STORM DRAINAGE SYSTEM
2012-2016 Capital Improvement Program City of Houston
8/3/2019 Houston Capital Plan Storm 2012 16
http://slidepdf.com/reader/full/houston-capital-plan-storm-2012-16 2/46
Storm Drainage - Summary of Funding Sources2012-2016 CAPITAL IMPROVEMENT PLAN ($ Thousands)
Project AllocationEstimated
2011Fiscal Year Planned Appropriations
2012-2016 Total2012 2013 2014 2015 2016
Acquisition 9,416 2,040 1,017 517 526 535 4,635 14,051Design 12,247 10,090 9,007 7,611 8,969 11,768 47,445 59,692Construction 62,065 46,630 47,503 51,672 48,625 47,524 241,954 304,019EquipmentCivic ArtOther 200 203 207 210 214 1,034 1,034Total Allocations 83,728 58,960 57,730 60,007 58,330 60,041 295,068 378,796
Funding SourceEstimated
2011Fiscal Year Planned Appropriations
2012-2016 Total2012 2013 2014 2015 2016
Fund 4030 - Ser-F Storm Sewer Const. Fund 56,313 56,313Fund 4505 - Storm Sewer Cons. Const. Fund 9,400 9,400Fund 4510 - Contribution for Capital Projects Fund 446 446Fund 5000 - Community Development Blk Grant 14,500 14,500Fund 8500 - Water & Sewer Sys Cons. Const. Fund 3,069 3,109 2,021 5,130 8,199Storm Drainage DDSRF 55,851 57,730 57,986 58,330 60,041 289,938 289,938Texas Dept. of Transportation
Total: 83,728 58,960 57,730 60,007 58,330 60,041 295,068 378,796
Active CIP Form D
8/3/2019 Houston Capital Plan Storm 2012 16
http://slidepdf.com/reader/full/houston-capital-plan-storm-2012-16 3/46
Storm Drainage - Summary of Funds2012-2016 CAPITAL IMPROVEMENT PLAN ($ Thousands)
CIP No. ProjectEst.
2011
Fiscal Year Planned Appropriations2012-2016
2012 2013 2014 2015 2016M-000100 Pre-Engineering for Storm Water Drainage Improvements
Fund 4030 - Ser-F Storm Sewer 1,300Storm Drainage DDSRF 2,185 2,690 3,092 3,629 4,184 15,780
Project Total: 1,300 2,185 2,690 3,092 3,629 4,184 15,780
M-000101 Miscellaneous and Emergency Needs (Acquisition, Engineering, Construction, and Legal)Storm Drainage DDSRF 200 203 207 210 214 1,034
Project Total: 200 203 207 210 214 1,034
M-000126 Local Drainage Program (LDP)Fund 4030 - Ser-F Storm Sewer 1,965Fund 4510 - Contribution for Cap 446Storm Drainage DDSRF 4,000 4,445 4,875 4,960 5,046 23,326
Project Total: 2,411 4,000 4,445 4,875 4,960 5,046 23,326
M-000220 Storm Drainage Program SupportFund 4030 - Ser-F Storm Sewer 2,437Storm Drainage DDSRF 1,610 994 595 605 615 4,419
Project Total: 2,437 1,610 994 595 605 615 4,419
M-000241 Stormwater Pump Station and Flood Warning System ImprovementsStorm Drainage DDSRF 2,415 3,158 2,497 2,541 10,611
Project Total: 2,415 3,158 2,497 2,541 10,611
M-000247 Nottingham and Yorkshire Drainage and PavingFund 8500 - Water & Sewer Sys 1,035 1,035Storm Drainage DDSRF 12,040 585 2,140 14,765
Project Total: 13,075 585 2,140 15,800
M-000250 Kirkwood Dr (Briar Forest) Drainage and PavingFund 4030 - Ser-F Storm Sewer 316Fund 4505 - Storm Sewer Cons. 8,100Fund 8500 - Water & Sewer Sys 860
Project Total: 9,276
M-000261 Buffalo Bayou Detention BasinFund 4030 - Ser-F Storm Sewer 2,350
Active CIP Form C
8/3/2019 Houston Capital Plan Storm 2012 16
http://slidepdf.com/reader/full/houston-capital-plan-storm-2012-16 4/46
Storm Drainage - Summary of Funds2012-2016 CAPITAL IMPROVEMENT PLAN ($ Thousands)
CIP No. ProjectEst.
2011
Fiscal Year Planned Appropriations2012-2016
2012 2013 2014 2015 2016Storm Drainage DDSRF 6,959 6,959
Project Total: 2,350 6,959 6,959
M-000262 Whiteheather Drainage and PavingFund 4030 - Ser-F Storm Sewer 9,131Fund 8500 - Water & Sewer Sys 620 575 575Storm Drainage DDSRF 8,855 8,855
Project Total: 9,751 9,430 9,430
M-000263 Sherwood Forest Drainage and PavingStorm Drainage DDSRF 8,304 8,304
Project Total: 8,304 8,304
M-000265 Rampart Street Drainage and PavingFund 4505 - Storm Sewer Cons. 600Storm Drainage DDSRF 16,514 14,920 31,434
Project Total: 600 16,514 14,920 31,434
M-000267 Shepherd Drive Drainage and PavingFund 4030 - Ser-F Storm Sewer 6,700
Project Total: 6,700
M-000271 Meyerland and Marilyn Estates Drainage and PavingFund 4030 - Ser-F Storm Sewer 1,000
Storm Drainage DDSRF 4,701 4,701Project Total: 1,000 4,701 4,701
M-000273 Glenbrook Valley Drainage and PavingFund 4030 - Ser-F Storm Sewer 220
Project Total: 220
M-000276 Astoria (Flushing Meadows to Binghampton) Drainage and PavingFund 4030 - Ser-F Storm Sewer 4,795
Project Total: 4,795
M-000277 Southpark and Southcrest Drainage and PavingFund 4030 - Ser-F Storm Sewer 600Storm Drainage DDSRF 4,903 4,903
Active CIP Form C
8/3/2019 Houston Capital Plan Storm 2012 16
http://slidepdf.com/reader/full/houston-capital-plan-storm-2012-16 5/46
Storm Drainage - Summary of Funds2012-2016 CAPITAL IMPROVEMENT PLAN ($ Thousands)
CIP No. ProjectEst.
2011
Fiscal Year Planned Appropriations2012-2016
2012 2013 2014 2015 2016
Project Total: 600 4,903 4,903
M-000280 Brays Village Drainage and PavingFund 4030 - Ser-F Storm Sewer 6,186Fund 8500 - Water & Sewer Sys 1,036
Project Total: 7,222
M-000281 Braesmont Dr (Braeswood to Lymbar) and S Rice Ave (Braeswood to Contour Place) Drainage and PavingFund 4030 - Ser-F Storm Sewer 600Storm Drainage DDSRF 1,828 1,828
Project Total: 600 1,828 1,828
M-000283 Bellaire West Drainage and PavingFund 4030 - Ser-F Storm Sewer 4,863Fund 4505 - Storm Sewer Cons.Fund 8500 - Water & Sewer Sys 553
Project Total: 5,416
M-000284 Airline Dr. Drainage and PavingFund 5000 - Community Develop 8,500Storm Drainage DDSRF 14,887 14,887
Project Total: 8,500 14,887 14,887
M-000285 Garden Oaks and Shepherd Forest Drainage and Paving
Storm Drainage DDSRF 600 6,728 7,328Project Total: 600 6,728 7,328
M-000286 Pleasantville and Glendale Drainage and PavingFund 4030 - Ser-F Storm Sewer 750Storm Drainage DDSRF 554 468 7,438 3,716 12,176
Project Total: 750 554 468 7,438 3,716 12,176
M-000287 Wirt Road Drainage and PavingFund 8500 - Water & Sewer Sys 1,499 1,499Storm Drainage DDSRF 10,957 4,355 15,312
Project Total: 12,456 4,355 16,811
M-000288 Easthaven Blvd (Bryant to Ledge) Drainage and Paving
Active CIP Form C
8/3/2019 Houston Capital Plan Storm 2012 16
http://slidepdf.com/reader/full/houston-capital-plan-storm-2012-16 6/46
Storm Drainage - Summary of Funds2012-2016 CAPITAL IMPROVEMENT PLAN ($ Thousands)
CIP No. ProjectEst.
