How to save 5-15% on construction costs? - Proxion VDC Products VDC Sketch •Visual BIM tool for...
Transcript of How to save 5-15% on construction costs? - Proxion VDC Products VDC Sketch •Visual BIM tool for...
How to save 5-15% on construction costs? Case studies from US, Norway and Finland – solutions and process workflows
Jarkko Sireeni Product Manager
Vianova Systems Finland Oy
2D Drawings 3D Models 3D Collaboration models 3D Integrated Intelligent models
ISOLATED COLLABORATIVE INTEGRATED
Where we are going Where we are
Single discipline
Manual & CAD
Discipline approach
Single discipline
Limited intelligence
Discipline approach
Multi discipline
VR-Visualization
Project approach
Multi discipline
Multi phase
Web-Server based
Life cycle approach
Industry is changing from documents to models
But Why and How?
A highly precise virtual reality model is being created
in parallel with the design of a Norwegian road, to
help avoid conflicts in both design and construction.
(World Highways 7 January 2008)
Case Study: RV 150 Ring 3, Ulven – Sinsen Owner: Road Department, Contractor : Veidekke
Average cost per change/conflict has
been calculated to be about
$ 9600 (Norwegian Road Authority)
Part 1: VDC model was not used About 250 out of 600 changes were caused by
design conflict between domains
Additional cost of $ 2.4 mill. (+4,6%)
Part 2: VDC model was used “There has been almost no design
change/conflict on this parcel, E22”, Petter
Bakke, Veidekke
Potential cost savings $ 2.4 mill.
Case Study: 31774 Gjønnes station Owner: KTP AS, Contractor: Veidekke
Total 350 conflicts was found
Half of them had not been
detected without a VDC model
Based on Norwegian Road
Authority estimate potential cost
savings have been $ 1.7 mill.
Case Study: Ring-I Mestari tunnel, Finland Owner: Road Authority, Contractor YIT
VDC model for simulating traffic
guidance and traffic safety
Sequence planning
Virtual training and testing
Traffic camera placement
Sunlight protection
Major time savings
Delivery 3 months earlier
Overall project 1 year earlier
Infrastructure construction of the
year 2010 award
Cost Savings Are For Real (According to studies made by Norwegian Road Administration)
Article in Norwegian IT Magazine, November 6, 2013 Article in Danish Engineering Magazine, November 11, 2013
VDC Potential in Construction
Typical construction additional change
orders are about 20% of construction costs
By using VDC about 75% of change orders
can be avoided
Potentially 5-15% savings
Almost 0 changes or waiting on site
because of design errors
VDC may increase design costs but:
Better design quality, error free designs
Less documents, more digital data
Understanding and communication increases
More time to study alternative better solutions
Affect costs and changes in in earlier phase
Less risks, more fluent construction
Clearly positive ROI, very good investment
0 10 20 30 40 50 60 70 80 90 100
Using VDC
Traditional
Design Construction
Norwegian Contractor Comments
“The 3D models we get for all domains, makes our
working day easier and more efficient. There has
been almost no design change/conflict on this
parcel, E22”
Petter Bakke, Veidekke
“In practise, there are no longer any
change/conflict in the design models we get for
each domain. We use the models for multiple
purpose: Stake out, communication with
construction workers to plan todays work etc.
We love working this way!”
Erik Hval Olsen, Veidekke
“Continuity in production, for all our man and
machine AND doing everything just once, is the
two most important issues for a cost effective
construction.
The use of collaboration models on the
Marienborg project, did that we actually had
almost zero stop at site, caused by errors in
design (like collision between domains). We could
produce continuously.”
Bård-Olav Aune, SKANSKA
Case Study: Zoo Interchange Pilot Owner: Wisconsin Department of Transportation, USA
Input data DGN, DWG, IFC (Utilities, Civil3D, Revit)
LandXML (InRoads, Civil3D)
Modeling Parametric tools allows automatic utilities
modeling from line data
Direct links to input data allows automatic
model updates when design changes
Results Cost effective GIS data modeling in 1 day
Immediate updates directly from Civil3D
Design system independent via open standards
Opportunity: 5% savings from 1.7B$ estimated
construction cost would be 85M$!
