Hospital Inspectors Recertification Program

Facilities Development Division

The Building Department for California’s Hospitals

1

Page 2: Hospital Inspectors Recertification Program - CA OSHPD · PDF fileHospital Inspectors Recertification Program Facilities Development Division The Building Department for California’s

Objective/Agenda

• Discuss changes in the CBC 2016 for:

Structural Special Inspections

Structural Testing

2

Page 3: Hospital Inspectors Recertification Program - CA OSHPD · PDF fileHospital Inspectors Recertification Program Facilities Development Division The Building Department for California’s

2016 California Building Code

An Overview of Amendments

For

CBC 2016

3

Page 4: Hospital Inspectors Recertification Program - CA OSHPD · PDF fileHospital Inspectors Recertification Program Facilities Development Division The Building Department for California’s

2016 California Building Code

(CBC 2016)

4

ASCE/SEI 7-10

Page 5: Hospital Inspectors Recertification Program - CA OSHPD · PDF fileHospital Inspectors Recertification Program Facilities Development Division The Building Department for California’s

Major Reference Standards NOT Updated

1. ASCE 7-10: Minimum Design Loads

2. AISC 360-10: Steel Design

3. AISC 341-10/358-10: Seismic Design of Steel

5

ASCE/SEI 7-10

Page 6: Hospital Inspectors Recertification Program - CA OSHPD · PDF fileHospital Inspectors Recertification Program Facilities Development Division The Building Department for California’s

Major Reference Standards Updated

1. ASCE 41-13: Seismic Evaluation and Retrofit of

Existing Buildings

2. ACI 318-14: Concrete Design

3. TMS-402/602-13: Masonry Design

6

ASCE/SEI 41-13

Page 7: Hospital Inspectors Recertification Program - CA OSHPD · PDF fileHospital Inspectors Recertification Program Facilities Development Division The Building Department for California’s

Major Reference Standards Updated

1. ADM1-15: Aluminum Design

2. NDS-15: Wood Design

3. SDPWS-15: Seismic Design of Woods

7

Page 8: Hospital Inspectors Recertification Program - CA OSHPD · PDF fileHospital Inspectors Recertification Program Facilities Development Division The Building Department for California’s

Impact of Limited Changes on Pre-Approvals

• All Pre-Approvals for the CBC 2013 can be used for the CBC 2016

2013 OSHPD Preapproved Details (OPDs)

will be permitted for the CBC 2016.

2013 OSHPD Preapproval of Manufacturer’s

Certifications (OPMs) will be permitted for the

CBC 2016 with no Caveats.

8

Page 9: Hospital Inspectors Recertification Program - CA OSHPD · PDF fileHospital Inspectors Recertification Program Facilities Development Division The Building Department for California’s

Chapter 17A Special Inspections & Tests

An Overview

• Special Inspections and Tests shall be

provided by “Approved Agencies” employed

by the Owner (& NOT Architect of Record /

Structural Engineer of Record or Contractor):

Responsibility for special inspection belongs

to “Approved Inspection Agencies” and

only indirectly to “Special Inspectors”, employed by the agencies.

9

Page 10: Hospital Inspectors Recertification Program - CA OSHPD · PDF fileHospital Inspectors Recertification Program Facilities Development Division The Building Department for California’s

2016 CBC: Special Inspections & Tests

• General – throughout the chapter “special

inspector” was changed to “approved

agency.”

The IOR is responsible for verifying the

individual who performs the special

inspections for the approved agency is

accepted by the architect/structural engineer

and OSHPD and is appropriately qualified to

perform the special inspections.

10

Page 11: Hospital Inspectors Recertification Program - CA OSHPD · PDF fileHospital Inspectors Recertification Program Facilities Development Division The Building Department for California’s

2016 CBC: 1703A Approvals

11

Page 12: Hospital Inspectors Recertification Program - CA OSHPD · PDF fileHospital Inspectors Recertification Program Facilities Development Division The Building Department for California’s

2016 CBC: Approved Testing and

Inspection Agencies

A testing agency accredited to ISO

17025 shall be deemed to be an

“Approved Testing Agency.” (CBC 2016

Section 1703A.4)

An inspection agency accredited to ISO

17020 shall be deemed to be an

“Approved Inspection Agency.” (CBC 2016

Section 1704A.2)

12

Page 13: Hospital Inspectors Recertification Program - CA OSHPD · PDF fileHospital Inspectors Recertification Program Facilities Development Division The Building Department for California’s

Approved Agency Responsibilities

(CBC 2016 Section 1704A.2.4)

Approved agencies shall keep records of all special

inspections and tests.

