How to achieve modernization and interoperability · 2019. 12. 7. · Technical Pillar of the 4th...
Transcript of How to achieve modernization and interoperability · 2019. 12. 7. · Technical Pillar of the 4th...
![Page 1: How to achieve modernization and interoperability · 2019. 12. 7. · Technical Pillar of the 4th Railway Package is a great opportunity for the European railway system to create...](https://reader035.fdocuments.in/reader035/viewer/2022062610/6118fc47743f2d3faf6b4b55/html5/thumbnails/1.jpg)
How to achieve modernization and interoperability ? 10th European Rail Transport Regulation Forum 18th of May 2015, Florence (IT) Gilles Peterhans Secretary General UIP
![Page 2: How to achieve modernization and interoperability · 2019. 12. 7. · Technical Pillar of the 4th Railway Package is a great opportunity for the European railway system to create...](https://reader035.fdocuments.in/reader035/viewer/2022062610/6118fc47743f2d3faf6b4b55/html5/thumbnails/2.jpg)
2
Table of contents
UIP: International Union of Wagon Keepers
Barriers ?
Removal
Conclusions
![Page 3: How to achieve modernization and interoperability · 2019. 12. 7. · Technical Pillar of the 4th Railway Package is a great opportunity for the European railway system to create...](https://reader035.fdocuments.in/reader035/viewer/2022062610/6118fc47743f2d3faf6b4b55/html5/thumbnails/3.jpg)
Founded in 1950
Represents the interests of Wagon Keepers and ECMs via 14 National Associations around Europe
Represents a European fleet of about 200.000 rail freight wagons producing more than 50% of all tonne-kilometres around Europe.
Seat in Brussels
UIP – International Union of Wagon Keepers
![Page 4: How to achieve modernization and interoperability · 2019. 12. 7. · Technical Pillar of the 4th Railway Package is a great opportunity for the European railway system to create...](https://reader035.fdocuments.in/reader035/viewer/2022062610/6118fc47743f2d3faf6b4b55/html5/thumbnails/4.jpg)
Single European Railway Area - Importance of technical pillar
Source: EC Impact Assessment 4thRP_SWD2013/8 final
4
![Page 5: How to achieve modernization and interoperability · 2019. 12. 7. · Technical Pillar of the 4th Railway Package is a great opportunity for the European railway system to create...](https://reader035.fdocuments.in/reader035/viewer/2022062610/6118fc47743f2d3faf6b4b55/html5/thumbnails/5.jpg)
Technical Pillar of the 4th Railway Package is a great opportunity for the European railway system to create...
5
How to achieve modernisation and interoperability if we are not able to achieve this in 2 years?
Conclusion 2013
![Page 6: How to achieve modernization and interoperability · 2019. 12. 7. · Technical Pillar of the 4th Railway Package is a great opportunity for the European railway system to create...](https://reader035.fdocuments.in/reader035/viewer/2022062610/6118fc47743f2d3faf6b4b55/html5/thumbnails/6.jpg)
The pessimist complains about the wind; the optimist expects it to change; the realist adjusts the sails. William Arthur Ward
Optimist – Pessimist - Realist
![Page 7: How to achieve modernization and interoperability · 2019. 12. 7. · Technical Pillar of the 4th Railway Package is a great opportunity for the European railway system to create...](https://reader035.fdocuments.in/reader035/viewer/2022062610/6118fc47743f2d3faf6b4b55/html5/thumbnails/7.jpg)
7
Table of contents
UIP: International Union of Wagon Keepers
Barriers?
Removal
Conclusions
![Page 8: How to achieve modernization and interoperability · 2019. 12. 7. · Technical Pillar of the 4th Railway Package is a great opportunity for the European railway system to create...](https://reader035.fdocuments.in/reader035/viewer/2022062610/6118fc47743f2d3faf6b4b55/html5/thumbnails/8.jpg)
8
Mojang (Minecraft): 47 employees, 100M+ players Whatsapp: 55 employees, 800M users
Customer service is not a department It’s an attitude.
A team is not a group of people who work together. It’s a group of people who trust each other.
