Transcript of Hotel Furdown Framing-Ceiling
Lbl Qty Member LengthC0 6 362S125-18 8 3/8"T0 2 362T100-18 8' - 5 7/8"
Lbl Qty Member LengthC0 6 362S125-18 8 3/8"T0 2 362T100-18 8' - 5 7/8"
Lbl Qty Member Length
B0 1 362S125-18 1' - 9 1/4"B1 1 362S125-18 3' - 0 3/4"
J0 1 362S125-18 3' - 0"
J1 1 362S125-18 4' - 6 3/4"
J2 1 362S125-18 3' - 8"
J3 1 362S125-18 2' - 2 3/4"
J4 1 362S125-18 4' - 11 3/4"
T0 1 362T100-18 8' - 6 3/64"
T1 1 362T100-18 6' - 3"
T2 1 362T100-18 1' - 4"
1' -
9 7/
8"
B1
T2
J0
J4J1
T0
T1
J2
J3B0
0" 8"
1' - 3
7/8"
3' - 0
"
5' - 0
"
7' - 0
"
7' - 7
1/2"
2' -
1 1/
2"3'
- 1
1/8"
6' - 3 5/8"1' - 3 7/8"
45.83°
0"
1' - 1
0 7/8"
3' - 1
1 1/8"
5' - 1
1 1/4"
7' - 1
0 5/8"
8' - 4
3/4"
8 1/
4"
C0 C0 C0 C0 C0
T0
T0
C0
3' -
7 3/
8"
42.30°
7' - 7 1/2"
Scale Project numberDateDrawn by Size
ASTEEL Drawing number
ReviewTRANSCON THE DRAWINGS HEREIN ARE MANUFACTURING DRAWINGS ONLY.CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR VERIFYING ALLDIMENSIONS, SITE CONDITIONS, AND THAT ALL STATE AND LOCALCODE REQUIREMENTS ARE MET. PLEASE CONTACT TRANSCON STEELFOR ANY ADDITIONAL CLARITY IN NEEDED PRIOR TO INSTALLATION.
FRAMING THE FUTURE As indicated 2.7
Panel6 & 21
12-105
Marriott Courtyard Sailisbury , NC
07/12/12
3/8" = 1'-0"1 Bill of Material
1/4" = 1'-0"3 Bill of Material
3/4" = 1'-0"5 Panel 6