Housing Repairs Game - Lean Competency System€¦ · lean thinking Housing Repairs Game. The game...

18
accreditation| certification | community THE BUCKINGHAM HOUSING REPAIRS GAME PREVIEW Copyright © PICSIE Books, 2006 PICSIE Books, Box 622, Buckingham, MK18 7YE

Transcript of Housing Repairs Game - Lean Competency System€¦ · lean thinking Housing Repairs Game. The game...

Page 1: Housing Repairs Game - Lean Competency System€¦ · lean thinking Housing Repairs Game. The game consists of 2 or 3 rounds, each consisting of 15 minutes A minute can be considered

accreditation| certification | community

THE BUCKINGHAM

HOUSING REPAIRS

GAME PREVIEW

Copyright © PICSIE Books, 2006

PICSIE Books, Box 622, Buckingham, MK18 7YE

Page 2: Housing Repairs Game - Lean Competency System€¦ · lean thinking Housing Repairs Game. The game consists of 2 or 3 rounds, each consisting of 15 minutes A minute can be considered

The Buckingham Housing Repairs Game was created by John Bicheno, Director of the Buckingham Lean Enterprise Unit (formerly a member of LERC).

The version described in this preview has minor revisions on JB’s original though is essentially the same.

The game can be purchased from John Bicheno or from the LCS for £400 (plus VAT).

Housing Repairs Game

Page 3: Housing Repairs Game - Lean Competency System€¦ · lean thinking Housing Repairs Game. The game consists of 2 or 3 rounds, each consisting of 15 minutes A minute can be considered

The game is suitable for introducing key lean/CI principles and concepts to those working is service organisations

Especially in operations, delivery, planning functions

It can be viewed as an alternative to games that tend to simulate manufacturing operations

eg games using Lego or Sticklebricks that mimic building physical products

It is ideally used at the start of a training course

No prior knowledge of lean thinking is required of players

It can take between 3 and 6 hours to play

It requires a minimum of 9 players, with a maximum of 18 In the latter roles are doubled up, plus discretionary roles can be used

Housing Repairs Game

Page 4: Housing Repairs Game - Lean Competency System€¦ · lean thinking Housing Repairs Game. The game consists of 2 or 3 rounds, each consisting of 15 minutes A minute can be considered

Players simulate working in a housing repairs & maintenance (R&M) department

e.g. in a council, housing association or linked to an insurance claims helpline.

Each player(s) performs a specific role in the R&M department

Their aim is to respond to requests for repair and maintenance from customers and deploy resources to get the jobs done as efficiently as possible.

Requests for work from customers cover windows, plumbing, painting, heating, roofing and electrical. Some jobs are classed as emergencies.

Housing Repairs Game

Page 5: Housing Repairs Game - Lean Competency System€¦ · lean thinking Housing Repairs Game. The game consists of 2 or 3 rounds, each consisting of 15 minutes A minute can be considered

The game aims to illustrate:

Lean/CI principles

Aspects of service quality

The concept of the value stream

The influence of service level agreements

Different forms of waste

Destructive nature of failure demand

How service improvements can be made through

lean thinking

Housing Repairs Game

Page 6: Housing Repairs Game - Lean Competency System€¦ · lean thinking Housing Repairs Game. The game consists of 2 or 3 rounds, each consisting of 15 minutes A minute can be considered

The game consists of 2 or 3 rounds, each consisting of 15 minutes

A minute can be considered to represent a day

Each minute, requests for repairs from customers are received by the call centre, which initiates the repair process

The process involves various roles in the R&M department that ultimately result in operatives visiting the customer to effect a repair

There are service level agreements, prioritisation rules and various standards that must be adhered to by players

Dice are used by some roles to simulate the innate variability of certain activities

Housing Repairs Game

Page 7: Housing Repairs Game - Lean Competency System€¦ · lean thinking Housing Repairs Game. The game consists of 2 or 3 rounds, each consisting of 15 minutes A minute can be considered

Round 1 represents the ‘current state’ and after it is completed, players discuss and make improvements to the system, guided by lean principles

After playing round 2, the performance of the system should substantially improve, thus demonstrating the positive impact of lean inspired changes.

Housing Repairs Game

Page 8: Housing Repairs Game - Lean Competency System€¦ · lean thinking Housing Repairs Game. The game consists of 2 or 3 rounds, each consisting of 15 minutes A minute can be considered

The R&M department roles are shown in the plan below, along with customer roles and an optional Government Statistics role.

The call centre and work operations roles should have two players if possible.