The approved agency shall submit reports of special

inspections and tests to the building official and to the

Registered Design Professional in responsible charge.

Note in a majority of OSHPD projects, the RDP in

responsible charge is the Architect and Structural

Engineer of Record.

All reports shall indicate that work inspected or tested

was or was not completed in conformance to approved

construction documents.

13

Page 14: Hospital Inspectors Recertification Program - CA OSHPD · PDF fileHospital Inspectors Recertification Program Facilities Development Division The Building Department for California’s

Approved Agency Responsibilities (Continued)

(CBC 2016 Section 1704A.2.4)

Discrepancies shall be brought to the immediate attention

of the contractor for correction.

If they are not corrected, the discrepancies shall be

brought to the attention of the building official and to the

Registered Design Professional (RDP) in responsible charge

prior to the completion of that phase of the work.

A final report documenting required special inspections and

tests, and correction of any discrepancies noted in the

inspections or tests, shall be submitted.

14

Page 15: Hospital Inspectors Recertification Program - CA OSHPD · PDF fileHospital Inspectors Recertification Program Facilities Development Division The Building Department for California’s

2016 California Building Code

Major Changes in

CBC 2016

15

Page 16: Hospital Inspectors Recertification Program - CA OSHPD · PDF fileHospital Inspectors Recertification Program Facilities Development Division The Building Department for California’s

Chapter 16A

Amendments in Chapter 16A Structural Design

16

Page 17: Hospital Inspectors Recertification Program - CA OSHPD · PDF fileHospital Inspectors Recertification Program Facilities Development Division The Building Department for California’s

Amendments to Chapter 16A

Structural Design

No major change between the CBC 2013

and CBC 2016.

17

Page 18: Hospital Inspectors Recertification Program - CA OSHPD · PDF fileHospital Inspectors Recertification Program Facilities Development Division The Building Department for California’s

Section 1616A.1.21: Suspended Ceilings

Transverse diagonal ceiling brace can be omitted for exit ways up to 8’ wide, when: Perimeter support satisfy ASTM 580; and Perimeter wall designed to carry lateral loads.

Brace spacing shall be justified by analysis or test & shall not exceed 12’x12’.

Ceiling support and bracing wires shall be spaced a minimum of 6” from pipes, ducts, conduits and equipment that are not bracedfor horizontal forces.

18

Page 19: Hospital Inspectors Recertification Program - CA OSHPD · PDF fileHospital Inspectors Recertification Program Facilities Development Division The Building Department for California’s

Section 1616A.1.19: Prequalified Post-Installed

Anchors and Specialty Inserts in Concrete & Masonry

1616A.1.19… prequalified post-installed

anchors… now includes specialty inserts.

Also, screw anchors in concrete and

masonry shall not be used in building enclosures (exterior walls).

19

Page 20: Hospital Inspectors Recertification Program - CA OSHPD · PDF fileHospital Inspectors Recertification Program Facilities Development Division The Building Department for California’s

Amendments in Chapter 17A Special Inspections and Tests

20

Page 21: Hospital Inspectors Recertification Program - CA OSHPD · PDF fileHospital Inspectors Recertification Program Facilities Development Division The Building Department for California’s

Special Inspection at Fabricator’s Shop(Section 1704A.2.5)

• Special inspection of the fabricated items

shall be performed during fabrication.

Special inspections during fabrication are

not required where the fabricator maintains

approved detailed fabrication and quality

control procedures.

Approval shall be based upon review of

fabrication & quality control procedures and periodic inspection.

