TURKISH STATISTICAL INSTITUTE
International Relations DepartmentInternational Project Management Group
IAOS 2014 Conference Da Nang, Vietnam
08-10 October 2014
How to Build Capacity in Statistics?
Alper GÜCÜMENGİLHead of International Project
Management Group
TURKISH STATISTICAL INSTITUTE
International Relations DepartmentInternational Project Management Group
IAOS 2014 Conference Da Nang, Vietnam
08-10 October 2014
Presentation Plan
• Why to Build Capacity in Statistics?
• Capacity Building in Statistics
• Steps in Capacity Building
• A Case Study: the Efforts for
Improvement of Capacity in TurkStat
• Conclusion
TURKISH STATISTICAL INSTITUTE
International Relations DepartmentInternational Project Management Group
IAOS 2014 Conference Da Nang, Vietnam
08-10 October 2014
Why to Build Capacity in Statistics? (1)
Statistics:
• sine qua non of all types of interactions among actors of social and economic life
• crucial in the fight against poverty, social and economic inequality, public health and environmental problems etc.
• indispensable tool for a rational governing, particularly for the policy making processes.
“Indispensable Tool”
TURKISH STATISTICAL INSTITUTE
International Relations DepartmentInternational Project Management Group
IAOS 2014 Conference Da Nang, Vietnam
08-10 October 2014
Why to Build Capacity in Statistics? (2)
Changing Conditions:
• Drastic changes in social, economic and cultural life
• Decision makers are under much more pressure
• ‘Need’ dimension and ‘User Profiles’ are different than before
• Emergence of new data demands
• Needs about comparable data among countries as a result of globalization
TURKISH STATISTICAL INSTITUTE
International Relations DepartmentInternational Project Management Group
IAOS 2014 Conference Da Nang, Vietnam
08-10 October 2014
Why to Build Capacity in Statistics? (3)NSOs’ Position: • Official statisticians’ task: much more difficult• NSOs of all countries: under intense pressures
• limited resources • changing needs and changing users• growing demands from traditional users
• Official statisticians should have adequate competencies to catch up the developments• NSOs need to develop/build capacity to cope with these challenges
http://www.keepcalm-o-matic.co.uk/p/keep-calm-because-i-am-statistician/
TURKISH STATISTICAL INSTITUTE
International Relations DepartmentInternational Project Management Group
IAOS 2014 Conference Da Nang, Vietnam
08-10 October 2014
Capacity Building in Statistics (1)
What is Capacity Building? (in general terms)
• the means by which skills, experience, technical and management capacity are developed
•within an organizational structure (contractors, consultants or contracting agencies)
•often through the provision of technical assistance, short/long-term training, and specialist inputs (e.g. computer systems).
TURKISH STATISTICAL INSTITUTE
International Relations DepartmentInternational Project Management Group
IAOS 2014 Conference Da Nang, Vietnam
08-10 October 2014
Capacity Building in Statistics (2)
Capacity in Statistics
Ability of NSOs to produce reliable, accurate, timely,
relevant and internationally
comparable data
Capacity building means:
• to create or strengthen this ability in statistical institutions
• in broader terms reforming a country’s statistical
system
TURKISH STATISTICAL INSTITUTE
International Relations DepartmentInternational Project Management Group
IAOS 2014 Conference Da Nang, Vietnam
08-10 October 2014
Capacity Building in Statistics (3)Dimensions of Capacity Building
•Legal infrastructure
•Autonomy
•Human resources
•Financial resources
•Infrastructure and technical resources
•Standards
•Coordination roles of NSOs
•Dissemination
•Culture
TURKISH STATISTICAL INSTITUTE
International Relations DepartmentInternational Project Management Group
IAOS 2014 Conference Da Nang, Vietnam
08-10 October 2014
Steps in Capacity Building (1)
Where to start?
1. Evaluating the present situation
• “Strengths, Weaknesses, Opportunities and Threats – SWOT” Analysis
• The environment (of NSOs) analysis (Political, Economical, Socio-cultural, Technological Factors – PEST)
• Global and sector assessment exercises
TURKISH STATISTICAL INSTITUTE
International Relations DepartmentInternational Project Management Group
IAOS 2014 Conference Da Nang, Vietnam
08-10 October 2014
Steps in Capacity Building (2)
2. Developing a strategy and using management tools•Preparation of a strategy – the determination of
principles, mission, vision, strategic aims, time specifications, human-finance resources allocation, specific goals, targets, milestones.
How to proceed?
