HRSG

9
Boiler & Heater Group Thermal Engineering The International Way B&W Heat Recovery Steam Generator

Transcript of HRSG

Page 1: HRSG

B&W

Thermax Babcock & WilcoxA Division of Thermax Limited

Boiler & Heater Group

www.tbwindia.com

International offices atBangladesh, Belgium, Brazil, China, Hongkong,Indonesia, Kenya, Malaysia, Nigeria, Philippines,Russia, Saudi Arabia, Sri Lanka, Thailand,UAE, UK, USA

Boilers & Heaters

Cooling & Heating

Air Pollution Control

Captive Power

Chemicals

Water & Waste Solutions

Thermax Business Portfolio

MumbaiDhanrajmahal 2nd floor,Chhatrapati Shivaji Maharaj Marg,Near Gateway of India, Colaba,Mumbai 400 039, India.Tel: 91-22-22045391, 22045324,Fax: 91-22-22040859

Delhi9, Community Centre, Basant Lok,New Delhi 110 057, India.Tel: 91-11-26145319, 26145326,Fax: 91-11-26148679

ChennaiFatima Akthar Court, 3rd floor, 312 Anna Salai, Teynampet, Chennai 600 018, India.Tel: 91-44-24353831, 24353834,Fax: 91-44-24353841

KolkataAzimganj House, 5th Floor,7 Camac Street, Kolkata 700 017, India.Tel: 91-33-22826711/2/3,Fax: 91-33-22826796

Hyderabad6-3-649 Nalanda Complex,Somaji Guda, Hyderabad 500 082 India.Tel: 91-40-23310254, 23312013, 23396820Fax: 91-40-23312335

D-1, MIDC, R. D. Aga Road,Chinchwad, Pune 411 019.Tel.: +91-20-66126464 Fax: +91-20-27479200, 27479050

We reserve the right to amend any product details without notice.

Nov

. 200

5 Ed

ition

Thermal Engineering The International Way

B&W

Boiler & Heater Group

TBW Experience List For Heat Recovery Steam Generators With Project Details

!

!

!

Turbomach India Pvt. for Welspun, Gujrat.2 20 10.5 SaturatedTaraus 60 with Supplementary firing, 2004.

Caterpiller for Appolo Tyres, Gujarat1 1.2 22 SaturatedTaraus 60 unfired, 2004

Caterpiller for Biocon, Bangalore.10.5 Saturated

Taraus 60 unfired, 2004

2x TPH, Kg/cm g, , HRSG,

2x 1 TPH, Kg/cm g, , HRSG,

21 x 50.2 TPH, Kg/cm g, , HRSG,

!

!

!

Reliance Industries Ltd., Hazira 2 125 117 512±5PG6581 natural gas +, 2004.

Reliance Industries Ltd., Jamnagar1 25 115 512±5Pg6581 natural gas + naphtha, 2004

Caterpiller for Biocon, Bangalore1 1.2 10.5 SaturatedPG6581 natural gas + naphtha, 2004

2 Ox TPH, Kg/cm g, C, HRSG,

2 Ox 1 TPH, Kg/cm g, C, HRSG,

2x 1 TPH, Kg/cm g, , HRSG,

!

!

!

Alok Industries Limited, Vapi1 0 10.5 SaturatedTaraus 60 unfired, 2006.

Reliance Utilities & Power Ltd., Jamnagar6 15 49 396Taurus 70, 2006

Gujarat Heavy Chemicals Ltd., Gujarat, Vapi1 6 10.5 SaturatedNatural Gas, 2006

2x 3 TPH, Kg/cm g, , HRSG,

2 Ox 3 TPH, Kg/cm g, C, HRSG,

2x 1 TPH, Kg/cm g, , HRSG,

HRSG installation at Apollo tyres

HRSG installation at Aban Power Ltd.

HRSG installation at Reliance Petrochemical Ltd.

Heat Recovery Steam Generator

Page 2: HRSG

TBW Experience List For Heat Recovery Steam Generators With Project Details

HRSG installation at Arvind Mills

HRSG installation at Oswal Chemicals & Fertilizer

HRSG installation at Numaligarh Refinery

!

