RAJIV GANDHI THERMAL POWER PLANT, KHEDAR, HISAR (A UNIT OF HARYANA POWER GENERATION CORPORATION LIMITED) PHONE NO.01693-243570, FAX-01693-243555,[email protected]
HPGCL
NIT No: 37 /2012-13/ RGTPP /BMD-II /02 Vol-III Dated: 01.10.2012
Sealed tenders are invited in two parts in triplicate by the Chief Engineer /
RGTPP, HPGCL, Khedar, Hisar for the following works at 2x600 MW RGTPP, HPGCL,
Khedar, Hisar on Annual Maintenance Contract basis:- 1. Description of Work : AMC of Coal Mills (Bowl Mill HP-1103) &
Gravimetric Raw Coal feeders (belt type)
etc. for Unit-I & Unit-II.
2. Make : M/s Shanghai Electric Corporation, China
3. Earnest Money : Rs. 208000/-
4. Cost of Tender Document : Rs. 1132 /- (including Sales Tax)
5. Last date of sale of tender : 25.10.2012 upto 1700 Hrs.
6. Last date of submission/receipt : 26.10.2012 upto 1300 Hrs.
7. Due date of opening of tender : 26.10.2012 upto 1530 Hrs. 1. Pre-Qualifying requirements:-
1. The firm has carried out successfully the erection & commissioning or having
done the maintenance work on AMC basis of either same type of mills or any
other model of Bowl Mills i.e. XRP / HP etc. in any Thermal Power Station having
Units of 210 MW capacity or more. The firm shall produce attested copies of
work orders executed by them alongwith completion certificate / repeat orders
during last 3 years valuing not less than 15 lacs for a single order in support of
their claim.
2. The contractor should have Service tax No., EPF Account No. & PAN No.
B. General Conditions:-
1. Tender documents along with qualifying requirements can be seen and downloaded from HPGCL‟s website www.hpgcl.gov.in.
2. Tender documents can be purchased from the O/o XEN/BMD-II, RGTPP,
Khedar, Hisar on any working day from 10 A.M to 05 PM by remitting the cost
of tender documents (non-refundable) in cash at counter or in the shape of
Crossed Demand Draft favoring Sr. Accounts Officer, RGTPP, HPGCL,
Khedar, Hisar and drawn on any scheduled bank at Hisar.
3. In case of any of aforesaid dates happen to be holiday then the next working
day shall be the due date for sale / submission / opening of tenders.
4. The telegraphic tenders will not be accepted.
5. Period of contract is one year for Unit-I & Unit-II and extendable for three
months same rate and terms and conditions.
6. Negotiations, if required, would be held only with the L-1 bidders.
7. The bidder shall submit a separate demand draft towards cost of tender documents along with Part-I offer in case of use of downloaded tender set.
8. Chief Engineer/RGTPP, HPGCL, Khedar, Hisar reserves the right to accept/cancel any or all tenders without assigning any reason whatsoever.
Executive Engineer / BMD-II For Chief Engineer / RGTPP, HPGCL, Khedar, Hisar.
Annexure-I
GENERAL INSTRUCTIONS FOR TENDERERS
All tenderers must carefully observe the following instructions:-
1. Offers / tenders not strictly in accordance with these instructions shall be liable to rejection.
2. Tenders must be completed in all respects. 3. Telegraphic tenders / offers will not be accepted. 4. Tenders should be submitted in triplicate by Registered post or by hand. All pages of
each copy should be duly signed & stamped. All copies should be separately tagged & clearly marked as „ORIGINAL‟, „DUPLICATE‟ and „TRIPLICATE‟.
5. Offers / tenders should positively reach before last date prescribed for their receipt. Those received late will not be considered irrespective of whether the same was sent by registered post or otherwise.
6. Only those firms are eligible to quote who have purchased tender set from RGTPP or have downloaded the same from HPGCL website and are depositing the tender cost along with Part-I offer.
7. Tenders / offers received without earnest money shall be straight way rejected. 8. The offers / tenders should be typed or written in ink. Any thing written in pencil in
the offer / tender shall be ignored. All cancellations, overwriting and insertions shall be duly attested by the tenderer.
9. In case, the date of submission / opening of tenders happens to be a holiday or a holiday is subsequently declared on that day, the tenders will be received / opened on the next working day following the holiday at the same time & place.
10. Since the contractor will be handling sophisticated equipments, he must have proper skilled staff that has already worked on similar jobs.
11. The firm should either be registered with the Labour Commissioner, Haryana or should get himself registered immediately after the award of the work. The payment can be withheld for the want of the registration certificate.
12. Depending upon the evaluation of Part-I tenders by Project Committee as constituted by CE/RGTPP, Khedar, Hisar. Part-II (Price Bid) of tenders of successful bidders would be opened accordingly. The decision of the committee shall be final and binding upon the bidders.
13. STUDY OF TENDER DOCUMENTS.
Before quoting, the tenderer shall carefully study all the clauses and specifications of the tender documents. If tenderer has any doubt for the meaning of any portion of the tender specifications or find discrepancies or omissions in the drawings or the tender documents issued are incomplete or need clarification in technical aspects, scope of work etc., he shall atonce contact the authority inviting the tender for clarification before submission of the tender. No arguments on this account whatsoever, shall be entertained after the last date & time of submission of tenders.
14. INSPECTION OF SITE OF WORK Before submission of tender, the tenderer is advised to inspect the site of work, the environment & get himself acquainted with the actual work & other prevalent conditions, facilities available. No claim will be entertained later, on the ground of lack of knowledge.
15. EARNEST MONEY. a) The tenderer shall be required to deposit earnest money of Rs. 208000 /- only in
one of the following forms: - i) Demand draft drawn on the State Bank of Patiala payable at Hisar in favour of
Sr. A.O. RGTPP, Khedar, Hisar ii) Cash at counter of RGTPP, Khedar, Hisar in the form of BA-16. iii) Earnest money in the name of any Officer other than mentioned above & in any
other form will not be accepted. b) The earnest money of successful tenderer will be treated by the HPGCL as part of
the security deposit for faithful execution of the contract. c) The Bank charges, if any, will be to the account of tenderer. d) No claim shall be entertained against the HPGCL in respect of interest on earnest
money deposit.
e) The failure on the part of tenderer to honour his commitment given in the tender will constitute a default and in that event, his earnest money will stand forfeited by HPGCL.
f) EMD shall also be forfeited in case the tenderer withdraws his tender at any stage during the currency of his validity period.
g) The earnest money should be submitted in a separate envelope along with Part-I, which should bear the words “Earnest money amount Rs._ _ _ enclosed”. The envelope should be properly sealed & signed by the tenderer. Tender Enquiry No. _ _ _ _ _ _ __ _ _ _ _ due date _ _ _ _ should also be mentioned on the Envelope.