• Strategic Management• Project Management• Governance• Total Quality Management• Risk Management• Resource Management• Time Management• Change Management
TURKISH STATISTICAL INSTITUTE
International Relations DepartmentInternational Project Management Group
IAOS 2014 Conference Da Nang, Vietnam
08-10 October 2014
Steps in Capacity Building (3)
3. Implementation process taking legal, institutional, methodological and practical actions
• Implementation of a strategy: the most difficult and challenging part
• The ownership and leadership of top management • Absorption capacity of NSS• Establishment of a team for the effective implementation
• Support of top management• Communication; networking is the key word for the success
Action
TURKISH STATISTICAL INSTITUTE
International Relations DepartmentInternational Project Management Group
IAOS 2014 Conference Da Nang, Vietnam
08-10 October 2014
Steps in Capacity Building (4)
Continuous Monitoring
4. Monitoring of the results
• Monitoring; the regular observation aimed at providingearly indicators of development and deficiencies
• Tools for monitoring: •Progress reports presented to the international organizations •Regular annual assessment meetings•New versions of global assessments, peer review studies•Project/programme evaluation missions •Compliance monitoring tools •Data availability exercises
TURKISH STATISTICAL INSTITUTE
International Relations DepartmentInternational Project Management Group
IAOS 2014 Conference Da Nang, Vietnam
08-10 October 2014
Steps in Capacity Building (5)Continuous Monitoring
4. Monitoring of the results • Some indicators to evaluate statistical capacity level:
•adoption of new law and regulations •introduction of formal planning processes•enhancement of staff knowledge•number of new statistical datasets •volume of data transmitted to international organizations •data validated and published by international organizations•percentage in completeness of data in international publications•number of surveys replaced by administrative registers•number of micro-datasets provided to the researchers
• Monitoring; the revision possibility for immediate actions and/or for further progress
TURKISH STATISTICAL INSTITUTE
International Relations DepartmentInternational Project Management Group
IAOS 2014 Conference Da Nang, Vietnam
08-10 October 2014
A Case Study: the Efforts for Improvement of Capacity in TurkStat
(1)
Starting Point
• Turkey’s EU candidacy in 1999 and
setting priority to EU membership
• TurkStat serves
• to modernize Turkish Statistical System (TSS) (1)
• provides data for the EU negotiation process (2)
“Double Role of Statistics”
TURKISH STATISTICAL INSTITUTE
International Relations DepartmentInternational Project Management Group
IAOS 2014 Conference Da Nang, Vietnam
08-10 October 2014
A Case Study: the Efforts for Improvement of Capacity in TurkStat
(2)1. Evaluation Process
• Interaction with Eurostat
• SWOT Analysis for TurkStat
• Global Assessment Exercise, 2002
• international reference document to upgrade TSS
TURKISH STATISTICAL INSTITUTE
International Relations DepartmentInternational Project Management Group
IAOS 2014 Conference Da Nang, Vietnam
08-10 October 2014
A Case Study: the Efforts for Improvement of Capacity in TurkStat
(3)2. Developing strategy and using the management
tools• A general strategy with the strategic aim to reform and
modernize the statistical system
• The capacity building initiative of TurkStat (1) legal infrastructure (2) programming and coordination among the actors (3) resources(4) statistical domains
TURKISH STATISTICAL INSTITUTE
International Relations DepartmentInternational Project Management Group
IAOS 2014 Conference Da Nang, Vietnam
08-10 October 2014
A Case Study: the Efforts for Improvement of Capacity in TurkStat (4)
2. Developing strategy and using the management tools
• Project management: the major tool in the process for TurkStat • Determination of risks • Time management to set the priorities and reach the goals of
projects • The management of all resources of TurkStat including
international funds• Strategic management-Multi annual planning
• Strategic Plans and Official Statistics Programme• Governance tool• Change management process • TQM approach in TurkStat: Process Management
TURKISH STATISTICAL INSTITUTE
International Relations DepartmentInternational Project Management Group
IAOS 2014 Conference Da Nang, Vietnam
08-10 October 2014
A Case Study: the Efforts for Improvement of Capacity in TurkStat (5)
3. Implementation
• New Turkish Statistical Law adopted in 2005
• “Silent Reform”
• Important contributions for the Turkish Statistical System
• Coordination role: strengthening of the coordination role and competency of TurkStat in TSS with New Law
• Re-structuring of Regional Offices according to NUTS levels
• Revision in the organizational structure of TurkStat
TURKISH STATISTICAL INSTITUTE
