Hoshin Kanriis Critical in Deploying a True Company‐Wide ... Deployment (Hoshin Kanri) Process...
Transcript of Hoshin Kanriis Critical in Deploying a True Company‐Wide ... Deployment (Hoshin Kanri) Process...
IOWA Conference
1
© Copyright Productivity Inc 10/181
Hoshin Kanri is Critical
in Deploying a True Company‐Wide
Strategy of ExcellenceCatherine Converset – Senior Partner Productivity
Document confidentiel – Copyright Productivity Europe 11/20152
CONFIDENTIEL – Tous droits réservés, 2007
www.productivityinc.com
IOWA Conference
2
© Copyright Productivity Inc 10/183
>1979 First ever study mission in Japan— Norman Bodek met with Ohno et Shingo
— PRODUCTIVITY was born
>15 years cooperation with Ohno and Shingo, forming first generation consultants, developing training material, writing books. Shingo Doctor Honoris Causa and Shingo Prizein the USA.
>All major Japanese practitioners started with Productivity their journey to the West : Among them:
—NAKAJIMA and JIPM (TPM, Autonomous Maintenance)
—FUKUDA (CEDAC), IWATA (Flow Kaizen events) and Shingjitsu (flow management and process optimization)
Our Origins with Roots in The Legendary Toyota Production System
Document confidentiel – Copyright Productivity Europe 11/20154
CONFIDENTIEL – Tous droits réservés, 2007
Keeping Enterprise in Motion
IOWA Conference
3
© Copyright Productivity Inc 10/185
Working in All Manufacturing and Service Industry
Our people bring years of direct process improvement experience and a good business savy to a broad‐range of business practices….
Aerospace & Electronics
Automotive
Chemicals
Consumer Packaged Goods
Engineering & Construction
Financial Services
Food & Beverage
Industrial Manufacturing
Metals & Mining
Oil & Gas
Pharmaceuticals & Health Care
© Copyright Productivity Inc 10/186
Our Value Proposition: Customised Consulting, Training and Support…
On site assessment
Lean and TPM implementation strategy
Policy Deployment (Hoshin Kanri)
Process improvement projects
Team and continuous improvement development
Design and implementation of specific Lean management system
Lean Leadership development
Support in building specific client resource
capabilities:
— Specific educational events
— Train the Trainers
— Lean leaders coaching
Management coaching and training
Audits and progress review
IOWA Conference
4
© Copyright Productivity Inc 10/187
A Long Experience in Training and CertificationIn Partnership With
Lean Manager Certification Manufacturing (LMAC)
Lean Manager Certification in Services (LMAC)
Lean Tool Awareness Certificate
Lean Primer for Service Processes (LPCS)
TPM Certification
Copyright Productivity 08/20168
www.productivityleanservices.com
Hoshin Kanri is Critical in Deploying a True Company-Wide
Strategy of Excellence
IOWA Conference
5
© Copyright Productivity Inc 10/189
Execs MiddleMgt.
LineAssoc.
71%
40%
3%
Source: CFO Magazine
Percentage of people whounderstand the strategy.
It is Difficult to Implement Strategy
The Kaizen Bubble Effect
IOWA Conference
6
© Copyright Productivity Inc 10/1811
Too many projects
Long lead‐time for each project
Many non‐focused projects
Why did we decide to launch the project?