16. SUBMISSION OF TENDER a) Tenders should be submitted in two parts, addressed to Executive Engineer /BMD-
II, RGTPP, Khedar, Hisar-125122. Part-I shall comprise of technical bid containing the scope of work, General / Technical terms & conditions & deviations, if any, along with the earnest money (Annexure-I, Annexure-III , Annexure-IV and Annexure-V of tender document). Part-II shall comprise of price bid only (Annexure-II). Both Part-I & Part-II are required to be submitted in separate sealed covers, each super-scribed with “Tender Enquiry No.” quoted for. Both these covers be enclosed in another envelope duly sealed & super-scribed with “Tender Enquiry No.” and the fact that “Earnest money amount of Rs. _ ___ is enclosed with Part-I tender”. Part-I shall be opened on due date & time and Part-II shall be opened on subsequent date which shall be intimated to those tenderers whose Part-I is accepted.
b) The tenders will be received in the office of Executive Engineer /BMD-II, RGTPP, Khedar, Hisar up to 1300 hours on the date of submission and will be opened on the same date at 1530 hours in the presence of the tenderer or his / their representatives who may like to be present.
c) After opening the main cover, the envelopes containing the cost of tender set
(applicable for downloaded tender set) and EMD shall be opened first. Qualifying requirements for the Bidders and Techno Commercial offer shall be opened subsequently, if cost of tender & EMD of requisite amount and in proper mode have been submitted by the tenderer. Otherwise the tender shall not be opened and re-sealed.
d). The Price Bid (Part-II of the tender) shall be opened after Part-I of the tenders have been scrutinized and evaluated. The tenderer whose Part I have been approved, will be allowed to participate in opening of Price Bid (Part-II). The due date and time for opening of Price Bid (Part-II) shall be informed later on.
17. RATES / PRICE QUOTIING METHOD
i) The tenderer shall quote the prices in English Language and international numerals.
ii) The rates quoted by the firm should be firm and inclusive of all levies, duties or any other tax levied by State / Central Govt. during the period of the contract if not specified.
iii) All the taxes considered while submitting the offer must be defined. The applicable rate of service tax shall be indicated. If there is any variation i.e. increases / decrease in these taxes, during the contract period, the same will be to the account of HPGCL.
18. ACCEPTANCE / DEVIATION
The Tenderers should record acceptance of all instructions and terms & conditions. Any deviation in the terms & conditions of tender document should specially be brought out in tender under the head “Schedule of deviations”-Annexure-V, with reference to sections and clause numbers in the tender specification, failing which, it shall be presumed that all the terms & conditions as laid down in tender documents are acceptable to the contractors.
19. RATE QUOTING SHEET (PRICE –BID) The tenderer will quote his rates STRICTLY AS PER THE RATE QUOTING
SHEET AT ANNEXURE–II (Part-A & B). 20. At any time before dead line for submission of tender, HPGCL may modify the
tender document by issuing an addendum and extend the date of receipt and opening of tender.
21. The authority inviting tenders reserves the right to accept or reject any or all
tenders, without assigning any reasons and will not be responsible to pay for any
expenses or losses that may be incurred by the tenderers in preparation of the tenders.
22. VALIDITY
The validity of tenders should atleast be for a period of 90 days from the date of opening of Part-II of tender.
23. The contract shall be awarded to the tenderer whose total overall rates (Fixed rates for Part-A & Unit rates for Part-B combined) are lowest.
Executive Engineer / BMD-II For Chief Engineer / RGTPP,
HPGCL, Khedar, Hisar.
Annexure-II
SCOPE OF WORK FOR PART-A
AMC for General / Routine / preventive Maintenance of Coal Mills (Bowl Type HP 1103) Gravimetric RC Feeders (Belt Type), PF Pipings for 2x600 MW Unit-I&II at RGTPP, Khedar, Hisar.
The jobs detailed below shall be carried out by the firm round the clock as per
requirement to ensure smooth and trouble free operation. 1. Toping up of oil in gear box of coal mill, grinding rolls and gear box of RC feeders
including actuators, if any. 2. Removal of the foreign material i.e. steel / iron rods, wooden plank debris, boulders etc.
from coal mills. 3. Attending of the coal leakage from coal pipes / coal mill body applying sodium silicate /
asbestos rope / any other adhesive or minor welding works. 4. Attending of minor air / water & oil leakages by applying adhesive /Teflon tape or minor
welding works. 5. Clearing of the jamming of coal / air dampers / gate / valve etc. and helping in the
operation of the same. 6. Cleaning of coal dust from coal mill body, RC Feeder body, coal piping, railing, platform,
ducting and actuators etc. on regular basis. Removing of all cobwebs & beehives. The scope of cleaning excludes ground floor of mill area.
7. Removing of scrap and other unwanted material from the site to the specified area. 8. Proper stacking of the spare parts at site for emergency requirement. 9. Regular cleaning of glass inspection window of RC Feeder and oil / water flow indicator
etc. 10. Belt tracking of RC Feeder while in service to ensure smooth operation. 11. Opening and closing of doors for inspections. 12. Oiling and greasing of various rotating / moving components / gates / damper mechanism
of mill and feeder etc. 13. Cleaning of lube oil filter, lube oil cooler (water side) including opening and re-fixing. 14. Preventive maintenance / up keeping of hoist of coal mill including cleaning. 15. Replacement of flexible hoses of Seal Air installed at coal mills. 16. Checking & Replacement of Spider of lube oil pump coupling. 17. Cleaning / Filtration / Replacement of oil by appropriate method as & when required. 18. Priming of all lube oil pumps as and when required. NOTE:- 1. Above works related to routine / preventive maintenance are of indicative nature and may
be carried out periodically. Out of the above jobs, some activities will be required to be undertaken as per site requirement on daily need basis.
2. Any of the works relating to above scope not indicated but required to be carried out as per site requirement is deemed to be included and contractor shall accomplish the same at no extra cost.
Rate per Month for the above Scope of Work
Unit Period Rate / Unit / Month Amount
I & II 12 months for Unit-I&Unit-II
Monthly rates in words per Unit For Unit-I&II Rs. /- P.M.
Executive Engineer / BMD-II For Chief Engineer / RGTPP,
HPGCL, Khedar, Hisar.
SCOPE OF WORK FOR PART-B
AMC for Coal Mills (Bowl Type HP 1103) Gravimetric RC Feeders (Belt Type), PF Pipings for 600 MW Unit-1 & 2 at RGTPP, Khedar, Hisar.
