Horst Schindler Budapest, October 9th, 2013

8
Horst Schindler Budapest, October 9th, 2013 Danube Commission, Budapest The current list of projects on bottlenecks on the Danube river High-level meeting High-level meeting 2013 2013 "Danube Navigation – a European Perspective"

description

High-level meeting 2013 " Danube Navigation – a European Perspective ". The current list of projects on bottlenecks on the Danube river. Horst Schindler Budapest, October 9th, 2013 Danube Commission, Budapest. - PowerPoint PPT Presentation

Transcript of Horst Schindler Budapest, October 9th, 2013

Page 1: Horst Schindler                              Budapest, October 9th, 2013

Horst Schindler Budapest, October 9th, 2013Danube Commission, Budapest

The current list of projects on bottlenecks on the Danube river

High-level meetingHigh-level meeting 2013 2013 "Danube Navigation – a European Perspective"

Page 2: Horst Schindler                              Budapest, October 9th, 2013

Masterplan for achieving recommended fairway parameters

Danube Navigation – a European Perspective Budapest, October 9th, 2013

Basis

Belgrade ConventionTEN-T priority areasWaterway ClassificationReports of Memberstates

Structure

IntroductionStatus Quo

Development of InfrastructureIdentification of priority areas

Masterplan

Masterplan

Structure follows ClassificationBridges and fairway distinguishedFields of actionGeneral descriptions of projects

Adopted

through DecisionDK/TAG 77/13

from the 25th December 2011

Page 3: Horst Schindler                              Budapest, October 9th, 2013

Masterplan for achieving recommended fairway parameters

Danube Navigation – a European Perspective Budapest, October 9th, 2013

Page 4: Horst Schindler                              Budapest, October 9th, 2013

Wachau

Masterplan for achieving recommended fairway parameters

Danube Navigation – a European Perspective Budapest, October 9th, 2013

Page 5: Horst Schindler                              Budapest, October 9th, 2013

Port Devinska Nova Ves

Bratislava/WolfsthalGabcikovo/Nagymaros

Masterplan for achieving recommended fairway parameters

Danube Navigation – a European Perspective Budapest, October 9th, 2013

Page 6: Horst Schindler                              Budapest, October 9th, 2013

Study Szob-Mohács

Apa

tinV

erm

elj/P

etre

sS

takl

ar

7 cr

itica

l sec

tions

Masterplan for achieving recommended fairway parameters

Danube Navigation – a European Perspective Budapest, October 9th, 2013

Page 7: Horst Schindler                              Budapest, October 9th, 2013

7 cr

itica

l sec

tions

ISPA 2ISPA 1B

elen

eB

atin

Sulina Canal

Masterplan for achieving recommended fairway parameters

Danube Navigation – a European Perspective Budapest, October 9th, 2013

Page 8: Horst Schindler                              Budapest, October 9th, 2013

Thank you for your attention

Horst SchindlerChief Engineer

Danube CommissionBenczúr utca 251068 Budapest

[email protected]

Danube Navigation – a European Perspective Budapest, October 9th, 2013