21

Page 22: Hospital Inspectors Recertification Program - CA OSHPD · PDF fileHospital Inspectors Recertification Program Facilities Development Division The Building Department for California’s

Modular Structures/Equipment Skids can use

Fabricator’s Shop Exception (Section 1703A.6)

• Modular Structures/Equipment Skids can use

Fabricator’s shop exception to avoid certain

on-site quality assurance inspection.

• Explicitly permitted by Section 1703A.6

22

Page 23: Hospital Inspectors Recertification Program - CA OSHPD · PDF fileHospital Inspectors Recertification Program Facilities Development Division The Building Department for California’s

Does OSHPD Consider Manufactured

Equipment to be Fabricated Items?

• In general, NO!

• Fabricated Item ONLY include structural elements, components, supports, and attachments for which structural provisions of the CBSC require Quality Assurance/Quality Control (QA/QC), as defined in the CBSC 2016 Section 1702A.1.

• Manufactured equipment which are not subject to QA/QC by structural provisions of the code are not considered to be fabricated item for the CBC 2016 Section 1704A.2.5: Pump is not considered a fabricated item;

Skid mounted pump assembly will be considered a fabricated item (since skid requires QA/QC)

23

Page 24: Hospital Inspectors Recertification Program - CA OSHPD · PDF fileHospital Inspectors Recertification Program Facilities Development Division The Building Department for California’s

Quality Assurance Vs. Quality Control

24

Quality Assurance (QA). Special Inspections and

testing by an approved agency employed by the

Owner. Project specific testing required by

approved construction documents shall be

performed by the approved agency responsible

for Quality Assurance.

Quality Control (QC). Inspections and

materials/functionality testing provided by the

fabricator, erector or other responsible contractor as

applicable.

Page 25: Hospital Inspectors Recertification Program - CA OSHPD · PDF fileHospital Inspectors Recertification Program Facilities Development Division The Building Department for California’s

Typical Split between QA and QC(AISC 341-10)

25

Perform (P) is

equivalent to

Continuous

Inspection.

Observe (O)

is equivalent

to Periodic

Inspection.

Page 26: Hospital Inspectors Recertification Program - CA OSHPD · PDF fileHospital Inspectors Recertification Program Facilities Development Division The Building Department for California’s

Inspectors shall work

Under the Direction of RDP

26

§129825. …Inspectors.

(a) ….the inspector shall act under the direction of the architect or structural engineer, or both, and be responsible to the board or authority.

Added to Section 1704A.2

Page 27: Hospital Inspectors Recertification Program - CA OSHPD · PDF fileHospital Inspectors Recertification Program Facilities Development Division The Building Department for California’s

2016 CBC: Certificate of Compliance

Requirements

• “Certificate of Compliance” shall be

submitted to the building official (in addition

to the submittal of reports of special inspections

and tests):

Requirements for “Certificate of Compliance”

that used to apply to special seismic

certification only is expanded to 7 (seven)

different categories.

27

Page 28: Hospital Inspectors Recertification Program - CA OSHPD · PDF fileHospital Inspectors Recertification Program Facilities Development Division The Building Department for California’s

Certificate of Compliance

(Section 1704A.5)

• “Certificate of Compliance” shall be submitted to the building official:

1. Fabrication of structural load bearing or lateral load resisting members.

2. Manufacturer’s Certification of non-structural components, supports and attachments.

3. Special Seismic Certification of equipment & components.

28

Page 29: Hospital Inspectors Recertification Program - CA OSHPD · PDF fileHospital Inspectors Recertification Program Facilities Development Division The Building Department for California’s

Certificate of Compliance (Section 1704A.5)

• “Certificate of Compliance” Continued:

4. Pre-Construction tests for shotcrete.

5. Open web steel joist and joist girders.

6. Weldability of reinforcing bars.

7. Mill certs for reinforcing bars.

29

Page 30: Hospital Inspectors Recertification Program - CA OSHPD · PDF fileHospital Inspectors Recertification Program Facilities Development Division The Building Department for California’s

Basis of Special Inspection Exemption

for Fabricator’s Shop

OSHPD shall enforce quality control provisions in the Code

Inspectors shall work under the direction of Registered Design Professionals (RDP)

Fabricator shall be approved by OSHPD on a project by project basis.