Uber, world’s largest taxi company: owns no vehicles Airbnb, world’s largest accommodation provider: owns no real estate Alibaba, most valuable retailer: has no inventory
Barriers
![Page 9: How to achieve modernization and interoperability · 2019. 12. 7. · Technical Pillar of the 4th Railway Package is a great opportunity for the European railway system to create...](https://reader035.fdocuments.in/reader035/viewer/2022062610/6118fc47743f2d3faf6b4b55/html5/thumbnails/9.jpg)
9
r = f(nm)
r = internal resistance to new ideas
n = number of employees
m = number of management levels
Barriers
![Page 10: How to achieve modernization and interoperability · 2019. 12. 7. · Technical Pillar of the 4th Railway Package is a great opportunity for the European railway system to create...](https://reader035.fdocuments.in/reader035/viewer/2022062610/6118fc47743f2d3faf6b4b55/html5/thumbnails/10.jpg)
10
Table of content
UIP: International Union of Wagon Keepers
Barriers?
Removal
Conclusions
![Page 11: How to achieve modernization and interoperability · 2019. 12. 7. · Technical Pillar of the 4th Railway Package is a great opportunity for the European railway system to create...](https://reader035.fdocuments.in/reader035/viewer/2022062610/6118fc47743f2d3faf6b4b55/html5/thumbnails/11.jpg)
4th railway package – Expectations
More interoperability, “interoperable” safety & strengthened role for ERA will provide:
Schengen for rail vehicles and railways
Same exams and same pass marks over Europe
Reduction of time to market and costs to market
Reduction of risks when launching new products
Closer cooperation between all stakeholders
Better use of resources
Boost innovation
Boost market access
Boost productivity
11
![Page 12: How to achieve modernization and interoperability · 2019. 12. 7. · Technical Pillar of the 4th Railway Package is a great opportunity for the European railway system to create...](https://reader035.fdocuments.in/reader035/viewer/2022062610/6118fc47743f2d3faf6b4b55/html5/thumbnails/12.jpg)
4th Railway Package
![Page 13: How to achieve modernization and interoperability · 2019. 12. 7. · Technical Pillar of the 4th Railway Package is a great opportunity for the European railway system to create...](https://reader035.fdocuments.in/reader035/viewer/2022062610/6118fc47743f2d3faf6b4b55/html5/thumbnails/13.jpg)
13
Create a culture of optimism
Attract young people
Remove politics from decisions
3 axis - Programme
Apart from 4th Railway Package, if we want to achieve modernization and interoperability:
![Page 14: How to achieve modernization and interoperability · 2019. 12. 7. · Technical Pillar of the 4th Railway Package is a great opportunity for the European railway system to create...](https://reader035.fdocuments.in/reader035/viewer/2022062610/6118fc47743f2d3faf6b4b55/html5/thumbnails/14.jpg)
3axis – programme in pictures
![Page 15: How to achieve modernization and interoperability · 2019. 12. 7. · Technical Pillar of the 4th Railway Package is a great opportunity for the European railway system to create...](https://reader035.fdocuments.in/reader035/viewer/2022062610/6118fc47743f2d3faf6b4b55/html5/thumbnails/15.jpg)
15
One network statement for Europe All basic govt services online (and automated),
ready to be built on Force organizations to open their data
KISS: try to begin with
![Page 16: How to achieve modernization and interoperability · 2019. 12. 7. · Technical Pillar of the 4th Railway Package is a great opportunity for the European railway system to create...](https://reader035.fdocuments.in/reader035/viewer/2022062610/6118fc47743f2d3faf6b4b55/html5/thumbnails/16.jpg)
16
Table of contents
UIP: International Union of Wagon Keepers
Barriers?
Removal
Conclusions
![Page 17: How to achieve modernization and interoperability · 2019. 12. 7. · Technical Pillar of the 4th Railway Package is a great opportunity for the European railway system to create...](https://reader035.fdocuments.in/reader035/viewer/2022062610/6118fc47743f2d3faf6b4b55/html5/thumbnails/17.jpg)
Policy-makers have to choose between protecting the past from the future, or protecting the future from the past. Tim O’Reilly
Conclusions
![Page 18: How to achieve modernization and interoperability · 2019. 12. 7. · Technical Pillar of the 4th Railway Package is a great opportunity for the European railway system to create...](https://reader035.fdocuments.in/reader035/viewer/2022062610/6118fc47743f2d3faf6b4b55/html5/thumbnails/18.jpg)
Thanks for your attention
GILLES PETERHANS
Austria Belgium Czech Republic
France Germany UK Hungary
NVPG
Italy Netherlands Poland Slovak Republic
Spain Sweden Switzerland