BENEFITS
HIGHLOW AVERAGE
High
Low
Aver
age
EFFORT
Copyright Productivity 08/201612
www.productivityleanservices.com
Most projectsare implemented in Operations
IOWA Conference
7
© Copyright Productivity Inc 10/1813
But is this Lean?>You are able to produce a part in 24 hours, but it takes you two weeks to review the PO and process the order…
>or>You want to increase sales but the development of a new product is 6 months late…
© Copyright Productivity Inc 10/1814
Building a Lean Organization
Develop the capability to transform: • the input (information…)• into finished goods or services, as quickly as possible,with the minimal waste,with perfect quality and reliability
IOWA Conference
8
© Copyright Productivity Inc 10/1815
Eliminate what prevents us from continuously doing
Right First TimeOn Time Delivery
© Copyright Productivity Inc 10/1816
Move From the Silo Thinking
QCD Customer objectives
SalesCustomer Service
R&D QualityMarketing
KPI’s: … KPI’s: …
Supply Chain Production
KPI’s: … KPI’s: … KPI’s: … KPI’s: … KPI’s: …
IOWA Conference
9
© Copyright Productivity Inc 10/1817
CustomerQCD
Objectives
… To the Lean Thinking> In which all functions are connected to optimize the Value Streams
SalesCustomer Service
R&D QualityMarketing
New KPI’s: … New KPI’s: …
Supply Chain Production
New KPI’s: … New KPI’s: … New KPI’s: … New KPI’s: … New KPI’s: …
Copyright Productivity 08/201618
www.productivityleanservices.com
All functions, departments, processes and people must constantly improve
IOWA Conference
10
Copyright Productivity 08/201619
www.productivityleanservices.com
Changing The Waythe Organization Works:
Policy Deployment (Hoshin Kanri)
© Copyright Productivity Inc 10/1820
Align the Organization
IOWA Conference
11
© Copyright Productivity Inc 10/1821
Two dimensions
Business As Usual
Continuously Improve Processes and Focus on Customer Service
Achieve Strategic Initiatives
Build new processes/services/products
© Copyright Productivity Inc 10/1822
Monitor Progress
IOWA Conference
12
© Copyright Productivity Inc 10/1823
How do you know you are progressing on the key issues?How many performance indicators do you follow?Are you measuring the right things?How do you see that projects are delivering?
© Copyright Productivity Inc 10/1824
Hoshin Kanri: the Definition
>Hoshin = vision
>Kanri = management
>Translation— Policy Deployment
— Vision Management
— Strategy Deployment
IOWA Conference
13
© Copyright Productivity Inc 10/1825
Principles of Hoshin Kanri (Strategy Deployment)
From vision to daily work
Can every member of your organisation explain your strategic objectives?
Can they describe the link between their daily work and your strategic objectives?
How do we progress beyond our daily work?
Copyright Productivity 08/201626
www.productivityleanservices.com
The Hoshin Kanri Process
Aligning the organization
Following progress
IOWA Conference
14
© Copyright Productivity Inc 10/1827
Business Model, Vision and Strategy
Level 0Executive committee
How much(Impact)
Strategic Actions
Target(How much)
Level 1: VP/Directors
and their teams
AS(What)
Initiatives (How)
How much(Target)
How much(Impact)
Level 2: Managers and team members
Initiatives(What)
Actions (How)
How much(Impact)
How much (Target)
KVD(What)
catchball
The Policy Deployment Process
© Copyright Productivity Inc 10/1828
We Use the X-Matrix to Help Building The Plan
STRATEGIC ACTIONS
KVD TARGETS
EXPECTEDRESULTS
Financial, market share, Customer‐focused
Social – Environmental.;.
What are the Key Value Drivers?
What are the targetresults?
What should we improve or achieve this year / on a 3‐year
horizon?
Impact of our actions
Activities for the current periodcorresponding with the Key Initiatives
The How?
Targets and milestones (dates) for completion ofeach Priority
How much?By when?
Get Focused
The What? Identify sponsors, leaders, and support personnel for eachInitiative
The Who?