VDC Benefits – ROI/CBA Owner: Wisconsin Department of Transportation
I-94 Mitchell IC Construction Project-$294.4 m
Field Issues - $22.2 m (669 DINs/CCOs) (~ 7,5%)
GN-General: 30.5% (148-$6.8 m-30.5%) ($45,674 per issue)
RD-Roadway/Drainage: 25.5% (66-$5.7 m) ($85,631 per issue)
WU-Wet Utilities/Drainage: 11.1% (90-$2.4 m) ($27,120 per issue)
BR-Bridges: 8.0% (114-$1.8 m) ($15,557 per issue)
NW-Noise Wall: 8.0% (14-$1.8 m) ($125,909 per issue)
RW-Retaining Wall: 7.7% (78-$1.7 m) ($21,818 per issue)
EW-Earthwork: 4.5% (17-$1.0 m) ($59,220 per issue)
EL-Electrical/ITS/FTMS: 2.6% (93-$0.6 m) ($15,557 per issue)
TR-Traffic: 2.1% (26-$0.5 m) ($18,174 per issue)
SS-Sign Structures: 0.1% (23-$0.02 m) ($738 per issue)
BIM Implementation Plan
3D Model Delivery Process/Deliverables
3D Model Standards
2D/3D CAD-BIM-GIS-CAE Software
2D/3D Model Exchange Protocol
3D Model Fidelity & Quality Control
3D Model Level of Detail
3D Model Level of Accuracy
Survey Procedures
Design & Construction Review Meeting
Procedures
Production
Typical Implementation Project
Workflow & Integration
Pilot project (Proof of Concept)
Training
Deployment
Support Services
01 02 03 04 05 06 07 08 09 10 11 12
Consultation Services
Software Delivery
Consultation Total Delivery Evaluation
Novapoint VDC Products VDC Sketch
• Visual BIM tool for easy and fast sketching
• Impact analysis and cost estimation
Virtual Map
• Parametric modeling and visualization
• Visually rich presentations
VDC Explorer
• Visual BIM tool for infrastructure
• Data analysis and simulation
VDC Live
• Model publishing on Internet (Server)
• Browser and mobile applications (Client)
VDC Collaboration Server
• Model based collaboration between project parties
• Comments or tasks with screenshots (Topics)
VDC Stream
• Process oriented project data management server
• Metadata, digital procedures, 3d-preview of models
Savings in civil construction costs
Better profitability and competition
Better coordination and communication
Effective presentations and visualization
Increased motivation and better sleep
Vianova’s local expertise and support
BIM Benefits = What? (Model) + How? (Process)
C
olla
bora
tion
Data modeling
VDC Live Model publishing on Internet using browser and mobile clients, augmented reality, feedback
VDC Sketch Visual BIM tool for general planning
Impact analysis and cost estimation
Standalone and CAD independent solution
VDC Explorer Visual BIM tool for infrastructure enginering
Data analysis and simulation
Standalone and CAD independent solution
Based on open data model standards
VDC Stream (Process oriented project data management server)
Design systems: Novapoint , Autodesk, Bentley, Tekla, … Design production and Data Modeling
Virtual Map: Integrated solution for design modeling, visualization and presentation
VDC Collaboration Server (Model based collaboration between project parties)
Novapoint VDC Sketch
Existing situation data as
base for planning Finnish national map data
Virtual model like city models
Easy and fast sketching of
alternatives Infrastructure focus
Road, rail, noise, …
Data model benefits Quantities, cost estimation,
alternative analysis, fast and easy
changes, collaboration
Export sketches digitally to
design tools
DWG, Cost resports
Novapoint Virtual Map
Integrated to design tools AutoCAD, Civil3D, Novapoint
Novapoint 18, 19
LandXML, IFC, 3D, DWG, DGN
Automated modeling Parametric objects
GIS to 3D
2D to 3D
Visualization
Materials, textures
Presentations Viewer package
Images and animations
Simulated sky, shadows,
animated traffic
Viewpoints and movement paths
Novapoint VDC Explorer
Combined data model
Multiple data models in one
LandXML, IFC, 3D, DWG, DGN, VM
All data in design coordinates
Visual checking of models
Collaboration
Model commenting and task
management (Topics)
Collaboration Server
Synchronization via cloud
Web and mobile access
Simulation and Analysis
Clash detection
5D tasks, phases and costs
Neutral Visual BIM solution
Open data model standards
Design system independent
No CAD or database installations
required
Simplified project structure
under which all data is
imported.