2011
Fiscal Year Planned Appropriations2012-2016
2012 2013 2014 2015 2016Fund 4030 - Ser-F Storm Sewer 800Storm Drainage DDSRF 4,400 4,400
Project Total: 800 4,400 4,400
M-000289 Minnetex Place and Almeda Genoa Place Drainage and PavingStorm Drainage DDSRF 230 702 6,049 6,981
Project Total: 230 702 6,049 6,981
M-000290 Montrose Area and Midtown Drainage and PavingFund 4030 - Ser-F Storm Sewer 1,100Fund 8500 - Water & Sewer Sys 2,021 2,021Storm Drainage DDSRF 40 11,342 1,573 12,955
Project Total: 1,100 40 13,363 1,573 14,976
M-000291 Sagemont Drainage and PavingFund 4030 - Ser-F Storm Sewer 600Storm Drainage DDSRF 1,287 1,287
Project Total: 600 1,287 1,287
M-000293 Binglewood, Inwood Forest, and Oak Forest Drainage and PavingStorm Drainage DDSRF 345 1,452 1,797
Project Total: 345 1,452 1,797
M-000294 Cullen Blvd. (Loop 610 to Old Spanish Trail) Drainage and Paving
Storm Drainage DDSRF 345 1,903 2,248Project Total: 345 1,903 2,248
M-000295 Scott Street (Loop 610 to Old Spanish Trail) Drainage and PavingStorm Drainage DDSRF 595 5,660 6,255
Project Total: 595 5,660 6,255
M-000296 Mitigation Program for Capital Improvement ProjectsFund 4030 - Ser-F Storm Sewer 10,300Fund 5000 - Community Develop 6,000Storm Drainage DDSRF 4,680 5,111 3,490 4,760 4,842 22,883
Project Total: 16,300 4,680 5,111 3,490 4,760 4,842 22,883
M-000297 Stormwater Quality Demonstration Projects
Active CIP Form C
8/3/2019 Houston Capital Plan Storm 2012 16
http://slidepdf.com/reader/full/houston-capital-plan-storm-2012-16 7/46
Storm Drainage - Summary of Funds2012-2016 CAPITAL IMPROVEMENT PLAN ($ Thousands)
CIP No. ProjectEst.
2011
Fiscal Year Planned Appropriations2012-2016
2012 2013 2014 2015 2016Fund 4030 - Ser-F Storm Sewer 300Storm Drainage DDSRF 1,610 1,610
Project Total: 300 1,610 1,610
M-000582 South Shaver Paving and Drainage: Gulf Freeway to Highway 3Storm Drainage DDSRF 3,608 3,608
Project Total: 3,608 3,608
M-000589 Tanner Road Paving and Drainage: Hempstead to Beltway 8Storm Drainage DDSRF 3,871 3,871
Project Total: 3,871 3,871
M-000597 Brittmoore: Hammerly to Clay Detention BasinStorm Drainage DDSRF 2,982 2,982
Project Total: 2,982 2,982
M-000800 Developer ParticipationFund 4505 - Storm Sewer Cons. 500Storm Drainage DDSRF 1,000 1,000 1,500 1,500 1,500 6,500
Project Total: 500 1,000 1,000 1,500 1,500 1,500 6,500
M-001010 Wycliffe Drive (Chatterton to Melronome) Drainage and PavingStorm Drainage DDSRF 713 8,244 8,957
Project Total: 713 8,244 8,957
M-001013 Willow Waterhole Drainage and PavingStorm Drainage DDSRF 403 3,805 4,208
Project Total: 403 3,805 4,208
M-NA ContingenciesFund 4505 - Storm Sewer Cons. 200Storm Drainage DDSRF 174 500 500 500 11,100 12,774
Project Total: 200 174 500 500 500 11,100 12,774
Total Appropriations: 83,728 58,960 57,730 60,007 58,330 60,041 295,068
Active CIP Form C
8/3/2019 Houston Capital Plan Storm 2012 16
http://slidepdf.com/reader/full/houston-capital-plan-storm-2012-16 8/46
2012-2016 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - Storm DrainageProject: Pre-Engineering for Storm Water Drainage Improvements Council District CIP No.:
M-000100Location: V Served: V
Geographic Ref.: NS Key Map: Neighborhood:
Description: Program supports development of Candidate Projects for programming in future years Capital Improvement Plans. FeasibilityAssessments are performed, either using professional engineeringservices or internal City staff, annually on Candidate Needs to defineprojects including detailed project scopes, cost estimates andimplementation schedules.
Date Ord. Date WBS # CUIC Amount Appr. Amt.
Justification: Developing specific, detailed projects to address the identified highestneeds will provide candidate projects with both costs and benefitsdefined for citywide comparison and ranking for implementation.
Total Authorized 0.00 0.00
Project AllocationEstimated
2011Fiscal Year Planned Appropriations Project
Total2012 2013 2014 2015 2016
Acquisition
Design 1,150 2,185 2,690 3,092 3,629 4,184 16,930
Construction 150 150
Equipment
Civic Art
Other
Total Allocations 1,300 2,185 2,690 3,092 3,629 4,184 17,080
Source of Funds
Fund 4030 - Ser-F Storm Sewer Const. Fund 1,300 1,300
Storm Drainage DDSRF 2,185 2,690 3,092 3,629 4,184 15,780
Total Funds 1,300 2,185 2,690 3,092 3,629 4,184 17,080
Active CIP Form A
8/3/2019 Houston Capital Plan Storm 2012 16
http://slidepdf.com/reader/full/houston-capital-plan-storm-2012-16 9/46
2012-2016 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - Storm DrainageProject: Miscellaneous and Emergency Needs (Acquisition, Engineering,
Construction, and Legal)Council District CIP No.:
M-000101Location: V Served: V
Geographic Ref.: NS Key Map: Neighborhood:
Description: This project provides for miscellaneous and emergency needsincluding right-of-way acquisition, design, construction and legalservices for future projects or unforeseen projects.
Date Ord. Date WBS # CUIC Amount Appr. Amt.
Justification: This project will construct storm drainage improvements to addressand reduce the risk of structural flooding. Improvements includemodification of street conveyance and sheet flow, and providedetention as mitigation.
Total Authorized 0.00 0.00
Project AllocationEstimated
2011Fiscal Year Planned Appropriations Project
Total2012 2013 2014 2015 2016
Acquisition
Design
Construction
Equipment
Civic Art
Other 200 203 207 210 214 1,034
Total Allocations 200 203 207 210 214 1,034
Source of Funds
Fund 4030 - Ser-F Storm Sewer Const. Fund
Storm Drainage DDSRF 200 203 207 210 214 1,034
Total Funds 200 203 207 210 214 1,034
Active CIP Form A
8/3/2019 Houston Capital Plan Storm 2012 16
http://slidepdf.com/reader/full/houston-capital-plan-storm-2012-16 10/46
2012-2016 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - Storm DrainageProject: Local Drainage Program (LDP) Council District CIP No.:
M-000126Location: V Served: V
Geographic Ref.: LD Key Map: V Neighborhood:
Description: This program provides professional engineering services andconstruction to address necessary local storm water drainage sys temimprovements citywide. It also addresses certain large-scale stormwater drainage system construction repairs.
Date Ord. Date WBS # CUIC Amount Appr. Amt.
Justification: This program is required to investigate and resolve existing localizedstorm water drainage problems reported by citizens.
Total Authorized 0.00 0.00
Project AllocationEstimated
2011Fiscal Year Planned Appropriations Project
Total2012 2013 2014 2015 2016
Acquisition
Design 460 1,000 1,287 1,308 1,331 1,354 6,740
Construction 1,951 3,000 3,158 3,567 3,629 3,692 18,997
Equipment
Civic Art
Other
Total Allocations 2,411 4,000 4,445 4,875 4,960 5,046 25,737
Source of Funds
Fund 4030 - Ser-F Storm Sewer Const. Fund 1,965 1,965
Fund 4505 - Storm Sewer Cons. Const. Fund
Fund 4510 - Contribution for Capital Projects Fund 446 446
Storm Drainage DDSRF 2,411 4,000 4,445 4,875 4,960 5,046 25,737
Active CIP Form A
8/3/2019 Houston Capital Plan Storm 2012 16
http://slidepdf.com/reader/full/houston-capital-plan-storm-2012-16 11/46
2012-2016 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - Storm DrainageProject: Storm Drainage Program Support Council District CIP No.:
M-000220Location: V Served: V
Geographic Ref.: NS Key Map: V Neighborhood:
Description: Provides project management, planning and technical support,engineering, and construction management to support planning,development, and implementation of the CIP.
