Monthly Safety Meeting for April 2012 Habshan 5 IGD Project, Abu Dhabi JGC-Tecnimont Joint Venture

description

http://www.h5jvhse.com/Safety/Documents/HSEApr2012.pdf

Transcript of HSEApr2012

Monthly Safety Meeting for April 2012

Habshan 5 IGD Project, Abu Dhabi JGC-Tecnimont Joint Venture

Presentation Agenda Project Lost Time Injury Frequency Rate & Recordable Frequency Rate;

Days and Man-hours without LTI and Days and Man-hours without RI;

JV Monthly Medical Consultation for April 2012;

Cumulative Up to April 2012;

FAC Body Part for the Month of April 2012;

Recordable Incidents for the Month of April 2012;

Noncompliance with safe work Issues for the Month of April 2012;

Poor Housekeeping Issues for the Month of April 2012;

Equipment & Tool Issues for the Month of April 2012;

PPE Issues for the Month of April 2012;

JV Risk Assessment Graph, High Medium & Low Risk Analysis;

NM, UC & UA Observation Report and Trend Analysis for JV;

Area Violation, Incident Violation for the Month of April 2012;

Safety Moment, Toolbox Meeting, and Safety Alert;

Manpower & Observation Up to April 2012;

Training Man-Hours Up to April 2012;

Action Tracking Register Up to April 2012;

JSO Register Up to April 2012

Monthly KPI and Target 2010 – 2012;

Traffic Management for April 2012;

IIF Culture;

HSE Campaign for April 2012 and Achievements

0.00

0.01

0.02

20102011 2012 PTD

0.00

3 0.00

3

0.00

3

LOST TIME INJURY

FREQUENCY RATE - PROJECT

YEARLY STATISTICS

0.00

0.05

0.10

0.15

0.20

2010 2011 2012 PTD

0.13 0.10

0.08 0.08

TOTAL RECORDABLE INJURY RATE

- PROJECT YEARLY STATISTICS

0

10

20

30

10 8

21

9

FIRST AID CASE

COMPARISON TABLE

Lost Time Injury Frequency Rate

Construction Period To Date

Man-Hours 4,878,008 79,555,599

LTI 0 1

LTIR 0.00 0.003 0.02

Days w/o LTI 283 Up to 27/04/2012

Date of Last LTI Case 19-Jul-11

Man-Hours Worked Since Last LTI 44,934,938

Total Recordable Injury Rate

Construction Period To Date

Man-Hours 4,878,008 79,555,599

Recorable Case 1 32

TRIR 0.04 0.14 0.08 0.30

Days w/o Rec.

Case 8

Up to

27/04/2012

Date of Last Rec. Case 19-Apr-12

Man-Hours Worked Since Last RI 1,392,023

0.003

0.02

0

0.02

0.04

LTIR

MONTH

Lost Time Injury Frequency Rate Target LTIR = 0.02

0.08

0.30

0.00

0.20

0.40

0.60

0.80

1.00

1.20

LTIR

MONTH

Total Recordable Injury Rate Target TRIR = 0.20

RIR, LTI x 1,000,000/man-hours - Company

RIR, LTI x 200,000/man-hours - JV

0

0

10,000,000

20,000,000

30,000,000

40,000,000

50,000,000

JV Days & Man-Hours without LTI

Up to April 2012

January 7, 2010

Starting Project

up to

Apr. 27, 2012

44,934,938

Date of Last LTI Case : 19th July 2011

0

0

5,000,000

10,000,000

15,000,000

JV Days & Man-Hours without Recordable

Up to April 2012

January 7, 2010

Starting Project

up to

Apr. 27, 2012

1,392,023

Date of Last RI Case : 19th April 2012

Cumulative

Up to April 2012

24

RWC, 7

LTI, 1

Recordable

FAC

433

Reportable

FAC-First Aid Case | MTC-Medical Treatment | RWC-Restricted Work Case

LTI-Lost Injury Incident

FAC by Body Part

For the Month of April 2012

Head

3

34%

Fingers

3

33%

Chest

1

11%

Forearm

1

11%

Leg

1

11%

Recordable Incidents by Body Part

For the Month of April 2012

MTC-Middle Finger

April 19, 2012

MTC-Medical Treatment

JV Observation Table

for April 2012

PPE

Equipment & Tool

Poor House Keeping

Noncompliance with safe work

Noncompliance with safe work (A)