!

!

OEP for Oswal Chemicals & Fertilizer Ltd. Shahajahanpur.

2 O2 x 100 TPH, 115 Kg/cm g, 515 C, HRSG on

frame 5 gas turbine with gas, 1992.

Maruti Udyog Ltd., Gurgaon.2 O1 x 75 TPH, 42 Kg/cm g, 410 C, HRSG on frame

5 gas turbine with gas, 1992.

Essar Gujrat Ltd., Hazira.2 O1 x 50.2 TPH, 42 Kg/cm g, 410 C, HRSG frame 5

gas turbine, 1993.

!

!

!

Daelim for Numaligarh Refinery Ltd., Numaligarh.

2 O2 x 130 TPH, 43 Kg/cm g, 456 C, HRSG on frame

6 gas turbine with natural gas and naphtha, 1995.

Arvind Mills Ltd., Ahmedabad. 2 O

2 x 32 TPH, 44 Kg/cm g, 440 C, HRSG on

naphtha, 1996.

BSES Ltd., Kochi.2 O

3 x 44 TPH, 46 Kg/cm g, 425 C, HRSG on LM

6000PC, 1998.

!

!

!

!

Reliance Petrochemicals Ltd, Jamnagar.2 O

1 x 125 TPH, 115 Kg/cm g, 510 C, HRSG on frame

6 gas turbine with natural gas and naphtha, 1999.

Tuma Turbomach SA for Sarabhai Piramal Pharmaceutical Ltd., Baroda.

21 x 12.7 TPH, 10 Kg/cm g, Saturated, HRSG on

Centaur 40 turbine with natural gas, 2001.

Aban Power Ltd., Tamilnadu.21 x 160/5 TPH, 110/28 Kg/cm g, 542 HP / 250 MP,

Supplementary fired HRSG, 2003.

Turbomach India Pvt. Ltd. for Deepak Fertilizers, Taloja.

2 O2 x 22 TPH, 41 Kg/cm g, 350 C, Supplementary

fired HRSG with fresh air firing system, 2003.

Improving your businessis our business

Thermax offers products, systems

and solutions in energy and

environment engineering to industrial

and commercial establishments

around the world. It’s business

expertise covers heating, cooling,

waste heat recovery, captive power,

water treatment & recycling, air

pollution control & waste

management and performance

chemicals.

Thermax brings to customers

extensive experience in industrial

applications and expertise thought

technology partnerships and

strategic alliance.

Operating from it’s Headquarters in

Pune (Western India), Thermax has

built an international sales & service

network spread over South East Asia,

Middle East, Africa, Russia, UK and

the US. It has a full-fledged ISO

9001 : 2000 and ISO 14000

accredited manufacturing setup.

Boiler & Heater Group

Thermax's B&H Group provides

solutions in Biomass combustion,

Waste Heat Recovery and Oil & Gas

Fired Boilers to generate steam and

power. Thermax also provides

Renovation & Modernization

solutions for old boilers and heaters.

We supply equipment for various

process applications in

Petrochemicals, Refineries, Sugar,

Power, Steel, Cement, Fertilizer,

Paper, Textile etc. We have

successfully executed over 1000

units for various applications.

Our equipment are installed across

the world for various projects in

countries like Middle East, South

East, CIS, Australia, Europe, Africa

through various renowned EPC

contractors.

TBW's design for HRSGs are based on technology from

Babcock & Wilcox, USA who are world leaders with

more than 100 HRSG installations worldwide. These

HRSGs incorporate the latest advances in thermal

technology offering such benefits as multiple pressure

levels and unprecedented reliability.

TBW can design and supply HRSGs for gas turbines

ranging from 5MW to 250MW with steam parameters

up to 500 TPH, design pressure 160 Kg/cm g and 565 C

temperature.

2 O

TBW

The Expertise To Meet Your Needs

O2

Page 3: HRSG
Page 4: HRSG
Page 5: HRSG
Page 6: HRSG
Page 7: HRSG
Page 8: HRSG

TBW Experience List For Heat Recovery Steam Generators With Project Details

HRSG installation at Arvind Mills

HRSG installation at Oswal Chemicals & Fertilizer

HRSG installation at Numaligarh Refinery

!