UNIT RATES
Sr. No.
Description of Work Unit completion Time
Tentati-ve
freq. (a)
Rate Rs. (b)
Amount (axb) Rs.
Coal Mill (HP-1103) Make :Shanghai Electric Corporation, China
1 Repair, replacement / servicing of 03 Nos. journal assy. including journal head liners, trunion bushes & all its components including alignment of bearings for all three nos. roller assy. and again installation and normalization including hard facing, if any without roller replacement.
Set 5 days 8
2 Work same as above, for 1 no. roller assy. Each 36 Hrs. 20
3 Dynamic Roller gap setting and spring gap adjustment of one coal mill and normalization including opening and closing man-holes.
Each 8 Hrs. 100
4 Reclamation of journal lower housing / journal shaft by metal building.
Each 10 Hrs. 4
5 Replacement / repair and servicing of spring assembly opening and re-fixing of all components. Setting the desired spring compression and normalization.
Each 12 Hrs. 4
6 Removal of journal assembly from mill, Replacement of mills grinding roll and re-fixing (3 Nos.)
Set 48 Hrs. 14
7 Work same as above, but for one roller assembly.
Each 16 Hrs. 4
8 Emptying of mill choking including central feed pipe.
Each 12 Hrs. 80
9 Adjustment of spring compression by making all studs jamming free.
Each 10 Hrs. 30
10 Replacement of trunion bush for 1 no. roller assy.
Each 8 Hrs. 4
11 Rotation of trunion from one position to another for all three roller assembly of mill.
Each Mill
8 Hrs. 6
12 Replacement of worn out bull ring segments & hard facing the cover plate and normalization.
Set 36 Hrs. 16
13 Replacement / repair of bowl extension ring segment's (Set of Eight pieces) & hard facing including air restriction plate.
Set 24 Hrs. 16
14 Work same as above, for one Bowl extension ring segments.
Each 10 Hrs. 32
15 Replacement / Repair of complete worn out vane wheel assembly consisting of Eight segments, hard facing, if required.
Set 30 Hrs. 14
16 Work same as above, for one no. vane wheel segments.
Each 10 Hrs. 50
17 Replacement/repair of air restriction ring. Each 4 Hrs. 150
18 Replacement of deflector liners support on all three sides of mills.
Set 18 Hrs. 4
19 Replacement of deflector liners supports one side of mills.
Each 9 Hrs. 4
20 Replacement of all deflector liners
consisting of lower deflector liners & intermediate liners with weld plug arrangement.
Each 24 Hrs. 36
Sr. No.
Description of Work Unit completion Time
Tentative
freq. (a)
Rate Rs. (b)
Amount (axb) Rs.
21 Replacement of any type of the deflector liner/jr. assy. Guard/RLD/bottom liner/opening frame liner with weld plug arrangement.
Each 6 Hrs. 60
22 Repair/Replacement of upper & lower skirt assy. and normalization including cleaning of seal air ports.
Each 18 Hrs. 12
23 Gap setting of lower skirt assembly and normalization including cleaning of seal air ports.
Each 2 Hrs. 30
24 Repair of Scrapper assembly including its hard facing.
Each 8 Hrs. 150
25 Replacement of scrapper assembly. Each 8 Hrs. 60
26 Decoupling and Coupling of Mill including replacement of components, if required.
Each 20 Hrs. 6
27 Replacement / Repair of mill motor coupling, mill motor alignment & normalization.
Each 24 Hrs. 4
28 Replacement / servicing / repairing of Pulverized Coal Gate valve at any location.
Each 12 Hrs. 16
29 Repair / Replacement of I No. MPO After removing of discharge gate valve including hard facing, if any, re-fitment / alignment of PC pipes & necessary locking of pipes.
Each 24 Hrs. 32
30 Repair / Replacement of all 4 Nos. MPO after removing of all 4 nos. discharge gates, hard facing if required including locking of coal pipes.
Each 36 Hrs. 4
31 Same work as above and replacement / repair / hard facing of vantury and vantury collar.
Each 5 days 4
32 Work same as above and replacement/ repair / rotations of inner cone and hard facing, if required.
Each 3 days 10
33 Servicing / Replacement of all the classifier vanes of coal mill.
Set 18 Hrs. 2
34 Replacement / repair of vantury vanes set of 4 PCs. & hard facing.
Set 12 Hrs. 6
35 Replacement of mill side liners & Wear Plate including providing the insulation.
Each 8 Hrs. 24
36 Gap Setting of Clearance Air Seal Assy. including opening & refixing of air seal guard.
Each 12 Hrs. 16
37 Complete overhauling of mill including all the works mentioned above, as per requirement of mill.
Each 16 days 4
38 Repair of bowl/bowl hub or both. Each 3 days 8
39 Dismantling, complete servicing of planetary gear box of coal mill including replacement of required components / Oil, refixing after assembly and normalization.
Each 5 days 2
40 Replacement of damaged bolts of mill base of mill after opening of bowl cover and related components including tilt out of roller assy., if required. Refixing and normalizing.
Set 36 Hrs. 2
41 Repair/Replacement of Shroud plate Each 8 Hrs. 180
42 Adjusting the Gap of Shroud Plate including hard facing, if required.
Each 8 Hrs. 10
43 Fabrication and replacement of shroud plate.
Each 10 Hrs. 30
44 Replacement of Lube Oil after cleaning / flushing of oil tank and gear box. Diesel for flushing shall be arranged by the firm.
Each 20 Hrs. 16
Sr. No.
Description of Work Unit completion Time
Tentati-ve
freq. (a)
Rate Rs. (b)
Amount (axb) Rs.
45 Replacement of diaphragm of Hot Air Duct.
Each 24 Hrs. 40
46 Replacement of oil of journal assembly. Each 5 Hrs. 70
47 Repair/Replacement of bolts of inner cones / support pipes (03 Nos.)of inner cones of coal mills.
Set 24 Hrs. 16
GRAVIMETRIC RAW COAL FEEDERS
48 Servicing of raw coal gate (feeder inlet/outlet/Bunker outlet).
Each 6 Hrs. 40
49 Replacement/opening & refixing of belt including cleaning / servicing of head pulley/take up pulley /span rollers all the relevant components (full work).
Each 24 Hrs. 20
50 Replacement / servicing of take up screw block housing and belt tracking.
Each 6 Hrs. 16
51 Emptying & cleaning of feeder and discharge pipe upto R.C.feeder outlet gate due to choking at discharge end & cleaning of all internals.
Each 8 Hrs. 60
52 Emptying & cleaning of feeder and discharge pipe upto R.C.feeder outlet gate due to choking at discharge end & cleaning of all internals including belt repair in situ position, if required.