Fabricator shall submit a “Certificate of Compliance” for the fabricated items.

30

Page 31: Hospital Inspectors Recertification Program - CA OSHPD · PDF fileHospital Inspectors Recertification Program Facilities Development Division The Building Department for California’s

When is Certificate of Compliance for

Supports and Attachments Required?

• Certificate of Compliance for Supports and

Attachments shall ONLY be required when:

1. Manufacturer’s Certification is used for

seismic design of supports and attachments;

and

2. Fabricator approval is used for manufacturing.

31

Page 32: Hospital Inspectors Recertification Program - CA OSHPD · PDF fileHospital Inspectors Recertification Program Facilities Development Division The Building Department for California’s

Certificate of Compliance for Components where

Special Seismic Certification is NOT required

• Certificate of Compliance for Seismic Certification of

Components, where Special Seismic Certification is NOT

required:

1. Components commonly designed by calculations (e.g.

those listed in ASCE 7-10 Table 13.5-1), such as

storage racks, shall be justified by calculations;

2. Mechanical and Electrical components (e.g. those listed

in ASCE 7-10 Table 13.6-1) can be justified by reference

to ANSI approved seismic design standards.

Certificate of Compliance shall specify validity range for SDS & z/h, and Ip.

32

Page 33: Hospital Inspectors Recertification Program - CA OSHPD · PDF fileHospital Inspectors Recertification Program Facilities Development Division The Building Department for California’s

Who provide Certificate of Compliance

for Components?

• Manufacturer shall provide “Certificate of Compliance” for components with Special Seismic Certification in accordance with ASCE 7-10 Section 13.2.2.

• For components where Special Seismic Certification is NOT required by Code, “Certificate of Compliance” can be provided by manufacturers, designers or suppliers (H&SC #129895).

• The owner or owner’s authorized agent shall submit certificate of compliance to OSHPD in accordance with the CBC 2016 Section 1704A.5.

33

Page 34: Hospital Inspectors Recertification Program - CA OSHPD · PDF fileHospital Inspectors Recertification Program Facilities Development Division The Building Department for California’s

Amendments in Chapter 18A Soils and Foundations

34

Page 35: Hospital Inspectors Recertification Program - CA OSHPD · PDF fileHospital Inspectors Recertification Program Facilities Development Division The Building Department for California’s

Shoring and Stone Column

Requirements Moved to Chapter 18• Provisions for Earth Retaining Shoring and

Vibro Stone Columns for Ground Improvement moved from Appendix J to Chapter 18A.

35

Page 36: Hospital Inspectors Recertification Program - CA OSHPD · PDF fileHospital Inspectors Recertification Program Facilities Development Division The Building Department for California’s

Steel Sheet Piles

• Provision for Steel Sheet Piles shoring are

added (Sections 1810A.3.2.3, 1810A.3.5.3.2 &

1810A.3.5.3.3).

Inspection, monitoring, and observation

requirements will be equivalent to those

required for installation of shoring with soldier

piles & legging (Sections 1812A.6 and 1812A.7).

36

Page 37: Hospital Inspectors Recertification Program - CA OSHPD · PDF fileHospital Inspectors Recertification Program Facilities Development Division The Building Department for California’s

Non-Hammer Driven Piles Testing

• Testing provisions and

acceptance criteria for

proprietary non-hammer

driven piles is added to

Section 1810A.3.3.1.2.

37

Page 38: Hospital Inspectors Recertification Program - CA OSHPD · PDF fileHospital Inspectors Recertification Program Facilities Development Division The Building Department for California’s

Amendments in Chapter 19A Concrete

38

Page 39: Hospital Inspectors Recertification Program - CA OSHPD · PDF fileHospital Inspectors Recertification Program Facilities Development Division The Building Department for California’s

ACI 318-14 is Completely Reorganized

Maintained most of the requirements from

ACI 318-11 and added information on

structural systems and diaphragms

All requirements related to construction

are in a single chapter (Chapter 26)

39

Page 40: Hospital Inspectors Recertification Program - CA OSHPD · PDF fileHospital Inspectors Recertification Program Facilities Development Division The Building Department for California’s

Chapter 19A Amendments

• Most existing OSHPD amendments are

deleted, since they are now covered by

ACI 318-14.