Easier to handle large
amounts of data.
Import standard data formats
like LandXML, IFC, DWG,
DGN and generic 3d model
formats.
Object Info window shows
selected object properties,
coordinates, dimensions etc.
Free text search allows users
to search objects by
properties.
Model view with easy navigation makes it easy to get overview of the project and go rapidly into
details. Models can be visualized using color coding or by attaching realistic materials to imported
model elements.
5D simulation tool allows attaching a schedule and cost information into model
parts. Supports MS Project. Schedule is linked to clash detection.
Value based clash detection finds most important design clashes easier and
faster than traditional clash methods.
Collaboration is integrated into the model. With collaboration users can attach
comments to model or manage model specific tasks. These topics can be viewed
with a thumbnail list or as an Excel like table with sorting and filtering tools. Topics
are sunchronized between users via VDC Collaboration Server.
Topics is the center for
collaboration. Topics have
name, description and
attributes.
Attributes are used to classify
topics for example by priority,
responsible, deadline,
discipline.
Topics can have multiple
viewpoints attached which
are saved to collaboration
server for users to browse
without model.
Under topic there can be
additional comments which
form a discussion thread
around the topic.
Novapoint VDC Explorer
Novapoint VDC Explorer – Case Studies
How 5% cost savigs were
achieved HW 150, Oslo, Norway
(Vianova Plan og Trafik AS)
BIM for Infrastructure for
beginners intro VT22 Kaukonen, Finland
(WSP Finland Oy)
VDC design analysis and
clash detection ZooIC, Wisconsin, USA
(Wisconsin DOT)
Combined data model for
maintenance Länsimetro subway, Finland
(Länsimetro Oy)
Novapoint VDC Live
Model Server Load models on server
Generic 3d model formats
Automatically from Novapoint VDC product
Define model location and properties
Server generates links, html <iframe> code, QR
codes and markers automatically
Mobile 3D Mobile App for viewing models
Normal model viewing
Virtual miniature model
Outdoor mode (Augmented Reality)
Web 3D Installation free, no plugins
WebGL compatible browsers: IE11, Chrome, Firefox
Models can be added to web pages like images
Install a free ”Viasys
VDC” App from
Apple AppStore
Novapoint VDC Live – Web and Mobile Tampere City Model
https://live.vianova.fi/vianova/default/webgl?qrcode=0jnHMP_xQoL1pU_K
Novapoint VDC Live – Data Models on Internet Länsimetro subway, Helsinki – Espoo, Finland
Novapoint VDC Live – Augmented Reality On-Site Kalasatama area plan / KSV, Helsinki
Novapoint VDC Live – On-Site Presentations HW7 Hamina - Vaalimaa, Hamina, Finland
Summary
BIM Implementation Vianova’s experts are ready to help
Change in culture and processes
Best practices to gain best benefits
Total solution delivery
BIM Consultation and Coaching
Software + Customization
Local training and support
BIM Tools Automation → Cost efficient BIM
Integration → Daily design work
Analysis and Simulation → Quality
Collaboration → Productivity
Open standards → Interoperability
Model Simulate Collaborate
www.vianova.ee