Each 10 Hrs. 12
53 Replacement/servicing of head pulley including replacement of bearings.
Each 6 Hrs. 10
54 Opening & refixing of all skirt plates including repairs if any.
Each 8 Hrs. 8
55 Opening & refixing belt scrapper including replacement, if any.
Each 6 Hrs. 2
56 Servicing /replacement of belt drive reducer gear box including replacement of components. Dismantle and mountings of motor.
Each 12 Hrs. 16
57 Decoupling/coupling of belt drive motor & its alignment with gear box.
Each 4 Hrs. 8
58 Removal of any foreign material struck up at inlet of feeder including removal of coal if required
Each 6 Hrs. 150
59 Replacement / opening & refixing of dresser coupling of RC feeder.
Each 4 Hrs. 4
60 Replacement of oil seal of gear box of Cleanout Conveyor / Main drive gear box.
Each 5 Hrs. 4
61 Repair / Replacement of Down Spout/Cone of centre feed pipe of RC Feeder.
Each 12 Hrs. 16
62 Repair / servicing of cleanout conveyor chain by changing chain pin / link etc. and normalization of relevant components.
Each 6 Hrs. 40
63 Repair / servicing / replacement of cleanout conveyor gear box including.
Each 6 Hrs. 4
P.F. PIPING/CENTER FEED PIPING
64 Attending leakage by MS/SS welding in coal discharge feed pipe or any location for attending leakage by patch. The size of patch is Approx. up to 250X300 mm and 12mm thick.
Each 2 Hrs. 400
65 Erection and removal of scaffolding to facilitate maintenance work at coal mill/PC piping/Raw & pulverized coal gates at any location above 3 mtr. Sqr.
Per mtr. Sqr.
3 Hrs. 200
66 Replacement / opening and refixing of victaulic coupling / Sleeve coupling including replacement of rubber gasket.
Each 3 Hrs. 30
67 Replacement of PC bends/elbow or transition piece / Spool piece with coupling or after fitting of 1meter straight pipe at both ends.
Each 20 Hrs. 4
Sr. No.
Description of Work Unit completion Time
Tentati-ve
freq. (a)
Rate Rs. (b)
Amount (axb) Rs.
68 Opening and refixing of expansion below assembly of pulverized coal pipe including repair of protection plate at inside.
Each 12 Hrs. 4
69 Replacement of straight pieces of coal discharge pipe of diameter 27“.
per Mtr length
10 Hrs. 40
70 Clearing of choking of pulverized fuel pipe outlet from mill out let to furnace.
Each 16 Hrs. 4
71 Repair / Servicing of wearable adjustable shrink hole (adjustable orifice) in pulverized coal piping.
Each 6 Hrs. 40
GATES AND DAMPERS
72 Servicing of I no. power cylinder & reinstalling In its position.
Each 8 Hrs. 2
73 Servicing of hot air regulating dampers including replacement of bearings of shaft/links if any (06 Nos.)
Each 20 Hrs. 16
74 Servicing of cold air damper Each 12 Hrs. 16
75 Servicing of cold air gate/ hot air gate including replacement of SS seals of hot shut off gates, if any
Each 12 Hrs. 20
76 Replacement of Actuator installed at hot / cold / mix air damper and Feeder gates at any elevation.
Each 10 Hrs. 8
77 Servicing of mechanical portion of actuator / replacement of actuator. Mechanical servicing of seal air damper/feeder outlet or inlet gate.
Each 10 Hrs. 10
MISCELLANEOUS 78 Supply of Skilled Labour. Each 8 Hrs. 20
79 Supply of Unskilled Labour. Each 8 Hrs. 20
80 Replacement of water line valve/ air line valve/ flow-Sight (including servicing) up to I00mm NB.
Each 4 Hrs. 8
81 Servicing of any seal air valve in mill/ RC feeder.
Each 3 Hrs. 8
82 Clearing of choking of mill at duct inlet/scrapper body.
Each 3 Hrs. 60
83 Replacement / repair of eroded MS sheet of duct.
Per Sq. Mtr.
3 Hrs. 60
84 Welding of air duct / Structure. Per Mtr.
1 Hrs. 20
85 Gas cutting of MS Plate. R/ Mtr.
0.5 Hrs. 40
86 Replacements of MS water/air line per inch dia per Mtr.
Per inch dia/ Mtr.
1Hrs. 60
87 Repairing/servicing of hoist in coal mill areas.(16 Ton capacity single girder under slung beam motorized LT drive).Total hoists installed 28 Nos.
Each 48 Hrs. 30
88 Dismantling & refixing of the motor of hoist.
Each 6 Hrs. 2
89 Lube oil pump replacement/repair including opening and refixing of spider rubber / coupling and alignment.
Each 6 Hrs. 20
90 Replacement / servicing of mech. Seal of lube oil pump, orifice replacement / preventive maintenance including replacement of spider rubber and alignment
Each 4 Hrs. 30
Sr. No.
Description of Work Unit completion Time
Tentati-ve
freq. (a)
Rate Rs. (b)
Amount (axb) Rs.
91 Painting after thorough cleaning of surface (Two coats). Paint to be provided by HPGCL.
Per Sq. Mtr.
02 Hrs. 80
92 Fabrication and erection of Steel (Time as per indent).
Per Ton
50
Total (Rs.)
NOTE:-
1. If any work / job has to be carried out in addition to the above mentioned work for completion of the activity, the same shall deemed to be included.
2. These item rates, if applicable can be used for carrying out similar jobs in other area of plant specified by Engineer- in-Charge.
3. The frequency of items is just indicative and provided for calculation of rates. These frequencies may vary, even some item may not be operated, depending upon the actual running / wear and tear of equipment‟s and occurrence of faults.
Executive Engineer / BMD-II For Chief Engineer / RGTPP,
HPGCL, Khedar, Hisar.
Annexure-III TECHNICAL TERMS & CONDITIONS
1. Consumables for cutting, cleaning and all small items including oxygen,
acetylene gas, cloth, cotton waste, emery paper, holdite, Kerosene oil, diesel,
rustoline, petrol,Anabond 666, hex blades, grinding wheel required for handling &
maintenance jobs will be arranged / provided by the firm. In case contractor fails
to bring sufficient consumables to site without which HPGCL work is suffering,
HPGCL shall be procuring the same from the market and recover the cost from
the contractor's bill @1.5 times the purchase price of the item. All
the welding electrodes to be used will be provided by HPGCL free of cost.
2. Contractor has to make his own arrangement for welding set and welding leads,
wire brush, welding torch, gloves, bulbs, wires and holders for temporary lighting
etc. at work place.