• Existing amendments that address

subjects not covered by ACI 318-14 are

retained:

• Post-Installed anchor bolt testing

• Field Rebar testing

40

Page 41: Hospital Inspectors Recertification Program - CA OSHPD · PDF fileHospital Inspectors Recertification Program Facilities Development Division The Building Department for California’s

Welding of Reinforcing Bars

• CBC 1903A.8 (ACI 318 Sec. 26.6.4.1(b)) –Welding of Reinforcing Bars

Repealed amendment that required chemical

analysis of reinforcing steel to be welded, since

they duplicate requirements in AWS D1.4.

Revised amendment to permit shop fusion

welding of reinforcing cages with holding wires.

41

Page 42: Hospital Inspectors Recertification Program - CA OSHPD · PDF fileHospital Inspectors Recertification Program Facilities Development Division The Building Department for California’s

Welding of Reinforcing Bars

42

Page 43: Hospital Inspectors Recertification Program - CA OSHPD · PDF fileHospital Inspectors Recertification Program Facilities Development Division The Building Department for California’s

Construction Documents & Inspection

• ACI 318-11: Construction Requirements

Located with the design requirements

• ACI 318-14: Construction requirements

Gathered in Chapter 26

43

Page 44: Hospital Inspectors Recertification Program - CA OSHPD · PDF fileHospital Inspectors Recertification Program Facilities Development Division The Building Department for California’s

ACI 318-14 Language

44

Page 45: Hospital Inspectors Recertification Program - CA OSHPD · PDF fileHospital Inspectors Recertification Program Facilities Development Division The Building Department for California’s

ACI 318-14: Chapter 26

ACI 318 Written for Engineers, not the

contractor

Construction requirements must be

communicated on construction

documents

45

Page 46: Hospital Inspectors Recertification Program - CA OSHPD · PDF fileHospital Inspectors Recertification Program Facilities Development Division The Building Department for California’s

Chapter 26: Const. Documents & Insp.

RDP shall specify the following on

Construction Documents (CDs), if

applicable:

1. Design Information (e. g. member size,

etc.);

2. Compliance Requirements (e.g. ASTM

C150 Portland Cement, etc.).

3. Inspection Requirements.

46

Page 47: Hospital Inspectors Recertification Program - CA OSHPD · PDF fileHospital Inspectors Recertification Program Facilities Development Division The Building Department for California’s

Contractor shall NOT Interpret ACI 318-14

47

Page 48: Hospital Inspectors Recertification Program - CA OSHPD · PDF fileHospital Inspectors Recertification Program Facilities Development Division The Building Department for California’s

Design Professional shall Provide

Information Required by Chapter 26

ACI 318 Section 1.8.1: The Licensed

Design Professional shall provide in the

construction documents the information

required in Chapter 26 and that required by

the Jurisdiction.

48

Page 49: Hospital Inspectors Recertification Program - CA OSHPD · PDF fileHospital Inspectors Recertification Program Facilities Development Division The Building Department for California’s

Amendments in Chapter 21A Masonry

49

Page 50: Hospital Inspectors Recertification Program - CA OSHPD · PDF fileHospital Inspectors Recertification Program Facilities Development Division The Building Department for California’s

Specified Compressive Strength f’m

• Basic Specified Compressive Strength, f’mis increased to 2,000 psi (from 1500 psi)

• ASTM C90-14: Increased concrete masonry

unit minimum net area compressive strength

to 2,000 psi (from 1900 psi).

Site specific prism tests can be used to justify f’m up to 3,000 psi.

50

Page 51: Hospital Inspectors Recertification Program - CA OSHPD · PDF fileHospital Inspectors Recertification Program Facilities Development Division The Building Department for California’s

Compressive Strength of Masonry (f’m) Vs.