Date Ord. Date WBS # CUIC Amount Appr. Amt.
Justification: Technical services are necessary to support the CIP to deliver stormwater drainage improvement projects that reduce the risk of structuralflooding. Improvements include modification of street conveyance andsheet flow, and provide detention as needed for mitigation.
Total Authorized 0.00 0.00
Project AllocationEstimated
2011Fiscal Year Planned Appropriations Project
Total2012 2013 2014 2015 2016
Acquisition
Design 2,437 1,610 994 595 605 615 6,856
Construction
Equipment
Civic Art
Other
Total Allocations 2,437 1,610 994 595 605 615 6,856
Source of Funds
Fund 4030 - Ser-F Storm Sewer Const. Fund 2,437 2,437
Storm Drainage DDSRF 1,610 994 595 605 615 4,419
Total Funds 2,437 1,610 994 595 605 615 6,856
Active CIP Form A
8/3/2019 Houston Capital Plan Storm 2012 16
http://slidepdf.com/reader/full/houston-capital-plan-storm-2012-16 12/46
2012-2016 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - Storm DrainageProject: Stormwater Pump Station and Flood Warning System Improvements Council District CIP No.:
M-000241Location: V Served: V
Geographic Ref.: MS Key Map: V Neighborhood:
Description: This program consists of engineering assessment, design,construction of new and rehabilitation of existing City storm water facilities, including: storm water pump stations and flood warningsystems at various locations citywide.
Date Ord. Date WBS # CUIC Amount Appr. Amt.
Justification: The program is necessary to identify and prioritize the need for safetyenhancements, improved functionality, and advance flood warning
system to alert the traveling public.
Total Authorized 0.00 0.00
Project AllocationEstimated
2011Fiscal Year Planned Appropriations Project
Total2012 2013 2014 2015 2016
Acquisition
Design 690 702 713 726 2,831
Construction 1,725 2,456 1,784 1,815 7,780
Equipment
Civic Art
Other
Total Allocations 2,415 3,158 2,497 2,541 10,611
Source of Funds
Fund 4030 - Ser-F Storm Sewer Const. Fund
Storm Drainage DDSRF 2,415 3,158 2,497 2,541 10,611
Total Funds 2,415 3,158 2,497 2,541 10,611
Active CIP Form A
8/3/2019 Houston Capital Plan Storm 2012 16
http://slidepdf.com/reader/full/houston-capital-plan-storm-2012-16 13/46
2012-2016 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - Storm DrainageProject: Nottingham and Yorkshire Drainage and Paving
Sub-Project I: Nottingham areaSub-Project II: Yorkshire area
Council District CIP No.:M-000247Location: G Served: G
Geographic Ref.: NS Key Map: 489A,B,E,F
Neighborhood:
Description: Project provides for the right-of-away acquisition, design andconstruction of storm drainage improvements, necessary concretepaving, curbs, sidewalks, driveways and underground utilities to servethe Nottingham and Yorkshire areas. CDP outfall W0208, W0209,W0211, W0212, W0224, W0917, and adjacent drainage areas.
Buffalo Bayou watershed. Project will be designed and constructed intwo subprojects.
Date Ord. Date WBS # CUICAmount Appr. Amt.
Justification: Project will construct storm drainage improvements to address andreduce the risk of structural flooding. Improvements includemodification of street conveyance and sheet flow, and providedetention as needed for mitigation.
Total Authorized 0.00 0.00
Project AllocationEstimated
2011Fiscal Year Planned Appropriations Project
Total2012 2013 2014 2015 2016
Acquisition 1,000 1,000
Design 460 585 1,045
Construction 11,615 2,140 13,755
Equipment
Civic Art
Other
Total Allocations 13,075 585 2,140 15,800
Source of Funds
Fund 4030 - Ser-F Storm Sewer Const. Fund
Fund 8500 - Water & Sewer Sys Cons. Const. Fund 1,035 1,035
Storm Drainage DDSRF 12,040 585 2,140 14,765
Total Funds 13,075 585 2,140 15,800
Active CIP Form A
8/3/2019 Houston Capital Plan Storm 2012 16
http://slidepdf.com/reader/full/houston-capital-plan-storm-2012-16 14/46
2012-2016 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - Storm DrainageProject: Kirkwood Dr (Briar Forest) Drainage and Paving Council District CIP No.:
M-000250Location: G Served: G
Geographic Ref.: NS Key Map: 489N Neighborhood: 18Description: Project provides for the right-of- away acquisition, design and
construction of storm water drainage improvements, necessaryconcrete paving, curbs, sidewalks, driveways and undergroundutilities. Project serves an area bound by Buffalo Bayou on the north,Westheimer on the south, Wilcrest on the east, and Dairy Ashford onthe west. CDP outfall W0014 and adjacent areas. Buffalo Bayou
watershed
Date Ord. Date WBS # CUICAmount Appr. Amt.
Justification: Project will construct storm drainage improvements to address andreduce the risk of structural flooding. Improvements includemodification of street conveyance and sheet flow, and providedetention as needed for mitigation.
Total Authorized 0.00 0.00
Project AllocationEstimated
2011Fiscal Year Planned Appropriations Project
Total2012 2013 2014 2015 2016
Acquisition 116 116
Design 200 200
Construction 8,960 8,960
Equipment
Civic Art
Other
Total Allocations 9,276 9,276
Source of Funds
Fund 4030 - Ser-F Storm Sewer Const. Fund 316 316
Fund 4505 - Storm Sewer Cons. Const. Fund 8,100 8,100
Fund 8500 - Water & Sewer Sys Cons. Const. Fund 860 860
Total Funds 9,276 9,276
Active CIP Form A
8/3/2019 Houston Capital Plan Storm 2012 16
http://slidepdf.com/reader/full/houston-capital-plan-storm-2012-16 15/46
2012-2016 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - Storm DrainageProject: Buffalo Bayou Detention Basin Council District CIP No.:
M-000261Location: G Served: G
Geographic Ref.: MS Key Map: 489 Neighborhood:
Description: Project addresses watershed storm water quantity and qualityrequirements. It includes design and construction of a detention basin.
Date Ord. Date WBS # CUIC Amount Appr. Amt.
Justification: Project is necessary for mitigation of impacts resulting from combinedstorm water drainage project improvements in the area.
Total Authorized 0.00 0.00
Project AllocationEstimated
2011Fiscal Year Planned Appropriations Project
Total2012 2013 2014 2015 2016
Acquisition
Design 350 234 584
Construction 2,000 6,725 8,725
Equipment
Civic Art
Other
Total Allocations 2,350 6,959 9,309
Source of Funds
Fund 4030 - Ser-F Storm Sewer Const. Fund 2,350 2,350
Storm Drainage DDSRF 6,959 6,959
Total Funds 2,350 6,959 9,309
Active CIP Form A
8/3/2019 Houston Capital Plan Storm 2012 16
http://slidepdf.com/reader/full/houston-capital-plan-storm-2012-16 16/46
2012-2016 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - Storm DrainageProject: Whiteheather Drainage and Paving
Sub-Project I; Sub-Project II; Sub-Project III; Sub-Project IVCouncil District CIP No.:
M-000262Location: D Served: D
Geographic Ref.: NS Key Map: 572 JNS Neighborhood:
Description: Project provides for the design and construction of storm drainageimprovements in the area, necessary concrete paving, curbs,sidewalks, driveways and underground utilities. Project will serve theDumbarton Oaks and South Glen area. CDP outfalls C0076, C0078,C0526,C1220 and adjacent areas. Sims Bayou watershed.
Date Ord. Date WBS # CUIC Amount Appr. Amt.
Justification: This project will construct storm drainage improvements to address
and reduce the risk of structural flooding. Improvements includemodification of street conveyance and sheet flow, and providedetention as needed for mitigation.
Total Authorized 0.00 0.00
Project AllocationEstimated
2011Fiscal Year Planned Appropriations Project
Total2012 2013 2014 2015 2016
Acquisition
Design
Construction 9,751 9,430 19,181
Equipment
Civic Art
Other
Total Allocations 9,751 9,430 19,181
Source of FundsFund 4030 - Ser-F Storm Sewer Const. Fund 9,131 9,131
Fund 8500 - Water & Sewer Sys Cons. Const. Fund 620 575 1,195
Storm Drainage DDSRF 8,855 8,855
Texas Dept. of Transportation 9,751 9,430 19,181
Active CIP Form A
8/3/2019 Houston Capital Plan Storm 2012 16
http://slidepdf.com/reader/full/houston-capital-plan-storm-2012-16 17/46
2012-2016 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - Storm DrainageProject: Sherwood Forest Drainage and Paving Council District CIP No.:
M-000263Location: G Served: G
Geographic Ref.: NS Key Map: 491B,C,F,G
Neighborhood:
Description: Project provides for the design and construction of storm drainageimprovements, necessary concrete paving, curbs, sidewalks,driveways and underground utilities. Project will serve the SherwoodForest area. CDP outfall W0434, W0507, and adjacent areas.Buffalo Bayou watershed.