IOWA Conference
15
© Copyright Productivity Inc 10/1829
Business Model, Vision and Strategy
Level 0Executive committee
How much(Impact)
Strategic Actions
Target(How much)
Level 1: VP/Directors
and their teams
SA(What)
Initiatives (How)
How much(Target)
How much(Impact)
Level 2: Managers and team members
Initiatives(What)
Actions (How)
How much(Impact)
How much (Target)
KVD(What)
catchball
From Level 0 to Level 1
October – December
© Copyright Productivity Inc 10/1830
30
The result of catchball
> The result of catchball is team alignment at the operationallevel through the chartering, linking, and networking of teams
Warning:
Do Not Omit This Step
IOWA Conference
16
© Copyright Productivity Inc 10/1831
Business Model, Vision and Strategy
Level 0Executive committee
How much(Impact)
Strategic Actions
Target(How much)
Level 1: VP/Directors
and their teams
SA(What)
Initiatives (How)
How much(Target)
How much(Impact)
Level 2: Managers and team members
Initiatives(What)
Actions (How)
How much(Impact)
How much (Target)
KVD(What)
catchball
From Level 1 to Level 2
October – December
© Copyright Productivity Inc 10/1832
32
Level 2 DeploymentMonitoring the plan and solving problems: Make strategy visible in the workplace
P O L I C I E S A N D O B J E C T I V E S M A T R I X
TEAM: Operations Divis ion Management DATE:Updated
#
15.0 P
14.0 P P P P
13.0P P
12.0P
11.0
10.0P
9.0
8.0P P P
7.0
6.0P P P
5.0
4.0P
3.0P
2.0P P P P P
1.0P P P P P P P
STRATEGIC ACTIONS
PO
LIC
IES
/KV
D
TA
RG
ET
S
He
len
Ro
be
rts
Bo
b L
eigh
field
Nic
k S
au
nde
rs
Pa
ul M
arc
hme
nt
Mar
k A
nde
rso
n
Nic
ky
Bre
nn
an
Vik
ki R
aff
ert
y
# 7 6 5 4 3 2 1 IMPACTS 1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 200 Cash flow revenue FOCUS TEAM
2 TBC Op Cost Saving3 1st Quartile CSI4 TBC Card business case5 >300 Acquisition saving6 500 Ad hoc revenues7 ESI
Mai
nta
in o
per
atin
g, v
ehic
le a
cqui
siti
on a
nd
mai
nte
nanc
e co
sts
Incr
ease
the
pro
port
ion
of re
venu
es fr
om n
on-f
ee
serv
ices
pro
vide
d
Incr
ease
the
spe
ed fr
om c
ust
om
er c
omm
itm
ent
to
acti
vat
ion
of s
erv
ice
Del
iver
the
proj
ect
bene
fit c
apab
ilit
y on
tim
e
Mee
t 10
0% o
f ag
reed
ser
vice
exp
ecta
tio
ns f
or
each
mar
ket s
egm
ent
Cre
ate
and
impl
emen
t su
stai
nabl
e co
st e
ffec
tiv
e pr
oce
sses
to u
nder
pin
card
pro
pos
itio
n
Cre
ate
an e
nvi
ron
men
t w
hic
h en
able
s hi
gh
perf
orm
ing
team
s
Reduc e SMR costs by 5% ye ar on yea r
Reduc e the cost of the t op 3 highest cost processe s by 20% in ea ch area.
Achie ve GS rat ing against all r isk cat egories and audit outcomes.Reduc e le ad time from customer commit ment to
activat ion t o achieve 200K cash flow benef it
Collect 100% of t he a uthorised tar iffsDefine a process for non-st andard requests and adhere to it
Reduc e by 30% t he defect rate for each product / servic e
Review and analyse employee surve y and build corrective act ion plans
Meet SLA expecta tions 100% for e ach segment
09-sept-08
Agree SLAs a nd KP Is with each segment
Design new cost effect ive processes for cardsHit the cr itical success factors for the implementa tion
of card processesImple ment 5S and Visual Pe rforma nc e management in all a reas
Improve ve hicle acquisit ion process cost s
Reduc e delays t o imple ment bene fit c apa bilit y by 20%
P O L I C I E S A N D O B J E C T I V E S M A T R I X
TEAM: Operations Division Management DATE:Updated
#
15.0 P
14.0 P P P P
13.0P P
12.0P
11.0
10.0P
9.0
8.0P P P
7.0
6.0P P P
5.0
4.0P
3.0P
2.0P P P P P
1.0P P P P P P P
STRATEGIC ACTIONS
PO
LIC
IES
/KV
D
TA
RG
ET
S
He
len
Ro
be
rts
Bo
b L
eigh
field
Nic
k S
au
nde
rs
Pa
ul M
arc
hme
nt
Mar
k A
nde
rso
n
Nic
ky
Bre
nn
an
Vik
ki R
aff
ert
y
# 7 6 5 4 3 2 1 IMPACTS 1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 200 Cash flow revenue FOCUS TEAM
2 TBC Op Cost Saving3 1st Quartile CSI4 TBC Card business case5 >300 Acquisition saving6 500 Ad hoc revenues7 ESI
Mai
nta
in o
per
atin
g, v
ehic
le a
cqui
siti
on a
nd
mai
nte
nanc
e co
sts
Incr
ease
the
pro
port
ion
of re
venu
es fr
om n
on-f
ee
serv
ices
pro
vide
d
Incr
ease
the
spe
ed fr
om c
ust
om
er c
omm
itm
ent
to
acti
vat
ion
of s
erv
ice
Del
iver
the
proj
ect
bene
fit c
apab
ilit
y on
tim
e
Mee
t 10
0% o
f ag
reed
ser
vice
exp
ecta
tio
ns f
or
each
mar
ket s
egm
ent
Cre
ate
and
impl
emen
t su
stai
nabl
e co
st e
ffec
tiv
e pr
oce
sses
to u
nder
pin
card
pro
pos
itio
n
Cre
ate
an e
nvi
ron
men
t w
hic
h en
able
s hi
gh
perf
orm
ing
team
s
Reduce SM R cost s by 5% year on year
Reduce t he cost of t he top 3 highest cost processes by 20% in each area.