Compressive Strength of concrete Masonry Units

51

Page 52: Hospital Inspectors Recertification Program - CA OSHPD · PDF fileHospital Inspectors Recertification Program Facilities Development Division The Building Department for California’s

Masonry Core Testing Requirements (Section 2105A.4)

• Core testing requirements for non-bearing

non-shear masonry walls (f’m≤ 2,000psi &

height <12’) built with single-Wythe hollow

unit concrete masonry unit is deleted:

All single-Wythe CMU pass this test.

Original requirements was a qualitative tests

for multi-Wythe masonry, CBC requirement is quantitative and apply to all Masonry.

52

Page 53: Hospital Inspectors Recertification Program - CA OSHPD · PDF fileHospital Inspectors Recertification Program Facilities Development Division The Building Department for California’s

Infrared Thermographic Survey

(2105A.4)

• Infrared Thermographic Survey or other

nondestructive test procedure shall be

permitted as an alternative system instead

of masonry core testing.

• These are usually required where wall is reinforced at every cell.

53

Page 54: Hospital Inspectors Recertification Program - CA OSHPD · PDF fileHospital Inspectors Recertification Program Facilities Development Division The Building Department for California’s

Amendments in Chapter 22A Steel

54

Page 55: Hospital Inspectors Recertification Program - CA OSHPD · PDF fileHospital Inspectors Recertification Program Facilities Development Division The Building Department for California’s

Testing of High Strength Bolts (Section

2213A)

• Tensile Test ONLY, in accordance with

ASTM F606

• 3-Sample per lot

• Need not exceed 3-samples per 400-bolts

55

Page 56: Hospital Inspectors Recertification Program - CA OSHPD · PDF fileHospital Inspectors Recertification Program Facilities Development Division The Building Department for California’s

Amendments in Chapter 23 Wood

56

Page 57: Hospital Inspectors Recertification Program - CA OSHPD · PDF fileHospital Inspectors Recertification Program Facilities Development Division The Building Department for California’s

Structural Glued Cross Laminated

Timber

• Cross Laminated Timber (CLT) shall be manufactured and identified in accordance with ANSI/APA PRG 320 (Section 2303.1.4)

Cross Laminated Timber (CLT) for seismic design will be considered to be alternative system (Section 2301.1.4 Item # 9)

57

Page 58: Hospital Inspectors Recertification Program - CA OSHPD · PDF fileHospital Inspectors Recertification Program Facilities Development Division The Building Department for California’s

Structural Hot Topics

58

Page 59: Hospital Inspectors Recertification Program - CA OSHPD · PDF fileHospital Inspectors Recertification Program Facilities Development Division The Building Department for California’s

How does OSHPD deal with Special Inspection of

Pre-Fabricated Equipment/Components Skid?

Depends:

1. Inspector need to be at fabricator’s shop where code requires continuous special inspection.

2. Exception to the CBC 2016 Section 1704A.2 waive inspection requirements for work of minor nature.

3. OSHPD does not require inspection at fabricators shop for components/skids with OSP.

4. Skid with bolts only does not require inspection in accordance with exception to the CBC 2016 Section 1705A.2.

5. Single pass fillet welds up to 5/16” can be inspected in the field (the CBC 2016 Table 1705A.2.1 Item # 5).

59

Page 60: Hospital Inspectors Recertification Program - CA OSHPD · PDF fileHospital Inspectors Recertification Program Facilities Development Division The Building Department for California’s

What Part of Design or Construction is Subject to

OSHPD review (CBC 2016 Section 1601A.2)?

Any aspect of design, construction, quality

assurance, or quality control subject to

approval by design professional is subject to OSHPD approval

60

Page 61: Hospital Inspectors Recertification Program - CA OSHPD · PDF fileHospital Inspectors Recertification Program Facilities Development Division The Building Department for California’s

Enforcement Agency (OSHPD)

Approval Authority

61

Page 62: Hospital Inspectors Recertification Program - CA OSHPD · PDF fileHospital Inspectors Recertification Program Facilities Development Division The Building Department for California’s

Construction Documents and Construction

Administration (H&SC §129805)

A structural engineer shall prepare the

structural design and shall sign plans and

specifications related thereto.

