Document

20
THE CONNECTED SITE An Industry Moves into the Future LaVonne Frazier Trimble Director of the Connected Site, Engineering and Construction Group

description

http://fiatech.org/images/stories/events/techconference/2008/Frazier-Tuesday-TechTrack.pdf

Transcript of Document

Page 1: Document

THE CONNECTED SITE An Industry Moves into the Future

LaVonne FrazierTrimble Director of the Connected Site, Engineering and Construction Group

Page 2: Document

Other industries have transformed productivity and quality through information technology−

Airlines−

Financial services−

Logistics

Construction has principally relied on scale factors (bigger and faster) to create productivity improvements −

Not aggressive in reengineering processes

CONSTRUCTION IS AN INFORMATION TECHNOLOGY LAGGARD*

Source: ASCE Journal Dec 2003

*Update: 2007 National Construction Technology Survey• 23% Very Aggressive (up from 15% in 2006)• 46% Aggressive (up from 39% in 2006)• 28% Somewhat Cautious (down from 34% in 2006)• 2% Very Cautions (down from 4% in 2006) Source: Constructech Magazine

Page 3: Document

PARTNERSHIPS & ALLIANCES ESSENTIAL

ERP SoftwareWireless ProvidersDesign and GIS softwareSurvey & Machine Control ManufacturersThird Party Heavy Equipment Parts ProvidersRental HousesAsset Management CompaniesProject Management CompaniesLogistics Suppliers

Customers require the services of many othercompanies to meet their full business needs

Page 4: Document

Tighter process integration becomes a key differentiator competitively – increasing efficiency & lowering costs. This may enable new organizational forms.

Planning Survey DesignFeasibility Estimate Earthwork Construct Maintain Operate

Most projects currently

Planning Survey DesignFeasibility EstimateEarthwork Construct Maintain Operate

Design and Build projects becoming more common

Total Connected Site Solution — 20 - 50% cost savings are possible.Focus should be on reducing rework which is about 20%.

Planning Survey DesignFeasibility Estimate Earthwork Construct Maintain Operate

Design, Build and Operate projects starting to appear

Page 5: Document

ENHANCING SELECTED INDUSTRIES’ PRODUCTIVITY BY TRANSFORMING THEIR WORK PROCESSES

• Firmware• Applications• Back office integration• Enterprise wide solutions• Internet hosted solutions

• Cellular• Radio • Bluetooth• Satellite• WiFi

• GPS• Laser• Optical• Inertial• VRS™• 3-D Scanning

Value is created by the integration of multiple technologies into solutionsCustomers are

demandingsolutions that require high levels of integration

HW to HWHW to SWHW & SW to external networks site to back office

Field hardware is the enabler

Page 6: Document

SATELLITE POSITIONING SYSTEMS Providing Ubiquitous Coverage

GPS II R WAAS

GLONASSEGNOS

Galileo GIOVE-A Satellite BasedAugmentation Systems

MSASQZSS

GAGANOmniSTAR

Page 7: Document

VRS INFRASTRUCTURE Centimeters at “The Flip of a Switch”

> 100 Systems Worldwide

Controlling > 3000 Reference Stations

No Need for Temporary Infrastructure

Improved Convenience, Cost, Quality

Page 8: Document

ADVANCES IN TOTAL STATION &LASER SCANNING TECHNOLOGY

Improved Speed & Robustness

Discrete Points to Surfaces

Integration of Back Office & Field

Effective Field Digitization

Page 9: Document

WIRELESS COMMUNICATIONSConnectivity Within the Site and to the Back Office

Standards Enable Efficient Data Transmission

Solution Requires Multiple Techniques

Page 10: Document

3D VISUALIZATION Key to Understanding the Data

Page 11: Document

OBJECTIVE IS TO ENABLE SIGNIFICANT SHARED DATA WITHIN THE CONNECTED SITE

DESIGNINITIAL SURVEY ESTIMATE

CHECK FINE GRADE EARTHWORKS

BUILD

Progress & Productivity

EstimatesDesign

Elements

Progress & Productivity

Quantities

Existing SurfaceData

Internet based project data: 3D, design, estimates, progress

& management reports

Design SurfaceData

DesignSurface

Data

Design Surface Data

DesignSurface Data

As-built Data

Page 12: Document

LIFECYCLE INFORMATION MANAGEMENT Information Backbone for the Connected Site

1. Plan/Design 2. Build

3. Operate

Page 13: Document

INTEGRATION PROGRESSIONToday, we have seamless data flow and sensor independence

focused within a single discipline or phase of the life cycle.

Survey Controller, TSM, TDS

SCS 900, LM 80

Page 14: Document

SOLUTION EXAMPLE: SURVEY INSTRUMENT

Eliminates 2nd person“Intelligence” where its neededReduces rework

Page 15: Document

SOLUTION EXAMPLE: GRADE CONTROL

Eliminates stakes Reduces reworkImproves accuracyImproves operator availability

Page 16: Document

Other 3rd party applications

Machine Control Data

Mobile Asset Data

Portable Asset Data

Personnel Asset Data

Inventory/Consumables Data

SOLUTION EXAMPLE: ASSET MANAGEMENT INTEGRATING SOLUTIONS

Page 17: Document

INTEGRATION PROGRESSIONNext – Across the entire life cycle

Survey Controller, TSM, TDS

Seamless data integration and

complete solution portfolio

SCS 900, LM 80

Page 18: Document
Page 19: Document
Page 20: Document

TRANSFORMING THE WORLD’S WORK

LaVonne [email protected]