HOSUR - KRISHNAGIRI SECTION OF NH-7 CEI-IE/NHAI/1213006/HKTRPL/2015/214 14, Aug 2015 To, The Chief Project Manager, HK Toll Road Pvt Ltd, Plot No.3 - 805, Alasanatham Road, Hosur. Sub: Six Laning of Hosur to Krishnagiri Section of NH - 7 - from KM.33+130 to Km.93+000 in the state of Tamil Nadu under NHDP phase V (Toll) on DBFOTbasis- Revised Traffic Diversion Plan for construction of Box Culvert at Ch.40+955 RHS-SR- Reg. Ref: Your letter no. HKTRPL/IE/2015/Site/1742 dated 06 Aug 2015 Dear Sir, The Traffic Diversion Plan is submitted by the Concessionaire in the above reference has been examined in detail and found to conform to requirements of IRC-SP-55 and hence approval is accorded hereby. However the Concessionaire is requested to widen the Service Road to 5.5m as per IRC-SP-55 instead of 4m shown in the drawing. Thanking you, Yours truly, For CDM Smith and Wilbur Smith Associates Pvt. Ltd JV C V Krishna Reddy Acting Team Leader End: Drawing( 1 Sheet) Cc: The Project Director, NHAI, PIU, Krishnagiri. Project Office No. 167- A, Bangalore Road, Krishnagiri, Tarnll Nadu 635001, India tel +91 4343 232040 fax +91 4343 232041 email [email protected] Registered Office 8, Second Floor, 80 Feet-Road, RT Nagar, Bangalore 560032, India tel +91 80 3918 7500 tax +91 80 23634097 website cdmsmith.com

Transcript of HOSUR- KRISHNAGIRI SECTIONOF NH-7 CEI …nhai.org.in/spw/IEReport/Our letter no.214 dated 14 Aug...

HOSUR- KRISHNAGIRI SECTIONOF NH-7

CEI-IE/NHAI/1213006/HKTRPL/2015/214 14, Aug 2015

To,

The Chief Project Manager,HK Toll Road Pvt Ltd,Plot No.3 - 805, Alasanatham Road,Hosur.

Sub: Six Laning of Hosur to Krishnagiri Section of NH - 7 - from KM.33+130 to Km.93+000 in thestate of Tamil Nadu under NHDP phase V (Toll) on DBFOTbasis- Revised Traffic Diversion Planfor construction of Box Culvert at Ch.40+955 RHS-SR- Reg.

Ref: Your letter no. HKTRPL/IE/2015/Site/1742 dated 06 Aug 2015

Dear Sir,

The Traffic Diversion Plan is submitted by the Concessionaire in the above reference

has been examined in detail and found to conform to requirements of IRC-SP-55 and hence

approval is accorded hereby.

However the Concessionaire is requested to widen the Service Road to 5.5m as per IRC-SP-55

instead of 4m shown in the drawing.

Thanking you,

Yours truly,

For CDM Smith andWilbur Smith Associates Pvt. Ltd JV

C V Krishna ReddyActing Team Leader

End: Drawing( 1 Sheet)

Cc: The Project Director, NHAI, PIU, Krishnagiri.

Project Office No. 167- A, Bangalore Road, Krishnagiri, Tarnll Nadu 635001, Indiatel +91 4343 232040 fax +91 4343 232041 email [email protected]

Registered Office 8, Second Floor, 80 Feet-Road, RT Nagar, Bangalore 560032, Indiatel +91 80 3918 7500 tax +91 80 23634097 website cdmsmith.com

; ,

I,' !~. ,~,:;;

; !,: ( ,)

! Il/11••i!

I1l!i_-=-----'-· -

"

I1i :11

___I K_._... _I.

......:..... -.-.... :

--