Achieve GS rat ing aga inst all risk c ategor ies and audit out comes.Reduce lead t ime from cust ome r commitment t o
ac tivation to achieve 200K cash f low benefit
Collec t 100% of the aut hor ised t ar if fsDefine a process for non-standard re quest s and adhere t o it
Reduce by 30% t he de fect rat e for each product/ service
Revie w and analyse employee survey and build correc tive action plans
M eet SLA expec tat ions 100% for each se gment
09-sept-08
Agree SLAs and KPIs wit h each segment
Design ne w cost effective processe s for cardsHit the cr it ical suc cess fact ors for t he impleme nt at ion
of c ard proce ssesImplement 5S and Visual Performance management in all areas
Improve vehicle acquisition proc ess costs
Reduce de la ys to implement benef it capability by 20%
A3- APP0 Matrix Level 2 HR
(specific)S
A # 4TEAM
ACTION PLAN
IMPROVEMENT AREA IMPROVEMENT TARGET / DESIRED FUTURE STATESLA's improvement
Incorporate project and business change programmes into resource planning Make sure that new ideas coming from other depts are discussed with DCC
ACTION TEAM
CURRENT STATE D
CC teamLack of visibili ty of small initiatives around the business, which creates extra work in DCC or difficulty to answer drivers. ACTION OWNERP
aul
ACTION PLAN PERFORMANCE MEASUREMENT
Actions Months
Who
11/08
12/08
01/09
02/09
03/09
04/09
05/09
06/09
07/09
08/09
09/09
10/09
11/09
12/09Obtain early warning from pricing regarding
new dealsP
aulPaul to get TAB minutes circulation list (weekly)
Paul
Understand impact of the changes on DCCP
aulPlan the activities / changes on how we can
manage the resources and the processP
aulFind/create incident log and implement it.
Joanna
Realign the process to reduce activation times for Minilease and Rental
Target:Establish process standards for Minilease
and RentalMeasurement
/ ReviewEstablish KPIs and measure lead time
performance for Minilease and Rental PERFORMANCE MEASUREMENT
Target: Measurement / Review
Level of achievement
Date: 29 october 08
A3- APP0 Matrix Level 2 HR
(specific)S
A # 4TEAM
ACTION PLAN
IMPROVEMENT AREA IMPROVEMENT TARGET / DESIRED FUTURE STATESLA's improvement
Incorporate project and business change programmes into resource planning Make sure that new ideas coming from other depts are discussed with DCC
ACTION TEAM
CURRENT STATE D
CC teamLack of visibili ty of small initiatives around the business, which creates extra work in DCC or difficulty to answer drivers. ACTION OWNERP
aul
ACTION PLAN PERFORMANCE MEASUREMENT
Actions Months
Who
11/08
12/08
01/09
02/09
03/09
04/09
05/09
06/09
07/09
08/09
09/09
10/09
11/09
12/09Obtain early warning from pricing regarding
new dealsP
aulPaul to get TAB minutes circulation list (weekly)
Paul
Understand impact of the changes on DCCP
aulPlan the activities / changes on how we can
manage the resources and the processP
aulFind/create incident log and implement it.