International Relations DepartmentInternational Project Management Group
IAOS 2014 Conference Da Nang, Vietnam
08-10 October 2014
A Case Study: the Efforts for Improvement of Capacity in TurkStat (6)
3. Implementation • Recruitment of young and educated staff
• total staff number increased by 19 percent: • 3124 (in 2003) 3717 (in 2014)
• Establishment of Training and Research Center in 2006 • Formal regular programme for the staff
• Studies on Dissemination
• New TurkStat website in June 2013 (considering user satisfaction surveys)
• Several tailor-made solutions for target user groups
• Efficient use of social media
• Design of the web site “www.officialstatistics.gov.tr”
TURKISH STATISTICAL INSTITUTE
International Relations DepartmentInternational Project Management Group
IAOS 2014 Conference Da Nang, Vietnam
08-10 October 2014
A Case Study: the Efforts for Improvement of Capacity in TurkStat (7)
3. Implementation • International programmes/projects• Upgrading the Statistical System of Turkey (USST) Programme
• Phase I (January 2003–March 2007) • Phase II (January 2007–November 2009) • Phase III (July 2011–December 2014)
• Eurostat Multi Beneficiary Programmes (MBPs)
• PHARE 2005 (January 2007-December 2008) • MBP 2006 (January 2008-December 2010) • IPA MBP 2009 (December 2010-November 2012) • IPA MBP 2011 (September 2012-August 2014)• IPA MBP 2012 (January 2014-November 2015)
TURKISH STATISTICAL INSTITUTE
International Relations DepartmentInternational Project Management Group
IAOS 2014 Conference Da Nang, Vietnam
08-10 October 2014
A Case Study: the Efforts for Improvement of Capacity in TurkStat (8)
3. Implementation
• International programmes/projects
• Financial support of approximately 30 Million Euro
• IT equipment of approximately 3 Million Euro
• Implementation of projects on several statistical areas to reach the international standards and EU Statistical Acquis
• Implementation of more than 30 data collection projects
TURKISH STATISTICAL INSTITUTE
International Relations DepartmentInternational Project Management Group
IAOS 2014 Conference Da Nang, Vietnam
08-10 October 2014
A Case Study: the Efforts for Improvement of Capacity in TurkStat (9)
3. Implementation
• International programmes/projects
• Consultancy service of more than 10000 Working Days• Consultants made assessments and
recommendations in each area• Questionnaires were revised• New surveys were launched• Methodological studies were carried out• Classification Server was set up• Infrastructure of Business Registers System was set up• User satisfaction survey was implemented • Statistical data request database was established
TURKISH STATISTICAL INSTITUTE
International Relations DepartmentInternational Project Management Group
IAOS 2014 Conference Da Nang, Vietnam
08-10 October 2014
A Case Study: the Efforts for Improvement of Capacity in TurkStat (10)
3. Implementation
• International programmes/projects
• 7540 participants from TurkStat and stakeholders
2301 international and local activities (SVs, TCs, TRs, Meetings, Conferences)
• Language Training (English) to 210 TurkStat staff and staff of stakeholders
• Translation Service: ~8000 pages of EU legislation and methodology
• Technical assistance to 12 Ministries within TSS
TURKISH STATISTICAL INSTITUTE
International Relations DepartmentInternational Project Management Group
IAOS 2014 Conference Da Nang, Vietnam
08-10 October 2014
A Case Study: the Efforts for Improvement of Capacity in TurkStat (11)
4. Monitoring• Capacity building in TurkStat: internal and external monitoring • Reporting: the major tool of the internal monitoring process • Goals and objectives of TurkStat strategic plan;
• performance evaluation: the comparable analysis of the performance goals with the outcomes in the monitoring reports
• The internal monitoring reports: attainment of the strategic objectives
• Performance indicators
TURKISH STATISTICAL INSTITUTE
International Relations DepartmentInternational Project Management Group
IAOS 2014 Conference Da Nang, Vietnam
08-10 October 2014
A Case Study: the Efforts for Improvement of Capacity in TurkStat (12)
4. Monitoring
External Monitoring• Project/Programme Evaluation Reports by independent experts
• USST Programme of TurkStat received the highest grade in the Evaluation Report of EU Programmes:
“the best EU Project implemented in Turkey” • Other mechanisms used for TurkStat:
• monitoring and progress reports presented to international organizations
• regular annual assessment meetings by mainly Eurostat • Light Peer Review studies • compliance monitoring tools and indicators related to the data
transmission to Eurostat
TURKISH STATISTICAL INSTITUTE
International Relations DepartmentInternational Project Management Group
IAOS 2014 Conference Da Nang, Vietnam
08-10 October 2014
A Case Study: the Efforts for Improvement of Capacity in TurkStat (13)