Date Ord. Date WBS # CUIC Amount Appr. Amt.
Justification: This project will construct storm drainage improvements to addressand reduce the risk of structural flooding. Improvements includemodification of street conveyance and sheet flow, and providedetention as needed for mitigation.
Total Authorized 0.00 0.00
Project AllocationEstimated
2011Fiscal Year Planned Appropriations Project
Total2012 2013 2014 2015 2016
Acquisition
Design
Construction 8,304 8,304
Equipment
Civic Art
Other
Total Allocations 8,304 8,304
Source of Funds
Fund 4030 - Ser-F Storm Sewer Const. Fund
Storm Drainage DDSRF 8,304 8,304
Total Funds 8,304 8,304
Active CIP Form A
8/3/2019 Houston Capital Plan Storm 2012 16
http://slidepdf.com/reader/full/houston-capital-plan-storm-2012-16 18/46
2012-2016 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - Storm DrainageProject: Rampart Street Drainage and Paving
Sub-Project I: Rampart/Renwick streets from Beechnut to JessamineSub-Project II: Rampart Street from Jessamine to Glenmont Street.
Council District CIP No.:M-000265Location: C,F Served: C,F
Geographic Ref.: NS Key Map: 531 A-T Neighborhood:
Description: Project provides for the design and construction of storm drainageimprovements in the area, necessary concrete paving, curbs,sidewalks, driveways and underground utilities. Project will serve theWestmoreland, Sharpstown, Breaburn, and Maplewood area. CDPoutfall D0326. Sims Bayou watershed.
Date Ord. Date WBS # CUIC Amount Appr. Amt.
Justification: Project will construct storm drainage improvements to address and
reduce the risk of structural flooding. Improvements includemodification of street conveyance and sheet flow, and providedetention as needed for mitigation.
Total Authorized 0.00 0.00
Project AllocationEstimated
2011Fiscal Year Planned Appropriations Project
Total2012 2013 2014 2015 2016
Acquisition
Design 600 760 1,360
Construction 15,754 14,920 30,674
Equipment
Civic Art
Other
Total Allocations 600 16,514 14,920 32,034
Source of FundsFund 4030 - Ser-F Storm Sewer Const. Fund
Fund 4505 - Storm Sewer Cons. Const. Fund 600 600
Storm Drainage DDSRF 16,514 14,920 31,434
Total Funds 600 16,514 14,920 32,034
Active CIP Form A
8/3/2019 Houston Capital Plan Storm 2012 16
http://slidepdf.com/reader/full/houston-capital-plan-storm-2012-16 19/46
2012-2016 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - Storm DrainageProject: Shepherd Drive Drainage and Paving Council District CIP No.:
M-000267Location: C,D,G Served: C,D,G
Geographic Ref.: NS Key Map: 492LMQRUV
Neighborhood:
Description: Project provides for the design and construction of storm drainageimprovements, necessary concrete paving, curbs, sidewalks,driveways and underground utilities. Project will serve an areasurrounding Shepherd Drive from Westheimer Road to Buffalo Bayou.CDP Outfall W0679 and adjacent areas. Buffalo Bayou watershed.
Date Ord. Date WBS # CUIC Amount Appr. Amt.
Justification: This project will construct storm drainage improvements to addressand reduce the risk of structural flooding. Improvements includemodification of street conveyance and sheet flow, and providedetention as needed for mitigation.
Total Authorized 0.00 0.00
Project AllocationEstimated
2011Fiscal Year Planned Appropriations Project
Total2012 2013 2014 2015 2016
Acquisition
Design
Construction 6,700 6,700
Equipment
Civic Art
Other
Total Allocations 6,700 6,700
Source of Funds
Fund 4030 - Ser-F Storm Sewer Const. Fund 6,700 6,700
Total Funds 6,700 6,700
Active CIP Form A
8/3/2019 Houston Capital Plan Storm 2012 16
http://slidepdf.com/reader/full/houston-capital-plan-storm-2012-16 20/46
2012-2016 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - Storm DrainageProject: Meyerland and Marilyn Estates Drainage and Paving
Project combined with M-000279Council District CIP No.:
M-000271Location: C Served: C
Geographic Ref.: NS Key Map: 531U Neighborhood:
Description: Project provides for the right-of- away acquisition, design andconstruction of storm drainage improvements, necessary concretepaving, curbs, sidewalks, driveways and underground utilities. Projectwill serve the Myerland and Marilyn Estates areas and will deliver project M-000279. CDP outfall D0192, D0212, D0320, D0219, D0220,D0273 and adjacent areas. Brays Bayou watershed.
Date Ord. Date WBS # CUIC Amount Appr. Amt.
Justification: Project will construct storm drainage improvements to address andreduce the risk of structural flooding. Improvements includemodification of street conveyance and sheet flow, and providedetention as needed for mitigation.
Total Authorized 0.00 0.00
Project AllocationEstimated
2011Fiscal Year Planned Appropriations Project
Total2012 2013 2014 2015 2016
Acquisition
Design 1,000 1,000
Construction 4,701 4,701
Equipment
Civic Art
Other
Total Allocations 1,000 4,701 5,701
Source of Funds
Fund 4030 - Ser-F Storm Sewer Const. Fund 1,000 1,000
Storm Drainage DDSRF 4,701 4,701
Total Funds 1,000 4,701 5,701
Active CIP Form A
8/3/2019 Houston Capital Plan Storm 2012 16
http://slidepdf.com/reader/full/houston-capital-plan-storm-2012-16 21/46
2012-2016 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - Storm DrainageProject: Glenbrook Valley Drainage and Paving Council District CIP No.:
M-000273Location: I Served: I
Geographic Ref.: NS Key Map: 535P,T Neighborhood:
Description: Drainage improvements to serve an area bound by Sims Bayou on thenorth, Bellfort on the south, HCFCD C165-00-00 on the east, and GlenValley on the west. CDP outfall C0016 and adjacent areas. Projectincludes construction of drainage swale to alleviate flooding on GlenDell and Santa Elena.
Date Ord. Date WBS # CUIC Amount Appr. Amt.
Justification: Drainage improvements include required piping, sheet flow
modifications, or detention to reduce the risk of structural floodingduring 100-year, 1% probability rainfall events. Project areas havemultiple reports of structural flooding.
Total Authorized 0.00 0.00
Project AllocationEstimated
2011Fiscal Year Planned Appropriations Project
Total2012 2013 2014 2015 2016
Acquisition
Design
Construction 220 220
Equipment
Civic Art
Other
Total Allocations 220 220
Source of FundsFund 4030 - Ser-F Storm Sewer Const. Fund 220 220
Total Funds 220 220
Active CIP Form A
8/3/2019 Houston Capital Plan Storm 2012 16
http://slidepdf.com/reader/full/houston-capital-plan-storm-2012-16 22/46
2012-2016 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - Storm DrainageProject: Astoria (Flushing Meadows to Binghampton) Drainage and Paving Council District CIP No.:
M-000276Location: E Served: E
Geographic Ref.: NS Key Map: 616DH-617A
Neighborhood:
Description: Drainage improvements along Astoria to serve the Scarsdale area.Project area bound by Sand Hook on the north, Adirondack on thesouth, Turkey Creek on the east, and Binghampton on the west. CDPoutfall A0034 and adjacent areas. Clear Creek watershed.
Date Ord. Date WBS # CUIC Amount Appr. Amt.
Justification: Project will construct storm drainage improvements to address and
reduce the risk of structural flooding. Improvements includemodification of street conveyance and sheet flow, and providedetention as needed for mitigation.