Joanna
Realign the process to reduce activation times for Minilease and Rental
Target:Establish process standards for Minilease
and RentalMeasurement
/ ReviewEstablish KPIs and measure lead time
performance for Minilease and Rental PERFORMANCE MEASUREMENT
Target: Measurement / Review
Level of achievement
Date: 29 october 08
Team action plans incorporated into team processesDaily team review
A3 Problem solving
Review of action plan achievement
Team processes and standards
Strategy achievement is a daily activity
IOWA Conference
17
© Copyright Productivity Inc 10/1833
33
Monitoring the plan and solving problemsBuild a system
P O L I C I E S A N D O B J E C T I V E S M A T R I X
TEAM: Operations Divis ion Management DATE:Updated
#
15.0 P
14.0 P P P P
13.0P P
12.0P
11.0
10.0P
9.0
8.0P P P
7.0
6.0P P P
5.0
4.0P
3.0P
2.0P P P P P
1.0P P P P P P P
STRATEGIC ACTIONS
PO
LIC
IES
/KV
D
TA
RG
ET
S
He
len
Ro
be
rts
Bo
b L
eigh
field
Nic
k S
au
nde
rs
Pa
ul M
arc
hme
nt
Mar
k A
nde
rso
n
Nic
ky
Bre
nn
an
Vik
ki R
aff
ert
y
# 7 6 5 4 3 2 1 IMPACTS 1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 200 Cash flow revenue FOCUS TEAM
2 TBC Op Cost Saving3 1st Quartile CSI4 TBC Card business case5 >300 Acquisition saving6 500 Ad hoc revenues7 ESI
Mai
nta
in o
per
atin
g, v
ehic
le a
cqui
siti
on a
nd
mai
nte
nanc
e co
sts
Incr
ease
the
pro
port
ion
of re
venu
es fr
om n
on-f
ee
serv
ices
pro
vide
d
Incr
ease
the
spe
ed fr
om c
ust
om
er c
omm
itm
ent
to
acti
vat
ion
of s
erv
ice
Del
iver
the
proj
ect
bene
fit c
apab
ilit
y on
tim
e
Mee
t 10
0% o
f ag
reed
ser
vice
exp
ecta
tio
ns f
or
each
mar
ket s
egm
ent
Cre
ate
and
impl
emen
t su
stai
nabl
e co
st e
ffec
tiv
e pr
oce
sses
to u
nder
pin
card
pro
pos
itio
n
Cre
ate
an e
nvi
ron
men
t w
hic
h en
able
s hi
gh
perf
orm
ing
team
s
Reduc e SMR costs by 5% ye ar on yea r
Reduc e the cost of the t op 3 highest cost processe s by 20% in ea ch area.
Achie ve GS rat ing against all r isk cat egories and audit outcomes.Reduc e le ad time from customer commit ment to
activat ion t o achieve 200K cash flow benef it
Collect 100% of t he a uthorised tar iffsDefine a process for non-st andard requests and adhere to it
Reduc e by 30% t he defect rate for each product / servic e
Review and analyse employee surve y and build corrective act ion plans
Meet SLA expecta tions 100% for e ach segment
09-sept-08
Agree SLAs a nd KP Is with each segment
Design new cost effect ive processes for cardsHit the cr itical success factors for the implementa tion
of card processesImple ment 5S and Visual Pe rforma nc e management in all a reas
Improve ve hicle acquisit ion process cost s
Reduc e delays t o imple ment bene fit c apa bilit y by 20%
P O L I C I E S A N D O B J E C T I V E S M A T R I X
TEAM: Operations Divis ion Management DATE:Updated
#
15.0 P
14.0 P P P P
13.0P P
12.0P
11.0
10.0P
9.0
8.0P P P
7.0
6.0P P P
5.0
4.0P
3.0P
2.0P P P P P
1.0P P P P P P P
STRATEGIC ACTIONS
PO
LIC
IES
/KV
D
TA
RG
ET
S
He
len
Ro
be
rts
Bo
b L
eigh
field
Nic
k S
au
nde
rs
Pa
ul M
arc
hme
nt
Mar
k A
nde
rso
n
Nic
ky
Bre
nn
an
Vik
ki R
aff
ert
y
# 7 6 5 4 3 2 1 IMPACTS 1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 200 Cash flow revenue FOCUS TEAM
2 TBC Op Cost Saving3 1st Quartile CSI4 TBC Card business case5 >300 Acquisition saving6 500 Ad hoc revenues7 ESI
Mai
nta
in o
per
atin
g, v
ehic
le a
cqui
siti
on a
nd
mai
nte
nanc
e co
sts
Incr
ease
the
pro
port
ion
of re
venu
es fr
om n
on-f
ee
serv
ices
pro
vide
d
Incr
ease
the
spe
ed fr
om c
ust
om
er c
omm
itm
ent
to
acti
vat
ion
of s
erv
ice
Del
iver
the
proj
ect
bene
fit c
apab
ilit
y on
tim
e
Mee
t 10
0% o
f ag
reed
ser
vice
exp
ecta
tio
ns f
or
each
mar
ket s
egm
ent
Cre
ate
and
impl
emen
t su
stai
nabl
e co
st e
ffec
tiv
e pr
oce
sses
to u
nder
pin
card
pro
pos
itio
n
Cre
ate
an e
nvi
ron
men
t w
hic
h en
able
s hi
gh
perf
orm
ing
team
s
Reduc e SMR costs by 5% ye ar on yea r
Reduc e the cost of the t op 3 highest cost processe s by 20% in ea ch area.