3. All tools and tackles like spanners, chain pulley block, hydraulic jack, portable
grinding machine, hoisting arrangement, hand operated bending machine and
drilling machine, personal protective equipments for the safety of workers, safety
belt, scaffolding material etc. shall have to be arranged by the contractor.
However available T&P like EOT Cranes and special fixtures for mill mtc.
installed at site, will be available to the contractor free of charge and contractor
will be responsible for upkeep of the electric hoist. Any minor repair required for
electric panels, pendent Switch and replacement of wire rope if required shall be
in scope of the firm. However, if EOT hoist is not available due to any reason, the
contractor shall make his own arrangement for completion of the work.
4. The entire work shall be completed by the contractor within the time given by
Engineer-in-Charge and to achieve this, contractor has to work round the clock.
However, in case of any delay in the supply of spare parts in time or any job
involving machining etc., the time extension shall be given accordingly by the
HPGCL.
5. All spares, bolts, nuts, grease, lubricants and gaskets, seals, „0‟ rings , electricity
supply for welding set / lighting, water and air etc. if required for any job will be
issued free of charge by HPGCL.
6. The description of works has been given in the scope of work in Part-A & B of
Annexure-II of the tender document. However, in case of any new job, the rate
shall be decided by HPGCL on the representation of the contractor. It will be
obligatory on the part of the contractor to carry out left over jobs relating to the
system.
7. The work shall be started immediately after getting written/verbal instructions
from the authorized representative of the Engineer-in-Charge.
8. Any temporary Platform/scaffolding etc. required to execute any work shall be in
the scope of contractor.
9. The electricity for carrying out the welding / cutting / other site works & for site
office at nearest point will be provided free of cost. The contractor will be
responsible to use the same judiciously.
10. The transportation of material from site to workshop & vice versa will be in the
scope of contractor. The contractor will assist the loading / unloading of spares,
if the same are to be got repaired from any private workshop.
11. The transportation of spares & other material from O&M store to site store or
place of work & transportation of scrap to store yard will be in the scope of
contractor.
12. After attending the job, the area will have to be got cleaned / cleared and scrap
etc. to be removed from site. In case Engineer-in-Charge feels that the area has
not been cleaned / cleared properly, HPGCL has the right to get the above work
done from other agency at the risk and cost of the contractor.
13. If required, the space for office and store can be provided if available by HPGCL.
The site office should be well painted and constructed in such a way that it
should give a good look.
14. The chemicals for carrying out DP test wherever required will also be arranged
by the contractor.
15. The removal of insulation, G. I. sheet / AL Sheet up to one meter square or so to
carry out any job & re-fixing the same after completing the job will be in the
scope of contractor.
16. In case spares are not available at site or in store and same are required to be
removed from other equipments i.e. mills / feeders etc., the contractor is bound
to do same without any extra cost.
17. To reduce down time, the contractor will keep ready atleast one spare roller
assembly per unit and same will be charged to the down coal mill.
18. Cleaning of dust from equipment i.e. coal mill and R.C. Feeders and its glasses,
Coal piping, ducting, hoists, structures and mill platform will be done daily,
preferably between 06:00 AM to 10:00 AM. All equipments shall be maintained
adequately cleaned & dust free.
19. The dismantled spares, new spares, kept at site for emergency use should be
properly stacked, kept cleaned and covered properly in safe custody.
20. If the grating of coal mill platform / stairs, railings, etc. gets damaged while
carrying out the repair work, same shall be rectified / repaired by the contractor.
21. Contractor will arrange all measuring instruments like micrometers, vernier
calipers, scales, dial gauge, hydraulic testing pumps for coolers etc.
22. Additional manpower will be required to be mobilized during overhauling of any
unit and the contractor will ensure adequacy of manpower so that overhauling
works are completed in time.
23. The contractor shall make an arrangement so that his authorized representative
is available round the clock at specified location to take maintenance job on all
days including Sundays / Holidays. The Supervisor / Foreman deputed by the
contractor should be technically sound and should have full know-how of the mill
works.
24. The contractor will ensure the presence of their representative i.e. Supervisor /
contractor himself at the time of cancellation of PTW / running of equipment after
completion of work.
Executive Engineer / BMD-II For Chief Engineer / RGTPP,
HPGCL, Khedar, Hisar.
Annexure-IV
GENERAL TERMS & CONDITIONS
1. PRICES
The rates shall be firm inclusive of taxes & statutory duties (except service
tax at the applicable rate) during the period of contract.
2. PERIOD OF CONTRACT
The period of contract shall be for one year from the date of
commencement of work. A notice of seven days shall be given for starting
the job, but the contractor should be able to mobilize his resources within
24 hours, if necessity arises. The period of contract may be extended up to
three months at the same rates & terms and conditions at the discretion
of HPGCL. The period of contract for unit-1& unit-II will be for one year.
3. PENALTY / DEDUCTIONS
a) i) If the quality of work is not upto the satisfaction of Engineer-in-Charge or
there is delay in attending of jobs of Part-A, a penalty @ 2% of the
monthly lumpsum charges shall be levied on the contractor for each
default.
a. ii) The contractor will provide sufficient labour i.e. 1 Technician/fitter,1 welder
cum gas cutter,1crane/hoist operator & 2 Helpers per shift per unit for
carrying out the activities of part A of scope of work. The contractor will
also provide 01 Supervisor per shift per Unit during day time and
01supervisor for both units during night hours for the above said work. If
the contractor fails to provide the manpower detailed above then a penalty
of Rs. 500/- per person per shift shall be levied.
a. iii) If cleaning of equipment is not maintained properly then a penalty of
Rs. 500/- per unit per day will be deducted from monthly lumpsum charges
under Part-A.
b. For the works covered under Part-B, a penalty @2% per hour (if completion
time is in hours) or @ 2% per day (if completion period is in days) shall be
levied, subject to max.10% of total rate of that particular item. The completion
time as per work order will be indicated in the indent.
c. If any unit is put under shut down for overhauling, then the period of
overhauling i.e. date of box up of boiler to date of light up of boiler will be
treated as total time for completion of any or all items of works. If the time
taken for the completion of any or all items of works exceeds the
shutdown period of the unit, penalty @2% per day per unit shall be levied
on the total charges to be paid to the contractor for the activities
scheduled to be carried out during shutdown period.
d. In case, HPGCL is unable to supply the spares in time to the contractor
after opening of any equipment and the contractor is unable to complete
the job in absence of these spares, then the contractor will be allowed the
extension in scheduled time for completion of that delayed activity for
the period for which contractor has not been provided the spares. This
extension will be granted with the approval of SE/In-charge, RGTPP,
HPGCL, Khedar, Hisar. In case any spares of the equipment under
outage are to be repaired & machined in the HPGCL / Private workshop and
the job gets delayed, the extension in completion time will also be considered
accordingly with the approval of SE/In-charge, RGTPP, HPGCL, Khedar,
Hisar. However, nothing extra will be paid for idling time etc.
