West End Connection Hope Memorial Bridge Enhancements West 17th St West 20th St West 19th St West 18th St 10 West 17th St SCALE 100 Feet 0 LEGEND Proposed Bike Route Signage (Westbound Innerbelt Bridge) Lorain Ave Lorain Ave 9’-6” Paved Buffer Zone 7’-8” New Concrete Proposed Barrier Proposed Barrier Ends 6’-9” Existing Sidewalk BBB 453 BBB 453 BBB 453 BBB 453 12’ Lane 14’-5” Multi-use Path 11’ Lane 12’ Left Turn Lane 6’-9” Sidewalk 11’ Lane 12’ Lane 9’-6” Buffer Zone Shoulder 10’ Max. 1’ Min. at West End of Bridge 1’ Shoulder Looking East 7’-8” New Concrete 6’-9” Existing Sidewalk Granite Cobble Pavers Color: Basalt / Belgian Blue 6” 6” Buffer Zone Treatment (to match Westbound Innerbelt Bridge) Curb Extension to reduce crosswalk distance for pedestrians crossing Lorain Ave by 36 feet Countdown Pedestrian Signal Heads to display remaining time to safely cross the street Curb Extension with mountable curbs to accomodate truck turning movements Pedestrian Lighting Roadway Lighting 80’ Ped & Roadway Light Posts to Alternate

Transcript of Hope Memorial Bridge Enhancements · Hope Memorial Bridge Enhancements est 20th St est 17th St est...

Page 1: Hope Memorial Bridge Enhancements · Hope Memorial Bridge Enhancements est 20th St est 17th St est 19th St est 18th St 10 est 17th St SCALE 100 Feet 0 LEGEND Proposed Bike Route Signage

West End Connection

Hope Memorial Bridge Enhancements

West 17th St

Wes

t 20t

h St

Wes

t 19t

h St

Wes

t18

th S

t

10

West 17th St

SCALE

100Feet0

LEGEND

Proposed Bike Route Signage(Westbound

Innerbelt Bridge)

Lorain AveLorain Ave

9’-6” Paved Buffer Zone7’-8” New Concrete

ProposedBarrier

Proposed Barrier Ends

6’-9” Existing Sidewalk

BBB 453Centennial

Ghibity

03 03

0303

BBB 453Centennial

Ghibity

03 03

0303

BBB 453Centennial

Ghibity

03 03

0303

BBB 453Centennial

Ghibity

03 03

0303

12’ Lane

14’-5”Multi-use

Path 11’ Lane

12’ Left Turn

Lane6’-9”

Sidewalk11’ Lane 12’ Lane

9’-6”BufferZone Shoulder

10’ Max.1’ Min. at West End of Bridge

1’ ShoulderLooking East

7’-8”New

Concrete

6’-9”ExistingSidewalk

Granite Cobble Pavers

Color: Basalt /Belgian Blue

6”

6”

Buffer Zone Treatment

(to match WestboundInnerbelt Bridge)

Curb Extension to reduce crosswalk distance for pedestrians crossing Lorain Ave by 36 feet

Countdown Pedestrian

Signal Heads to display remaining

time to safely cross the street

Curb Extension with mountable curbs to accomodate truck

turning movements

Pedestrian Lighting Roadway Lighting

80’

Ped &RoadwayLight Poststo Alternate