Falling Object Awareness

GASCO Live Fire Fighting Training | Fire Fight Demonstration

Quarterly Tools Equipment Inspection

6

31

47

54

121

150

153

244

736

0 200 400 600 800

No JSA

PTW

Traffic rule

Excavation Safety

Lifting and rigging

Electrical Safety rule

Fire Prevention

Work at height

Others

March 2012-1,542

4

27

29

27

135

131

273

227

663

0 200 400 600 800

No JSA

PTW

Traffic Rule

Excavation safety

Lifting & Rigging

Electrical Safety rule

Fire Prevention

Work at Height

Others

April 2012-1,516

Noncompliance with safe work (A) – Others

1

3 3

11

12

14

16

17 18

23

24

25

26

36

38

38

76

93

119

143

0 50 100 150 200

No Banksman

Worker Behavior

Falling Object

Fall Prevention

Restricted Area

No Flagman

Confined Space

Signage

Trip/Slip/Fall

Hygiene

Hot Work

Health

Grating

illumination

Environmental

Open Hole

Access and egress

Cable Management

Scaffolding

Barricade

March 2012 - 736

1

6 14

22

2

3

9

31 14

10

22

17

8

24

15

14

41

35

68

59

85

163

0 50 100 150 200

Security

Positive Observation

No Banksman

Worker Behavior

Falling Object

Fall Prevention

Restricted Area

No Flagman

Confined Space

Signage

Trip/Slip/Fall

Hygiene

Hot Work

Health

Grating

illumination

Environmental

Open Hole

Access and Egress

Cable Management

Scaffolding

Barricade

April 2012 - 663

Poor House Keeping (B)

42

48

96

113

125

141

212

0 100 200 300

Hazardous material

storage

Protruding Nails

Segregation of waste

Material on access

Material arrangement

Waste disposal

Cleaning of rubbish

on site

March 2012 - 777

19

30

57

21

142

117

240

0 100 200 300

Hazardous material

storage

Protruding Nails

Segregation of waste

Material on access

Material arrangement

Waste disposal

Cleaning of rubbish

on site

April 2012 - 626

Equipment & Tool (C)

15

16

43

44

52

54

65

91

0 50 100

Inappropriate safety

device

Unauthorized

equipment/tool

Unauthorized Operation

Wrong equipment/tool

Incorrect Usage

No/wrong colour code

Poor Maintenance

No Inspection with

tag/sticker

March 2012 - 380

29

7

46

130

63

80

44

126

0 50 100 150

Inappropriate safety

device

Unauthorized

equipment/tool

Unauthorized Operation

Wrong equipment/tool

Incorrect Usage

No/wrong colour code

Poor Maintenance

No inspection with

tag/sticker

April 2012 - 525

PPE (D)