Administration of the work of construction

shall be under the responsible charge of the architect and structural engineer

62

Page 63: Hospital Inspectors Recertification Program - CA OSHPD · PDF fileHospital Inspectors Recertification Program Facilities Development Division The Building Department for California’s

Written Approval(Sections 1703A.2 & 202)

63

Page 64: Hospital Inspectors Recertification Program - CA OSHPD · PDF fileHospital Inspectors Recertification Program Facilities Development Division The Building Department for California’s

Scope of OSHPD Observation(CAC 2016 Section 7-147)

Scope of special inspections are clearly defined

in the code.

Code gives OSHPD authority to decide what to

observe.

OSHPD does not observe everything that are subject to special inspection.

64

Page 65: Hospital Inspectors Recertification Program - CA OSHPD · PDF fileHospital Inspectors Recertification Program Facilities Development Division The Building Department for California’s

CAC 2016 Section 7-147

65

Page 66: Hospital Inspectors Recertification Program - CA OSHPD · PDF fileHospital Inspectors Recertification Program Facilities Development Division The Building Department for California’s

Steel Construction

(AISC 341 Section J2/AISC 360 Section N3)

The following documents shall be submitted for

review by the Engineer Of Record (EOR):

Welding procedure specifications (WPS)

Welder performance qualification records

(WPQR)

Concrete mix design and test reports for the mix design

66

Page 67: Hospital Inspectors Recertification Program - CA OSHPD · PDF fileHospital Inspectors Recertification Program Facilities Development Division The Building Department for California’s

Does OSHPD review WPS?

Yes, for primary lateral force resisting system.

Special Inspector(s) shall verify ALLWPS/WPQR

Submittal requirement is added to OSHPD standard comments.

For all others, OSHPD shall review them when weld quality is questionable.

OSHPD can review WPS and WPQR, when ever there are valid reasons to do so.

67

Page 68: Hospital Inspectors Recertification Program - CA OSHPD · PDF fileHospital Inspectors Recertification Program Facilities Development Division The Building Department for California’s

Does OSHPD review Concrete Mix Design?

Yes

For primary lateral and gravity force resisting system.

Minor projects can be exempted (Exception to the CBC 2016 Section 1705A.3)

Special Inspector(s) shall verify ALL Concrete Mix Design.

Submittal requirement is added to OSHPD standard comments.

For all others, OSHPD shall review Concrete Mix Design when quality is questionable.

OSHPD can review Concrete Mix Design, when ever there are valid reasons to do so.

68

Page 69: Hospital Inspectors Recertification Program - CA OSHPD · PDF fileHospital Inspectors Recertification Program Facilities Development Division The Building Department for California’s

Concrete Design Submittal

26.4.4.1 – Documentation for concrete mixture characteristics shall be submitted for review by the RDP (AOR/SEOR) before the mixture is used or before making changes to mixture already in use.f’c <= 5 ksi can be justified by experience.

f’c>5 ksi shall be justified by test.

Strength test record shall not be more than 24-months old.

CBC 2016 Table 1705A.3 Item # 5: Verify use of required Mix Design.

69

Page 70: Hospital Inspectors Recertification Program - CA OSHPD · PDF fileHospital Inspectors Recertification Program Facilities Development Division The Building Department for California’s

CBC 2016 Table 1705A.3

70

Page 71: Hospital Inspectors Recertification Program - CA OSHPD · PDF fileHospital Inspectors Recertification Program Facilities Development Division The Building Department for California’s

Should WPS/Mix Design be Deferred

Approvals?

No!

IOR/Special Inspector (and/or SEOR/AOR) shall make all items required for special inspection available to DSE’s, as and when necessary (CAC Section 7-145(a)(4)).

OSHPD DSE’s shall ensure that submittal requirements in the construction documents include submittal of WPS, WPQR, Concrete Mix Design, etc.

71

Page 72: Hospital Inspectors Recertification Program - CA OSHPD · PDF fileHospital Inspectors Recertification Program Facilities Development Division The Building Department for California’s

Thank You!

72

Questions?