There are two customer roles

The facilitator(s) can play the customer role(s)

Housing Repairs Game

Page 9: Housing Repairs Game - Lean Competency System€¦ · lean thinking Housing Repairs Game. The game consists of 2 or 3 rounds, each consisting of 15 minutes A minute can be considered

Each role has its own A3 sized placemat, which indicates where the players are located and summarises the role

Housing Repairs Game

Page 10: Housing Repairs Game - Lean Competency System€¦ · lean thinking Housing Repairs Game. The game consists of 2 or 3 rounds, each consisting of 15 minutes A minute can be considered

The chart illustrates the process flow of a job that is taken at the call centre

Housing Repairs Game

Page 11: Housing Repairs Game - Lean Competency System€¦ · lean thinking Housing Repairs Game. The game consists of 2 or 3 rounds, each consisting of 15 minutes A minute can be considered

Several forms are used by the various roles.

Job Request Cards represent phone calls from customers to the call centre

The game has 80 different jobs – enough for 3 rounds

Housing Repairs Game

Page 12: Housing Repairs Game - Lean Competency System€¦ · lean thinking Housing Repairs Game. The game consists of 2 or 3 rounds, each consisting of 15 minutes A minute can be considered

The GAME BOARD is used to track the progress of repair jobs and measure its performance.

Housing Repairs Game

Customer 2 operates the game board, which is displayed prominently on a wall in the game room.

The time when key activities are performed for each job is tracked.

Permission is granted to the works team to commence jobs.

3

3

3

3

In the example above, job 3’s progress is shown, indicating it took 4 minutes in total

to complete

Page 13: Housing Repairs Game - Lean Competency System€¦ · lean thinking Housing Repairs Game. The game consists of 2 or 3 rounds, each consisting of 15 minutes A minute can be considered

There are instruction sheets for each role These need to be studied carefully before the game begins

Housing Repairs Game

Depending on number of players

Some roles are optional Eg analyst

Roles can be doubled up

There are service level agreements

Rules for job start, duration, priorities

Page 14: Housing Repairs Game - Lean Competency System€¦ · lean thinking Housing Repairs Game. The game consists of 2 or 3 rounds, each consisting of 15 minutes A minute can be considered

At the end of each round key measures are calculated

The average time from call received to job completed is a key measure

Housing Repairs Game

A key objective for the players is to reduce this time in round two.

The number of reminders in the system is also important, as these represent ‘failure demand’

Page 15: Housing Repairs Game - Lean Competency System€¦ · lean thinking Housing Repairs Game. The game consists of 2 or 3 rounds, each consisting of 15 minutes A minute can be considered

Game introduction (30 mins)Covers aims, game description, timetable, allocation of roles, role briefing, test rounds

Play round 1 (15 minutes)“Current State” - no changes allowed to be made

• Players mentally note problems within system & think about possible solutions

Review round 1 performance ( 20 mins)The R&M department’s performance data as shown on the game board is discussed

Key measures, such as average time from call to job completed, are calculated and discussed; the measures template can be competed

The players collectively review round 1 performance

Housing Repairs Game

Page 16: Housing Repairs Game - Lean Competency System€¦ · lean thinking Housing Repairs Game. The game consists of 2 or 3 rounds, each consisting of 15 minutes A minute can be considered

Lean principles presentation (20 mins)Takes place during round 1 review, before changes are proposed

The content will depend of the player’s knowledge/experience of lean

Players discuss & select improvements (1 to 2 hours)The facilitator outlines the ground rules

The facilitator should not intervene in the group discussion

Players implement improvements (10 mins)

Play round 2 (15 minutes)

Review performance, summary & key learning points discussed (30 mins)

Templates can be used to capture players’ learnings

A standard presentation is available for this

Housing Repairs Game

Page 17: Housing Repairs Game - Lean Competency System€¦ · lean thinking Housing Repairs Game. The game consists of 2 or 3 rounds, each consisting of 15 minutes A minute can be considered

Laminated role place mats A3

Laminated role instructions A4

Laminated game board A3

Laminated measures & observations chart

Dice x 4

Pack of paper clips

Introductory presentation

End of Round 1 & Game Summary presentation

Lean principles presentation

Game learnings template

Minutes slides (timed) ppt

Jobs by minute A4 laminated

Job details

80 job requests x2 (one on yellow paper, the other on pink paper)

Job forms – 4 types – 80 copies of each

Marker pens, Blutac

Soft copies of all material on a USB stick

Facilitator's Guide

Spreadsheet for game data analysis

Housing Repairs Game

Page 18: Housing Repairs Game - Lean Competency System€¦ · lean thinking Housing Repairs Game. The game consists of 2 or 3 rounds, each consisting of 15 minutes A minute can be considered

It is beneficial to run a train-the-trainer session prior to its first time use in a training programme

Contact JB or the LCS to discuss this option

The game can be adapted according to preference after several iterations.

Housing Repairs Game