Total Authorized 0.00 0.00
Project AllocationEstimated
2011Fiscal Year Planned Appropriations Project
Total2012 2013 2014 2015 2016
Acquisition
Design 200 200
Construction 4,595 4,595
Equipment
Civic Art
Other
Total Allocations 4,795 4,795
Source of FundsFund 4030 - Ser-F Storm Sewer Const. Fund 4,795 4,795
Total Funds 4,795 4,795
Active CIP Form A
8/3/2019 Houston Capital Plan Storm 2012 16
http://slidepdf.com/reader/full/houston-capital-plan-storm-2012-16 23/46
2012-2016 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - Storm DrainageProject: Southpark and Southcrest Drainage and Paving Council District CIP No.:
M-000277Location: D Served: D
Geographic Ref.: NS Key Map: 533;534 Neighborhood:
Description: Project provides for the design and construction of storm drainageimprovements, necessary concrete paving, curbs, sidewalks,driveways and underground utilities. Project will serve the Southparkand Southcrest areas. CDP outfall D0898 and adjacent areas. SimsBayou watershed.
Date Ord. Date WBS # CUIC Amount Appr. Amt.
Justification: Project will construct storm drainage improvements to address and
reduce the risk of structural flooding. Improvements includemodification of street conveyance and sheet flow, and providedetention as needed for mitigation.
Total Authorized 0.00 0.00
Project AllocationEstimated
2011Fiscal Year Planned Appropriations Project
Total2012 2013 2014 2015 2016
Acquisition
Design 600 600
Construction 4,903 4,903
Equipment
Civic Art
Other
Total Allocations 600 4,903 5,503
Source of FundsFund 4030 - Ser-F Storm Sewer Const. Fund 600 600
Storm Drainage DDSRF 4,903 4,903
Total Funds 600 4,903 5,503
Active CIP Form A
8/3/2019 Houston Capital Plan Storm 2012 16
http://slidepdf.com/reader/full/houston-capital-plan-storm-2012-16 24/46
2012-2016 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - Storm DrainageProject: Brays Village Drainage and Paving Council District CIP No.:
M-000280Location: F Served: F
Geographic Ref.: Key Map: 529B,F Neighborhood:
Description: Drainage improvements along Boone and certain side streets to servethe Brays Village area. Project area bound by Harwin on the north,Brays Bayou on the south, Wildacres on the west, and Dairy Propertyon the east. CDP outfall D-0687 and adjacent areas.
Date Ord. Date WBS # CUIC Amount Appr. Amt.
Justification: Project involves the constructruction of storm drainage improvementsto address and reduce the risk of structural flooding. Improvements
include modification of street conveyance and sheet flow, and providedetention as needed for mitigation.
Total Authorized 0.00 0.00
Project AllocationEstimated
2011Fiscal Year Planned Appropriations Project
Total2012 2013 2014 2015 2016
Acquisition
Design
Construction 7,222 7,222
Equipment
Civic Art
Other
Total Allocations 7,222 7,222
Source of Funds
Fund 4030 - Ser-F Storm Sewer Const. Fund 6,186 6,186
Fund 8500 - Water & Sewer Sys Cons. Const. Fund 1,036 1,036
Total Funds 7,222 7,222
Active CIP Form A
8/3/2019 Houston Capital Plan Storm 2012 16
http://slidepdf.com/reader/full/houston-capital-plan-storm-2012-16 25/46
2012-2016 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - Storm DrainageProject: Braesmont Dr (Braeswood to Lymbar) and S Rice Ave (Braeswood to
Contour Place) Drainage and PavingSub-Project ISub-Project II
Council District CIP No.:M-000281Location: C Served: C
Geographic Ref.: Key Map: 530 Neighborhood:
Description: Braesmont drainage improvements to serve the Marilyn Estates area.Project area bound by Atwell on the west, Chimney Rock on the east,Brays Bayou on the north, and Lymbar on the south. CDP outfallD0320.
Date Ord. Date WBS # CUIC Amount Appr. Amt.
Justification: Drainage improvements to reduce the risk of structural flooding
caused by insufficient storm water drainage system capacity; includingmodification of street conveyance and addressing storm water flowmitigation as applicable.
Total Authorized 0.00 0.00
Project AllocationEstimated
2011Fiscal Year Planned Appropriations Project
Total2012 2013 2014 2015 2016
Acquisition
Design 600 600
Construction 1,828 1,828
Equipment
Civic Art
Other
Total Allocations 600 1,828 2,428
Source of Funds
Fund 4030 - Ser-F Storm Sewer Const. Fund 600 600
Storm Drainage DDSRF 1,828 1,828
Total Funds 600 1,828 2,428
Active CIP Form A
8/3/2019 Houston Capital Plan Storm 2012 16
http://slidepdf.com/reader/full/houston-capital-plan-storm-2012-16 26/46
2012-2016 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - Storm DrainageProject: Bellaire West Drainage and Paving Council District CIP No.:
M-000283Location: F Served: F
Geographic Ref.: NS Key Map: 529 Neighborhood:
Description: The project consists of storm water drainage improvements to servethe Bellaire West area. CDP outfall D0736 and adjacent drainageareas. Brays Bayou watershed. Project includes construction of drainage swale along Cook Rd to intercept overland sheetflow fromthe Crown Colony area.
Date Ord. Date WBS # CUIC Amount Appr. Amt.
Justification: Project involves the constructruction of storm drainage improvements
to address and reduce the risk of structural flooding. Improvementsinclude modification of street conveyance and sheet flow, and providedetention as needed for mitigation.
Total Authorized 0.00 0.00
Project AllocationEstimated
2011Fiscal Year Planned Appropriations Project
Total2012 2013 2014 2015 2016
Acquisition
Design 100 100
Construction 5,316 5,316
Equipment
Civic Art
Other
Total Allocations 5,416 5,416
Source of FundsFund 4030 - Ser-F Storm Sewer Const. Fund 4,863 4,863
Fund 4505 - Storm Sewer Cons. Const. Fund
Fund 8500 - Water & Sewer Sys Cons. Const. Fund 553 553
Total Funds 5,416 5,416
Active CIP Form A
8/3/2019 Houston Capital Plan Storm 2012 16
http://slidepdf.com/reader/full/houston-capital-plan-storm-2012-16 27/46
2012-2016 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - Storm DrainageProject: Airline Dr. Drainage and Paving
Sub-Project I: Tidwell Street Outfall (FY11)Sub-Project II: Airline Drive and Clark storm systems.
Council District CIP No.:M-000284Location: H Served: H
Geographic Ref.: NS Key Map: 413, 453 Neighborhood:
Description: Project provides for the design and construction of storm drainageimprovements, necessary concrete paving, curbs, sidewalks,driveways and underground utilities. Project will serve the Airline Drivearea CDP outfall E0369. White Oak Bayou watershed.
Date Ord. Date WBS # CUIC Amount Appr. Amt.
Justification: Project will construct storm drainage improvements to address andreduce the risk of structural flooding. Improvements include
modification of street conveyance and sheet flow, and providedetention as needed for mitigation.
Total Authorized 0.00 0.00
Project AllocationEstimated
2011Fiscal Year Planned Appropriations Project
Total2012 2013 2014 2015 2016
Acquisition
Design
Construction 8,500 14,887 23,387
Equipment
Civic Art
Other
Total Allocations 8,500 14,887 23,387
Source of Funds
Fund 4030 - Ser-F Storm Sewer Const. Fund
Fund 5000 - Community Development Blk Grant 8,500 8,500
Storm Drainage DDSRF 14,887 14,887
Total Funds 8,500 14,887 23,387
Active CIP Form A
8/3/2019 Houston Capital Plan Storm 2012 16
http://slidepdf.com/reader/full/houston-capital-plan-storm-2012-16 28/46
2012-2016 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - Storm DrainageProject: Garden Oaks and Shepherd Forest Drainage and Paving
Sub-Project ISub-Project II
Council District CIP No.:M-000285Location: A,H Served: A,H
Geographic Ref.: NS Key Map: 452 Neighborhood:
Description: Project provides for the design and construction of storm drainageimprovements, necessary concrete paving, curbs, sidewalks,driveways and underground utilities. Project will serve the GardenOaks, Shepherd Forest, Shepherd Park, Candlelight Plaza, Pinemont,and Oak Grove areas. CDP outfall E0247, E0159, E0189. E0403,E0410, and adjacent areas. White Oak watershed.
Date Ord. Date WBS # CUIC Amount Appr. Amt.
Justification: Project will construct storm drainage improvements to address andreduce the risk of structural flooding. Improvements includemodification of street conveyance and sheet flow, and providedetention as needed for mitigation.
