Horizon 2 Schemes for consideration for future years · Horizon 2 – Schemes for consideration for...
Transcript of Horizon 2 Schemes for consideration for future years · Horizon 2 – Schemes for consideration for...
Surrey Highways
Horizon 2 Schemes for consideration for future years
Surrey Heath Please note this is a provisional list. We cannot guarantee that any scheme on this list will be
carried out.
Page 87
ITE
M 8
Horizon 2 – Schemes for consideration for future years - Version: SURREY HEATH 1.1, 15.02.18
2
1. This is a list of works being considered for future years 2. This list will change as condition survey information is received
3. This is a list of works being considered for future years 4. This list will change as condition survey information is received 5. This list is not in priority order
Horizon 2 Schemes for consideration for future years – Surrey Heath
Horizon 2 ROADS Schemes for consideration for future years
Road
No.
Road / scheme
name Location Limits
Length
(metres) Type of Work
Surrey
Highways
ID
Other information
B386 Chertsey Road Windlesham Burma Road roundabout
To Windsor Road 1280
Road Major
Maintenance 378
D33 Church Lane Bisley A322 to property Belper
Cottage 555
Road Major
Maintenance 750
D31 Clews Lane Woking Entire Length 478 Road Major
Maintenance 2480
B3411 Frimley Road Frimley The Avenue To James
Road 1360
Road Major
Maintenance 103
D3585 Guildford Road Bagshot Replace Anti-Skid
surfacing 300
Road Major
Maintenance 2481
Page 88
ITE
M 8
Horizon 2 – Schemes for consideration for future years - Version: SURREY HEATH 1.1, 15.02.18
3
1. This is a list of works being considered for future years 2. This list will change as condition survey information is received
3. This is a list of works being considered for future years 4. This list will change as condition survey information is received 5. This list is not in priority order
Horizon 2 ROADS Schemes for consideration for future years - continued
Road
No.
Road / scheme
name Location Limits
Length
(metres) Type of Work
Surrey
Highways
ID
Other information
D3512 High Street Camberley Obelisk Way To A30
Service Road 100
Road Major
Maintenance 791
A30 London Road Camberley Frimley Road To Knoll
Road 1567
Road Major
Maintenance 3117
A30 London Road Bagshot
200 meters east of
Yaverdale Drive To 200
meters west.
217 Road Major
Maintenance 990
D3514 Park Street Camberley Park Lane To Park Road
(Mini Rounabout) 388
Road Major
Maintenance 793
A325 Portsmouth
Road Frimley
Frimley High Street
(Toshiba Roundabout) To
Chobham Road (Frimley
Park Hospital)
420 Road Major
Maintenance 299
D3412 Star Post Road Camberley Saddleback Road To
Upper College Ride 170
Road Major
Maintenance 766
Page 89
ITE
M 8
Horizon 2 – Schemes for consideration for future years - Version: SURREY HEATH 1.1, 15.02.18
4
1. This is a list of works being considered for future years 2. This list will change as condition survey information is received
3. This is a list of works being considered for future years 4. This list will change as condition survey information is received 5. This list is not in priority order
Horizon 2 ROADS Schemes for consideration for future years - continued
Road
No.
Road / scheme
name Location Limits
Length
(metres) Type of Work
Surrey
Highways
ID
Other information
D3526 Belton Road Camberley
Church Hill to Grange
Road 330
Road Surface
Treatment 796
B386 Chertsey Road Windlesham Updown Hill to Heathpark
Drive 542
Road Surface
Treatment 380
D3486 Hawkswood
Avenue Camberley
Tomlins Avenue To
Alphington Avenue 220
Road Surface
Treatment 781
D3453 Salisbury Grove Mytchett Mytchett Road To
Mytchett Place Road 522
Road Surface
Treatment 774
D3517 The Avenue Camberley Frimley Road To
Southwell Park Road 520
Road Surface
Treatment 2469
D3410
Upper College
Ride Camberley Diamond Ridge to
Kingstone Road 1000
Road Surface
Treatment 2458
D3535 Verran Road Camberley Russett Gardens To End 495 Road Surface
Treatment 803
Page 90
ITE
M 8
Horizon 2 – Schemes for consideration for future years - Version: SURREY HEATH 1.1, 15.02.18
5
1. This is a list of works being considered for future years 2. This list will change as condition survey information is received
3. This is a list of works being considered for future years 4. This list will change as condition survey information is received 5. This list is not in priority order
Horizon 2 PAVEMENTS Schemes for consideration for future years
Road
No.