14

23

26

48

58

61

132

154

0 50 100 150 200

No Safety Shoes

Inappropriate Clothes

No Respiratory Protection

No Hard Hat

No Ear Protection

No Body

Harness/Lanyard

No Hand Protections

No Eyes/Face Protections

March 2012 - 516

14

35

11

32

49

66

107

134

0 50 100 150

No Safety Shoes

Inappropriate Clothes

No Respiratory Protection

No Hard Hat

No Ear Protection

No Body

Harness/Lanyard

No Hand Protections

No Eyes/Face Protections

April 2012 - 448

819

1485

911

703

1285

1127

0

200

400

600

800

1000

1200

1400

1600

Low Medium High

March 2012 April 2012

March 2012 – 3,215

April 2012 – 3,115

JV Risk Assessment Graph

Near Miss, Unsafe Act and Unsafe Condition Observation Report

and Trend Analysis for March 2012

917

2,298

911

21 1 0 0 0 0

846

2,265

1,127

9 1 0 0 0 0 0

500

1000

1500

2000

2500

March 2012 April 2012

FAC-First Aid Case | MTC-Medical Treatment

| RWC-Restricted Work Case LWC-Lost Work

Case | FAT – Fatality LTI-Lost Time Injury

Area Violation by Issues

for the Month of April 2012

2

3

751 Observation Issues

518 Observation Issues

406 Observation Issues

3 Near Miss

4

1,253 Observation Issues

1 Near Miss

1 MTC

1 ADS

4 ADS

187 Observation Issues

Apr-05-2012

Lifting Violation @ Unit

531 3rd

Apr-04-2012

Scaffolding Violation

@ C200

1st

Incident Violation Indicator Area Focus

for the Month of April 2012

Apr-04-2012

Permit to Work

Violation @ Unit 507

Apr-11-2012

Grating Violation @

Unit 553

1st

2nd

Safety Moment for April 2012

Toolbox Meeting for April 2012

Safety Alert for April 2012

21,012

3,115

Manpower Observation

Manpower and Observation

for April 2012

221,792

Total Training Man-Hours 1,022,628

Up to April 2012

Training Man-hours Completed 221,792

for April 2012

HOUR CRAFT

INDUCTION

Induction

Training

TCM JGC

1,374 1,374

74

22

142

6

22

PERMIT TO

WORK

LOCKOUT

TAG OUT

SUPERVISOR

SKILL

LEADERSHIP

WORKSHOP

Supervisor Training

TCM JGC

STARRT/TOOLBOX

MEETING/COACHING

Site Training

TCM JGC

12,555

82,405

WORK AT HEIGHT

STARRT & JSA

CONFINED SPACE ENTRY

SAFE DRIVING

FIRE FIGHTING

IIF Orientation

Heat Stress

SAFE USE OF HAND GRINDER

Inert GAS

ELECTRICAL SAFETY…

Specific

Training

TCM JGC

2,859

4,354

Action Tracking Register Up to April 2012

6,595

578 325

130 162 29 44

6,592

369 314

110 149 22 38 3 209

11 20 13 7 6 0

1000

2000

3000

4000

5000

6000

7000

Safety

Walkdown

JV Site Audit GASCO

Observation

JV HSE Meeting JV Food Audit Corporate Audit Hygiene and

Sanitary

Facilities

Raised Closed Open

7,863 7,495

368

Total Action Tracking

Register

0

0.01

0.02

0.03

Lost time Injury Frequency Rate

Actual LTIR Target LTIR

0.00

0.20

0.40

0.60

0.80

1.00

1.20

Total Recordable Injuries Rate

Actual RIR Target RIR

Monthly KPI and Target 2010 – 2012 Up to April 2012

0

1

Fatality Rate

Actual Fatality Target Fatality

0

500

1000

1500

2000

2500

3000

Observation + Near Misses Cases

Actual (Observation + Near Misses)

Target (Observation + Near Misses)

Target 0

Target 0.02

Target 0.20 Target >1000

1

0.003

0.08

3,115

On April 04, 2012 at 07:30; A CCEPC

Toyota Corolla (Plate # 93827) was following too

close (approximately 3 meters) to a Toyota Pickup

(Plate # 68222) of Mamoet going to H5 main gate.

A loader crossed the path of the vehicle, the

Pickup slowed and stopped, the Corolla applied

brake and struck the Pickup at the rear part

resulting in minor damaged to both vehicle. Access Road - 3

Ring Road - 5

Village Road - 14

Road Traffic Accident

OBEY TRAFFIC SIGNS

Up to Date

On April 06, 2012 at 21:00; A CCEPC

TATA bus was returning from Abu Dhabi with 50

passengers to Habshan 5 Village. The vehicle was

traveling along Habshan 5 Village Road

(approximately 300 meters from H5 Village) when

reason it struck a camel which was on the road.

Nobody was injured, the camel died and the bus

incurred damaged.

Road JGC Apr-12 Total TCM Apr-12 Total

Access Road 0 0 0 3 0 3

Village Road 8 1 9 5 0 5

Ring Road 2 1 3 2 0 2

Total 10 2 12 10 0 10

HSE CAMPAIGN : POSTER COMPETITION

HSE Banners on site

SAFETY FOR LIFE