Total Authorized 0.00 0.00
Project AllocationEstimated
2011Fiscal Year Planned Appropriations Project
Total2012 2013 2014 2015 2016
Acquisition
Design 600 600
Construction 6,728 6,728
Equipment
Civic Art
Other
Total Allocations 600 6,728 7,328
Source of Funds
Storm Drainage DDSRF 600 6,728 7,328
Total Funds 600 6,728 7,328
Active CIP Form A
8/3/2019 Houston Capital Plan Storm 2012 16
http://slidepdf.com/reader/full/houston-capital-plan-storm-2012-16 29/46
2012-2016 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - Storm DrainageProject: Pleasantville and Glendale Drainage and Paving
Sub-Project I; Sub-Project II; Sub-Project IIICouncil District CIP No.:
M-000286Location: B Served: B
Geographic Ref.: NS Key Map: 495F,K,L,P
Neighborhood:
Description: Project provides for the design and construction of storm drainageimprovements, necessary concrete paving, curbs, sidewalks,driveways and underground utilities. Project will serve thePleasantville and Glendale areas. CDP outfall H0072 and adjacentareas. Buffalo Bayou and San Jacinto River watersheds.
Date Ord. Date WBS # CUIC Amount Appr. Amt.
Justification: Project will construct storm drainage improvements to address andreduce the risk of structural flooding. Improvements includemodification of street conveyance and sheet flow, and providedetention as needed for mitigation.
Total Authorized 0.00 0.00
Project AllocationEstimated
2011Fiscal Year Planned Appropriations Project
Total2012 2013 2014 2015 2016
Acquisition
Design 750 554 468 1,772
Construction 7,438 3,716 11,154
Equipment
Civic Art
Other
Total Allocations 750 554 468 7,438 3,716 12,926
Source of Funds
Fund 4030 - Ser-F Storm Sewer Const. Fund 750 750
Storm Drainage DDSRF 554 468 7,438 3,716 12,176
Total Funds 750 554 468 7,438 3,716 12,926
Active CIP Form A
8/3/2019 Houston Capital Plan Storm 2012 16
http://slidepdf.com/reader/full/houston-capital-plan-storm-2012-16 30/46
2012-2016 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - Storm DrainageProject: Wirt Road Drainage and Paving
Sub-Project I: Coordinates with N-000381Sub-Project II: Coordinates with N-000397
Council District CIP No.:M-000287Location: A Served: A
Geographic Ref.: MS Key Map: 451M-X491AB
Neighborhood:
Description: Project provides for the design and construction of storm drainageimprovements, necessary concrete paving, curbs, sidewalks,driveways and underground utilities. Project will serve the Wirt Roadarea. Wirt Road from I-10 to Hempstead Hwy. CDP outfall W0404and adjacent areas. Buffalo Bayou watershed.
Date Ord. Date WBS # CUIC Amount Appr. Amt.
Justification: Project will construct storm drainage improvements to address andreduce the risk of structural flooding. Improvements includemodification of street conveyance and sheet flow, and providedetention as needed for mitigation.
Total Authorized 0.00 0.00
Project AllocationEstimated
2011Fiscal Year Planned Appropriations Project
Total2012 2013 2014 2015 2016
Acquisition
Design 518 518
Construction 11,938 4,355 16,293
Equipment
Civic Art
Other
Total Allocations 12,456 4,355 16,811
Source of Funds
Fund 8500 - Water & Sewer Sys Cons. Const. Fund 1,499 1,499
Storm Drainage DDSRF 10,957 4,355 15,312
Total Funds 12,456 4,355 16,811
Active CIP Form A
8/3/2019 Houston Capital Plan Storm 2012 16
http://slidepdf.com/reader/full/houston-capital-plan-storm-2012-16 31/46
2012-2016 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - Storm DrainageProject: Easthaven Blvd (Bryant to Ledge) Drainage and Paving Council District CIP No.:
M-000288Location: I Served: I
Geographic Ref.: NS Key Map: 575, 567 Neighborhood:
Description: Project provides for the design and construction of storm drainageimprovements, necessary concrete paving, curbs, sidewalks,driveways and underground utilities. Project will be located alongEasthaven Blvd and certain side streets to serve the Easthaven andHales area. CDP outfall C1054 and adjacent areas. Sims Bayouwatershed.
Date Ord. Date WBS # CUIC Amount Appr. Amt.
Justification: Project will construct storm drainage improvements to address andreduce the risk of structural flooding. Improvements includemodification of street conveyance and sheet flow, and providedetention as needed for mitigation.
Total Authorized 0.00 0.00
Project AllocationEstimated
2011Fiscal Year Planned Appropriations Project
Total2012 2013 2014 2015 2016
Acquisition
Design 800 800
Construction 4,400 4,400
Equipment
Civic Art
Other
Total Allocations 800 4,400 5,200
Source of Funds
Fund 4030 - Ser-F Storm Sewer Const. Fund 800 800
Storm Drainage DDSRF 4,400 4,400
Total Funds 800 4,400 5,200
Active CIP Form A
8/3/2019 Houston Capital Plan Storm 2012 16
http://slidepdf.com/reader/full/houston-capital-plan-storm-2012-16 32/46
2012-2016 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - Storm DrainageProject: Minnetex Place and Almeda Genoa Place Drainage and Paving
Sub-Project ICouncil District CIP No.:
M-000289Location: D Served: D
Geographic Ref.: NS Key Map: 573, 574 Neighborhood:
Description: Project provides for the design and construction of storm drainageimprovements, necessary concrete paving, curbs, sidewalks,driveways and underground utilities. Project will be located alongCullen Blvd and certain side streets to serve the Minnetex Place andAlmeda Genoa. CDP outfall C1147 and adjacent areas. Sims Bayouand Clear Creek watersheds.
Date Ord. Date WBS # CUIC Amount Appr. Amt.
Justification: Project will construct storm drainage improvements to address andreduce the risk of structural flooding. Improvements includemodification of street conveyance and sheet flow, and providedetention as needed for mitigation.
Total Authorized 0.00 0.00
Project AllocationEstimated
2011Fiscal Year Planned Appropriations Project
Total2012 2013 2014 2015 2016
Acquisition
Design 230 702 932
Construction 6,049 6,049
Equipment
Civic Art
Other
Total Allocations 230 702 6,049 6,981
Source of Funds
Storm Drainage DDSRF 230 702 6,049 6,981
Total Funds 230 702 6,049 6,981
Active CIP Form A
8/3/2019 Houston Capital Plan Storm 2012 16
http://slidepdf.com/reader/full/houston-capital-plan-storm-2012-16 33/46
2012-2016 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - Storm DrainageProject: Montrose Area and Midtown Drainage and Paving
Sub-Project I: Project incorporates N-000400 (NSR 467)Sub-Project II: TBD
Council District CIP No.:M-000290Location: C,D,I Served: C,D,I
Geographic Ref.: NS Key Map: 493 Neighborhood:
Description: Project provides for the design and construction of storm drainageimprovements, necessary concrete paving, curbs, sidewalks,driveways and underground utilities. Project will serve an area boundby Buffalo Bayou on the north, US-59 on the south, Caroline on theeast, and Montrose on the west. CDP outfall W0686 and adjacentareas. Buffalo Bayou watershed.
Date Ord. Date WBS # CUIC Amount Appr. Amt.
Justification: Project will construct storm drainage improvements to address andreduce the risk of structural flooding. Improvements includemodification of street conveyance and sheet flow, and providedetention as needed for mitigation.
Total Authorized 0.00 0.00
Project AllocationEstimated
2011Fiscal Year Planned Appropriations Project
Total2012 2013 2014 2015 2016
Acquisition 40 40
Design 1,100 1,573 2,673
Construction 13,363 13,363
Equipment
Civic Art
Other
Total Allocations 1,100 40 13,363 1,573 16,076
Source of Funds
Fund 4030 - Ser-F Storm Sewer Const. Fund 1,100 1,100
Fund 8500 - Water & Sewer Sys Cons. Const. Fund 2,021 2,021
Storm Drainage DDSRF 40 11,342 1,573 12,955
Total Funds 1,100 40 13,363 1,573 16,076
Active CIP Form A
8/3/2019 Houston Capital Plan Storm 2012 16
http://slidepdf.com/reader/full/houston-capital-plan-storm-2012-16 34/46
2012-2016 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - Storm DrainageProject: Sagemont Drainage and Paving Council District CIP No.:
M-000291Location: E Served:
Geographic Ref.: NS Key Map: 576, 616 Neighborhood:
Description: Project provides for the design and construction of storm drainageimprovements, necessary concrete paving, curbs, sidewalks,driveways and underground utilities. Project will serve the FreewayManor and Sagemont areas. CDP Outfalls C0250, A0061 and A0130and adjacent areas. Sims Bayou and Clear Creek watersheds.