Road / scheme
name Location Limits
Length
(metres) Type of Work
Surrey
Highways
ID
Other information
D3413 Highland Road Camberley
Upper College Ride To
Loraine School / Ajoining
Poppyhills Road Footway-
Both Sides
380 Pavement
Reconstruction 1012
D535 Gloucester Road
Footpath Bagshot
Gloucester Road To
Anderson Place- Footway 45
Pavement Slurry
Seal 1025
D533 Heathpark Drive Windlesham
Woodlands Lane To
Chertsey Drive- Both
Sides
1190 Pavement Slurry
Seal 885
D3551 Regent Way Frimley
St. Catherines Road To
Melville Avenue- Both
Sides
640 Pavement Slurry
Seal 879
A3046 Station Road Chobham Speed Change To Hazard 202 Pavement Slurry
Seal 200
Page 91
ITE
M 8
Horizon 2 – Schemes for consideration for future years - Version: SURREY HEATH 1.1, 15.02.18
6
1. This is a list of works being considered for future years 2. This list will change as condition survey information is received
3. This is a list of works being considered for future years 4. This list will change as condition survey information is received 5. This list is not in priority order
B311 Upper Chobham
Road
Frimley,
Camberley
Chobham Road To Robin
Hill Drive 1800
Pavement Slurry
Seal 48
Horizon 2 PAVEMENTS Schemes for consideration for future years - continued
Road
No.
Road / scheme
name Location Limits
Length
(metres) Type of Work
Surrey
Highways
ID
Other information
D516 Windsor Court
Road Chobham
Bowling Green Road To
Burr Hill Lane- Both Sides 370
Pavement Slurry
Seal 84
Horizon 2 STRUCTURES Schemes for consideration for future years
Road
No.
Road / scheme
name Location Limits
Length
(metres) Type of Work
Surrey
Highways
ID
Other information
C4 Broadway Road Lightwater Broadway Road Bridge -
Construction N/A Structures C4/510
Page 92
ITE
M 8
Horizon 2 – Schemes for consideration for future years - Version: SURREY HEATH 1.1, 15.02.18
7
1. This is a list of works being considered for future years 2. This list will change as condition survey information is received
3. This is a list of works being considered for future years 4. This list will change as condition survey information is received 5. This list is not in priority order
A322 Guildford Road Bisley Bisley Bridge -
Construction N/A Structures A322/4
Horizon 2 DRAINAGE Schemes for consideration for future years
Road
No.
Road / scheme
name Location Limits
Length
(metres) Type of Work
Surrey
Highways
ID
Other information
A322 Guildford Road Bisley
Near to junction with
Limecroft Road -
Investigation
N/A Drainage Sh019
B3029 Guildford Road Bagshot
Between junctions with
Glourcester Road and
Bagshot Green -
Investigation
N/A Drainage Sh028
B3411 Mytchett Road Camberley Investigation N/A Drainage Sh062
Page 93
ITE
M 8
Horizon 2 – Schemes for consideration for future years - Version: SURREY HEATH 1.1, 15.02.18
8
1. This is a list of works being considered for future years 2. This list will change as condition survey information is received
3. This is a list of works being considered for future years 4. This list will change as condition survey information is received 5. This list is not in priority order
D36 Steep Hill Chobham Investigation N/A Drainage Sh039
Horizon 2 SAFETY BARRIERS Schemes for consideration for future years
Road
No.