!

!

Oswal Chemicals & Fertilizer Ltd., Shahajahanpur.

2 O2 x 100 TPH, 115 Kg/cm g, 515 C HRSG on GE Frame

5 gas turbine with Supplementary Firing on Natural Gas,1992.

Maruti Udyog Ltd., Gurgaon.2 O1 x 75 TPH, 42 Kg/cm g, 410 C HRSG on GE Frame 5

gas turbine with Supplementary Firing and with

Integral Deaerator on Natural Gas, 1992.

Essar Gujarat Ltd., Hazira.2 O1 x 50.2 TPH, 42 Kg/cm g, 410 C unfired HRSG on

GE Frame 5 gas turbine with Integral Deaerator,1993.

!

!

!

!

Daelim for Numaligarh Refinery Ltd., Numaligarh.

2 O2 x 130 TPH, 43 Kg/cm g, 456 C HRSG on GE Frame

6 gas turbine with Supplementary Firing on Natural Gas and Naphtha,1995.

Arvind Mills Ltd., Naroda & Santej. 2 O4 x 32 TPH, 44 Kg/cm g, 440 C HRSG on PGT 10 gas

turbine with Supplementary Firing on Naphtha,1996.

BSES Ltd., Kochi.2 O3 x 40.2 TPH, 46 Kg/cm g, 425 C dual pressure unfired

HRSG on LM 6000 Gas Turbine, 1998.

Reliance Petrochemicals Ltd., Jamnagar.2 O1 x 125 TPH, 115 Kg/cm g, 510 C HRSG on GE Frame

6 gas turbine with Supplementary Firing on Natural

Gas, Naphtha, Kerosene and Distillates,1999.

!

!

!

Tuma Turbomach SA for Sarabhai Piramal Pharmaceutical Ltd., Baroda.

21 x 12.7 TPH, 10 Kg/cm g, Saturated, HRSG on Centaur

40 turbine with Supplementary Firing on Natural Gas,

2001.

Aban Power Ltd., Tamilnadu.2 O1 x 168 TPH, 110 Kg/cm g, 542 C HRSG on GE Frame 6

FA gas turbine with Supplementary Firing on Natural

Gas, 2003.

Turbomach India Pvt. Ltd. for Deepak Fertilizers, Taloja.

2 O2 x 22 TPH, 41 Kg/cm g, 350 C HRSG on Taurus 70 with

Supplementary/Fresh Air Firing system on Natural Gas

& Naphtha, 2003.

Improving your businessis our business

Thermax offers products, systems

and solutions in energy and

environment engineering to industrial

and commercial establishments

around the world. It’s business

expertise covers heating, cooling,

waste heat recovery, captive power,

water treatment & recycling, air

pollution control & waste

management and performance

chemicals.

Thermax brings to customers

extensive experience in industrial

applications and expertise thought

technology partnerships and

strategic alliance.

Operating from it’s Headquarters in

Pune (Western India), Thermax has

built an international sales & service

network spread over South East Asia,

Middle East, Africa, Russia, UK and

the US. It has a full-fledged ISO

9001 : 2000 and ISO 14000

accredited manufacturing setup.

Boiler & Heater Group

Thermax's B&H Group provides

solutions in Biomass combustion,

Waste Heat Recovery and Oil & Gas

Fired Boilers to generate steam and

power. Thermax also provides

Renovation & Modernization

solutions for old boilers and heaters.

We supply equipment for various

process applications in

Petrochemicals, Refineries, Sugar,

Power, Steel, Cement, Fertilizer,

Paper, Textile etc. We have

successfully executed over 1000

units for various applications.

Our equipment are installed across

the world for various projects in

countries like Middle East, South

East, CIS, Australia, Europe, Africa

through various renowned EPC

contractors.

TBW's design for HRSGs are based on technology from

Babcock & Wilcox, USA who are world leaders with

more than 100 HRSG installations worldwide. These

HRSGs incorporate the latest advances in thermal

technology offering such benefits as multiple pressure

levels and unprecedented reliability.

