How to Use the New FIMS AAIM Module Annual FIMS Comprehensive Training Y-12 New Hope Center Oak...
-
Upload
dominic-holmes -
Category
Documents
-
view
216 -
download
1
Transcript of How to Use the New FIMS AAIM Module Annual FIMS Comprehensive Training Y-12 New Hope Center Oak...
![Page 1: How to Use the New FIMS AAIM Module Annual FIMS Comprehensive Training Y-12 New Hope Center Oak Ridge, TN March 25, 2014 Mark Gordy Gayle Smith.](https://reader036.fdocuments.in/reader036/viewer/2022082612/56649eff5503460f94c14923/html5/thumbnails/1.jpg)
How to Use the New FIMS AAIM Module
Annual FIMS Comprehensive TrainingY-12 New Hope Center
Oak Ridge, TN March 25, 2014
Mark GordyGayle Smith
![Page 2: How to Use the New FIMS AAIM Module Annual FIMS Comprehensive Training Y-12 New Hope Center Oak Ridge, TN March 25, 2014 Mark Gordy Gayle Smith.](https://reader036.fdocuments.in/reader036/viewer/2022082612/56649eff5503460f94c14923/html5/thumbnails/2.jpg)
What is AAIM?Anticipated Asset Information Module◦Accessible from FIMS◦Tracks planned acquisitions for DOE - regardless of planning stage New assets Expansion of existing
assets
![Page 3: How to Use the New FIMS AAIM Module Annual FIMS Comprehensive Training Y-12 New Hope Center Oak Ridge, TN March 25, 2014 Mark Gordy Gayle Smith.](https://reader036.fdocuments.in/reader036/viewer/2022082612/56649eff5503460f94c14923/html5/thumbnails/3.jpg)
Why was AAIM created?The Office of Management and Budget
(OMB) Management Procedures Memorandum No. 2013-02◦Departments may not increase their gross
square footage over their FY 2012 baseline For owned, leased, or GSA predominant office or
warehouse space
◦Triennially produce and annually update a plan related to office and warehouse real property acquisitions
◦Annually evaluate their performance against their plan
◦Known as Freeze the Footprint (FTF)
![Page 4: How to Use the New FIMS AAIM Module Annual FIMS Comprehensive Training Y-12 New Hope Center Oak Ridge, TN March 25, 2014 Mark Gordy Gayle Smith.](https://reader036.fdocuments.in/reader036/viewer/2022082612/56649eff5503460f94c14923/html5/thumbnails/4.jpg)
Types of Assets Tracked by AAIMRequired for:
◦New assets before they reach beneficial occupancy OR expansion of existing assets
◦Building and Trailers
◦Predominate usage:
◦May optionally be used for all other building/trailer predominate usage
DOE Owned DOE Leased
GSA Owned GSA Leased
Office – FIMS Usage Code 101
Warehouse – FIMS Usage Codes 400 – 450
![Page 5: How to Use the New FIMS AAIM Module Annual FIMS Comprehensive Training Y-12 New Hope Center Oak Ridge, TN March 25, 2014 Mark Gordy Gayle Smith.](https://reader036.fdocuments.in/reader036/viewer/2022082612/56649eff5503460f94c14923/html5/thumbnails/5.jpg)
Required for Usage Codes:FIMS Usage Code - Description
101 – Office
400 – General Storage
401 – Programmatic General Storage
410 – Hazardous/Flammable Storage
411 – Nuclear Contaminated Storage
412 – Special Nuclear Material Storage
415 – Nuclear Waste Storage Facility
421 – Secure Storage Facility
422 – Automated Warehousing
423 –Temperature and Humidity Controlled Warehousing
424 – Magazine, Ammunition Storage
425 – Magazine Igloo Staging Facility
440 – Environmental Controlled Storage
450 – Shed Storage
![Page 6: How to Use the New FIMS AAIM Module Annual FIMS Comprehensive Training Y-12 New Hope Center Oak Ridge, TN March 25, 2014 Mark Gordy Gayle Smith.](https://reader036.fdocuments.in/reader036/viewer/2022082612/56649eff5503460f94c14923/html5/thumbnails/6.jpg)
After beneficial occupancy …AAIM provides a process to transfer an
AAIM asset to FIMS ◦For new construction
Create a new FIMS record using the AAIM asset information
Archive the AAIM asset
◦For existing assets Update the FIMS existing record by
Adding the AAIM sqft to the FIMS sqft Updating the FIMS Usage Code with the AAIM Usage
Code Adding the Acquisition Cost/Rent to the FIMS record
Initial Acquisition Cost/Annual rent
Archive the AAIM asset
![Page 7: How to Use the New FIMS AAIM Module Annual FIMS Comprehensive Training Y-12 New Hope Center Oak Ridge, TN March 25, 2014 Mark Gordy Gayle Smith.](https://reader036.fdocuments.in/reader036/viewer/2022082612/56649eff5503460f94c14923/html5/thumbnails/7.jpg)
FY 2014 AAIM UpdatesBy April 9, 2014
◦Update AAIM to reflect all anticipated acquisitions and expansions occurring between FY 2014 and FY 2016 For DOE Owned, DOE Leased buildings and
trailers and GSA Owned/Leased buildings With predominant Usage Codes of Office or
Warehouse
Driven by the Annual Agency Evaluation required 120 days after the FRPP submission
![Page 8: How to Use the New FIMS AAIM Module Annual FIMS Comprehensive Training Y-12 New Hope Center Oak Ridge, TN March 25, 2014 Mark Gordy Gayle Smith.](https://reader036.fdocuments.in/reader036/viewer/2022082612/56649eff5503460f94c14923/html5/thumbnails/8.jpg)
AAIM
DEMO