4. FORCE MAJEURE
Contractor shall not be liable for any delay for reasons arising out of
compliance with regulations, orders or instructions of Central / State Govt.,
acts of the God, acts of civil and Military authorities, fires, floods, strikes,
lockout, freight embargoes, war-risk, riots, civil commotion, epidemics
and accidental. If the contractor wants to extend the completion period
under this clause, he will request for such extension of the completion
period alongwith all necessary evidence, before the expiry of the schedule
date of completion. In no case, the completion period shall be extended
under this clause, in case the request is received after the due date of
completion. Extension in the completion period may be granted only for the
period for which the completion of the work is proved by the contractor
to have been delayed for circumstances mentioned in the clause.
5. NEGLIGENCE
If the contractor neglects to execute the work with due diligence and
expedition or refuses to do the work, then HPGCL may serve 15 days
notice, in writing to the contractor to make good the failure within the
stipulated time otherwise HPGCL shall be at liberty to take the work
wholly or partially at the risk and cost of the contractor at a reasonable
price. It shall be lawful for the HPGCL to retain any balance which may
otherwise be due to the contractor on any account, if dues of the
contract are not sufficient to cover the amount thus recoverable from the
contractor and to recover the whole of the balance of the amount from the
contractor by action at law or otherwise. The remedy under this clause will
be in addition to and without prejudice to rights available to the HPGCL under
other clauses of the terms and conditions.
6. SUBLETTING NOT ALLOWED
Contractor shall neither sublet the contract nor suspend the work at any
time during the period of contract without any lawful excuse and without
the earlier permission of the project authorities.
7. SECURITY DEPOSIT AND EMD
10% of the monthly running bill will be retained as security deposit from
each running / monthly bill of the contractor. However, the earnest money
deposited by the contractor shall be adjusted into the security deposit.
Security Deposit & EMD shall be returned to the contractor after the
faithful execution and satisfactory completion of contract including
guarantee / warranty period and completion of all pending documentary
formalities. No claim for interest on security amount shall be acceptable. If
the contractor fails or neglects to observe or perform any of his obligations
under the contract, it shall be lawful for the HPGCL to forfeit either in
whole or in part at its absolute discretion, the security deposit furnished
by the contractor. The forfeiture of security deposit shall be without
prejudice to the right of the HPGCL to recover any further amount of any
liquidated or other damages, under payments or over payments made to the
contractor under this contract or any other contract.
8. PERIOD OF LIABILITY
The contractor shall give guarantee for the work done for a period of 45 days
or 500 running hours whichever is earlier from the date of successful
commissioning of equipment repaired. During the liability period, if any
defect is observed in the equipment, which is attributed to poor
workmanship or poor quality of material used by the contractor, the same
shall be attended by the contractor at his own cost.
9. DOCUMENTATION / BILLING
All measurements shall be in metric system. All the works completed will
be measured by the representative of the Engineer-in-Charge. The
contractor will submit the bill in triplicate on approved Performa to the
Engineer-in-Charge. The bill for works covered under category „A‟ i.e.
works for General / Routine / preventive maintenance will be raised in
two parts, half for each Unit-I&II respectively. For works covered under
category "B" i.e. the works for which unit rates are applicable, the bill will
be raised separately for Unit-I&II as per the actual works carried out for
each unit.
10. ENGAGEMENT OF ADEQUATE LABOUR
The contractor would station adequate working persons of the category
like FM/ supervisor / mill wright fitter, technician / fitter, welder cum gas
cutter, riggers skilled / unskilled, electrician etc. and would deploy them in
such a way that the maintenance work is carried out effectively and without
any delay round the clock. However, contractor shall make his arrangement
to deploy minimum one fitter / technician, one welder cum gas cutter
and two helpers and one crane/Hoist operator per shift per unit. The
contractor shall also make his arrangement to deploy one supervisor per
unit per shift during day time and one supervisor for both units during night
hrs. as job is of continuous nature. No extra payment on this account will be
made. The work shall have to be started immediately as per the instructions
of Engineer-in-Charge or his representative. The contractor should be able
to mobilize the working force as per the quantum of work and should be
capable of executing maintenance work simultaneously at all the fronts, coal
mills / RC feeders depending upon the site requirements. If more persons
are required for completion of work in the time schedule as per emergency
defined by Engineer- in-Charge, the same shall be arranged by the
contractor without any extra payment to complete the work. It is also made
clear that the deployment of the workers of contractors will be subject to
approval of Engineer- in-Charge of the works.
The contractor would be responsible for the following:-
a. All the labour / workmen deployed during the execution of the contract shall
be adequately got insured by the contractor at his own cost.
b. Any mishappening / accident to any workmen at site of work &
compensation payable to workmen on this account, all liabilities arising
out of any provision of Labour Act / Workman's Compensation Act shall be
the responsibility of the contractor. Any expenditure incurred by HPGCL
arising out of the negligence of the contractor would be recovered from
his bills / pending dues.
c. The good conduct of all the workmen at work site.
d. The loss / damage caused to the property of HPGCL or any other agency
of the contractor or any of his workman / employee.
e. The contractor may employ such employees, as he may think fit to ensure
the execution of the work to the entire satisfaction of Engineer-in-Charge.
The employees would not be deemed to be in the employment of HPGCL
for any purpose whatsoever. The contractor shall abide by the rules, laws
and regulations that may be enforced from time to time regarding the
employment conditions of service of his employees.
f. Under no circumstances whatsoever, HPGCL would be held responsible
to the labour of the contractor. HPGCL shall have the right to pass on the
responsibility on the contractor for any expense incurred by HPGCL as a
result of certain dues on the part of employees of the contractor. HPGCL
shall be entitled to recover / claim dues / compensation from the
contractor in that event.
g. The labour / employees engaged by the contractor shall not be below the
age of 18 years and above 60 years.
h. Further, the contractor would furnish an undertaking on non judicial stamp
paper of appropriate value by each and every worker employed by him,
that the worker will not claim any lien as a worker of HPGCL for the
services, he is rendering to the contractor.
i. The contractor shall also indemnify HPGCL against any liability towards
its labour for non-compliance of laws etc.
11. TERMS OF PAYMENT
Subject to any deduction which the HPGCL may be authorized to make
under this contract, the payment shall be made as follows
“90% payment shall be made against the running bill or monthly bills
for the work done & balance 10% shall be kept as security which shall be
released after the satisfactory completion of the contract including the
period of guarantee / warranty”. No interest shall be pa id by HPGCL on
the security amount.
