Chatur Nirmaan - structure manual
SEPTIC TANK
MUMTY
BEAM
PARAPET
COLUMN
The structure is RCC (reinforced cement concrete) frame made of rcc columns, beams and slabs with brick infill
-
Chatur Nirmaan - structure manual
3
remove props under slabs only after 14 days of casting
next slab to be cast min after 21 days of the previous slab
cure the slab for 7 days
1 the foundation should be at least 3 deep 2 all columns should be the same size, like a table should have same size legs
3 beams are needed to support the slabs at each floor
4 a strong house requires a tie beam at the plinth level
6 Time for curing
7 waterproofing on the terrace and plaster outside is compulsory to avoid seepage
8 if you dont have a public sewage supply and want to build a toilet, then you must build a septic tank
5 the stirrups should be more closely spaced at all junctions and should be bint at 45