Road / scheme
name Location Limits
Length
(metres) Type of Work
Surrey
Highways
ID
Other information
A322 Bagshot By Pass Bagshot
A322-004 Barrier Site -
Road Restraint System
Works
N/A Safety Barrier A322-004
A322 Bracknell Road Bagshot
A322-001 Barrier Site -
Road Restraint System
Works
N/A Safety Barrier A322-001
Page 94
ITE
M 8
Horizon 2 – Schemes for consideration for future years - Version: SURREY HEATH 1.1, 15.02.18
9
1. This is a list of works being considered for future years 2. This list will change as condition survey information is received
3. This is a list of works being considered for future years 4. This list will change as condition survey information is received 5. This list is not in priority order
A30 London Road Frimley A30-015/16 Barrier Site -
Renewal of safety barrier N/A Safety Barrier
A30-
015/16
A321 Marshall Road Frimley A321-004 Barrier Site -
Renewal of safety barrier N/A Safety Barrier A321-004
Horizon 2 TRAFFIC SIGNALS Schemes for consideration for future years
Road
No.
Road / scheme
name Location Limits
Length
(metres) Type of Work
Surrey
Highways
ID
Other information
A322 Bagshot By-Pass Bagshot Junction with New Road N/A Traffic Signals J317
A322 Guildford Road Bisley Near School Close N/A Traffic Signals P307
A322 Guildford Road Bisley Junction with Queens
Road / Clewes Lane N/A Traffic Signals J335
Page 95
ITE
M 8
Horizon 2 – Schemes for consideration for future years - Version: SURREY HEATH 1.1, 15.02.18
10
1. This is a list of works being considered for future years 2. This list will change as condition survey information is received
3. This is a list of works being considered for future years 4. This list will change as condition survey information is received 5. This list is not in priority order
A30 /
D3514 London Road Camberley
Junction with Park Street
/ Staff College Road
(Royal Military Academy)
N/A Traffic Signals J319
A30 /
D3512 London Road Camberley
Junction with Kings Ride /
Knoll Road N/A Traffic Signals J302
A30 /
D3515 London Road Camberley
Junction with Lower
Charles Street N/A Traffic Signals J316
Horizon 2 TRAFFIC SIGNALS Schemes for consideration for future years - continued
Road
No.
Road / scheme
name Location Limits
Length
(metres) Type of Work
Surrey
Highways
ID
Other information
A30 London Road York Town Junction with Laundry
Lane / Yorktown Way N/A
Traffic signal
refurbishment J351
A30 London Road Windlesham Junction with Sunninghill
Road N/A
Traffic signal
refurbishment J329
Page 96
ITE
M 8
Horizon 2 – Schemes for consideration for future years - Version: SURREY HEATH 1.1, 15.02.18
11
1. This is a list of works being considered for future years 2. This list will change as condition survey information is received
3. This is a list of works being considered for future years 4. This list will change as condition survey information is received 5. This list is not in priority order
A30 London Road Bagshot Junction with Yaverland
Drive N/A
Traffic signal
refurbishment J315
A30 London Road Camberley Junction with Frimley
Road N/A
Traffic signal
refurbishment J312
A30 London Road Bagshot Near Church Road N/A Traffic signal
refurbishment P306
A30 London Road Bagshot Junction with Bridge Road
/ Station Road N/A
Traffic signal
refurbishment J333
A30 London Road Camberley Junction with Caesars
Camp Road N/A
Traffic signal
refurbishment J314
Horizon 2 MAJOR SCHEMES / SUSTAINABLE TRANSPORT SCHEMES / RESILIENCE Schemes for
consideration for future years
Road
No.
Road / scheme
name Location Limits
Length
(metres) Type of Work
Surrey
Highways
ID
Other information
Page 97
ITE
M 8
Horizon 2 – Schemes for consideration for future years - Version: SURREY HEATH 1.1, 15.02.18
12
1. This is a list of works being considered for future years 2. This list will change as condition survey information is received
3. This is a list of works being considered for future years 4. This list will change as condition survey information is received 5. This list is not in priority order
N/A Blackwater Gold
Grid Camberley N/A N/A Major Schemes EM11
Scheme currently in
very early stages of
planning and we are
awaiting further details
of scheme.
A30
A30 and
Camberley town
centre
improvements
Camberley N/A N/A Major Schemes EM14
Scheme currently in
very early stages of
planning and we are
awaiting further details
of scheme.
Please note this is a provisional list. We cannot guarantee that any scheme on this list will be
carried out.
Page 98
ITE
M 8