Date Ord. Date WBS # CUIC Amount Appr. Amt.
Justification: Project will construct storm drainage improvements to address and
reduce the risk of structural flooding. Improvements includemodification of street conveyance and sheet flow, and providedetention as needed for mitigation.
Total Authorized 0.00 0.00
Project AllocationEstimated
2011Fiscal Year Planned Appropriations Project
Total2012 2013 2014 2015 2016
Acquisition
Design 600 600
Construction 1,287 1,287
Equipment
Civic Art
Other
Total Allocations 600 1,287 1,887
Source of FundsFund 4030 - Ser-F Storm Sewer Const. Fund 600 600
Storm Drainage DDSRF 1,287 1,287
Total Funds 600 1,287 1,887
Active CIP Form A
8/3/2019 Houston Capital Plan Storm 2012 16
http://slidepdf.com/reader/full/houston-capital-plan-storm-2012-16 35/46
2012-2016 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - Storm DrainageProject: Binglewood, Inwood Forest, and Oak Forest Drainage and Paving Council District CIP No.:
M-000293Location: A Served: A
Geographic Ref.: NS Key Map: 411 Neighborhood:
Description: Project provides for the design and construction of storm drainageimprovements, necessary concrete paving, curbs, sidewalks,driveways and underground utilities. Project will serve theBinglewood, Inwood Forest, and Oak Forest area. CDP outfall E0758,E0119, and E0918 and adjacent areas. White Oak watershed.
Date Ord. Date WBS # CUIC Amount Appr. Amt.
Justification: Project will construct storm drainage improvements to address and
reduce the risk of structural flooding. Improvements includemodification of street conveyance and sheet flow, and providedetention as needed for mitigation.
Total Authorized 0.00 0.00
Project AllocationEstimated
2011Fiscal Year Planned Appropriations Project
Total2012 2013 2014 2015 2016
Acquisition
Design 345 345
Construction 1,452 1,452
Equipment
Civic Art
Other
Total Allocations 345 1,452 1,797
Source of FundsStorm Drainage DDSRF 345 1,452 1,797
Total Funds 345 1,452 1,797
Active CIP Form A
8/3/2019 Houston Capital Plan Storm 2012 16
http://slidepdf.com/reader/full/houston-capital-plan-storm-2012-16 36/46
2012-2016 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - Storm DrainageProject: Cullen Blvd. (Loop 610 to Old Spanish Trail) Drainage and Paving Council District CIP No.:
M-000294Location: D Served: D
Geographic Ref.: NS Key Map: 533M,O,R
Neighborhood:
Description: Project provides for the design and construction of storm drainageimprovements, necessary concrete paving, curbs, sidewalks,driveways and underground utilities. Project will serve the Cullen BlvdArea (Loop 610 to OST). CDP Outfall D0888. Sims Bayou watershed.
Date Ord. Date WBS # CUIC Amount Appr. Amt.
Justification: Project will construct storm drainage improvements to address and
reduce the risk of structural flooding. Improvements includemodification of street conveyance and sheet flow, and providedetention as needed for mitigation.
Total Authorized 0.00 0.00
Project AllocationEstimated
2011Fiscal Year Planned Appropriations Project
Total2012 2013 2014 2015 2016
Acquisition
Design 345 345
Construction 1,903 1,903
Equipment
Civic Art
Other
Total Allocations 345 1,903 2,248
Source of FundsStorm Drainage DDSRF 345 1,903 2,248
Total Funds 345 1,903 2,248
Active CIP Form A
8/3/2019 Houston Capital Plan Storm 2012 16
http://slidepdf.com/reader/full/houston-capital-plan-storm-2012-16 37/46
2012-2016 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - Storm DrainageProject: Scott Street (Loop 610 to Old Spanish Trail) Drainage and Paving Council District CIP No.:
M-000295Location: D Served: D
Geographic Ref.: NS Key Map: 533 Neighborhood:
Description: Project provides for the design and construction of storm drainageimprovements, necessary concrete paving, curbs, sidewalks,driveways and underground utilities. Project will serve the Scott StreetArea (Loop 610 to OST). CDP Outfall D0068. Brays Bayouwatershed.
Date Ord. Date WBS # CUIC Amount Appr. Amt.
Justification: Project will construct storm drainage improvements to address and
reduce the risk of structural flooding. Improvements includemodification of street conveyance and sheet flow, and providedetention as needed for mitigation.
Total Authorized 0.00 0.00
Project AllocationEstimated
2011Fiscal Year Planned Appropriations Project
Total2012 2013 2014 2015 2016
Acquisition
Design 595 595
Construction 5,660 5,660
Equipment
Civic Art
Other
Total Allocations 595 5,660 6,255
Source of FundsStorm Drainage DDSRF 595 5,660 6,255
Total Funds 595 5,660 6,255
Active CIP Form A
8/3/2019 Houston Capital Plan Storm 2012 16
http://slidepdf.com/reader/full/houston-capital-plan-storm-2012-16 38/46
2012-2016 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - Storm DrainageProject: Mitigation Program for Capital Improvement Projects Council District CIP No.:
M-000296Location: V Served: V
Geographic Ref.: MS Key Map: V Neighborhood:
Description: This project provides for the right-of-way acquisition, design andconstruction of detention basins. This includes analyzing thefeasibility of providing detention for mitigation of impacts due to City of Houston projects, existing infrastructure limited areas, and potentialdevelopment. Preliminary engineering for regional detention projectsfor Halls, Little White Oak, Hunting, Sims and White Oak Bayous.
Date Ord. Date WBS # CUIC Amount Appr. Amt.
Justification: The City constructs many projects that require determination andmitigation of impacts. Designing and contracting on a regional or subregional basis for multiple projects would reduce up-front and longterm maintenance costs at multiple sites.
Total Authorized 0.00 0.00
Project AllocationEstimated
2011Fiscal Year Planned Appropriations Project
Total2012 2013 2014 2015 2016
Acquisition 9,300 1,000 1,017 517 526 535 12,895
Design 1,000 1,150 585 595 605 615 4,550
Construction 6,000 2,530 3,509 2,378 3,629 3,692 21,738
Equipment
Civic Art
Other
Total Allocations 16,300 4,680 5,111 3,490 4,760 4,842 39,183
Source of Funds
Fund 4030 - Ser-F Storm Sewer Const. Fund 10,300 10,300
Fund 5000 - Community Development Blk Grant 6,000 6,000
Storm Drainage DDSRF 4,680 5,111 3,490 4,760 4,842 22,883
Total Funds 16,300 4,680 5,111 3,490 4,760 4,842 39,183
Active CIP Form A
8/3/2019 Houston Capital Plan Storm 2012 16
http://slidepdf.com/reader/full/houston-capital-plan-storm-2012-16 39/46
2012-2016 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - Storm DrainageProject: Stormwater Quality Demonstration Projects Council District CIP No.:
M-000297Location: V Served: V
Geographic Ref.: Key Map: Neighborhood:
Description: Implementation of stormwater quality demonstration projects throughpartnerships with the Texas Commission on Environmental Quality(TCEQ), Environmental Protection Agency and other non-profitorganizations. Two grants awarded with 40% local share.
Date Ord. Date WBS # CUIC Amount Appr. Amt.
Justification: Implementation of pilot projects using leveraged partnerships todevelop local data for future efforts under the Municipal Separate
Storm Sewer System (MS4) Permit and Total Maximum Daily Load(TMDL) limitations.
Total Authorized 0.00 0.00
Project AllocationEstimated
2011Fiscal Year Planned Appropriations Project
Total2012 2013 2014 2015 2016
Acquisition
Design 300 300
Construction 1,610 1,610
Equipment
Civic Art
Other
Total Allocations 300 1,610 1,910
Source of Funds
Fund 4030 - Ser-F Storm Sewer Const. Fund 300 300
Storm Drainage DDSRF 1,610 1,610
Total Funds 300 1,610 1,910
Active CIP Form A
8/3/2019 Houston Capital Plan Storm 2012 16
http://slidepdf.com/reader/full/houston-capital-plan-storm-2012-16 40/46
2012-2016 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - Storm DrainageProject: South Shaver Paving and Drainage: Gulf Freeway to Highway 3
Funding associated with Street Paving and Drainage Project N-000582.
Council District CIP No.:M-000582Location: E Served: E
Geographic Ref.: MS Key Map: 576K,L,P Neighborhood:
Description: Project consists of constructing drainage and detention facilities for Shaver Road at Berry Bayou to facilitate construction of the SouthShaver paving project. TxDOT will manage c onstruction.