Achie ve GS rat ing against all r isk cat egories and audit outcomes.Reduc e le ad time from customer commit ment to
activat ion t o achieve 200K cash flow benef it
Collect 100% of t he a uthorised tar iffsDefine a process for non-st andard requests and adhere to it
Reduc e by 30% t he defect rate for each product / servic e
Review and analyse employee surve y and build corrective act ion plans
Meet SLA expecta tions 100% for e ach segment
09-sept-08
Agree SLAs a nd KP Is with each segment
Design new cost effect ive processes for cardsHit the cr itical success factors for the implementa tion
of card processesImple ment 5S and Visual Pe rforma nc e management in all a reas
Improve ve hicle acquisit ion process cost s
Reduc e delays t o imple ment bene fit c apa bilit y by 20%
A3- APP0 Matrix Level 2 HR
(specific)S
A # 4TEAM
ACTION PLAN
IMPROVEMENT AREA IMPROVEMENT TARGET / DESIRED FUTURE STATESLA's improvement
Incorporate project and business change programmes into resource planning Make sure that new ideas coming from other depts are discussed with DCC
ACTION TEAM
CURRENT STATE D
CC teamLack of visibili ty of small initiatives around the business, which creates extra work in DCC or difficulty to answer drivers. ACTION OWNERP
aul
ACTION PLAN PERFORMANCE MEASUREMENT
Actions Months
Who
11/08
12/08
01/09
02/09
03/09
04/09
05/09
06/09
07/09
08/09
09/09
10/09
11/09
12/09Obtain early warning from pricing regarding
new dealsP
aulPaul to get TAB minutes circulation list (weekly)
Paul
Understand impact of the changes on DCCP
aulPlan the activities / changes on how we can
manage the resources and the processP
aulFind/create incident log and implement it.
Joanna
Realign the process to reduce activation times for Minilease and Rental
Target:Establish process standards for Minilease
and RentalMeasurement
/ ReviewEstablish KPIs and measure lead time
performance for Minilease and Rental PERFORMANCE MEASUREMENT
Target: Measurement / Review
Level of achievement
Date: 29 october 08
A3- APP0 Matrix Level 2 HR
(specific)S
A # 4TEAM
ACTION PLAN
IMPROVEMENT AREA IMPROVEMENT TARGET / DESIRED FUTURE STATESLA's improvement
Incorporate project and business change programmes into resource planning Make sure that new ideas coming from other depts are discussed with DCC
ACTION TEAM
CURRENT STATE D
CC teamLack of visibili ty of small initiatives around the business, which creates extra work in DCC or difficulty to answer drivers. ACTION OWNERP
aul
ACTION PLAN PERFORMANCE MEASUREMENT
Actions Months
Who
11/08
12/08
01/09
02/09
03/09
04/09
05/09
06/09
07/09
08/09
09/09
10/09
11/09
12/09Obtain early warning from pricing regarding
new dealsP
aulPaul to get TAB minutes circulation list (weekly)
Paul
Understand impact of the changes on DCCP
aulPlan the activities / changes on how we can
manage the resources and the processP
aulFind/create incident log and implement it.
