Project Overview Tier 1 and OBPAC #1 Project

2.3 miles of a planned 5.3 mile paved, multi-use trail

Utilizes irrigation canal maintenance road

Connects neighborhoods to jobs, shopping, transit and medical facilities

Leverages grant-funded Phase 1 improvements

Supports a looped trail network

Identified as a Priority in Multiple Planning Efforts

Population Density

Access to Jobs

Households with No Vehicles

**More than 60% of households below County Median Family Income level

Safer Route for Pedestrians

Transit Hub Access

Transit Hub

Project Scope Approx. 2.3 miles long with street

crossing enhancements

12 feet wide where possible

2” asphalt w/6” baserock

Landscaping improvements

Amenities (benches, interpretive signage, drinking fountains, trash receptacles)

Project Budget

Phase II ◦ ConnectOregon VI Grant: $467,052 ◦ Match: $730,000**

Total Project Cost $1,197,052

**Leveraging street improvement project funds scheduled for construction in FY 2016/2017