4. MonitoringMain results of the monitoring process: • Legal infrastructure for TSS with important features:
Establishment of a Statistical Council and ensure its functionality Having the right of TurkStat to access administrative registers
for statistical usage Maintaining the professional and technical autonomy of TurkStat Transition to multi-year programming – Official Statistics
Programme• A modern and integrated statistical system • Enhancement of cooperation and coordination between TurkStat
and main data providers• New organizational structure of TurkStat based on GSBPM
TURKISH STATISTICAL INSTITUTE
International Relations DepartmentInternational Project Management Group
IAOS 2014 Conference Da Nang, Vietnam
08-10 October 2014
A Case Study: the Efforts for Improvement of Capacity in TurkStat (14)
4. Monitoring
Main results of the monitoring process: • Improvement of the capacity of TurkStat regional offices • Developed human resources structure • Incrased knowledge of TurkStat and TSS staff about the
international statistical standards, terminologies and methods (specifically EU) • create the awareness of reforms and requirements in TSS • communication channels and network
• Institutional transformation process has mainly given an international point of view to the staff and created a common language
• Improved English levels of TurkStat and main data providers’ personnel
TURKISH STATISTICAL INSTITUTE
International Relations DepartmentInternational Project Management Group
IAOS 2014 Conference Da Nang, Vietnam
08-10 October 2014
A Case Study: the Efforts for Improvement of Capacity in TurkStat (15)
4. MonitoringMain results of the monitoring process: • Renewal of Information and Communication Technology (ICT)
infrastructure of TurkStat• Establishment of Classification Server • Setting up Infrastructure of Business Register System • Established Address Based Population Registration System • Improved methodology of statistics in line with the EU standards
TURKISH STATISTICAL INSTITUTE
International Relations DepartmentInternational Project Management Group
IAOS 2014 Conference Da Nang, Vietnam
08-10 October 2014
A Case Study: the Efforts for Improvement of Capacity in TurkStat (15)
4. MonitoringMain results of the monitoring process: • The increase in number of datasets transmitted to Eurostat from
Turkey: • 25 (in 2004) 328 (in 2012) • percentage of transmission of the requested data increased by
nine times• With the renewal of TurkStat’s website structure, TurkStat now has
more user friendly databases (around 70 user databases) • The information: more visible and accessible for the users • Social media: the use of statistics has been promoted
TURKISH STATISTICAL INSTITUTE
International Relations DepartmentInternational Project Management Group
IAOS 2014 Conference Da Nang, Vietnam
08-10 October 2014
A Case Study: the Efforts for Improvement of Capacity in TurkStat (16)
4. Monitoring
Remarks • Important steps between 2000 and 2014• Overall objective (Harmonization of Statistics to EU Methodology
or international standards) has not been fully achieved yet • Monitoring indicators still need to be enhanced• One of the main challenges: the revisions in EU Statistical Acquis
and international standards • Another challenge: insufficient administrative registers in Turkey
TURKISH STATISTICAL INSTITUTE
International Relations DepartmentInternational Project Management Group
IAOS 2014 Conference Da Nang, Vietnam
08-10 October 2014
A Case Study: the Efforts for Improvement of Capacity in TurkStat (17)
4. Monitoring
Remarks • The increase in the attendance and contributions of TurkStat
experts as “best practice” to international events: • Consultancy services of 1150 Working Days by TurkStat Experts
to the NSOs • 710 experts from relevant countries in training programmes in
Turkey. • TurkStat’s Critical Role in capacity building process:
• the proper use of funds • establishment of qualified team • good communication channels with the stakeholders “Institutional capacity of TurkStat has been considerably
developed by means of the comprehensive studies”
TURKISH STATISTICAL INSTITUTE
International Relations DepartmentInternational Project Management Group
IAOS 2014 Conference Da Nang, Vietnam
08-10 October 2014
Conclusion
• Capacity building: a continuous effort • NSOs need to reform and modernize their
infrastructure and adopt new developments in the statistical arena without breaks
• Dynamic process • Ceasing investment in statistical capacities:
weakness in coping with the new challenges
TURKISH STATISTICAL INSTITUTE
International Relations DepartmentInternational Project Management Group
IAOS 2014 Conference Da Nang, Vietnam
08-10 October 2014
Last Words:
“The most authentic thing about us is our capacity to create, to overcome, to endure, to transform, to
love and to be greater than our suffering.” Ben Okri, Nigerian Poet and Novelist, 1959 - ....
Thank You…