In case any unit i.e. Unit I or II remains under shutdown for more than 30
days due to capital / annual overhauling or due to any other reason, or not
commissioned, the payment under lumpsum fixed charges will not be made
for that particular unit. An advance notice of 3 days in this regard will be
given to the contractor. However, for the days during the months in which
the unit was running, payment will be made on prorata basis.
12. CONTRACTOR TO REMOVE UNSUITABLE LABOUR
On instruction of the Engineer-in-Charge, the contractor would immediately
remove any person employed on the work, who misbehaves or causes any
nuisance or otherwise in the opinion of the Engineer-in-Charge is not fit to
be deployed on the work, such person shall not be re-employed or allowed
on the work without the prior written permission of the Engineer-in-
Charge.
13. MODE OF PAYMENT
The payment shall be made through account payee cheque in favour of
contracting firm by the Sr. Accounts Officer, RGTPP, HPGCL, Khedar,
Hisar. No Bank charges etc. of any kind shall be paid by HPGCL.
14. INCOME AND OTHER TAXES DEDUCTIONS
The income tax plus surcharges and any other statutory levies required to
be deducted by the HPGCL will be deducted at source at the rate
applicable from time to time.
15. SERVICE TAX
No service tax will be paid extra until and unless it is liable on the
services provided by the contractor and specifically demanded for the
same in his offer. However, non-claiming of service tax from the HPGCL by
the contractor cannot help the contractor in escaping from his liability to the
Govt. against the taxable service. In case, the service tax is to be paid by
the HPGCL, the contractor will have to submit the proof of submission of
service tax claimed from HPGCL to the relevant authority.
16. TAXES AND DUTIES
No taxes or duties will be paid extra until and unless the same has been
demanded by the firm in its offer specifically. In case the same is to be
paid by the HPGCL, an undertaking is to be submitted by the firm in this
regard stating that the taxes or duties as claimed from the HPGCL have
been deposited with the relevant authority
17. EPF REGISTRATION
The contractor / firm should be registered with the Regional Employees
Provident Fund Commissioner, Govt. of India and should possess valid
EPF Registration number. Contractor shall ensure the deposit of monthly
EPF contribution of his workers engaged on said works with EPF
Department in the accounts of the workers. Documentary evidence in
respect of the amount deposited for the previous month must be
submitted before submitting the bill for the following month by the
contractor. Annual EPF inspection from the respective inspector is also
required to be submitted by the contractor before closing of the contract.
18. INSURANCE
Immediately before the commencement of the work, a group insurance policy
of appropriate value valid for the term of the contract in respect of all the
workers deployed on work under Workman Compensation Act 1923 shall be
obtained by the contractor to cover up the risk of injury / death /fatal / non-fatal
accident. The documentary proof of the same shall have to be furnished with
the first running bill. The contractor shall be fully and wholly responsible for
any mishappening, injury, fatal / non-fatal accident sustained by him / his
employees / workers at site during performance of the work under the contract
and HPGCL shall not entertain any claim of this account. However, if HPGCL
is forced to pay any compensation to any workman employed / engaged by the
contractor, the amount so paid shall be recovered from the contractor from his
pending dues against this contract or any other contract with the HPGCL.
19. LABOUR LAWS
I. The contractor must get himself registered with the Labour Department,
Haryana under Section-7 of Labour Contract Act 1970.
II. He should also obtain a valid Labour License as applicable under Section
12 of Act for the work awarded to him immediately after the allotment of
work and a copy of the same must be submitted alongwith the contract
Agreement.
III. The contractor shall abide by all labour-laws required to be followed under
Factories Act, 1948, Industrial Dispute Act 1947, Workmen Compensation
Act 1923, Employees State Insurance Act 1948, EPF Act 1952, Payment of
Wages Act 1936 & Minimum Wages Act 1948 and other rules & regulations
framed by Central / Haryana Govt. from time to time in this regard.
IV. The contractor shall maintain necessary records viz. Register of wages,
Muster roll / Attendance register, Employment card / Gate Pass, Overtime
Register and other necessary records etc. as required under aforesaid
Acts and the same shall be made available to the Engineer-in-Charge /
Project Authorities / Govt. of Haryana for checking / inspection as and
when required.
V. The contractor shall indemnify the HPGCL against all the obligations of
the Labour Rules and Regulations under any Statutory Act as
mentioned above.
VI. The contractor shall submit an undertaking stating that all risks &
responsibilities towards labour will be owned by him.
VII. The contractor will engage labour after getting the character antecedents
verified from the Police department.
VIII. The workmen engaged by the contractor shall not be treated as
employees of HPGCL. The HPGCL shall have no relation with workers
engaged by the contractor. An affidavit from the labour / workmen shall be
submitted by the contractor that they will not claim themselves as
employees of HPGCL.
IX. The contractor shall deduct labour welfare fund @Rs. 5/- from each
worker with employers share @ Rs. 10/- per worker (i.e. total Rs. 15/- for
each worker or any other further amendment by the competent authority)
deposit the same with the Welfare Commissioner, Haryana, Chandigarh
and present its documentary proof alongwith the bill.
20. SAFETY RULES
I. Contractor shall have to comply with all the provisions of safety rules. The
Engineer-in-Charge or The Chief Safety Officer shall impose penalty of
Rs.100/-per day per head if the workers of contractor are found to be
working carelessly or in violation of use of proper protective equipments
i.e. safety helmets, shoes, safety belts, goggles, ear plugs etc. and
against violation of any other clause. A penalty of Rs. 500/- per violation
(minimum) shall be levied in case of repeated violation. Further, if the
violation made by the contractor / labour which may cause any serious
accident or direct loss to the corporation or threatens to cause severe
consequences, the higher penalty may be imposed including suspension /
termination of the contract.
11. Following undertaking is also required to be submitted by the
contractor:-
"I / We have gone through all the terms & conditions on safety
regulations and undertake to strictly enforce the same during the execution
of this contract including mobilization period, if any”. In case of violation of
these terms & conditions, the HPGCL is free to take action as deemed fit.
III. In case of any fatal / non fatal accident or any other violation of Factory Act
1948. Pb Hr Factory Rules 1952 or under other Industrial or Labour Act are
made by / with the workers of the contractor and if prosecution is launched
by Chief Inspector of Factories, Chandigarh against occupier / Factory
Manager or any other authority of HPGCL, the contractor shall be liable
to deposit the amount of fine / penalty decided by the Court, on the same
day. In case of default, the amount will be recovered from the
outstanding dues / liabilities of the contractor against this contract or any
other contract at RGTPP besides other action as the HPGCL may deem fit
like black listing of the firm etc.
