Running head: Hunting camp facility1
Hunting Camp Facility
Ryan Fremin
ET 494 – Senior Design - 2
Advisor: Mr. Rode
Instructor: Dr. Chris Koutsougeras
Hunting camp facility 2
Abstract
This senior design project will reflect the material learned from all aspects of construction
engineering. The theoretical construction of this hunting camp facility will show all of these
aspects learned here at Southeastern for the construction process. It will cover the research that
needs to be done prior to the design process, rough drawings for preliminary estimates,
scheduling using primavera and designing the facility using AutoCAD to create drawings of the
final design for the facility.
Table of Contents
Hunting camp facility 3
ABSTRACT 2
HUNTING CAMP FACILITY 4
RESEARCH 4
PROJECT 4
REFERENCES 6
FOOTNOTES 7
TABLES 8
FIGURES 9
Hunting camp facility 4
Hunting Camp Facility
This hunting camp facility construction will theoretically be taking place in Woodville,
Mississippi. This is a location that will allow access for any measurements that need to be taken
and surveying that must be done.
Research
The choice of the hunting camp facility for this senior project must be back up with proof
this can be a profitable business. As in the real world there will have to be reasoning for building
a facility like this. Hunting has grown in popularity in recent years. According to the United
States Census Bureau, Louisiana State residents spend $245 million dollars on trip related hunts.
Also, 43% of all hunting expenditures for Louisiana residents in 2011 were on trip related
hunting. Table 1 will show these stats in a pie chart as well as a bar chart so they can be
compared to the other types of money spent on hunting in other expenditures. Many hunters
prefer to travel to a hunting location that can accommodate them fully. With this amount of
money spent in one year on hunting trips alone, this can be a lucrative business.
Project
This project will contain all information needed to select and build the most cost efficient
hunting camp facility. The theoretical owner has 420 acres of land and would like to house up to
16 hunters or guests at the maximum. Researching the types of structures that can meet the
requirement of the owner is the first step that will be taken. The two structures that seem the
most relevant to the owners needs are: 1.) The pre-engineered metal building and 2.) A log cabin.
Creating rough drawings for the two types of facilities will be the next step. A rough estimate
will be performed on both of the facilities after the designs have been drawn up using AutoCAD.
Hunting camp facility 5
Once these rough estimates have been completed a decision will be made on which structure to
move forward with.
Log Cabin
The log cabin is a popular structure in many hunting locations. It provides the guests with
all needed accommodation. The log cabin that was designed on AutoCAD for this project has a
total dimension of 59’ x 89’ with a total square footage of 4,561sq.feet. This will supply the
owner with 7 bedrooms and 5 bathrooms. It is a two-story structure that is enclosed with 12” x
20’ logs. Figure 1 shows the floor plan design that has been constructed for rough estimating to
be performed.
Pre-Engineered Metal Building
The pre-engineered is a simply designed structure that has become increasingly popular
for businesses over the recent years. The pre-engineered metal building was designed on
AutoCAD for this project has a total dimension of 40’ x 80’ with a total square footage of 7,200
sq. feet. Only 50% of the bottom section will be used for living space, which brings the total
livable square footage down to 4,800 sq. feet. This structure will more than accommodate the
owner with the required space needed to house up to 16 guests. The structure will contain 8
bedrooms, 4 ½ bathrooms, and a 40’ x 40’ garage that will be connected to the first floor of the
structure. Figure 2 shows the floor plan design that has been constructed for rough estimating to
be performed.
Rough Estimating
A rough estimate has been completed for both of these structures. Using the floor plans
that were drawn using AutoCAD and average cost per square foot for construction of each type
of build. The rough estimate is just a preliminary estimate that was completed to decide which
Hunting camp facility 6
structure has the opportunity to be more cost effective for the theoretical owner. Figure 3 shows
the calculations that where done to complete these estimates.
Deciding on Structure
The theoretical owner selected the pre-engineered metal building. The decision was
based on the rough estimate and the amount of time that will be needed to construct the structure.
The pre-engineered metal building gave the owner the 16-guest capacity that was desired along
with added space to store equipment that will be needed to keep up with the property. The
unused bottom half will serve as a storage facility for this equipment. The price difference
between the two structures was over $50,000. The pre-engineered metal building was the correct
option due to the price, extra space, less amount of land used, and timeframe it can be completed
in.
Semester 2
In the second semester of senior design, I will be completing a Complete set of drawings
using AutoCAD, a complete estimate, a survey of the site being used for the construction and the
scheduling and planning of the build using primavera. These will all be worked during the
semester with some of them overlapping each other.
The drawing where started on during the semester break to allow for enough time to
complete a full set of working drawings. These drawings may be complex and will take some
time to complete. There will be some calculations that must be made while completing the
drawings. These include load calculations for the building and second floor support beam. There
will also be a door that must be designed for the back of the building instead of a roll-up door.
This has yet to be decided on. Surveying the location will determine what needs to be done to the
site to prepare the site for construction. This must be done to determine what machinery must be
Hunting camp facility 7
used on the job site as well as determining elevation of the ground that the build will be done on.
This preparation can increase cost if there is a large amount of material that must be moved on
the site. The estimate will include all materials needed for the completion of the construction
including: 1. Metal materials, 2. Wood Materials, 3. Machinery, 4. Labor, 5. Any other materials
needed for construction. The planning and scheduling will be done after these other deliverables
have been complete. I will be using primavera to do the scheduling.
Hunting camp facility 8
References
U.S. Department of the Interior, U.S. Fish and Wildlife Service, and U.S. Department of
Commerce, U.S. Census Bureau. 2011 National Survey of Fishing, Hunting, and
Wildlife-Associated Recreation.
Hunting camp facility 9
Tables
Table 1: Table 1 shows the charts comparing the hunting trip-related expenditures to the
equipment and other items. This was found on the United States Census Bureau website.
Hunting camp facility 10
Figures
Figure 1: Floor plan for the design of the log cabin. Done on AutoCAD.
Hunting camp facility 11
Figure 2: Floor plan for the design of the pre-engineered metal building. This was done on
AutoCAD.
Hunting camp facility 12
Figure 3: These are the calculation that where done to complete the rough estimate for both the
log cabin and the pre-engineered metal building. The calculations show that the metal building
will provide more livable space than the log cabin and will be able to be constructed at a lesser
cost. About $50,000 less than that of the log cabin.