Date Ord. Date WBS # CUIC Amount Appr. Amt.
Justification: Project will construct storm drainage improvements to address andreduce the risk of structural flooding. Improvements includemodification of street conveyance and sheet flow, and providedetention as needed for mitigation.
Total Authorized 0.00 0.00
Project AllocationEstimated
2011Fiscal Year Planned Appropriations Project
Total2012 2013 2014 2015 2016
Acquisition
Design
Construction 3,608 3,608
Equipment
Civic Art
Other
Total Allocations 3,608 3,608
Source of Funds
Storm Drainage DDSRF 3,608 3,608
Total Funds 3,608 3,608
Active CIP Form A
8/3/2019 Houston Capital Plan Storm 2012 16
http://slidepdf.com/reader/full/houston-capital-plan-storm-2012-16 41/46
2012-2016 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - Storm DrainageProject: Tanner Road Paving and Drainage: Hempstead to Beltway 8
Funding associated with Street Paving and Drainage Project N-000589.
Council District CIP No.:M-000589Location: A Served: A
Geographic Ref.: MS Key Map: 410,450 Neighborhood:
Description: Project consists of constructing a 72 inch diameter storm sewer system to serve a drainage area required for the construction of Tanner Road.
Date Ord. Date WBS # CUIC Amount Appr. Amt.
Justification: Project will construct storm drainage improvements to address andreduce the risk of structural flooding. Improvements include
modification of street conveyance and sheet flow, and providedetention as needed for mitigation.
Total Authorized 0.00 0.00
Project AllocationEstimated
2011Fiscal Year Planned Appropriations Project
Total2012 2013 2014 2015 2016
Acquisition
Design
Construction 3,871 3,871
Equipment
Civic Art
Other
Total Allocations 3,871 3,871
Source of Funds
Storm Drainage DDSRF 3,871 3,871
Total Funds 3,871 3,871
Active CIP Form A
8/3/2019 Houston Capital Plan Storm 2012 16
http://slidepdf.com/reader/full/houston-capital-plan-storm-2012-16 42/46
2012-2016 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - Storm DrainageProject: Brittmoore: Hammerly to Clay Detention Basin
Funding associated with Street Paving and Drainage, CIP # N-000597Council District CIP No.:
M-000597Location: A Served: A
Geographic Ref.: MS Key Map: 449LQ Neighborhood:
Description: Project includes an off site detention basin to facilitate the constructionof the Brittmoore: Hammerly to Clay paving improvements.
Date Ord. Date WBS # CUIC Amount Appr. Amt.
Justification: Project will construct storm drainage improvements to address andreduce the risk of structural flooding. Improvements includemodification of street conveyance and sheet flow, and providedetention as needed for mitigation.
Total Authorized 0.00 0.00
Project AllocationEstimated
2011Fiscal Year Planned Appropriations Project
Total2012 2013 2014 2015 2016
Acquisition
Design
Construction 2,982 2,982
Equipment
Civic Art
Other
Total Allocations 2,982 2,982
Source of Funds
Storm Drainage DDSRF 2,982 2,982
Total Funds 2,982 2,982
Active CIP Form A
8/3/2019 Houston Capital Plan Storm 2012 16
http://slidepdf.com/reader/full/houston-capital-plan-storm-2012-16 43/46
2012-2016 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - Storm DrainageProject: Developer Participation Council District CIP No.:
M-000800Location: V Served: V
Geographic Ref.: NS Key Map: V Neighborhood:
Description: This project provides for the City's share of the cost of participation in joint property for storm water drainage system improvementssponsored by property owners and developers.
Date Ord. Date WBS # CUIC Amount Appr. Amt.
Justification: This allows additional drainage systems to be constructed usingsponsors' funds to match City funding.
Total Authorized 0.00 0.00
Project AllocationEstimated
2011Fiscal Year Planned Appropriations Project
Total2012 2013 2014 2015 2016
Acquisition
Design
Construction 500 1,000 1,000 1,500 1,500 1,500 7,000
Equipment
Civic Art
Other
Total Allocations 500 1,000 1,000 1,500 1,500 1,500 7,000
Source of Funds
Fund 4030 - Ser-F Storm Sewer Const. Fund
Fund 4505 - Storm Sewer Cons. Const. Fund 500 500
Storm Drainage DDSRF 1,000 1,000 1,500 1,500 1,500 6,500
Total Funds 500 1,000 1,000 1,500 1,500 1,500 7,000
Active CIP Form A
8/3/2019 Houston Capital Plan Storm 2012 16
http://slidepdf.com/reader/full/houston-capital-plan-storm-2012-16 44/46
2012-2016 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - Storm DrainageProject: Wycliffe Drive (Chatterton to Melronome) Drainage and Paving Council District CIP No.:
M-001010Location: A Served: A
Geographic Ref.: NS Key Map: 449 Neighborhood:
Description: Project provides for the design and construction of storm drainageimprovements in the area, necessary concrete paving, curbs,sidewalks, driveways and underground utilities. Project will serve theWestern Village and Sherwood Estates Area. CDP Outfall W1005and adjacent areas. Buffalo Bayou watershed.
Date Ord. Date WBS # CUIC Amount Appr. Amt.
Justification: This project will construct storm drainage improvements to address
and reduce the risk of structural flooding. Improvements includemodification of street conveyance and sheet flow, and providedetention as needed for mitigation.
Total Authorized 0.00 0.00
Project AllocationEstimated
2011Fiscal Year Planned Appropriations Project
Total2012 2013 2014 2015 2016
Acquisition
Design 713 713
Construction 8,244 8,244
Equipment
Civic Art
Other
Total Allocations 713 8,244 8,957
Source of FundsStorm Drainage DDSRF 713 8,244 8,957
Total Funds 713 8,244 8,957
Active CIP Form A
8/3/2019 Houston Capital Plan Storm 2012 16
http://slidepdf.com/reader/full/houston-capital-plan-storm-2012-16 45/46
2012-2016 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - Storm DrainageProject: Willow Waterhole Drainage and Paving
Sub-Project I:Sub-Project II:
Council District CIP No.:M-001013Location: C Served: C
Geographic Ref.: NS Key Map: 531 Neighborhood:
Description: Project provides for the design and construction of storm drainageimprovements in the area, necessary concrete paving, curbs,sidewalks, driveways and underground utilities. Project will serveWestbury, Myerland, Willow Meadows, and Willow Bend areas. CDPOutfalls D0172, D0388, D0241, D0155, D0189, D0180, D5021, andadjacent drainage areas. Brays Bayou watershed.
Date Ord. Date WBS # CUIC Amount Appr. Amt.
Justification: This project will construct storm drainage improvements to addressand reduce the risk of structural flooding. Improvements includemodification of street conveyance and sheet flow, and providedetention as needed for mitigation.
Total Authorized 0.00 0.00
Project AllocationEstimated
2011Fiscal Year Planned Appropriations Project
Total2012 2013 2014 2015 2016
Acquisition
Design 403 403
Construction 3,805 3,805
Equipment
Civic Art
Other
Total Allocations 403 3,805 4,208
Source of Funds
Storm Drainage DDSRF 403 3,805 4,208
Total Funds 403 3,805 4,208
Active CIP Form A
8/3/2019 Houston Capital Plan Storm 2012 16
http://slidepdf.com/reader/full/houston-capital-plan-storm-2012-16 46/46
2012-2016 CAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - Storm DrainageProject: Contingencies Council District CIP No.:
M-NALocation: W Served: W
Geographic Ref.: NS Key Map: Neighborhood:
Description: This project provides for unforeseen needs for facility right-of-way,site, and easement acquisition; engineering and construction services;and legal services required in conjunction with various projects andactivities.
Date Ord. Date WBS # CUIC Amount Appr. Amt.
Justification: Project is required to provide for unforeseen costs.
Total Authorized 0.00 0.00
Project AllocationEstimated
2011Fiscal Year Planned Appropriations Project
Total2012 2013 2014 2015 2016
Acquisition
Design 500 5,000 5,500
Construction 200 174 500 500 6,100 7,474
Equipment
Civic Art
Contingencies
Total Allocations 200 174 500 500 500 11,100 12,974
Source of Funds
Fund 4505 - Storm Sewer Cons. Const. Fund 200 200
Storm Drainage DDSRF 174 500 500 500 11,100 12,774
Total Funds 200 174 500 500 500 11,100 12,974
Active CIP Form A