre-Initial (PRR 568 Analysis) Initial SettlementDate Daily Avg UFE Approx. Range UFE Daily Avg UFE Approx. Range UFE

Sep-19 0% -3% - +2% 0% -3% - +2%

Sep-20 0% -4% - +2% 0% -4% - +2%

Sep-21 -2% -5% - +1% -1% -5% - +1%

Sep-22 -11% -15% - -4% -8% -12% - -1%

Sep-23 -13% -22% - -8% -9% -17% - -5%

Sep-24 -16% -24% - -11% -12% -19% - -9%

Sep-25 -9% -20% - -2% -6% -14% - 0%

Page 16: Hurricane Rita

16

UFE on September 24, 2005