Joanna
Realign the process to reduce activation times for Minilease and Rental
Target:Establish process standards for Minilease
and RentalMeasurement
/ ReviewEstablish KPIs and measure lead time
performance for Minilease and Rental PERFORMANCE MEASUREMENT
Target: Measurement / Review
Level of achievement
Date: 29 october 08
Regular team meetings at every level
Introduction of standard work for managers
« Go and see » activities
Simple Lean system audits
Systematic performance review for earlyproblem detection
System is key to reinforce Lean behaviours
Week Ending:
NVST delivery confirmed updated - 2 days from reciept from dealership
80% 99%
Service LevelAverage time to respond to service booking requests (mins)
60 37 minsAbandoned Rate
Rental vehicle to be delivered at time requested
99% 100%Not Ready %
Breakdown incidents to be repaired at roadside
80% 86%
SMR driver satisfaction survey 90% tbc Rental Booking Defect Rate
SMR utilisation 65% 66%SAP Error Rate (000)
VP utilisation 75% 69%
Number of Rectifies received and responded to within agreed service level
80% 84%
CostPreferred Vs nominated cost difference NVST
PSN %
SMR event savings £10.00 £16.67
Michelin utilisation 70% 84%
Productivity Units per FTE
Non network usage across all channels TBC TBCReduction in AHT of Rental booking calls (mins)
Dealer auction delivery process with preferred and nominated dealers
TBC TBC Online bookings (percentage)
Reduce leadtime for claiming rebates TBC TBC
5S audit score 5 5S audit score 5 5S audit score 5 5S audit score
Team meeting review 5 Team meeting review 5 Team meeting review 5 Team meeting review
PD and Visual Mgt board 5 PD and Visual Mgt board 5 PD and Visual Mgt board 5 PD and Visual Mgt board
Paul
Reduction in AHT of Rental boocalls
Increase Online bookin
SMR cost savings
Reduce leadtime on process with highest impact on service activation
OPERATIONS WEEKLY PERFORMANCE REVIEW
Key Improvements
Bob Nick
Team processes audit (monthly)
27/03/2009 Helen
KPI
SLA's
Quality
PD Action plan achievement (Key
Actions)
Week Ending:
NVST delivery confirmed updated - 2 days from reciept from dealership
80% 99%
Service LevelAverage time to respond to service booking requests (mins)
60 37 minsAbandoned Rate
Rental vehicle to be delivered at time requested
99% 100%Not Ready %
Breakdown incidents to be repaired at roadside
80% 86%
SMR driver satisfaction survey 90% tbc Rental Booking Defect Rate
SMR utilisation 65% 66%SAP Error Rate (000)
VP utilisation 75% 69%
Number of Rectifies received and responded to within agreed service level
80% 84%
CostPreferred Vs nominated cost difference NVST
PSN %
SMR event savings £10.00 £16.67
Michelin utilisation 70% 84%
Productivity Units per FTE
Non network usage across all channels TBC TBCReduction in AHT of Rental booking calls (mins)
Dealer auction delivery process with preferred and nominated dealers
TBC TBC Online bookings (percentage)
Reduce leadtime for claiming rebates TBC TBC
5S audit score 5 5S audit score 5 5S audit score 5 5S audit score
Team meeting review 5 Team meeting review 5 Team meeting review 5 Team meeting review
PD and Visual Mgt board 5 PD and Visual Mgt board 5 PD and Visual Mgt board 5 PD and Visual Mgt board
Paul
Reduction in AHT of Rental boocalls
Increase Online bookin
SMR cost savings
Reduce leadtime on process with highest impact on service activation
OPERATIONS WEEKLY PERFORMANCE REVIEW
Key Improvements
Bob Nick
Team processes audit (monthly)
27/03/2009 Helen
KPI
SLA's
Quality
PD Action plan achievement (Key
Actions)
Weekly Departmental Review
Weekly Divisional Review
© Copyright Productivity Inc 10/1834
Level 2 Deployment ‐Monitoring the plan and solvingproblems
IOWA Conference
18
© Copyright Productivity Inc 10/1835
Regular Hoshin Kanri Review at Management Committee Level
> A new scorecardintegrating both:
—The Business As usual KPI’s
—The progressreview on the main projects and the related KPI’s
>Monthly / quaterlyreviews
© Copyright Productivity Inc 10/1836