HOW TECHNOLOGY IS ENABLING MODERN METHODS OF CONSTRUCTION …
Transcript of HOW TECHNOLOGY IS ENABLING MODERN METHODS OF CONSTRUCTION …
HOW TECHNOLOGY IS
ENABLING MODERN
METHODS OF
CONSTRUCTION AND
ASSET MANAGEMENT
IBRAHIM ATTA-APAU
2
SECTION
01 INTRODUCTION
02 MODERN METHODS OF CONSTRUCTION
03 INTEGRATED PROJECT DELIVERY FRAMEWORK
04 IPD AND MMC ADOPTION
05 MMC AND IPD FOR EFFICIENT LIFECYCLE DELIVERY
06 Q&A
Modern Methods & Construction
3
MODULE
#1
MODULE
#2
Traditional to DfMA to PPVC
4
TRADITIONAL DFMA PPVC
TraditionalMajor the components of the project are constructed and casted on site.
DfMADividing the building into a prefabricated components which to be assembled on-site, improving quality through the application of efficiency.
Concrete Prefabricated Prefinished Volumetric Construction; 3-dimensional modules are completed with internal finishes, fixtures and fittings in an off-site fabrication facility.
Traditional to DfMA to PPVC
5
CONSTRUCTION TIME
MATERIAL EFFICIENCY
DESIGN FLEXIBILITY
LABOUR ON SITE
LOGISTICS ON SITE
COST CERTAINTY
*ANIMATED IMAGE
TRADITIONAL
CONSTRUCTION TIME
MATERIAL EFFICIENCY
DESIGN FLEXIBILITY
LABOUR ON SITE
LOGISTICS ON SITE
COST CERTAINTY
DFMA PPVC
CONSTRUCTION TIME
MATERIAL EFFICIENCY
DESIGN FLEXIBILITY
LABOUR ON SITE
LOGISTICS ON SITE
COST CERTAINTY
*ANIMATED IMAGE *ANIMATED IMAGE
Change Footer here: Insert > Header and Footer (delete if none)
6
Edaroth
7
10 Degrees
• Location – London
• Height – 135m
• 44 Storeys
• 1,500 Modules
• 40% Reduction in Carbon
Emissions
COORDINATE SUPPLY CHAIN
ACCELERATE DESIGN
GOLDEN THREAD:
INTEGRATOR RUNS THROUGH ENTIRE PROCESS,
ENSURING AN END-TO-END OFFERING.
ASSEMBLY (ON SITE)
HANDOVER ASSET MANAGEMENT
PRODUCTION HUB (OFF SITE)
ACCELERATING SHOVEL-READY INFRASTRUCTURE
SNC-LAVALIN
INFRASTRUCTURE PROGRAM
DELIVERY PARTNERSHIP
NATIONAL VIRTUAL
PRODUCTION HUB
MODERN METHODS OF CONSTRUCTION -MODULARIZATION
DIGITAL TWIN
DESIGN
INFRASTRUCTURE PROGRAM
DELIVERY PARTNERSHIP
INTEGRATOR
ASSET MANAGEMENT
PLANNING
ANALYSIS
PRODUCTION HUB
DELIVERY & ASSEMBLY
ASSET
MANAGEMENT
Challenges of adoption in MENA Region
10
• Traditional Contracting
• Investment from the Supply Chain
• Limited Off-Site Manufacturing Facilities in Region
• Aesthetics
• Complex Projects
Integrated Project Delivery
11
Provides the golden thread to prevent time and value leakage throughout the traditional fragmented end-to-end construction process.
RIBA
Plan of Work
20200 | Strategic
Definition
1 | Preparation
& Brief
2 | Concept
Design
3 | Spatial
Coordination
4 | Technical
Design
5 | Manufacturing
& Construction
6 | Handover 7 | Use
Delivery Integrator
DESIGN CONSULTANTS + SPECIALIST CONSULTANTSStrategic Advisory – Collaborative
Contracting
ESI* & Operator MAIN CONTRACTOR
Selecting The Right Enterprise
Partners
Linking the Risk Profile to Reward
Mechanisms Contracting to Support Enterprise
Infrastructure Program Delivery Partnership with Progressive Assurance
CO
MM
ER
CIA
L
ST
RA
TE
GY
Establishing a
Performance Baseline
DE
LIV
ER
Y P
AR
TIE
S
Enterprise Transformation Strategy
Client
Consultant
Contractor
Contract OWNER
DELIVERY
INTEGRATOR
Suppliers Advisors
*Early Supply Chain
Involvement
MMC & IPDDeliver complex Infrastructure projects in a collaborative model and with modern
digital technologies
Simpler commercial framework and
improved behaviours in the supply chain
Enabling a capable owner to build a confident
supply chain, faster mobilization and delivery
Simplifying the supply chain, lowering bar of
entry
Simulating performance and controlling
waste
Uses digital twins to simulate delivery
20%
50%
50%
30%
ZERO
MORE EFFICIENT
FASTER TO MARKET
MODULARIZATION
OFFSITE BY 2025
LESS CARBON
HARM
ACCELERATION
Decision-making support across
the asset's life cycle for better-
quality
decision making.
INTELLIGENCE
Progressive assurance,
risk management,
transparency, and safety.
TRANSPARENCY
Digital engineering and faster
delivery and better quality
product.
QUALITY
Supply chain management for
safe and well-executed
delivery.
DISPUTES / CLAIMS
POOR
COLLABORATION
LOW CAPABILITY
ACROSS SUPPLY
CHAIN
WASTE
POOR SAFETY
RECORD
CAPABLE
OWNER(S)
CONFIDENT
SUPPLIERS
MODERN METHODS
OF CONSTRUCTION
SUBSTITUTABLE
MANUFACTURING AND
DELIVERY CAPABILITY
INTERNAL
INDUSTRYRESOURCES
MARKET DYNAMICS