TBW can design and supply HRSGs for gas turbines

ranging from 5MW to 250MW with steam parameters

up to 500 TPH, design pressure 160 Kg/cm g and 565 C

temperature.

2 O

TBW

The Expertise To Meet Your Needs

O2

Page 9: HRSG

B&W

Thermax Babcock & WilcoxA Division of Thermax Limited

Boiler & Heater Group

www.tbwindia.com

International offices atBangladesh, Belgium, Brazil, China, Hongkong,Indonesia, Kenya, Malaysia, Nigeria, Philippines,Russia, Saudi Arabia, Sri Lanka, Thailand,UAE, UK, USA

Boilers & Heaters

Cooling & Heating

Air Pollution Control

Captive Power

Chemicals

Water & Waste Solutions

Thermax Business Portfolio

MumbaiDhanrajmahal 2nd floor,Chhatrapati Shivaji Maharaj Marg,Near Gateway of India, Colaba,Mumbai 400 039, India.Tel: 91-22-22045391, 22045324,Fax: 91-22-22040859

Delhi9, Community Centre, Basant Lok,New Delhi 110 057, India.Tel: 91-11-26145319, 26145326,Fax: 91-11-26148679

ChennaiFatima Akthar Court, 3rd floor, 312 Anna Salai, Teynampet, Chennai 600 018, India.Tel: 91-44-24353831, 24353834,Fax: 91-44-24353841

KolkataAzimganj House, 5th Floor,7 Camac Street, Kolkata 700 017, India.Tel: 91-33-22826711/2/3,Fax: 91-33-22826796

Hyderabad6-3-649 Nalanda Complex,Somaji Guda, Hyderabad 500 082 India.Tel: 91-40-23310254, 23312013, 23396820Fax: 91-40-23312335

D-1, MIDC, R. D. Aga Road,Chinchwad, Pune 411 019.Tel.: +91-20-66126464 Fax: +91-20-27479200, 27479050

We reserve the right to amend any product details without notice.

Nov

. 200

6 Ed

ition

Thermal Engineering The International Way

B&W

Boiler & Heater Group

TBW Experience List For Heat Recovery Steam Generators With Project Details

!

!

!

Turbomach India Pvt. for Welspun, Gujarat.1 20 10.5 SaturatedTaurus 70 with Supplementary Firing on Natural Gas, 2004.

Caterpiller for Appolo Tyres, Gujarat1 1.7 22 Saturated

Taurus 60, 2004

Caterpiller for Biocon, Bangalore.10.5 Saturated

Taurus 60, 2004

2x TPH, Kg/cm g, , HRSG on

2x 1 TPH, Kg/cm g, unfired HRSG on

22 x 11.2 TPH, Kg/cm g, unfired HRSG on

!

!

Reliance Industries Ltd., Hazira 2 125 117 512±5

Gas Turbine with Supplementary Firing on Natural Gas, Naphtha, Kerosene & Distillates, 2004.

Reliance Industries Ltd., Jamnagar1 25 115 512±5

Gas Turbine with Supplementary Firing on Natural Gas, Naphtha, Kerosene & Distillates, 2004.

2 Ox TPH, Kg/cm g, C, HRSG on GE Frame 6

2 Ox 1 TPH, Kg/cm g, C, HRSG on GE Frame 6

!

!

!

Alok Industries Limited, Vapi1 0 10.5 SaturatedTaurus 60 with Supplementary firing on Natural Gas, 2006.

Reliance Utilities & Power Ltd., Jamnagar6 15 49 396Frame 9E with Supplementary Firing on Natural Gas, Naphtha and Distillate, 2006

Gujarat Heavy Chemicals Ltd., Gujarat, Vapi1 6 10.5 Saturated

Natural Gas, 2006

2x 3 TPH, Kg/cm g, HRSG on

2 Ox 3 TPH, Kg/cm g, C, HRSG on

2x 1 TPH, Kg/cm g, , HRSG on Taurus 60 Gas Turbine with Supplementary Firing on

HRSG installation at Apollo tyres

HRSG installation at Aban Power Ltd.

HRSG installation at Reliance Petrochemical Ltd.

Heat Recovery Steam Generator