IV. The liability of the injured person shall be borne by the contractor,
irrespective of the location at which the accident has occurred.
21. LOSS OF PLANT / HPGCL PROPERTY DURING EXECUTION OF THE
WORK
The contractor shall ensure that no damage or loss is done to HPGCL / Plant
property or any other agency in the jurisdiction of work site. In case, it is
found that there is any loss to the plant equipment, HPGCL property or
human being due to negligence of the labour / worker of the contractor, the
same shall be made good to HPGCL by the contractor at his own cost.
22. BREACH OF CONTRACT
If the contractor fails to adhere to the time schedule or if his services are
found to be unsatisfactory, the HPGCL will be entitled at its option either:-
a) To recover damages as per penalty clause mentioned as above, if the said
delay is not covered under the Force Majeure reasons.
b) To get the work done from any other agency after serving a notice of three
days to the contractor at his risk and cost and without prejudice to the other
provisions of the work order.
OR
c) To cancel the contract by giving 15 days notice & forfeit the security.
23. CONTRACT AGREEMENT
The contractor shall execute a contract agreement on specific Performa on
Non judicial Stamp Paper of appropriate value within 7 days of date of issue
of LOI / W.O. Cost of the stamp paper will be borne by the contractor. The
person who has signed the tender papers should have got authority to sign
on behalf of the contractor. If it is discovered at any time that the person
so signing has no authority to do so, the HPGCL without prejudice to any
other right or remedy available to it, may cancel the contract and get the
work done from any other agency at risk and cost of the contractor. The
contractor shall mean the contractor's legal representatives, successors
and assigns.
24. ARBITRATION
In all cases of disputes or disagreements between the parties arising out
for the settlement of the differences, the matter shall be finally settled by
the Arbitrator appointed by the Chief Engineer, RGTPP, HPGCL & the
dispute will be dealt in accordance with provision of the Arbitration &
Conciliation Act, 1996.
25. JURISDICTION
All legal proceedings in connection with contract shall be subject to the
territorial jurisdiction of local court at Hisar (Haryana).
26. ELECTRICITY / AIR / WATER
Electricity/ Air / Water will be provided free of cost at one point per unit as
per requirement of job. HPGCL may provide suitable space for site store /
temporary workshop free of charges to the contractor. The electricity for
site store / office will be provided by HPGCL free of cost. The contractor
will use electricity / air / water judiciously.
27. ACCOMMODATION
The contractor will be responsible for the accommodation of his employees /
workers deployed for execution of work. However, if the accommodation is
available with HPGCL the same may be allotted on chargeable basis as per
HPGCL rules.
28. TRANSPORTATION OF MATERIAL
a) The contractor shall make his own arrangement for transportation of the
material from O&M stores to site of work, from site of work to O&M
workshop, if required and return of scrap back to stores. The contractor shall
also assist in loading / unloading of material being sent for repairs or
received after repair to / from outside of RGTPP.
b) The contractor shall make his own arrangement for removal of old as well
as unused material from the site to the place as specified by the Engineer-
in-Charge after completion of work.
29. PRESERVATION & STORAGE OF MATERIAL
All the material issued to the contractor by the HPGCL or brought by the
contractor for its bonafide use shall be stored and preserved against any
loss, damage, shrinkages or deterioration in any form. Any damage / loss
suffered on this account shall be considered as loss due to willful
negligence on part of the contractor and shall be liable to compensate
HPGCL for these losses suffered at penal rates to be determined by the
HPGCL. The rates charged for the purpose of recovery shall be final and
binding on the contractor.
30. SUPERVISION OF WORK
a) The Engineer-in-Charge shall have the general supervision of the work.
The work shall have to be started by the contractor as per the instruction of
Engineer-in-Charge or his authorized representative at any time on working
day, on holiday or after office hours, and shall be confirmed by post dated
indent. The indent will indicate the date / time of start of work, details of
work and scheduled time of completion of work as per contract. The time
allowed for a work maintained in the indent will be addition of time of all the
jobs / activities as per contract. The Engineer-in-Charge may reduce the
total cumulative time of various activities, keeping in view of emergency to
bring back the equipment in time. The total time allowed by the Engineer-in-
Charge will be final & binding on the contractor. He has the authority to stop
the work whenever such stoppage is necessary to ensure the proper
execution of the contract. He shall also have authority to reject all works or
part thereof and give necessary direction to carry out work again to his
satisfaction. No claim whatsoever on this account will be entertained. The
work shall be subjected to the inspection by Engineer-in-Charge all the time
b) The decision of Engineer-in-Charge shall be final with regards to all matters
relating to his contract.
c) The decision of Engineer-in-Charge for determining the category of the
work with reference to the items not mentioned in scope of work shall be
final.
d) The execution of work may entail working at all the sites and weather
conditions and no extra claim will be considered on this account. The
contractor may have to carry out jobs and work round the clock, as per the
requirement to be decided by Engineer-in-Charge. No extra claim / over time
will be paid on this account.
e) In case the contractor fails to do the extra / substituted work, Engineer-in-
Charge will have the option to get the work done through any other agency at
the risk & cost of the contractor.
f) In case of any dispute, the contractor may represent in writing to the
Engineer-in-Charge.
31. TELEPHONE
The successful contractor shall provide the phone facility to his supervisor
to facilitate HPGCL for easy communication with the contactor. The phone
Number shall be intimated by the contractor immediately after the award of
the contract.
32. AUTHORIZED REPERSENTATIVE
The firm will intimate (in writing) the name of authorized representative
at site to whom necessary instructions regarding the works can be imparted
and who will make correspondence regarding contract related issues. The
signatures of the aforesaid authorized representative shall be got
attested from First Class Magistrate or Notary Public.
33. OWNERSHIP DEED
The firm will give ownership deed / partnership deed / proprietorship deed
(as applicable) duly attested by Notary Public for record and reference of
his office.
34. Any other work relating to preventive maintenance of the equipments not
mentioned in Part-A of scope of work but otherwise felt necessary will also
be in the scope of contractor. No extra payment on this account will be
made.
35. The frequency of works covered under Part-B can vary depending upon site
condition. But the total value of the work order shall remain fixed for the
period mentioned in the order.
Executive Engineer / BMD-II For Chief Engineer / RGTPP,
HPGCL, Khedar, Hisar.
Annexure-V
SCHEDULE OF DEVIATION
Executive Engineer / BMD-II For Chief Engineer / RGTPP,
HPGCL, Khedar, Hisar.
Sr. No. Clause No. Description of deviation Justification
1 2 3 4